Refine search Expand filter

Reports

Published

Actions for Audit Insights 2018-2022

Audit Insights 2018-2022

Community Services
Education
Environment
Finance
Health
Industry
Justice
Local Government
Premier and Cabinet
Planning
Transport
Treasury
Universities
Whole of Government
Asset valuation
Cross-agency collaboration
Compliance
Cyber security
Financial reporting
Fraud
Information technology
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management
Regulation
Risk
Service delivery
Shared services and collaboration
Workforce and capability

What the report is about

In this report, we have analysed the key findings and recommendations from our audit reports over the past four years.

This analysis includes financial audits, performance audits, and compliance audits of state and local government entities that were tabled in NSW Parliament between July 2018 and February 2022.

The report is framed by recognition that the past four years have seen significant challenges and emergency events.

The scale of government responses to these events has been wide-ranging, involving emergency response coordination, service delivery, governance and policy.

The report is a resource to support public sector agencies and local government to improve future programs and activities.

What we found

Our analysis of findings and recommendations is structured around six key themes:

  • Integrity and transparency
  • Performance and monitoring
  • Governance and oversight
  • Cyber security and data
  • System planning for disruption
  • Resource management.

The report draws from this analysis to present recommendations for elements of good practice that government agencies should consider in relation to these themes. It also includes relevant examples from recent audit reports.

In this report we particularly call out threats to the integrity of government systems, processes and governance arrangements.

The report highlights the need for balanced advice to government on options and risks, for transparent documentation and reporting of directions and decisions, and for early and open sharing of information with integrity bodies and audit.

A number of the matters highlighted in this report are similar to those described in our previous Insights Report, (Performance Audit Insights: key findings from 2014–2018) specifically in relation to cyber and information security, to performance measurement, reporting and evaluation, and system and workforce planning and capability.

Fast facts

  • 72 audits included in the Audit Insights 2018–2022 analysis
  • 4 years of audits tabled by the Auditor-General for New South Wales
  • 6 key themes for Audit Insights 2018–2022.

picture of Margaret Crawford Auditor-General for New South Wales in black dress with city skyline as backgroundI am pleased to present the Audit Insights 2018–2022 report. This report describes key findings, trends and lessons learned from the last four years of audit. It seeks to inform the New South Wales Parliament of key risks identified and to provide insights and suggestions to the agencies we audit to improve performance across the public sector.

The report is framed by a very clear recognition that governments have been responding to significant events, in number, character and scale, over recent years. Further, it acknowledges that public servants at both state and council levels generally bring their best selves to work and diligently strive to deliver great outcomes for citizens and communities. The role of audit in this context is to provide necessary assurance over government spending, programs and services, and make suggestions for continuous improvement.

A number of the matters highlighted in this report are similar to those described in our previous Insights Report, (Performance Audit Insights: key findings from 2014–2018) specifically in relation to cyber and information security, to performance measurement, reporting and evaluation, and system and workforce planning and capability.

However, in this report we particularly call out threats to the integrity of government systems, processes and governance arrangements. We highlight the need for balanced advice to government on options and risks, for transparent documentation and reporting of directions and decisions, and for early and open sharing of information with integrity bodies and audit. Arguably, these considerations are never more important than in an increasingly complex environment and in the face of significant emergency events and they will be key areas of focus in our future audit program.

While we have acknowledged the challenges of the last few years have required rapid responses to address the short-term impacts of emergency events, there is much to be learned to improve future programs. I trust that the insights developed in this report provide a helpful resource to public sector agencies and local government across New South Wales. I would be pleased to receive any feedback you may wish to offer.

Margaret Crawford
Auditor-General for New South Wales

Integrity and transparency Performance and monitoring Governance and oversight Cyber security and data System planning Resource management
Insufficient documentation of decisions reduces the ability to identify, or rule out, misconduct or corruption. Failure to apply lessons learned risks mistakes being repeated and undermines future decisions on the use of public funds. The control environment should be risk-based and keep pace with changes in the quantum and diversity of agency work. Building effective cyber resilience requires leadership and committed executive management, along with dedicated resourcing to build improvements in cyber security and culture. Priorities to meet forecast demand should incorporate regular assessment of need and any emerging risks or trends. Absence of an overarching strategy to guide decision-making results in project-by-project decisions lacking coordination. Governments must weigh up the cost of reliance on consultants at the expense of internal capability, and actively manage contracts and conflicts of interest.
Government entities should report to the public at both system and project level for transparency and accountability. Government activities benefit from a clear statement of objectives and associated performance measures to support systematic monitoring and reporting on outcomes and impact. Management of risk should include mechanisms to escalate risks, and action plans to mitigate risks with effective controls. In implementing strategies to mitigate cyber risk, agencies must set target cyber maturity levels, and document their acceptance of cyber risks consistent with their risk appetite. Service planning should establish future service offerings and service levels relative to current capacity, address risks to avoid or mitigate disruption of business and service delivery, and coordinate across other relevant plans and stakeholders. Negotiations on outsourced services and major transactions must maintain focus on integrity and seeking value for public funds.
Entities must provide balanced advice to decision-makers on the benefits and risks of investments. Benefits realisation should identify responsibility for benefits management, set baselines and targets for benefits, review during delivery, and evaluate costs and benefits post-delivery. Active review of policies and procedures in line with current business activities supports more effective risk management. Governments hold repositories of valuable data and data capabilities that should be leveraged and shared across government and non-government entities to improve strategic planning and forecasting. Formal structures and systems to facilitate coordination between agencies is critical to more efficient allocation of resources and to facilitate a timely response to unexpected events. Transformation programs can be improved by resourcing a program management office.
Clear guidelines and transparency of decisions are critical in distributing grant funding. Quality assurance should underpin key inputs that support performance monitoring and accounting judgements. Governance arrangements can enable input into key decisions from both government and non-government partners, and those with direct experience of complex issues.     Workforce planning should consider service continuity and ensure that specialist and targeted roles can be resourced and allocated to meet community need.
Governments must ensure timely and complete provision of information to support governance, integrity and audit processes.          
Read more Read more Read more Read more Read more Read more

 

This report brings together a summary of key findings arising from NSW Audit Office reports tabled in the New South Wales Parliament between July 2018 and February 2022. This includes analysis of financial audits, performance audits, and compliance audits tabled over this period.

  • Financial audits provide an independent opinion on the financial statements of NSW Government entities, universities and councils and identify whether they comply with accounting standards, relevant laws, regulations, and government directions.
  • Performance audits determine whether government entities carry out their activities effectively, are doing so economically and efficiently, and in accordance with relevant laws. The activities examined by a performance audit may include a selected program or service, all or part of an entity, or more than one government entity. Performance audits can consider issues which affect the whole state and/or the local government sectors.
  • Compliance audits and other assurance reviews are audits that assess whether specific legislation, directions, and regulations have been adhered to.

This report follows our earlier edition titled 'Performance Audit Insights: key findings from 2014–2018'. That report sought to highlight issues and themes emerging from performance audit findings, and to share lessons common across government. In this report, we have analysed the key findings and recommendations from our reports over the past four years. The full list of reports is included in Appendix 1. The analysis included findings and recommendations from 58 performance audits, as well as selected financial and compliance reports tabled between July 2018 and February 2022. The number of recommendations and key findings made across different areas of activity and the top issues are summarised at Exhibit 1.

The past four years have seen unprecedented challenges and several emergency events, and the scale of government responses to these events has been wide-ranging involving emergency response coordination, service delivery, governance and policy. While these emergencies are having a significant impact today, they are also likely to continue to have an impact into the future. There is much to learn from the response to those events that will help the government sector to prepare for and respond to future disruption. The following chapters bring together our recommendations for core elements of good practice across a number of areas of government activity, along with relevant examples from recent audit reports.

This 'Audit Insights 2018–2022' report does not make comparative analysis of trends in public sector performance since our 2018 Insights report, but instead highlights areas where government continues to face challenges, as well as new issues that our audits have identified since our 2018 report. We will continue to use the findings of our Insights analysis to shape our future audit priorities, in line with our purpose to help Parliament hold government accountable for its use of public resources in New South Wales.

Appendix one – Included reports, 2018–2022

Appendix two – About this report

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for NSW planning portal

NSW planning portal

Planning
Industry
Environment
Local Government
Information technology
Project management
Risk

What the report is about

The ePlanning program is an initiative of the Department of Planning and Environment (the department) to deliver a digital planning service for New South Wales through the NSW planning portal (the portal).

Using the portal, relevant planning activities can be carried out online, including all stages of development applications.

The portal has been developed under three separate business cases in 2013, 2014 and 2020.

In late 2019, the government mandated the use of the portal for all development applications. This decision took effect across 2020–21.

This audit assessed the effectiveness of the department's implementation, governance and stakeholder engagement in delivering the NSW planning portal. 

What we found

Since implementation commenced in 2013, the NSW planning portal has progressively achieved its objectives to provide citizens with access to consolidated planning information, and allow them to prepare and submit development applications online.

Shortcomings in the department's initial planning and management of the program led to a significant time overrun. It has taken the department longer and cost significantly more to implement the portal than first anticipated. 

In recent years the department has improved the planning, implementation and governance of the ePlanning program, resulting in improved delivery of the portal’s core functions.

The department now has a clear view of the scope necessary to finalise the program, but has not yet published the services it plans to implement in 2022 and 2023.

Mandating the use of the portal for all development applications changed the program's strategic risk environment and required the department to work more closely with a cohort of stakeholders, many of whom did not want to adopt the portal.

Despite this change, the department kept its overall delivery approach the same.

While implementation of the portal has delivered financial benefits, the department has overestimated their value.

The Department has only reported benefits since 2019 and has not independently assured the calculation of benefits.

What we recommended

By December 2022, the department should:

  • publish a roadmap of the services it expects to release on the portal across 2022 and 2023
  • update its ePlanning program assumptions, benefits targets and change management approach to reflect the government's decision to mandate the use of the portal for all stages of a development application
  • independently assure and report publicly the correct calculation of ePlanning program benefits.

Fast facts

  • 10 years taken to implement the portal when completed
  • 3 years longer than initially planned to implement the portal
  • $146m capital expenditure on the portal when completed
  • $38.5m more spent than planned in the business cases.

The ePlanning program is an initiative of the Department of Planning and Environment (the department) to deliver a digital planning service for New South Wales through the NSW planning portal (the portal, or the planning portal). The department defines the portal as an online environment where community, industry and government can work together to better understand and meet their obligations under the Environmental Planning and Assessment Act 1979 (NSW). Using the portal, relevant planning activities can be carried out online throughout New South Wales. This includes, but is not limited to:

  • applying for and gaining planning approval
  • applying for and gaining approval for building works, sub-dividing land and similar activities
  • issuing occupancy and other certificates.

The portal has been developed under three separate business cases. The first business case in 2013 led to the creation of a central portal, which made planning information available to view by planning applicants and allowed some planning applications to be lodged and tracked online.

Under a second business case prepared in 2014, the department set out to improve and widen the functions available via the portal. The department prepared a third business case in 2020 to fund further improvements to the portal over the period July 2020 to June 2023. The third business case also extended the portal's functions to support the building and occupation stages of the planning cycle.

In late 2019, the government mandated the use of the portal for all stages of development applications. This decision took effect across 2020–21 and applied to all councils as well as certifiers and others involved in the planning process.

The objective of this performance audit was to assess the effectiveness of the department's implementation, governance and stakeholder engagement in delivering the NSW planning portal. We investigated whether:

  • delivery of the NSW planning portal was planned effectively
  • sound governance arrangements are in place to ensure effective implementation of the program
  • users of the NSW planning portal are supported effectively to adopt and use the system.
Conclusion

Since implementation commenced in 2013, the NSW planning portal has progressively achieved its objectives to provide citizens with access to consolidated planning information and allow them to prepare and submit development applications online. Implementation was initially hindered by deficiencies in planning and it has taken the department significantly longer and cost significantly more to implement the portal than first anticipated. While the portal's implementation has delivered financial benefits, the department has overestimated their value. As a result, the department cannot yet demonstrate that the portal has achieved overall financial benefits, relative to its costs.

