Reports
Actions for Planning and Environment 2018
Planning and Environment 2018
The Auditor-General for New South Wales, Margaret Crawford, released her report today on the NSW Planning and Environment cluster. The report focuses on key observations and findings from the most recent financial audits of these agencies. Unqualified audit opinions were issued for all agencies' financial statements. However, some cultural institutions had challenges valuing collection assets in 2017–18. These issues were resolved before the financial statements were finalised.
This report analyses the results of our audits of financial statements of the Planning and Environment cluster for the year ended 30 June 2018. The table below summarises our key observations.
This report provides parliament and other users of the Planning and Environment cluster agencies' financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations
- service delivery.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making is enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Planning and Environment cluster for 2018.
Observation | Conclusions and recommendations |
2.1 Quality of financial reporting | |
Unqualified audit opinions were issued for all agencies' financial statements. | The quality of financial reporting remains high across the cluster. |
2.2 Key accounting issues | |
There were errors in some cultural institutions' collection asset valuations. | Recommendation: Collection asset valuations could be improved by:
|
2.3 Timeliness of financial reporting | |
Except for two agencies, the audits of cluster agencies’ financial statements were completed within the statutory timeframe. | Issues with asset revaluations delayed the finalisation of two environment and heritage agencies' financial statement audits. |
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.
This chapter outlines our observations and insights from:
- our financial statement audits of agencies in the Planning and Environment cluster for 2018
- the areas of focus identified in the Audit Office work program.
The Audit Office annual work program provides a summary of all audits to be conducted within the proposed time period as well as detailed information on the areas of focus for each of the NSW Government clusters.
Observation | Conclusions and recommendations |
3.1 Internal controls | |
One in five internal control weaknesses reported in 2017–18 were repeat issues. | Delays in implementing audit recommendations can prolong the risk of fraud and error. Recommendation (repeat issue): Management letter recommendations to address internal control weaknesses should be actioned promptly, with a focus on addressing repeat issues. |
One extreme risk was identified relating to the National Art School. The School does not have an occupancy agreement for the Darlinghurst campus. | Lack of formal agreement creates uncertainty over the School's continued occupancy of the Darlinghurst site. The School should continue to liaise with stakeholders to formalise the occupancy arrangement. |
3.2 Information technology controls | |
The controls and governance arrangements when migrating payroll data from the Aurion system to SAP HR system were effective. | Data migration from the Aurion system to SAP HR system had no significant issues. |
The Department can improve controls over user access to SAP system. | The Department needs to ensure the SAP user access controls are appropriate, including investigation of excess access rights and resolving segregation of duties issues. |
3.3 Annual work program | |
Agencies used different benchmarks to monitor their maintenance expenditure. | The cluster agencies under review operate in different industries. As a result, they do not use the same benchmarks to assess the adequacy of their maintenance spend. |
This chapter outlines certain service delivery outcomes for 2017–18. The data on activity levels and performance is provided by cluster agencies. The Audit Office does not have a specific mandate to audit performance information. Accordingly, the information in this chapter is unaudited.
We report this information on service delivery to provide additional context to understand the operations of the Planning and Environment cluster, and to collate and present service information for different segments of the cluster in one report.
In our recent performance audit, ‘Progress and measurement of Premier's Priorities’, we identified 12 limitations of performance measurement and performance data. We recommended the Department of Premier and Cabinet ensure that processes to check and verify data are in place for all relevant agency data sources.
Actions for Newcastle Urban Transformation and Transport Program
Newcastle Urban Transformation and Transport Program
The urban renewal projects on former railway land in the Newcastle city centre are well targeted to support the objectives of the Newcastle Urban Transformation and Transport Program (the Program), according to a report released today by the Auditor-General for New South Wales, Margaret Crawford. The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the government. However, the evidence that the cost of the light rail will be justified by its contribution to the Program is not convincing.
The Newcastle Urban Transformation and Transport Program (the Program) is an urban renewal and transport program in the Newcastle city centre. The Hunter and Central Coast Development Corporation (HCCDC) has led the Program since 2017. UrbanGrowth NSW led the Program from 2014 until 2017. Transport for NSW has been responsible for delivering the transport parts of the Program since the Program commenced. All references to HCCDC in this report relate to both HCCDC and its predecessor, the Hunter Development Corporation. All references to UrbanGrowth NSW in this report relate only to its Newcastle office from 2014 to 2017.
This audit had two objectives:
- To assess the economy of the approach chosen to achieve the objectives of the Program.
- To assess the effectiveness of the consultation and oversight of the Program.
We addressed the audit objectives by answering the following questions:
a) Was the decision to build light rail an economical option for achieving Program objectives?
b) Has the best value been obtained for the use of the former railway land?
c) Was good practice used in consultation on key Program decisions?
d) Did governance arrangements support delivery of the program?
1. The urban renewal projects on the former railway land are well targeted to support the objectives of the Program. However, there is insufficient evidence that the cost of the light rail will be justified by its contribution to Program objectives.
The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the Government. HCCDC, and previously UrbanGrowth NSW, identified and considered options for land use that would best meet Program objectives. Required probity processes were followed for developments that involved financial transactions. Our audit did not assess the achievement of these objectives because none of the projects have been completed yet.
Analysis presented in the Program business case and other planning documents showed that the light rail would have small transport benefits and was expected to make a modest contribution to broader Program objectives. Analysis in the Program business case argued that despite this, the light rail was justified because it would attract investment and promote economic development around the route. The Program business case referred to several international examples to support this argument, but did not make a convincing case that these examples were comparable to the proposed light rail in Newcastle.
The audited agencies argue that the contribution of light rail cannot be assessed separately because it is a part of a broader Program. The cost of the light rail makes up around 53 per cent of the total Program funding. Given the cost of the light rail, agencies need to be able to demonstrate that this investment provides value for money by making a measurable contribution to the Program objectives.
2. Consultation and oversight were mostly effective during the implementation stages of the Program. There were weaknesses in both areas in the planning stages.
Consultations about the urban renewal activities from around 2015 onward followed good practice standards. These consultations were based on an internationally accepted framework and met their stated objectives. Community consultations on the decision to close the train line were held in 2006 and 2009. However, the final decision in 2012 was made without a specific community consultation. There was no community consultation on the decision to build a light rail.
The governance arrangements that were in place during the planning stages of the Program did not provide effective oversight. This meant there was not a single agreed set of Program objectives until 2016 and roles and responsibilities for the Program were not clear. Leadership and oversight improved during the implementation phase of the Program. Roles and responsibilities were clarified and a multi-agency steering committee was established to resolve issues that needed multi-agency coordination.
Recommendations
For future infrastructure programs, NSW Government agencies should support economical decision-making on infrastructure projects by:
- providing balanced advice to decision makers on the benefits and risks of large infrastructure investments at all stages of the decision-making process
- providing scope and cost estimates that are as accurate and complete as possible when initial funding decisions are being made
- making business cases available to the public.
The planned uses of the former railway land align with the objectives of encouraging people to visit and live in the city centre, creating attractive public spaces, and supporting growth in employment in the city. The transport benefits of the activities are less clear, because the light rail is the major transport project and this will not make significant improvements to transport in Newcastle.
The processes used for selling and leasing parts of the former railway land followed industry standards. Options for the former railway land were identified and assessed systematically. Competitive processes were used for most transactions and the required assessment and approval processes were followed. The sale of land to the University of Newcastle did not use a competitive process, but required processes for direct negotiations were followed.
Recommendation
By March 2019, the Hunter and Central Coast Development Corporation should:
- work with relevant stakeholders to explore options for increasing the focus on the heritage objective of the Program in projects on the former railway land. This could include projects that recognise the cultural and industrial heritage of Newcastle.
Consultations focusing on urban renewal options for the Program included a range of stakeholders and provided opportunities for input into decisions about the use of the former railway land. These consultations received mostly positive feedback from participants. Changes and additions were made to the objectives of the Program and specific projects in response to feedback received.
There had been several decades of debate about the potential closure of the train line, including community consultations in 2006 and 2009. However, the final decision to close the train line was made and announced in 2012 without a specific community consultation. HCCDC states that consultation with industry and business representatives constitutes community consultation because industry representatives are also members of the community. This does not meet good practice standards because it is not a representative sample of the community.
There was no community consultation on the decision to build a light rail. There were subsequent opportunities for members of the community to comment on the implementation options, but the decision to build it had already been made. A community and industry consultation was held on which route the light rail should use, but the results of this were not made public.
Recommendation
For future infrastructure programs, NSW Government agencies should consult with a wide range of stakeholders before major decisions are made and announced, and report publicly on the results and outcomes of consultations.
