Refine search Expand filter

Reports

Published

Actions for Government Advertising 2017-18

Government Advertising 2017-18

Premier and Cabinet
Compliance
Regulation

The State Insurance Regulatory Authority’s (SIRA) ‘green slip refund’ campaign, and the TAFE semester one 2018 student recruitment campaign, complied with most requirements of the Government Advertising Act 2011 and the Government Advertising Guidelines, according to a report released today by the Auditor-General for New South Wales, Margaret Crawford.

The Government Advertising Act 2011 (the Act) requires the Auditor-General to conduct a performance audit on the activities of one or more government agencies in relation to government advertising campaigns in each financial year. The performance audit assesses whether a government agency or agencies has carried out activities in relation to government advertising in an effective, economical and efficient manner and in compliance with the Act, the regulations, other laws and the Government Advertising Guidelines (the Guidelines).

This audit examined two campaigns conducted in 2017–18:

  • the 'Green slip refund' campaign run by the State Insurance Regulatory Authority (SIRA)
  • the semester one component of the 'TAFE NSW 2018 Student Recruitment Annual Campaign Program' run by the NSW TAFE Commission (TAFE).

Section 6 of the Act prohibits political advertising. Under this section, material that is part of a government advertising campaign must not contain the name, voice or image of a minister, member of parliament or a candidate nominated for election to parliament or the name, logo or any slogan of a political party. Further, a campaign must not be designed to influence (directly or indirectly) support for a political party.

Conclusion
Neither campaign breached the prohibition on political advertising contained in section 6 of the Act. Both campaigns also complied with most requirements of the Act, the regulations, other laws and the Guidelines. Neither agency could demonstrate that their campaigns were fully effective or economical.
SIRA did not breach section 6 of the Act, which prohibits political advertising. However, SIRA used its post-campaign evaluation to ask the public whether they believe the government was helping to reduce the cost of living by making reforms in a variety of areas, including some that were not related to the green slip campaign. SIRA advised that these additional statements were included to provide a broader context for any change in the green slip campaign survey results. This is not an appropriate use of the post-campaign evaluation because the post-campaign evaluation should measure the success of the campaign against its stated objectives.
Neither campaign met all their key objectives, limiting the overall effectiveness of the campaigns. SIRA successfully increased awareness of the availability of green slip refunds and met the target for the proportion of people claiming their refunds online. However, it did not meet its objective to inform the public about the reforms to the green slip scheme, beyond the refunds available to motorists. While 62 per cent of surveyed people were aware of the reforms, there was little knowledge about many specific aspects of the reforms, which people largely associated with lower insurance prices and refunds. TAFE was successful in achieving targets for changing the public perception of TAFE. However, it failed to achieve its semester one enrolment target.
SIRA was not able to demonstrate that its campaign was economical as it directly negotiated with a single supplier for the campaign's creative materials. This is contrary to the NSW Government's and SIRA's own procurement guidance that advise it to seek quotes from suppliers on a prequalification scheme if available. SIRA had access to the Advertising and Digital Communication Services prequalification scheme, but still continued with direct negotiations. While SIRA sought to demonstrate value for money by comparing the supplier's quote to the expenditure on creative materials in other campaigns, it did not document this evaluation to ensure that decision makers were fully informed. 
TAFE was not able to demonstrate that its campaign was economical as it did not compare the campaign with a zero-advertising scenario to demonstrate the exact benefits directly attributable to the campaign. TAFE's cost-benefit analysis also did not identify to what extent benefits could be achieved without advertising, nor did it consider alternatives to advertising which could achieve the same impact as the advertising campaign. All these elements should have been included in TAFE's cost benefit analysis.
Both agencies achieved some efficiencies in implementing their campaigns. SIRA booked all of its media placements in a cost-efficient manner. TAFE booked most of its media placements in a cost-efficient manner and achieved further efficiencies through the re-use of previous campaign material.

The State Insurance Regulatory Authority (SIRA) conducted the 'Green slip refund' campaign between March and June 2018. SIRA ran this campaign to raise awareness of the Compulsory Third Party (CTP) refunds and reforms after the Motor Accidents Injuries Act 2017 commenced in December 2017. SIRA's view is that the reforms include a reduced cost for CTP insurance, benefits for at-fault drivers, reduced opportunity for fraud and attempts to lower insurance company profits. Green slip holders are also able to claim partial refunds on their 2017 green slip insurance premium. The campaign aimed to make green slip holders aware of the refunds available, encourage them to claim online and to inform people about the changes to the green slip scheme. The campaign focused on the first two of these objectives. The total cost of the campaign was $1.9 million. See Appendix two for more details on this campaign.

The 'Green slip refund' advertising campaign did not breach section 6 of the Act which prohibits political advertising. However, SIRA used its post-campaign evaluation to ask the public whether they believe the government was helping to reduce the cost of living by making reforms in a variety of areas, including some that were not related to the green slip campaign. SIRA advised that these additional statements were included to provide a broader context for any change in the green slip campaign survey results. This is not an appropriate use of the post-campaign evaluation because the post-campaign evaluation should measure the success of the campaign against its stated objectives. 
The campaign met most of its objectives, including raising awareness of the green slip refunds and encouraging people to claim online. However, the campaign was not fully effective because it did not inform the public of the green slip reforms. This was one of the objectives of the campaign. Sixty-two per cent of people in the post-campaign survey stated that they were aware of the reforms, an increase from the baseline of 20 per cent. However, these people largely associated the reforms with lower insurance prices and had a low awareness of any other elements of the reforms, such as SIRA's view that the reforms introduced better support for people injured on the road. This indicates that the campaign did little to inform people about the green slip reforms beyond the price of insurance. 
SIRA was able to ensure cost-efficient media purchases by signing its media booking authority within the timeframe advised by DPC.
SIRA could not demonstrate that the campaign was carried out economically. SIRA directly negotiated with a single supplier to procure the creative materials for this campaign. Direct negotiations make it difficult to ensure value for money due to the lack of competition. SIRA proceeded with direct negotiations despite being able to access a prequalification scheme which could increase competition. In doing so, SIRA did not follow government's or its internal procurement guidance. While SIRA sought to demonstrate value for money by comparing the supplier's quote to the expenditure on creative materials in other campaigns, it did not document this evaluation to ensure that decision makers were fully informed. 

Campaign materials we reviewed did not breach section 6 of the Act

Section 6 of the Act prohibits political advertising as part of a government advertising campaign. A government advertising campaign must not:

  • be designed to influence (directly or indirectly) support for a political party
  • contain the name, voice or image of a minister, a member of parliament or a candidate nominated for election to parliament
  • contain the name, logo, slogan or any other reference to a political party.

The audit team found no breaches of section 6 of the Act in the campaign material we reviewed.

Before the start of the campaign, SIRA conducted a survey which asked people whether they agreed ‘that the NSW Government is helping to reduce the cost of living by making positive reforms to:

  • reduce the cost of green slips
  • reduce the cost of health insurance
  • increase the number of jobs
  • increase investment in the state.'