In the first two years of the ePlanning program, the department delivered a portal that allowed planners, developers, certifiers and the public to view important planning information. However, the department found the delivery of a second, transactional version of the portal in 2017 to be much more challenging. This version was intended to offer more integrated information and allow development applications to be submitted and managed online. The department did not rollout this version after a pilot showed significant weaknesses with the portal's performance. A subsequent review found that this was partly because the department did not have a clear view of the portal’s role or the best way to implement it. In recent years the department has improved the planning, implementation and governance of the ePlanning program resulting in improved delivery of the portal’s core functions.

By the time the program reaches its scheduled completion in 2023, it will have taken the department ten years and around $146 million in capital expenditure to implement the portal. This will be significantly longer and more expensive than the department originally expected. This overrun is partly due to an increased scope of services delivered through the portal and an initial under-appreciation of what is involved in creating a standard, central resource such as the portal. The department also experienced some significant implementation difficulties – which saw the transactional portal discontinued after it was found to be not fit for purpose. Following this, the department re-set the program in 2017–18 and re-planned much of the portal's subsequent development.

In November 2019, the New South Wales Government decided to mandate the use of the portal for all stages of development applications by the end of 2020–21. The department had previously planned that the portal would be progressively adopted by all councils and other stakeholders over the five years to 2025. The decision to mandate the portal's use for all development applications brought forward many of the portal's benefits as well as the challenges of its implementation. The department did not change its overall delivery approach in response to the changed risks associated with the government's decision to mandate use of the portal.

The current version of the portal has given the department more timely and comprehensive planning information and has helped New South Wales to provide continuous planning services during COVID-19 lockdowns, which interrupted many other public functions. The portal has also delivered financial benefits, however the department has not independently assured benefits calculations carried out by its consultant, and the reported benefits are overstated. In addition, some stakeholders report that the portal is a net cost to their organisation. This has included some certifiers and some councils which had implemented or had started to implement their own ePlanning reforms when use of the portal was mandated in 2019. The department now needs to address the issues faced by these stakeholders while continuing to deliver the remaining improvements and enhancements to the portal. Over the remaining year of the program, it will be critical that the department focuses on the agreed program scope and carefully evaluates any opportunities to further develop the portal to support future planning reforms.

This part of the report sets out how:

  • the ePlanning program has been planned and delivered
  • users of the portal have been supported
  • the program has been governed.

This part of the report sets out the ePlanning program's:

  • expected and reported financial benefits
  • calculation of financial benefits.

In 2019, the department increased its expectations for net financial benefits

The department's three ePlanning business cases each forecast substantial financial benefits from the implementation of the planning portal. The department expected that most financial benefits would flow to planning applicants due to a quicker and more consistent planning process. It also expected that government agencies and councils would benefit from the portal.

Exhibit 6: Summary of the financial benefits originally expected
  Business case 1
($ million)
Business case 2
($ million)
Business case 3
($ million)
Total
($ million)
Benefits 90.0 44.3 270.9 405.2
Costs 43.3 29.4 89.8 162.5
Net benefits 46.7 15.0 181.1 242.7

Note: Benefits and costs are incremental. All amounts are calculated over ten years. Amounts for business case 1, 2 and 3 amounts are expressed in 2013, 2015 and 2019 dollars respectively. All amounts are discounted at seven per cent to show their value at the time when they were calculated. Amounts may not add due to rounding.
Source: Audit Office analysis of data provided by the Department of Planning and Environment.

In 2019 the department commissioned a review to explore opportunities to better identify, monitor and realise the benefits of the ePlanning program. Using this work, the department updated the expected benefits for business cases 1 and 2 to take account of:

  • errors and miscalculations in the original benefits calculations
  • slower delivery of the portal and changes to the take-up of portal services by councils
  • changes to the services supported by the portal.
Exhibit 7: Summary of the financial benefits expected for business case 1 and 2 after the 2019 update
  Original business case 1 and 2 (combined)
($ million)
New business case 1 and 2 (combined)
($ million)
Benefits 134.3 210.6
Costs 72.7 96.3
Net benefits 61.7 114.3

Note: Benefits and costs are incremental. All amounts are calculated over ten years. Amounts for the original business case 1 and 2 are expressed in 2013 and 2015 dollars respectively. The new combined amount is expressed in 2019 dollars. All amounts are discounted or inflated at seven per cent to show their value at the time when they were calculated. Amounts may not add due to rounding.
Source: Audit Office analysis of data provided by the Department of Planning and Environment.

Reported benefits significantly exceed the current targets

In September 2021, the department reported that the program had achieved $334 million of benefits over the three financial years up to June 2021 plus the first two months of 2021–22. These reported benefits were significantly higher than expected. 

Exhibit 8: Reported financial benefits from the ePlanning program
  2018–19
($ million)
2019–20
($ million)
2020–21
($ million)
July to August 2021
($ million)
Total
($ million)
Benefits 5.2 68.8 214.7 45.1 333.8
Target 2.5 14.4 56.7 19.2 92.8
Amount and per cent above target 2.7
108%
54.4
378%
158
279%
25.9
135%
241
260%

Source: Audit Office analysis of data provided by the Department of Planning and Environment.

The department attributes the higher-than-expected financial benefits to the following:

  • benefit targets have not been updated to reflect the impact of the 2019 decision to mandate the use of the portal for all development applications. This decision brought forward the expected benefits as well as potential costs of the program. However, the department did not update its third business case which was draft at the time. The business case was subsequently approved in July 2020
  • one-off cost savings for agencies not having to develop their own systems
  • public exhibitions of planning proposals continuing to be available online during 2020 when some newspapers stopping printing due to COVID-19.

The calculation of benefits is overstated

The department reported $334 million of benefits in September 2021 due to the ePlanning program. This calculation is overstated because:

  • a proportion of reported benefits is likely to be due to other planning reforms
  • the calculation of the largest single benefit is incorrect
  • the reported benefits may not fully account for dis-benefits reported by some stakeholders.

The program’s benefits are calculated primarily from changes in planning performance data, such as the time it takes to determine a planning development application. The department currently attributes the benefits from shorter planning cycles entirely to the effect of the ePlanning program. However, planning cycles are impacted by many other factors such as the complexity of planning regulations and the availability of planning professionals. Planning cycles may also be impacted by other departmental initiatives which are designed to improve the time that it takes for a planning application to be evaluated. The Introduction describes some of these initiatives.

The largest contribution to the department’s September 2021 benefit report was an estimated saving of $151 million for developers due to lower costs associated with holding their investment for a shorter time. However, the department’s calculation of this benefit assumes a high baseline for the time to determine a development application. It also assumes that all development applications except for additions or alterations to existing properties will incur financing costs. However, a small but material number of these applications will be self-financed. The calculation also includes several data errors in spreadsheets.

The calculation of some benefits relies upon an extrapolation of the benefits experienced by a small number of early-adopter councils, including lower printing and scanning costs, fewer forms and quicker processing times. However, some councils report that their costs have increased following the introduction of the portal, primarily because aspects of the portal duplicate work that they carry out in their own systems. The portal has also required some councils to re-engineer aspects of their own systems, such as the integration of their planning systems with other council systems such as finance or property and rating systems. It has also required councils to create new ways of integrating council information systems with the planning portal.

The department has published information to help councils and certifiers to automatically integrate their systems with the planning portal. This approach uses application programming interfaces (or APIs) which are an industry-standard way for systems to share information. In April and May 2021, the government granted $4.8 million to 96 regional councils to assist with the cost of developing, implementing and maintaining APIs. The maximum amount of funding for each council was $50,000. The department is closely monitoring the implementation of APIs by councils and other portal users. Once they are fully implemented the department expects APIs to reduce costs incurred by stakeholders.

The department has not yet measured stakeholder costs. It was beyond the scope of this audit to validate these costs.

The department has not independently assured the calculation of reported benefits

In 2020 the department appointed an external provider to calculate the benefits achieved by the ePlanning program. The department advised that it chose to outsource the calculation of benefits because the provider had the required expertise and because it wanted an independent calculation of the benefits. The process involves:

  • extraction and verification of planning performance data by the department
  • population of data input sheets by the department
  • calculation of benefits by the external provider using the data input
  • confirmation by the department that the calculation includes all expected benefit sources.

The department does not have access to the benefits calculation model which is owned and operated by the external provider. The department trusts that the provider correctly calculates the benefits and does not verify the reported benefit numbers. However, as the benefits model involves many linked spreadsheets and approximately 300 individual data points, there is a risk that the calculation model contains errors beyond those discussed in this audit.

The reported benefits have only been calculated since 2019

The department originally intended to track benefits from October 2014. However, it only started to track benefits in 2019 when it appointed an external provider to calculate the benefits achieved by the portal. Any benefits or dis-benefits between the introduction of the portal and 2019 are unknown and not included in the department’s calculation of benefits.

Appendix one – Response from agency

Appendix two – About the audit

Appendix three – Performance auditing

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #366 - released 21 June 2022

Published

Actions for Treasury 2021

Treasury 2021

Treasury
Finance
Compliance
Financial reporting
Internal controls and governance
Management and administration

What the report is about

The results of Treasury cluster agencies' financial statement audits for the year ended 30 June 2021. The results of the audit of the NSW Government's consolidated Total State Sector Accounts (TSSA), which are prepared by NSW Treasury, are reported separately in our report on State Finances 2021.

What we found

Unmodified audit opinions were issued for all Treasury cluster agencies.

The number of identified monetary misstatements increased from 16 in 2019–20 to 24 in 2020–21.

Reported corrected monetary misstatements decreased from 15 in 2019–20 to seven with a gross value of $1.1 billion in 2020–21.

The largest corrected misstatement was in NSW Treasury's financial statements and was a $1 billion correction to administered borrowings.

Reported uncorrected monetary misstatements increased from one in 2019–20 to 17 with a gross value of $168 million in 2020–21.

Seven of the 2020–21 uncorrected misstatements related to one common decision relating to investment management funds terminated during the year by the NSW Treasury Corporation (TCorp).

All agencies submitted their 2020–21 financial statements within NSW Treasury's reporting deadlines.

What the key issues were

Significant audit findings were identified with respect to NSW Treasury's processes to prepare the NSW Government's consolidated TSSA (whole of government accounts). This included one extreme finding and several high-risk findings related to NSW Treasury processes. These are reported in our report on State Finances 2021.

Two high-risk issues raised in 2019–20 were also not addressed by NSW Treasury during the year and were repeat issues reported to management. These related to the appropriations framework and resolution of cross cluster payments, and instances where some agencies spent deemed appropriations money without an authorised delegation.

A number of previously reported audit findings and recommendations with respect to icare continue to be ongoing issues, namely:

  • The Workers Compensation Nominal Insurer continues to hold less assets than the estimated present value of its future payment obligations.
  • The Workers Compensation Nominal Insurer's four week return-to-work rate fell from 68% to 64%. This is below icare's 70% target. Contributing factors include COVID-19 lockdowns which have impacted claims handling processes, and increased barriers to claimants returning to work.
  • Instances were noted where inadequate documentation was kept on file to support claims, including pre-injury average weekly earnings (PIAWE) calculations.

The Workers Compensation (Dust Diseases) Authority increased its outstanding claims liability by $93.9 million, which included $39.3 million to remediate historical underpayments, resulting from workers not being paid the rate required by existing legislation.

The icare Board approved a new approach for remediating PIAWE underpayments on 24 September 2021, the date the Workers Compensation Nominal Insurer’s financial statements were approved for issue. The impact of the decision on the financial statements was not discussed with the Audit Office and assessed as an ‘after balance date event’.

