Refine search Expand filter

Reports

Published

Actions for Managing demand for ambulance services 2017

Managing demand for ambulance services 2017

Health
Information technology
Management and administration
Risk
Service delivery
Shared services and collaboration
Workforce and capability

NSW Ambulance has introduced several initiatives over the past decade to better manage the number of unnecessary ambulance responses and transports to hospital emergency departments. However, there is no overall strategy to guide the development of these initiatives nor do NSW Ambulance's data systems properly monitor their impact. As a result, the Audit Office was unable to assess whether NSW Ambulance's approach to managing demand is improving the efficiency of ambulance services.

Demand for ambulance services is increasing. Demographic factors including population growth and ageing have contributed to this and ongoing growth in demand is likely. It is important that NSW Ambulance finds ways to respond to this demand more efficiently, while maintaining patient safety standards and meeting community expectations.

Most triple zero calls to NSW Ambulance do not involve medical issues that require an emergency response. NSW Ambulance has introduced a range of initiatives to change the way it manages these less urgent requests for assistance. Its major demand management initiatives include using a telephone advice line, referring some patients to services other than hospital emergency departments and using specialist paramedics to respond to less urgent cases.

The role of NSW Ambulance has changed in recent years. It is aiming to become a ‘mobile health service’ that identifies the needs of patients and provides or refers them to the most appropriate type of care. This change involves a significant expansion of the clinical decision-making role of paramedics. Considerable strategic and organisational efforts are required to make this work. The successful implementation of demand management initiatives is important to NSW Ambulance's ability to continue to meet demand for its services.

This audit assessed NSW Ambulance's major demand management initiatives that aim to reduce unnecessary demand for ambulance responses and unnecessary transport to hospital emergency departments. It aimed to assess the extent to which these initiatives have improved the efficiency of its services.

Conclusion

NSW Ambulance has introduced several initiatives that aim to manage demand for its services from less urgent cases more efficiently. There is no overall strategy for these initiatives and NSW Ambulance’s data systems do not measure their outputs or outcomes. As a result, we are unable to assess the impact of NSW Ambulance's demand management initiatives on the efficiency of ambulance services. More focus is needed to ensure these initiatives achieve the efficiency improvements necessary to help NSW Ambulance meet future increases in demand.

Increasing demand for ambulance services is a key issue for NSW Ambulance. Demand has increased at a faster rate than population growth in recent years and continued growth is expected. NSW Ambulance has introduced several initiatives that aim to manage demand for its services from people with less urgent medical issues more efficiently and align its approach with the rest of the health system in New South Wales.

These individual initiatives lack a broader strategy to guide their development. NSW Ambulance’s demand management initiatives also lack clear goals and performance targets, with insufficient organisational resources allocated to support their implementation. NSW Ambulance does not have a data system that allows it to conduct accurate routine monitoring of the activity and performance of these initiatives.

More effort is required to make demand management initiatives a core part of NSW Ambulance's work. Key relationships with other health services to support demand management initiatives have only recently been established. NSW Ambulance has not communicated proactively with the public about its demand management initiatives. To ensure paramedics are as well prepared as possible for their expanded roles, they need better professional development and up to date technology.

Demand for ambulance services in New South Wales is increasing steadily. Forecast future increases in demand due to population growth and ageing mean that NSW Ambulance must improve its efficiency to maintain its performance.

Demand for ambulance services is growing at a rate higher than population growth. The increase in demand is likely to continue as the population continues to grow and age. NSW Ambulance has made several recent changes to remove large parts of demand for its services, including moving non-emergency patient transport to a separate government agency and changing the way triple zero calls are categorised.

These changes were expected to improve emergency response time performance, but the anticipated improvements have not been achieved. If demand continues to increase as forecast, NSW Ambulance will need to find more efficient ways to manage demand to maintain its performance.

NSW Ambulance has introduced initiatives to change the way it manages demand from patients who have less urgent medical issues. These have the potential to achieve positive results, but we were unable to fully assess their impact because of weaknesses in data systems and monitoring. More needs to be done to demonstrate progress toward the efficiency improvements required.

NSW Ambulance uses a telephone referral system to manage triple zero calls from people with medical issues that do not require an ambulance. This has the potential to achieve efficiency improvements but there are weaknesses in NSW Ambulance's use and monitoring of this system. Paramedics are now able to make decisions about whether patients need transport to a hospital emergency department. NSW Ambulance does not routinely measure or monitor the decisions paramedics make, so it does not know whether these decisions are improving efficiency. Extended Care Paramedics who have additional skills in diagnosing and treating patients with less urgent medical issues were introduced in 2007. NSW Ambulance analysis indicates that these paramedics have the potential to improve efficiency, but have not been used as effectively as possible.

Our 2013 audit of NSW Ambulance found that accurate monitoring of activity and performance was not being conducted. More than four years later, this remains the case. 

NSW Ambulance has recognised the need to change the way it manages demand and has developed initiatives that have the potential to improve efficiency. However, there are significant weaknesses in the strategy for and implementation of its demand management initiatives.

NSW Ambulance has identified the goal of moving from an emergency transport provider to a mobile health service and developed several initiatives to support this. Its demand management initiatives have the potential to contribute to the broader policy directions for the health system in New South Wales. However, there is no clear overall strategy guiding these initiatives and their implementation has been poor.

NSW Ambulance's reasons for changing its approach to demand management have not been communicated proactively to the community. Demand management initiatives that have been operating for over a decade still do not have clear performance measures or targets. Project management of new initiatives has been inadequate, with insufficient organisational resources to oversee them and inadequate engagement with other healthcare providers.

NSW Ambulance uses an in-house Vocational Education and Training course to recruit some paramedics, as well as recruiting paramedics who have completed a university degree. No other Australian ambulance services continue to provide their own Vocational Education and Training qualifications. Paramedics will need more support in several key areas to be able to fulfil their expanded roles in providing a mobile health service. Performance and development systems for paramedics are not used effectively. Up to date technology would help paramedics make better decisions and improve NSW Ambulance's ability to monitor demand management activity.

There are gaps in NSW Ambulance's oversight of the risks of some of the initiatives it has introduced, particularly its lack of information on the outcomes for patients who are not transported to hospital. Weaknesses in the way NSW Ambulance uses its data limit its ability to properly assess the risks of the demand management initiatives it has introduced.

Appendix one - Response from agency

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary reference - Report number #295 - released 13 December 2017

Published

Actions for Government Advertising: Campaigns for 2015–16 and 2016–17

Government Advertising: Campaigns for 2015–16 and 2016–17

Premier and Cabinet
Justice
Local Government
Compliance
Internal controls and governance
Management and administration
Procurement

The 'Stronger Councils, Stronger Communities' and the 'Dogs deserve better' government advertising campaigns complied with the Government Advertising Act and most elements of the Government Advertising Guidelines.

However, some advertisements were designed to build support for government policy and used subjective or emotive messages. This is inconsistent with the requirement in the Government Advertising Guidelines for 'objective presentation in a fair and accessible manner'.

Advertisements in the 'Stronger Councils, Stronger Communities' campaign used subjective statements such as 'the system is broken' and 'brighter future'. While advertisements in the 'Dogs deserve better' campaign used confronting imagery such as gun targets, blood smears and gravestones.

The Government Advertising Act 2011 (the Act) requires the Auditor-General to conduct a performance audit in relation to at least one government advertising campaign in each financial year. The performance audit assesses whether advertising campaigns were carried out effectively, economically and efficiently and in compliance with the Act, the regulations, other laws and the Government Advertising Guidelines (the Guidelines). In this audit, we examined two campaigns:

  • the ‘Stronger Councils, Stronger Communities’ campaign run by the Office of Local Government and the Department of Premier and Cabinet
  • the ‘Dogs deserve better’ campaign run by the Department of Justice.    

Section 6 of the Act details the specific prohibitions on political advertising. Under this section, material that is part of a government advertising campaign must not contain the name, voice or image of a minister, member of parliament or a candidate nominated for election to parliament or the name, logo or any slogan of a political party. Further, a campaign must not be designed so as to influence (directly or indirectly) support for a political party.

The ‘Stronger Councils, Stronger Communities’ government advertising campaign was run by the Office of Local Government and the Department of Premier and Cabinet in four phases from August 2015 to May 2016. The total cost of the campaign was over $4.5 million. See Appendix 2 for more details on this campaign.

The ‘Stronger Councils, Stronger Communities’ advertising campaign has not breached the specific provisions of Section 6 of the Act which prohibits political advertising.

Two factors potentially compromised value for money for the campaign. The request for quotes for the design of the Phase 1 advertisement did not reflect the full scale of work to be undertaken, which was substantially greater than initially quoted. Further, the department did not meet all recommended timeframes to minimise media booking costs for all phases of the campaign.

The campaign did not comply with all administrative requirements in all phases. Advertising for Phase 1 commenced before the compliance certificate was signed. There was no evidence that a compliance certificate was signed for Phase 2 extension. The cost benefit analyses for Phase 2 and Phase 2 extension did not sufficiently consider alternatives to advertising, as is required by the Government Advertising Guidelines.

Advertisements adopted subjective messages designed to build public support for council mergers and directed audiences to websites for more detailed information. Campaign research identified statements that were most likely to reduce resistance to mergers. Some advertising content used subjective language, which we consider inconsistent with the requirement for ‘objective presentation’. Evaluations of advertising effectiveness also measured the success of the advertisements in increasing public support for council mergers.

No breach of specific prohibitions in the Act

Section 6 of the Act prohibits the use of government advertising for political advertising. A government advertising campaign must not:

  • be designed to influence (directly or indirectly) support for a political party
  • contain the name, voice or image of a minister, any other member of parliament or a candidate nominated for election to parliament
  • contain the name, logo or any slogan of, or any other reference relating to, a political party.

We did not identify any breach of the specific prohibitions listed above in the advertising content of this campaign.

Request for quotes to design advertisement did not reflect the full scope required

The request for quotes for the design of the Phase 1 advertisement did not reflect the full scale of work that was to be undertaken, and this created a risk to achieving value for money. The Office of Local Government sought quotes for design of a television advertisement only. It did not request an estimate for radio, online advertisements, or translation for linguistically diverse audiences, which were ultimately required for the campaign.
 

A full and fair assessment of which supplier could provide the best value for money could not be made given that the quotes obtained did not reflect the full scope of work. The final amount paid for the design of Phase 1 was 2.7 times the original quote. It is possible that another supplier that provided a quote could have provided overall better value for money.

The Office of Local Government continued to use the Phase 1 supplier for Phase 2 and Phase 2 extension (Exhibit 4). Where there are other suppliers that could feasibly compete for a contract, direct negotiation increases the risk the agency has not obtained the best value for money. The department advised that it continued with the same agency to avoid costs involved in briefing a new agency on the campaign.

The ‘Dogs deserve better’ government advertising campaign was run by the Department of Justice from August 2016, after the government announced its decision to prohibit greyhound racing, and was terminated in October 2016 after a change of government policy. The campaign had a budget of $1.6 million, with an actual spend of $1.3 million. See Appendix 2 for more details on this campaign.

