Actions for Volume Three 2010 focus on Total State Sector

Volume Three 2010 focus on Total State Sector

Whole of Government
Asset valuation
Compliance
Financial reporting
Internal controls and governance
Management and administration
Project management

The final Budget result for 2009-10 was a surplus of $994 million, originally budgeted to be a $990 million deficit. If the Commonwealth Government’s capital stimulus funding had been excluded, the result would have been a deficit of $861 million. Employee costs (excluding superannuation costs) increased by approximately 3.5 per cent compared to 7.5 per cent in the prior year.
 
“I have issued a qualified Independent Auditor’s Report as the State has not recognised the value of Crown Reserves and the infrastructure on those reserves that should be recorded as an asset,” Mr Achterstraat said. 

Published

Actions for Electronic Information Security

Electronic Information Security

Whole of Government
Cyber security
Internal controls and governance
Risk

The Government is not able to provide assurance that it is safeguarding its holdings of sensitive personal information because its policy has not been properly implemented. This is likely to remain the case until there are clear, mandatory, minimum standards that agencies sign up to, and scrutiny of performance against these standards is strengthened.

 

Parliamentary reference - Report number #207 - released 20 October 2010

Published

Actions for Severance Payments to Special Temporary Employees

Severance Payments to Special Temporary Employees

Premier and Cabinet
Compliance
Internal controls and governance
Management and administration
Workforce and capability

In reviewing both the severance pay guidelines and a sample of payments, we found the guidelines to be clear and all except two payments were made in accordance with them. In these two cases the severance payment was stipulated in the employment contract guaranteeing the STE a minimum of six months pay on termination, irrespective of the length of service.

 

Parliamentary reference - Report number #201 - released 16 June 2010

Published

Actions for Injury Management in the NSW Public Sector

Injury Management in the NSW Public Sector

Premier and Cabinet
Treasury
Finance
Management and administration
Workforce and capability

We found that during Working Together, agencies reduced the impact of workplace injuries. Most of the results have been positive in both our sample agencies and the public sector, and savings have been achieved. Between 2005 and 2008, while the number of claims in the sample agencies remained at around 15,000, the average cost of claims reduced by around 22 per cent from $22,349 to $17,360. The incidence rate of claims for the sample agencies also decreased by nine per cent to 7.3 claims per 100 staff.

 

Parliamentary reference - Report number #199 - released 31 March 2010

Published

Actions for Improving the Performance of Metropolitan Bus Services

Improving the Performance of Metropolitan Bus Services

Transport
Internal controls and governance
Management and administration
Procurement
Service delivery

The 2004 Review of Bus Services in NSW always envisaged that there would be a transition period as the new bus contracts were introduced. NSWTI has developed and implemented the new arrangements, and pursued a range of new initiatives including the network improvement program, strategic corridors and uniform bus fares and concessions. The new contracts provided for a performance management regime to hold operators accountable. But this is still being developed four years after the bus contracts came into effect and it remains unproven as a basis for ensuring value for money from the contracts - each of which guarantees monopoly rights to the operators.

 

Parliamentary reference - Report number #198 - released 10 March 2010

Published

Actions for Improving Road Safety: School Zones

Improving Road Safety: School Zones

Transport
Management and administration
Service delivery

Overall, speed cameras change driver behaviour and improve road safety. Fixed speed cameras reduce crashes and speeding. While the overall impact of speed cameras has been positive, 38 of the 141 fixed speed cameras need to be closely examined as they appear to have no significant road safety benefit. Other road safety measures may be needed for these sites.

 

Parliamentary reference - Report number #197 - released 10 March 2010

Published

Actions for Condition of State Roads

Condition of State Roads

Transport
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management
Service delivery

The Roads and Traffic Authority (RTA) has improved the overall surface condition of State Roads in the last decade. Country road surfaces are now generally much better. Ride quality has improved and cracking has been reduced. The RTA has also achieved a substantial reduction in the number of structurally deficient bridges over the same period. 

Despite a significant increase in the State’s contribution to maintenance since 1999-2000, the RTA has deferred road rebuilding projects. The RTA is rebuilding at less than half its long term target, and has not met this target at any time this decade. The RTA has not identified how it will address deferred rebuilding, although it advises it is developing a new road network management plan which will address this.

 

Parliamentary reference - Report number #157 - released 16 August 2006

Published

Actions for Fraud control improvement kit: Meeting your fraud control obligations

Fraud control improvement kit: Meeting your fraud control obligations

Whole of Government
Fraud
Internal controls and governance
Management and administration

Fraud risks, and fraud control obligations, are growing at a rate which demands that more be done.  Our 2005 report showed that still only 50 per cent of NSW public sector organisations had achieved an adequate level of performance in developing and implementing a fraud control strategy.  In response to this, our 2005 report provided a range of recommendations for improving fraud control and urged that fraud control become a key item for attention by audit committees.

We recognise that organisations need a simple and effective way to review and monitor how effectively they are implementing fraud control strategies.  This kit has been developed for precisely that purpose.  Its development reflects an extended period of consultation, focus-group review and pilot-testing to ensure that that the kit is simple to use, practical and flexible.  The kit assists organisations to meet their fraud control obligations in a cost-effective manner, tailored to their situation and based on risk.

 

Parliamentary reference - Report number #156 - released 20 July 2006

Published

Actions for Agency use of performance information to manage services

Agency use of performance information to manage services

Treasury
Whole of Government
Management and administration

Overall the results were mixed. There is some good news but this is such a basic and vital issue that we must conclude that a good deal more needs to be done. Three agencies did not have sufficient information to provide a balanced view of services. And two of these agencies could not tell us whether their services actually made a difference to customers. Across the ten programs we found many examples of good practice, but some variation in the quality and coverage of performance measures. Agencies that we identified as not having sufficient information to judge services were either unaware of its importance, collected data on activities but not results or reported system limitations.

 

Parliamentary reference - Report number #153 - released 21 June 2006

Published

Actions for The Cross City Tunnel Project

The Cross City Tunnel Project

Transport
Treasury
Premier and Cabinet
Planning
Environment
Infrastructure
Management and administration
Procurement
Project management
Risk

In our opinion the Government’s ‘no net cost to government’ requirement was a legitimate (but not the only possible) basis for the tunnel bid process. The Government was entitled to decide that tunnel users meet the tunnel costs. Structuring the bid process on the basis of an upfront reimbursement of costs incurred (or to be incurred) by the Roads and Traffic Authority (RTA) was therefore appropriate.

In our opinion, however, the Government, Treasury and the RTA did not sufficiently consider the implications of an upfront payment involving more than simple project cost reimbursement (i.e. the ‘Business Consideration Fee’ component). In addition, the RTA was wrong to change the toll escalation factor late in 2002 to compensate the tunnel operator, Cross City Motorway Pty Ltd, for additional costs.

 

Parliamentary reference - Report number #152 - released 31 May 2006