What we recommended

Our report on State Finances 2021 made several recommendations to improve NSW Treasury processes. These included:

  • improve processes to ensure information is shared with audit on a timely basis
  • seek legislative amendments to resolve statutory inconsistencies relating to statutory reporting time frames
  • implement effective quality review processes over key accounting information
  • establish a policy to determine the minimum expected rate of return on equity injections in other public sector entities
  • prepare robust financial projections to support accounting decisions
  • re-confirm sector classifications of TAHE, Sydney Trains and NSW Trains
  • ensure sufficient oversight of its use of consultants and assess the risk of an overdependence on consultants at the cost of internal capability
  • improve disclosures of equity injections invested in other public sector entities
  • determine a state-wide policy on when borrowings are recognised in agency financial statements
  • make legislative amendments to ensure expenditure incurred across financial years does not exceed the appropriation authority and assess the financial reporting impact
  • improve the guidance provided to agencies to ensure expenditure of public money is properly supported by authorised delegations.

We also recommended icare should ensure:

  • it has sufficient controls over claim payments including an effective quality assurance program, to minimise claim payment errors
  • that documentation to support injured worker benefit calculations is appropriately maintained, and the documentation requirements are set out in a policy
  • the impact of ‘after balance date events’ on financial statements is appropriately assessed
  • its operational practices are improved to ensure the correct payment of claims in compliance with legislative requirements. icare also needs to act on a timely basis on received legal advice and amend operational practices to ensure correct payments are made.

Fast facts 

NSW Treasury notes that it is the Government's principal financial and economic adviser to guide the State’s growth for the benefit of the people who live, work and study in NSW.

  • $111b funds under management as at 30 June 2021
  • 100% unqualified audit opinions were issued on agencies’ 30 June 2021 financial statements
  • 24 monetary misstatements were reported in 2020–21
  • $17b total expenditure incurred in 2020–21
  • 12 extreme and high-risk findings were identified
  • 30% of reported issues were repeat issues

This report focuses on agencies within the Treasury cluster and provides parliament and other users of the Treasury cluster's financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

NSW Treasury also prepares the consolidated NSW whole of government financial statements (the Total State Sector Accounts), which is reported in the report on State Finances 2021.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making is enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Treasury cluster (the cluster) for 2021.

Section highlights

  • Unmodified audit opinions were issued on all the cluster agencies 2020–21 financial statements.
  • The number of identified monetary misstatements increased from 16 in 2019–20 to 24 in 2020–21.
  • Reported corrected monetary misstatements decreased from 15 in 2019–20 to seven with a gross value of $1.1 billion in 2020–21. The largest corrected misstatement was in NSW Treasury's financial statements resulting in a $1 billion correction to its administered borrowings. The correction was to address an understatement by NSW Treasury which did not recognise a liability for funds raised by NSW Treasury Corporation (TCorp) on its behalf as it applied settlement date accounting rather than trade date when recognising these borrowings. A corresponding receivable from TCorp was also recognised to reflect that funds were to be received on 1 July 2021.
  • The number of uncorrected misstatements increased from one in 2019–20 to 17 in 2020–21. Two of the misstatements above $5 million related to investment valuations within the SAS Trustee Corporation Pooled Fund, two related to premium income overstatements within the Workers Compensation Nominal Insurer, and one related to NSW Treasury administered liabilities and expenses where it recognised a provision for remediation costs when it had no present obligation. A further seven related to investment management funds that were terminated during the year by TCorp.
  • Nine agencies that were required to perform early close procedures did not complete a total of 25 mandatory procedures. The most common incomplete early close procedures include inter and intra (cluster) agency balances and transactions not confirmed with the counterparty agency and significant management judgements and assumptions made when estimating transactions and balances not documented.
  • To ensure compliance with Australian Accounting Standards, transactions and balances that were formerly reported in the Crown Entity’s financial statements are now reported by NSW Treasury as it primarily controls or administers the transactions and balances on behalf of the State.
  • icare changed the risk margin applied to measure the Workers Compensation Nominal Insurer's outstanding claims liability. If the risk margin used when valuing its 2019–20 outstanding claims liability had been retained, its net asset deficiency would have worsened compared to the prior year. The change in risk margin aligns the Nominal Insurer’s ‘probability of adequacy’ with the Australian Prudential Regulation Authority’s minimum reporting requirements for general insurers.
  • The icare Board approved a new approach for remediating pre-injury average weekly earnings underpayments (subject to legal advice, and assessment by a wage remediation expert), on 24 September 2021 and announced on 11 November 2021. The impact of the decision on the Nominal Insurer's financial statements was not assessed by icare as an ‘after balance date event’ and was not raised with the Audit Office prior to icare finalising its 2021 financial statements on 24 September 2021.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Treasury cluster.

Section highlights

  • The 2020–21 audits identified one new Extreme Risk and 11 High Risk findings. The extreme risk finding related to the incomplete provision and timely access to information to the Total State Sector Accounts (TSSA) audit and the accounting for the General Government Sector's investment in TAHE. Findings related to the TSSA audit are reported in the report on State Finances 2021. Of the 11 high risk findings, two were repeat findings relating to cross cluster payments and authorisation to spend deemed funds. High risk repeat findings need to be addressed with greater priority.
  • There were 21 moderate risk findings reported to management in 2020–21, ten of which were repeat findings. The most common repeat finding related to claims processing, information technology user access administration. Repeat findings, particularly those that relate to data protection, need greater prioritisation and should be implemented on a timely basis.
  • icare is in the process of implementing organisational reform in response to findings in recent external reviews. These reviews identified 151 recommendations for icare to improve in the areas of risk and governance, performance, and culture and accountability. All of the recommendations were accepted by icare and are expected to be addressed through their ‘Improvement Program’. A number of the observations referred to in this report were also identified in the external reviews.
  • The Nominal Insurer's four week return-to-work rate fell from 68% at 30 June 2020 to 64% at 30 June 2021 and was at 63% at 30 September 2021. This is below icare's target of 70%.
  • The Nominal Insurer overpaid, and underpaid claims to policyholders due to claims processing weaknesses. There was also insufficient documentation to support key inputs to weekly benefit payments, thereby further increasing the risk of claims being overpaid, and underpaid.
  • The Home Building Compensation Fund's net liability position reduced from $746 million at 30 June 2020 to $534 million at 30 June 2021 due to increases in premium rates and increased building activity from stimulus measures.
  • The Nominal Insurer's provision for errors in pre-injury average weekly earnings decreased from $21 million to 30 June 2020, to $11.6 million at 30 June 2021. The provision was not reassessed for icare’s decision to proactively remediate PIAWE underpayments.
  • The NSW Self Insurance Corporation also recognised a $12.8 million provision at 30 June 2021 to remediate past underpayments.

Findings reported to management

The number of findings reported to management has decreased, but 30% of all issues were repeat issues and these need greater focus and prioritisation

Breakdowns and weaknesses in internal controls increase the risk of fraud and error. Deficiencies in internal controls, matters of governance interest and unresolved issues were reported to management and those charged with governance of agencies. The Audit Office does this through management letters, which include observations, related implications, recommendations and risk ratings.

In 2020–21, there were 57 findings raised across the cluster (71 in 2019–20), 30% of which were repeat issues (32% in 2019–20).

The most common repeat issues related to claims processing and information technology user access administration.

A delay in implementing audit recommendations increases the risk of intentional and accidental errors in processing information, producing management reports and generating financial statements. This can impair decision-making, affect service delivery and expose agencies to fraud, financial loss and reputational damage. Poor controls may also mean agency staff are less likely to follow internal policies, inadvertently causing the agency not to comply with legislation, regulation and central agency policies.

The table below describes the common issues identified across the cluster by category and risk rating.

Risk rating Issue
Information technology

Moderate2
4 new
2 repeat

Low1
6 new
4 repeat

The financial audits identified the need for agencies to improve information technology processes and controls that support the integrity of financial data used to prepare agencies' financial statements. Of particular concern are issues associated with:
  • poor user access administration and monitoring of privileged user activities
  • lack of disaster recovery planning.
Internal control deficiencies or improvements

High3
1 repeat

Moderate2
5 new
7 repeat

Low1
9 new
 

 

The financial audits identified internal control weaknesses across key business processes, including:
  • lack of controls to ensure cluster expenditure does not exceed a minister's appropriation authority received under the annual Appropriations Act and the GSF Act
  • inadequate procurement controls including purchase orders not being used and policy documents not stipulating thresholds which require minimum quotations or tenders
  • inadequate claim processing controls leading to documentation not kept to support claims, and errors in payments.
High risk issues are discussed later in this chapter.
Financial reporting

High3
2 new

Moderate2
2 new
1 repeat

Low1
2 new 

The financial audits identified opportunities for agencies to strengthen financial reporting, including:
  • need to review significant judgements, and continue to assess whether assets are controlled
  • grants being incorrectly accounted for leading to errors
  • provisions not including costs to settle the obligation and errors in the accuracy and completeness of underlying data used in valuations.
High risk issues are discussed later in this chapter.
Governance and oversight

Extreme4
1 new

High3
7 new

Low1
1 new
 

The financial audits identified the need for agencies to improve governance and oversight processes, including:
  • documentation was inadequate and key documents were either not provided to the Audit Office, or were not provided on a timely basis, or their existence was not made known to the Audit Office
  • inconsistencies in the GSF Act and GSA Act relating to statutory timeframes
  • numerous versions of working papers were submitted all of which contained errors, omissions and/or poor logic
  • no formal policy or benchmark on expected investment returns from other government sectors
  • addressing significant uncertainty relating to access fees to be paid by rail operators raised in the Total State Sector Accounts audit opinion
  • the sector classification of certain Public Non-Financial Corporations needs to be confirmed with the Australian Bureau of Statistics
  • external consultants were used extensively to advise government agencies on matters related to TAHE
  • there is no state-wide policy about borrowings which provides guidance around performance obligations arising under trades between government agencies.
Extreme and high risk issues are discussed later in this chapter and in the report on State Finances 2021.
Non-compliance with key legislation and/or central agency policies

High3
1 repeat

Low1
1 new
1 repeat

The financial audits identified the need for agencies to improve its compliance with key legislation and central agency policies, including:
  • non-compliance with the GSA Act and expenditure of public monies not supported by authorised delegations or spent for an authorised and valid purpose
  • input tax credits were not always claimed correctly.
High risk issues are discussed later in this chapter.

 Extreme risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
3 High risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
2 Moderate risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
1 Low risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.

 Note: Management letter findings are based either on final management letters issued to agencies, or draft letters where findings have been agreed with management.

The number of moderate risk findings decreased from prior year

There were 21 moderate risk findings reported in 2020–21, representing a 30% decrease from 2019–20. Of these, ten were repeat findings, and 11 were new issues.

Moderate risk repeat findings include:

  • claims processing weaknesses including claim payment errors, and inadequate documentation to support calculations and evidence claims were reviewed by someone with appropriate delegation
  • inadequate review of user access and higher risks of unintended or unauthorised system access
  • controls assurance reports from an outsourced service provider did not cover the services it provided to the government agency
  • failure to review procurement contracts register to ensure it is accurate and complete
  • ongoing control deficiencies with grant application and approval processes
  • key policies including delegations not being reviewed in a number of years and do not incorporate new requirements from more recent legislation
  • quality review processes failing to identify material classification errors associated with grant funding.

NSW Treasury related matters

Accounting for the Government's investment in Transport Asset Holding Entity

A total of seven recommendations were made with respect to NSW Treasury's processes to prepare the NSW Government's consolidated whole of government accounts (the TSSA). This included one extreme risk finding and six high risk findings. The extreme finding related to NSW Treasury needing to significantly improve its processes to ensure all key information is identified and shared with the Audit Office on a timely basis. Other high-risk findings were identified which resulted in the following recommendations for NSW Treasury:

  • establishing a policy to determine the minimum expected rate of return on the GGS equity injections in other public sectors entities and report on the performance of these GGS investments in the TSSA, including how much and what type of returns the government is obtaining from its investments compared to its targeted return
  • facilitate revised commercial agreements to reflect access and license fees that were agreed in the 18 December 2021 Heads of Agreement between Transport for NSW, TAHE and the operators Sydney Trains and NSW Trains
  • with TAHE, prepare robust projections and business plans to support GGS investment returns beyond FY2031.
  • liaising with the ABS to re-confirm the classification of TAHE, NSW Trains and Sydney Trains as entities within the PNFC sector
  • monitoring the risk that control of TAHE assets could change in future reporting periods and the implications on the TSSA
  • consider whether there is sufficient competent oversight of its use of consultants and assess the risk of an over dependence on consultants at the cost of internal capability.

