Reports
Actions for Planning and Environment 2017
Planning and Environment 2017
The following report highlights results of financial audits of agencies in the Planning and Environment cluster. The report focuses on key observations and findings from the most recent audits of these agencies.
The audits were completed for most agencies in the cluster and unqualified audit opinions issued. Issues identified during the financial statement audits of seven small agencies delayed their finalisation beyond the statutory deadline, and six of these remain incomplete. Apart from these small agencies, the quality of financial reporting across the cluster remained at a high standard.
This report provides Parliament and others with the audit results, observations and recommendations for Planning and Environment cluster agencies. The report has been structured into two chapters focussing on financial reporting and controls and service delivery.
The Planning and Environment cluster plays a role in ensuring each community across New South Wales receives the services and infrastructure it needs.
This chapter outlines our audit observations and recommendations related to financial reporting and controls of Planning and Environment cluster agencies for 2016–17.
Observation | Conclusion or recommendation |
2.1 Quality of financial reporting |
|
Unqualified audit opinions were issued for 39 of the 45 cluster agencies' financial statements. |
Issues identified during the financial statement audits of seven smaller agencies delayed their completion. Six audits remain incomplete at the date of this report. Apart from these seven small agency audits, the quality of financial reporting across the cluster remained at a high standard. |
2.2 Timeliness of financial reporting |
|
Seven agencies' financial statement audits were not completed by the statutory deadline with six audits incomplete at the date of this report. |
Issues identified during the financial statement audits of seven smaller agencies delayed their finalisation beyond the statutory deadline. These agencies would benefit from performing additional early close procedures in future reporting periods. |
2.3 Financial and sustainability analysis |
|
Water and Electricity utility agencies continue to operate with low liquidity ratios. |
A liquidity ratio below one is an indicator that an entity may not be able to pay its debts as and when they fall due. Whilst liquidity ratios were below one, utility agencies demonstrated they can continue to support ongoing operations due to:
|
2.5 Internal controls |
|
One in six internal control weaknesses reported in 2016–17 were repeat issues. |
Delays in implementing audit recommendations can prolong the risk of fraud and error. Recommendation (repeat issue): anagement letter recommendations to address internal control weaknesses should be actioned promptly, with a focus on addressing repeat issues. |
Nine of these internal control weaknesses related to the creation, modification, deletion and review of user access to financial systems. |
These control weaknesses may compromise the integrity and security of financial data. Recommendation (repeat issue): Management of user administration over financial systems should be strengthened to prevent inappropriate access to financial information. |
This chapter outlines our audit observations, conclusions and recommendations relating to service delivery for 2016–17.
Observation | Conclusion or recommendation |
3.1 Premier's and State priorities |
|
The Planning and Environment cluster is responsible for delivering five Premier's and State priorities. |
One priority target was achieved in 2016–17, two targets are on track to be achieved and progress towards one target slowed. Progress against one target cannot be determined. |
3.2 Planning |
|
Housing Completion |
|
There were 63,506 housing completions in 2016–17. This was 4.1 per cent above the Premier’s priority target of delivering 61,000 housing completions per year. |
The Australian Bureau of Statistics data shows the housing completions target was achieved in 2016–17. |
Housing supply |
|
The number of approvals for new houses in 2016–17 was 72,472 against the State priority target of more than 50,000 approvals per year. |
The Australian Bureau of Statistics data indicates the housing approvals target was achieved in 2016–17. |
Major project assessment |
|
State significant developments are not clearly defined for the purposes of reporting against the State priority target. | The Department of Planning and Environment will clarify with the Department of Premier and Cabinet which developments are captured by the State priority target. |
The Department of Planning and Environment’s data shows the time taken to assess complex State significant developments increased by 16 per cent in 2016–17 while the time taken to assess less complex developments reduced by 20 per cent. | The Department of Planning and Environment considers it is on track to meet the State priority target of halving the time taken to assess State significant developments, despite uncertainty over the target measure. |
Housing acceleration fund |
|
Program business cases were not developed for projects in Housing Acceleration Fund Rounds 1 to 4. The Department advised a program business case will be developed for Housing Acceleration Fund Round 5 projects. |
A program business case is necessary to ensure related projects are evaluated, managed and coordinated effectively. |
A benefit realisation review process has not yet been approved for Housing Acceleration Fund projects. The Department of Planning and Environment advised it is developing a benefit realisation review process. |