The ‘Dogs deserve better’ advertising campaign has not breached the specific provisions of Section 6 of the Act which prohibits political advertising.

The Secretary of the department determined that urgent circumstances existed that required advertising to commence prior to completing a cost benefit analysis and peer review. There was a concern that industry participants may make impulse decisions to destroy greyhounds without further information on support services; there was also an identified need to promote public greyhound adoptions.

Phase 1 advertisements focused on explaining the reasons for the prohibition on greyhound racing with a reference to a website for further information. While industry participants were identified as the primary audience, media expenditure was not specifically targeted to this group. Phase 2 advertisements more effectively addressed the originally identified ‘urgent needs’ of providing information on support services for greyhound owners and information on how the public could adopt a greyhound.

The urgency to advertise potentially compromised value for money. The department did not use price competition when selecting a creative supplier due to a concern this would add to timeframes. Further, the department did not meet recommended timeframes to minimise media booking costs.

We identified three other areas in Phase 1 advertisements that were inconsistent with government advertising requirements. Advertisements used provocative language and confronting imagery, which we consider to be inconsistent with the requirement for ‘objective presentation’. Two statements presented as fact based on the Special Commission’s Inquiry report were inaccurate; one of these was due to a calculation error. Radio advertisements did not clearly identify that they were authorised by the New South Wales Government for the first few days of the campaign.

No breach of specific prohibitions in the Act

Section 6 of the Act prohibits the use of government advertising for political advertising. A government advertising campaign must not:

  • be designed to influence (directly or indirectly) support for a political party
  • contain the name, voice or image of a minister, any other member of parliament or a candidate nominated for election to parliament
  • contain the name, logo or any slogan of, or any other reference relating to, a political party.

We did not identify any breach of the specific prohibitions listed above in the advertising content of this campaign.
 

Animal welfare concerns were identified as the reason for urgent advertising

A brief prepared by the department in July 2016 raised concerns about the welfare of greyhounds following the NSW Premier’s announcement that the government would prohibit greyhound racing. The brief raised the risk that industry members may make impulse decisions to destroy their greyhounds without information on support that was being offered.

The department used the provisions in Sections 7(4) and 8(3) of the Act to expedite the release of advertising due to ‘other urgent circumstances’. This provision allows advertising to commence prior to completing the peer review process and cost benefit analysis.

In introducing the Government Advertising Bill to parliament in 2011, the then Premier noted that exceptional circumstances would cover situations ‘such as a civil emergency or sudden health epidemic’. There is no other guidance on when it is appropriate to use this section. It is at the discretion of a government agency head to determine whether a campaign is urgent.
 

Phase 1 advertisements did not focus on the urgent needs

This advertising campaign had three overarching objectives:

  • to increase public awareness of the animal welfare reasons for the closure of the greyhound racing industry
  • to change the behaviour of dog owners from potentially harming their greyhounds to treating them humanely, by accessing the support options and packages available
  • to promote greyhound adoptions by the public.

Alongside advertising, the department took other steps to engage with the greyhound racing industry. This included direct mail, face to face meetings around the State, setting up a call centre and community consultation through an online survey. Other government agencies and animal welfare agencies were also engaged to reach out to affected stakeholders.

Phase 1 advertising content focused on providing information about the reasons for the closure of the industry. The department’s radio and television advertisements did not refer to support packages or encourage the public to adopt a greyhound. While print advertisements did mention these things, this was only presented in fine print. In all advertisements, audiences were referred to a website for further information.

The focus of advertisements on the reasons for industry closure was not consistent with the identified needs to urgently commence advertising to influence the behaviour of dog owners and encourage the public to adopt a greyhound.

The content in Phase 2 advertisements, which began around four weeks after the first phase, was more explicit in highlighting the services and support for industry members such as offering business and retraining advice. These advertisements also referred audiences to a call centre number as well as the website.

Peer review process limited to influencing second phase of advertisements

In urgent circumstances, the Act allows for peer review to be completed after advertising has commenced. For this campaign, the peer review process was completed on 19 August 2016, two weeks after advertising had commenced. Where advertising commences before the peer review process is completed, the usefulness of peer reviewers’ recommendations is limited to informing subsequent phases of advertising and the post-campaign evaluation.

The peer review report found the messages in Phase 1 advertisements were not clearly defined, and the role of advertising was not clearly defined amongst other campaign activities. These recommendations informed the second phase of advertising, which ran from 27 August 2016 until the campaign was terminated in October 2016.
 

The department could not demonstrate value for money was achieved for creative work

The department provided a fixed budget for creative work when requesting quotes from creative agencies to develop advertising material. This is not consistent with the quotation requirements in the government’s Guidelines for Advertising and Digital Communication Services. This approach creates risks to achieving value for money as creative agencies are not required to compete on price for their services. The department advised that it had pre-set the creative costs based on a comparative government campaign of a similar size. This was done due to a concern that requiring agencies to compete on price would affect the short timeframe given to develop creative material.

Three creative agencies accepted the opportunity to present design ideas for the campaign. The department was unable to provide evidence of how it chose the preferred supplier out of these three agencies. Records are important for accountability and allow a procurement decision to be audited after an urgent decision.     
 

Short notice did not allow for cost-efficient media booking for all phases

Placement of advertisements in various media channels was done through the State’s Media Agency Services contract. This contract achieves savings as the government can use its aggregated media spend to gain discounts from the media supplier.

The Department of Premier and Cabinet provides guidance to ensure cost efficient media booking. For example, media time for a television advertisement should be booked at least 6 to 12 weeks in advance. Radio advertisements should be booked at least 2 to 8 weeks in advance.

The peer review report noted that the department did not have adequate time to look for the most cost-efficient way to advertise. In its response to the peer reviewers, the department acknowledged this to be due to the urgency to start advertising. The media booking authority was signed by the department one day before the campaign commenced.
 

The department used a wide public campaign for a narrow target audience

The campaign identified greyhound industry participants as the primary target audience. In 201516 there were 1,342 greyhound trainers, 1,695 owner/trainers, 983 attendants and 1,247 breeders in New South Wales. The department’s advertising submission identified ‘concerns that industry members could make impulsive decisions, potentially jeopardising the welfare of a large number of dogs, prior to the shutdown of the industry’.

The submission’s evidence of advertising effectiveness focused on increasing the level of wider community support for the ban rather than stopping industry members from making impulse decisions. It used an early opinion poll to show that total support for the ban on greyhound racing rises by 17 points and opposition drops by four points following explanation of the findings of the Special Commission of Inquiry report.

The peer review report noted that the role of advertising was not clearly defined amongst the department’s range of other direct and targeted communications and consultations held with industry members.

No demonstrated basis for use of confronting imagery and provocative language

The Guidelines require ‘objective presentation in a fair and accessible manner’. Neither the Guidelines or Handbook further explain what objective presentation means. We have used an ordinary definition of this term as ‘not influenced by personal feelings or opinions in considering and representing facts’. This is synonymous with terms like ‘impartial’, ‘neutral’, and ‘dispassionate’ and opposite to ‘subjective’. We consider that to meet the current requirements in the Guidelines for objectivity, advertising content should contain accurate statements or facts, and avoid subjective language.

Phase 1 focussed on the ongoing consequences if no action was taken to close the industry. The advertisements used provocative language, for example ‘Up to 70 per cent of dogs are deemed wastage by their own industry. Wastage! Slaughtered just for being slow’. Advertisements used confronting imagery like gravestones, blood smears and gun targets.

Our literature review into this area highlighted mixed findings on the effectiveness of confrontational advertising materials. In some cases, shock campaigns may cause an audience to reject or ignore the message, and may even encourage people to do the opposite of the intended behaviour. In other cases, such as in road safety campaigns, this style of advertising can be successful. This shows the importance of conducting pre-campaign research before adopting a confrontational or emotive approach in advertising.

The Government Advertising Handbook recommends that an agency explain the rationale and the evidence for their chosen advertising approach. There was no evidence that the department researched the effectiveness of its advertising approach with its target audience. The department had planned to undertake creative concept testing as part of a strategy to ensure the creative material was understood by its audience. The department advised that due to the urgency of the campaign, it did not have time to conduct this testing.

Not all Phase 1 radio advertisements clearly identified that they were authorised by the New South Wales Government

For the first few days on air, Phase 1 radio advertisements ended by referring the audience to a government website, instead of clearly identifying that it had been authorised by the New South Wales Government. Government authorisations and logos ensure the work and the programs of the NSW Government are easily identifiable by the community.    

The department’s cost benefit analysis did not consider alternatives to advertising

For government advertising campaigns that cost over $1.0 million, the Act requires the advertising agency to carry out a cost benefit analysis and obtain approval from the Cabinet Standing Committee on Communications, prior to commencing the campaign.

The department engaged with audiences through direct mail, face to face forums, and a telephone helpline in addition to advertising. However, the department’s cost benefit analysis did not meet the requirements in the Guidelines to specify the extent to which expected benefits could be achieved without advertising, and to compare costs of options other than advertising that could be used to successfully implement the program (see Exhibit 6).

The cost benefit analysis made optimistic assumptions about the impact of the campaign on greyhound adoptions. It estimated that 2,360 greyhounds would be adopted if the campaign was run. This is significantly higher than the ‘most optimistic outcome’ of re-homing in the Special Commission Inquiry report (we calculated this to be 1,467 greyhounds). There was insufficient evidence to support the higher number of adoptions in the cost benefit analysis.

The sensitivity analysis shows that using the Special Commission’s ‘most optimistic outcome’ figure of re-homing would reduce the net present value of advertising to be negative. Further, the cost benefit analysis also assumed that increased government funding would be made available to animal welfare and rehoming organisations to support more adoptions, but did not estimate or include this cost when calculating the net present value of advertising.
 

There were two factual inaccuracies in key messages used for Phase 1 advertisements

Section 8(2) of the Act requires the head of a government agency to certify that the proposed campaign ‘contains accurate information’. The Secretary of the Department of Justice signed the compliance certificate on 29 July 2016, before advertisements commenced.

We examined the accuracy of factual claims in this advertising campaign, by comparing the key statements to the report of Special Commission of Inquiry into the Greyhound Racing Industry (the Commissioner report). The Commissioner report was quoted by the NSW Government as the basis for its policy to transition the greyhound racing industry to closure.

We identified that two of the key statements used in Phase 1 advertisements to support the animal welfare reasons for industry closure were inaccurate (Exhibit 7).    

Published

Actions for Energy rebates for low income households

Energy rebates for low income households

Planning
Industry
Compliance
Fraud
Internal controls and governance
Management and administration

The Department of Planning and Environment provides more than $245 million in energy rebates to around 27 percent of NSW households. This report highlights that the department is not monitoring the rebate schemes to understand whether they are delivering the best outcomes.

Most rebates are ongoing payments applied directly to energy bills reducing the amount payable by the householder. The structure of these rebates is complex and can be inequitable. Some households are eligible for four different rebates, each with its own eligibility criteria.  Also, some households in very similar circumstances receive different levels of support depending on what type of energy is used in their home or which adult in the house is the energy account holder. For example, a household using both electricity and gas receives more assistance than a household with electricity alone even if total energy bills are the same. 