More details on the recommendations to NSW Treasury relating to its accounting for the GGS investment in TAHE are included on pages 7 to 24 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. 

Borrowings of $1 billion were understated by NSW Treasury

NSW Treasury, a GGS agency, made agreements to borrow $1 billion from New South Wales Treasury Corporation (TCorp), a PFC sector agency. Some of these agreements were entered as early as 17 May 2021 and all agreements for borrowings were entered into before 30 June 2021. However, NSW Treasury requested that settlement of those additional borrowings be deferred until 1 July 2021.

As TCorp raised the funds before 30 June 2021, it recognised a financial asset and liability to NSW Treasury on 30 June 2021. Despite TCorp having raised the funds by 30 June 2021 under the mutually agreed trade deal, NSW Treasury did not recognise any borrowings at year end on the basis that it requested the settlement date and receipt of cash to be deferred to past the balance sheet date. This led to an understatement of debt liabilities of $1 billion by NSW Treasury, and an inconsistent accounting treatment between the two agencies. NSW Treasury subsequently corrected the misstatement after the matter was raised by the audit, resulting in the GGS recognising $1 billion in financial assets and borrowings at 30 June 2021.

More detail on these inconsistencies is on page 37 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. We recommended NSW Treasury seek develop a state-wide accounting policy for borrowings which ensure correct and consistent accounting treatment between agencies and sectors.

Inconsistencies exist in the GSF Act and GSA Act related to key statutory timeframes

There are inconsistencies between key statutory reporting timeframes imposed on the Treasurer and Auditor-General for the Consolidated State Financial Statements (the Statements) in the Government Sector Finance Act 2018 (GSF Act) and Government Sector Audit Act 1983 (GSA Act). Ambiguity in the statutory reporting timeframes could impact on the future timely provision of this information to Parliament. More detail on these inconsistencies is on page 54 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. We recommended NSW Treasury seek legislative amendments in Parliament to resolve these inconsistencies.

NSW Treasury lacks a framework to monitor and provide assurance to ministers that they are in compliance with their appropriation authority

In July 2021, NSW Treasury highlighted a potential issue associated with certain cross-cluster payments which was based on advice received from the Crown Solicitor in January 2021. After being made aware of the issue, the Audit Office obtained its own advice on matters related to the appropriations framework under relevant state legislation. In the advice to the Audit Office, the Crown Solicitor advised that an agency is not subject to its own legally appropriated expenditure limit (assuming it is not subject to any annual spending limit imposed through an instrument of delegation or a budget control authority issued by the Treasurer under section 5.1 of the GSF Act). In effect, because responsible ministers are given appropriations, these legal expenditure limits, rest in aggregate, with the principal department and agencies the minister is responsible for. It is not possible for an individual agency to monitor or determine at what ‘point in time’ expenditure has been incurred in excess of the minister’s appropriation authority and there is currently no framework to monitor this.

Further detail on this matter is on pages 54 to 56 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. In this report, we recommended that NSW Treasury:

  • ensure a framework exists to monitor and provide assurance to ministers that expenditure incurred across a financial year by agencies under the relevant minister's coordination does not exceed the appropriation authority conferred by the annual Appropriations Act and the GSF Act
  • assess how the requirement to prepare a Summary of Compliance under Australian Accounting Standards impacts relevant principal departments and cluster agencies financial statement disclosures.

Agencies have again spent monies without an authorised delegation

In the State Finances NSW Auditor-General's Report to Parliament for 2020 and 2021 we reported instances where agencies spent money received from an annual appropriation and/or deemed appropriation money without an authorised delegation from the relevant minister(s) as required by sections 4.6(1) and 5.5(3) of the GSF Act. Further detail on this matter is on pages 56 to 57 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. In this report, we recommended NSW Treasury promptly improve the guidance it provides agencies to ensure that expenditure of public monies is properly supported by authorised delegations.

Control deficiencies at NSW Treasury's service providers

NSW Treasury's business processes and information technology services were provided by Infosys, Unisys and the Department of Customer Service during 2020–21. Together this constitutes the GovConnect environment.

The GovConnect information technology general controls (ITGC) were qualified in 2020–21. The key controls over user access, system changes and batch process failed in all ITGC reports. Most of these deviations were not mitigated or sufficiently mitigated to address the risk of unauthorised user access.

In response to the internal control qualifications, the audit teams performed data analytics over payroll and accounts payable to obtain reasonable assurance that these control deficiencies did not materially impact on relevant agencies' financial statements.

Refer to the Customer Service 2021 NSW Auditor-General’s Report to Parliament for further details.

Insurance related matters

icare is in the process of implementing organisational reform in response to findings in recent external reviews. These reviews have identified 151 recommendations for icare to improve in the areas of risk and governance, performance, and culture and accountability. The reviews include the April 2021 McDougall Review, and the February 2021 ‘Independent Review of icare governance, accountability and culture’ which was recommended by SIRA in the Dore Report.

All of these recommendations were accepted by icare and are expected to be addressed through their ‘Improvement Program’. As at February 2022, icare report that 21 have been addressed, 139 are in progress, and 15 still to commence.

A number of the observations referred to in this report were also identified in the above reviews and are expected to be actioned as part of the improvement program.

Workers Compensation Nominal Insurer (the Nominal Insurer)

The Nominal Insurer’s net asset deficiency at 30 June 2021

Last year's Central Agencies Report to Parliament reported that the Workers Compensation Nominal Insurer (the Nominal Insurer), the NSW Self Insurance Corporation and the Lifetime Care and Support Authority of New South Wales all had negative net assets at 30 June 2020. After strong investment returns in 2020–21, only the Nominal Insurer continued to have negative net assets at 30 June 2021.

The Nominal Insurer's negative net assets of $252.9 million at 30 June 2021 ($316.2 million at 30 June 2020) means that it still does not hold sufficient capital to meet the estimated present value of its future payment obligations, when measured in accordance with the accounting framework. The financial statements continued to be prepared on a going concern basis because the future payment obligations are not all due for settlement within the next 12 months.

As noted in section 2.4 ‘Key accounting issues’, icare changed from an 'Accounting Ratio', to an 'Insurance Ratio', to assess the Nominal Insurer’s capital position from 2020–21. The insurance ratio uses a (higher) discount rate based on the expected earnings rate on the Nominal Insurer’s assets, rather the ‘risk free’ rate which is used for financial reporting.

Last year's Report to Parliament also noted that the deterioration in the value of the Nominal Insurer’s net assets has resulted in its funding ratio at 30 June 2020 being outside of the ‘target operating zone’ set by the Board of icare. The Insurance Ratio at 30 June 2021 is 122%, which is less than icare's target operating zone of over 130%.

icare is assessing how it can increase the Nominal Insurer’s funding ratio, and advises that actions taken to date include the execution of the Nominal Insurer Improvement Program (the Improvement Program) and an increase in premium rates.

icare were given approval by the State Insurance Regulatory Authority (SIRA) to increase workers compensation premium rates from 1.4% to 1.44%  of wages (2.9%) for the 2021–22 policy year. icare advises that their pricing strategy for workers compensation premiums is for ‘modest increases over the medium term’.

Return-to-work rates have worsened

Last year's Central Agencies Report to Parliament noted that the Nominal Insurer has experienced deteriorating return-to-work rates since late 2017. According to data published by SIRA, the Nominal Insurer’s monthly four week return-to-work rate has continued to decline, falling from 68% at 30 June 2020 to 64% at 30 June 2021, and down to 63% at 30 September 2021.

A key assumption when measuring the Nominal Insurer’s outstanding claims liability, is the amount of time that injured workers will remain on benefits (i.e. continuance rates). This assumption is significantly aligned with return-to-work rate measures. At 30 June 2021, the liability was increased by $296 million due to changes in continuance rate assumptions, with workers expected to remain on benefits longer. This change is consistent with the fall in four week return-to-work rates.

The four week return-to-work rate trend since August 2017 is shown in the graph below.

Appendix one - Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

Appendix five – Acquittals and other opinions

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Published

Actions for Integrity of grant program administration

Integrity of grant program administration

Local Government
Premier and Cabinet
Internal controls and governance
Management and administration

What the report is about

This report assessed the integrity of the assessment and approval processes for two grant programs:

  • Stronger Communities Fund Round 2 (tied grants round), which was administered by the former Office of Local Government (OLG) and provided $252 million to newly amalgamated councils and other councils that had been subject to a merger proposal during 2017–18 and 2018–19.
  • Regional Cultural Fund, which was administered by Create NSW (now within the Department of Premier and Cabinet) and awarded $100 million for cultural projects in regional NSW.

What we found

The assessment and approval process for Round 2 of the Stronger Communities Fund lacked integrity. The government decided to prioritise funds for councils that had worked constructively with the government through the 2016 merger process. 

However, this information was not included in the program guidelines. The program guidelines were not published and did not contain details of selection and assessment processes. Councils and projects were instead identified by the former Premier, Deputy Premier and Minister for Local Government and communicated to OLG with little or no information about the basis for the council or project selection. There was no merit assessment of identified projects. This process resulted in 96 per cent of funds allocated to coalition state seats.

The assessment process that Create NSW used for the Regional Cultural Fund was robust and produced transparent and defensible recommendations to the minister. However, the former Minister for the Arts, in consultation with the former Deputy Premier, did not follow the recommendations of the independent assessment panel in 22 per cent of cases. Reasons for these changes were not documented by Create NSW.

What we recommended

The Department of Premier and Cabinet should develop a model for grant administration that must be used for all grant programs administered in NSW that:

  • is based on ethical principles such as impartiality, equity and transparency 
  • ensures assessments and decisions can be made against clear eligibility criteria
  • ensures accountability for decisions and actions of all those who are involved in the program 
  • includes minimum mandatory administration and documentation standards
  • requires any ministerial override of recommendations to be documented. 

The Department of Planning and Environment should ensure that guidelines prepared for all grant programs are published and include a governance framework that includes accountabilities and key assessment steps.

Fast facts    

Stronger Communities Fund Round 2

  • $252m allocated to 24 councils    
  • 96% allocated to council projects in coalition state seats
  • 36% of the funding ($90m) was allocated to a single council
  • $8m in projects identified before the program guidelines were finalised

Regional Cultural Fund

  • 405 applications received across three funding rounds
  • $99m awarded for 147 cultural projects in regional NSW 
  • 22% panel recommendations not followed by ministers  
  • $9.3m awarded to projects not recommended by panel

Grants are frequently used by the state government to deliver funds to councils and community organisations to provide infrastructure and services important to their local communities. Grant programs are administered by NSW Government agencies in line with priorities and objectives set by the government.

Guidance for agencies administering grant programs is available in the Good Practice Guide to Grants Administration (the 'DPC Guide') which is maintained by the Department of Premier and Cabinet (DPC). In addition to this guide, some agencies maintain their own grant program policies and guidelines. More broadly, public servants are required to comply with financial legislation and the Government Sector Employment Act 2013 which include requirements to be transparent, fiscally responsible and focus on the efficient, effective and prudent use of resources.

The objective of this performance audit is to assess the integrity of the assessment and approval processes for NSW Government grant programs.

