Actions for Albert 'Tibby' Cotter Walkway
Albert 'Tibby' Cotter Walkway
On 17 September 2015, the Acting Auditor-General of New South Wales, Tony Whitfield, released a report on the Albert ‘Tibby’ Cotter Walkway which crosses over Anzac Parade in Moore Park. The Walkway’s primary function is to cater for event patrons in the precinct. Moore Park is listed on the State Heritage Register and is an open space specifically established to cater for public recreation.
Roads and Maritime Services (RMS) delivered the Walkway to an extremely tight timeframe. It was operational for the 2015 Cricket World Cup at the Sydney Cricket Ground as promised by the government. However, the World Cup deadline added substantially to the total cost of the Walkway, which is projected to be $38 million.
Transport for NSW and RMS could not provide evidence of a compelling economic or financial argument to support the construction of the Walkway or for the tight deadline. Also, the processes they adopted to provide assurance of the project’s value for money were not adequate.
Parliamentary reference - Report number #260 - released 17 September 2015
Actions for Sydney metropolitan bus contracts
Sydney metropolitan bus contracts
On 9 September 2015, the Acting Auditor-General of New South Wales, Tony Whitfield, released a report on Sydney Metropolitan Bus Service Contracts.
All scheduled bus services in the Sydney metropolitan area are provided under contracts with the public and private operators. The contracts allow Transport for NSW (TfNSW) to determine what bus services are provided and to whom. This audit assessed the effectiveness of TfNSW’s design and management of these contracts.
Bus services provided under the Sydney Metropolitan Bus Service Contracts have largely been effective and efficient. Operators are mostly meeting their key performance indicators. Customer satisfaction is better than under the previous contracts and improving, patronage is increasing, and the unit costs of providing services are now lower than under the previous contracts.
However, punctuality remains a problem. Private operators are mostly starting their trips on time, but rarely meeting their mid and end-of-trip targets. State Transit Authority’s (STA) punctuality is improving but is worse than private operators, and other areas of performance are generally below private operators.
The current situation is a substantial improvement over what we found in our 2010 audit on the previous contracts.
Parliamentary reference - Report number #258 - released 9 September 2015
Actions for Identifying productivity in the public sector
Identifying productivity in the public sector
This report examines selected areas of government activity to see if sufficient information was available to identify and assess changes in productivity. The areas examined were primary and secondary school public education, acute inpatient care in NSW public hospitals, CityRail, the NSW Police Force, and the NSW Local Court.
Productivity is commonly defined as the amount of output per unit of input.
Parliamentary reference - Report number #256 - released 16 July 2015
Actions for Implementing performance audit recommendations
Implementing performance audit recommendations
NSW Government agencies have sound processes for implementing performance audit recommendations in Auditor-General’s Reports to Parliament. There are many cases of good practice. For example, some agencies formed a steering committee and developed a detailed plan to implement recommendations. Another incorporated the implementation of recommendations into both its business plan and the work plans of individual officers who were managing projects. Most agencies also used their Audit and Risk Committees to monitor recommendations.
We found some cases where agencies can improve how they coordinate actions to address recommendations. Most agencies were not revisiting these actions to determine whether they remain appropriate.
Parliamentary reference - Report number #254 - released 24 June 2015
Actions for Government advertising 2015
Government advertising 2015
The Government Advertising Act 2011 requires the Auditor-General to conduct an annual performance audit to check NSW Government agency compliance with the Act.
This audit focused on the Department of Premier and Cabinet’s (DPC) role in monitoring government agencies compliance with government advertising requirements, and examined advertising campaigns run by Destination NSW and the Sydney Opera House.
Parliamentary reference - Report number #253 - released 22 June 2015
Actions for Large construction projects
Large construction projects
The independent assurance given to the NSW Government and sponsor agencies on the viability of large capital projects throughout their lifecycle is inadequate. Government policy is regularly not followed and not properly communicated to those responsible for implementing such policy.
This audit sought to test the effectiveness of the NSW capital project assurance system - which includes gateway reviews and reporting - but significant levels of non-compliance identified in our case studies prevented this. The NSW Commission of Audit also identified this issue in 2012. Gateway reviews are conducted by independent reviewers at key stages of a project’s life cycle and provide an independent assessment on a project’s readiness to proceed to the next stage.
Parliamentary reference - Report number #252 - released 7 May 2015
Actions for Security of critical IT infrastructure
Security of critical IT infrastructure
Roads and Maritime Services and Transport for NSW have deployed many controls to protect traffic management systems but these would have been only partially effective in detecting and preventing incidents and unlikely to support a timely response. There was a potential for unauthorised access to sensitive information and systems that could have disrupted traffic.
Until Roads and Maritime Services’ IT disaster recovery site is fully commissioned, a disaster involving the main data centre is likely to lead to higher congestion in the short-term as traffic controllers would be operating on a regional basis without the benefit of the Traffic Management Centre.
Parliamentary reference - Report number #248 - released 21 January 2015
Actions for Sale of the TAB
Sale of the TAB
The Audit Office is of the opinion that:
-
the sale was delivered with reasonable efficiency and effectiveness
-
the sale yielded a satisfactory return to the NSW Government. The possibility for a higher return was limited to about 2% to 4% on gross proceeds of $936m. It would have required setting a higher share price for all investors and adopting a more flexible approach to share allocation
-
the Government’s objective to promote community and investor support was achieved. The scale of the demand for script added to costs and was not fully translated into higher proceeds
-
generally satisfactory accountability frameworks were put in place for the sale and no probity concerns were identified
-
the frameworks to achieve the Government’s wider reforms of the racing and wagering industries have substantially been implemented.
Parliamentary reference - Report number #61 - released 23 December 1998
Actions for NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 1 Summary and Research Report
NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 1 Summary and Research Report
The Audit Office is of the opinion that there are several features of the current Senior Executive Service (SES) model, or its application, which hinder the capacity of the SES to operate effectively in line with the Government’s stated objectives. The ultimate effect of these features is to reduce the capacity or perceived capacity of the SES to meet the Government’s objectives for the operation of the SES.
Taken overall, difficulties in the SES identified by the audit included: uncertainty caused by the way some contracts have been applied in practice, removal for reasons other than poor performance, informal strategies such as using restructuring to “terminate contracts and to move people in and out of positions regardless of their formal reported performance” (Section 5.4), inconsistently applied rules about selection/recruitment, appointment and removal of the SES, an imbalance between CES responsibility to the Minister as the employer/reviewer with their responsibility not to act in a political or partial manner, apparent lack of rigour in, value of and Ministerial accountability for CES performance review processes and failure to implement an adequate system of rewards and sanctions related to performance.
Parliamentary reference - Report number #59.1 - released 17 December 1998
Actions for NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 2 SES Research
NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 2 SES Research
This Performance Audit Report, prepared by the University of Technology, Sydney (UTS) on behalf of The Audit Office of New South Wales (NSW), is a study of the NSW Senior Executive Service (SES).
It found the dissonance between where optimal executive performance might take place on a performance spectrum, encompassing the formal SES and less formal political arenas, is canvassed. The critical point here is that this arena, between the informal political actions and the application of formal SES structures, where much of the important decision making takes place, will always be difficult to manage. Transparency in decision making processes where non partisan and partisan actions are clearly defined seems a primary essential element of performance if the integrity of the NSW SES is to be maintained.