The Department of Planning and Environment (Department) administers five energy rebate schemes targeted to low-income households. The five rebates are of two key types:

1. Ongoing support to pay energy bills
2. Crisis Support  

More than one million rebates are paid each year to over 800,000, or around 27 per cent, of NSW households. Households learn about rebates from a variety of sources including: Service NSW, government and energy retailer websites, energy retailer welcome packs, Department marketing efforts, information on energy bills, and Centrelink.  

The budget for energy rebates is increasing every year and in 2017–18 is more than $245 million. The Department delivers most rebates through a network of partnership arrangements with:

  • energy retailers, who apply rebates directly onto energy bills
  • more than 340 charities and other NGOs who assess households' eligibility for crisis support and distribute support through the Energy Accounts Payment Assistance scheme (EAPA)
  • Service NSW, who informs NSW households about rebates through their call centre.

The energy rebates budget is substantial and the distribution arrangements are complex. The objective of the audit was to assess whether the current design and distribution of energy rebates schemes is effective.

Conclusion
The Department administers the rebate schemes using partners to ensure funds are directed towards energy bills as intended. Ongoing support schemes provide assistance to low-income households as intended, but have no measurable objectives or outcome measures and therefore can't be assessed for their effectiveness. Crisis support (EAPA) has a clear objective, to keep households experiencing financial crisis connected to energy services, but the Department does not monitor the performance of EAPA against this objective.  

The structure of rebates providing ongoing support is complex and can be inequitable for some households. Reducing the number of separate schemes and simplifying eligibility requirements offers the most scope for improving effectiveness of ongoing support schemes.  

The growth of embedded networks1 represents a future administrative risk to the Department.

Partnering with energy retailers, charities and NGOs delivers advantages, but stronger oversight is required over partner organisations.

The Department and partner organisations administer the rebate schemes as designed

The Department oversees a complex package of rebate schemes in partnership with 25 retailers and around 340 charities and NGOs. The partnership arrangements ensure that funds are distributed directly to energy bills as intended. The schemes provide support to recipients and are administered in line with government decisions about eligibility.  

Communication about rebates does not reach all eligible households

Households learn about rebate schemes through a mix of communication channels including retailer websites and call centres, Department websites, Centrelink, financial counsellors, EAPA Providers, the Energy and Water Ombudsman and Service NSW. Some low-income groups, such as those with poor English language skills, do not find out about energy rebates.

Scheme objectives are not measurable

Rebate schemes that provide ongoing support do not have measurable objectives or outcome measures. Without clear and measurable objectives, the Department cannot report to government on whether the schemes are achieving the intended policy outcomes, nor recommend improvements to ensure the schemes deliver the greatest benefit to the most financially vulnerable households.

The EAPA crisis support scheme has a clearer objective in that it aims to keep households experiencing financial crisis connected to energy services. However, the Department does not measure outcomes from providing this type of support, and does not know if the crisis support achieves this objective.  

The structure of rebate schemes for ongoing support is complex

The Low Income Household Rebate accounts for 80 per cent of the budget for ongoing support rebates. The remaining 20 per cent of the budget is administered through four separate schemes: Gas Rebate, Medical Energy Rebate, Family Energy Rebate and Life Support Rebate.

Each of these rebates has its own eligibility criteria and some require separate application processes. The Family Energy Rebate is complex to access and apply for, and around one third of households do not reapply each year. Eligible households that receive energy through embedded networks apply directly to the Department for rebates, which are paid by the Department into bank accounts. Embedded networks are energy supply arrangements where the manager of a residential facility such as a caravan park, retirement village or apartment block, buys energy in bulk and then on-sells it to residents. The Department is yet to develop strategies to address a forecast increase in such households.

The design of the rebate schemes creates some inequities

Households in similar circumstances can receive different levels of assistance depending on which adult in the house is the energy account holder, the mix of energy types used in the home, or the EAPA Provider they turn to when in financial crisis.

Households with both gas and electricity connections receive more assistance than those with only electricity. Households in rural and regional areas receive the same value rebate as households closer to Sydney, despite higher distribution charges. Family Energy Rebate is a two-tier payment, with a higher amount available to families with greater means. Lower-income families receive a much smaller Family Energy Rebate on the assumption that they already receive Low Income Household Rebate. Charities and NGOs distributing EAPA crisis support apply inconsistent standards when assessing household need, which leads to inequitable levels of assistance.

Departmental oversight of energy retailers and EAPA Providers is not strong enough

While partnering with energy retailers and EAPA Providers delivers advantages, stronger management is needed to ensure that partners follow Departmental guidelines and to minimise the potential for fraud. The Department's accreditation process for potential EAPA Providers does not consider the applicant's financial governance standards and the most recent audit of EAPA Providers was 2013.


[1] Embedded networks are energy supply arrangements where the manager of a residential facility such as a caravan park, retirement village or apartment block, buys energy in bulk and then on-sells it to residents.

By September 2018, the Department of Planning and Environment should:

  1. Ensure effective strategies are in place to make information about rebates available to all eligible, low-income households
     
  2. Evaluate alternative models and develop advice for government to reduce complexity and improve equity of ongoing rebates
     
  3. Establish measurable objectives for schemes that provide ongoing support, and monitor and measure performance of all schemes against objectives and outcome measures
     
  4. Assess the impacts of the forecast increase in embedded networks and develop strategies to manage any increased administrative risk
     
  5. Strengthen assurance that EAPA is being provided in accordance with its objectives and guidelines by implementing accreditation and compliance programs
     
  6. Ensure those eligible for EAPA financial support are not disadvantaged by inflexible payments, inconsistent provider practices, or inability to access an EAPA provider in a timely manner. Options include:
    • moving from a fixed-value voucher to a flexible payment based on need irrespective of energy type
    • establishing a ‘Provider of Last Resort’ facility for households that cannot access an EAPA Provider.

Appendix one - Response from the Agency

Appendix two - About the audit

 

Parliamentary reference - Report number #292 - released 19 September 2017 

Published

Actions for Planning and evaluating palliative care services in NSW

Planning and evaluating palliative care services in NSW

Health
Management and administration
Service delivery
Workforce and capability

NSW Health’s approach to planning and evaluating palliative care is not effectively coordinated. There is no overall policy framework for palliative and end-of-life care, nor is there comprehensive monitoring and reporting on services and outcomes.

Palliative care is an essential component of modern health care services and an increasingly important part of the wider health and social care systems. Palliative care is healthcare and support for people with a life-limiting illness, their families and carers. It is provided by, or informed by, professionals who specialise in palliative care. ‘End of life’ care is provided to people approaching the end of life by health professionals, who may work in the health, community or aged care systems. Not everyone receiving end of life care needs palliative care.

NSW Health has a policy and planning role in palliative and end-of-life care, and it coordinates a wide range of service providers. Local Health Districts (LHDs) provide care services in settings such as homes, hospitals and clinics to patients with varying needs. There are several care providers that can be involved.

Due to this shared nature of palliative care — where many people, services and settings are involved in delivering care to the patient — availability and communication of information is critical. For service planning, data and evidence must be drawn from various sources in a timely and efficient way.

This audit assessed whether NSW Health is effectively planning and evaluating palliative care services, in the context of rising demand, increasingly complex needs, and the diversity of service providers.

Conclusion 

NSW Health’s approach to planning and evaluating palliative care is not effectively coordinated. There is no overall policy framework for palliative and end-of-life care, nor is there comprehensive monitoring and reporting on services and outcomes.  

NSW Health has a limited understanding of the quantity and quality of palliative care services across the state, which reduces its ability to plan for future demand and the workforce needed to deliver it. At the district level, planning is sometimes ad hoc and accountability for performance is unclear.

The capacity of LHDs to use accurate and complete data to plan and deliver services is hindered by multiple disjointed information systems and manual data collections. Further, a data collection on patient outcomes, for benchmarking and quality improvement, is not used universally. This limits the ability of districts to plan, benchmark and improve services based on outcomes data.

NSW Health's engagement with stakeholders is not systematic. The lack of an overall stakeholder engagement strategy puts at risk the sustainability and value of stakeholder input in planning and limits transparency.

Over the last two years, NSW Health has taken steps to improve its planning and support for districts. The Agency for Clinical Innovation has produced an online resource which will assist LHDs in constructing their own, localised models of care. eHealth, which coordinates information communication technology for the state’s healthcare, aims to invest in integrating and improving information systems. These initiatives should help to address many of the issues now inhibiting integrated service delivery, reporting on activity and outcomes, and planning for the future.

1. By July 2018, NSW Health should develop an integrated palliative and end-of-life care policy framework that:

  • clearly articulates the interface between palliative and end of life care and outlines the priorities for the respective areas
  • defines policy goals and objectives, and a performance and evaluation framework for palliative care service planning and delivery
  • informs a related workforce plan which supports the policy framework and is linked to the Health Professional Workforce Plan 2012–2022
  • reviews the funding allocation model to ensure future enhancement funds are distributed equitably and transparently based on the need and population of districts.

By December 2018, NSW Health should:

2. assess how the functionality provided in data collection programs such as the Palliative Care Outcomes Collaboration program can be provided across all palliative care services in NSW

3. complete its statewide review of systems and reporting for end of life management including specialist palliative care, and develop a business case to implement a more integrated set of solutions to:

  • support providers delivering end of life and palliative care
  • help monitor service quality and quantity
  • provide comprehensive data for service planning

4. improve stakeholder engagement by:

  • developing a statewide stakeholder engagement strategy that brings together current activity and good practice, and is transparent and publicly available
  • defining accountability for overseeing and implementing the strategy at state and district levels.

1. Performance monitoring is inadequate

NSW Government policy on palliative care is outlined in the NSW Government Plan to Increase Access to Palliative Care 2012–2016 (the Plan). Under the Plan, the overarching policy is ‘to ensure that everyone has access to quality palliative care regardless of their economic or social circumstances, their geographical location or their medical condition.’ Some initiatives under the Plan are still being implemented.

NSW Health only has measures in place to assess some processes and activities for individual initiatives under the Plan. There is no tracking of outcomes relating to the policy goals set out in the Plan, such as increased choice to die at home or the location of the patient’s choice, and improved access to specialist palliative care services. NSW Health has not conducted an overall assessment of the Plan’s outcomes to guide future priorities.

Further, there is no overall performance and reporting framework for palliative and end of life care, meaning there is no monitoring of performance of palliative care services for NSW as a whole. This lack of evaluation and performance measurement impacts on NSW Health's ability to monitor progress and achievements, address gaps in service, and plan for future service enhancement. 

2. Statewide planning and evaluation lacks coordination

Currently, palliative care services are complex to plan and evaluate. Many policies, strategies, guidelines, directives and data collections currently inform services. Even definitions of services vary. The split of policy functions for palliative care and end-of-life care between different branches within NSW Health adds further complexity. These arrangements create the risk of confusion, gaps in advice and support for LHDs.

Consistency is needed in the use of terminology and planning to achieve an integrated approach at all levels, including:

  • standard definitions of palliative care and end-of-life care
  • planning within a single structured policy framework to help clarify what services are to be delivered, who is accountable for delivering them and how to measure their outcomes.