SIRA's initial submission to peer review listed one of the campaign objectives as improving the perception of the government as a positive reformer. DPC advised SIRA that this should not be included. SIRA removed this objective.

Even though SIRA appropriately removed this objective, the post-campaign evaluation still measured agreement with the above statements, three of which did not relate to this campaign or SIRA's responsibilities. SIRA advised that these three additional statements were included to provide a broader context for any change in the green slip campaign survey results. For example, if all four measures reported an increase in positive responses of roughly the same size, then the increase may have been due to factors other than the advertising campaign.

This is not an appropriate use of the post-campaign evaluation, which should measure the success of the campaign against its stated objectives. The Guidelines list the purposes that government advertising may serve and none of these relate to improving the perception of the government. The inclusion of the above questions in SIRA's post-campaign evaluation creates a risk that the results may be used for party political purposes.

The campaign met most targets, however some were not challenging to achieve

The post-campaign evaluation demonstrated that the campaign met the targets for 12 of its 13 objectives including the targets relating to raising awareness of the refunds and the proportion of people claiming their refunds online. A fourteenth objective, the percentage of people aware that they should contact SIRA after a road accident injury, did not have a target set, meaning that it is not possible to say whether the campaign had the desired impact in this case.

In August 2017, before the campaign commenced, SIRA conducted a survey to determine the baselines for some of its objectives. This is a good practice to support an effective post campaign evaluation process. The survey found that 20 per cent of people were aware of the green slip reforms. SIRA's objective was to raise this to 25 per cent, which represents a small gain relative to the proposed campaign expenditure. The campaign aimed for 40 per cent of motorists to be aware of refunds, which is very low given that this was the primary focus of the campaign. SIRA followed the advice of its survey provider when setting these targets. 

In the survey carried out after the campaign, 66 per cent of people were aware of the availability of green slip refunds for most motorists. The campaign also aimed to get 83 per cent of motorists to claim their refunds via online channels. It met this target, with a total of 84 per cent. Finally, 62 per cent of people in the post-campaign survey were aware of the green slip reforms. This result is discussed further below.

The overall target for total number of refunds claimed is 85 per cent of eligible drivers, that is to say CTP holders. SIRA will evaluate the results of this objective after the conclusion of the refund period in June 2019.

The campaign did little to inform the public about the broader green slip reforms

One objective of the green slip refund campaign was to inform the public about the green slip reforms. The final campaign creative material focused almost entirely on the green slip refunds rather than the range of other reforms. This was because the peer review raised concerns that the creative material was attempting to deliver too many messages. 

The campaign submission stated that the advertising campaign would raise awareness of the broader reforms to the CTP scheme, citing several examples such as reduced opportunities for fraud and reduced insurer profits. SIRA also advised the Minister for Finance, Services and Property that secondary messaging in the campaign would benefit public understanding of the reforms.

Some of the television and radio advertisements referred to ‘more protection’ or ‘better protection’ for people injured on New South Wales roads, however advertisements did not refer to other elements of the reforms. Other campaign creative materials contained messages solely relating to the green slip refund and made no further reference to the broader reforms. SIRA used other communication channels, such as giving wallet cards to health service providers, to spread these messages to people, particularly those who had been injured.

Sixty two per cent of people in the post-campaign survey were aware of the green slip reforms. SIRA asked these people which benefits they associated with the reforms. The results of this survey are in Exhibit 4. Seventy-one per cent of this sample identified the reduced costs of green slips as one of the changes, but awareness of other elements of the reforms remains low. Though 29 per cent of people perceive the reforms to make the green slip scheme ‘fairer’, no more than 15 per cent of people could list a specific benefit which did not relate to insurance prices.

Exhibit 4: Perceived benefits associated with the changes to the CTP green slip scheme
Perceived benefit Percentage aware of this benefit
Reduced costs of green slips for vehicle owners 71%
A fairer scheme for all people 29%
Reduced costs of comprehensive vehicle insurance 20%
Better support for people injured on our roads 15%
Less chances of fraudulent claims 15%
Lowering insurance company profits 13%
Quicker payment of claims to injured people 10%

Source: State Insurance Regulatory Authority.

Another campaign target was to ensure that people understood that they should contact SIRA in case of an injury. None of the campaign creative materials contained this information. SIRA did some limited work to inform the public about this through its social media channels. One of the pieces of creative material directed the reader to SIRA's website for further information on the reforms, which contained this information. During the campaign period, there was an increase in the number of calls received by SIRA's CTP Assist phone line. However, in the post-campaign evaluation, only two per cent of surveyed people identified that they should contact SIRA in case of an injury.

The media plan allowed sufficient time for cost-efficient media placement

During the peer review process, DPC provides advice to agencies about the time they should allow to ensure cost-efficient media placement. For example, DPC advise that agencies book television advertising six to 12 weeks in advance and that agencies book radio advertising two to eight weeks in advance.

SIRA allowed sufficient time between the completion of the peer review process and the commencement of the first advertising. SIRA signed the agreement with the approved Media Agency Services provider eight weeks before the campaign started, meaning that it could achieve cost-efficient media placement for all types of media used in this campaign.

SIRA directly negotiated with a single supplier, making it difficult to demonstrate value for money

SIRA directly negotiated with a single supplier to procure the campaign's creative material. A direct negotiation occurs when an agency negotiates with a proponent without first undergoing a competitive process. It is difficult to demonstrate value for money using direct negotiation due to the lack of competition. 

ICAC's 'Guidelines for managing risks in direct negotiations' (ICAC Guidelines) provide guidance on how to undertake direct negotiations. SIRA has a direct negotiation checklist that aligns to the ICAC Guidelines. The SIRA checklist advises that staff should confirm that existing New South Wales prequalification schemes cannot provide the procurement before undertaking a direct negotiation. SIRA did not do this.

To procure creative materials, agencies can access the Advertising and Digital Communication Services prequalification scheme (the prequalification scheme). Using the prequalification scheme allows agencies to quickly seek quotes from suppliers who have a demonstrated track record and expertise. While agencies are not required to use the prequalification scheme, the NSW Procurement Board advises that agencies should use prequalification schemes where they are available to promote competition. 

By using direct negotiation when the prequalification scheme was available, and by not seeking quotes from other suppliers, SIRA was acting in a way that reduced competition. This increases the risk that SIRA did not achieve value for money in its procurement of creative materials.

SIRA advised that it sought to ensure value for money by comparing the quote from its selected supplier with the amount spent on creative materials in other campaigns of similar size. SIRA did not document this analysis at the time or include it as part of the briefing note staff used to seek approval for undertaking direct negotiation. As a result, decision-makers were not fully informed when approving this engagement. 

SIRA reported in a briefing note that it engaged in direct negotiations because:

  • it believed that the original timeframe did not allow for a competitive tender process
  • the supplier had done previous work on a related campaign for SIRA
  • the supplier provided sample work which received positive feedback from focus groups.

