1. Financial Reporting |
|
Audit opinion | Unmodified audit opinions issued for the financial statements of all Transport cluster entities. |
Quality and timeliness of financial reporting | All cluster agencies met the statutory deadlines for completing the early close and submitting the financial statements. Transport cluster agencies continued to experience some challenges with accounting for land and infrastructure assets. The former Roads and Maritime Services and Sydney Metro recorded prior period corrections to property, plant and equipment balances. |
Impact of COVID-19 on passenger revenue and patronage | Total patronage and revenue for public transport decreased by approximately 18 per cent in 2019–20 due to COVID-19. The Transport cluster received additional funding from NSW Treasury during the year to support the reduced revenue and additional costs incurred such as cleaning on all modes of public transport and additional staff to manage physical distancing. |
Completion of the CBD and South East Light Rail | The CBD and South East Light Rail project was completed and commenced operations in this financial year. At 30 June 2020, the total cost of the project related to the CBD and South East Light Rail was $3.3 billion. Of this total cost, $2.6 billion was recorded as assets, whilst $700 million was expensed. |
2. Audit Observations |
|
Internal control | While internal controls issues raised in management letters in the Transport cluster have decreased compared to the prior year, control weaknesses continue to exist in access security for financial systems. We identified 56 management letter findings across the cluster and 43 per cent of all issues were repeat issues. The majority of the repeat issues relate to information technology controls around user access management. There were three high risk issues identified - two related to financial reporting of assets and one for implementation of TAHE (see below). |
Agency responses to emergency events | Transport for NSW established the COVID-19 Taskforce in March 2020 to take responsibility for the overall response of planning and coordination for the Transport cluster. It also implemented the COVIDSafe Transport Plan which incorporates guidance on physical distancing, increasing services to support social distancing and cleaning. |
RailCorp transition to TAHE | On 1 July 2020, RailCorp was renamed Transport Asset Holding Entity of New South Wales (TAHE) and converted to a for-profit statutory State-Owned Corporation. TAHE is a commercial for-profit Public Trading Entity with the intent to provide a commercial return to its shareholders. A plan was established by NSW Treasury to transition RailCorp to TAHE which covered the period 1 July 2015 to 1 July 2019. A large portion of the planned arrangements were not implemented by 1 July 2020. As at the time of this report, the TAHE operating model, Statement of Corporate Intent (SCI) and other key plans and commercial agreements are not finalised. The State Owned Corporations Act 1989 generally requires finalisation of an SCI three months after the commencement of each financial year. However, under the Transport Administration Act 1988, TAHE received an extension from the voting shareholders, the Treasurer and Minister for Finance and Small Business, to submit its first SCI by 31 December 2020. In accordance with the original plan, interim commercial access arrangements were supposed to be in place with RailCorp prior to commencement of TAHE. Under the transitional arrangements, TAHE is continuing to operate in accordance with the asset and safety management plans of RailCorp. The final operating model is expected to include considerations of safety, operational, financial and fiscal risks. This should include a consideration of the potential conflicting objectives of a commercial return, and maintenance and safety measures. This matter has been included as a high risk finding in our management letter due to the significance of the financial reporting impacts and business risks for TAHE. Recommendation: TAHE management should:
Resolution of the above matters are critical as they may significantly impact the financial reporting arrangements for TAHE for 2020–21, in particular, accounting policies adopted as well as measurement principles of its significant infrastructure asset base. |
Completeness and accuracy of contracts registers | Across the Transport cluster, contracts and agreements are maintained by the transport agencies using disparate registers. Recommendation (repeat): Transport agencies should continue to implement a process to centrally capture all contracts and agreements entered. This will ensure:
|
This report provides parliament and other users of the Transport cluster’s financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations
- the impact of emergencies and the pandemic.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Transport cluster for 2020, including any financial implications from the recent emergency events.
Section highlights
|
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.
This chapter outlines our:
- observations and insights from our financial statement audits of agencies in the Transport cluster
- assessment of how well cluster agencies adapted their systems, policies and procedures, and governance arrangements in response to recent emergencies.
Section highlights
|
Appendix one – List of 2020 recommendations
Appendix two – Status of 2019, 2018 and 2017 recommendations
Appendix three – Management letter findings
Appendix four – Financial data
Copyright notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Planning, Industry and Environment 2020
Planning, Industry and Environment 2020
This report analyses the results of our audits of financial statements of the Planning, Industry and Environment cluster agencies for the year ended 30 June 2020. The table below summarises our key observations.
1. Financial reporting
Audit opinions |
There are 45 separate entities in the cluster. Unqualified audit opinions were issued for 38 cluster agencies' 30 June 2020 financial statements audits. Four financial statements audits are still ongoing, and three agencies were not subject to audit due to NSW Treasury reporting exemptions. |
Timeliness of financial reporting |
The majority of cluster agencies subject to statutory reporting deadlines met the revised timeline for submitting financial statements. Twenty‑four of the 26 cluster agencies required to submit early close financial statements met the revised timeframe. Due to issues identified during the audit, 13 financial statements audits were not completed and audit opinions not issued by the statutory deadline. |
Implementation of AASB 16 'Leases' |
Significant deficiencies were identified in Property NSW's lease data maintenance and lease calculations. Recommendation (partially repeat): Property NSW should:
Our audits of the cluster agencies identified there was a lack of thorough quality assurance over the accuracy of lease information provided by Property NSW. Recommendation: The Department and cluster agencies should:
|
Unprocessed Aboriginal land claims continued to increase |
In 2019–20, the Department resolved an additional 468 Aboriginal land claims compared to the prior year. However, the total number of unprocessed Aboriginal land claims increased by 914 to 36,769 at 30 June 2020. The number of claims remaining unprocessed for more than ten years after lodgement increased by 10.9 per cent from last year. Until claims are resolved, there is an uncertainty over who is entitled to the land and the uses and activities that can be carried out on the land. Auditor-General's Reports to Parliament since 2007 have recommended action to address the increasing number of unprocessed claims. To date, the Department has not been able to resolve this issue. During 2020–21, a performance audit will assess the effectiveness and efficiency of the administration of Aboriginal land claims. |
Financial reporting of Crown land managers |
The Department will need to provide additional support and guidance to help Crown land managers (CLMs) meet their financial reporting obligations. Recommendation: The Department should:
During 2019–20, NSW Treasury established the reporting exemption criteria for the CLMs. Based on available information, the Department determined 31 CLMs would not meet the exemption criteria and therefore are required to prepare annual financial statements. |
2. Audit observations
Internal controls |
Six high‑risk issues were identified across the cluster in 2019–20:
One in three internal control issues identified and reported to management in 2019–20 were repeat issues. Recommendation: Management letter recommendations to address internal control weaknesses should be actioned promptly, with a focus on addressing high‑risk and repeat issues. |
Agencies response to recent emergencies |
The unprecedented bushfires and COVID‑19 pandemic presented challenges for the cluster. Agencies established taskforces or response teams to respond to these emergencies. With more staff working from home, agencies implemented protocols and procedures to manage risks associated with the remote working arrangements, and also needed to address certain technology issues. The Department is responsible for the new Planning System Acceleration Program, which aims to fast‑track planning assessments, boost the State's economy and keep people in jobs during COVID‑19 pandemic. Between April and October 2020, the Department announced and determined 101 major projects and planning proposals. |
Recognition of Crown land |
Crown land is an important asset of the State. Management and recognition of Crown land assets is weakened when there is confusion over who is responsible for a particular Crown land parcel. Auditor-General's Reports to Parliament since 2017 have recommended that the Department should ensure the database of Crown land is complete and accurate. Whilst the Department has commenced actions to improve the database, this remained an issue in 2019–20. Recommendation (repeat issue): The Department should prioritise action to ensure the Crown land database is complete and accurate. This allows state agencies and local councils to be better informed about the Crown land they control. |
Implementation of Machinery of Government (MoG) changes |
Since its creation on 1 July 2019, the Department has largely established its governance arrangements, including setting up the Audit and Risk Committee and internal audit function for the Department and relevant cluster agencies. The Department still operated three main financial reporting systems in 2019–20, and has commenced the process to consolidate some of the systems. The recent Regional NSW MoG change led to the transfer of $446 million net assets and $284 million 2019–20 budget from the Department to the newly created Department of Regional NSW on 2 April 2020. |
This report provides parliament and other users of the Planning, Industry and Environment cluster agencies’ financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations
- the impact of emergencies and the pandemic.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.