Workforce planning is also affected. While NSW Health has identified significant gaps in the specialist palliative care workforce (especially in regional and remote areas) and it previously made workforce capacity one of its priorities, limited work has been undertaken in producing a statewide strategy to reduce these gaps.

3. District planning is not systematic and some external providers are poorly managed

An integrated approach would inform district-level service planning for palliative care. Planning in the districts we visited was sometimes ad hoc and accountability for performance unclear. Districts would benefit from:

  • better integrating data collection systems with planning
  • clearer guidelines, easy-to-use tools, monitoring and accountability systems.

The recently developed guide – A Blueprint for Improvement, from the Agency for Clinical Innovation – should help districts plan more effectively and consistently as it rolls out more widely in 2017. This takes an integrated approach to palliative and end-of-life care. Only one district we visited has finalised a comprehensive plan using the Blueprint.

Issues with district planning extend to external agreements with service providers, as these are sometimes poorly managed and do not support improved patient outcomes. Examples we reviewed showed a significant reporting burden with process-focused reporting. We also found little evidence of monitoring or action as a result of these reports.

4. Diverse information systems mean data collection and use are inconsistent

NSW Health gathers a broad range of data from many collection points and systems to inform palliative care services at hospital, ward or unit level, and community teams. However, the current data is limited because: 

  • activity is under-reported, particularly in community-based services
  • collection is not universal across districts and services.

Districts also struggle with evidence-based planning and service delivery because multiple information systems mean data may be incomplete or inaccurate. Too often, clinicians and service managers rely on manual collection and paper-based systems. 

eHealth, which coordinates information communication technology (ICT) for the state’s healthcare, is planning a statewide approach to capture information and report on all palliative care activity. The current plans of eHealth to review and improve systems should make data more complete, robust and accessible for quality improvement and planning.

5. An overarching stakeholder strategy would strengthen engagement

Just as data is central to effective planning and evaluation, so too is stakeholder engagement. However, there is currently no explicit stakeholder strategy, which means consultation is inconsistent across the state and not systematic at a district level.

While NSW Health uses a range of platforms to consult, the purpose and value is often not clear to stakeholders. Individual districts have some good practices, but there are limited mechanisms to identify and share these with other areas. A state-wide strategy would improve the quality and consistency of engagement, which will in turn inform service planning and delivery.

A stakeholder engagement strategy would integrate current initiatives, such as the two major networks that consult with health planning staff and clinicians. But it will also need to extend the feedback gathered from families, carers and volunteers, and from the peak bodies that represent them. 

Published

Actions for Information and Communication Technologies in schools for teaching and learning

Information and Communication Technologies in schools for teaching and learning

Education
Information technology
Infrastructure
Management and administration
Service delivery
Workforce and capability

Several factors are reducing effective use of information and communication technology (ICT) in the classroom.

These are primarily:

  • ageing ICT equipment and inadequate wireless networks
  • variable student access to devices at school
  • variable teacher access to centrally provided devices for use outside of the classroom.

Information and communication technologies (ICT) are pervasive in modern life. Australian research has identified that the workforce demand for digital literacy and advanced digital skills is growing across most areas of work. There is broad agreement internationally and in Australian school systems that digital literacy is a core skill for the workforce and students will need to be confident with ICT. Education systems around the world are using ICT in classrooms to support learning and employment goals.  

The New South Wales Department of Education’s (the Department’s) overall strategic directions for teaching and learning with ICT are set in the 'Strategic Information Technology Plan 2016–19'. The Department centrally provides a base level of resources to schools for ICT and schools supplement funding from their existing school budget and Parents and Citizens Associations. Each school decides how to allocate these funds to meet local needs. Schools also set expectations for how teachers and students will use technology to help deliver outcomes.

This audit assessed how well New South Wales public schools are using ICT to improve teaching and learning. It focussed on planning and teacher and student use of ICT. We examined whether:

  • the Department identifies key strategic opportunities to enhance the use of ICT platforms and technologies in schools
  • teachers are integrating ICT into classroom practice
  • the Department monitors the impact of ICT on student learning.
Conclusion 

Several factors are reducing the effective use of ICT in the classroom. These are primarily:

  • ageing ICT equipment and inadequate wireless networks
  • variable student access to devices at school
  • variable teacher access to centrally provided devices to use outside of the classroom.

Many schools are struggling to keep up with growing ICT needs within available funding. The Department needs to review whether its current technology programs provide schools with sufficient resources and support to meet the Department’s strategic goals for 21st Century classrooms. The Department should also target additional support to schools to improve planning for ICT resources.  

Most teachers are using ICT in the classroom, however, teacher access to devices outside the classroom varies between schools. In practice, teacher working days extend outside classroom hours. Teachers need access to devices for activities such as lesson preparation and student assessment. With limited access to devices outside of the classroom, teachers may not be able to effectively integrate ICT into lessons. Teachers also require further professional learning to support them to develop their skills in using ICT.  

The Department is not sufficiently monitoring the digital literacy of New South Wales students, which has declined in national tests. Teachers could benefit from support to assess these skills at a school level. The Department also needs to investigate links between student use of ICT and learning outcomes, so they can better support teachers with evidence-based approaches to enhancing learning through ICT.

Old equipment and wireless networks are not keeping pace with modern demands

The Department’s vision for ICT is to enable ‘any learning opportunity, anywhere, anytime’. This vision is at risk due to an ageing stock of devices and wireless networks. The average age of devices in New South Wales schools is over four years. Older devices are less reliable, require greater maintenance and support, and cannot run demanding applications. Further, many school wireless networks are beyond the end of their useful life. This limits the number of teachers and students who can access online content on wireless networks at the same time.

The central funding model for ICT in schools is not meeting current needs

Funding for the Technology for Learning program to deliver ICT in schools has not increased since 2004, despite an increase in the number of students and emphasis placed on ICT in teaching and learning during this time. Schools supplement funding for ICT from their existing school budget and Parents and Citizens Associations.  

The Department’s current funding model for ICT is not adequately addressing a growing gap in the provision of contemporary ICT in classrooms between schools able to access funding from other sources and those which cannot. The Department needs to review whether the Technology for Learning program is equitable in equipping all schools with the modern technology needed to achieve its vision.

Many teachers are not provided with devices for use outside of the classroom

School Principals we interviewed reported that technology is an essential part of a modern classroom and teacher access to devices outside of the classroom can impact how they use ICT. This is because, in practice, teacher working days extend outside classroom hours and teachers need access to devices for activities such as lesson preparation and student assessment. The Department provides teachers with access to a suite of software tools for these tasks.

The Commonwealth Government’s Digital Education Revolution program provided teachers of secondary school students with laptops from 2009 to 2013. The Department’s evaluation of the Digital Education Revolution program found that teachers reported greater confidence with, and use of, ICT throughout the program.  
Providing desktop computers, laptops or tablets for teachers is now a school level decision and arrangements vary across schools. Each school must trade-off between allocating devices for students and teachers. Most other States and Territories provide all teachers with a laptop for use in and outside of the classroom or offer subsidised access to one.  

There is limited teacher professional learning in the use of ICT

The Department’s research has identified that professional learning is an important factor in how effectively teachers use ICT to enhance teaching and learning. Despite this, the Department provides few courses on using ICT in the classroom directly, and most of these are offered in Sydney. This limits accessibility for teachers outside of the metropolitan area. Schools we visited reported that the costs of courses and providing relief teachers limits the number of external courses or events that teachers attend, especially for rural and regional schools. Increasing the use of online learning would improve access for teachers in these areas.  

The Department is not adequately monitoring trends in professional learning in ICT or evaluating the overall effectiveness of courses. A recent upgrade to the professional learning system may provide the Department with better quality data to do this.

Greater monitoring and reporting on technology use in schools is required

The Local Schools, Local Decisions policy gives schools greater authority to make strategic decisions on the use of ICT appropriate to their local contexts. To support this, the Department needs to better monitor current trends, and identify emerging needs to determine future direction and how best to support schools.  

For example, the Department does not currently know how many devices are allocated to teachers or how many schools have implemented a student Bring Your Own Device scheme. This affects how schools are using ICT, and places demand on the network and the type of support the Department must provide. An assessment of the ICT maturity of schools would help the Department target its resources to schools requiring greater assistance with planning.

The Department does not regularly monitor or report on student capabilities with ICT. A national assessment found that the ICT literacy of a sample of Year 6 and Year 10 New South Wales students fell between 2011 and 2014. The fall was greater in New South Wales than in other States and Territories. Without more regular assessment or reporting, the reasons behind this fall and the distribution of student capabilities between schools will remain unknown. 

By July 2018, the Department of Education should:

  1. Review the Technology for Learning program and school ICT support resourcing to determine whether resourcing is adequate for modern school requirements.
     
  2. Develop a program to improve wireless networks in all NSW schools, for instance by expanding the Connecting Country Schools Program to all NSW schools.  
     
  3. Implement an assessment of school ‘ICT maturity’ and use this to target assistance to those schools requiring support with forward planning for ICT.
     
  4. Improve the use of evidence to inform plans and strategies, including:
    • more detailed monitoring of teacher and student access to and use of ICT
    • evaluating the impact of teacher professional learning on student outcomes 
    • further examining the links between ICT and student outcomes.
       
  5. Improve teacher access to devices for use outside of the classroom to improve how effectively they integrate ICT into teaching and learning.
     
  6. Improve teacher professional learning by providing more:
    • online learning opportunities for teachers in regional and remote areas
    • courses focused on pedagogy to make best use of ICT.
       
  7. Identify the ICT skills students need, and provide teaching resources to develop these skills and monitor their achievement.

Appendix One - Response from the Agency

Appendix Two - About the audit

Appendix Three - Performance auditing

 

Parliamentary reference - Report number #289 - released 6 July 2017 

Published

Actions for Sydney Road Maintenance Contracts

Sydney Road Maintenance Contracts

Transport
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management

In November 2013, Roads and Maritime Services (RMS) outsourced the maintenance of State roads in the Sydney region south and west zones using an innovative contracting approach called the Stewardship Maintenance Contract (SMC). The SMC links risk to reward, and uses a performance framework where outcomes should drive improved performance over time.

RMS’ SMC contract management includes most elements of good practice, including governance and dispute resolution mechanisms. However, key elements are missing which reduces its effectiveness.

Roads and Maritime Services (RMS) is responsible for the Sydney region State roads network This includes over 2,800 kilometres of roads and associated road corridor infrastructure such as bridges, tunnels and drainage structures. RMS divides the network into three geographical areas: south, west and north zones.

In 1995, RMS first outsourced road corridor infrastructure maintenance for the north zone through a Performance Specified Maintenance Contract (PSMC). The current 10-year PSMC for the north zone will expire in October 2018. Prior to November 2013, RMS maintained roads in the south and west zones through its Road and Fleet Services unit. 

In November 2013, RMS outsourced road maintenance services for the south and west zones using Stewardship Maintenance Contracts (SMC). The contracts run for seven years with an option for a further three years at RMS’ discretion. RMS estimated that the annual cost of these contracts was around $240 million in total. In March 2018, the contract prices are due to be reset by negotiation to reflect the contractors’ experience with, and better information about, the road networks and routine maintenance requirements. 