In July 2017, when peer review commenced, SIRA planned to launch the campaign in November 2017 to coincide with the beginning of the green slip reforms. SIRA believed that this timeframe was narrow enough to warrant entering direct negotiations. The ICAC Guidelines advise that a narrow timeframe is not a valid reason to enter into a direct negotiation. In late October 2017, the campaign launch was delayed until March 2018 to stagger the demand on the resources of Service NSW, which is administering the refund. 

The ICAC Guidelines also advise against re-appointing a supplier because it has performed previous work. Instead, agencies could consider previous experience as one of several factors when deciding between quotes. In cases where an agency asks a supplier to provide sample work, the ICAC Guidelines advise that agencies should request sample work from multiple potential suppliers to promote competition.

The campaign's cost benefit analysis complied with the Act and Guidelines 

The Act requires a cost benefit analysis (CBA) for any government advertising campaign likely to exceed $1.0 million in value. Section six of the Guidelines set out the requirements for a government advertising CBA. The campaign's CBA complied with the requirements of the Act and the Guidelines.

The campaign CBA could have demonstrated further cost effectiveness if it considered alternative media mixes as outlined in NSW Treasury's 'Cost Benefit Analysis Framework for Government Advertising and Information Campaigns'. This would also have been consistent with the Handbook.

The cluster Secretary signed the compliance certificate instead of the head of SIRA

The Act requires the head of the agency running the campaign to sign a compliance certificate. 

The Secretary of the Department of Finance, Services and Innovation, the cluster to which SIRA belongs, signed the campaign's compliance certificate. However, section 17(2) of the State Insurance and Care Governance Act 2015 states that SIRA is ‘for the purposes of any Act, a NSW Government agency.’ Given this, the Chief Executive of SIRA was responsible for signing the compliance certificate for this campaign.

This is a minor non-compliance with the Act because the Chief Executive had reviewed the campaign and recommended that the Secretary sign the compliance certificate.  

The NSW TAFE Commission (TAFE) ran the 'TAFE NSW 2018 Student Recruitment Annual Campaign Program' from November 2017 to September 2018. The aim of the campaign was to assist TAFE in achieving its 2018 student enrolment target by improving the perception of TAFE's brand and generating student enquiries. This is the first state-wide campaign run by TAFE operating under the One TAFE model. Previously, each TAFE Institute ran its own campaigns. The total budget of the campaign was $19.5 million. This audit examined only the semester one 2018 component of the campaign, which ran from November 2017 to April 2018 at a total cost of $9.5 million. See Appendix two for more details on this campaign.

The semester one component of the 'TAFE NSW 2018 Student Recruitment Annual Campaign Program' did not breach the specific provisions of section 6 of the Act which prohibits political advertising.
The campaign was not fully effective because it did not achieve its objective of reaching TAFE's semester one enrolment target.
The campaign was successful at achieving the campaign's targets which related to changing the public perception of TAFE.
TAFE was able to place most of its campaign media within cost-efficient timeframes. TAFE also achieved efficiencies by re-using many creative materials from a previous campaign.
TAFE could not demonstrate this campaign was carried out economically. TAFE's cost benefit analysis (CBA) for this campaign did not comply with three requirements of the Guidelines. For example, TAFE did not compare the campaign to a baseline case of not advertising. 
The Guidelines require government advertising to be accurate in all statements. TAFE breached this requirement. The campaign material included one statement that was inaccurate and one that was overstated.
The revision of the Brand Guidelines in August 2017 impacted this campaign. TAFE re-used many creative materials that were created when TAFE was not required to include the NSW Government logo on its advertising material. DPC appears to have directed agencies that were launching advertising campaigns to immediately comply with the Brand Guidelines, however we could not find evidence that this advice was given to TAFE. As such, 59 per cent of TAFE's materials were not compliant with the Brand Guidelines at the launch of the campaign in November 2017. TAFE had made most of this campaign's creative materials compliant by June 2018.

The campaign materials we reviewed did not breach section 6 of the Act

Section 6 of the Act prohibits political advertising as part of a government advertising campaign. A government advertising campaign must not:

  • be designed to influence (directly or indirectly) support for a political party
  • contain the name, voice or image of a minister, a member of parliament or a candidate nominated for election to parliament
  • contain the name, logo, slogan or any other reference to a political party.

The audit team found no breaches of section 6 of the Act in the campaign material we reviewed.

The campaign achieved 16 of 24 objectives, but did not reach its enrolment target

The campaign had 24 objectives which had a target for semester one. TAFE set these targets using a combination of previous experience, corporate objectives and brand surveys.

The overall objective of the combined semester one and two campaigns was to support TAFE achieving its 2018 total enrolment target of 549,636. TAFE's semester one target was 361,350, which it did not achieve. This indicates that the campaign was not fully effective.

The campaign achieved 11 of its 16 output objectives. The output targets related to TAFE's media placements and ability to reach an audience efficiently. TAFE tracked progress against many of the campaign's output objectives daily. TAFE altered its media channels throughout the campaign meaning that some of the output objectives were not met because TAFE decided to focus on alternative media channels. The campaign also achieved all seven of its outcome objectives. The outcome objectives related to changing the public perception of TAFE.

TAFE's initial media plan allowed for efficient media placement

During the peer review process, DPC provides advice to agencies about the time they should allow to ensure cost-efficient media placement. For example, DPC advise that agencies book television advertising six to 12 weeks in advance and that agencies book radio advertising two to eight weeks in advance. 

While TAFE's initial media plan allowed sufficient time between the approval of the campaign and its launch, a delay in receiving final approval for the campaign meant TAFE could not purchase media placements until two months later than planned. Most purchases still remained within DPC's recommended timeframes, but Indigenous television advertisements and metropolitan out of home advertisements both fell outside DPC's recommended time periods by one week. These delays did not impact on TAFE's efficiency.

TAFE re-used many creative materials, achieving some cost-savings

Rather than commissioning new creative materials, TAFE re-used many creative materials from the previous campaign and supplemented these with a selection of new creative materials. TAFE advised that this led to a cost saving of approximately $130,000.
TAFE sought quotes from suppliers on the government's Advertising and Digital Communication Services prequalification scheme for two creative material contracts. These contracts covered updates to existing materials and a selection of new materials.

The campaign's cost-benefit analysis did not comply with three requirements of the Guidelines

The Act requires an agency to conduct a cost-benefit analysis (CBA) if the cost of an advertising campaign is likely to exceed $1.0 million. The Guidelines set out the requirements of this CBA. TAFE did not comply with three of these requirements, outlined in Exhibit 5.

Exhibit 5: Guideline requirements for CBAs with which TAFE did not comply
6.2 The cost benefit analysis must isolate the additional costs and benefits attributable to the advertising campaign itself compared to the base-case of not-advertising.
6.3 The cost benefit analysis must specify the extent to which the expected benefits could be achieved without advertising.
6.4 The cost benefit analysis must outline what options other than advertising could be used to successfully implement the program and achieve the program benefits and a comparison of their costs.
Source: NSW Government Advertising Guidelines (2012).