A benefit realisation review process is necessary to determine whether funded projects achieved intended outcomes. |
Greater Sydney Commission |
|
The Greater Sydney Commission forecasts a further 725,000 dwellings in the greater Sydney region will be required up to 2036 to meet housing demand. | In response to population growth, the Commission has set a five-year housing supply target of 189,100 houses across the five Greater Sydney Commission districts. |
ePlanning system |
|
The Department of Planning and Environment did not perform a benefit realisation review for phase one of the ePlanning project. It has committed to performing a benefit realisation review after completion of phase two in 2018. | It cannot be determined if phase one of the project delivered expected outcomes as a benefit realisation review was not performed. |
3.3. Environment and Heritage |
|
Litter volume in New South Wales was 6.6 litres per 1,000 square metres in 2016–17, an increase of 16 per cent from the prior year. This is above the Premier's priority litter volume target of 4.2 litres per 1,000 square metres by 2020. | The Environment Protection Authority's data indicates the progress towards the target of reducing the volume of litter by 40 per cent by 2020 has slowed. |
The NSW Government plans to invest $240 million to facilitate strategic biodiversity conservation on private land. | Performance measures have not yet been developed for the private land conservation program. |
3.4 Water |
|
IPART reduced water usage charges for most Sydney Water Corporation customers in 2016–17. | Water usage prices in New South Wales compare favourably to larger water utilities in other jurisdictions. |
Hunter Water Corporation's water recycling and water conservation performance has been stable over recent years. The volume of Sydney Water Corporation’s recycled water reduced by 12 per cent in 2016–17 compared to the previous year. |
Sydney Water Corporation experienced reduced industry demand for recycled water. Several large industrial customers relocated away from Sydney. |
3.5 Arts and culture |
|
A State priority target is to increase overall attendance at cultural venues and events in New South Wales by 15 per cent from 2014–15 levels by 2019. | The Department of Planning and Environment's data indicates overall attendance increased by 16 per cent in 2015–16, although attendance fluctuated across individual venues and events. This indicates progress towards achieving the overall target by 2019. |
Actions for Industry 2017
Industry 2017
The following report highlights the results of the financial audits of NSW Government entities in the Industry cluster. The report focuses on key observations and findings from the most recent audits of these entities.
The report notes that TAFE NSW will continue to incur extra costs each year to produce reliable financial information due to deficiencies in its student administration system. TAFE NSW plans to replace its Student Administration and Learning Management system in 2018-19 at an estimated cost of $89 million.
1. Financial reporting and controls
Financial reporting |
Unqualified audit opinions were issued for 44 out of 48 financial statement audits with four audits incomplete. Early close procedures continue to promote earlier and better quality financial reporting. |
Financial performance | The cluster recorded a net deficit of $107 million in 2016–17 ($78.0 million in 2015–16). Contributing to the overall cluster net deficit was the Department's $226 million net deficit offset by net surpluses at Water NSW and the Forestry Corporation of New South Wales. |
TAFE NSW continues to experience system issues | TAFE NSW incurs extra costs each year to produce reliable financial information due to deficiencies in its student administration system. TAFE NSW plans to replace its Student Administration and Learning Management system in 2018–19 at an estimated cost of $89 million. |
Internal controls |
We identified 180 internal control issues, including 61 repeat issues across the cluster. We rated four of these issues as 'high' risk, 98 as ‘moderate’ risk and 78 as ‘low’ risk. Of the 180 issues raised, 37 related to financial reporting and 52 related to controls over processes such as procurement and fixed assets. Some internal control issues and recommendations identified in previous years, have been repeated and should be addressed promptly to reduce risks and improve processes. |
Deficient user administration access | Agencies need to strengthen user access administration to critical financial systems. |
2. Service delivery
Premier and State Priorities |
Australian Bureau of Statistics data shows the Premier's priority for job creation has been achieved. While performance has declined for the State priority to increase the proportion of people completing apprenticeships and traineeships, the Department advises it has initiatives in place to achieve this State priority, and the State priority for New South Wales to lead Australia in business confidence. |
Crown land | The Department is working to respond to the recommendations from a Parliamentary Inquiry into Crown Land and to implement the revised framework contained in the Crown Land Management Act 2016. |
Aboriginal land claims |
Despite a continued focus, the Department has been unsuccessful in reducing the number of unprocessed Aboriginal land claims. The Department should continue to implement measures to reduce the backlog of unprocessed Aboriginal land claims. |
This report focuses on agencies in the Industry cluster. The report focuses on audit results, observations, conclusions and recommendations for financial reporting and controls, and service delivery.
