Actions for Workforce reform in three amalgamated councils

Workforce reform in three amalgamated councils

Local Government
Management and administration
Project management
Workforce and capability

The Inner West Council and the Snowy Monaro and Queanbeyan-Palerang Regional Councils have all made progress towards efficient organisational structures following the amalgamation of their former council areas in 2016, according to a report released today by the Auditor-General of New South Wales.

All three councils are now operating with a single workforce and have largely achieved the milestones they planned for the first stage of their amalgamations. None have finished reviewing and aligning services across their former council areas nor integrated their ICT systems. They need to do this to be in a position to implement an optimal structure. 

 

On 12 May 2016, the NSW Government announced the amalgamation of 42 councils into 19 new councils. This followed a period of 18 months during which the NSW Independent Pricing and Regulatory Tribunal (IPART) had assessed councils' ‘fitness for the future’, and communities were consulted about proposed mergers. A further amalgamated council was created on 9 September 2016.

Upon amalgamation, existing elected councils were abolished, interim General Managers appointed, and Administrators engaged to undertake the role of the previously elected councils until Local Government elections were held 18 months later. During the period of administration, councils were asked to report on the progress of their amalgamations to the Department of Premier and Cabinet (DPC).

Council amalgamations not only require a re-drawing of boundaries, but re-establishment of local representation, decisions about alignment of services across the former council areas, and establishment of an amalgamated workforce.

The objective of this audit was to assess whether three councils, Inner West Council, Queanbeyan-Palerang Regional Council and Snowy Monaro Regional Council, are effectively reforming their organisation structures to realise efficiency benefits from amalgamation and managing the impact on staff.

Conclusion
The three councils we examined have made progress towards an efficient organisation structure.

Following amalgamation, all three councils developed detailed plans to bring their former workforces together, review positions and salaries, amalgamate salary structures and align human resources policies. All three councils have largely achieved the milestones included in these plans.
Benefits realisation plans show that councils did not expect to achieve material savings or efficiencies from workforce reform within the first three years of amalgamation.
Two councils do not clearly report on whether their reform initiatives are achieving benefits.

Administrators at all three councils endorsed lower savings targets than the NSW Government’s early analysis suggested may be possible. All three councils have plans or strategies to progress and achieve benefits from the amalgamation. However, Inner West Council and Snowy Monaro Regional Council could more clearly link their reform initiatives with expected benefits and include this in public reporting.

Amalgamations represent a substantial period of change for affected communities and amalgamated councils should be routinely reporting to their communities about the costs and benefits of amalgamation.

Councils have not yet determined their future service offerings and service levels nor completed integration of ICT systems. These decisions need to be made before an optimal organisation structure can be implemented.

Before amalgamated councils can implement an optimal organisation structure, they need to review and confirm their customer service offerings and service levels in consultation with their communities. This work is underway but is not yet complete in any of the councils.

Progress towards an efficient structure has been slowed by staff protections in the Local Government Act 1993 (the Act) and a range of logistical and administrative issues associated with amalgamation. These include multiple IT systems and databases that need to be integrated and different working conditions, policies and practices in the former councils that are not yet fully
harmonised.

The councils implemented legislated staff protections and focused on the people side of change but cannot reliably measure the impact of their change management efforts.

The Act provides protections that reduce the impact of amalgamations on staff. Beyond implementing these protections, the councils have communicated with staff, sought to prepare them for change, and involved staff in key decisions. All councils have conducted staff surveys over time. However, at this stage these staff surveys have not provided an effective or reliable measure of the impact of change management efforts. 

Published

Actions for Transport Access Program

Transport Access Program

Transport
Infrastructure
Project management
Service delivery

The following report is available in an Easy English version that is intended to meet the needs of some people with lower literacy skills, some people with an intellectual disability and some people from different cultural backgrounds.

View the Easy English version of the Transport Access Program report

Transport for NSW’s process for selecting and prioritising projects for the third stage of its Transport Access Program balanced compliance with national disability standards with broader customer outcomes. Demographics, deliverability and value for money were also considered. However, Transport for NSW does not know the complete scope of work required for full compliance, limiting its ability to demonstrate that its approach is effective, according to a report released today by the Auditor-General for New South Wales, Margaret Crawford.