In this circumstance, section 6.2 of the Guidelines required the CBA to identify the number of enrolments TAFE would expect if it did not advertise. TAFE advised us that it is not possible to say what this scenario would look like because there had always been some degree of advertising, however, this argument is not reflected in the CBA. 

TAFE used 2017 as the baseline in the CBA. In 2017, TAFE spent $13.2 million on advertising. As such, the CBA was only able to isolate the impact of the increased expenditure rather than the impact of the campaign's entire $19.5 million expenditure. TAFE advised that 2017 had the most reliable state-wide data and this contributed to the decision to use it as the baseline.

During the audit, TAFE sought advice from NSW Treasury regarding whether a 2017 baseline was appropriate and NSW Treasury advised that it was. Regardless, TAFE did not receive this advice prior to writing the CBA and did not put commentary around this in the CBA. This would also not be sufficient for fulfilling the requirements of the Guidelines.

The CBA did not comply with sections 6.3 and 6.4 of the Guidelines. The CBA briefly considered the impact of spending the campaign budget directly on new training courses, however there was no sustained analysis of this option. TAFE staff advised that there are no realistic alternatives to advertising for achieving the campaign's objectives. However we did not see analysis to support this conclusion in documents provided to us. 

The campaign CBA could have better demonstrated cost effectiveness if it considered alternative media mixes as outlined in NSW Treasury's 'Cost Benefit Analysis Framework for Government Advertising and Information Campaigns'. This would also have been consistent with the Handbook.

TAFE made one inaccurate claim in its advertising and overstated a second

The Guidelines set out rules regarding the content of a government advertising campaign. Exhibit 6 sets out one of the principles with which agencies must comply.

Exhibit 6: Guidelines' requirement for accuracy
The following principles apply to the style and content of government advertising campaigns:
  • Accuracy in the presentation of all facts, statistics, comparisons and other arguments. All statements and claims of fact included in government advertising campaigns must be able to be substantiated.
Source: NSW Government Advertising Guidelines (2012).

TAFE made one inaccurate claim in its advertising and overstated a second.

In some campaign creative material, TAFE claimed that 78 per cent of its own graduates are employed after training (Exhibit 15 in Appendix 2). According to the National Centre for Vocational Education Research, 78 per cent of New South Wales Vocational Education and Training (VET) graduates (i.e. from all training providers) are employed after training. The result for TAFE graduates is 70.4 per cent.

One of the campaign's television advertisements refers to TAFE as ‘Australia's most reputable education provider’. This statement referred to a survey of current TAFE students who were asked where they would consider studying in future: TAFE, University or a private college. The current TAFE students selected TAFE by a large margin. The limited scope of TAFE's student survey and its results do not support the claim that it is ‘Australia's most reputable education provider’.

DPC did not consistently communicate the transitional arrangements for the Brand Guidelines and as such much of TAFE's creative material did not comply at campaign launch

On 7 August 2017, the government released the NSW Government Brand Guidelines (Brand Guidelines), setting out how agencies use the NSW Government logo. The Brand Guidelines replaced the Branding Style Guide which had been in place since September 2015. Some agencies were exempt from using the Branding Style Guide and the introduction of the new Brand Guidelines required these agencies to apply for a new exemption.

TAFE had recently commenced the peer review process for this campaign when the Brand Guidelines were released. TAFE was exempt from the requirements of the Branding Style Guide and as such the material which TAFE was planning to re-use in the new campaign did not contain the NSW Government logo.

Communication about how long agencies had to make themselves compliant with the Brand Guidelines was unclear. On 11 August 2017, the Chair of the Cabinet Standing Committee on Communication and Government Advertising (the Committee) sent a letter to the Secretary of the Department of Industry informing him that the Department must update all its material to be compliant with the Brand Guidelines ‘as soon as practicable within an 18-month transition period’. The Department of Industry advised TAFE that new advertising would need to be immediately compliant, however it was not clear if this included materials which agencies were re-using from previous campaigns. DPC advised the audit team that it expected re-used materials to be compliant when agencies launched new campaigns. DPC provided this advice to some agencies but did not communicate it more broadly. We could not source evidence that DPC provided this advice to TAFE.

DPC ran workshops to explain the transitional arrangements in September 2017 for the changes in the Brand Guidelines, however these did not specifically address the transitional timeframes for new advertising campaigns.

The Department of Industry, on behalf of TAFE, applied to the Committee for approval to co-brand the TAFE logo with the NSW Government logo. This was approved in October 2017. The requirements for co-branding are in Exhibit 7.

Exhibit 7: Co-branding in the NSW Government Brand Guidelines

Co-branding partners the agency logo with the NSW Government logo. The NSW Government logo must always be presented as the dominant or lead brand. The Brand Guidelines provide the following template shown below the exhibit box.

The NSW Government logo is on the left and the agency logo is placed on the right, with a dividing line between them.

Published

Actions for Unsolicited proposal process for the lease of Ausgrid

Unsolicited proposal process for the lease of Ausgrid

Premier and Cabinet
Asset valuation
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management
Service delivery
Shared services and collaboration

In October 2016, the NSW Government accepted an unsolicited proposal from IFM Investors and AustralianSuper to lease 50.4 per cent of Ausgrid for 99 years. The deal followed the Federal Government’s rejection of two bids from foreign investors, for national security reasons.

A performance audit of the lease of Ausgrid has found shortcomings in the unsolicited proposal process. Releasing the audit findings today, the Auditor-General for New South Wales, Margaret Crawford said ‘this transaction involved a $20 billion asset owned by the people of New South Wales. As such, it warranted strict adherence to established guidelines’.

Ausgrid is a distributor of electricity to eastern parts of Sydney, the Central Coast, Newcastle and the Hunter Region.

In June 2014, the then government announced its commitment to lease components of the state's electricity network as part of the Rebuilding NSW plan. Implementation of the policy began after the government was re-elected in 2015. Between November 2015 and August 2016, the NSW Government held a competitive tender process to lease 50.4 per cent of Ausgrid for 99 years. The NSW Government abandoned the process on 19 August 2016 after the Australian Treasurer rejected two bids from foreign investors, for national security reasons. That day, the Premier and Treasurer released a media statement clarifying the government's objective to complete the transaction via a competitive process in time to include the proceeds in the 2017–18 budget.

On 31 August 2016, the state received an unsolicited proposal from IFM Investors and AustralianSuper to acquire an interest in Ausgrid under the same terms proposed by the state during the tender process. In October 2016, the government accepted the unsolicited proposal. 

This audit examined whether the unsolicited proposal process for the partial long-term lease of Ausgrid was effectively conducted and in compliance with the government’s 2014 Unsolicited Proposals: Guide for Submission and Assessment (Unsolicited Proposals Guide or the Guide). 

The audit focused on how the government-appointed Assessment Panel and Proposal Specific Steering Committee assessed key requirements in the Guide that unsolicited proposals must be demonstrably unique and represent value for money. 

Conclusion

The evidence available does not conclusively demonstrate the unsolicited proposal was unique, and there were some shortcomings in the negotiation process, documentation and segregation of duties. That said, before the final commitment to proceed with the lease, the state obtained assurance that the proposal delivered value for money. 