The SMC model adopted stewardship principles to improve value for money. RMS defined stewardship principles as a broad set of values, attitudes and behaviours, required of the contractor to effectively manage the assets on behalf of RMS. The SMC also includes commercial principles, such as linking risk to reward, and a performance framework where outcomes drive performance.

This audit assessed whether RMS had effectively managed the outsourcing of road maintenance in the Sydney region south and west zones. In making this assessment, we answered the following questions:

  1. Did RMS justify the decision to adopt the SMC model?
  2. Do SMCs include key performance indicators (KPIs) and incentives which promote efficiency and effectiveness? 
  3. Does RMS collect high quality information on contractor performance and take action to correct performance deficiencies?
  4. Are the expected benefits being achieved?

Conclusion

RMS developed an innovative contracting approach with the SMC. RMS has realised some benefits in the first year, including savings, from outsourcing road maintenance in the Sydney region south and west zones using the SMC. However, RMS’ management of the SMC has key elements missing which reduces its effectiveness.

The SMC includes performance measures and incentives to drive efficiency and effectiveness improvements over time.  

RMS has established a contract management framework which includes most elements of good practice, including governance and dispute resolution mechanisms. However, it does not have procedures to guide its contract managers in managing specific provisions of the SMC. Consequently, RMS has not exercised several significant SMC requirements, such as having the contractor account for an efficiency dividend in its pricing at the start of each three-year works period. It also has not done enough to assure itself that the contractor provided performance and financial data are correct. This is important because the data is used to measure performance and calculate contractor payments.  

RMS assessed that it had achieved around 80 per cent of the expected cost benefit in the initial year of the SMC. However, it has not tracked its achievement of benefits since then.

The Stewardship Maintenance Contract

RMS justified adopting the SMC model and included KPIs to drive efficiency and effectiveness

The SMC model includes features that RMS had not previously used for road maintenance contracts. These included adopting stewardship principles and transferring price risk to the contractor over time as the contractor becomes familiar with the assets being maintained.

The SMC model meets RMS’ requirements for flexibility in pricing models, the need for collaboration in asset maintenance planning, promoting innovation and effective performance management.

RMS used many good practices to develop the SMC model, including:

  • preparing a robust business case comparing the SMC model to RMS maintaining the road network itself, as well as assessing whether two other contracting models
    (traditional and alliance) would meet its requirements
  • assessing experiences with similar arrangements in other jurisdictions and identifying elements that worked to get the best outcomes
  • developing a robust performance framework, which included a mix of efficiency and effectiveness KPIs that reflected NSW Government policy and RMS priorities
  • incorporating risk and reward incentives delivered through cost sharing arrangements which change as the contract matures
  • using a contract duration that supports RMS priorities and provides an incentive for better quality outcomes.

RMS uses data provided by the contractor to measure performance and calculate payments to the contractor. The SMC includes a specific sanction if RMS finds that the contractor provided incorrect performance data, but no specific sanction if the contractor provides incorrect financial data. If RMS finds that the contactor provided incorrect performance or financial data, RMS can only recover over-payments which may have been made using the incorrect data.  

To provide a stronger incentive for the contractor to ensure data it provides is accurate, RMS should consider whether to incorporate stronger sanctions when negotiating the commercial reset due in mid-2018 for south and west zones. RMS should also consider this for the new contract for the north zone when the current PSMC contract expires in October 2018.

RMS' contract management approach and benefits realization

RMS can improve the effectiveness of its oversight and management of the SMC

RMS does not have SMC specific contract procedures to guide its contract managers. Consequently, RMS has not exercised several significant SMC requirements, such as having the contractors account for an efficiency dividend in their pricing at the start of each three-year works period. Effective contract management should be supported by contract specific procedures, with explanations of, and allocation of responsibility for, the various interventions that RMS may be required to exercise in the SMC.

Performance and financial reporting under the SMC is based on a mix of RMS and contractor provided data. While there are a range of audits of contractor provided performance and financial data that RMS can conduct each year under the SMC, it does not have a schedule of audits it will conduct and when.  
During the first year of the SMC, RMS commissioned some limited audits of financial data. In the first three years of the SMC, RMS did not conduct any audits of performance data. Had there been SMC specific procedures in place, this would have reduced the risk of RMS not implementing a systematic audit program to give it reasonable assurance on the quality of the data that the contractor has provided. This is important because the data is used to measure performance and calculate contractor payments.

RMS has been aware of data quality issues since 2015. While RMS advised that it commenced addressing some data quality issues in response to a series of reviews conducted in 2015, a recent internal audit report indicates that RMS has not resolved the data quality issues.  

RMS achieved benefits in the first year, but has not tracked benefits since

As part of the business case, RMS agreed to implement a benefits realisation strategy, including a benefits tracking tool. RMS commenced tracking benefits, but did not establish a comparative baseline pre-SMC on non-financial benefits, and has not tracked benefits past year one.

In 2015, a benchmarking study commissioned by RMS found that it had achieved 80 per cent of the expected recurrent cost savings and other benefits, such as improved workplace safety, in the first full year of the SMC. However, there was no clear baseline to measure
non-financial performance. The study was qualified due to gaps in available data. The study also did not reconcile the actual one-off transition costs to the business case estimate.

During the course of the audit, RMS advised that it intends to repeat this type of study to determine whether it has achieved all expected benefits (and their value), and that it would use the results to inform its negotiation with the SMC contractors as part of the commercial reset due in mid-2018.

Roads and Maritime Services is responsible for the State Roads network in the Sydney region

Roads and Maritime Services (RMS) is responsible for the Sydney region State roads network. This includes over 2,800 kilometres of roads and associated road corridor infrastructure such as bridges, tunnels and drainage structures. The network is divided into three geographical areas: south, west and north zones. Prior to November 2013, RMS maintained roads in the Sydney region south and west zones through its Road and Fleet Services unit.  

In 1995, RMS first outsourced road corridor infrastructure maintenance for the north zone through a Performance Specified Maintenance Contract (PSMC). The current 10-year PSMC for the north zone will expire in October 2018. This contract is worth around $35 million per annum.  

NSW Government priorities and road maintenance

Efficient and effective road maintenance contributes to the following NSW Government priorities:

  • improving road travel reliability
  • ensuring on-time running of public transport
  • reducing road fatalities
  • improving government services
  • keeping our environment clean.

The NSW Commission of Audit recommended outsourcing the maintenance of State roads

The NSW Commission of Audit in its Final Report on Government Expenditure (May 2012) recommended contestability as an appropriate strategy to consider for improving road maintenance service delivery for State roads.  

The Commission benchmarked RMS’ road surface quality and cost per lane kilometre against those of Western Australia, Victoria, and Queensland. This showed that New South Wales lagged the other states on both these measures.  

Exhibit 1: Interjurisdictional comparison of road maintenance outcomes 2009–10
  WA VIC QLD NSW
Roads managed (lane kms) 52,659 50,510 71,353 80,348
Estimated spend ($/lane km) 5,000 4,500 6,000 7,000
Road quality measure (%) 99 99 94 91

Source: NSW Commission of Audit Final Report May 2012.

The Commission noted that RMS had conducted two independent reviews to examine the potential for extending road maintenance contestability. The Commission found that there was inadequate and inconclusive benchmarking to establish the efficiency of RMS’ Road and Fleet Services unit when compared to outsourcing. It recommended that RMS bring forward a proposal to conduct a competitive tender for the road maintenance of the Sydney region south zone road network to inform the feasibility of a progressive rollout of road maintenance contestability across other areas of the State. In August 2012, the NSW Government adopted the Commission’s recommendation.

The NSW Government introduced road maintenance contestability through Stewardship Maintenance Contracts

In April 2013, the NSW Government announced that it would introduce road maintenance contestability across the Sydney region, using a Stewardship Maintenance Contract (SMC) model to improve value for money. In doing so, it excluded RMS’ Road and Fleet Services unit from tendering.  

The SMC model is based on the following key commercial and performance principles set by RMS:

  • performance driven by outcomes
  • flexible and adaptable
  • transparent and measurable
  • linking risk to reward
  • continuous improvement
  • criteria for selection of, and transition to, different payment models.

The following key stewardship principles underpin the SMC’s broad set of values, attitudes and behaviours, which are required of the contractor to effectively manage the assets on behalf of RMS:

  • putting RMS’ customers (road users and the general public) first and being responsive to them
  • being responsible and accountable for the outcomes resulting from the management of the assets
  • managing the assets diligently, efficiently and effectively with limited direction from RMS
  • working collaboratively with RMS to deliver services that are tailored to meet RMS’ evolving needs
  • acting with integrity and transparency in performing the services
  • performing the services in the best interests of RMS and asset users.

Other key features of the SMC include:

  • service requirements which describe the scope of the services, and the standards the contractor must meet
  • a commercial framework which defines how payments are structured, how performance assessment will impact on payments and outlines the key commercial principles. SMCs primarily divide payments into two main mechanisms, these being the priced component (or fixed price) and the target cost calculated as follows:
    • fixed price – the contractor is paid a pre-agreed amount for specific services being provided, regardless of the actual costs incurred
    • target cost – RMS and the contractor agree on a target cost for a project, and any cost overruns or underruns are shared between them
  • a performance framework which provides mechanisms for assessing contractor performance. This includes a comprehensive listing of the key result areas (KRAs) and key performance indicators (KPIs) against which RMS measures the contractor’s performance. The framework also outlines the scoring methodology that RMS uses to determine whether the contractor’s bid margin (profit and overheads) is reduced due to less than satisfactory performance or whether a bonus is paid if a threshold performance score is exceeded.

Road maintenance under SMCs for Sydney region south and west zones commenced in November 2013

In November 2013, RMS awarded SMCs to the Leighton Boral Amey consortium, now named Ventia Boral Amey (VBA), for the south zone and the DownerMouchel (DM) consortium for the west zone. The contracts run for seven years with an option for a further three years at RMS’ discretion. In April 2014, full services commenced following a four-month transition period. RMS estimated that the annual cost of these contracts was around $240 million in total. In March 2018, the contract prices are due to be reset by negotiation to reflect the contractors’ experience with, and better information about, the road networks and routine maintenance requirements. 

  1. Roads and Maritime Services should consider whether to incorporate stronger sanctions in the Stewardship Maintenance Contract if the contractor provides incorrect performance or financial data to RMS, when:
     
    1. negotiating the commercial reset for the next works period with the Sydney region south and west zone contractors due in July 2018.
    2. finalising a new SMC contract for the Sydney region north zone, due to commence in October 2018.

Roads and Maritime Services should, by September 2017:

2.  Review its contract management framework for SMCs to ensure that all authorities and accountabilities of
     contract managers are clearly defined, including:

a) accountability and procedures for exercising all operational clauses in the SMC where RMS may opt to, or be required to intervene, or make a decision

b) authority to approve or initiate the interventions RMS is required to, or may, exercise under the SMC

c) the audits that RMS will conduct to systematically validate the performance and financial data that the SMC contractors provide

d) the accountabilities of RMS contract managers to systematically review audits and quality reviews that the SMC contractors must conduct to demonstrate compliance with their service plans

e) the accountabilities of RMS contract managers to check that the monthly and annual reports provided by SMC contractors do not contain errors, omissions or inaccuracies.