The COVID‑19 Legislation Amendment (Emergency Measures–Treasurer) Act 2020 amended legislation administered by the Treasurer to implement further emergency measures as a result of the COVID‑19 pandemic. These amendments:
- allowed the Treasurer to authorise payments from the Consolidated fund until the enactment of the 2020–21 budget – impacting the going concern assessments of cluster agencies
- revised budgetary, financial and annual reporting time frames – impacting the timeliness of financial reporting
- exempted certain statutory bodies and departments from preparing financial statements.
This chapter outlines our audit observations related to the financial reporting of agencies in the Planning, Industry and Environment cluster for 2020, including any financial implications from the recent emergency events.
Section highlights
The Department has not yet developed a statutory reporting framework for Crown land managers and will need to provide additional resources to help Crown land managers meet their financial reporting obligations. |
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.
This chapter outlines our:
- observations and insights from our financial statements audits of agencies in the Planning, Industry and Environment cluster
- assessment of how well cluster agencies adapted their systems, policies and procedures, and governance arrangements in response to recent emergencies
- review of how the cluster agencies managed the increased risks associated with new programs aimed at stemming the spread of COVID-19 and stimulating the economy.
Cluster agencies experienced a range of control and governance related issues in recent years. An increased number of high risk issues and greater proportion of repeat issues were identified as part of our audits. It is important for cluster agencies to promptly address these issues.
Section highlights
|
Actions for Report on Local Government 2019
Report on Local Government 2019
I am pleased to present my third report to the Parliament on the 2019 audits of local government councils in New South Wales.
This report notes that unqualified audit opinions were issued on the 2018–19 financial statements of 134 councils and 11 joint organisations. The opinion for one council was disclaimed and three audits are yet to complete.
The report also highlights improvements I have seen in financial reporting and governance arrangements across councils. Fewer errors were identified. More councils have audit, risk and improvement committees and internal audit functions. Risk management practices, including fraud control systems, have also improved.
These are very pleasing indicators of the gradual strengthening of governance and financial oversight of the sector. I want to acknowledge the investment councils have made in working with the Audit Office to improve consistency of practice and accountability generally.
Of course there is more work to do, particularly to prepare for new accounting standards and to strengthen controls over information technology and cyber security management. Asset management practices can also be improved. This report provides some guidance to council on these matters and we will continue to partner with the Office of Local Government in the Department of Planning, Industry and Environment to support good practice.
Auditor-General
5 March 2020
This report focuses on key observations and findings from the 2018–19 financial audits of councils and joint organisations.
Unqualified audit opinions were issued on the financial statements for 134 councils and 11 joint organisations. The audit opinion for Bayside’s 2017–18 and 2018–19 financial statements were disclaimed. Three audits are still in progress and will be included in next year’s report.
The report highlights a number of areas where there has been improvement. There was a reduction in errors identified in council financial statements and high risk issues reported in audit management letters. More councils have audit, risk and improvement committees and internal audit functions. Risk management practices and fraud control systems have also improved.
The report also found that councils could do more to be better prepared for the new accounting standards, asset management practices could be strengthened, and information technology controls and cyber security management could be improved.
The Auditor-General recommended that the Office of Local Government within the Department of Planning, Industry and Environment develop a cyber security policy by 30 June 2021 to ensure a consistent response to cyber security risks across councils.
Financial reporting is an important element of good governance. Confidence in and transparency of public sector decision making is enhanced when financial reporting is accurate and timely. Strong financial performance provides the platform for councils to deliver services and respond to community needs.
This chapter outlines our audit observations on the financial reporting and performance of councils and joint organisations.
Section highlights
- There was a reduction in the number and dollar value of errors identified in councils' financial statements.
- We continue to identify prior period errors, which are predominantly asset-related.
- Unqualified audit opinions were issued for 99 per cent of completed audits for councils and joint organisations.
- Three audits remain outstanding, with the outcomes to be reported in next year's Report to Parliament.
- Seventy-nine per cent of councils and joint organisations lodged their financial reports by 31 October 2019.
- Councils that performed some early reporting procedures achieved better outcomes in terms of the quality and timeliness of financial reporting.
- Councils are at various levels of preparedness to implement the new accounting standards for the 2019–20 financial year. Some have made the necessary modifications to systems and processes, but others are still assessing impacts.
- Most councils met the prescribed benchmarks for the liquidity and working capital performance measures over the past three years.
- More councils reported negative operating performance compared with the prior year, meaning their operating expenditure exceeded their operating revenue.
Strong governance systems and internal controls help councils to operate effectively and efficiently, produce reliable financial reports, comply with laws and regulations and support ethical government.
This chapter outlines the overall trends related to governance and internal control issues across councils and joint organisations for 2018–19.
Section highlights
- While the total number of issues reported in our management letters increased compared with the prior year, the total number of high risk issues have decreased. Of the high-risk issues, 41 per cent were deficiencies in information technology controls.
- More councils have established audit, risk and improvement committees and internal audit functions.
- Councils have improved risk management practices, with over 75 per cent of councils now having a risk management policy and register.
- While most councils have policies and processes to manage gifts and benefits, we identified some instances of non-compliance with the Model Code of Conduct.
- Most councils have policies and processes to manage the use of credit cards.
- Councils can strengthen policies and practices for managing fraud controls and legislative compliance.