It is particularly important to demonstrate unsolicited proposals are unique, in order to justify the departure from other transaction processes that offer greater competition, transparency and certainty about value for money.

The Assessment Panel and the Proposal Specific Steering Committee determined the Ausgrid unsolicited proposal was unique, primarily on the basis that the proponent did not require foreign investment approval from the Australian Treasurer, and the lease transaction could be concluded earlier than through a second tender process. However, the evidence that persuaded the Panel and Committee did not demonstrate that no other proponent could conclude the transaction in time to meet the government’s deadline. 

It is not appropriate to determine an unsolicited proposal is unique because it delivers an earlier outcome than possible through a tender process. The Panel and Committee did not contend, and it is not evident, that the unsolicited proposal was the only way to meet the government’s transaction deadline.

The evidence does not demonstrate that the proponent was the only party that would not have needed foreign investment approval to participate in the transaction. It also does not demonstrate that the requirement for foreign investment approval would have reduced the pool of foreign buyers to the degree that it would be reasonable to assume none would emerge. 

The Panel, Committee and financial advisers determined that the final price represented value for money, and that retendering offered a material risk of a worse financial outcome. However, an acceptable price was revealed early in the negotiation process, and doing so made it highly unlikely that the proponent would offer a higher price than that disclosed. The Department of Premier and Cabinet (DPC) and NSW Treasury were not able to provide a documented reserve price, bargaining strategy or similar which put the negotiations in context. It is not evident that the Panel or Committee authorised, justified or endorsed negotiations in advance. 

Key aspects of governance recommended by the Guide were in place. Some shortcomings relating to role segregation, record keeping and probity assurance weakened the effectiveness of the unsolicited proposal process adopted for Ausgrid.

The reasons for accepting that the proposal and proponent were unique are not compelling.

The Unsolicited Proposals Guide says the 'unique benefits of the proposal and the unique ability of the proponent to deliver the proposal' must be demonstrated. 

The conclusion reached by the Panel and Committee that the proposal offered a ‘unique ability to deliver (a) strategic outcome’ was primarily based on the proponent not requiring foreign investment approval from the Australian Treasurer, and allowing the government to complete the lease transaction earlier than by going through a second tender process. 

It is not appropriate to determine an unsolicited proposal is unique because it delivers an earlier outcome than possible through a tender process. The Panel and Committee did not contend, and it is not evident, that the unsolicited proposal was the only way to meet the government’s transaction deadline.

The evidence does not demonstrate that the proponent was the only party that would not have needed foreign investment approval to participate in the transaction. Nor does it demonstrate that the requirement for foreign investment approval would have reduced the pool of foreign buyers to the degree that it would be reasonable to assume none would emerge. 

That said, the Australian Treasurer’s decision to reject the two bids from the previous tender process created uncertainty about the conditions under which he would approve international bids. The financial advisers engaged for the Ausgrid transaction informed the Panel and Committee that:

  • it was not likely another viable proponent would emerge soon enough to meet the government’s transaction deadline
  • the market would be unlikely to deliver a better result than offered by the proponent
  • going to tender presented a material risk of a worse financial result. 

The Unsolicited Proposals Guide says that a proposal to directly purchase or acquire a government-owned entity or property will generally not be unique. The Ausgrid unsolicited proposal fell into this category. 

Recommendations:
DPC should ensure future Assessment Panels and Steering Committees considering a proposal to acquire a government business or asset:

  • recognise that when considering uniqueness they should: 
    • require very strong evidence to decide that both the proponent and proposal are the only ones of their kind that could meet the government’s objectives 
    • give thorough consideration to any reasonable counter-arguments against uniqueness.
  • rigorously consider all elements of the Unsolicited Proposals Guide when determining whether a proposal should be dealt with as an unsolicited proposal, and document these deliberations and all relevant evidence
  • do not use speed of transaction compared to a market process as justification for uniqueness.
The process to obtain assurance that the final price represented value for money was adequate. However, the negotiation approach reduced assurance that the bid price was maximised. 

The Panel and Committee concluded the price represented value for money, based on peer-reviewed advice from their financial advisers and knowledge acquired from previous tenders. The financial advisers also told the Panel and Committee that there was a material risk the state would receive a lower price than offered by the unsolicited proposal if it immediately proceeded with a second market transaction. 

The state commenced negotiations on price earlier than the Guide says they should have. Early disclosure of a price that the state would accept reduced the likelihood of achieving a price greater than this. DPC says the intent of this meeting was to quickly establish whether the proponents could meet the state’s benchmark rather than spending more time and resources on a proposal which had no prospect of proceeding.

DPC and NSW Treasury were not able to provide a documented reserve price, negotiation strategy or similar which put the negotiations and price achieved in context. It was not evident that the Panel or Committee authorised, justified or endorsed negotiations in advance. However, the Panel and Committee endorsed the outcomes of the negotiations. 

The negotiations were informed by the range of prices achieved for similar assets and the specific bids for Ausgrid from the earlier market process.

Recommendations:
DPC should ensure any future Assessment Panels and Steering Committees considering a proposal to acquire a government business or asset:

  • document a minimum acceptable price, and a negotiating strategy designed to maximise price, before commencing negotiations
  • do not communicate an acceptable price to the proponent, before the negotiation stage of the process, and then only as part of a documented bargaining strategy.
Key aspects of governance recommended by the Guide were in place, but there were some shortcomings around role segregation, record keeping and probity assurance.

The state established a governance structure in accordance with the Unsolicited Proposals Guide, including an Assessment Panel and Proposal Specific Steering Committee. The members of the Panel and Steering Committee were senior and experienced officers, as befitted the size and nature of the unsolicited proposal. 

The separation of negotiation, assessment and review envisaged by the Guide was not maintained fully. The Chair of the Assessment Panel and a member of the Steering Committee were involved in negotiations with the proponent. 

DPC could not provide comprehensive records of some key interactions with the proponent or a documented negotiation strategy. The absence of such records means the Department cannot demonstrate engagement and negotiation processes were authorised and rigorous. 

The probity adviser reported there were no material probity issues with the transaction. The probity adviser also provided audit services. This is not good practice. The same party should not provide both advisory and audit services on the same transaction.

Recommendations:
DPC should ensure any future Assessment Panels and Steering Committees considering a proposal to acquire a government entity or asset:
•    maintain separation between negotiation, assessment and review in line with the Unsolicited Proposals Guide
•    keep an auditable trail of documentation relating to the negotiation process
•    maintain separation between any probity audit services engaged and the probity advisory and reporting services recommended in the current Guide.

Published

Actions for Regulation of water pollution in drinking water catchments and illegal disposal of solid waste

Regulation of water pollution in drinking water catchments and illegal disposal of solid waste

Environment
Compliance
Internal controls and governance
Management and administration
Regulation
Risk

There are important gaps in how the Environmental Protection Authority (EPA) implements its regulatory framework for water pollution in drinking water catchments and illegal solid waste disposal. This limits the effectiveness of its regulatory responses, according to a report released today by the Auditor-General for New South Wales, Margaret Crawford.