3.  Improve its management of benefits realisation by:

a) initiating a further benefits realisation review and record the benefits delivered against those
    estimated following the tender process, including the one-off transition costs

b) identify any benefits, including savings, not yet attained and develop strategies to address any short-falls

c) establish a tool to track the ongoing realisation of benefits.

Published

Actions for NorthConnex

NorthConnex

Premier and Cabinet
Treasury
Transport
Compliance
Infrastructure
Internal controls and governance
Management and administration
Procurement

The processes used to assess NorthConnex adequately considered value for money for taxpayers.This report also found that the impact of tolling concessions on road users and the motorway network was consistent with policy objectives described in the 2012 NSW Long Term Transport Master Plan.

NorthConnex is a nine-kilometre tolled motorway tunnel between the M1 Pacific motorway at Wahroonga and the M2 Hills motorway at West Pennant Hills. The total cost for the project is $3.1 billion. NorthConnex will be funded through toll charges, and contributions from the NSW and Australian Governments of up to $405 million each. In January 2015, the NSW Roads Minister signed the final contracts for NorthConnex.

By December 2017, the Department of Premier and Cabinet should:

1. publish an updated ‘Unsolicited Proposals – Guide for Submission and Assessment’ which clarifies obligations with requirements in other NSW Government policies such as the NSW PPP guideline and Infrastructure Investor Assurance Framework. The update should require:

a) a business case to be prepared, and a business case gateway review completed, as part of the assessment of the detailed proposal (currently stage 2)

b) probity reports must be completed and considered before the decision to proceed to the next stage.
 

The Department of Premier and Cabinet and NSW Treasury should immediately:

2. improve record keeping to ensure compliance with the State Records Act 1998 and the NSW Government Standard on Records Management.

 

Published

Actions for Medical equipment management in NSW public hospitals

Medical equipment management in NSW public hospitals

Health
Compliance
Internal controls and governance

In an audit of medical equipment in NSW hospitals, the NSW Auditor-General, Margaret Crawford found that the management of PET-CT scanners could be enhanced by better performance reporting and replacement planning, and that biomedical equipment needed more timely testing and maintenance.

The NSW Auditor-General examined the management of:

  • a high-value piece of equipment primarily used for diagnosing cancer - Positron Emission Tomography and Computed Tomography (PET-CT) scanners
  • a small sample of lower value but critical medical equipment known as biomedical equipment.

Medical equipment needs to be properly managed over its lifecycle, from planning to acquisition, operation and disposal, to ensure patient safety and quality of care.

This audit assessed how well NSW hospitals managed medical equipment to meet the needs of patients. We examined the management of:

  1. Positron Emission Tomography and Computed Tomography (PET-CT) scanners, a high-value piece of equipment commonly used for diagnosing cancer
  2. a small sample of lower value but critical medical equipment known as biomedical equipment.  

We examined five hospitals for this audit: Lismore Base Hospital (in the Northern NSW Local Health District (LHD)), Liverpool Hospital (South Western Sydney LHD), Nepean Hospital (Nepean Blue Mountains LHD), Royal Prince Alfred Hospital (Sydney LHD) and Westmead Hospital (Western Sydney LHD).

Conclusion 

Management of PET-CT scanners

PET-CT scanners were well managed, though could be enhanced by better performance reporting and replacement planning.


The PET-CT scanners we reviewed were well utilised and there was prompt reporting of scan results by specialists to referring doctors.  

In 2015–16, 10 per cent of PET-CT scans were inpatient services (funded mostly by NSW Health), 60 per cent were Medicare-funded outpatient services, and the remaining 30 per cent were privately referred outpatient services not funded by Medicare. Service costs for privately referred scans not funded by Medicare were met by a range of sources, including hospitals’ general purpose funds and patient out-of-pocket charges. Across the five hospitals, out-of-pocket charges varied and ranged from $250 to $950 per scan.  

While responsibility for providing PET-CT services has been delegated to Local Health Districts, NSW Health could assume an enabling role in collating performance reporting to inform service planning and benchmarking.

There was little equipment replacement planning for PET-CT scanners, making it unclear when and how equipment might be replaced, including what model of funding might apply.

Management of biomedical equipment

Improvement is needed in the timeliness of testing and maintenance for biomedical equipment. Outdated and inefficient information systems used for day-to-day management of biomedical equipment need to be improved or replaced.


Only about half of the items of equipment included in our sample had testing and maintenance completed according to scheduled intervals or within 30 days of the scheduled date. These intervals were set under the Australian/New Zealand Standard 3551 ‘Management programs for medical equipment’, which requires regular testing and maintenance of biomedical equipment to ensure it is safe and suitable for clinical use.

The information systems used to record service histories of biomedical equipment were inefficient and inadequate for effective planning, monitoring and reporting of testing and maintenance. The implementation of a state-wide asset management system, Asset and Facilities Management Online (AFM Online), which will replace existing systems, has experienced delays. In addition, hospitals did not maintain adequate oversight of testing and maintenance that was outsourced to external contractors.

Management of PET-CT scanners

PET-CT scanners were well utilised and reports were promptly sent to referring doctors

PET-CT scanners in Liverpool, Westmead and Royal Prince Alfred Hospitals were utilised to over 85 per cent of capacity. Utilisation at Nepean Hospital (around 60 per cent) was lower due to the age of the equipment and insufficient ‘uptake rooms’ for patients to receive radioactive injections. Lismore Base Hospital had a lower population to service and scheduled its PET-CT patients into three days a week to optimise efficiency.

PET-CT services were generally available to patients in a timely way and reports were promptly sent back to referring doctors. While clinicians we interviewed advised that there was generally no delay in patients accessing PET-CT scanners, only one hospital collected patient waiting time data to confirm this view.

Funding of PET-CT scans is complex

The funding of health services in NSW public hospitals involves a complex arrangement between the Australian and NSW Governments. In 2015–16, 10 per cent of PET-CT scans were inpatient services (funded mostly by NSW Health), 60 per cent were Medicare-funded outpatient services, and the remaining 30 per cent were privately referred outpatient services not funded by Medicare. Service costs for privately referred scans not funded by Medicare were met by a range of sources, including hospitals’ general purpose funds and patient out-of-pocket charges. Across the five hospitals, out-of-pocket charges varied and ranged from $250 to $950 per scan.

Better performance reporting could enable better planning of PET-CT scanners

NSW Health has delegated the planning functions for many pieces of high-value medical equipment, including PET-CT scanners, to Local Health Districts. This is intended to ensure local decision-making that is responsive to local community needs.

While local planning and service delivery is delegated to each Local Health District, under the Health Administration Act 1982, the Secretary of NSW Health is responsible for planning the provision of comprehensive, balanced and co-ordinated health services throughout New South Wales.

NSW Health could enable better service delivery and planning by collating and sharing performance information about PET-CT services across Local Health Districts.  

Equipment replacement planning was unclear 

Planning for future replacement of PET-CT scanners at the hospitals we examined was unclear, including when equipment would be replaced and what funding model might be applied. A better practice would be to have a clear equipment replacement plan for existing scanners that would ensure clarity about when equipment will be replaced, whether the replacement scanner should be leased, purchased or shared, and possible funding sources.

Management of biomedical equipment 

Equipment testing and maintenance did not always comply with intervals set under the Australian/New Zealand Standard All hospitals we examined adopted the Australian/New Zealand Standard 

All hospitals we examined adopted the Australian/New Zealand Standard 3551 ‘Management programs for medical equipment’ (the Standard) for managing medical equipment, the purpose of which is to ensure that equipment is safe and suitable for use. The Standard requires the regular testing and maintenance of biomedical equipment at predetermined intervals.  

Our review of three years of service records for 50 items of biomedical equipment found that:

  • nineteen (38 per cent) items of equipment were tested and maintained within the intervals determined by hospitals under the Standard
  • five (ten per cent) had at least one instance where they were tested and maintained less than 30 days later than when the work was due
  • thirteen (26 per cent) had at least one instance where they were tested and maintained one to six months later than when the work was due
  • six (12 per cent) had at least one instance where they were tested and maintained more than six months later than when the work was due
  • seven (14 per cent) were lost, removed from clinical use or unable to be unidentified.

The Standard envisages that there may be circumstances when testing and maintenance does not occur according to schedule, and sets out a procedure that should be followed when testing and maintenance is overdue. This procedure was not followed in any of the hospitals we reviewed.  

Two out of five audited hospitals used risk rating to oversee equipment maintenance

Only two out of five hospitals we examined used risk rating, under which equipment is classified according to clinical risk, to prioritise equipment maintenance and to determine appropriate frequencies for equipment testing and maintenance.  

Some hospitals had inadequate oversight of work performed by external contractors

There was variable oversight of outsourced service contracts for high-risk biomedical equipment. In some cases, hospitals did not maintain complete histories of testing and maintenance work performed by contractors. Some contractors had incorrectly recorded items they had tested, or had refused to provide details of testing and maintenance performed.

New peer review process may improve assurance over testing and maintenance

NSW Health has started a peer review process in a small number of hospitals. This process covers a range of performance indicators relating to equipment management practices, including the auditing of test and maintenance records for two pieces of equipment per hospital. There is opportunity to build upon this effort by including all hospitals in the peer review process, and by expanding the sample of equipment subject to records audit.  

Hospitals’ record keeping of testing and maintenance service histories was inefficient and inadequate

The Standard requires that adequate and traceable equipment maintenance histories be kept. We found that hospitals’ record keeping of equipment service histories was inefficient and inadequate. None of the hospitals used an information system that provided the full three-levels of capability outlined below:

  • storing equipment information electronically, allowing easy retrieval
  • managing service requests and holding full service histories and test results
  • automatically generating reports to allow risk based prioritisation of equipment maintenance, repairs and replacements.

There is an urgent need to implement the state-wide asset management system for biomedical equipment

Hospitals advised that the current outdated systems will be replaced by a state-wide asset management system, Asset and Facilities Management Online, though this implementation has experienced delays.

There was good governance over equipment acquisition, replacement and disposal

All hospitals had formal processes for acquiring and replacing biomedical equipment, including management committees to oversee equipment needs. Equipment disposal processes were aligned with relevant standards and policies.

All hospitals purchased the majority of their biomedical equipment through HealthShare, the central procurement agency of NSW Health. This contributed to cost savings across the health system.

Management of medical equipment in the NSW public health system

In New South Wales, responsibility for the management of public hospitals is devolved from the NSW Ministry of Health to 15 Local Health Districts and two Speciality Health Networks.The Secretary of NSW Health retains a function under the Health Administration Act 1982 to plan the provision of comprehensive, balanced and co-ordinated health services throughout the State.

Every year, the Ministry of Health and Local Health Districts sign a service agreement that sets out the expected performance from Local Health Districts and the funding they will receive to provide their services. Under these arrangements, responsibility for managing medical equipment is delegated to Local Health Districts.  