The audit focuses on two grant programs, both administered during the 2017–18 and 2018–19 financial years. The Stronger Communities Fund (round two tied grants round) was administered by the former Office of Local Government (OLG), now referred to as the Local Government Group within the Department of Planning and Environment (DPE). The fund awarded $252 million to 24 councils that had amalgamated in 2016 or which had been the subject of a merger proposal. The Regional Cultural Fund was administered by Create NSW, now within the Department of Premier and Cabinet (DPC). The fund awarded $100 million to organisations in regional New South Wales to support the development of cultural infrastructure in regional areas.

The audit comments upon the role played by the then Premier, Deputy Premier, ministers and their staff in the audited grant programs to provide context. The Audit Office of NSW cannot compel those individuals to participate in the audit or provide documents. In all cases, reference to the Premier, Deputy Premier, ministers, MPs and their staff refers to the individuals who were in those roles at the time the grant programs were administered unless otherwise noted.

Conclusion

Stronger Communities Fund

The assessment and approval processes for round two of the Stronger Communities Fund (SCF) lacked integrity. The program guidelines developed by the Office of Local Government (OLG) were deficient in a number of aspects and were not used to guide the selection of councils or projects for funding. Of the 55 councils that met the eligibility criteria in the guidelines, 24 received funding. Ninety-six per cent of available SCF funding was allocated to projects in coalition-held state government electorates. Funding for councils was determined by the then Premier, Deputy Premier and Minister for Local Government and communicated by their staff through emails to OLG with little or no information about the basis for the council or project selection. OLG administered payment of these funds without questioning or recording the basis for selection. For the 22 councils where funding allocations were determined by the former Premier and Deputy Premier, the only record of their approval is a series of emails from their staff. The exclusion of key information from the program guidelines and the lack of formality in approving 22 of the 24 funding allocations prevent accountability and transparency over the government's approach to selecting councils for funding.

In July 2017, the NSW Government established priorities for how the remaining SCF funds should be used. The funds were to be used to cover costs associated with councils' legal action relating to amalgamation, to reimburse costs incurred by councils that were unable to merge but had participated constructively in the merger process, and to fund community initiatives in council areas that had amalgamated in 2016.

OLG developed the initial grant program guidelines between July 2017 and September 2017 in consultation with the then Premier, Deputy Premier and Minister for Local Government and their staff. These were then revised in June 2018. Neither version of the guidelines made reference to the type of projects that were to be prioritised and did not set out how the funds should be administered in accordance with these priorities. The guidelines also did not include information about how councils and projects would be selected and made no provision for an assessment of identified projects against the criteria for eligible projects in the guidelines. OLG did not publish the guidelines and the process adopted by the Premier, Deputy Premier and Minister for Local Government to select projects did not reference the criteria for eligible projects in the guidelines. The selection of councils and funded projects resulted in 96 per cent of available funding being allocated to projects in coalition-held state government electorates.

The Minister for Local Government was responsible for distributing the SCF funds but only approved funding for projects at two of 24 councils, both paid in November 2017. Projects at the other 22 councils were identified by the former Premier and Deputy Premier between June 2018 and June 2019 in consultation with other coalition Members of Parliament and communicated to OLG through emails from Premier and Deputy Premier's staff. When making payments in response to email instructions from staff in the offices of the Premier, Deputy Premier and Minister for Local Government, OLG did not seek to ensure that identified projects were consistent with the guidelines and made payments to selected councils with little or no information to justify them. With the exception of the two funding allocations approved by the then Minister for Local Government, OLG also did not ensure that formal records were in place to document approval for the remaining 22 funding allocations.

Regional Cultural Fund

The assessment process that Create NSW used for the Regional Cultural Fund was robust and produced transparent and defensible recommendations to the then Minister for the Arts. However, the integrity of the approval process for funding allocations was compromised because the minister, in consultation with the then Deputy Premier, did not follow the recommendations of the independent assessment panel in multiple cases and the reasons for making changes were not documented by the minister's office or Create NSW.

All projects that received funding were assessed by Create NSW as eligible for funding under the program. An independent assessment panel assessed applications against the program objective and criteria. This process was designed in line with good practice in grants administration and was implemented consistently. The then Minister for the Arts, in consultation with the former Deputy Premier, did not follow the panel's recommendations for 22 per cent, or more than one in five, of the applications assessed for funding. Thirty-four applications that were recommended by the independent panel did not receive any funding. In the second funding round, seven of the top ten ranked applications were not funded.

The Minister for the Arts approved funding for 22 applications that were not recommended by the independent panel. This resulted in around $9.3 million being awarded to applicants that were not rated highest by the independent panel, including six applicants that received grants of $500,000 or more. Most did not meet one or more assessment criteria and received low ratings.

The then minister did not provide reasons for not approving funding in line with the recommendations of the panel. This did not breach any legislation or guidelines in New South Wales, but it compromised Create NSW's ability to demonstrate integrity and value for money in the RCF approval process. It creates a clear perception that factors other than the merits of the projects influenced funding decisions.

Create NSW's administration of the Regional Cultural Fund was based on relevant legislative requirements and good practice guidance. The objectives of the program were defined clearly and the guidelines and criteria were consistent with the program objectives. The governance and probity framework was appropriate for the size and nature of the program.

Appendix one – Response from agencies

Appendix two – List of funded projects - Stronger Communities Fund Round 2

Appendix three – List of funded projects - Regional Cultural Fund

Appendix four – About the audit

Appendix five – Performance auditing

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #361 - released 8 February 2022.

Published

Actions for Planning, Industry and Environment 2021

Planning, Industry and Environment 2021

Environment
Industry
Local Government
Planning
Asset valuation
Financial reporting
Information technology
Internal controls and governance
Risk

This report analyses the results of our audits of the Planning, Industry and Environment cluster agencies for the year ended 30 June 2021.

Our preferred approach is to table the ‘Report on State Finances’ in Parliament before any other cluster report. This is because the 'Report on State Finances' focuses on the audit results and observations relating to the Total State Sector Accounts, in effect a consolidation of all government agencies. This year the 'Report on State Finances' has been delayed due to significant accounting issues being considered in the Total State Sector Accounts and which may impact the Treasury and Transport clusters.

As there are no outstanding matters relating to audits in the Planning, Industry and Environment cluster impacting the Total State Sector Accounts we have decided to break with normal practice and table this cluster report ahead of the ‘Report on State Finances’.

What the report is about

The results of the Planning, Industry and Environment cluster agencies' financial statements audits for the year ended 30 June 2021.

What we found

Unmodified audit opinions were issued for all completed 30 June 2021 financial statements audits of cluster agencies. Three audits are ongoing.

An 'Other Matter' paragraph was included in the Independent Planning Commission's (the IPC) audit opinion because the prior year comparative figures were not audited. Prior to 2020–21, the IPC was not required to prepare separate financial statements under the Public Finance and Audit Act 1983 (PF&A Act). The financial reporting provisions of the Government Sector Finance Act 2018 now require the IPC to prepare financial statements.

The number of identified misstatements increased from 51 in 2019–20 to 54 in 2020–21.

The 2010–11 to 2019–20 audits of the Water Administration Ministerial Corporation’s (the Corporation) financial statements are incomplete due to insufficient records and evidence to support the transactions of the Corporation, particularly for the earlier years. Management has commenced actions to improve the governance and financial management of the Corporation. These audits are currently in progress and the 2020–21 audit will commence shortly.

There are 609 State controlled Crown land managers (CLMs) across New South Wales that predominantly manage small parcels of Crown land.

Eight CLMs prepared and submitted 2019–20 financial statements by the revised deadline of 30 June 2021. A further 24 CLMs did not prepare financial statements in accordance with the PF&A Act. The remaining CLMs were not required to prepare 2019–20 financial statements as they met NSW Treasury's financial reporting exemption criteria.

The Department of Planning, Industry and Environment's (the department) preliminary assessment indicates that 60 CLMs are required to prepare financial statements in 2020–21. To date, no CLMs have prepared and submitted financial statements for audit in 2020–21.

There are also 120 common trusts that have never submitted financial statements for audit. Common trusts are responsible for the care, control and management of land that has been set aside for specific use in a certain locality, such as grazing, camping or bushwalking.

What the key issues were

The number of matters we reported to management increased from 135 in 2019–20 to 180 in 2020–21, of which 40 per cent were repeat findings.

Seven high-risk issues were identified in 2020–21:

  • system control deficiencies at the department relating to user access to HR and payroll management systems, vendor master data management and journal processing, which require manual reviews to mitigate risks
  • deficiencies related to the Centennial Park and Moore Park Trust's tree assets valuation methodology
  • the Lord Howe Island Board did not regularly review and monitor privileged user access rights to key information systems
  • the Natural Resources Access Regulator identified and adjusted three prior period errors retrospectively, which indicate deficiencies within the financial reporting processes
  • deficiencies relating to the Parramatta Park Trust's tree assets valuation methodology
  • lease arrangements have not been confirmed between the Planning Ministerial Corporation and Office of Sport regarding the Sydney International Regatta Centre
  • the Wentworth Park Sporting Complex land manager (the land manager) has a $6.5 million loan with Greyhound Racing NSW (GRNSW). GRNSW requested the land manager to repay the loan. However, the land manager subsequently requested GRNSW to convert the loan to a grant. Should this request be denied, the land manager would not be able to continue as a going concern without financial support. This matter remains unresolved for many years.

There continues to be significant deficiencies in Crown land records. The department uses the Crown Land Information Database (CLID) to record key information relating to Crown land in New South Wales that are managed and controlled by the department and land managers (including councils and land managers controlled by the state). The CLID system was not designed to facilitate financial reporting and the department is required to conduct extensive adjustments and reconciliations to produce accurate information for the financial statements.

The department is implementing a new system to record Crown land (the CrownTracker project). The department advised that the project completion date will be confirmed by June 2022.

What we recommended

The department should ensure CLMs and common trusts meet their statutory reporting obligations.

Cluster agencies should prioritise and action recommendations to address internal control deficiencies, with a focus on addressing high-risk and repeat issues.

The department should prioritise action to ensure the Crown land database is complete and accurate. This will allow the department and CLMs to be better informed about the Crown land they control.

Fast facts

The Planning, Industry and Environment cluster aims to make the lives of people in New South Wales better by developing well-connected communities, preserving the environment, supporting industries and contributing to a strong economy.

There are 54 agencies, 609 State controlled Crown land managers that predominantly manage small parcels of Crown land and 120 common trusts in the cluster.

  • 42% of the area of NSW is Crown land
  • $33.2b water and electricity infrastructure as at 30 June 2021
  • 100% unqualified audit opinions were issued for all completed 30 June 2021 financial statements audits
  • 7 high-risk management letter findings were identified
  • 54 monetary misstatements were reported in 2020–21
  • 40% of reported issues were repeat issues

This report provides parliament and other users of the Planning, Industry and Environment cluster (the cluster) agencies’ financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Planning, Industry and Environment cluster (the cluster) for 2021.

Section highlights

  • Unmodified audit opinions were issued for all completed 30 June 2021 financial statements audits of cluster agencies. Three audits are ongoing.
  • An 'Other Matter' paragraph was included in the Independent Planning Commission’s (the IPC) audit opinion because the prior year comparative figures were not audited. Prior to 2020–21, the IPC was not required to prepare separate financial statements under the Public Finance and Audit Act 1983. From 2020–21, the IPC is required to prepare financial statements under the Government Sector Finance Act 2018.
  • The 2010–11 to 2019–20 audits of the Water Administration Ministerial Corporation’s (the Corporation) financial statements were incomplete due to insufficient records and evidence to support the transactions of the Corporation, particularly for the earlier years. These audits are currently underway, and the 2020–21 audit will commence shortly.
  • The Department of Planning, Industry and Environment's (the department) preliminary assessment indicates that 60 State controlled Crown land managers (CLMs) are required to prepare financial statements in 2020–21. To date, no CLMs have prepared and submitted financial statements for audit in 2020–21. All 120 common trusts have never submitted their financial statements for audit. The department needs to do more to ensure that the CLMs and common trusts meet their statutory reporting obligations.
  • Nine agencies that were required to perform early close procedures did not complete a total of 20 mandatory procedures. The most common incomplete early close procedures include the revaluation of property, plant and equipment, documenting all significant management judgments and assumptions, and the implementation of new and updated accounting standards.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.