The NSW Environment Protection Authority (the EPA) is the State’s primary environmental regulator. The EPA regulates waste and water pollution under the Protection of the Environment Operations Act 1997 (the Act) through its licensing, monitoring, regulation and enforcement activities. The community should be able to rely on the effectiveness of this regulation to protect the environment and human health. The EPA has regulatory responsibility for more significant and specific activities which can potentially harm the environment.

Activities regulated by the EPA include manufacturing, chemical production, electricity generation, mining, waste management, livestock processing, mineral processing, sewerage treatment, and road construction. For these activities, the operator must have an EPA issued environment protection licence (licence). Licences have conditions attached which may limit the amount and concentrations of substances the activity may produce and discharge into the environment. Conditions also require the licensee to report on its licensed activities.

This audit assessed the effectiveness of the EPA’s regulatory response to water pollution in drinking water catchments and illegal solid waste disposal. The findings and recommendations of this review can be reasonably applied to the EPA’s other regulatory functions, as the areas we examined were indicative of how the EPA regulates all pollution types and incidents.

 
Conclusion
There are important gaps in how the EPA implements its regulatory framework for water pollution in drinking water catchments and illegal solid waste disposal which limit the effectiveness of its regulatory response. The EPA uses a risk-based regulatory framework that has elements consistent with the NSW Government Guidance for regulators to implement outcomes and risk-based regulation. However, the EPA did not demonstrate that it has established reliable practices to accurately and consistently detect the risk of non compliances by licensees, and apply consistent regulatory actions. This may expose the risk of harm to the environment and human health.
The EPA also could not demonstrate that it has effective governance and oversight of its regulatory operations. The EPA operates in a complex regulatory environment where its regional offices have broad discretions for how they operate. The EPA has not balanced this devolved structure with an effective governance approach that includes appropriate internal controls to monitor the consistency or quality of its regulatory activities. It also does not have an effective performance framework that sets relevant performance expectations and outcome-based key performance indicators (KPIs) for its regional offices. 
These deficiencies mean that the EPA cannot be confident that it conducts compliance and enforcement activities consistently across the State and that licensees are complying with their licence conditions or the Act.
The EPA's reporting on environmental and regulatory outcomes is limited and most of the data it uses is self reported by industry. It has not set outcome-based key result areas to assess performance and trends over time. 
The EPA uses a risk-based regulatory framework for water pollution and illegal solid waste disposal but there are important gaps in implementation that reduce its effectiveness.
Elements of the EPA’s risk-based regulatory framework for water pollution and illegal solid waste disposal are consistent with the NSW Government Guidance for regulators to implement outcomes and risk-based regulation. There are important gaps in how the EPA implements its risk-based approach that limit the effectiveness of its regulatory response. The EPA could not demonstrate that it effectively regulates licensees because it has not established reliable practices that accurately and consistently detect licence non compliances or breaches of the Act and enforce regulatory actions.
The EPA lacks effective governance arrangements to support its devolved regional structure. The EPA's performance framework has limited and inconclusive reporting on regional performance to the EPA’s Chief Executive Officer or to the EPA Board. The EPA cannot assure that it is conducting its regulatory responsibilities effectively and efficiently. 
The EPA does not consistently evaluate its regulatory approach to ensure it is effective and efficient. For example, there are no set requirements for how EPA officers conduct mandatory site inspections, which means that there is a risk that officers are not detecting all breaches or non-compliances. The inconsistent approach also means that the EPA cannot rely on the data it collects from these site inspections to understand whether its regulatory response is effective and efficient. In addition, where the EPA identifies instances of non compliance or breaches, it does not apply all available regulatory actions to encourage compliance.
The EPA also does not have a systematic approach to validate self-reported information in licensees’ annual returns, despite the data being used to assess administrative fees payable to the EPA and its regulatory response to non-compliances. 
The EPA does not use performance frameworks to monitor the consistency or quality of work conducted across the State. The EPA has also failed to provide effective guidance for its staff. Many of its policies and procedures are out-dated, inconsistent, hard to access, or not mandated.
Recommendations
By 31 December 2018, to improve governance and oversight, the EPA should:
1. implement a more effective performance framework with regular reports to the Chief Executive Officer and to the EPA Board on outcomes-based key result areas that assess its environmental and regulatory performance and trends over time
By 30 June 2019, to improve consistency in its practices, the EPA should:
2. progressively update and make accessible its policies and procedures for regulatory operations, and mandate procedures where necessary to ensure consistent application
3. implement internal controls to monitor the consistency and quality of its regulatory operations. 
The EPA does not apply a consistent approach to setting licence conditions for discharges to water.
The requirements for setting licence conditions for water pollution are complex and require technical and scientific expertise. In August 2016, the EPA approved guidance developed by its technical experts in the Water Technical Advisory Unit to assist its regional staff. However, the EPA did not mandate the use of the guidance until mid-April 2018. Up until then, the EPA had left discretion to regional offices to decide what guidance their staff use. This meant that practices have differed across the organisation. The EPA is yet to conduct training for staff to ensure they consistently apply the 2016 guidance.
The EPA has not implemented any appropriate internal controls or quality assurance process to monitor the consistency or quality of licence conditions set by its officers across the State. This is not consistent with good regulatory practice.
The triennial 2016 audit of the Sydney drinking water catchment report highlighted that Lake Burragorang has experienced worsening water quality over the past 20 years from increased salinity levels. The salinity levels were nearly twice as high as in other storages in the Sydney drinking water catchment. The report recommended that the source and implication of the increased salinity levels be investigated. The report did not propose which public authority should carry out such an investigation. 
To date, no NSW Government agency has addressed the report's recommendation. There are three public authorities, the EPA, DPE and WaterNSW that are responsible for regulating activities that impact on water quality in the Sydney drinking water catchment, which includes Lake Burragorang. 
Recommendation
By 30 June 2019, to address worsening water quality in Lake Burragorang, the EPA should:
4. (a) review the impact of its licensed activities on water quality in Lake Burragorang, and
  (b) develop strategies relating to its licensed activities (in consultation with other relevant NSW Government agencies) to improve and maintain the lake's water quality.
The EPA’s risk-based approach to monitoring compliance of licensees has limited effectiveness. 
The EPA tailors its compliance monitoring approach based on the performance of licensees. This means that licensees that perform better have a lower administrative fee and fewer mandatory site inspections. 
However, this approach relies on information that is not complete or accurate. Sources of information include licensees’ annual returns, EPA site inspections and compliance audits, and pollution reports from the public. 
Licensees report annually to the EPA on their performance, including compliance against their licence conditions. The Act contains significant financial penalties if licensees provide false and misleading information in their annual returns. However, the EPA does not systematically or consistently validate information self-reported by licensees, or consistently apply regulatory actions if it discovers non-compliance. 
Self-reported compliance data is used in part to assess a licensed premises’ overall environmental risk level, which underpins the calculation of the administrative fee, the EPA’s site inspection frequency, and the licensee’s exposure to regulatory actions. It is also used to assess the load-based licence fee that the licensee pays.
The EPA has set minimum mandatory site inspection frequencies for licensed premises based on its assessed overall risk level. This is a key tool to detect non-compliance or breaches of the Act. However, the EPA has not issued a policy or procedures that define what these mandatory inspections should cover and how they are to be conducted. We found variations in how the EPA officers in the offices we visited conducted these inspections. The inconsistent approach means that the EPA does not have complete and accurate information of licensees’ compliance. The inconsistent approach also means that the EPA is not effectively identifying all non-compliances for it to consider applying appropriate regulatory actions.
The EPA also receives reports of pollution incidents from the public that may indicate non-compliance. However, the EPA has not set expected time frames within which it expects its officers to investigate pollution incidents. The EPA regional offices decide what to investigate and timeframes. The EPA does not measure regional performance regarding timeframes. 
The few compliance audits the EPA conducts annually are effective in identifying licence non-compliances and breaches of the Act. However, the EPA does not have a policy or required procedures for its regulatory officers to consistently apply appropriate regulatory actions in response to compliance audit findings. 
The EPA has not implemented any effective internal controls or quality assurance process to check the consistency or quality of how its regulatory officers monitor compliance across the State. This is not consistent with good regulatory practice.
Recommendations
To improve compliance monitoring, the EPA should implement procedures to:
5. by 30 June 2019, validate self-reported information, eliminate hardcopy submissions and require licensees to report on their breaches of the Act and associated regulations in their annual returns
6. by 31 December 2018, conduct mandatory site inspections under the risk-based licensing scheme to assess compliance with all regulatory requirements and licence conditions.
 