Medical equipment is used to diagnose, treat and manage patients. It includes items as diverse as patient beds, dialysis machines, operating tables and heart monitors. The good management of medical equipment contributes to ensuring patient care and safety, as well as keeping the cost burden on the public health system low.

The New South Wales public health system uses a wide range of medical equipment. Most of this equipment is used in hospital settings, however, some is also used in community health centres and patients’ homes. The cost of individual items ranges from less than $100 to several million dollars. In total, about $1.2 billion, or six per cent of NSW Health’s total asset value, was for medical equipment.

The approach used to manage medical equipment varies between hospitals, and between expensive and less-expensive items. Different service models are also used, for example, some items may be purchased in one hospital, but leased in another.  

About the audit

This audit assessed how well NSW public hospitals managed medical equipment to meet the needs of patients. We looked at the lifecycle of biomedical equipment, which comprises planning, acquisition, operation and maintenance, and then replacement and disposal. The audit questions in relation to each stage of the lifecycle are summarised in Exhibit 1. 

By June 2018 

  1. NSW Health should review all services provided by Local Health Districts which use high-value medical equipment (with establishment cost that exceeds $3 million), to determine whether state-level coordination, service benchmarking and equipment usage reporting is warranted.

  2. NSW public hospitals offering PET-CT services should collect and use patient waiting time data (the difference between the date of referral and the actual date of the scan) as part of improving service efficiency and meeting patient needs.

  3. Local Health Districts should ensure that there is a formal equipment replacement plan at the time of procuring high-value equipment, for both new and existing services. The plan should include an estimated time of replacement. The Ministry of Health should regularly review capital funding implications from these planned equipment replacements.

By June 2019

4. NSW public hospitals should review internal business rules and processes for biomedical equipment management to ensure that:  

a) equipment is accessible by service technicians for testing and maintenance work, including establishing internal processes to assist service technicians in gaining access to equipment that has missed previous testing and maintenance attempts in accordance with the Australian/New Zealand Standard 3551

b) adequate maintenance records are kept, including descriptions of testing and maintenance work carried out in accordance with the Australian/New Zealand Standard 3551

c) there is regular reporting to Local Health District Chief Executives on the compliance of equipment testing and maintenance, including equipment that is tested or maintained later than scheduled intervals

d) there is specified statement of risk tolerance for late equipment testing and maintenance and mechanisms to appropriately prioritise equipment testing and maintenance.

5. Ministry of Health should encourage that all NSW public hospitals have their biomedical equipment management practices reviewed under the new peer review process, and that the review sample from each hospital be increased to more than two pieces of equipment per hospital.

6. Ministry of Health should complete the implementation of AFM Online for biomedical equipment management.

Appendix One - Response from NSW Health

Appendix Two - About the Audit

 

Parliamentary reference - Report number #286 - released 25 May 2017

Published

Actions for Contingent workforce - management and procurement

Contingent workforce - management and procurement

Industry
Management and administration
Procurement
Workforce and capability

The Department of Industry, Transport for NSW and the Department of Education were not able to demonstrate that the use of contingent labour is the best resourcing strategy to meet their business needs or deliver value for money.

NSW Government agencies use contingent labour to help deliver services to the community. The NSW Public Service Commission (PSC) defines contingent labour as people employed by a recruitment agency and hired by government agencies to provide labour or services. Agencies use contingent labour to fill a gap in skills or capability, for example, to fill a position while a staff member is on leave or where specialist knowledge may be needed on a short-term basis. The PSC estimated that in 2016 the contingent workforce represented 2.3 per cent of the public sector workforce, equivalent to 7,571 full-time employees.

The PSC recommends that contingent labour only be used when it is the most efficient and effective option available to respond to an agency’s business needs. It also recommends that agencies’ use of contingent labour be informed by workforce planning. 

Government spending on contingent labour has increased significantly over the last five years, from $503 million in 2011–12 to $1.1 billion in 2015–16. To reduce spend in this area, the NSW Government has introduced the Contingent Workforce Renewal Strategy, overseen by NSW Procurement. The Strategy aims to achieve greater efficiency and effectiveness in the use of contingent labour. It has four pillars:

  • prequalification scheme – a list of approved contingent labour suppliers
  • vendor management system – an information system to manage contingent workers
  • managed service provider – a recruitment agency broker
  • contractor management organisations – organisations that manage a contingent labour database, which agencies can source labour from.

The prequalification scheme is mandatory for public sector agencies. Agencies are progressively rolling out the other pillars. The vendor management system and managed service provider are together called ‘Contractor Central’.

Within the context of sector reform aimed at promoting efficiency and effectiveness, the objective of this audit is to assess whether agencies’ approach to purchasing and managing their contingent workforce meets business needs and delivers value for money. In making this assessment, we reviewed three agencies each at a different stage of the reform:

  • Department of Education (Education) – Contractor Central introduced in August 2015
  • Department of Industry (Industry) – Contractor Central introduced in November 2016, after our review
  • Transport for NSW (Transport) – Contractor Central not in place.
Conclusion

None of the three agencies we reviewed were able to demonstrate that contingent labour is the best resourcing strategy to meet their agencies’ business needs or delivers value for money. There are three reasons for this. First, agencies’ use of contingent labour was not informed by workforce planning at an agency level, with limited work undertaken in this area. Second, two of the three agencies have limited oversight of their contingent workforce. Information is not reliable or accurate, reports are onerous to produce, and there is limited reporting to the agency’s executive. Finally, none of the agencies routinely monitor and centrally document the performance of contingent workers to ensure services are delivered as planned. Together, these factors make it difficult for agencies to ensure contingent labour is engaged only when needed, at reasonable rates, and delivers quality services.

Some of these issues will be addressed by Contractor Central, which had only been introduced at Education at the time of our review. The new software program enables staff to easily obtain real-time reports on its contingent workforce. The recruitment broker also has the potential to improve value through better negotiation and benchmarking of pay rates. However, Contractor Central will only address some of the issues highlighted above. Better workforce planning and performance monitoring are needed to ensure an agencies’ workforce, including contingent workers, meets its business needs and represents value for money.


The use of contingent labour neither informs nor is informed by agency level workforce plans

None of the three agencies we reviewed had an agency level workforce plan in place. Agencies could not demonstrate that they had analysed their use of contingent labour at an agency level, including how it is being used to address any skills gaps. An agency’s executive is responsible for ensuring that an agency level workforce plan is in place. An agency level workforce plan helps hiring managers to make decisions on the best resource strategy to meet their business needs. This is important because contingent labour should only be engaged after considering all other recruitment options and the agency’s workforce plan.

Contingent workforce data is not always reliable or accurate

The accuracy and reliability of contingent workforce data varied significantly across the three agencies we reviewed. In Industry and Transport, information on contingent labour is difficult to obtain because it must be drawn from different data sources, affecting its accuracy, reliability and timeliness. This information is also incomplete, with these agencies not having a full picture of their contingent workforce. Quality data is important because it improves an agency’s capacity to plan and monitor its use of contingent labour to ensure it meets business needs.

At the time of our review, only Education, through Contractor Central, was able to obtain timely and accurate data on its use of contingent labour. Contractor Central has also improved its reporting capability, with the agency’s executive now receiving quarterly reports on its contingent workforce. In contrast, executives in Industry and Transport received ad-hoc reports on the use of contingent labour that only gave them limited oversight of their contingent workforce.

Long tenure of contingent workers is an issue in agencies

We found that the maximum tenure of contingent labour varied across agencies from nine to more than 20 years. In Education and Transport, staff reported that hiring managers assume contingent workers are automatically renewed at the end of their contract, with no formal consideration about whether contingent labour is still needed. Also, contingent labour is used for significant capital projects in the information technology and infrastructure areas where a project may run for several years.

None of the agencies reviewed undertook an analysis to determine how to reduce tenure while ensuring business needs are met. This is particularly important for long-term use of contingent labour for large capital projects. Understanding whether contingent labour represents best value compared to other recruitment options, such as secondments or temporary employment, is essential. Contingent workers are engaged under different working conditions to employees. Long tenure can pose an industrial relations risk to agencies because contingent workers may believe they are entitled to the same working conditions as employees.

On and off-boarding processes could be strengthened

Agencies have processes to engage and release contingent labour, also called on boarding and off-boarding. This includes access to IT systems, building access, and the return of property. However, not all agencies had on boarding or off-boarding checklists with specific requirements for engaging or releasing contingent labour. In addition, agencies’ off boarding guidelines did not always provide for knowledge transfer. This was identified as a key risk by staff because it is important to ensure that critical skills and knowledge are retained.

Risk that agencies are being overcharged when engaging contingent labour

We found that in agencies without Contractor Central, there is limited assurance that recruitment agencies charge in line with the prequalification scheme fees. NSW Procurement estimates that the government was overcharged $1.3 million in 2015–16. In addition, there is a risk that hiring managers do not have sufficient information to benchmark pay rates when negotiating contingent labour engagements. Agencies with Contractor Central may be more likely to get reasonable rates by using a recruitment broker who has specialised market knowledge.

No system in place to monitor the performance of contingent workers

None of the agencies we reviewed had a system in place to monitor the performance of their contingent workforce at an agency level to ensure it delivers value for money. Hiring managers are not required to evaluate whether contingent labour delivers the services for which they are hired. For example, hiring managers do not routinely assess and centrally document the quality of services provided, including whether services are delivered on time and within budget. This means contingent workers who are not performing may be re-hired by other managers or agencies. With the implementation of Contractor Central, there is the means to capture agency-wide information on the performance of contingent workers.

Contractor Central has the potential to improve value for money

Contractor Central has the potential to improve value for money. This is because the recruitment broker has specialised market knowledge and is able to promote competition, and benchmark and negotiate pay rates. In addition, the new software can streamline invoice processing and ensure correct supplier rates are charged. Education reports that it achieved a net saving of $944,600 from August 2015 to May 2016 due to the introduction of Contractor Central. Industry also expects to achieve similar results with Contractor Central, which it advised was implemented in November 2016.

The Department of Industry and Transport for NSW should, by December 2017:

1. improve the accuracy and reliability of their data on contingent labour

2. routinely report the use of contingent labour to agency executive.

The Department of Industry, Department of Education, and Transport for NSW should:

by December 2017:

3. ensure agency-wide on-boarding and off-boarding guidelines or checklists detail the specific requirements for engaging or releasing contingent labour, including provisions for knowledge transfer.

by March 2018

4. ensure that contingent labour informs and is informed by workforce planning, by:

  • analysing agency-wide business needs, staff capability, and skills gaps
  • understanding how gaps are filled by contingent workers or other recruitment options
  • assessing whether long-term contingent worker engagements are the most economical and effective labour option
  • evaluating whether contingent workers meet agency business needs and deliver value for money.

5. assess and centrally document the performance of their contingent workforce to ensure that services are delivered as contracted

6. implement processes to ensure that hiring managers consider other recruitment options prior to engaging or re-engaging contingent workers.
    

Sector-wide learnings

This audit identified learnings that government agencies across the sector should consider when procuring and managing contingent labour:

1. Contingent workforce planning should be part of an agency’s broader workforce planning.

2. Using information systems to manage and procure contingent labour improves the accuracy, reliability and timeliness of contingent labour data. This information enables agencies to consistently assess contingent labour rates and to identify persistent skills gaps in their workforce.