This chapter outlines our observations and insights from our financial statements audits of agencies in the Planning, Industry and Environment cluster.

Section highlights

  • The number of findings reported to management has increased from 135 in 2019–20 to 180 in 2020–21, and 40 per cent were repeat issues.
  • Seven high-risk issues were identified in 2020–21, and three high-risk findings were repeat issues.
  • There continues to be significant deficiencies in Crown land records. The department should prioritise action to ensure the Crown land database is complete and accurate.

Appendix one - Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Premier and Cabinet 2021

Premier and Cabinet 2021

Premier and Cabinet
Whole of Government
Asset valuation
Financial reporting
Infrastructure
Internal controls and governance
Shared services and collaboration

This report analyses the results of our audits of the Premier and Cabinet cluster agencies for the year ended 30 June 2021.

Our preferred approach is to table the ‘Report on State Finances’ in Parliament before any other cluster report. This is because the 'Report on State Finances' focuses on the audit results and observations relating to the Total State Sector Accounts, in effect a consolidation of all government agencies. This year the 'Report on State Finances' has been delayed due to significant accounting issues being considered in the Total State Sector Accounts and which may impact the Treasury and Transport clusters.

As there are no outstanding matters relating to audits in the Premier and Cabinet cluster impacting the Total State Sector Accounts we have decided to break with normal practice and table this cluster report ahead of the ‘Report on State Finances’.

What the report is about

The results of the Premier and Cabinet cluster (the cluster) agencies' financial statement audits for the year ended 30 June 2021.

What we found

Unmodified audit opinions were issued for all Premier and Cabinet cluster agencies.

The number of monetary misstatements decreased from 49 in 2019–20 to 38 in 2020–21.

The Library Council of New South Wales corrected a prior period error of $325 million. In 2017, the council split its collection assets into six asset classes, but not the related asset revaluation reserves. To correct this error, some revaluation decrements previously recognised in asset revaluation reserves were reclassified to accumulated funds.

Eight agencies did not complete all of the mandatory early close procedures.

What the key issues were

The Premier and Cabinet cluster was impacted by three Machinery of Government (MoG) changes during 2020–21.

The changes resulted in the transfer of activities and functions in and out of the cluster and the creation of a new entity - Investment NSW.

The transferor entities continued to provide services to Investment NSW subsequent to 30 June 2021. There were no formal service level agreements in place for the provision of these services.

The New South Wales Electoral Commission (the Commission) and Sydney Opera House Trust obtained letters of financial support from their relevant Minister and/or NSW Treasury in 2020–21. The postponement of local government elections impacted the Commission's operations due to increased planned expenditure to support a COVID-safe election. Sydney Opera House Trust's ability to generate revenue was impacted due to the closure of the Concert Hall partly due to COVID-19 and planned renovations.

The number of repeated audit issues raised with management and those charged with governance increased from 22 in 2019–20 to 24 in 2020–21.

There were 47 moderate risk and 28 low risk findings identified. Of the total findings there were 24 repeat issues.

What we recommended

Investment NSW should ensure services received from other agencies are governed by service level agreements.

Fast facts

The Department of Premier and Cabinet supports the Premier and Cabinet to deliver the government's objectives, infrastructure, preparedness for disaster, incident recovery, arts and culture.

  • $11.9b of property, plant and equipment as at 30 June 2021
  • $4.4b total expenditure incurred in 2020-21
  • 100% unqualified audit opinions were issued on agencies' 30 June 2021 financial statements
  • 47 moderate risk findings were reported to management 
  • 38 monetary misstatements were reported in 2020-21
  • 32% of all reported issues were repeat issues.

This report provides Parliament and other users of the Premier and Cabinet’s financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Premier and Cabinet cluster (the cluster) for 2021.

Section highlights

  • Unqualified audit opinions were issued on all completed cluster agencies' 2020–21 financial statements.
  • Monetary misstatements decreased from 49 in 2019–20 to 38 in 2020–21.
  • Thirteen agencies were exempt from financial reporting in 2020–21. 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Premier and Cabinet cluster.

Section highlights

  • The 2020–21 audits identified 47 moderate risk issues across the cluster. Sixteen of the moderate risk issues were repeat issues. Many repeat issues related to governance and oversight and information technology.
  • The number of moderate risk findings increased by 42 per cent in 2020–21.
  • The moderate risk issues included information technology improvements, lack of service level agreements, risk management, contract and procurement and asset management improvements.

Appendix one – Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Fast-tracked Assessment Program

Fast-tracked Assessment Program

Planning
Industry
Environment
Compliance
Internal controls and governance
Management and administration
Service delivery

What the report is about

This report examines the effectiveness of the Fast-tracked Assessment Program, administered by the Department of Planning, Industry and Environment (DPIE) between April 2020 and October 2020. 

The program aimed to support the construction industry during the COVID-19 crisis by accelerating the final assessment stages for planning proposals and development applications. 

DPIE selected projects and planning proposals for fast tracked assessment that demonstrated the potential to:

  • deliver jobs
  • progress to the next stage of development within six months of determination
  • deliver public benefit.

The audit assessed whether the Fast-tracked Assessment Program achieved its objectives while complying with planning controls.

What we found

Through tranches three to six of the program, DPIE successfully accelerated the final stages of 53 assessments. DPIE reported that 89 per cent of these proceeded to the next stage of development within six months.

Assessment of projects and planning proposals was compliant with legislation and other requirements. However, the audit found gaps in DPIE's management of conflicts of interest.

DPIE has not evaluated or costed the program and is not able to demonstrate the extent to which it provided support to the construction industry during COVID-19. 

Aspects of the program have been incorporated into longer term reforms to create a new level of transparency over the progress and status of planning assessments. 

What we recommended

DPIE should:

  • strengthen controls over conflicts of interest 
  • evaluate the Fast-tracked Assessment Program.

Fast facts

Construction industry support 
  • The program aimed at providing immediate support to the construction industry during the COVID-19 crisis
59 fast-tracked projects 
  • 59 projects and 42 planning proposals projects were assessed in six tranches
89% of all fast-tracked assessments in tranches three to six progressed to the next stage of the planning process within six months of determination

In April 2020, the Department of Planning, Industry and Environment (DPIE) introduced programs aimed at providing immediate support to the construction industry during the COVID-19 crisis. One of these was the Fast-tracked Assessment Program. This program identified planning proposals and development applications (DAs), across six tranches, that were partially-assessed and could be accelerated to determination.

In accordance with the program objectives, the planning proposals and DAs selected for fast-tracked assessment had to:

  • deliver jobs – particularly in the construction industry
  • be capable of progressing to the next stage of development within six months of determination
  • deliver public benefit.

At the same time, the Fast-tracked Assessment Program was to lay a foundation for future reform of the planning system by piloting changes in the assessment process that could be adopted in the medium to long term.

This audit assessed whether the Fast-tracked Assessment Program achieved its objectives while complying with planning controls. The audit focused on tranches three to six of the program, which were determined between July 2020 and October 2020. The rationale for focusing on these four tranches was that the program design had been slightly modified after the first two tranches to address identified risks.

Conclusion

Through tranches three to six of the Fast-tracked Assessment Program, DPIE successfully accelerated the final stages of 53 assessments. DPIE’s internal monitoring indicates that 31 DAs and 16 planning proposals selected in these tranches proceeded to the next stage of development within six months of determination. DPIE achieved this while also successfully managing the risk of non-compliance with planning controls arising from the accelerated process. While DPIE has incorporated components of the Fast-tracked Assessment Program into other longer-term reforms, it has not evaluated the program and is not able to demonstrate the extent to which the program provided support to the construction industry during COVID-19.

Between April and October 2020, DPIE adopted a case management approach to accelerate the final stages of assessment for 42 planning proposals and 59 DAs in six tranches. Tranches three to six were the focus of this audit and included 22 planning proposals and 31 DAs. Applicants involved in the program were expected to progress their projects to the next stage of development within six months of determination. While DPIE had no way of compelling applicants to do this and relied on non-binding commitments obtained from applicants, DPIE’s internal monitoring indicates that 47 of the 53 applicants selected in tranches three to six honoured this commitment.

Fast-tracked assessment only applied to the final stages of assessment and required DPIE staff and other stakeholders to work towards a determination deadline. DPIE effectively used a case management approach to manage the risk that the accelerated timeframe could result in planning controls not being fully compliant with legislation. There is some room for improvement in the process, as four of 28 staff assessing planning proposals and DAs had not lodged current conflict of interest declarations.

Based on the results of and learnings from the Fast-tracked Assessment Program, DPIE has incorporated some elements of the program into other longer-term reforms. There is now increased transparency about when applicants can expect to receive a planning determination and DPIE has also introduced a case management approach for strategic and high priority planning applications. Applicants benefiting from case-managed assessment are now required to commit to a formal service charter that specifies the obligations of both DPIE and the applicant.

DPIE has not evaluated the Fast-tracked Assessment Program to understand the costs and benefits of the program, nor which aspects of the program were most effective as a basis for future reform.

Appendix one – Response from agency

Appendix two – Planning determination pathways

Appendix three – About the audit

Appendix four – Performance auditing

 

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary reference - Report number #354 - released (27 July 2021).

Planned

Actions for Water management and regulation

Water management and regulation

Planning
Environment
Compliance
Fraud
Internal controls and governance
Management and administration
Regulation
Service delivery

Water regulation aims to achieve sustainable environmental, economic and social outcomes from the management of water resources, consistent with the Water Management Act 2000. Following recommendations from reviews into water theft, reforms were made to strengthen water regulation, compliance and enforcement – including the establishment of the Natural Resources Access Regulator (NRAR) in 2018. The Department of Planning and Environment shares responsibility for issuing water access licences and approvals with the state-owned corporation, WaterNSW.

This audit could assess how effectively the Department, WaterNSW and NRAR are undertaking relevant planning, licensing and regulatory functions to ensure secure, sustainable and transparent water sharing in New South Wales. This topic could also consider how effectively the Department has implemented reforms to enhance water metering technology and rules, and the efficacy of NRAR’s activities to support this program.

Published

Actions for Service NSW's handling of personal information

Service NSW's handling of personal information

Premier and Cabinet
Finance
Cyber security
Fraud
Information technology
Internal controls and governance
Management and administration
Risk
Service delivery

The Auditor-General for New South Wales, Margaret Crawford, released a report today examining the effectiveness of Service NSW’s handling of customers’ personal information to ensure its privacy.

The audit found that Service NSW is not effectively handling personal customer and business information to ensure its privacy. Service NSW continues to use business processes that pose a risk to the privacy of personal information. This includes the routine emailing of personal information between Service NSW service centres and other agencies, which is one of the processes that contributed to the data breach earlier this year. The audit found that previously identified risks and recommended solutions had not been implemented on a timely basis.

The Auditor-General made eight recommendations aimed at ensuring improved processes, technologies, and governance arrangements for how Service NSW handles customers’ personal information.

The Hon. Victor Dominello, MP, Minister for Customer Service, requested this audit under section 27(B)(3)(c) of the Public Finance and Audit Act 1983 following public reports in May 2020 of a cyber security attack which had led to a breach of Service NSW customer information. This audit also included the Department of Customer Service which supports Service NSW with privacy, risk and governance functions.

Service NSW was established in 2013 with the intention that it would, over time, 'become the primary interaction point for customers accessing New South Wales Government transaction services'.

Service NSW's functions are set out in the Service NSW (One stop Access to Government Services) Act 2013. This legislation allows for other NSW Government agencies to delegate to and enter into agreements with the Chief Executive Officer of Service NSW in order for Service NSW to undertake service functions for the agency.

Service NSW now has agreements with 36 NSW Government client agencies to facilitate over 1,200 types of interactions and transactions for the community.