The EPA cannot assure that its regulatory enforcement approach is fully effective.
The EPA’s compliance policy and prosecution guidelines have a large number of available regulatory actions and factors which should be taken into account when selecting an appropriate regulatory response. The extensive legislation determining the EPA’s regulatory activities, and the devolved regional structure the EPA has adopted in delivering its compliance and regulatory functions, increases the risk of inconsistent compliance decisions and regulatory responses. A good regulatory framework needs a consistent approach to enforcement to incentivise compliance. 
The EPA has not balanced this devolved regional structure with appropriate governance arrangements to give it assurance that its regulatory officers apply a consistent approach to enforcement.
The EPA has not issued standard procedures to ensure consistent non-court enforcement action for breaches of the Act or non-compliance with licence conditions. Given our finding that the EPA does not effectively detect breaches and non-compliances, there is a risk that it is not applying appropriate regulatory actions for many breaches and non-compliances.
A recent EPA compliance audit identified significant non-compliances with incident management plan requirements. However, the EPA has not applied regulatory actions for making false statements on annual returns for those licensees that certified their plans complied with such requirements. The EPA also has not applied available regulatory actions for the non-compliances which led to the false or misleading statements.
Recommendation
By 31 December 2018 to improve enforcement, the EPA should:
7. Implement procedures to systematically assess non-compliances with licence conditions and breaches of the Act and to implement appropriate and consistent regulatory actions.
The EPA has implemented the actions listed in the NSW Illegal Dumping Strategy 2014–16. To date, the EPA has also implemented four of the six recommendations made by the ICAC on EPA's oversight of Regional Illegal Dumping Squads.
The EPA did not achieve the NSW Illegal Dumping Strategy 2014–16 target of a 30 per cent reduction in instances of large scale illegal dumping in Sydney, the Illawarra, Hunter and Central Coast from 2011 levels. 
In the reporting period, the incidences of large scale illegal dumping more than doubled. The EPA advised that this increase may be the result of greater public awareness and reporting rather than increased illegal dumping activity. 
By June 2018, the EPA is due to implement one outstanding recommendation made by the ICAC but has not set a time for the other outstanding recommendation.  

Published

Actions for Regional Assistance Programs

Regional Assistance Programs

Premier and Cabinet
Planning
Transport
Compliance
Infrastructure
Management and administration
Project management

Infrastructure NSW effectively manages how grant applications for regional assistance programs are assessed and recommended for funding. Its contract management processes are also effective. However, we are unable to conclude whether the objectives of these programs have been achieved as the relevant agencies have not yet measured their benefits, according to a report released today by the Auditor-General for New South Wales, Margaret Crawford. 

In 2011, the NSW Government established Restart NSW to fund new infrastructure with the proceeds from the sale and lease of government assets. From 2011 to 2017, the NSW Government allocated $1.7 billion from the fund for infrastructure in regional areas, with an additional commitment of $1.3 billion to be allocated by 2021. The NSW Government allocates these funds through regional assistance programs such as Resources for Regions and Fixing Country Roads. NSW councils are the primary recipients of funding provided under these programs.

The NSW Government announced the Resources for Regions program in 2012 with the aim of addressing infrastructure constraints in mining affected communities. Infrastructure NSW administers the program, with support from the Department of Premier and Cabinet.

The NSW Government announced the Fixing Country Roads program in 2014 with the aim of building more efficient road freight networks. Transport for NSW and Infrastructure NSW jointly administer this program, which funds local councils to deliver projects that help connect local and regional roads to state highways and freight hubs.

This audit assessed whether these two programs (Resources for Regions and Fixing Country Roads) were being effectively managed and achieved their objectives. In making this assessment, we answered the following questions:

  • How well are the relevant agencies managing the assessment and recommendation process?
  • How do the relevant agencies ensure that funded projects are being delivered?
  • Do the funded projects meet program and project objectives?

The audit focussed on four rounds of Resources for Regions funding between 2013–14 to 2015–16, as well as the first two rounds of Fixing Country Roads funding in 2014–15 and 2015–16.

Conclusion
Infrastructure NSW effectively manages how grant applications are assessed and recommended for funding. Infrastructure NSW’s contract management processes are also effective. However, we are unable to conclude on whether program objectives are being achieved as Infrastructure NSW has not yet measured program benefits.
While Infrastructure NSW and Transport for NSW managed the assessment processes effectively overall, they have not fully maintained all required documentation, such as conflict of interest registers. Keeping accurate records is important to support transparency and accountability to the public about funding allocation. The relevant agencies have taken steps to address this in the current funding rounds for both programs.
For both programs assessed, the relevant agencies have developed good strategies over time to support councils through the application process. These strategies include workshops, briefings and feedback for unsuccessful applicants. Transport for NSW and the Department of Premier and Cabinet have implemented effective tools to assist applicants in demonstrating the economic impact of their projects.
Infrastructure NSW is effective in identifying projects that are 'at‑risk' and assists in bringing them back on track. Infrastructure NSW has a risk‑based methodology to verify payment claims, which includes elements of good practice in grants administration. For example, it requires grant recipients to provide photos and engages Public Works Advisory to review progress claims and visit project sites.
Infrastructure NSW collects project completion reports for all Resources for Regions and Fixing Country Roads funded projects. Infrastructure NSW intends to assess benefits for both programs once each project in a funding round is completed. To date, no funding round has been completed. As a result, no benefits assessment has been done for any completed project funded in either program.
 