The governance arrangements that were in place during the planning stages of the Program did not provide effective oversight. Project leadership and oversight improved during the implementation phase of the Program.
Multi-agency coordination and oversight were ineffective during the planning stages of the Program. Examples include: multiple versions of Program objectives being in circulation; unclear reporting lines for project management groups; and poor role definition for the initial advisory board. Program ownership was clarified in mid-2016 with the appointment of a new Program Director with clear accountability for the delivery of the Program. This was supported by the creation of a multi-agency steering committee that was more effective than previous oversight bodies.
The limitations that existed in multi-agency coordination and oversight had some negative consequences in important aspects of project management for the Program. This included whole-of-government benefits management and the coordination of work to mitigate impacts of the Program on small businesses.
Recommendations
For future infrastructure programs, NSW Government agencies should:
- develop and implement a benefits management approach from the beginning of a program to ensure responsibility for defining benefits and measuring their achievement is clear
- establish whole-of-government oversight early in the program to guide major decisions. This should include:
- agreeing on objectives and ensuring all agencies understand these
- clearly defining roles and responsibilities for all agencies
- establishing whole-of-government coordination for the assessment and mitigation of the impact of major construction projects on businesses and the community.
By March 2019, the Hunter and Central Coast Development Corporation should update and implement the Program Benefits Realisation Plan. This should include:
- setting measurable targets for the desired benefits
- clearly allocating ownership for achieving the desired benefits
- monitoring progress toward achieving the desired benefits and reporting publicly on the results.
Appendix one - Response from agencies
Appendix two - About the audit
Appendix three - Performance auditing
Parliamentary reference - Report number #310 - released 12 December 2018
Actions for Internal Controls and Governance 2018
Internal Controls and Governance 2018
The Auditor-General for New South Wales Margaret Crawford found that as NSW state government agencies’ digital footprint increases they need to do more to address new and emerging information technology (IT) risks. This is one of the key findings to emerge from the second stand-alone report on internal controls and governance of the 40 largest NSW state government agencies.
This report analyses the internal controls and governance of the 40 largest agencies in the NSW public sector for the year ended 30 June 2018.
This report covers the findings and recommendations from our 2017–18 financial audits that relate to internal controls and governance at the 40 largest agencies (refer to Appendix three) in the NSW public sector.
This report offers insights into internal controls and governance in the NSW public sector
This is our second report dedicated to internal controls and governance at NSW State Government agencies. The report provides insights into the effectiveness of controls and governance processes in the NSW public sector by:
- highlighting the potential risks posed by weaknesses in controls and governance processes
- helping agencies benchmark the adequacy of their processes against their peers
- focusing on new and emerging risks, and the internal controls and governance processes that might address those risks.
Without strong governance systems and internal controls, agencies increase the risks associated with effectively managing their finances and delivering services to citizens. The way agencies deliver services increasingly relies on contracts and partnerships with the private sector. Many of these arrangements deliver front line services, but others provide less visible back office support. For example, an agency may rely on an IT service provider to manage a key system used to provide services to the community. The contract and service level agreements are only truly effective where they are actively managed to reduce risks to continuous quality service delivery, such as interruptions caused by system outages, cyber security attacks and data security breaches.
Our audits do not review all aspects of internal controls and governance every year. We select a range of measures, and report on those that present heightened risks for agencies to mitigate. This report divides these into the following five areas:
- Internal control trends
- Information technology (IT), including IT vendor management
- Transparency and performance reporting
- Management of purchasing cards and taxis
- Fraud and corruption control.
The findings in this report should not be used to draw conclusions on the effectiveness of individual agency control environments and governance arrangements. Specific financial reporting, controls and service delivery comments are included in the individual 2018 cluster financial audit reports, which will be tabled in Parliament from November to December 2018.
The focus of the report has changed since last year
Last year's report topics included asset management, ethics and conduct, and risk management. We are reporting on new topics this year. We plan to introduce new topics and re-visit our previous topics in subsequent reports on a cyclical basis. This will provide a baseline against which to measure the NSW public sectors’ progress in implementing appropriate internal controls and governance processes to mitigate existing, new and emerging risks in the public sector.
Agencies selected for the volume account for 95 per cent of the state's expenditure
While we have covered only 40 agencies in this report, those selected are a large enough group to identify common issues and insights. They represent about 95 per cent of total expenditure for all NSW public sector agencies.
Internal controls are processes, policies and procedures that help agencies to:
- operate effectively and efficiently
- produce reliable financial reports
- comply with laws and regulations
- support ethical government.
This chapter outlines the overall trends for agency controls and governance issues, including the number of findings, level of risk and the most common deficiencies we found across agencies. The rest of this volume presents this year’s controls and governance findings in more detail.
Observation | Conclusions and recommendations |
---|---|
2.1 High risk findings | |
We found six high risk findings (seven in 2016–17), one of which was repeated from both last year and 2015–16. | Recommendation: Agencies should reduce risk by addressing high risk internal control deficiencies as a priority. |
2.2 Common findings | |
We found several internal controls and governance findings common to multiple agencies. | Conclusion: Central agencies or the lead agency in a cluster can play a lead role in helping ensure agency responses to common findings are consistent, timely, efficient and effective. |
2.3 New and repeat findings | |
Although internal control deficiencies decreased over the last four years, this year has seen a 42 per cent increase in internal control deficiencies. | The increase in new IT control deficiencies and repeat IT control deficiencies signifies an emerging risk for agencies. |
IT control deficiencies feature in this increase, having risen by 63 per cent since last year. The number of repeat IT control deficiencies has doubled and is driven by the increasing digital footprint left by agencies as government prioritises on-line interfaces with citizens, and the number of transactions conducted through digital channels increases |
Recommendation: Agencies should reduce IT risks by:
|
Government agencies’ financial reporting is now heavily reliant on information technology (IT). IT is also increasingly important to the delivery of agency services. These systems often provide the data to help monitor the efficiency and effectiveness of agency processes and services they deliver. Our audits reviewed whether agencies have effective controls in place to manage both key financial systems and IT service contracts.
Observation | Conclusions and recommendations |
---|---|
3.1 Management of IT vendors | |
Contract management framework Although 87 per cent of agencies have a contract management policy to manage IT vendors, one fifth require review. |
Conclusion: Agencies can more effectively manage IT vendor contracts by developing policies and procedures to ensure vendor management frameworks are kept up to date, plans are in place to manage vendor performance and risk, and compliance with the framework is monitored by:
|
Contract risk management Forty-one per cent of agencies are not using contract management plans and do not assess contract risks. Half of the agencies that did assess contract risks, had not updated the risk assessments since the commencement of the contract. |
Conclusion: Instead of applying a 'set and forget' approach in relation to management of contract risks, agencies should assess risk regularly and develop a plan to actively manage identified risks throughout the contract lifecycle - from negotiation and commencement, to termination. |
Performance management Only 24 per cent of agencies sought assurance about the accuracy of vendor reporting against KPIs, yet sixty-seven per cent of the IT contracts allow agencies to determine performance based payments and/or penalise underperformance. |
Conclusion: Agencies are monitoring IT vendor performance, but could improve outcomes and more effectively manage under-performance by:
|
Transitioning services Where IT vendor contracts do make provision for transitioning-out, only 28 per cent of agencies have developed a transitioning-out plan with their IT vendor. |
Conclusion: Contract transition/phase out clauses and plans can mitigate risks to service disruption, ensure internal controls remain in place, avoid unnecessary costs and reduce the risk of 'vendor lock-in'. |
Contract Registers Eleven out of forty agencies did not have a contract register, or have registers that are not accurate and/or complete. |
Conclusion: A contract register helps to manage an agency’s compliance obligations under the Government Information (Public Access) Act 2009 (the GIPA Act). However, it also helps agencies more effectively manage IT vendors by:
Recommendation: Agencies should ensure their contract registers are complete and accurate so they can more effectively govern contracts and manage compliance obligations. |
3.2 IT general controls | |
Governance Ninety-five per cent of agencies have established policies to manage key IT processes and functions within the agency, with ten per cent of those due for review. |
Conclusion: Regular review of IT policies ensures risks are considered and appropriate strategies and procedures are implemented to manage these risks on a consistent basis. An absence of policies can lead to ad-hoc responses to risks, and failure to consider emerging IT risks and changes to agency IT environments. |
User access administration
|
Recommendation: Agencies should strengthen the administration of user access to prevent inappropriate access to key systems. |
Privileged access Forty per cent of agencies do not periodically review logs of the activities of privileged users to identify suspicious or unauthorised activities. |
Recommendation: Agencies should:
|
Password controls Twenty-three per cent of agencies did not comply with their own policy on password parameters. |
Recommendation: Agencies should ensure IT password settings comply with their password policies. |
Program changes Fifteen per cent of agencies had deficient IT program change controls mainly related to segregation of duties and authorisation and testing of IT program changes prior to deployment. |
Recommendation: Agencies should maintain appropriate segregation of duties in their IT functions and test system changes before they are deployed. |
This chapter outlines our audit observations, conclusions and recommendations from our review of how agencies reported their performance in their 2016–17 annual reports. The Annual Reports (Statutory Bodies) Regulation 2015 and Annual Reports (Departments) Regulation 2015 (annual reports regulation) currently prescribes the minimum requirements for agency annual reports.