This cluster leads the State's promotion of New South Wales as the place to invest and produce goods and services. Significant cluster agencies deliver services in the following areas:
Confidence in public sector decision-making and transparency is enhanced when financial reporting is accurate and timely. Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies.
This chapter outlines audit observations, conclusions and recommendations for the financial reporting and controls of agencies in the cluster for 2016–17.
Observation | Conclusion or recommendation |
2.1 Quality of financial reporting | |
Unqualified audit opinions were issued for 44 out of 48 financial statement audits. Four audits are continuing. | Ongoing improvements in the preparation of financial statements helped identify and resolve material issues. |
The number of misstatements within the cluster fell from 104 in 2015–16 to 70 in 2016–17. | The ‘early close procedures’ initiative introduced by the Treasury in 2011–12 has reduced the number of misstatements each year. |
2.2 Timeliness of financial reporting | |
Most agencies complied with the Treasury’s early close procedures and the timetable for the preparation and audit of financial statements. | Greater focus on financial reporting and effective early close procedures has improved the timeliness of financial reporting, but further improvements are required. |
2.3 Key financial issues from cluster agencies | |
The Department of Industry completed a revaluation of Crown land and continues work on improving the accounting for Crown land. | The value of Crown land recognised in the Department's financial statements at 30 June 2017 was $5.3 billion. The revaluation was carried out using a revised mass valuation approach which reduced complexity and subjectivity and improved transparency. |
There is no process in place to ensure agencies recognise all the Crown land they manage and control. | Recommendation: The Department should confirm the completeness and accuracy of the Crown land database with other organisations that manage and control Crown land to improve the reliability of its records. |
TAFE NSW incurred approximately $6 million of direct costs to deal with issues in its student administration system and establish the integrity of its financial data for 2016–17. | TAFE NSW will continue to incur extra costs each year to produce reliable financial information. TAFE NSW advises it intends to replace the Student Administration and Learning Management system it jointly implemented with the Department of Education three years ago at a cost $40.2 million. TAFE plans to implement the new system in 2018–19 at an estimated cost of $89 million. |
2.4 Key financial information | |
The cluster recorded a net deficit of $107 million in 2016–17 ($78.0 million in 2015–16). | The overall cluster net deficit included the Department's $226 million net deficit which was partly offset by net surpluses in a number of other agencies, including Water NSW and the Forestry Corporation of New South Wales. Most agencies in the cluster, including the Department, but excluding the State owned corporations, are dependent on the NSW Government for the majority of their revenue. |
2.5 Financial performance and sustainability | |
We assessed the performance of certain agencies against key financial sustainability indicators. This identified four agencies with adjusted net deficits and two agencies with liquidity ratios below one. | Overall, based on our analysis these agencies are not at high risk of sustainability concerns. |
2.6 Internal controls | |
A significant number of repeat internal control issues were again raised with management for certain agencies in the cluster. |
Recommendation (repeat issue): Internal control issues and recommendations from previous years should be addressed promptly to reduce risks and improve processes. |
User access administration over financial systems needs to be improved. 17 moderate risk issues related to user access administration across nine agencies were identified. |
Recommendation: Agencies should ensure administration of user access to critical systems
|
Government outcomes can be achieved by delivering services through a mix of the public, private or not-for-profit sectors. Service delivery reform is most successful if there is clear accountability for service delivery outcomes, decisions are aligned to the government's strategic direction, and performance and value for money are monitored and evaluated.