The project selection criteria are consistent with the program objectives set by the NSW Government, and the RIAP applied the criteria consistently. Probity and record keeping practices did not fully comply with the probity plans.

The assessment methodology designed by Infrastructure NSW is consistent with2 the program objectives and criteria. In the rounds that we reviewed, all funded projects met the assessment criteria.

Infrastructure NSW developed probity plans for both programs which provided guidance on the record keeping required to maintain an audit trail, including the use of conflict of interest registers. Infrastructure NSW and Transport for NSW did not fully comply with these requirements. The relevant agencies have taken steps to address this in the current funding rounds for both programs.

NSW Procurement Board Directions require agencies to ensure that they do not engage a probity advisor that is engaged elsewhere in the agency. Infrastructure NSW has not fully complied with this requirement. A conflict of interest arose when Infrastructure NSW engaged the same consultancy to act as its internal auditor and probity advisor.

While these infringements of probity arrangements are unlikely to have had a major impact on the assessment process, they weaken the transparency and accountability of the process.

Some councils have identified resourcing and capability issues which impact on their ability to participate in the application process. For both programs, the relevant agencies conducted briefings and webinars with applicants to provide advice on the objectives of the programs and how to improve the quality of their applications. Additionally, Transport for NSW and the Department of Premier and Cabinet have developed tools to assist councils to demonstrate the economic impact of their applications.

The relevant agencies provided feedback on unsuccessful applications to councils. Councils reported that the quality of this feedback has improved over time.

Recommendations

  1. By June 2018, Infrastructure NSW should:
    • ensure probity reports address whether all elements of the probity plan have been effectively implemented.
  1. By June 2018, Infrastructure NSW and Transport for NSW should:
    • maintain and store all documentation regarding assessment and probity matters according to the State Records Act 1998, the NSW Standard on Records Management and the relevant probity plans

Infrastructure NSW is responsible for overseeing and monitoring projects funded under Resources for Regions and Fixing Country Roads. Infrastructure NSW effectively manages projects to keep them on track, however it could do more to assure itself that all recipients have complied with funding deeds. Benefits and outcomes should also start to be measured and reported as soon as practicable after projects are completed to inform assessment of future projects.

Infrastructure NSW identifies projects experiencing unreasonable delays or higher than expected expenses as 'at‑risk'. After Infrastructure NSW identifies a project as 'at‑risk', it puts in place processes to resolve issues to bring them back on track. Infrastructure NSW, working with Public Works Advisory regional offices, employs a risk‑based approach to validate payment claims, however this process should be strengthened. Infrastructure NSW would get better assurance by also conducting annual audits of compliance with the funding deed for a random sample of projects.

Infrastructure NSW collects project completion reports for all Resources for Regions and Fixing Country Roads funded projects. It applies the Infrastructure Investor Assurance Framework to Resources for Regions and Fixing Country Roads at a program level. This means that each round of funding (under both programs) is treated as a distinct program for the purposes of benefits realisation. It plans to assess whether benefits have been realised once each project in a funding round is completed. As a result, no benefits realisation assessment has been done for any project funded under either Resources for Regions or Fixing Country Roads. Without project‑level benefits realisation, future decisions are not informed by the lessons from previous investments.

Recommendations

  1. By December 2018, Infrastructure NSW should:
    • conduct annual audits of compliance with the funding deed for a random sample of projects funded under Resources for Regions and Fixing Country Roads
    • publish the circumstances under which unspent funds can be allocated to changes in project scope
    • measure benefits delivered by projects that were completed before December 2017
    • implement an annual process to measure benefits for projects completed after December 2017
  1. By December 2018, Transport for NSW and Infrastructure NSW should:
    • incorporate a benefits realisation framework as part of the detailed application.

Published

Actions for Freedom of Information

Freedom of Information

Transport
Premier and Cabinet
Education
Management and administration
Regulation
Service delivery

Freedom of Information (FOI) Coordinators and their staff were supportive of the legislation. However, the agencies examined can do considerably more to fully achieve the intentions of the Act. On the positive side, all three agencies had processes in place to handle requests and had made a number of changes to improve the effectiveness of the FOI process. Fees and charges had also been kept to a minimum. No processing fees were requested in the majority of cases, and if charged, were not unreasonable.

 

Parliamentary reference - Report number #114 - released 28 August 2003

Published

Actions for Northside Storage Tunnel Project

Northside Storage Tunnel Project

Planning
Environment
Infrastructure
Internal controls and governance
Procurement
Project management
Service delivery

The Northside Storage Tunnel was the first major public sector construction project using an alliance approach. In our opinion, the outcome of the project suggests that an alliance approach, when applied to a suitable project and managed appropriately, can support positive project outcomes. And in many respects the Alliance worked well. There are, however, a number of issues that we believe need to be addressed for future alliances.

 

Parliamentary reference - Report number #113 - released 24 July 2003

Published

Actions for Protecting Our Rivers

Protecting Our Rivers

Environment
Internal controls and governance
Regulation
Shared services and collaboration

The Audit Office is of the opinion that responsibility for protecting the quality of river water is not clearly delineated. The current arrangements lack the structure to ensure success. There is no lead entity to co-ordinate efforts to protect river water. New South Wales has no overarching water quality or river health strategy and no water quality management plans to ensure clear outcomes and responsibilities for protecting river water quality and integrated decision-making to protect areas of greatest risk to water quality.

 

Parliamentary reference - Report number #108 - released 7 May 2003

Published

Actions for Environmental impact assessment of major projects in NSW

Environmental impact assessment of major projects in NSW

Environment
Management and administration
Regulation
Service delivery

The Audit Office is of the opinion that the basis for environmental impact assessment of major projects in NSW is sound. The key concept of 'environmental significance' is well defined. The system is closely specified. The Department of Urban Affairs and Planning (DUAP) leads a whole-of-government approach to environmental impact assessment and its assessments are comprehensive. However, the Audit Office considers that there are opportunities for improvement by more actively managing the participants and the performance of the environmental impact assessment system. DUAP needs to strengthen its internal documentation and must ensure the public have greater involvement.

 

Parliamentary reference - Report number #92 - released 28 November 2001

Published

Actions for Controlling and reducing pollution from industry

Controlling and reducing pollution from industry

Planning
Environment
Compliance
Management and administration
Regulation

The regulatory framework introduced under the Protection of the Environment Operations Act 1997, along with other initiatives progressively being implemented by the Environment Protection Authority (EPA), should enhance the overall effectiveness of environment protection in NSW. The Audit Office is of the opinion that the framework is consistent with best practice and once fully implemented, should contribute to the achievement of further improvements in the environmental performance of industry.

However while the legislative framework supports best practice in regulation and enforcement, there are a number of issues which limit the effectiveness of the reforms. Some of the problems, such as the quality of licences and the effectiveness of compliance activities, have been identified by the EPA and may be addressed through recent initiatives.

 

Parliamentary reference - Report number #82 - released 18 April 2001