Observation | Conclusion or recommendation |
4.1 Reporting on performance | |
Only 57 per cent of agencies linked reporting on performance to their strategic objectives. The use of targets and reporting performance over time was limited and applied inconsistently. |
Conclusion: There is significant disparity in the quality and consistency of how agencies report on their performance in their annual reports. This limits the reliability and transparency of reported performance information. Agencies could improve performance reporting by clearly linking strategic objectives to reported outcomes, and reporting on performance against targets over time. NSW Treasury may need to provide more guidance to agencies to support consistent and high-quality performance reporting in annual reports. |
There is no independent assurance that the performance metrics agencies report in their annual reports are accurate. Prior performance audits have noted issues related to the collection of performance information. For example, our 2016 Report on Red Tape Reduction highlighted inaccuracies in how the dollar-value of red tape reduction had been reported. |
Conclusion: The ability of Parliament and the public to rely on reported information as a relevant and accurate reflection of an agency's performance is limited. The relevance and accuracy of performance information is enhanced when:
|
4.2 Reporting on reports | |
Agency reporting on major projects does not meet the requirements of the annual reports regulation. Forty-seven per cent of agencies did not report on costs to date and estimated completion dates for major works in progress. Of the 47 per cent of agencies that reported on major works, only one agency reported detail about significant cost overruns, delays, amendments, deferments or cancellations. |
NSW Treasury produce an annual report checklist to help agencies comply with their annual report obligations. Recommendation: Agencies should comply with the annual reports regulation and report on all mandatory fields, including significant cost overruns and delays, for their major works in progress. |
The information the annual reports regulation requires agencies to report deals only with major works in progress. There is no requirement to report on completed works. Sixteen of 30 agencies reported some information on completed major works. |
Conclusion: Agencies could improve their transparency if they reported, or were required to report:
|
This chapter outlines our audit observations, conclusions and recommendations, arising from our review of agency preventative and detective controls over purchasing card and taxi use for 2017–18.
Observation | Conclusion or recommendation |
5.1 Management of purchasing cards | |
Volume of credit card spend Purchasing card expenditure has increased by 76 per cent over the last four years in response to a government review into the cost savings possible from using purchasing cards for low value, high volume procurement. |
Conclusion: The increasing use of purchasing cards highlights the importance of an effective framework for the use and management of purchasing cards. |
Policy framework We found all agencies that held purchasing cards had a policy in place, but 26 per cent of agencies have not reviewed their purchasing card policy by the scheduled date, or do not have a scheduled revision date stated within their policy. |
Recommendation: Agencies should mitigate the risks associated with increased purchasing card use by ensuring policies and purchasing card frameworks remain current and compliant with the core requirements of TPP 17–09 'Use and Management of NSW Government Purchasing Cards'. |
Preventative controls We found that:
|
Agencies have designed and implemented preventative controls aimed at deterring the potential misuse of purchasing cards. Conclusion: Further opportunities exist for agencies to better control the use of purchasing cards, such as:
|
Detective controls Major reviews, such as data analytics (29 per cent of agencies) and independent spot checks (49 per cent of agencies) are not widely used. |
Agencies have designed and implemented detective controls aimed at identifying potential misuse of purchasing cards. Conclusion: More effective monitoring using purchasing card data can provide better visibility over spending activity and can be used to:
|
5.2 Management of taxis | |
Policy framework Thirteen per cent of agencies have not developed and implemented a policy to manage taxi use. In addition:
|
Conclusion: Agencies can promote savings and provide more options to staff where their taxi use policies:
|
Detective controls All agencies approve taxi expenditure by expense reimbursement, purchasing card and Cabcharge, and have implemented controls around this approval process. However, beyond this there is minimal monitoring and review activity, such as data monitoring, independent spot checks or internal audit reviews. |
Conclusion: Taxi spend at agencies is not significant in terms of its dollar value, but it is significant from a probity perspective. Agencies can better address the probity risk by incorporating taxi use into a broader purchasing card or fraud monitoring program. |
Fraud and corruption control is one of the 17 key elements of our governance lighthouse. Recent reports from ICAC into state agencies and local government councils highlight the need for effective fraud control and ethical frameworks. Effective frameworks can help protect an agency from events that risk serious reputational damage and financial loss.
Our 2016 Fraud Survey found the NSW Government agencies we surveyed reported 1,077 frauds over the three year period to 30 June 2015. For those frauds where an estimate of losses was made, the reported value exceeded $10.0 million. The report also highlighted that the full extent of fraud in the NSW public sector could be higher than reported because:
- unreported frauds in organisations can be almost three times the number of reported frauds
- our 2015 survey did not include all NSW public sector agencies, nor did it include any NSW universities or local councils
- fraud committed by citizens such as fare evasion and fraudulent state tax self-assessments was not within the scope of our 2015 survey
- agencies did not estimate a value for 599 of the 1,077 (56 per cent) reported frauds.
Commissioning and outsourcing of services to the private sector and the advancement of digital technology are changing the fraud and corruption risks agencies face. Fraud risk assessments should be updated regularly and in particular where there are changes in agency business models. NSW Treasury Circular TC18-02 NSW Fraud and Corruption Control Policy now requires agencies develop, implement and maintain a fraud and corruption control framework, effective from 1 July 2018.
Our Fraud Control Improvement Kit provides guidance and practical advice to help organisations implement an effective fraud control framework. The kit is divided into ten attributes. Three key attributes have been assessed below; prevention, detection and notification systems.
This chapter outlines our audit observations, conclusions and recommendations, arising from our review of agency fraud and corruption controls for 2017–18.
Observation | Conclusion or recommendation |
6.1 Prevention systems | |
Prevention systems Only 54 per cent of agencies have an employment screening policy and all agencies have IT security policies, but gaps in IT security controls could undermine their policies. |
Conclusion: Most agencies have implemented fraud prevention systems to reduce the risk of fraud. However poor IT security along with other gaps in agency prevention systems, such as employment screening practices heightens the risk of fraud and inappropriate use of data. Agencies can improve their fraud prevention systems by:
|
Twenty-three per cent of agencies were not performing fraud risk assessments and some agency fraud risk assessments may not be as robust as they could be. | Conclusion: Agencies' systems of internal controls may be less effective where new and emerging fraud risks have been overlooked, or known weaknesses have not been rectified. |
6.2 Detection systems | |
Detection systems Several agencies reported they were developing a data monitoring program, but only 38 per cent of agencies had already implemented a program. |
Studies have shown data monitoring, whereby entire populations of transactional data are analysed for indicators of fraudulent activity, is one of the most effective methods of early detection. Early detection decreases the duration a fraud remains undetected thereby limiting the extent of losses. Conclusion: Data monitoring is an effective tool for early detection of fraud and is more effective when informed by a comprehensive fraud risk assessment. |
6.3 Notification systems | |
Notification system All agencies have notification systems for reporting actual or suspected fraud and corruption. Most agencies provide multiple reporting lines, provide training and publicise options for staff to report actual or suspected fraud and corruption. |
Conclusion: Training staff about their obligations and the use of fraud notification systems promotes a fraud-aware culture |
Actions for Planning and Environment 2017
Planning and Environment 2017
The following report highlights results of financial audits of agencies in the Planning and Environment cluster. The report focuses on key observations and findings from the most recent audits of these agencies.
The audits were completed for most agencies in the cluster and unqualified audit opinions issued. Issues identified during the financial statement audits of seven small agencies delayed their finalisation beyond the statutory deadline, and six of these remain incomplete. Apart from these small agencies, the quality of financial reporting across the cluster remained at a high standard.
This report provides Parliament and others with the audit results, observations and recommendations for Planning and Environment cluster agencies. The report has been structured into two chapters focussing on financial reporting and controls and service delivery.