This chapter outlines our audit observations, conclusions and recommendations for the service delivery of agencies in the cluster for 2016–17.
Issues | Conclusion or recommendation |
3.1 Measuring and reporting on performance |
|
The Department is responsible for two State priorities (increasing apprenticeships and business confidence) and the Premier's priority of creating jobs. The Department also supports four state priorities. | Australian Bureau of Statistics data shows the Premier's priority for job creation continues to be achieved. The Department reported that the number of people completing apprenticeships and traineeships had declined to 59 per cent against a 2019 target of 65 per cent, while the State was ranked first or second on a range of business confidence indicators. |
3.2 Improvements required in the administration of Crown land |
|
The Department faces many challenges in the administration of Crown land. These challenges range from inadequate systems and processes through to satisfying competing commercial, environmental, and community interests. |
The Department has implemented, or is implementing the recommendations from a performance audit on the Sale and Lease of Crown land and the Parliamentary Inquiry into Crown land. It is also implementing the revised framework for Crown land contained in the Crown Land Management Act 2016. |
3.3 Aboriginal land claims over Crown land |
|
The number of unprocessed Aboriginal land claims continues to increase. Work on finalising Aboriginal Land Agreements, which may help address the claims backlog, is continuing. | Recommendation (repeat Issue): The Department should continue to implement measures to reduce the number of unprocessed Aboriginal land claims. |
3.4 Skills development |
|
Eleven contracted Smart and Skilled service providers had their contracts cancelled for quality issues. There were 391 providers of Smart and Skilled qualifications as at October 2017. | The Department of Industry spent $1.4 billion on the provision of vocational education and training. The Department has controls in place to monitor the performance of contracted service providers to ensure quality delivery of training. |
Actions for Mining Rehabilitation Security Deposits
Mining Rehabilitation Security Deposits
The Department of Planning and Environment requires mining companies to rehabilitate sites according to conditions set in the mining development approval. The Department holds mining rehabilitation security deposits that are meant to cover the full cost of rehabilitation if a mining company defaults on its rehabilitation obligations.
Parliamentary reference - Report number #285 - released 11 May 2017
Actions for 2016 - An overview
2016 - An overview
This report focuses on key observations and findings from 2016 audits and highlights key areas of focus for financial and performance audits in 2017.
Financial reporting | |
Observation | Conclusion |
Only one qualified audit opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. | The quality of financial reporting continued to improve across the NSW public sector. |
More 2015–16 financial statements and audit opinions were signed within three months of the year end. | Timely financial reporting was facilitated by more agencies resolving significant accounting issues early, completing asset valuations on time and compiling sufficient evidence to support financial statement balances. |
NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues. For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures. |
The narrowed scope of mandatory early close procedures may diminish the good performance in ensuring the quality and timeliness of financial reporting achieved in recent years. To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years. |
Although most agencies complied with NSW Treasury’s early close asset revaluation procedures we identified areas where they can improve. | Asset revaluations need to commence early enough to ensure all assets are identified and the results are analysed, recorded and reflected accurately in the early close financial statements. |
Number of misstatements | |||||
Year ended 30 June | 2015-16 | 2014-15 | 2013-14 | 2012-13 | 2011-12 |
Total reported misstatements | 298 | 396 | 459 | 661 | 1,077 |
All material misstatements identified by agencies and audit teams were corrected before the financial statements and audit opinions were signed. A material misstatement relates to an incorrect amount, classification, presentation or disclosure in the financial statements that could reasonably be expected to influence the economic decisions of users.
Significant matters reported to the portfolio Minister, Treasurer and Agency Head
In 2015–16, we reported the following significant matters to the portfolio Minister, Treasurer and agency head in our Statutory Audit Reports:
Appropriate financial controls help ensure the efficient and effective use of resources and the implementation and administration of agency policies. They are essential for quality and timely decision making.
In 2015–16, our audit teams made the following key observations on the financial controls of NSW public sector agencies.