The nature of each agreement between Service NSW and its client agencies varies. Some client agencies have delegated authority to allow Service NSW staff to conduct transactions on their behalf in the agencies' systems. Other arrangements do not include the same degree of delegation. In these cases, Service NSW provides services such as responding to enquiries and validating documents.

In addition, Service NSW conducts transactions for its own programs, such as the Seniors Card. Personal information for these programs, as well as information for customers' MyServiceNSW accounts, are stored by Service NSW on its Salesforce Customer Relationship Management (CRM) system.

In March 2020, Service NSW suffered two cyber security attacks in short succession. Technical analysis undertaken by the Department of Customer Service (DCS) concluded that these attacks resulted from a phishing exercise through which external threat actors gained access to the email accounts of 47 staff members. These attacks resulted in the breach of a large amount of personal customer information that was contained in these email accounts. See Section 1.1 for further details.

This audit is being conducted in response to a request from the Hon. Victor Dominello, Minister for Customer Service, under section 27B(3)(c) of the Public Finance and Audit Act 1983. Minister Dominello requested that the Auditor General conduct a performance audit in relation to Service NSW's handling of sensitive customer and business information.

This audit assessed how effectively Service NSW handles personal customer and business information to ensure its privacy.

It addressed the following:

  • Does Service NSW have processes and governance in place to identify and manage risks to the privacy of personal customer and business information?
  • Does Service NSW have policies, processes and systems in place that support the effective handling of personal customer and business information to ensure its privacy?
  • Has Service NSW effectively implemented its policies, processes and systems for managing personal customer and business information?

Conclusion

Service NSW is not effectively handling personal customer and business information to ensure its privacy. It continues to use business processes that pose a risk to the privacy of personal information. These include routinely emailing personal customer information to client agencies, which is one of the processes that contributed to the March 2020 data breach. Previously identified risks and recommended solutions had not been implemented on a timely basis.

Service NSW identifies privacy as a strategic risk in both its Risk Management Guideline and enterprise risk register and sets out a zero level appetite for privacy risk in its risk appetite statement. That said, the governance, policies, and processes established by Service NSW to mitigate privacy risk are not effective in ensuring the privacy of personal customer and business information. While Service NSW had risk identification and management processes in place at the time of the March 2020 data breach, these did not prevent the breach occurring.

Some of the practices that contributed to the data breach are still being followed by Service NSW staff. For example, business processes still require Service NSW staff to scan and email personal information to some client agencies.

The lack of multi factor authentication has been identified as another key contributing factor to the March 2020 data breach as this enabled the external threat actors to gain access to staff email accounts once they had obtained the user account details through a phishing exercise. Service NSW had identified the lack of multi factor authentication on its webmail platform as a risk more than a year prior to the breach and had committed to addressing this by June 2019. It was not implemented until after the breach occurred.

There are weaknesses in the general IT and security controls implemented by Service NSW over its Salesforce Customer Relationship Management (CRM) system, which holds the personal information of over four million NSW residents.

Internal audits carried out by Service NSW, including one completed in August 2020, have identified significant weaknesses in the general IT and security controls implemented by Service NSW over its Salesforce CRM system. These include deficiencies in the management of role based access, monitoring and audit of user access, and partitioning of program specific transaction information. These deficiencies create an increased risk of unauthorised access to the personal information of over four million customers held in the system.

Lines of responsibility for meeting privacy obligations are not clearly drawn between Service NSW and its client agencies.

Service NSW has agreements in place with client agencies. However, the agreements lack detail and clarity about the roles and responsibilities of the agencies in relation to the collection, storage and security of customer's personal information. This lack of clarity raises the risk that privacy obligations will become confused and missed between the agencies.

Service NSW carries out privacy impact assessments for major new projects but does not routinely review existing processes and systems.

Service NSW carries out privacy impact assessments as part of its routine processes for implementing major new projects, ensuring that privacy management is considered as part of project design. Service NSW does not regularly undertake privacy impact assessments or reviews of existing or legacy processes and systems, which has resulted in some processes continuing despite posing significant risks to the privacy of personal information, such as the scanning, emailing, and storing of identification documents.

1. Key findings

Service NSW identifies privacy risks, but the controls and processes it put in place to mitigate these privacy risks were not adequate to prevent or limit the extent of the data breach that occurred in March 2020

Service NSW’s approach to risk management is framed by its Risk Management Guideline, which defines 'privacy and compliance' as one of the key types of risk for the agency. Service NSW's enterprise risk register identifies four strategic privacy related risks. Service NSW has set out a zero level appetite for privacy risk in its risk appetite statement.

Service NSW has assessed the adequacy of its controls for privacy risks as needing improvement. To be fully effective, the Risk Management Guideline says that these controls should have a focus that is ‘largely preventative and address the root causes’.

One of the business processes that was a key contributing factor to the data breach was the emailing of personal information by Service NSW staff to client agencies.

This process had been identified as a risk prior to the breach and some steps had been put in place to mitigate the risk. In particular, staff were required to manually delete emails that contained personal information. However, these measures were ineffective in preventing the breach, as the external threat actors still gained access to 47 staff email accounts that contained a large amount of personal information.

It is unclear why Service NSW did not effectively mitigate this risk prior to the breaches. However, Service NSW has advised that it implemented measures in June and October 2020 to automatically archive emails likely to contain personal information. This is expected to limit the quantity of information retained in email accounts for extended periods.

Service NSW has not put in place any technical or other solutions to avoid Service NSW staff having to scan and email personal information to some client agencies. Urgent action is needed to remove the requirement for staff to email personal information to client agencies, thereby mitigating the risk inherent in sending and storing this information using email.

There are weaknesses in the general IT and security controls implemented by Service NSW over its Salesforce CRM system, which holds the personal information of over four million customers

There are weaknesses in the general IT and security controls implemented by Service NSW over its Salesforce CRM system. These weaknesses include deficiencies in governance of role based access, monitoring and audit of staff access, and partitioning of program specific transaction information. These deficiencies create an increased risk of unauthorised access to the personal information of over four million customers which is stored in this system.

In addition, there is an absence of important controls to safeguard customers' privacy, such as multi factor authentication and reviewable logs of access history to their information. Such controls, when properly implemented, would enhance the control that customers are able to exercise over their personal information.

A privacy impact assessment conducted on Service NSW’s Salesforce CRM system in 2015 recommended that the system include the ability for customers to review access history to their personal information, as well as the option for customers to apply multi factor authentication to their accounts. While both these recommendations appeared positively received by Service NSW, neither have been implemented.

Since its inception, Service NSW’s use of Salesforce has extended to storing transaction data, particularly for transactions for which Service NSW is responsible, such as the Seniors Card. It also holds details of over four million MyServiceNSW account holders, including name, email address and phone number, and optional address details. It was not originally intended for the system to hold this volume and nature of customer information.

Lines of responsibility for meeting privacy obligations are unclear between Service NSW and its client agencies

Service NSW's privacy management plan does not clearly set out the privacy obligations of Service NSW and its client agencies. It sets out that 'compliance with the privacy principles will primarily be the responsibility of that [client] agency'. However, Service NSW has its own obligations under the security principles of the Privacy and Personal Information Protection Act 1998 (PPIP Act) to take reasonable steps to prevent unauthorised access to personal information, which is not made clear in the privacy management plan.

The agreements between Service NSW and client agencies reviewed for this audit only include general and high level references to privacy. Most do not include details of each parties' privacy responsibilities such as: which agency will provide the customer with a privacy notice explaining how their personal information will be handled, how personal information will be kept secure, how long Service NSW will retain information, what processes will be followed for internal reviews, and what specific planning is in place to respond to data breaches.

Service NSW's privacy management plan has not been updated to include new programs and governance changes

Service NSW's privacy management plan includes most of the matters required by law or good practice, with some exceptions. It does not explain any exemptions that the agency commonly relies on under the PPIP Act and does not address any health information that Service NSW may handle. It had also not been updated to reflect governance changes and the fact that, at the time this audit commenced, Service NSW was disclosing the content of internal review applications (the formal expression for 'complaints') to the Department of Customer Service (DCS). These governance changes were part of the centralisation of Service NSW's corporate support functions into DCS in late 2019, though internal review staff were seconded back into Service NSW during the course of this audit.

The current July 2019 privacy management plan has also not been updated since the rollout of a number of major new initiatives in 2020. These include 2019–20 bushfire emergency recovery initiatives (such as small business grants) and COVID 19 pandemic response initiatives (such as small business grants, border permits and the COVID safe check in app).

Service NSW routinely conducts privacy impact assessments for new initiatives, though privacy risks remain in legacy systems and processes

Service NSW routinely conducts privacy impact assessments for major new initiatives and the assessments reviewed for this audit largely accorded with good practice guidance.

Service NSW does not routinely review existing processes and systems to ensure that they are effective in ensuring the privacy of customer personal information. Business processes that create the highest risk to privacy, such as emailing of personal information, are more common in these longstanding legacy systems.

Service NSW's significant and rapid growth has outpaced the establishment of a robust control environment which has exacerbated privacy risks

Since it was established in 2013, Service NSW has experienced significant growth in the number and diversity of the types of transactions it provides, as well as the number of client agencies with which it works. The pace and extent of this growth has contributed to important controls not being properly implemented on a timely basis, which has heightened privacy risks, particularly in regard to existing, legacy systems and processes.

The pace of change and increasing demand for new program implementation has limited the opportunity for Service NSW, in collaboration with its client agencies, to revisit and redesign legacy business practices which pose a greater privacy risk. This includes the scanning and emailing of personal information.

While 2019–20 has seen additional demands placed on Service NSW in responding to the 2019–20 bushfire emergency and COVID 19 pandemic, it is the nature of the agency’s work that it operates in a fast paced and complex environment, where it is required to respond to multiple client agencies and stakeholders. Ensuring customer privacy should be integral to Service NSW’s business as usual operations.

2. Recommendations

Service NSW commissioned a number of external reviews and investigations stemming from the data breaches. The Auditor General's recommendations below have taken these other reviews into account. In order to offer assurance that it is appropriately protecting the privacy of its customers, Service NSW should address the full breadth of findings and recommendations made across all relevant reviews.

As a matter of urgency, Service NSW should:

1. in consultation with relevant client agencies and the Department of Customer Service, implement a solution for a secure method of transferring personal information between Service NSW and client agencies

2. review the need to store scanned copies of personal information and, if still required, implement a more secure method of storing this information and regular deletion of material.

By March 2021, Service NSW should:

3. ensure that all new agreements entered into with client agencies from 1 April 2021 address the deficiencies identified in this audit, including that they provide clarity on:

  • the content and provision of privacy collection notices
  • the terms by which personal information will be retained, stored, archived, and disposed of when no longer required
  • steps that will be taken by each agency to ensure that personal information is kept secure
  • the circumstances in which, and processes by which, applications for internal review will be referred by one agency to the other
  • how identified breaches of privacy will be handled between agencies

4. in collaboration with the Department of Customer Service, review its privacy management plan to address the deficiencies raised in this audit, including:

  • to clarify Service NSW's understanding of how responsibility for meeting privacy obligations are delineated between Service NSW and client agencies
  • to better reflect the full scope and complexity of personal information handled by Service NSW
  • to better explain how applications for internal review are handled between Service NSW and the Department of Customer Service
  • to ensure regular ongoing review, either according to a schedule or when Service NSW experiences substantial change to its programs and handling of personal information

5. in consultation with the Department of Customer Service, review its policies and processes for the management of privacy risks, including to:

  • ensure that there are appropriate mechanisms to escalate identified privacy risks from business units to the Executive Leadership Team
  • ensure that there are action plans to address strategic privacy risks that are assessed as having ineffective controls.
By June 2021, Service NSW should:

6. address deficiencies in the controls over, and security for, its Salesforce customer relationship management and related systems that hold customer personal information, including:

  • establish policies and processes for regular access reviews and monitoring of user activity in these systems, including for privileged users
  • enable partitioning and role based access restrictions to personal information collected for different programs
  • provide customers the choice to use multi factor authentication to further secure their MyServiceNSW accounts
  • enable customers to view the transaction history of their personal information to detect possible mishandling.
By December 2021, Service NSW should:

7. ensure that all existing agreements with client agencies address the deficiencies identified in this audit, including that they provide clarity on:

  • the content and provision of privacy collection notices
  • the terms by which personal information will be retained, stored, archived, and disposed of when no longer required
  • steps that will be taken by each agency to ensure that personal information is kept secure
  • the circumstances in which, and processes by which, applications for internal review will be referred by one agency to the other
  • how identified breaches of privacy will be handled between agencies

8. carry out a risk assessment of all processes, systems and transactions that involve the handling of personal information and undertake a privacy impact assessment for those that:

  • are identified as high risk and have not previously had a privacy impact assessment
  • have had major changes or updates since the privacy impact assessment was completed.