The Planning and Environment cluster plays a role in ensuring each community across New South Wales receives the services and infrastructure it needs.
This chapter outlines our audit observations and recommendations related to financial reporting and controls of Planning and Environment cluster agencies for 2016–17.
Observation | Conclusion or recommendation |
2.1 Quality of financial reporting |
|
Unqualified audit opinions were issued for 39 of the 45 cluster agencies' financial statements. |
Issues identified during the financial statement audits of seven smaller agencies delayed their completion. Six audits remain incomplete at the date of this report. Apart from these seven small agency audits, the quality of financial reporting across the cluster remained at a high standard. |
2.2 Timeliness of financial reporting |
|
Seven agencies' financial statement audits were not completed by the statutory deadline with six audits incomplete at the date of this report. |
Issues identified during the financial statement audits of seven smaller agencies delayed their finalisation beyond the statutory deadline. These agencies would benefit from performing additional early close procedures in future reporting periods. |
2.3 Financial and sustainability analysis |
|
Water and Electricity utility agencies continue to operate with low liquidity ratios. |
A liquidity ratio below one is an indicator that an entity may not be able to pay its debts as and when they fall due. Whilst liquidity ratios were below one, utility agencies demonstrated they can continue to support ongoing operations due to:
|
2.5 Internal controls |
|
One in six internal control weaknesses reported in 2016–17 were repeat issues. |
Delays in implementing audit recommendations can prolong the risk of fraud and error. Recommendation (repeat issue): anagement letter recommendations to address internal control weaknesses should be actioned promptly, with a focus on addressing repeat issues. |
Nine of these internal control weaknesses related to the creation, modification, deletion and review of user access to financial systems. |
These control weaknesses may compromise the integrity and security of financial data. Recommendation (repeat issue): Management of user administration over financial systems should be strengthened to prevent inappropriate access to financial information. |
This chapter outlines our audit observations, conclusions and recommendations relating to service delivery for 2016–17.
Observation | Conclusion or recommendation |
3.1 Premier's and State priorities |
|
The Planning and Environment cluster is responsible for delivering five Premier's and State priorities. |
One priority target was achieved in 2016–17, two targets are on track to be achieved and progress towards one target slowed. Progress against one target cannot be determined. |
3.2 Planning |
|
Housing Completion |
|
There were 63,506 housing completions in 2016–17. This was 4.1 per cent above the Premier’s priority target of delivering 61,000 housing completions per year. |
The Australian Bureau of Statistics data shows the housing completions target was achieved in 2016–17. |
Housing supply |
|
The number of approvals for new houses in 2016–17 was 72,472 against the State priority target of more than 50,000 approvals per year. |
The Australian Bureau of Statistics data indicates the housing approvals target was achieved in 2016–17. |
Major project assessment |
|
State significant developments are not clearly defined for the purposes of reporting against the State priority target. | The Department of Planning and Environment will clarify with the Department of Premier and Cabinet which developments are captured by the State priority target. |
The Department of Planning and Environment’s data shows the time taken to assess complex State significant developments increased by 16 per cent in 2016–17 while the time taken to assess less complex developments reduced by 20 per cent. | The Department of Planning and Environment considers it is on track to meet the State priority target of halving the time taken to assess State significant developments, despite uncertainty over the target measure. |
Housing acceleration fund |
|
Program business cases were not developed for projects in Housing Acceleration Fund Rounds 1 to 4. The Department advised a program business case will be developed for Housing Acceleration Fund Round 5 projects. |
A program business case is necessary to ensure related projects are evaluated, managed and coordinated effectively. |
A benefit realisation review process has not yet been approved for Housing Acceleration Fund projects. The Department of Planning and Environment advised it is developing a benefit realisation review process. |
A benefit realisation review process is necessary to determine whether funded projects achieved intended outcomes. |
Greater Sydney Commission |
|
The Greater Sydney Commission forecasts a further 725,000 dwellings in the greater Sydney region will be required up to 2036 to meet housing demand. | In response to population growth, the Commission has set a five-year housing supply target of 189,100 houses across the five Greater Sydney Commission districts. |
ePlanning system |
|
The Department of Planning and Environment did not perform a benefit realisation review for phase one of the ePlanning project. It has committed to performing a benefit realisation review after completion of phase two in 2018. | It cannot be determined if phase one of the project delivered expected outcomes as a benefit realisation review was not performed. |
3.3. Environment and Heritage |
|
Litter volume in New South Wales was 6.6 litres per 1,000 square metres in 2016–17, an increase of 16 per cent from the prior year. This is above the Premier's priority litter volume target of 4.2 litres per 1,000 square metres by 2020. | The Environment Protection Authority's data indicates the progress towards the target of reducing the volume of litter by 40 per cent by 2020 has slowed. |
The NSW Government plans to invest $240 million to facilitate strategic biodiversity conservation on private land. | Performance measures have not yet been developed for the private land conservation program. |
3.4 Water |
|
IPART reduced water usage charges for most Sydney Water Corporation customers in 2016–17. | Water usage prices in New South Wales compare favourably to larger water utilities in other jurisdictions. |
Hunter Water Corporation's water recycling and water conservation performance has been stable over recent years. The volume of Sydney Water Corporation’s recycled water reduced by 12 per cent in 2016–17 compared to the previous year. |
Sydney Water Corporation experienced reduced industry demand for recycled water. Several large industrial customers relocated away from Sydney. |
3.5 Arts and culture |
|
A State priority target is to increase overall attendance at cultural venues and events in New South Wales by 15 per cent from 2014–15 levels by 2019. | The Department of Planning and Environment's data indicates overall attendance increased by 16 per cent in 2015–16, although attendance fluctuated across individual venues and events. This indicates progress towards achieving the overall target by 2019. |
Actions for Agency compliance with NSW Government travel policies
Agency compliance with NSW Government travel policies
Overall, agencies materially complied with NSW Government travel policies.
However, the Auditor-General found some agencies:
- did not always book official travel through the approved supplier
- had weaknesses in their travel approval processes
- had travel policies that were inconsistent with the NSW Government policy
- did not adequately manage their travel records.
We asked the 15 participating agencies to complete a self assessment of the processes they have implemented to comply with the new policy. The key observations are summarised below.
Actions for State Finances 2017
State Finances 2017
Total State Sector Accounts received an unqualified audit opinion for the fifth consecutive year.
There was a $5.7 billion State budget surplus and continued investment in new infrastructure, in part funded by the long-term leases of Ausgrid and Endeavour Energy assets. This report also comments on key accounting matters, including the correction of some previously reported balances and the first time reporting of combined Cabinet members’ compensation in the Total State Sector Accounts.
Pursuant to the Public Finance and Audit Act 1983, I present my Report on State Finances 2017.
You will note that the format of this report has changed from previous years.
The intent of this change is to draw attention to the key matters that have been the focus of our audit and highlight significant factors that have contributed to the outcome.
First, it is pleasing to report once again that I issued a clear audit opinion on the State’s consolidated financial statements. This outcome demonstrates the Government’s continued focus on the quality of financial reporting across the NSW public sector.
High quality financial management and reporting are crucial to properly inform the public and build community confidence in our system of government.
The Treasury’s Financial Management Transformation program also aims to improve financial governance, budgeting and reporting arrangements across the sector. My Office is working collaboratively with The Treasury on reforms to reduce the burden of reporting, without weakening established safeguards.
The reforms should include measures to provide independent assurance of the budget process, of outcome reporting by agencies, and the power to “follow the dollar” given the increasing use of non-government organisations to deliver Government programs.
This Report also highlights another year of strong financial performance. The State’s budget result was a $5.7 billion surplus, and investment in new infrastructure has continued, in part funded by the long-term leases of Ausgrid and Endeavour Energy assets.
Finally, could I take this opportunity to thank the staff of The Treasury for the way they approached this audit. Our partnership is critical to ensuring NSW is an exemplar of quality financial management and reporting.
Margaret Crawford
24 October 2017
A clear audit opinion on the State’s consolidated financial statements was issued.
Timely and accurate financial reporting is essential for informed decision making, effective management of public funds and enhancing public accountability.
This year’s clear audit opinion reflects the Government’s continued efforts to improve the quality of financial reporting across the NSW public sector.
Since the introduction of ‘early close procedures’ in 2011-12, the number of significant errors in financial statements of agencies has generally fallen largely due to identifying and resolving complex accounting issues early. Agencies’ 2016-17 financial statements submitted for audit contained nine errors exceeding $20 million. All errors were subsequently corrected in the individual agencies financial statements.