Access to transport is critical to ensuring that people can engage in all aspects of community life, including education, employment and recreation. People with disability can encounter barriers when accessing public transport services. In 2015, there were 1.37 million people living with disability in New South Wales.

Accessible public transport is about more than physical accessibility. It also means barrier-free access for people who have vision, hearing or cognitive impairments. All users, not just people with disability, benefit from improvements to the accessibility and inclusiveness of transport services. 

Transport for NSW has an obligation under Australian Government legislation to provide accessible services to people with disabilities in a manner which is not discriminatory. Under the Disability Standards for Accessible Public Transport 2002 (the DSAPT - an instrument of the Disability Discrimination Act 1992 (the Act) (Commonwealth)), there is a requirement to modify and develop new infrastructure, means of transport and services to provide access for people with disabilities. All public transport operators are required to ensure that at least 90 per cent of their networks met DSAPT by December 2017 and the networks will need to be 100 per cent compliant with all parts of the standards by 31 December 2022. Trains are not required to be fully compliant with DSAPT until December 2032. 

The Transport Access Program (TAP) is Transport for NSW's largest program with a specific focus on improving access to public transport for people with disability. The TAP is a series of projects to upgrade existing public transport infrastructure across four networks: Sydney Trains, Intercity Trains, Regional Trains and Sydney Ferries. Transport for NSW established the TAP as a rolling program and, to date, it has delivered the first tranche of TAP (TAP 1) and is completing the final projects for the second tranche (TAP 2). NSW budget papers estimate that by 30 June 2018, Transport for NSW had spent $1.2 billion in the TAP since its commencement in 2011-12.

After the completion of TAP 1 and TAP 2 (as well as through other transport infrastructure programs), Transport for NSW estimates that 58.5 per cent of the Sydney Trains, Regional Trains and Intercity Trains networks, and 66 per cent of the Sydney Ferries network, will be accessible. To close the significant gap in compliance with the DSAPT target, the objective for TAP 3 is ‘to contribute to Disability Discrimination Act 1992 related targets through DSAPT compliance upgrades’. 

The audit assessed whether Transport for NSW has an effective process to select and prioritise projects as part of the TAP, with a specific focus on the third tranche of TAP funding.

In August 2018, at the commencement of this audit, Transport for NSW intended to complete the selection of projects for the TAP 3 final business case in December 2018. Transport for NSW advise that it now intends to complete the development stage and final business case in the first quarter of 2019, prior to the final investment decision of the TAP program. This report is based on the TAP 3 strategic business case and information provided by Transport for NSW up to December 2018.

Conclusion
Transport for NSW’s process for selecting and prioritising projects for TAP 3 balanced DSAPT compliance goals with broader customer outcomes. It also considered demographics, deliverability and value for money. However, Transport for NSW does not know the complete scope of work required for full DSAPT compliance, and this limits its ability to demonstrate that its approach is effective. 
Transport for NSW has applied most of the external review recommendations from previous funding rounds to the implementation of the third round of TAP funding (TAP3), with positive results. Changes made include a clear objective for TAP 3 to focus on improving compliance, improved governance arrangements, and better consideration of deliverability and design during project planning. 
Through TAP 3, Transport for NSW is also trying to better address disability access in a way that balances DSAPT compliance with other considerations - such as population demographics, access to services and value for money. Transport for NSW developed an objective prioritisation and selection methodology to assess projects for TAP 3 funding. 
Transport for NSW cannot quantify the work needed to meet DSAPT compliance targets across the rail and ferry networks as it has not completed a comprehensive audit of compliance. This information is needed to ensure the effective targeting of funding, and to measure the contribution of TAP 3 work to meeting the DSAPT compliance targets. Instead, Transport for NSW has undertaken a phased approach to completing a comprehensive audit of compliance across the networks, with a focus on first assessing compliance at locations that are not wheelchair accessible. This creates two problems. First, Transport for NSW does not know the complete scope of work required to achieve DSAPT compliance. Second, not all wheelchair accessible locations fully meet DSAPT standards.
Transport for NSW's proposed communication plan for the schedule of TAP 3 funded works does not align with its Disability Inclusion Action Plan 2018-2022. The Disability Inclusion Action Plan commits Transport for NSW to providing a full list of stations and wharves to be upgraded with their estimated time of construction when the next round of funding, TAP 3, is announced. Given the long timeframes associated with improving transport infrastructure, this information is important as it allows people to make informed decisions about where they live, work or study. Instead, Transport for NSW plans to communicate information to customers on a project by project basis.