Appendix one – Responses from agencies

Appendix two – About the audit

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Central Agencies 2020

Central Agencies 2020

Premier and Cabinet
Treasury
Financial reporting
Internal controls and governance
Management and administration
Risk

This report analyses the results of our audits of the financial statements of the Treasury, Premier and Cabinet, Customer Service cluster agencies (central agencies), and the Legislature for the year ended 30 June 2020. The table below summarises our key observations.

1. Financial reporting

Audit opinions and timeliness of reporting

Unqualified audit opinions were issued on the 2019–20 financial statements of central agencies and the Legislature.

The audit opinion on the Social and Affordable Housing NSW Fund's compliance with the payment requirements of the Social and Affordable Housing NSW Fund Act 2016 was qualified.

All agencies met statutory deadlines for submitting
financial statements. 

Agencies were financially impacted by recent emergency events The NSW Government allocated $1.4 billion to provide small business support and bushfire recovery relief, support COVID-19 quarantine compliance management, recruit more staff to respond to increased customer demand, and meet additional COVID-19 cleaning requirements. Agencies spent $901 million (64 per cent of the allocated funding) for the financial year ended 30 June 2020. NSW Self Insurance Corporation reported an increase of $850 million in its liability for claims related to emergency events.
AASB 16 'Leases' resulted in significant changes to agencies' financial position The implementation of new accounting standards was challenging for many agencies. The New South Wales Government Telecommunications Authority was not well-prepared to implement AASB 16 'Leases' and had not completely assessed contracts that contained leases. This resulted in understatements of leased assets and liabilities by $56 million which were subsequently corrected.
Implementation of new revenue standards NSW Treasury did not adequately implement the new revenue standard AASB 1058 ‘Income of Not-for-Profit Entities’ for the Crown Entity. This resulted in understatements of $274 million in opening equity and $254 million to current year revenue, which have been corrected in the final financial statements.

2. Audit observations

Management letter findings and repeat issues Our 2019–20 audits identified nine high risk and 122 moderate risk issues across central agencies and the Legislature. The high risk issues were identified in the audits of:
  • Insurance and Care NSW
  • New South Wales Government Telecommunications Authority
  • Rental Bond Board
  • Independent Commission Against Corruption
  • NSW Treasury
  • Crown Entity
  • Department of Premier and Cabinet.

High risk findings include:

  • Insurance and Care NSW (icare) allocates service costs to the Workers Compensation Nominal Insurer, and the other schemes it supports. The documentation supporting cost allocations does not demonstrate how these allocations reflect actual costs. There is a risk of the Workers Compensation Nominal Insurer being overcharged.
  • New South Wales Government Telecommunications Authority's delay in capitalisation and valuation of material capital projects; and insufficient work performed to implement the new accounting standard AASB 16 ‘Leases’.
  • NSW Treasury's four-year plan to transition RailCorp to a for-profit State Owned Corporation called Transport Asset Holding Entity of New South Wales (TAHE) by 1 July 2019, remains to be implemented. On 1 July 2020, RailCorp converted to TAHE. A large portion of the planned arrangements are still to be implemented. As at the time of the audit, the TAHE operating model, Statement of Corporate Intent (SCI) and other key plans and commercial agreements were not finalised. In the absence of commercial arrangements with the public rail operators, there is a lack of evidence to demonstrate TAHE’s ability to create a commercial return in the long term. This matter has been included as a high risk finding in our management letter as there may be financial reporting implications to the State if TAHE does not generate a commercial return for its shareholders in line with the original intent. NSW Treasury and TAHE should ensure the commercial arrangements, operating model and SCI are finalised in 2020–21.

Of the 122 moderate risk issues, 36 per cent were repeat issues. The most common repeat issue related to weaknesses in controls over information technology user access administration, which increases the risk of inappropriate access to systems and records.

Grants administration for disaster relief Service NSW delivers grants responding to emergency events on behalf of other NSW Public Sector agencies. Since the first grant program commenced in January 2020, Service NSW processed approximately $791 million to NSW citizens and businesses impacted by emergency events for the financial year ended 30 June 2020. A performance audit of grants administration for disaster relief is planned for 2020–21. It will assess whether grants programs administered under the Small Business Support Fund were effectively designed and implemented to provide disaster relief.
Internal controls at GovConnect NSW service providers require enhancement

GovConnect NSW provides transactional and information technology services to central agencies. It engages an independent service auditor (service auditor) from the private sector to perform annual assurance reviews of controls at service providers, namely Infosys, Unisys and the Department of Customer Service (DCS). The service auditor issued:

  • unqualified opinions on information technology and business process controls at Infosys and Unisys, but there was an increase in control deficiencies identified in the user access controls at these service providers
  • a qualified opinion on DCS's information technology (IT) security monitoring controls because security tools were not implemented and monitored for the entire financial year. Responsibility for IT security monitoring transitioned from Unisys to DCS in 2019–20. These control deficiencies can increase the risk of fraud and inappropriate use of sensitive data.

These may impact on the ability of agencies to detect and respond to a cyber incident.

Recommendation:

We recommend DCS work with GovConnect service providers to resolve the identified control deficiencies as a matter of priority.

The NSW Public Sector's cyber security resilience needs to improve

The NSW Cyber Security Policy requires agencies to provide a maturity self-assessment against the Australian Cyber Security Centre (ACSC) Essential 8 to the head of the agency and Cyber Security NSW annually. Completed self-assessment returns highlighted limited progress in implementing the Essential 8.

Repeat recommendation:

Cyber Security NSW and NSW government agencies need to prioritise improvements to their cyber security resilience as a matter of urgency

Three Insurance and Care NSW (icare) entities had net asset deficiencies at 30 June 2020 The Workers Compensation Nominal Insurer, NSW Self Insurance Corporation and the Lifetime Care and Support Authority of NSW all had negative net assets at 30 June 2020. These icare entities did not hold sufficient assets to meet the estimated present value of all of their future payment obligations at 30 June 2020. The deterioration in net assets was largely due to increases in outstanding claims liabilities. Notwithstanding the overall net asset deficiencies, the financial statements for these entities were prepared on a going concern basis. This is because future payment obligations are not all due within the next 12 months. Settlement is instead expected to occur over years into the future, depending on the nature of the benefits provided by each scheme.
icare has not been able to demonstrate that its allocation of costs reflects the actual costs incurred by the Workers Compensation Nominal Insurer and other schemes

Costs are incurred by icare as the 'service entity' of the statutory scheme it administers, and then subsequently recovered from the schemes through 'service fees'. In the absence of documentation supported by robust supporting analysis, there is a risk of the schemes being overcharged, and the allocation of costs being in breach of legislative requirements.

Recommendation:

icare should ensure its approach to allocating service fees to the Workers Compensation Nominal Insurer and the other schemes it manages, is transparent and reflects actual costs.

icare did not comply with GIPA requirements icare did not comply with the Government Information (Public Access) Act 2009 (GIPA) contract disclosure requirements in 2019–20 and has not complied for several years. A total of 417 contracts were identified by management as not having been published on the NSW Government’s eTendering website. The final upload of these past contracts occurred on 20 August 2020.
Implementation of Machinery of Government (MoG) changes MoG changes impacted the governance and business processes of some agencies. Our audits identified and reported areas for improvement in the consolidation of corporate functions following MoG implementation processes at Infrastructure NSW and in the Customer Service cluster.

This report provides Parliament and other users of NSW Government central agencies' financial statements and the Legislature's financial statements with the results of our financial audits, observations, analyses, conclusions and recommendations.

Emergency events, such as bushfires, floods and the COVID-19 pandemic significantly impacted agencies in 2019–20. Our findings on nine agencies that were most impacted by recent emergency events are included throughout this report.

Refer to Appendix one for the names of all central agencies and Appendix four for the nine agencies most impacted by emergency events.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely. This chapter outlines our audit observations on the financial reporting of central agencies and the Legislature for 2020, including the financial implications from recent emergency events.

Section highlights

  • Unqualified audit opinions were issued on the 2019–20 financial statements of central agencies and the Legislature. All agencies met the statutory deadlines for submitting their financial statements.
  • The audit opinion on the Social and Affordable Housing NSW Fund's compliance with the payment requirements of the Social and Affordable Housing NSW Fund Act 2016 was qualified as a result of a payment made without a Treasurer's delegation.
  • Agencies were impacted by emergency events during 2019–20. This included additional grants to fund specific deliverables.
  • The implementation of new accounting standards was challenging for many agencies. The New South Wales Government Telecommunications Authority was not well-prepared to implement AASB 16 'Leases' and had not completely assessed contracts that contained leases. This resulted in understatements of leased assets and liabilities by $56 million which were subsequently corrected.
  • NSW Treasury did not adequately implement the new revenue standard AASB 1058 ‘Income of Not-for-Profit Entities’ for the Crown Entity. This resulted in understatements of $274 million in opening equity and $254 million to current year revenue in the financial statements. These misstatements were due to incorrect revenue calculations performed by the Transport agencies. The Crown Entity relies on information from Transport agencies as they are responsible for carrying out the State’s contractual obligations for Commonwealth funded transport projects. The extent of misstatements could have been reduced with more robust quality review processes in place by Treasury and Transport.

 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines:

  • our observations and insights from the financial statement audits of agencies in the central agencies and the Legislature
  • our assessment of how well agencies adapted their systems, policies, procedures and governance arrangements in response to recent emergencies.

Section highlights

  • The 2019–20 audits identified nine high risk and 122 moderate risk issues across the agencies. Of the 122 moderate risk issues, 44 (36 per cent) were repeat issues. The most common repeat issue relates to weaknesses in controls over information technology user access administration.
  • Service NSW delivers grants responding to emergency events on behalf of other NSW Public Sector agencies. Since the first grant program commenced in January 2020, Service NSW processed approximately $791 million to NSW citizens and businesses impacted by these emergency events for the financial year ended 30 June 2020.
  • GovConnect NSW engaged an independent auditor (the service auditor) from the private sector to evaluate the internal controls of its service providers. DCS's information technology security monitoring controls were qualified by the service auditor because security tools were not implemented and monitored for the entire financial year. These may impact on the ability of agencies to detect and respond to a cyber incident.
  • NSW Government agency self-assessment results show that the NSW Public Sector's cyber security resilience needs urgent attention.
  • The Workers Compensation Nominal Insurer, NSW Self Insurance Corporation and the Lifetime Care and Support Authority of NSW all had negative net assets at 30 June 2020. The financial statements for these entities continued to be prepared on a going concern basis as their liabilities are not all due for settlement within the next 12 months.
  • icare did not comply with the Government Information (Public Access) Act 2009 (GIPA) contract disclosure requirements in 2019–20, and has not complied for several years. A total of 417 contracts were identified by management as not having been published on the NSW Government’s eTendering website. The final upload of these past contracts occurred on 20 August 2020.
  • Machinery of Government (MoG) changes impacted the governance and business processes of affected agencies. Our audits identified and reported areas for improvement in the consolidation of corporate functions following MoG changes at Infrastructure NSW and in the Customer Service cluster.