Agencies should continue to respond to key accounting issues as soon as they are identified. Where issues are identified, accounting position papers should be prepared for consideration by the Audit Office, their Audit and Risk Committee members, and when relevant, The Treasury.
The State addressed the following key accounting matters during 2016-17.
The State recognised rail tunnels and earthworks valued at $8.5 billion.
Some rail tunnels and earthworks have never been valued by the State. These include the City Circle, the country rail network and other tunnels and earthworks built before the year 2000. Some of these tunnels and earthworks date back to the early 1900s.
For many years, the State did not account for these assets as they believed that their value could not be reliably measured. This year an independent valuer was engaged to perform a comprehensive valuation. The methodology used demonstrated
that the assets could have been reflected in the financial statements earlier.
The State recorded an additional $8.5 billion to correct the value of infrastructure assets at 1 July 2016.
Cabinet member’s compensation and related party transactions were reviewed.
Due to changes in Accounting Standards, the State had to consider 'related party information' in the financial statements. Previously this only applied to for-profit entities.
This year, requirements to report related party information extended to members of Cabinet, considered to be “key management personnel” of the State, as defined by Accounting Standards.
The Treasury implemented a process to assess and report Cabinet member’s compensation, and transactions between Cabinet members and/or their close family members, and government agencies.
Collectively, Cabinet members’ remuneration was $8.8 million, which was mainly salaries and allowances, and $3.5 million of non-monetary benefits such as security and drivers. The Treasury determined there were no other specific “related party” transactions or balances that required disclosure in the State’s financial statements.
Information system limitations continue at TAFE NSW.
TAFE NSW has experienced ongoing issues with its student administration system.
TAFE NSW has again implemented additional processes to verify the accuracy and completeness of revenue from sales of goods and services.
TAFE NSW expects to spend up to $89 million on a new information system to address these issues. Modules of the new student enrolment system are expected to be in place for the 2018 enrolment period.
Restatements relating to the General Government Sector's investment in the commercial sector.
The State corrected two previously reported balances relating to the General Government Sector’s investment in the commercial sector.
Accounting Standards require the General Government Sector to effectively store gains or losses related to its investment in the commercial sector in reserves until the investment is derecognised.
When these investments are disposed of, the cumulative gains and losses must be cleared and recognised in the operating result. However, the Government had previously cleared the cumulative gains and losses directly to Accumulated Funds within equity.
To comply with Accounting Standards, a total of $6 billion previously reported as a movement in equity at 30 June 2016, has now been corrected to the operating result.
In addition, Accounting Standards only allow gains or losses on its investments to be stored in reserves. In past years, the State recognised all changes in the value of its investment in Available for Sale Reserves, including the capital contributed to establish the State’s investment. In 2016-17, a total of $23.4 billion of contributed capital was corrected to accumulated funds at 1 July 2015.
The State’s budget result was a $5.7 billion surplus, $2.0 billion higher than the budget estimate.
The Total State Sector comprises 310 entities controlled by the NSW Government.
Of the total, the General Government Sector comprises 215 entities that provide goods and services not directly paid for by consumers.
The non-General Government Sector comprises 95 Government businesses that provide goods and services such as water and electricity, or financial services.
A principal measure of a Government’s overall performance is its Net Operating Balance, or Budget Result. The Net Operating Balance reports the difference between the cost of General Government service delivery and the revenue earned to fund these sectors.
The State has recorded budget surpluses and exceeded the original budget result in nine of the last ten years.
The State maintained its AAA credit rating.
The object of the Act is to maintain the AAA credit rating.
NSW’s finances are managed in alignment with the Fiscal Responsibility Act 2012 (the Act).
The Act established the framework for fiscal responsibility and strategy needed to protect the State’s AAA credit rating and service delivery to the people of NSW.
The purpose of maintaining the AAA credit rating is to reduce the cost of, and ensure the broadest access to, borrowings.
A triple-A credit rating also helps maintain business and consumer confidence so economic activity and employment are sustained. The legislation sets out targets and principles for financial management to achieve this.
New South Wales has credit ratings of AAA/Negative from Standard & Poor’s and Aaa/Stable from Moody’s Investors Service.
The fiscal targets for achieving this objective are:
General Government expenditure growth is lower than long term revenue growth.
General Government expenditure growth was 4.2 per cent in 2016-17, below the long-term revenue growth of 5.6 per cent.
Eliminating unfunded superannuation liabilities by 2030.
The Act sets a target of eliminating unfunded defined benefit superannuation liabilities by 2030. The State’s net superannuation liability was $58.6 billion at 30 June 2017 ($71.2 billion at 30 June 2016).
The Government predicts the 2030 target will be achieved. The State’s funding plan is to contribute amounts escalated by five per cent each year so the schemes will be fully funded by 2030. In 2016-17, the State made employer contributions of $1.5 billion, which is largely consistent with contributions over the past five years.
The liability values in the graph below do not reflect the values recorded in the Total State Sector Accounts. For financial reporting purposes, Accounting Standards (AASB 119 Employee Benefits) require the State to discount its superannuation liability using the government bond rate (refer to page 10 of this report).
The relevant government bond rate in the current economic climate is 2.62 per cent.
The State’s target for the unfunded superannuation liability is measured using AASB 1056 Superannuation Entities. This is because it adopts a measurement basis that reflects expected earnings on fund assets, which are currently between 5.9 and 7.4 per cent. Using these rates, the liability is $15.0 billion at 30 June 2017 ($16.1 billion at 30 June 2016). The unfunded liability is $2.4 billion less than when the Act was introduced.
The State’s assets grew by $31.6 billion during 2016-17 to $409 billion.
Valuing the State’s physical assets.
When we audit the financial statements, we focus on areas we consider as higher risk. These areas are often complex, and require the use of estimates and judgements.
The State has $307.2 billion of physical assets measured at fair value in accordance with Australian Accounting Standards. Fair value calculations are inherently complex and sensitive to assumptions and estimates, increasing the risk these assets are incorrectly valued.
In our audits, we assess the reasonableness and appropriateness of assumptions used in valuing physical assets. This includes obtaining an understanding of the valuation methodologies applied and judgements made. We also review the completeness of asset registers, and the mathematical accuracy of valuation models.
Net movements between years includes additions, disposals, depreciation and valuations. This year, valuations of physical assets added $16.2 billion to the State’s assets, comprising:
-
Transport for NSW and Railcorp $8.5 billion
-
New South Wales Land and Housing Corporation $4.8 billion
-
Roads and Maritime Services $930 million
-
Crown Entity $400 million.
The State’s financial assets increased $27.5 billion in 2016-17
The State’s financial assets have increased by 88 per cent over the past four years. In 2016-17, financial assets increased primarily due to proceeds from the sale of government assets and businesses.
The Government implemented reforms to better use the State’s financial assets. A key element was the creation of an Asset and Liability Committee (ALCO) to provide advice on ways to improve balance sheet management.
Since the creation of the ALCO, reforms include:
-
Establishment of the New South Wales Infrastructure Future Fund (NIFF). The net proceeds from the State’s asset recycling program are invested into the NIFF, which is managed by TCorp, with a balance of $14.6 billion by 30 June 2017. Funds raised are invested through the NIFF until the Government requires them for critical infrastructure projects that are part of the Restart NSW and Rebuilding NSW program of works. ALCO and TCorp provide advice on the NIFF’s performance and management
-
Establishment of the Social and Affordable Housing Fund ($1.1 billion at 30 June 2017). ALCO oversees the Fund to ensure an appropriate investment approach that will maintain funding certainty for new social and affordable housing stock
-
Cash and liquidity management reforms to centralise cash previously held by agencies in the Treasury Banking System. This reform is designed to ensure agencies have adequate levels of liquidity but with surplus funds invested centrally for better returns.
The State’s liabilities decreased by $13.1 billion during 2016-17 to $182 billion.
Valuing the State’s liabilities relies on an actuarial assessment.
Nearly half of the State’s liabilities relate to its employees. This includes unfunded superannuation, and employee benefits, such as long service and recreation leave.
Valuation of these obligations is subject to complex estimation techniques and significant judgements. Small changes in assumptions can materially impact the financial statements.
We address the risk associated with auditing these balances:
-
using actuarial specialists
-
testing controls around underlying employee data used in data models, and testing the accuracy of the calculations
-
evaluating assumptions applied in calculating employee entitlements such as the discount rate and the probability of long service leave vesting conditions being met.
The State’s superannuation obligations reduced by $12.6 billion in 2016-17.