In 2015, there were 1.37 million people living with disability in New South Wales. Access to transport is critical to ensuring that people can engage in all aspects of community life, including education, employment and recreation. People with disability can encounter barriers when accessing public transport services. 

The social model of disability, outlined in the United Nations Convention on the Rights of Persons with Disabilities, views people with disability as not disabled by their impairment but by the barriers in the community and environment that restrict their full and effective participation in society on an equal basis with others. 

Accessible public transport is more than the provision of physical access to premises and conveyances, it provides barrier-free access for people who have vision, hearing or cognitive impairments. All users, not just people with disability, benefit from improvements to the accessibility and inclusiveness of transport services.

According to the Australian Bureau of Statistics, the main types of difficulties experienced by people with disability when using public transport relate to steps (39.9 per cent), difficulty getting to stops and stations (25 per cent), fear and anxiety (23.3 per cent) and lack of seating or difficulty standing (20.7 per cent).

Transport for NSW has a Disability Inclusion Action Plan (the Action Plan) 2018-2022 that sets an overall framework for planning, delivering and reporting on initiatives to increase accessibility of the transport network. It covers all elements of the journey experienced when using public transport, including journey planning, staff training, customer services and interaction between the physical environment and modes of transport. Appendix five outlines the guiding principles of the Action Plan.

Transport for NSW's Transport Social Policy branch developed the Action Plan in consultation with internal and external stakeholders. The director of the Transport Social Policy branch is a member of the TAP executive steering committee, which supports alignment between the Action Plan and TAP.

Transport for NSW's Disability Inclusion Action Plan describes a customer focussed approach to accessibility

One of the guiding principles of the Action Plan is ‘intelligent compliance’. Transport for NSW describes this as compliance that prioritises customer-focused outcomes over a narrow focus on legal compliance with accessibility standards. As well as being compliant, infrastructure should be practical, usable, fit for purpose and convenient. 

The TAP prioritisation and selection methodology reflects Transport for NSW’s focus on intelligent compliance. We consider this a reasonable approach as had Transport for NSW focussed exclusively on achieving compliance with the DSAPT targets by upgrading the most affordable infrastructure, some locations, that are used by more customers, would remain inaccessible to people with disability. However, this approach should not be seen as an alternative to Transport for NSW meeting its DSAPT compliance obligations.

TAP program staff consult with the Accessible Transport Advisory Committee

The Accessible Transport Advisory Committee (ATAC) has representatives from disability and ageing organisations, who provide expert guidance to Transport for NSW on access and inclusion. The ATAC provide guidance and feedback on projects and project solutions, including user testing where appropriate. TAP program staff provide regular updates at ATAC meetings, which include briefings on progress. The ATAC also provides feedback and suggestions to TAP program staff, which is considered and sometimes included in current and future projects.For example, in March 2017 the TAP program team briefed the ATAC on the challenges with respect to a number of ferry wharves and sought support for DSAPT exemptions proposed in the TAP 3 strategic business case.

Case study: Feedback on Braille lettering for lift buttons
In June 2018, the Program team sought feedback on a variety of lift button options to improve accessibility on future TAP projects. In September 2018, during the ATAC meeting attended by the Audit Office, the program team sought feedback on the standard designs for TAP 3. Some ATAC members noted that the standard design included Braille lettering on the lift buttons, and that this was not good practice because people can accidently press the button while reading it. As a result, Transport for NSW are incorporating this feedback into design requirements for the lifts for TAP 3, which will consider larger buttons, clearer Braille and Braille signage adjacent to the button.

Transport for NSW has not briefed the Advisory Committee on the outcome of the prioritisation and selection process

TAP program staff briefed the Advisory Committee about the prioritisation and selection methodology, after the Minister approved it in 2016. However, Transport for NSW have not briefed or consulted the Advisory Committee on the outcome of the prioritisation process. Infrastructure NSW noted this issue during its review of the strategic business case. 

