Reports

Published

Actions for Handback of the M4 Tollway

Handback of the M4 Tollway

Transport
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management

This audit focuses on the M4 handback. It looks at whether the road will be in good condition when the State gets it back, and whether it will cope with the extra traffic after the toll is removed. These are critical issues for taxpayers and motorists. Taxpayers don’t want to be responsible for a large repair bill and motorists don’t want to be stuck in traffic jams.

To ensure that future private sector partnerships (PPP) deal adequately with handback, we recommend that the Roads and Traffic Authority (RTA):

  • ensure deeds spell out an appropriate inspection and testing program to determine repairs required to bring roads up to a satisfactory condition at handback (p.11)
  • ensure deeds link condition standards and maintenance approaches to changing industry standards and approaches over the life of the PPP (p.11)
  • consider including in deeds a requirement that operators provide a performance bond or similar security over the cost of handback repairs (p.11)
  • review the lessons learnt from the M4 tollway handback and determine whether it should seek to negotiate changes to existing tollway deeds to better deal with handback, by June 2010 (p.11)

 

Parliamentary reference - Report number #193 - released 27 October 2009

Published

Actions for Government Licensing Project

Government Licensing Project

Finance
Information technology
Internal controls and governance
Management and administration
Project management
Shared services and collaboration

The Government Licensing Project (GLP) is standardising and simplifying processes of agencies which issue licences. However, it is currently running over the original anticipated completion date, exceeding the original budget and expected to produce savings less than originally planned.

 

Parliamentary reference - Report number #192 - released 7 October 2009

Published

Actions for Administering Domestic Waterfront Tenancies

Administering Domestic Waterfront Tenancies

Planning
Transport
Management and administration
Service delivery
Shared services and collaboration

The audit’s overall conclusion is that Lands and Maritime are broadly achieving outcomes consistent with the IPART report on administering domestic waterfront tenancies. But a lack of collaboration between the agencies is contributing to poor customer service. Inconsistencies with the IPART report recommendations and operational differences between the two agencies result in different rents and conditions for tenants in the two agencies. The differences are having a significant impact on customer service.

 

Parliamentary reference - Report number #191 - released 23 September 2009

Published

Actions for Environmental Grants Administration

Environmental Grants Administration

Planning
Environment
Internal controls and governance
Management and administration
Procurement
Shared services and collaboration

We found many aspects of good grants management, particularly in the Trust. All of the programs we looked at are clearly aligned to the Government’s objective to improve environmental outcomes. The Trust also has good practices for allocating grants. Performance in respect of results was mixed although many grants delivered tangible benefits - homes were protected from floods, degraded waterways restored and endangered habitats protected.

Generally we found that while both Department of Environment, Climate Change and Water and the NSW Environmental Trust had a range of strategies to monitor grants these were not always applied consistently or effectively. Grant programs need to be regularly evaluated to see what is working and what can be done better.

 

Parliamentary reference - Report number #190 - released 26 August 2009

Published

Actions for Helping Aboriginal Defendants through MERIT

Helping Aboriginal Defendants through MERIT

Justice
Health
Management and administration
Service delivery

The Magistrates Early Referral into Treatment program (MERIT) diverts adult defendants with drug problems from the local court into a drug treatment program. Recent studies of MERIT outcomes indicate that MERIT is a highly appropriate intervention program for Aboriginal defendants. It has improved the health of participants, including significant reduction in drug use and significant improvement in mental health. Better justice outcomes include lower rates of imprisonment and reduced rates of reoffending.

Overall, the ability to identify MERIT clients, the eligibility criteria, the location and the ability of MERIT teams to engage with Aboriginal defendants are key factors that limit MERIT’s capacity to treat Aboriginal defendants. MERIT needs to overcome these barriers. If MERIT is to be a truly mainstream program, it must adapt to meet the needs of all who should participate.

 

Parliamentary reference - Report number #189 - released 5 August 2009

Published

Actions for Tackling Cancer with Radiotherapy

Tackling Cancer with Radiotherapy

Health
Internal controls and governance
Management and administration
Procurement
Service delivery
Workforce and capability

Overall radiotherapy services are managed in a reasonably efficient and effective manner. Much is being done to further improve efficiency and effectiveness, and more can be done. While New South Wales has a number of well-established radiotherapy treatment centres, the high capital cost limits their availability in all hospitals. Some patients need to travel long distances and be away from their homes for up to seven weeks. The projected growth in demand for radiotherapy services will further challenge NSW Health and it needs to more clearly demonstrate how it will have the right facilities in the right place at the right time.

 

Parliamentary reference - Report number #188 - released 23 June 2009

Published

Actions for Management of road passenger transport regulation

Management of road passenger transport regulation

Transport
Management and administration
Regulation
Service delivery
Shared services and collaboration

The Audit Office is of the opinion that the Department’s levels of regulatory activity in respect of road passenger transport regulation may have exceeded optimum levels. The Department’s current focus on processing activity limits the Department in achieving all of its desired outcomes. The Audit Office considers that a change in the approach to undertaking and managing road passenger transport regulatory activities would achieve better outcomes for the community and a better use of resources within the Department.

The Audit Office believes that while there is scope to make some improvements from procedural changes, such changes would not be sufficient to generate significant improvements.

 

Parliamentary reference - Report number #75 - released 6 September 2000

Published

Actions for Group homes for people with disabilities

Group homes for people with disabilities

Community Services
Management and administration
Regulation
Service delivery
Shared services and collaboration

The Audit Office acknowledges that this is an extremely complex and difficult area of Government activity and that putting in place effective systems is a significant challenge. Nevertheless, it is a critical task, given the vulnerability of clients and the scarcity of resources. Whilst there has been progress in improving systems, and further enhancements are planned, nevertheless, five years after the creation of the Ageing and Disability Department as the industry regulator, there are a number of fundamental issues which remain to be resolved.

The Audit Office is of the opinion that significant further development of performance information systems is required before there can be an adequate level of assurance that Government funding is provided in conformity with the Disability Services Act 1993 and that services provided represent value for money.

 

Parliamentary reference - Report number #74 - released 27 June 2000

Published

Actions for Using computers in schools for teaching and learning

Using computers in schools for teaching and learning

Education
Information technology
Infrastructure
Management and administration
Workforce and capability

Realisation of the Government’s objectives for integrating computers into the school environment is a major change that will take some time to achieve. The logistics of equipping schools with computers and making them operational have been approached energetically by the Department. Four years into the Computers in Schools Program, student and teacher access to computer hardware, software and the Internet is now substantially greater and teachers are now better placed to integrate computers into teaching and learning. But while much has been achieved there are significant challenges that still remain.

 

Parliamentary reference - Report number #73 - released 7 June 2000

Published

Actions for Hospital emergency departments: Delivery services to patients

Hospital emergency departments: Delivery services to patients

Health
Management and administration
Service delivery
Workforce and capability

There have been notable changes in the provision of emergency department services over the last decade, principally by increasing the number, seniority and training of staff and upgrading facilities. More recently, programs have focussed on achieving improvements in emergency department waiting times (the time taken to see a doctor) and access block (delay in accessing a hospital bed). However, these programs have had limited effect. Although waiting times for seriously ill patients have decreased, waiting times for around 95% of emergency department patients have increased or remain unchanged and performance against benchmarks for access block has declined each year.

Although The Audit Office identified opportunities to improve patient flow in the emergency department, benefits will be limited by access block and the congestion caused by being unable to move patients to a ward. Only a better balance of resources between inpatient access programs (that is booked and emergency department patients) will bring about improvements in access block.

 

Parliamentary reference - Report number #72 - released 15 March 2000