- There are further opportunities for councils to improve internal controls over revenue, purchasing, payroll, cash, financial accounting and governance processes.
Councils rely on information technology (IT) to deliver services and manage information. While IT delivers considerable benefits, it also presents risks that council needs to address.
In prior years, we reported that councils need to improve IT governance and controls to manage key financial systems. This chapter outlines the progress made by councils in the management of key IT risks and controls, with an added focus on cyber security.
Section highlights
- We continue to report deficiencies in information technology controls, particularly around user access management. These controls are key to ensuring IT systems are protected from inappropriate access and misuse.
- Many councils do not have IT policies and procedures and others do not identify, monitor or report on IT risks.
- Cyber security management requires improvement, with some basic elements of governance not yet in place for many councils.
Councils are responsible for managing a significant range of assets to deliver services on behalf of the community.
This chapter outlines our asset management observations across councils and joint organisations.
Section highlights
- There was an increase in the total number of issues reported in our management letters for asset management processes.
- There were less high-risk issues reported compared to the previous year.
- We continue to identify discrepancies between the council's Crown land asset records and the Crown Land Information Database (CLID) managed by the former Department of Industry (DOI).
- Inconsistent practices remain across the Local Government sector in accounting for landfill sites.
Appendix one – Response from the Office of Local Government within the Department of Planning, Industry and Environment
Appendix two – Status of 2018 recommendations
Appendix three – Status of audits
Copyright notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Planning and Environment 2017
Planning and Environment 2017
The following report highlights results of financial audits of agencies in the Planning and Environment cluster. The report focuses on key observations and findings from the most recent audits of these agencies.
The audits were completed for most agencies in the cluster and unqualified audit opinions issued. Issues identified during the financial statement audits of seven small agencies delayed their finalisation beyond the statutory deadline, and six of these remain incomplete. Apart from these small agencies, the quality of financial reporting across the cluster remained at a high standard.
This report provides Parliament and others with the audit results, observations and recommendations for Planning and Environment cluster agencies. The report has been structured into two chapters focussing on financial reporting and controls and service delivery.
The Planning and Environment cluster plays a role in ensuring each community across New South Wales receives the services and infrastructure it needs.
This chapter outlines our audit observations and recommendations related to financial reporting and controls of Planning and Environment cluster agencies for 2016–17.
Observation | Conclusion or recommendation |
2.1 Quality of financial reporting |
|
Unqualified audit opinions were issued for 39 of the 45 cluster agencies' financial statements. |
Issues identified during the financial statement audits of seven smaller agencies delayed their completion. Six audits remain incomplete at the date of this report. Apart from these seven small agency audits, the quality of financial reporting across the cluster remained at a high standard. |
2.2 Timeliness of financial reporting |
|
Seven agencies' financial statement audits were not completed by the statutory deadline with six audits incomplete at the date of this report. |
Issues identified during the financial statement audits of seven smaller agencies delayed their finalisation beyond the statutory deadline. These agencies would benefit from performing additional early close procedures in future reporting periods. |
2.3 Financial and sustainability analysis |
|
Water and Electricity utility agencies continue to operate with low liquidity ratios. |
A liquidity ratio below one is an indicator that an entity may not be able to pay its debts as and when they fall due. Whilst liquidity ratios were below one, utility agencies demonstrated they can continue to support ongoing operations due to:
|
2.5 Internal controls |
|
One in six internal control weaknesses reported in 2016–17 were repeat issues. |
Delays in implementing audit recommendations can prolong the risk of fraud and error. Recommendation (repeat issue): anagement letter recommendations to address internal control weaknesses should be actioned promptly, with a focus on addressing repeat issues. |
Nine of these internal control weaknesses related to the creation, modification, deletion and review of user access to financial systems. |
These control weaknesses may compromise the integrity and security of financial data. Recommendation (repeat issue): Management of user administration over financial systems should be strengthened to prevent inappropriate access to financial information. |
This chapter outlines our audit observations, conclusions and recommendations relating to service delivery for 2016–17.
Observation | Conclusion or recommendation |
3.1 Premier's and State priorities |
|
The Planning and Environment cluster is responsible for delivering five Premier's and State priorities. |
One priority target was achieved in 2016–17, two targets are on track to be achieved and progress towards one target slowed. Progress against one target cannot be determined. |
3.2 Planning |
|
Housing Completion |
|
There were 63,506 housing completions in 2016–17. This was 4.1 per cent above the Premier’s priority target of delivering 61,000 housing completions per year. |
The Australian Bureau of Statistics data shows the housing completions target was achieved in 2016–17. |
Housing supply |
|
The number of approvals for new houses in 2016–17 was 72,472 against the State priority target of more than 50,000 approvals per year. |
The Australian Bureau of Statistics data indicates the housing approvals target was achieved in 2016–17. |
Major project assessment |
|
State significant developments are not clearly defined for the purposes of reporting against the State priority target. | The Department of Planning and Environment will clarify with the Department of Premier and Cabinet which developments are captured by the State priority target. |
The Department of Planning and Environment’s data shows the time taken to assess complex State significant developments increased by 16 per cent in 2016–17 while the time taken to assess less complex developments reduced by 20 per cent. | The Department of Planning and Environment considers it is on track to meet the State priority target of halving the time taken to assess State significant developments, despite uncertainty over the target measure. |
Housing acceleration fund |
|
Program business cases were not developed for projects in Housing Acceleration Fund Rounds 1 to 4. The Department advised a program business case will be developed for Housing Acceleration Fund Round 5 projects. |
A program business case is necessary to ensure related projects are evaluated, managed and coordinated effectively. |
A benefit realisation review process has not yet been approved for Housing Acceleration Fund projects. The Department of Planning and Environment advised it is developing a benefit realisation review process. |
A benefit realisation review process is necessary to determine whether funded projects achieved intended outcomes. |
Greater Sydney Commission |
|
The Greater Sydney Commission forecasts a further 725,000 dwellings in the greater Sydney region will be required up to 2036 to meet housing demand. | In response to population growth, the Commission has set a five-year housing supply target of 189,100 houses across the five Greater Sydney Commission districts. |
ePlanning system |
|
The Department of Planning and Environment did not perform a benefit realisation review for phase one of the ePlanning project. It has committed to performing a benefit realisation review after completion of phase two in 2018. | It cannot be determined if phase one of the project delivered expected outcomes as a benefit realisation review was not performed. |
3.3. Environment and Heritage |
|
Litter volume in New South Wales was 6.6 litres per 1,000 square metres in 2016–17, an increase of 16 per cent from the prior year. This is above the Premier's priority litter volume target of 4.2 litres per 1,000 square metres by 2020. | The Environment Protection Authority's data indicates the progress towards the target of reducing the volume of litter by 40 per cent by 2020 has slowed. |
The NSW Government plans to invest $240 million to facilitate strategic biodiversity conservation on private land. | Performance measures have not yet been developed for the private land conservation program. |
3.4 Water |
|
IPART reduced water usage charges for most Sydney Water Corporation customers in 2016–17. | Water usage prices in New South Wales compare favourably to larger water utilities in other jurisdictions. |
Hunter Water Corporation's water recycling and water conservation performance has been stable over recent years. The volume of Sydney Water Corporation’s recycled water reduced by 12 per cent in 2016–17 compared to the previous year. |
Sydney Water Corporation experienced reduced industry demand for recycled water. Several large industrial customers relocated away from Sydney. |
3.5 Arts and culture |
|
A State priority target is to increase overall attendance at cultural venues and events in New South Wales by 15 per cent from 2014–15 levels by 2019. | The Department of Planning and Environment's data indicates overall attendance increased by 16 per cent in 2015–16, although attendance fluctuated across individual venues and events. This indicates progress towards achieving the overall target by 2019. |
Actions for Transport 2017
Transport 2017
The following report focuses on key observations and findings from the most recent financial statement audits of agencies in the Transport cluster.