Transport for NSW advised us that it established the ATAC as an advisory group, and that Transport for NSW does not disclose sensitive information to it. Transport for NSW intends to share the outcome of the prioritisation process following the completion of the TAP 3 development stage and final investment decision.

The TAP communication plan does not fully meet the requirements of the Disability Inclusion Action Plan

The Disability Inclusion Action Plan includes an action item to ‘provide a listing of stations and wharves to be upgraded with estimated time of construction as each new tranche of the Transport Access Program is announced’ The TAP Communication Plan that we reviewed does not include this provision instead focussing on communication on a per project basis. Given the long timeframes associated with improving transport infrastructure, this information is important as it allows people to make informed decisions about where they live, work or study.

Published

Actions for Supply of secondary teachers in STEM-related disciplines

Supply of secondary teachers in STEM-related disciplines

Education
Management and administration
Service delivery
Workforce and capability

The NSW Department of Education’s plans and strategies to respond to the demand for secondary teachers in STEM-related disciplines are limited by incomplete data and underperforming scholarship and sponsorship program. The Department does not collect sufficient information to monitor what disciplines teachers actually teach nor does it predict supply and demand for teachers by discipline and location. This restricts the Department’s ability to track and forecast the supply and demand for secondary teachers in STEM-related disciplines.

In recent years, Australian and international education policy has focused on improving outcomes in Science, Technology, Engineering and Mathematics (STEM) subjects. However, research has identified a shortage of qualified secondary teachers in STEM-related disciplines 1. This is projected to worsen due to a combination of student population increases, an ageing workforce, and fewer people going into teaching. Shortfalls are likely to be more acute in rural and remote areas, and areas of low socio-economic status.

The Department of Education (the Department) has a variety of strategies to encourage teachers to practise in locations or disciplines of need. These include scholarships for tertiary students going into teaching, sponsorships for teachers seeking approval to teach additional disciplines, and incentives to attract teachers to rural and remote locations. 

This audit assessed the effectiveness of the Department's workforce plans and strategies in responding to the demand for secondary teachers in STEM-related disciplines. We assessed:

  • how well the Department tracks the supply and demand for secondary teachers in STEM-related disciplines across NSW
  • whether the Department has effective strategies to attract and retain secondary teachers in STEM-related disciplines.
Conclusion
There are two key shortcomings that fundamentally limit the effectiveness of the Department's plans and strategies to respond to the demand for secondary teachers in STEM-related disciplines. First, the Department is not accurately tracking the supply and demand for secondary teachers by discipline due to incomplete data. Second, not all scholarship and sponsorship places are allocated and many scholars withdraw from the programs before completion. The Department has recognised and started to address these problems with a new workforce model, revised incentives and scholarship programs. 

The Department’s current workforce planning model does not provide the information needed to target workforce plans and strategies to areas of need. This is because it does not predict supply and demand for teachers by discipline and location. An internal review in 2017 acknowledged the limitations of this model. In response the Department developed a new model, which it is currently enhancing, to predict supply and demand for teachers by discipline and location. For this to be successful, the Department needs to monitor the level of out-of-field teaching and improve data on the willingness of teachers to work in particular locations. 

The Department does not allocate all available scholarship and sponsorship places and around 30 per cent of recipients do not complete the term of their agreement. An internal review in 2017 highlighted that some programs were not targeting workforce need and that there were no key performance indicators to determine the overall effectiveness of these programs. However, scholarship programs and incentives are promoted well through social media and face-to-face events at Universities. Further, the Department has used findings from internal reviews of incentives and scholarships in 2016 and 2017 to inform recent changes to programs. 

The Department has little oversight of access to practicum placements for pre-service teachers in areas of need. Professional experience agreements were established with each University in 2015 to improve the placement process for disciplines of need. Initial teacher education students must complete several ‘practicum placements’ before they can be qualified to teach in a school. Several universities we consulted reported difficulties finding practicum placements for pre-service teachers specialising in STEM-related disciplines. The Department is now revising the agreements to improve the quality of data it collects on the number, location and subject area of practicum placements. 

1 Australian Council for Educational Research 2015, The teacher workforce in Australia - supply, demand and data issues.

 

The Department is not accurately tracking the supply and demand for secondary teachers by discipline due to incomplete data. 