The State’s $58.6 billion superannuation liability represents obligations for past and present employees, less the value of assets set aside to meet those obligations. The superannuation liability decreased from $71.2 billion to $58.6 billion, largely due to an increase in the discount rate from 1.99 per cent to 2.62 per cent. This alone reduced the liability by $9.2 billion
The State’s borrowings totalled $70.6 billion at 30 June 2017.
The State’s borrowings totalled $70.6 billion at 30 June 2017, $9.5 billion less than the previous year. This was largely due to the repayment of borrowings when the assets of Ausgrid and Endeavour Energy were leased to the private sector.
TCorp issues bonds to raise funds for NSW Government agencies. The bonds are actively traded in financial markets providing price transparency and liquidity to public sector borrowers and institutional investors. All TCorp bonds are guaranteed by the NSW Government.
The Government manages its debt liabilities through its balance sheet management strategy. The strategy extends to TCorp, which applies an active risk management strategy to the Government’s debt portfolio.
General Government Sector debt is being restructured by replacing shorter-term debt with longer-term debt. This lengthens the portfolio to better match liabilities with the funding requirements of infrastructure assets and reduces refinancing risks. It also allows the Government to take advantage of the low interest rate environment.
The State recorded revenue of $83.5 billion in 2016-17, an increase of $5.3 billion from 2015-16.
The State’s results are underpinned by revenue growth in taxation, fees and fines.
Taxation, fees, fines and other revenue comprises $30.5 billion of taxation ($28.7 billion in 2015-16) and $5.3 billion of fees, fines and other revenue ($4.6 billion).
Tax revenue for the Total State Sector increased by $1.8 billion, or 6.4 per cent compared to 2015-16, primarily due to:
-
one-off business asset sales and lease transactions, including $718 million in transfer duty from the Ausgrid and Endeavour Energy lease transactions
-
$385 million increase in payroll tax from growth in NSW employment and average employee compensation
-
a $426 million increase in land taxes.
Growth in stamp duty is expected to slow over the next 4 years.
General Government Sector stamp duties have increased from $6.2 billion in 2012-13 to $11.5 billion in 2016-17, an annual average growth rate of 16.5 per cent. The Government’s budget forecasts the growth in stamp duties to decline, to an average annual growth rate of 2.6 per cent between 2016-17 and 2020-21.
The State received Commonwealth grants and subsidies of $30.8 billion in 2016-17.
The State received $30.8 billion from the Commonwealth Government in 2016-17, $1.6 billion more than in 2015-16. This was primarily due to transaction based asset recycling grants of $1.0 billion and a $720 million increase in national land transport grants. This increase was offset by a $435 million decrease in General Purpose Grants, which mainly comprises New South Wales’ share of the Goods and Services Tax (GST).
The State spent $79.4 billion in 2016-17 to deliver services to the community, an increase of $3.9 billion from 2015-16.
Overall expenses increased 5.2 per cent from last year. Most of the increase was due to higher employee costs and operating costs.
Total salaries and wages increased by 4.2 per cent from 2015-16.
Total salaries and wages increased to $30 billion from $28.8 billion in 2015-16. The Government wages policy aims to limit the growth in remuneration and other employee costs to no more than 2.5 per cent per annum.
Operating expenses increased by 12.4 per cent from 2015-16.
Within operating expenses, payments for supplies, services and other expenses increased, in part, due to the State:
-
reacquiring mining licenses worth $482 million and additional land remediation costs of $101 million
-
spending more on health including additional drug supplies relating to Hepatitis C.
State spend on transport and communications increased by 68.1 per cent since 2012-13.
While spending on health and education remain the largest functional areas provided by Government, expenditure on transport and communication increased, on average, by 13.9 per cent annually between 2012-13 and 2016-17. This increase reflects the Government’s investment in transport infrastructure such as the Sydney Metro and Westconnex. Over the same period, spending on health increased by $3.9 billion.
Expenditure on fuel and energy has decreased by an average of 44.7 per cent since 2012-13, reflecting the State’s leases of electricity network assets.
In 2011, the Government established Restart NSW to fund high priority infrastructure projects.
Restart NSW projects are primarily funded from the proceeds from the asset recycling program enabling Government to deliver new infrastructure investment.
Restart NSW provides funding for the delivery of Rebuilding NSW, which is the Government’s 10-year plan to invest $20 billion in new infrastructure.
The State finalised long-term leases of Ausgrid and Endeavour Energy assets.
In June 2017, the Government finalised its long-term lease of 50.4 per cent of Endeavour Energy. This transaction follows on from the long-term leases of TransGrid in December 2015 and 50.4 per cent of Ausgrid in December 2016. Net proceeds of $15.0 billion were paid into Restart NSW relating to these transactions.
The Government also finalised an arrangement for the private sector to provide land titling and registry services to the public for 35 years. The State, through Restart NSW, received an upfront payment of $2.6 billion from the new operator.
Restart NSW is funding $29.8 billion of new infrastructure.
The Government has detailed its plan to invest $20 billion into the Rebuilding NSW plan from Restart NSW.
At 30 June 2017, around $2.9 billion has already been spent on Rebuilding NSW projects from Restart NSW, with a further $9 billion included in the budget aggregates. The Government has also earmarked a further $8.1 billion in Restart NSW for future projects.
The most significant project is the Sydney Metro. The Government has committed $7.0 billion from Restart NSW to build a 30-kilometre metro line, linking Sydney Metro Northwest at Chatswood, through new stations in the lower North Shore, the Sydney CBD and southwest to Bankstown. At 30 June 2017, $2.4 billion has been spent on this project from Restart NSW.
Other significant projects funded by Restart NSW include a $1.8 billion contribution to WestConnex and reserved funding of $1 billion towards the State’s Major Stadia Network program.
The Treasury initiated the Financial Management Transformation (FMT) program with the aim of changing and improving financial governance, budgeting and reporting arrangements of the New South Wales public sector.
FMT aims to deliver better outcomes for the people of New South Wales and focuses on transparency and accountability for expenditure, and better value for money.
New Financial Management System
PRIME is the Information Technology (IT) solution component of the FMT program, replacing several historical systems. PRIME will provide both financial and performance information within one IT platform for all agencies in the NSW public sector.
It is expected to give Government more timely information to plan and deliver its policy priorities and the budget.
Independent assurance over the budget process would improve confidence in the reliability of the State’s financial information.
Actions for Office of Strategic Lands
Office of Strategic Lands
The Office of Strategic Lands effectively fulfils most aspects of its defined role, however, it could do more to support strategic land planning by identifying and acquiring land for future public use proactively rather than waiting for agencies or landholders to approach it. It may also have greater impact if it expanded its activities beyond greater Sydney.
The Office of Strategic Lands (OSL) was established under the Environmental Planning and Assessment Act 1979 (EP&A Act) to identify, acquire, manage and divest land required for long-term planning by the NSW Government, particularly for open space and public purposes.
OSL is a Corporation Sole acting on behalf of the Minister for Planning and is run within the Department of Planning and Environment (DPE). OSL is a self-funding entity, and is responsible for administering the Sydney Region Development Fund (SRDF), a statutory fund used for ongoing land acquisition and management. OSL currently only operates within greater Sydney and holds over a billion dollars in land assets in this region.
This audit assessed whether OSL effectively fulfils its role to identify, acquire, manage and dispose of land, and whether OSL ensures it is sustainable over the long-term to meet its objectives.
Conclusion:
OSL effectively fulfils most aspects of its defined role, but is not supporting strategic land planning through proactive identification and acquisition of land for future public use. OSL is diligent in its financial management over the short and medium terms. However, it has identified that relying on the sale of surplus land to continue funding its ongoing operations is not sustainable, and it is yet to finalise a strategy to address this.
OSL does not currently have a strategic or proactive focus to improve land planning outcomes. This is primarily due to the lack of a clear strategy and business plan to direct its work which defines OSL’s purpose, objectives, goals and performance targets.
OSL expects to finalise and implement a Strategic Business Plan to guide its future direction and long-term sustainability, in late 2017.
OSL has three primary sources of funding. The largest source is Treasury loans which it needs to repay. The next most significant source of funding is from sales of land no longer required for government’s long-term needs. OSL has identified that it is likely to run out of surplus land within ten years. This is a significant financial risk for OSL, which should be addressed through a long-term financial strategy.
Contributions by Sydney councils into the SRDF are OSL’s only regular and consistent income stream. The formula to calculate these contributions has not been reviewed for over 25 years, and recent council mergers and border changes have increased the need to review the formula.
OSL is not used as extensively as it could be by other NSW Government agencies. It has the potential to play a much bigger role in assisting NSW Government agencies with longer term planning by partnering with them to identify, acquire, hold and manage land for future needs. For example, it could acquire land in future residential growth areas for needed public services such as schools, hospitals and transport corridors. There is also potential for OSL to expand its operations beyond the greater Sydney region into other parts of NSW to provide a statewide benefit from its unique role in government.