Unqualified audit opinions were issued for all agencies' financial statements. However, the report notes the agencies can improve their asset revaluation processes.
Actions for Central Agencies 2017
Central Agencies 2017
This report highlights the results of the financial audits of NSW Government central agencies. The report focuses on key observations and findings from the most recent financial statement audits of agencies in the Treasury, Premier and Cabinet, and Finance, Services and Innovation clusters.
The report includes a range of findings in respect to service delivery. One repeat finding is that while the Government regularly reports on the 12 Premier's priorities, there is no comprehensive reporting on the 18 State priorities.
1. Financial reporting and controls
Audit Opinions | Unqualified audit opinions were issued for all agencies' 30 June 2017 financial statements. |
Early close | Early close procedures continue to facilitate the timely preparation of financial statements and completion of audits, but agencies can make further improvement. |
Deficient user administration access | User access administration over financial systems remains an area of weakness. Agencies need to strengthen user access administration to critical systems. |
Transitioning to outsourced service providers | Transitioning of services to outsourced service providers can be improved. Outsourcing services can lead to better outcomes, which may include lower transaction costs and improved services, but it also introduces new risks. |
2. Service delivery
Premier and State Priorities | A comprehensive report of performance against the 18 State Priorities is yet to be published. While some measures are publicly reported through agency annual reports or other sources, a comprehensive report of performance against the 18 State Priorities would ensure all State Priorities are publicly reported, provide a single and easily accessible source of reference and improve transparency. |
ICT and digital government | The Digital Government Strategy was released in May 2017. Targets will need to be set to assess and monitor progress against the Strategy. |
Digital information security | Not all agencies are complying with the NSW Government's information security policy. This increases the risk of noncompliance with legislation, information security breaches and difficulty restoring data or maintaining business continuity in the event of a disaster or disruption. |
Property and asset utilisation | Property NSW's performance reporting would be enhanced by developing and reporting on customer satisfaction, reporting against set targets and benchmarking cost of service to the private sector. |
3. Government financial services
Prudential oversight of NSW Government superannuation funds |
Prudential oversight of SAS Trustee Corporation Pooled Fund and Parliamentary Contributory Superannuation Fund has not been prescribed. Structured and comprehensive prudential oversight of these funds remains important as they operate in a specialised, complex and continuously changing investment market sector, have over 106,000 members and manage investments in excess of $42.4 billion. |
Green slip scheme affordability | Currently, Green Slips in NSW are the most expensive in Australia. However, CTP reforms are expected to reduce the cost of Green Slips. |
This report sets out the results of the 30 June 2017 financial statement audits of NSW Government's central agencies and their cluster agencies.
Central agencies play a key role in ensuring policy coordination, good administrative and people management practices and prudent fiscal management. The central agencies and their key responsibilities are set out below.
Confidence in public sector decision‑making and transparency is enhanced when financial reporting is accurate and timely. Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. This chapter outlines our audit observations, conclusions or recommendations related to financial reporting and controls of agencies for 2016–17.
Observation | Conclusion or recommendation |
2.1 Quality of financial reporting | |
Unqualified audit opinions were issued for all agency financial statements. | The quality of financial reporting continues to remain strong across the clusters. |
2.2 Timeliness of financial reporting | |
Most agencies complied with the statutory timeframes for completion of early close procedures and preparation and audit of financial statements. | Early close procedures continue to facilitate the timely preparation of financial statements and completion of audits, but agencies can make further improvement. |
2.3 Financial performance and sustainability | |
We assessed the performance of agencies listed in Appendix six against some key financial sustainability indicators. This highlighted two agencies with negative operating margins of more than ten per cent and one agency with a liquidity ratio of less than 0.5. | These agencies have strategies in place to remain financially sustainability and manage their liquidity. Our analysis found that, overall, the agencies are not at high risk of sustainability concerns. |
2.4 Internal Controls | |
User access administration over financial systems remains an area of weakness. Sixteen moderate risk and ten low risk issues related to user access administration across eight agencies were identified. |
Recommendation: Agencies should review user access administration to critical systems to ensure:
|
Transitioning of services to outsourced service providers can be improved. Our 2016–17 audits identified one high risk issue relating to Property NSW's outsourcing of property and facility management services to the private sector. While a high risk issue was identified in 2015–16 from the Department of Finance, Services and Innovation's outsourcing of transactional and information technology services to GovConnect there has been an improvement in GovConnect's internal control environment throughout |
Outsourcing services can lead to better outcomes, which may include lower transaction costs and improved services, but it also introduces new risks. The transition needs to be carefully managed and requires thorough planning and effective project governance. This should be supported by oversight and direction from senior management and independent project assurance. |
2.5 Human Resources | |
The percentage of full‑time equivalent staff with annual leave greater than 30 days in the Finance, Services and Innovation, Premier and Cabinet and the Treasury clusters is 7.9 per cent, 17.1 per cent and 18.4 per cent respectively. | Agencies have strategies in place to reduce annual leave balances that are greater than 30 days. The effectiveness of these strategies will need to be monitored to ensure they are helping to achieve the desired outcome. |
This chapter outlines our audit observations, conclusions and recommendations relating to service delivery for 2016–17.