The Department’s current workforce planning model does not accurately predict supply and demand for teachers by discipline and location. An internal review in 2017 acknowledged the limitations of this model. In response the Department developed a new model which it is currently enhancing to address the findings of the review. For this model to be successful, the Department needs to monitor the level of out-of-field teaching and improve data on the willingness of teachers to work in particular locations. Further work also needs to be undertaken to refine the assumptions that underpin the Department’s workforce planning models as it starts to predict the need for teachers by discipline.

The Department has not publicly reported on the supply and demand for teachers by discipline since 2015. While it does report annually on its current workforce profile, this information is not detailed enough to inform future strategies or programs. More detailed public reporting may help the Department to influence the future supply of teachers by communicating its projected areas of need. Planned improvements to the Department's workforce planning model, as relayed to us, will add to the data available on areas of need. Once available, this should be reported publicly. 

Recommendations
By December 2019, the Department of Education should:

  1. Improve its workforce planning model to better understand and communicate supply and demand for teachers by: 
    • determining the extent, and analysing the impact, of out-of-field teaching by permanent and temporary teachers in each school
    • sourcing additional data to more accurately reflect teacher location preferences
    • projecting supply and demand by subject level and geographic area
    • regularly reporting on the supply and demand for secondary teachers in each discipline to communicate future areas of need to future teacher education students.

The Department's current scholarship and sponsorship programs are not allocating all available places and many scholars withdraw from the programs before completion. An internal review in 2017 raised several issues with the effectiveness of programs and the Department has started to revise its scholarship, sponsorship and incentive programs. 

An internal review in 2017 highlighted that scholarship and sponsorship programs were not targeting workforce need, and that there were no key performance indicators to determine the overall effectiveness of these strategies. In addition, the review found that only 79 per cent of available scholarship placements are allocated each year, and 31 per cent of scholarship recipients withdraw prior to completing their required service period. The Department recently announced changes to its scholarship programs from 2019 onwards.

The Department has incentives to encourage teachers to work in rural and remote areas, including teachers in STEM-related disciplines. Incentives include access to priority transfers, rental subsidies and other allowances. Research conducted in 2016 examined the influence of incentives in encouraging teachers to work in rural and remote areas. The Department used findings of this research when updating its set of rural and remote incentives in 2017.

The Department promotes its scholarship and sponsorship programs through the teach.NSW website. It uses social media to direct applicants to this website. It also promotes its programs through careers fairs, University open days, and professional events. Past applicants have reported that the website clearly communicates eligibility criteria and the terms of agreement for all scholarship programs. 

The Department could strengthen its relationship with universities to attract teachers to areas of need by collecting and analysing data on practicum placements, facilitating placements for scholarship recipients, and communicating predicted teacher needs by discipline. 

Recommendations
By December 2019, the Department of Education should:

2. Implement changes to address the findings of the 'Teacher Scholarship Realignment' report, including by:

  • testing a range of program designs with target candidates to determine the best options to attract more suitable applicants
  • establishing key performance indicators, and setting targets, to better monitor the effectiveness of the programs
  • reducing the number of scholars appointed to over-establishment positions
  • increasing the proportion of scholars appointed to priority locations 
  • further analysing scholarship recipients career paths to inform future improvements to the scholarship programs.

3. Review its role in the practicum placement process of pre-service teachers by:

  • analysing how many students each school accommodates per year, to ensure there are appropriate placements available for students in high needs disciplines
  • working with universities to facilitate practicum placements for scholarship recipients
  • establishing mechanisms for ongoing monitoring of its partnerships with universities to ensure they are meeting their aims.

Appendix one - Response from agency

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary Reference - Report number #313 - released 29 January 2019.

Published

Actions for Relocating Agencies to Regional Areas

Relocating Agencies to Regional Areas

Premier and Cabinet
Internal controls and governance
Management and administration
Service delivery
Shared services and collaboration
Workforce and capability

Decisions to relocate government agencies to non-metropolitan areas are not made purely for cost reasons. They can also serve government policy objectives, such as promoting regional economic development.