Financial controls | |
Observation | Conclusion |
More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016. |
Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner. |
Agencies continue to face challenges managing information security. Most information technology issues we identified related to poor IT user administration in areas like password controls and inappropriate access. | Agencies should review the design and effectiveness of information security controls to ensure data is adequately protected. |
We found shared service provider agreements did not always adequately address information security requirements. |
Where agencies use shared service providers they should consider whether the service level arrangements adequately address information security. |
Thirteen of 108 agencies required to attest to having a minimum set of information security controls did not do so in their 2015 annual reports. | The 'NSW Government Digital Information Security Policy' recognises the growing need for effective information security. With cyber security threats continuing to increase as digital services expand we plan to look at cyber security as part of our 2017–18 performance audit program. |
We identified instances where service level agreements with shared service providers were outdated, signed too late or did not exist. | Corporate and shared service arrangements are more effective when service level arrangements are negotiated and signed in time, clearly detail rights and responsibilities and include meaningful KPIs, fee arrangements and dispute resolution processes. |
Internal controls at GovConnect, the private sector provider of transactional and information technology services to many NSW public sector agencies were ineffective in 2015–16. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. | The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector. |
Maintenance backlogs exist in several NSW public sector agencies, including Roads and Maritime Services, Sydney Trains, NSW Health, the Department of Education and the Department of Justice. | To address backlog maintenance it is important for agencies to have asset lifecycle planning strategies that ensure newly built and existing assets are funded and maintained to a desired service level. |
Actions for Industry, Skills, Electricity and Water 2016
Industry, Skills, Electricity and Water 2016
The Auditor-General, Margaret Crawford released a report today highlighting a decline in net profits of electricity agencies and the distributions the government received from these agencies. The report also details continuing issues in the management of Crown Land and TAFE NSW's student administration system.
Actions for Planning and Environment 2016
Planning and Environment 2016
Auditor-General, Margaret Crawford released a report on the planning and environment cluster today, concluding that the quality of financial reporting is improving. However, the cluster can improve its financial controls and governance framework.
Actions for Implementation of the NSW Government’s program evaluation initiative
Implementation of the NSW Government’s program evaluation initiative
The NSW Government’s ‘program evaluation initiative’, introduced to assess whether service delivery programs achieve expected outcomes and value for money, is largely ineffective according to a report released today by NSW Auditor-General, Margaret Crawford.
Government services, in areas such as public order and safety, health and education, are delivered by agencies through a variety of programs. In 2016–17, the NSW Government estimates that it will spend over $73 billion on programs to deliver services.
Parliamentary reference - Report number #277 - released 3 November 2016
Actions for Improving efficiency of irrigation water use on farms
Improving efficiency of irrigation water use on farms
The Department of Primary Industries (DPI) has a crucial role in assisting the irrigation industry to respond to the conflicting demands placed upon the state’s water resources. The State Plan emphasises the importance of water to agriculture, and gives DPI responsibility to use its training programs to help farmers continue to increase water use efficiency. DPI needs to work closely with agencies with which it shares responsibilities in the State Plan to ensure that its water use efficiency activities contribute to the State Plan goals. It needs to work closely with Treasury to document the services it will require to do this, the resources which will be needed, and how its success will be measured. This will ensure that DPI is well placed to continue to assist the NSW farming industry to adapt and survive periods of reduced water availability.
Parliamentary reference - Report number #172 - released 21 November 2007
Actions for Northside Storage Tunnel Project
Northside Storage Tunnel Project
The Northside Storage Tunnel was the first major public sector construction project using an alliance approach. In our opinion, the outcome of the project suggests that an alliance approach, when applied to a suitable project and managed appropriately, can support positive project outcomes. And in many respects the Alliance worked well. There are, however, a number of issues that we believe need to be addressed for future alliances.
Parliamentary reference - Report number #113 - released 24 July 2003
Actions for Implementing the Ovine Johne's Disease Program
Implementing the Ovine Johne's Disease Program
The implementation of the Ovine Johne's Disease (OJD) program in New South Wales has been prolonged and difficult. In our view, the OJD Program in New South Wales has experienced two major difficulties with its implementation: the lack of a strategic approach to program management, and an ill-defined governance structure. Both the NSW Government and industry need to be better organised and improve the planning, direction and co-ordination of the OJD Program and future programs.
Parliamentary reference - Report number #107 - released 26 February 2003