3. Routine reporting of contingent labour to agency executives provides oversight of an agency’s use of contingent labour.

4. Hiring managers should consider all recruitment options, with advice from human resources staff, before engaging contingent labour to ensure that it is the most appropriate solution for a specific need.

5. Regularly assessing long tenure contingent labour engagements helps to ensure that such engagements are still the most economical and effective labour option.

6. Planning the engagement of contingent workers, including provisions for knowledge transfer, maximises the potential to obtain value for money from the use of contingent labour.

7. Assessing and centrally documenting the performance of contingent labour against agreed deliverables helps to ensure services are delivered as planned, including in terms of quality, and timeliness.

Download appendices for report on Contingent workforce

 

Parliamentary reference - Report number #282 - released 27 April 2017

Published

Actions for Building the readiness of the non-government sector for the NDIS

Building the readiness of the non-government sector for the NDIS

Community Services
Internal controls and governance
Management and administration
Project management
Risk
Service delivery
Shared services and collaboration
Workforce and capability

The Department of Family and Community Services has managed the risks of the transition to the National Disability Insurance Scheme (NDIS) in New South Wales effectively by increasing the overall capacity of the non-government sector and investing in provider capability.

The National Disability Insurance Scheme (NDIS) is a major reform that aims to change the way disability support is provided and received. Responsibility for overseeing the system to support people with disability in New South Wales will transfer from the NSW Government to the National Disability Insurance Agency (NDIA), an independent statutory agency of the Australian Government. Eligible people with disability will receive individual funding from the NDIA and purchase support from their chosen service providers, rather than being referred to services funded or provided by government. The NSW Government will transfer all disability services it currently provides to the non-government sector.

Approximately 78,000 people received NSW Government-funded disability support in 2015–16 at a cost of around $3.3 billion. An estimated 142,000 people will have an individual NDIS support plan in New South Wales, with total funding rising to around $6.8 billion in 2018–19. NDIS trials began in New South Wales in 2013. The full scheme was introduced in July 2016 and is scheduled to be operating across the state by July 2018.

This audit assessed the effectiveness of the NSW Department of Family and Community Services' (the Department's) management of the risks of the NDIS transition in New South Wales. It focused on the Department's work to build the readiness of the non-government sector for the NDIS. To make this assessment, we asked whether:

  1. the Department supported the non-government sector to build capacity to meet the expected increase in demand under the NDIS
  2. the Department supported disability service providers in NSW to improve their capability to deliver NDIS services
  3. the Department's work to prepare for the NDIS has been coordinated with the Australian Government's NDIS readiness work.

In addition to the audit questions above, this audit identified principles governments should consider when building the capacity and capability of the non-government sector to deliver human services.

Conclusion

The Department of Family and Community Services has managed the risks of the transition to the NDIS in New South Wales effectively by increasing the overall capacity of the sector and investing in provider capability building initiatives. More work is needed to build the sector's capacity to provide services to people with more complex support needs and to help existing providers complete the transition to the NDIS successfully.

The Department expanded the capacity of the non-government sector over the past decade in a way that was consistent with NDIS objectives. The development of a national market and workforce for the NDIS is an Australian Government responsibility and the Department has supported the Australian Government's work. More targeted work will be needed to build the capacity of the non-government sector to provide services to people with the most complex support and access needs.

The Department invested in provider capability building by funding programs that were delivered in partnership with sector peak bodies. The larger programs were evaluated and received positive feedback, but many providers will need more support to transition to the NDIS. The overall impact of the programs on provider readiness for the NDIS is not clear because baseline information on provider capability was not collected and targets for improvement were not set.

The Department managed the transition coordination risks by establishing comprehensive governance arrangements, contributing to the Australian Government's sector development work through national policy coordination forums and sharing lessons from New South Wales.

Building the capacity of the non-government sector

The Department supported an increase in the capacity of non-government providers

The Department started building the capacity of the non-government sector before the NDIS was developed. This included moving services provided by government into the non‑government sector, funding early intervention and community-based disability support, and introducing some individual support packages. The Department checks that the business and operational systems of non-government disability providers are adequate. However, its understanding of the outcomes for people using the services is limited.

Service gaps are possible for people with more complex support or access needs

There are risks to the supply of services to people who have more complex support or access needs, including people who need specialist clinical support, people in remote areas, Aboriginal and Torres Strait Islander communities and culturally and linguistically diverse communities. The Department has supported the NDIA's initial market development work and funded some programs to help providers build their capacity to support these groups.  However, there is a risk the market will not expand quickly enough to meet the increase in demand for services.

Sector sustainability depends on support from outside the disability services sector

The sustainability of funded disability services provided by the non-government sector depends on support from outside the sector. Most people with disability receive significant unpaid support from family members, so carers will play a key role in the sustainability of the NDIS. There are opportunities for organisations that do not provide specific disability services to contribute to sector sustainability by providing some NDIS services. To do this, many will need help to make their services more accessible and inclusive to people with disability.

Helping non-government providers develop their capability

The Department invested in capability building programs for providers

The Department has spent more than $30 million over six years on programs that aim to improve the capability of disability support providers. This work began before the NDIS was established and was adjusted to focus on NDIS readiness from December 2012. It was guided by an industry development strategy that was developed after consultation with the sector and delivered in partnership with sector peak bodies. This approach gave the sector some responsibility for developing its own capability, which is important because the sector will not receive support from the NSW Government after the transition to the NDIS.

The overall impact of the programs on the capability of providers is not clear

The overall effectiveness of the Department's spending on provider capability is not clear. The Department had some information on the general financial health and organisational capability of providers from previous industry development work. However, baseline information on provider capability was not collected before programs commenced and targets for improvements in provider capability were not set. Without this information, the Department cannot demonstrate clearly that the capability building programs it funded represent good value for money.

Most providers will need more support to transition to the NDIS effectively

In late 2015, the Department assessed the transition progress of providers in New South Wales. This assessment indicates almost one third of providers are highly likely to need additional assistance to transition to the NDIS successfully, with only 14 per cent unlikely to need further assistance. We conducted a survey of 299 providers in New South Wales in August 2016. Most reported that they feel they are on track to transition to the NDIS successfully. Sixty-two per cent said the Department-funded programs and resources they had used had improved their readiness for the NDIS. Fifty-four per cent said the changes made because of using these programs and resources had a lasting impact on their organisation.

Coordinating sector development

Governance systems and planning processes for the NDIS transition were established

The Department developed governance arrangements for the transition in New South Wales. It contributed actively to the development of national policy and strategy documents including a strategy for national market development.

The Department shared sector readiness lessons with the Australian Government

Two NDIS sector readiness programs funded by the NSW Government were later expanded to national programs through funding from the Australian Government. New South Wales only received around five per cent of the total Australian Government funding for NDIS sector readiness initiatives. A report by the Australian National Audit Office in 2016 found there was limited evidence of a strategic approach by the Australian Government when allocating this funding to states and territories.

The Department has monitored transition issues and mitigated these where possible

The Department has monitored administrative issues for providers, which have included the changes in funding arrangements and registering for the NDIS. It has taken action to mitigate these where possible, although some issues, such as the operation of NDIA administrative systems, are beyond its control.

The National Disability Insurance Scheme (NDIS)

The NDIS is a fundamental change to the disability support system

The NDIS is a major reform that aims to make significant changes to the way disability support is provided and received. Under the NDIS, the administration of funding for disability support in New South Wales will transfer from the NSW Government to the National Disability Insurance Agency (NDIA), an independent statutory agency of the Australian Government. The NSW and Australian Governments will both contribute to funding the NDIS. The size of the disability services sector in New South Wales is expected to more than double when the NDIS is fully operational (Exhibit 1).

Exhibit 1: Estimated increase in the disability services sector under the NDIS
Measure of sector capacity Pre-NDIS (2015-16) NDIS (2018-19)
Funding for services $3.3 billion $6.8 billion
People receiving support 78,000 142,000
Workforce required 25,000-30,000 48,000-59,000
Number of providers 699 Determined by the market

Sources: NSW Government Budget Paper No.3, 2015–16; NDIS NSW Market Position Statement, March 2016; Department of Family and Community Services Funding Management System, 2015–16 (unpublished).

One of the main objectives of the NDIS is to increase the choice and control that people with disability have over the support they receive. Under the NDIS, people with disability receive individual funding packages which they can use to pay their chosen providers for the support they need, instead of being referred to services that are deemed appropriate for their needs. This is a fundamental change to the nature of disability support. Before the NDIS, people with disability were moved around the system according to decisions made by government or other organisations providing disability support. Under the NDIS, the funding will move around the system based on the choices people with disability make. The development of the new market for NDIS disability services is expected to take up to ten years because the changes to the system are so extensive.

In addition to increasing choice and control for participants, the NDIS aims to:

  • improve outcomes for people with disability by intervening early to help reduce the need for support later in life
  • increase integration by helping people with disability access mainstream government services such as health and education
  • increase the involvement of people with disability in the community by making it easier to access community services such as sports clubs and community groups.

The transition to the NDIS is underway

The transition to the NDIS is underway in most Australian states and territories, following trials over the last three years. In New South Wales, a trial site was established in the Hunter area in July 2013. Early roll out of the NDIS began in July 2015 for people aged under 18 in the Nepean Blue Mountains area. On 30 June 2016, about 7,800 people had an NDIS plan in the Hunter trial site and around 1,800 people had a plan in the Nepean Blue Mountains area.

The full roll out of the NDIS began in about half of New South Wales in July 2016. The NDIS will start operating in the rest of the state from July 2017 and the transition is scheduled to be completed by July 2018 (Exhibit 2).

For the rest of the transition, the Department of Family and Community Services should:

  1. Work with the Australian Government, NDIA and other NSW Government agencies to identify gaps and develop the capacity of specialist clinical services, focusing on regional and rural areas.
  2. Continue to implement projects to increase the number of organisations that can support Aboriginal and Torres Strait Islander and culturally and linguistically diverse communities.
  3. Target remaining capability building assistance to less prepared providers, including via one-to-one support and mentoring in identified areas of weakness.
  4. Continue working with the Australian Government and the NDIA to ensure lessons from sector capability programs are shared.

Principles for developing the non-government sector

  1. Commence work to increase the capacity of the non-government sector early to allow time for service capacity to be built in a sustainable way.
  2. Decide whether to increase the capacity of the sector by supporting existing providers to expand their operations, attracting new organisations from outside the existing provider group, or some combination of these.
  3. Tailor approaches to supporting groups that have additional support or access needs because of cultural or geographic factors.
  4. Define the desired outcomes for people using services and, where possible, include outcomes in service delivery contracts.
  5. Invest in the sector by partnering with sector peak bodies to deliver capability programs.
  6. Include one-to-one support and mentoring in capability building programs where possible to improve the targeting of support to the specific needs of providers.
  7. Collect baseline information on provider capability before commencing programs and build robust tracking and evaluation into their design.
  8. Establish whole-of-government governance arrangements to ensure roles, responsibilities and accountability for delivery are clear.