Regardless of the policy objectives that may exist, I would expect that decisions on individual agency relocations would be based on sound business cases. Those business cases would show how the relocation achieves any relevant government objectives, what costs (or savings) would be involved, logistical considerations such as obtaining appropriate accommodation and staff, and any impacts on levels service to the public.

In my view, the existence of government policy objectives does not remove the need for individual decisions to be made in a transparent, rational and accountable manner. Responsible public servants should provide the appropriate information to government to allow it to judge how best to implement its policies.

 

Parliamentary reference - Report number #147 - released 14 December 2005

Published

Actions for Liverpool to Parramatta Bus Transitway

Liverpool to Parramatta Bus Transitway

Transport
Treasury
Infrastructure
Management and administration
Project management
Service delivery

Several of my recent audits have identified a need to improve our public transport system – both for the benefit of travellers and to assist in achieving better air quality.

Bus Transitways can provide a good public transport solution for lower density population areas, potentially at a relatively low capital cost. This audit examines the transitway running between Liverpool and Parramatta, the first of several planned for Sydney. This audit should contribute to a better understanding of the lessons learnt from this first project, and so to future transitways providing better value for money.

But this audit also raises broader issues.

It highlights the importance of accurately projecting the total cost of major infrastructure projects before governments lock in their decisions. It also highlights the need for sound decision-making processes when government agencies compete with the private sector. The principles and recommendations flowing from these issues are ones I would draw to the attention of all agencies, and to the Government.

 

Parliamentary reference - Report number #146 - released 5 December 2005

Published

Actions for Purchasing Hospital Supplies: Follow-up of 2002 Performance Audit

Purchasing Hospital Supplies: Follow-up of 2002 Performance Audit

Health
Asset valuation
Financial reporting
Management and administration
Procurement
Service delivery

Periodically we review the extent to which agencies have changed their practices as a result of our audits. This gives Parliament and the public an update on the extent of progress made.

In this follow-up audit, we examine changes following our September 2002 report, to assess whether NSW Health has improved its buying of hospital supplies using electronic systems.

NSW Health spends over $1.3 billion on hospital supplies. It is the largest expenditure area after employee costs. Reform of this area has the potential to make significant savings that could be redirected to frontline services.

As part of our series of audits in the area of e-government, our previous audit looked closely at the extent to which technology was being used to deliver potentially major savings in purchasing hospital supplies. This is a key area of so-called “process re-engineering” in the “e” field, and NSW Health provided an ideal case study.

Whilst implementing large-scale e-procurement has many technical aspects, it is not chiefly a technical issue. The key requirements for success reside in effective change management, in particular being clear as to who has the authority to make change decisions and be held accountable.

This audit looks at NSW Health’s successes to date, and its frustrations and challenges in making further progress in this field. Many of the issues raised in this report may provide lessons for any agency that is seeking to drive a significant change program.

 

Parliamentary reference - Report number #145 - released 23 November 2005

Published

Actions for Oversight of State Owned Electricity Corporations

Oversight of State Owned Electricity Corporations

Treasury
Asset valuation
Financial reporting
Management and administration
Service delivery

Issues of corporate governance have long been a matter for concern in the private sector. Following recent corporate collapses and scandals, legislators and regulators in a number of countries have focused on strengthening governance in publicly traded corporations. Considerable attention has been given to setting clear expectations for the performance of boards and for the disclosure of information to various stakeholders.

Good governance is no less important in the public sector.

Indeed issues of oversight and accountability may be more complex in the public sector, particularly in government businesses. There are more stakeholders involved (portfolio Ministers, shareholder Ministers, Parliament and central agencies) and there are competing – and potentially conflicting - objectives (financial, social, environmental, etc).

Because of these potential conflicts, it is important that Boards understand what government expects of them. Some of these expectations reflect the government’s regulatory role in areas such as safety, pricing and ensuring consumers receive essential services. Some expectations reflect the government’s role as a business owner.

Having a clear separation of regulatory expectations from ownership expectations is essential if boards are to be accountable for their performance on both aspects. To assist in this separation, New South Wales (like many other jurisdictions) has adopted the concept of ‘shareholder Ministers’ – as distinct from the portfolio Minister – to exercise the ownership function.

This report looks more closely at a particular area - how the State conducts itself as the owner of the State owned electricity corporations. This is an important issue as the State’s (ie taxpayers’) equity in these businesses is worth over $9 billion. Managing the risks associated with continuing ownership of these businesses is an essential aspect of good governance.