OSL has a unique role amongst government agencies, and could be used across NSW
NSW Government agencies we spoke with consider OSL fulfils an important role for the state that no other government agency performs. As a self-funding long-term land holder and manager, OSL can acquire and manage land beyond the four-year budget cycle that other government agencies face. Consideration should be given to expanding to other growth areas in NSW, where its unique role could assist in longer term land planning.
OSL has established good processes and procedures for most aspects of its role. This includes governance processes that we found to have been applied effectively. There was also adequate oversight and approvals for land transactions.
OSL has yet to finalise a business strategy to ensure long-term sustainability
OSL has shown that it is financially and operationally viable in the short to medium term. However, it does not have an overarching business strategy to guide its operations and ensure it is financially sustainable for the long-term. With a unique role in government, it is important for OSL to clarify its direction and implement a strategic business plan to drive its progress.
While there is no overarching long-term strategy, OSL has documented operating plans which guide its land acquisition and land divestment activities over the short to medium term. It has not developed a plan for its ongoing land management activities.
OSL advised that its Strategic Business Plan will be finalised and implemented in late 2017. This Plan should clarify OSL’s long-term direction, and guide its business to ensure it is financially sustainable.
OSL does not have adequate performance targets and measures
OSL has four key deliverables as part of DPE’s business plan. These deliverables cover land management, working with other agencies, and ensuring the SRDF is sustainable. There was no evidence that OSL or DPE monitor whether OSL achieves all key deliverables.
Currently, OSL’s performance targets are limited to meeting dollar values. OSL does not have any measures to demonstrate the achievement of outcomes that align with its core business, such as its success in land management or in working with other agencies. OSL staff also said that dollar targets were not always adequate or appropriate to measure its business performance.
With the development of its Strategic Business Plan, OSL has the opportunity to clarify its future business direction. This includes ensuring it has a range of relevant goals and performance measures that will support it becoming a strategic land planning partner with NSW Government agencies and local councils, and a land holder for the long-term.
OSL’s current financial management approach may impact long-term sustainability
OSL has valued the land that it needs to purchase on behalf of government to meet long-term strategic land needs in the Greater Sydney region, at $1.2 billion. However, OSLs annual budget for purchasing land is only between $40 million and $50 million until 2021. Also, in each of the last four years, OSL has not spent more than $30 million on land purchases because it relies on landowners to initiate contact when they are ready to sell their land.
Without a more proactive approach, it is not possible for OSL to make needed purchases in a timely manner. OSL acknowledges the substantial gap between these values, but has not established a budget or plan for how it will purchase all the identified land.
OSL has developed a Divestment Strategy which provides a five-year schedule of planned divestments. This is land OSL owns which has been identified as no longer required for government purposes. OSL has established an approach to generate the best and highest price for these sales. While funds are generated through the sale of surplus land, it also means that OSL holds fewer land assets to sell. OSL has identified it will run out of surplus land within ten years.
OSL needs to finalise and implement a business model to ensure it is financially and operationally capable to sustain and grow its business for the long-term.
OSL is working to improve transparency and engagement with key stakeholders
To deliver on its role, OSL needs to be able to effectively engage and work with its stakeholders, including NSW Government agencies, local councils, and people selling or buying land.
NSW Government agencies we spoke with are generally satisfied with OSL’s level of engagement and consultation. However, it would be beneficial for all parties to clarify and document their expectations of each other through a formal arrangement. OSL could also be more proactive in promoting its services, and working with additional NSW Government agencies to identify strategic lands.
The local councils in the Sydney region we spoke with are not as satisfied with OSL’s engagement and communication. The councils advised that they do not consider they are well-informed of OSL’s plans for their area, or how their contributions to the SRDF are spent.
More broadly, the activities of OSL are not reported transparently to stakeholders or the general public. OSL is developing a communication package for local councils and the community. This is an opportunity for OSL to improve the transparency of its role, operations, projects, and the SRDF, as well as promote its services and achievements.
The Office of Strategic Lands (OSL) was established in 1951 to identify, acquire, manage and divest land required for the NSW Government's long term planning purposes. OSL acts on behalf of the Minister for Planning, as a Corporation Sole, under the Environmental Planning and Assessment Act 1979 (EP&A Act).
OSL acquires and manages land identified for long-term strategic needs, and then transfers or sells it to other government agencies for ultimate use. It also sells land identified as surplus to government’s long term strategic requirements. Surplus land can also be transferred to local councils. OSL operates only in the greater Sydney region (from Wyong in the north, to the base of the Blue Mountains in the west, and south to Wollondilly). OSL has 20 staff who manage over 6,000 parcels of land.
Parliamentary reference - Report number #290 - released 10 August 2017
Actions for 2016 - An overview
2016 - An overview
This report focuses on key observations and findings from 2016 audits and highlights key areas of focus for financial and performance audits in 2017.
Financial reporting | |
Observation | Conclusion |
Only one qualified audit opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. | The quality of financial reporting continued to improve across the NSW public sector. |
More 2015–16 financial statements and audit opinions were signed within three months of the year end. | Timely financial reporting was facilitated by more agencies resolving significant accounting issues early, completing asset valuations on time and compiling sufficient evidence to support financial statement balances. |
NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues. For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures. |
The narrowed scope of mandatory early close procedures may diminish the good performance in ensuring the quality and timeliness of financial reporting achieved in recent years. To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years. |
Although most agencies complied with NSW Treasury’s early close asset revaluation procedures we identified areas where they can improve. | Asset revaluations need to commence early enough to ensure all assets are identified and the results are analysed, recorded and reflected accurately in the early close financial statements. |
Number of misstatements | |||||
Year ended 30 June | 2015-16 | 2014-15 | 2013-14 | 2012-13 | 2011-12 |
Total reported misstatements | 298 | 396 | 459 | 661 | 1,077 |
All material misstatements identified by agencies and audit teams were corrected before the financial statements and audit opinions were signed. A material misstatement relates to an incorrect amount, classification, presentation or disclosure in the financial statements that could reasonably be expected to influence the economic decisions of users.
Significant matters reported to the portfolio Minister, Treasurer and Agency Head
In 2015–16, we reported the following significant matters to the portfolio Minister, Treasurer and agency head in our Statutory Audit Reports:
Appropriate financial controls help ensure the efficient and effective use of resources and the implementation and administration of agency policies. They are essential for quality and timely decision making.
In 2015–16, our audit teams made the following key observations on the financial controls of NSW public sector agencies.
Financial controls | |
Observation | Conclusion |
More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016. |
Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner. |
Agencies continue to face challenges managing information security. Most information technology issues we identified related to poor IT user administration in areas like password controls and inappropriate access. | Agencies should review the design and effectiveness of information security controls to ensure data is adequately protected. |
We found shared service provider agreements did not always adequately address information security requirements. |
Where agencies use shared service providers they should consider whether the service level arrangements adequately address information security. |
Thirteen of 108 agencies required to attest to having a minimum set of information security controls did not do so in their 2015 annual reports. | The 'NSW Government Digital Information Security Policy' recognises the growing need for effective information security. With cyber security threats continuing to increase as digital services expand we plan to look at cyber security as part of our 2017–18 performance audit program. |
We identified instances where service level agreements with shared service providers were outdated, signed too late or did not exist. | Corporate and shared service arrangements are more effective when service level arrangements are negotiated and signed in time, clearly detail rights and responsibilities and include meaningful KPIs, fee arrangements and dispute resolution processes. |
Internal controls at GovConnect, the private sector provider of transactional and information technology services to many NSW public sector agencies were ineffective in 2015–16. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. | The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector. |
Maintenance backlogs exist in several NSW public sector agencies, including Roads and Maritime Services, Sydney Trains, NSW Health, the Department of Education and the Department of Justice. | To address backlog maintenance it is important for agencies to have asset lifecycle planning strategies that ensure newly built and existing assets are funded and maintained to a desired service level. |
Actions for Assessing major development applications
Assessing major development applications
The Planning Assessment Commission (the Commission) has improved its decision-making processes for major development applications in recent years. The Commission has improved how it consults the public and manages conflicts of interest, and now also publishes records of its meetings with applicants and stakeholders.
The Planning Assessment Commission (the Commission) is an independent body established in 2008 under the Environmental Planning and Assessment Act 1979 (the EP&A Act). It makes decisions on major development applications in New South Wales. Along with the Department of Planning and Environment (the Department) and the Land and Environment Court, it is one of three bodies that have a role in making decisions on these applications.