Observation | Conclusion or recommendation |
3.1 Premier and State priorities | |
The Department of Premier and Cabinet monitors the achievement of targets and the implementation of initiatives to deliver the 12 Premier’s Priorities. Responsible ministers and agencies manage the 18 State Priorities. A comprehensive report of performance against the 18 State Priorities is yet to be published. |
While some measures are publicly reported through agency annual reports or other sources, a comprehensive report of performance against the 18 State Priorities would ensure all State Priorities are publicly reported, provide a single and easily accessible source of reference and improve transparency. Where possible, independent sources are used to measure performance, however without independent assurance there is an increased risk that the target measures are inaccurate, not relevant or do not fairly represent actual performance. |
Performance against the State Priority to make NSW the easiest state to start a business is not currently published. |
Initiatives, such as easy to do business and red tape reduction are in place to help achieve this priority. The regulatory policy framework is under review following an October 2016 performance audit on ‘Red tape reduction’ that found the regulatory burden of legislation had increased. |
3.2 Financial management | |
Revenue NSW earned record crown revenue of $30.0 billion in 2016–17 to support the state's finances. | Record crown revenue has been driven by the sustained increase in duties revenue, which has increased by 93.7 per cent over the last five years. This is a consequence of the continued strength in the property market over this time and large one off NSW Government business asset sales and leases. |
3.3 ICT and digital government | |
The Digital Government Strategy (the Strategy) was released in May 2017 to build on reforms set out in previous ICT strategies. | The Strategy’s priorities and enablers aim to support digital innovation. Targets and measures will need to be set to assess and monitor progress against the Strategy. |
The Digital Information Security Policy (DISP) is a key tool that helps ensure a minimum set of information security controls are implemented across NSW Government agencies. A review of 2016 annual reports found 15 agencies (13 in 2015) did not attest to compliance with the DISP and of the agencies that attested to compliance, 34 reported issues associated with their compliance. |
The Strategy’s priorities and enablers aim to support digital innovation. Targets and measures will need to be set to assess and monitor progress against the Strategy. |
3.4 Property and asset utilisation | |
Property NSW's performance reporting could be |
Property NSW's performance reporting would be enhanced by developing and reporting on customer satisfaction, reporting against set targets and benchmarking cost of service to the private sector. |
This chapter outlines our audit observations, conclusions and recommendations specific to NSW Government agencies providing financial services.
Observation | Conclusion or recommendation |
4.1 Key issues | |
The SAS Trustee Corporation (STC) Pooled Fund and the Parliamentary Contributory Superannuation (PCS) Fund are not required to comply with the prudential and reporting standards issued by the Australian Prudential Regulation Authority (APRA). Amendments to relevant legislation allows the Minister for Finance, Services and Property to prescribe applicable prudential standards and audit requirements. |
Structured and comprehensive prudential oversight of these funds remains important as they operate in a specialised, complex and continuously changing investment market sector, have over 106,000 members and manage investments of more than $42.4 billion. Recommendation: The Treasury should liaise with the respective Trustees to implement appropriate prudential standards and oversight arrangements for the exempt public sector superannuation funds. |
Currently, Green Slips in NSW are the most expensive in Australia. Average premiums for Sydney Metropolitan vehicles increased by 10.4 per cent between 1 January 2016 and 31 December 2016. |
CTP reforms are expected to reduce the cost of Green Slips. The State Insurance Regulatory Authority will need to ensure it has appropriate processes in place to track and report against the expected benefits. |
4.2 Financial performance and sustainability | |
Net unfunded superannuation liabilities were $15.0 billion at 30 June 2017. Under the Fiscal Responsibility Act 2012, the NSW Government’s target is to eliminate unfunded superannuation liabilities by 2030. |
The superannuation funds’ strategic asset allocation and investment strategies are monitored and adjusted to help achieve a fully funded position by 2030. |
The Home Warranty Scheme commenced in 2011. Over this time total premiums collected have not been sufficient to cover expected claim costs. | Funding arrangements introduced during 2016–17 allow the Home Building Compensation Fund to apply to the Crown for reimbursement of unfunded realised losses from under-pricing of premiums. Other reforms are planned to address the long term sustainability of the home building compensation scheme. |
4.3 Investment performance | |
The NSW Government’s main superannuation funds have maintained the management expense ratio (MER) at consistent levels over the past two years. The Parliamentary Contributory Superannuation (PCS) Fund does not set an MER target. | MER is an industry recognised ratio to measure the performance of funds and investment managers. Recommendation: The Fund Secretary for the PCS Fund, in conjunction with the Trustee, should consider establishing an appropriate management expense ratio target to measure performance. |
Actions for State Finances 2017
State Finances 2017
Total State Sector Accounts received an unqualified audit opinion for the fifth consecutive year.
There was a $5.7 billion State budget surplus and continued investment in new infrastructure, in part funded by the long-term leases of Ausgrid and Endeavour Energy assets. This report also comments on key accounting matters, including the correction of some previously reported balances and the first time reporting of combined Cabinet members’ compensation in the Total State Sector Accounts.
Pursuant to the Public Finance and Audit Act 1983, I present my Report on State Finances 2017.
You will note that the format of this report has changed from previous years.
The intent of this change is to draw attention to the key matters that have been the focus of our audit and highlight significant factors that have contributed to the outcome.
First, it is pleasing to report once again that I issued a clear audit opinion on the State’s consolidated financial statements. This outcome demonstrates the Government’s continued focus on the quality of financial reporting across the NSW public sector.
High quality financial management and reporting are crucial to properly inform the public and build community confidence in our system of government.
The Treasury’s Financial Management Transformation program also aims to improve financial governance, budgeting and reporting arrangements across the sector. My Office is working collaboratively with The Treasury on reforms to reduce the burden of reporting, without weakening established safeguards.
The reforms should include measures to provide independent assurance of the budget process, of outcome reporting by agencies, and the power to “follow the dollar” given the increasing use of non-government organisations to deliver Government programs.
This Report also highlights another year of strong financial performance. The State’s budget result was a $5.7 billion surplus, and investment in new infrastructure has continued, in part funded by the long-term leases of Ausgrid and Endeavour Energy assets.
Finally, could I take this opportunity to thank the staff of The Treasury for the way they approached this audit. Our partnership is critical to ensuring NSW is an exemplar of quality financial management and reporting.
Margaret Crawford
24 October 2017
A clear audit opinion on the State’s consolidated financial statements was issued.
Timely and accurate financial reporting is essential for informed decision making, effective management of public funds and enhancing public accountability.
This year’s clear audit opinion reflects the Government’s continued efforts to improve the quality of financial reporting across the NSW public sector.
Since the introduction of ‘early close procedures’ in 2011-12, the number of significant errors in financial statements of agencies has generally fallen largely due to identifying and resolving complex accounting issues early. Agencies’ 2016-17 financial statements submitted for audit contained nine errors exceeding $20 million. All errors were subsequently corrected in the individual agencies financial statements.
Agencies should continue to respond to key accounting issues as soon as they are identified. Where issues are identified, accounting position papers should be prepared for consideration by the Audit Office, their Audit and Risk Committee members, and when relevant, The Treasury.
The State addressed the following key accounting matters during 2016-17.
The State recognised rail tunnels and earthworks valued at $8.5 billion.
Some rail tunnels and earthworks have never been valued by the State. These include the City Circle, the country rail network and other tunnels and earthworks built before the year 2000. Some of these tunnels and earthworks date back to the early 1900s.
For many years, the State did not account for these assets as they believed that their value could not be reliably measured. This year an independent valuer was engaged to perform a comprehensive valuation. The methodology used demonstrated
that the assets could have been reflected in the financial statements earlier.