Although the audit focuses on the State’s holdings in the electricity sector, its findings and recommendations have relevance for all State owned corporations.

 

Parliamentary reference - Report number #144 - released 19 October 2005

Published

Actions for Implementing Asset Management Reforms

Implementing Asset Management Reforms

Justice
Planning
Finance
Treasury
Asset valuation
Financial reporting
Infrastructure
Internal controls and governance
Management and administration
Project management

Hospitals, schools, public housing, roads, bridges, buses and trains are just some of the assets used by government in providing services to citizens.

The NSW Government’s asset base is impressive in size - with a value of around $167 billion and with government plans to spend around $8 billion acquiring or replacing assets in the current year. Another $2 billion is spent each year on maintenance.

Good asset management is very important to government; even a small efficiency gain in this area can provide significant returns. Good practice by those responsible for managing assets can improve reliability, extend asset life, save on maintenance costs and aid in identifying and disposing of unnecessary or non-performing assets.

Improving the NSW public sector’s approach to asset management has been on the reform agenda for at least a decade. Changes in practice have been accelerated more recently by integrating asset management policy with the budget process.

In this audit we examined NSW Treasury’s efforts to improve asset management practices in the public sector and the progress made by 3 agencies - the Department of Corrective Services, NSW Fire Brigades and the Powerhouse Museum - towards better managing their asset portfolios.

This report informs Parliament and the community on progress to date and what more needs to be done to ensure that agencies manage assets effectively and achieve best value.

 

Parliamentary reference - Report number #143 - released 12 October 2005

Published

Actions for Managing and Measuring Success: Department of Juvenile Justice

Managing and Measuring Success: Department of Juvenile Justice

Justice
Compliance
Internal controls and governance
Management and administration
Service delivery

Criminal or anti-social juvenile behaviour affects us all. Some of us may be victims of juvenile crime, some may be apprehensive about their personal safety, while others may know of young people who have been in trouble with the law. And, as taxpayers, all of us contribute to the costs of juvenile justice.

Currently about one in every 200 young people in NSW is convicted of a crime each year. The Department of Juvenile Justice works with these young offenders to help them fit back into society and lead a life free of crime.

This is not an easy task. Young offenders are often difficult to help. Many come from disadvantaged backgrounds and may have had poor parental supervision. They may have achieved little at school, have poor work prospects and psychological problems, and be part of an anti-social peer group.

While the Department of Juvenile Justice has prime responsibility, agencies in the justice and welfare systems need to work closely together to tackle these complex and diverse issues. They ultimately desire the same result for young offenders – progression to a well-adjusted, crime-free adulthood.

The report highlights the challenges facing all those who work with young offenders - youth workers, police officers, magistrates, health workers and teachers. Achieving the best possible outcome for these young people will help bring about safer and more harmonious communities for us all.

This is the first of two audits in our current performance audit program that deals with young offenders. We examined how the Department of Juvenile Justice measures performance, and whether staff have adequate information to make sound planning decisions and recommend appropriate interventions for young offenders.

Our next audit, starting later in 2005, will review whether relevant government agencies effectively coordinate the management of young offenders.

 

Parliamentary reference - Report number #142 - released 14 September 2005

Published

Actions for Coordination of Rescue Services

Coordination of Rescue Services

Justice
Internal controls and governance
Management and administration
Regulation
Service delivery
Workforce and capability

Nearly 11,000 rescues are carried out each year in New South Wales, the majority involving motor vehicle accidents.

In metropolitan areas we have three emergency services providing general land rescue - NSW Police, the Ambulance Service and the NSW Fire Brigades. The two volunteer services, the State Emergency Service and the Volunteer Rescue Association, generally cover the remainder of the State.

Rescue arrangements in NSW are different to all other mainland states. Elsewhere, the trend in metropolitan areas has been towards consolidation with only one provider of rescue services.

The State Rescue Board of NSW was set up in 1989. Its primary role is to ensure efficient and effective rescue services are maintained throughout the State.

In this audit we examined how well placed the Board was to provide assurance to Parliament and the community that the organisation of rescue services in NSW best serves those in need of rescuing.