The Department refers development applications to the Commission where 25 or more objections have been received from the community, a local council objects to the proposal, or the applicant has donated to a political party.
These applications are often complex and controversial, and can attract a high level of public interest. This may mean that, regardless of the process, not all stakeholders are satisfied with the outcome.
The Commission is required to take into account section 79C of the EP&A Act when making decisions. Section 79C includes consideration of the likely environmental, social and economic impacts of the development.
This audit assessed the extent to which the Commission’s decisions on major development applications are made in a consistent and transparent manner. To assist us in making this assessment, we asked whether the Commission:
- has sound processes in place to help it make decisions on major development applications that are informed and made in a consistent manner
- ensures its decisions are free from bias and transparent to stakeholders and the public.
Conclusion
Over the last two years, the Commission has improved its decision-making process. It has improved how it consults the public and manages conflicts of interest, and now also publishes records of its meetings with applicants and stakeholders.
However, there are still some vital issues to be addressed to ensure it makes decisions in a consistent and transparent manner. Most importantly, the Commission was not able to show in every decision we reviewed how it met its statutory obligation to consider the matters in section 79C of the EP&A Act.
Despite improved probity measures put in place by the Commission, there is a perception among some stakeholders that it is not independent of the Department. The reasons for some of these concerns are outside of the Commission’s control. For example, the Commission becomes involved after the Department has prepared an assessment report which recommends whether a development should proceed. This creates the perception that the Commission is acting on the recommendation of the Department. The Department’s assessment report should state whether an application meets relevant legislative and policy requirements, but not recommend whether a development should be approved or not.
More can also be done to improve transparency in decision-making and the public’s perception of the independence of Commissioners. The Commission should continue to improve how it communicates the reasons for its decisions and also publish on its website a summary of Commissioners’ conflict of interest declarations for each development application.
Decision-making processes have improved but some key aspects need to be addressed
Although not articulated in one document, there is a framework in place to assist Commissioners make decisions on major development applications. This includes setting out the information to be considered, who to consult, and that a report is to be prepared. The Commission has recently improved how it conducts public meetings and the level of support provided to Commissioners to ensure they understand the decision-making process. The Commissioners we interviewed all showed a good understanding of their role.
As a consent authority, the Commission is required to consider the matters in section 79C of the EP&A Act when making a decision. However, it was not able to show how it met this requirement in every decision we reviewed. We found some evidence of these considerations in six of the nine cases we reviewed, for example in meeting notes or in its report on a decision. Of these six cases, the degree to which the Commission considered all matters under section 79C varied considerably. The larger, more complex applications were more likely to address these considerations. To demonstrate compliance with the EP&A Act, the Commission must be able to show how it considers all matters in section 79C for each decision it makes.
We found that the Commission has access to relevant information to make a decision and consults stakeholders for their views of the development. The level of consultation depends on the size and complexity of an application. If Commissioners decide they need more information to make a decision, they consult local councils, the community, other government agencies and experts as needed.
The Commission’s public meetings are a valuable part of the decision-making process, where new perspectives or issues are often raised. However, some aspects could be improved. For example, many stakeholders thought the five minutes allowed for individual speakers was insufficient. The Commission could be more flexible with this timeframe. Identifying new ways to notify the public of its meetings, other than advertisements on its website and in newspapers, would also ensure it reaches as many interested parties as possible.
Improved transparency and probity but the Commission is not seen by some as impartial
The Commission has sound processes in place to ensure that its decisions are impartial and transparent to the community. It has improved its probity measures over the last two years, following a review by the NSW Ombudsman in 2014. We found that the Commission:
- has probity policies and procedures which are available on its website
- has improved its record keeping of some processes, such as meetings with applicants and stakeholders
- publishes its decision and supporting documentation, such as meeting notes, on its website.
Conflicts of interest are a significant risk for the Commission because they could lead to corruption, abuse of public office, and affect the public’s view of its independence. The Commission manages this risk well. It has a policy in place to address potential, perceived or actual conflicts. Commissioners update their conflicts of interest records annually, and declare any conflicts when the Commission assigns them to a development application. Unlike the Commission’s probity polices, Commissioners’ conflict of interest declarations are not available on its website. Providing a summary of this information on its website when Commissioners are allocated to a development application would further improve transparency around conflicts of interest.
The Commission has been improving how it communicates its decisions to the public. It now produces fact sheets for its decisions on matters that attract a high level of public interest. Its reports on decisions for complex applications also discuss issues raised by the community. However, the level of detail varied in the decisions we reviewed, and it was not always clear how conditions placed on a development would resolve identified issues. Similarly, the reports did not clearly address the matters under section 79C of the EP&A Act. Reporting this would further improve the transparency of its decisions, and clearly demonstrate compliance with the EP&A Act.
While we did not find any issues that would make us question the integrity or independence of Commissioners, there remains a perception among some stakeholders that the Commission is not impartial. Some of these concerns are within the Commission’s control to fix, such as allowing individual speakers at public meetings extra time to discuss their issues, therefore avoiding perceptions of bias.
Other perceptions, such as the Commission being part of the Department and not an independent decision making authority, are outside the Commission’s immediate control. For example, the Commission receives applications at the end of the assessment process, after the Department has prepared an assessment report recommending whether the application should be approved. This means there are effectively two reports on an application; the Department’s assessment report and the Commission’s report on its decision. However, there is only one decision-maker: the Commission. This may cause community confusion about the roles of the Department and the Commission in the decision-making process. Clearer separation of their roles in assessing applications and preparing reports is needed.
To minimise the perception that the Commission is simply ‘rubber stamping’ the Department’s recommendations, assessment reports should not recommend whether or not a project be approved. Instead, they should provide the Department’s views on whether a project meets relevant legislative and policy requirements. The Commission should also be involved earlier in the process, so it can establish key facts and identify relevant issues sooner. It should request that the Department’s assessment report covers matters Commissioners consider particularly important when assessing projects under section 79C. Earlier referral of applications should also help the Commission to plan its work in assessing applications, and may reduce the time taken to reach a decision.
Unless these issues are addressed, stakeholders will continue to believe the Commission does not act in a transparent and impartial manner, which could erode public confidence in the Commission.
The Planning Assessment Commission
The Planning Assessment Commission (the Commission) is a planning authority established in 2008 under the Environmental Planning and Assessment Act 1979 (the EP&A Act). One of its functions is to make decisions on major development applications.
The Commission is independent of the Department of Planning and Environment (the Department) and the Minister for Planning. This means its decisions are not subject to the direction or control of the Department or the Minister.
The Department refers applications for major development to the Commission, including state significant development and infrastructure applications. These projects are generally initiated by the private sector. Applications are referred to the Commission when one or more of the following criteria are met:
- more than 25 objections are received about the proposal
- the local council objects to the proposal
- the applicant has donated $1,000 or more to a political party or member of parliament.
These applications are often controversial and may attract a high level of public interest. Of the 29 development applications the Commission received in 2015–16, almost 40 per cent were in the mining and energy sectors, and another 40 per cent related to urban development.
Section 79C of the EP&A Act outlines the matters the Commission must consider when making decisions about major development applications. These include:
- any relevant environmental and planning instruments
- likely environmental, social and economic impacts of the development
- suitability of the site for the development
- submissions received about the application
- the public interest.
In addition to making decisions about major development applications, the Commission also reviews major developments as part of the planning process, and provides independent expert advice to the government on planning and development matters. Since the Commission’s inception, it has provided advice on 76 matters, conducted 39 reviews, and made 444 decisions on development applications.
Process for approving major development applications
The Commission is one of three bodies that have a role in the planning and approval process for major development applications in New South Wales, as seen in Exhibit 1. The other two bodies are the Department of Planning and Environment, and the Land and Environment Court.
The Department determines the outcomes of major development applications. When an application meets one of the criteria listed above, it refers these to the Commission to make the decision. In certain circumstances, the Land and Environment Court hears appeals against decisions made by either the Department or the Commission.
A Memorandum of Understanding between the Commission and the Department sets out timeframes the Commission must meet when making a decision, specifically:
- two weeks where no stakeholder meetings are required
- three weeks where stakeholder meetings are required
- six weeks when a public meeting is required.
Parliamentary reference - Report number #279 - released 19 January 2017
Actions for Planning and Environment 2016
Planning and Environment 2016
Auditor-General, Margaret Crawford released a report on the planning and environment cluster today, concluding that the quality of financial reporting is improving. However, the cluster can improve its financial controls and governance framework.