The State recorded an additional $8.5 billion to correct the value of infrastructure assets at 1 July 2016.
Cabinet member’s compensation and related party transactions were reviewed.
Due to changes in Accounting Standards, the State had to consider 'related party information' in the financial statements. Previously this only applied to for-profit entities.
This year, requirements to report related party information extended to members of Cabinet, considered to be “key management personnel” of the State, as defined by Accounting Standards.
The Treasury implemented a process to assess and report Cabinet member’s compensation, and transactions between Cabinet members and/or their close family members, and government agencies.
Collectively, Cabinet members’ remuneration was $8.8 million, which was mainly salaries and allowances, and $3.5 million of non-monetary benefits such as security and drivers. The Treasury determined there were no other specific “related party” transactions or balances that required disclosure in the State’s financial statements.
Information system limitations continue at TAFE NSW.
TAFE NSW has experienced ongoing issues with its student administration system.
TAFE NSW has again implemented additional processes to verify the accuracy and completeness of revenue from sales of goods and services.
TAFE NSW expects to spend up to $89 million on a new information system to address these issues. Modules of the new student enrolment system are expected to be in place for the 2018 enrolment period.
Restatements relating to the General Government Sector's investment in the commercial sector.
The State corrected two previously reported balances relating to the General Government Sector’s investment in the commercial sector.
Accounting Standards require the General Government Sector to effectively store gains or losses related to its investment in the commercial sector in reserves until the investment is derecognised.
When these investments are disposed of, the cumulative gains and losses must be cleared and recognised in the operating result. However, the Government had previously cleared the cumulative gains and losses directly to Accumulated Funds within equity.
To comply with Accounting Standards, a total of $6 billion previously reported as a movement in equity at 30 June 2016, has now been corrected to the operating result.
In addition, Accounting Standards only allow gains or losses on its investments to be stored in reserves. In past years, the State recognised all changes in the value of its investment in Available for Sale Reserves, including the capital contributed to establish the State’s investment. In 2016-17, a total of $23.4 billion of contributed capital was corrected to accumulated funds at 1 July 2015.
The State’s budget result was a $5.7 billion surplus, $2.0 billion higher than the budget estimate.
The Total State Sector comprises 310 entities controlled by the NSW Government.
Of the total, the General Government Sector comprises 215 entities that provide goods and services not directly paid for by consumers.
The non-General Government Sector comprises 95 Government businesses that provide goods and services such as water and electricity, or financial services.
A principal measure of a Government’s overall performance is its Net Operating Balance, or Budget Result. The Net Operating Balance reports the difference between the cost of General Government service delivery and the revenue earned to fund these sectors.
The State has recorded budget surpluses and exceeded the original budget result in nine of the last ten years.
The State maintained its AAA credit rating.
The object of the Act is to maintain the AAA credit rating.
NSW’s finances are managed in alignment with the Fiscal Responsibility Act 2012 (the Act).
The Act established the framework for fiscal responsibility and strategy needed to protect the State’s AAA credit rating and service delivery to the people of NSW.
The purpose of maintaining the AAA credit rating is to reduce the cost of, and ensure the broadest access to, borrowings.
A triple-A credit rating also helps maintain business and consumer confidence so economic activity and employment are sustained. The legislation sets out targets and principles for financial management to achieve this.
New South Wales has credit ratings of AAA/Negative from Standard & Poor’s and Aaa/Stable from Moody’s Investors Service.
The fiscal targets for achieving this objective are:
General Government expenditure growth is lower than long term revenue growth.
General Government expenditure growth was 4.2 per cent in 2016-17, below the long-term revenue growth of 5.6 per cent.
Eliminating unfunded superannuation liabilities by 2030.
The Act sets a target of eliminating unfunded defined benefit superannuation liabilities by 2030. The State’s net superannuation liability was $58.6 billion at 30 June 2017 ($71.2 billion at 30 June 2016).
The Government predicts the 2030 target will be achieved. The State’s funding plan is to contribute amounts escalated by five per cent each year so the schemes will be fully funded by 2030. In 2016-17, the State made employer contributions of $1.5 billion, which is largely consistent with contributions over the past five years.
The liability values in the graph below do not reflect the values recorded in the Total State Sector Accounts. For financial reporting purposes, Accounting Standards (AASB 119 Employee Benefits) require the State to discount its superannuation liability using the government bond rate (refer to page 10 of this report).
The relevant government bond rate in the current economic climate is 2.62 per cent.
The State’s target for the unfunded superannuation liability is measured using AASB 1056 Superannuation Entities. This is because it adopts a measurement basis that reflects expected earnings on fund assets, which are currently between 5.9 and 7.4 per cent. Using these rates, the liability is $15.0 billion at 30 June 2017 ($16.1 billion at 30 June 2016). The unfunded liability is $2.4 billion less than when the Act was introduced.
The State’s assets grew by $31.6 billion during 2016-17 to $409 billion.
Valuing the State’s physical assets.
When we audit the financial statements, we focus on areas we consider as higher risk. These areas are often complex, and require the use of estimates and judgements.
The State has $307.2 billion of physical assets measured at fair value in accordance with Australian Accounting Standards. Fair value calculations are inherently complex and sensitive to assumptions and estimates, increasing the risk these assets are incorrectly valued.
In our audits, we assess the reasonableness and appropriateness of assumptions used in valuing physical assets. This includes obtaining an understanding of the valuation methodologies applied and judgements made. We also review the completeness of asset registers, and the mathematical accuracy of valuation models.
Net movements between years includes additions, disposals, depreciation and valuations. This year, valuations of physical assets added $16.2 billion to the State’s assets, comprising:
-
Transport for NSW and Railcorp $8.5 billion
-
New South Wales Land and Housing Corporation $4.8 billion
-
Roads and Maritime Services $930 million
-
Crown Entity $400 million.
The State’s financial assets increased $27.5 billion in 2016-17
The State’s financial assets have increased by 88 per cent over the past four years. In 2016-17, financial assets increased primarily due to proceeds from the sale of government assets and businesses.
The Government implemented reforms to better use the State’s financial assets. A key element was the creation of an Asset and Liability Committee (ALCO) to provide advice on ways to improve balance sheet management.
Since the creation of the ALCO, reforms include:
-
Establishment of the New South Wales Infrastructure Future Fund (NIFF). The net proceeds from the State’s asset recycling program are invested into the NIFF, which is managed by TCorp, with a balance of $14.6 billion by 30 June 2017. Funds raised are invested through the NIFF until the Government requires them for critical infrastructure projects that are part of the Restart NSW and Rebuilding NSW program of works. ALCO and TCorp provide advice on the NIFF’s performance and management
-
Establishment of the Social and Affordable Housing Fund ($1.1 billion at 30 June 2017). ALCO oversees the Fund to ensure an appropriate investment approach that will maintain funding certainty for new social and affordable housing stock
-
Cash and liquidity management reforms to centralise cash previously held by agencies in the Treasury Banking System. This reform is designed to ensure agencies have adequate levels of liquidity but with surplus funds invested centrally for better returns.
The State’s liabilities decreased by $13.1 billion during 2016-17 to $182 billion.
Valuing the State’s liabilities relies on an actuarial assessment.
Nearly half of the State’s liabilities relate to its employees. This includes unfunded superannuation, and employee benefits, such as long service and recreation leave.
Valuation of these obligations is subject to complex estimation techniques and significant judgements. Small changes in assumptions can materially impact the financial statements.
We address the risk associated with auditing these balances:
-
using actuarial specialists
-
testing controls around underlying employee data used in data models, and testing the accuracy of the calculations
-
evaluating assumptions applied in calculating employee entitlements such as the discount rate and the probability of long service leave vesting conditions being met.
The State’s superannuation obligations reduced by $12.6 billion in 2016-17.
The State’s $58.6 billion superannuation liability represents obligations for past and present employees, less the value of assets set aside to meet those obligations. The superannuation liability decreased from $71.2 billion to $58.6 billion, largely due to an increase in the discount rate from 1.99 per cent to 2.62 per cent. This alone reduced the liability by $9.2 billion
The State’s borrowings totalled $70.6 billion at 30 June 2017.
The State’s borrowings totalled $70.6 billion at 30 June 2017, $9.5 billion less than the previous year. This was largely due to the repayment of borrowings when the assets of Ausgrid and Endeavour Energy were leased to the private sector.
TCorp issues bonds to raise funds for NSW Government agencies. The bonds are actively traded in financial markets providing price transparency and liquidity to public sector borrowers and institutional investors. All TCorp bonds are guaranteed by the NSW Government.
The Government manages its debt liabilities through its balance sheet management strategy. The strategy extends to TCorp, which applies an active risk management strategy to the Government’s debt portfolio.
General Government Sector debt is being restructured by replacing shorter-term debt with longer-term debt. This lengthens the portfolio to better match liabilities with the funding requirements of infrastructure assets and reduces refinancing risks. It also allows the Government to take advantage of the low interest rate environment.
The State recorded revenue of $83.5 billion in 2016-17, an increase of $5.3 billion from 2015-16.
The State’s results are underpinned by revenue growth in taxation, fees and fines.
Taxation, fees, fines and other revenue comprises $30.5 billion of taxation ($28.7 billion in 2015-16) and $5.3 billion of fees, fines and other revenue ($4.6 billion).
Tax revenue for the Total State Sector increased by $1.8 billion, or 6.4 per cent compared to 2015-16, primarily due to:
-
one-off business asset sales and lease transactions, including $718 million in transfer duty from the Ausgrid and Endeavour Energy lease transactions
-
$385 million increase in payroll tax from growth in NSW employment and average employee compensation
-
a $426 million increase in land taxes.
Growth in stamp duty is expected to slow over the next 4 years.
General Government Sector stamp duties have increased from $6.2 billion in 2012-13 to $11.5 billion in 2016-17, an annual average growth rate of 16.5 per cent. The Government’s budget forecasts the growth in stamp duties to decline, to an average annual growth rate of 2.6 per cent between 2016-17 and 2020-21.
The State received Commonwealth grants and subsidies of $30.8 billion in 2016-17.
The State received $30.8 billion from the Commonwealth Government in 2016-17, $1.6 billion more than in 2015-16. This was primarily due to transaction based asset recycling grants of $1.0 billion and a $720 million increase in national land transport grants. This increase was offset by a $435 million decrease in General Purpose Grants, which mainly comprises New South Wales’ share of the Goods and Services Tax (GST).
The State spent $79.4 billion in 2016-17 to deliver services to the community, an increase of $3.9 billion from 2015-16.
Overall expenses increased 5.2 per cent from last year. Most of the increase was due to higher employee costs and operating costs.
Total salaries and wages increased by 4.2 per cent from 2015-16.
Total salaries and wages increased to $30 billion from $28.8 billion in 2015-16. The Government wages policy aims to limit the growth in remuneration and other employee costs to no more than 2.5 per cent per annum.
Operating expenses increased by 12.4 per cent from 2015-16.
Within operating expenses, payments for supplies, services and other expenses increased, in part, due to the State:
-
reacquiring mining licenses worth $482 million and additional land remediation costs of $101 million
-
spending more on health including additional drug supplies relating to Hepatitis C.
State spend on transport and communications increased by 68.1 per cent since 2012-13.
While spending on health and education remain the largest functional areas provided by Government, expenditure on transport and communication increased, on average, by 13.9 per cent annually between 2012-13 and 2016-17. This increase reflects the Government’s investment in transport infrastructure such as the Sydney Metro and Westconnex. Over the same period, spending on health increased by $3.9 billion.
Expenditure on fuel and energy has decreased by an average of 44.7 per cent since 2012-13, reflecting the State’s leases of electricity network assets.
In 2011, the Government established Restart NSW to fund high priority infrastructure projects.
Restart NSW projects are primarily funded from the proceeds from the asset recycling program enabling Government to deliver new infrastructure investment.
Restart NSW provides funding for the delivery of Rebuilding NSW, which is the Government’s 10-year plan to invest $20 billion in new infrastructure.
The State finalised long-term leases of Ausgrid and Endeavour Energy assets.
In June 2017, the Government finalised its long-term lease of 50.4 per cent of Endeavour Energy. This transaction follows on from the long-term leases of TransGrid in December 2015 and 50.4 per cent of Ausgrid in December 2016. Net proceeds of $15.0 billion were paid into Restart NSW relating to these transactions.
The Government also finalised an arrangement for the private sector to provide land titling and registry services to the public for 35 years. The State, through Restart NSW, received an upfront payment of $2.6 billion from the new operator.
Restart NSW is funding $29.8 billion of new infrastructure.
The Government has detailed its plan to invest $20 billion into the Rebuilding NSW plan from Restart NSW.
At 30 June 2017, around $2.9 billion has already been spent on Rebuilding NSW projects from Restart NSW, with a further $9 billion included in the budget aggregates. The Government has also earmarked a further $8.1 billion in Restart NSW for future projects.
The most significant project is the Sydney Metro. The Government has committed $7.0 billion from Restart NSW to build a 30-kilometre metro line, linking Sydney Metro Northwest at Chatswood, through new stations in the lower North Shore, the Sydney CBD and southwest to Bankstown. At 30 June 2017, $2.4 billion has been spent on this project from Restart NSW.
Other significant projects funded by Restart NSW include a $1.8 billion contribution to WestConnex and reserved funding of $1 billion towards the State’s Major Stadia Network program.
The Treasury initiated the Financial Management Transformation (FMT) program with the aim of changing and improving financial governance, budgeting and reporting arrangements of the New South Wales public sector.
FMT aims to deliver better outcomes for the people of New South Wales and focuses on transparency and accountability for expenditure, and better value for money.
New Financial Management System
PRIME is the Information Technology (IT) solution component of the FMT program, replacing several historical systems. PRIME will provide both financial and performance information within one IT platform for all agencies in the NSW public sector.
It is expected to give Government more timely information to plan and deliver its policy priorities and the budget.
Independent assurance over the budget process would improve confidence in the reliability of the State’s financial information.
Actions for 2016 - An overview
2016 - An overview
This report focuses on key observations and findings from 2016 audits and highlights key areas of focus for financial and performance audits in 2017.
Financial reporting | |
Observation | Conclusion |
Only one qualified audit opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. | The quality of financial reporting continued to improve across the NSW public sector. |
More 2015–16 financial statements and audit opinions were signed within three months of the year end. | Timely financial reporting was facilitated by more agencies resolving significant accounting issues early, completing asset valuations on time and compiling sufficient evidence to support financial statement balances. |
NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues. For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures. |
The narrowed scope of mandatory early close procedures may diminish the good performance in ensuring the quality and timeliness of financial reporting achieved in recent years. To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years. |
Although most agencies complied with NSW Treasury’s early close asset revaluation procedures we identified areas where they can improve. | Asset revaluations need to commence early enough to ensure all assets are identified and the results are analysed, recorded and reflected accurately in the early close financial statements. |
Number of misstatements | |||||
Year ended 30 June | 2015-16 | 2014-15 | 2013-14 | 2012-13 | 2011-12 |
Total reported misstatements | 298 | 396 | 459 | 661 | 1,077 |
All material misstatements identified by agencies and audit teams were corrected before the financial statements and audit opinions were signed. A material misstatement relates to an incorrect amount, classification, presentation or disclosure in the financial statements that could reasonably be expected to influence the economic decisions of users.
Significant matters reported to the portfolio Minister, Treasurer and Agency Head
In 2015–16, we reported the following significant matters to the portfolio Minister, Treasurer and agency head in our Statutory Audit Reports:
Appropriate financial controls help ensure the efficient and effective use of resources and the implementation and administration of agency policies. They are essential for quality and timely decision making.
In 2015–16, our audit teams made the following key observations on the financial controls of NSW public sector agencies.
Financial controls | |
Observation | Conclusion |
More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016. |
Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner. |
Agencies continue to face challenges managing information security. Most information technology issues we identified related to poor IT user administration in areas like password controls and inappropriate access. | Agencies should review the design and effectiveness of information security controls to ensure data is adequately protected. |
We found shared service provider agreements did not always adequately address information security requirements. |
Where agencies use shared service providers they should consider whether the service level arrangements adequately address information security. |
Thirteen of 108 agencies required to attest to having a minimum set of information security controls did not do so in their 2015 annual reports. | The 'NSW Government Digital Information Security Policy' recognises the growing need for effective information security. With cyber security threats continuing to increase as digital services expand we plan to look at cyber security as part of our 2017–18 performance audit program. |
We identified instances where service level agreements with shared service providers were outdated, signed too late or did not exist. | Corporate and shared service arrangements are more effective when service level arrangements are negotiated and signed in time, clearly detail rights and responsibilities and include meaningful KPIs, fee arrangements and dispute resolution processes. |
Internal controls at GovConnect, the private sector provider of transactional and information technology services to many NSW public sector agencies were ineffective in 2015–16. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. | The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector. |
Maintenance backlogs exist in several NSW public sector agencies, including Roads and Maritime Services, Sydney Trains, NSW Health, the Department of Education and the Department of Justice. | To address backlog maintenance it is important for agencies to have asset lifecycle planning strategies that ensure newly built and existing assets are funded and maintained to a desired service level. |
Actions for Assessing major development applications
Assessing major development applications
The Planning Assessment Commission (the Commission) has improved its decision-making processes for major development applications in recent years. The Commission has improved how it consults the public and manages conflicts of interest, and now also publishes records of its meetings with applicants and stakeholders.
The Planning Assessment Commission (the Commission) is an independent body established in 2008 under the Environmental Planning and Assessment Act 1979 (the EP&A Act). It makes decisions on major development applications in New South Wales. Along with the Department of Planning and Environment (the Department) and the Land and Environment Court, it is one of three bodies that have a role in making decisions on these applications.
The Department refers development applications to the Commission where 25 or more objections have been received from the community, a local council objects to the proposal, or the applicant has donated to a political party.
These applications are often complex and controversial, and can attract a high level of public interest. This may mean that, regardless of the process, not all stakeholders are satisfied with the outcome.
The Commission is required to take into account section 79C of the EP&A Act when making decisions. Section 79C includes consideration of the likely environmental, social and economic impacts of the development.
This audit assessed the extent to which the Commission’s decisions on major development applications are made in a consistent and transparent manner. To assist us in making this assessment, we asked whether the Commission:
- has sound processes in place to help it make decisions on major development applications that are informed and made in a consistent manner
- ensures its decisions are free from bias and transparent to stakeholders and the public.
Conclusion
Over the last two years, the Commission has improved its decision-making process. It has improved how it consults the public and manages conflicts of interest, and now also publishes records of its meetings with applicants and stakeholders.
However, there are still some vital issues to be addressed to ensure it makes decisions in a consistent and transparent manner. Most importantly, the Commission was not able to show in every decision we reviewed how it met its statutory obligation to consider the matters in section 79C of the EP&A Act.
Despite improved probity measures put in place by the Commission, there is a perception among some stakeholders that it is not independent of the Department. The reasons for some of these concerns are outside of the Commission’s control. For example, the Commission becomes involved after the Department has prepared an assessment report which recommends whether a development should proceed. This creates the perception that the Commission is acting on the recommendation of the Department. The Department’s assessment report should state whether an application meets relevant legislative and policy requirements, but not recommend whether a development should be approved or not.
More can also be done to improve transparency in decision-making and the public’s perception of the independence of Commissioners. The Commission should continue to improve how it communicates the reasons for its decisions and also publish on its website a summary of Commissioners’ conflict of interest declarations for each development application.
Decision-making processes have improved but some key aspects need to be addressed
Although not articulated in one document, there is a framework in place to assist Commissioners make decisions on major development applications. This includes setting out the information to be considered, who to consult, and that a report is to be prepared. The Commission has recently improved how it conducts public meetings and the level of support provided to Commissioners to ensure they understand the decision-making process. The Commissioners we interviewed all showed a good understanding of their role.
As a consent authority, the Commission is required to consider the matters in section 79C of the EP&A Act when making a decision. However, it was not able to show how it met this requirement in every decision we reviewed. We found some evidence of these considerations in six of the nine cases we reviewed, for example in meeting notes or in its report on a decision. Of these six cases, the degree to which the Commission considered all matters under section 79C varied considerably. The larger, more complex applications were more likely to address these considerations. To demonstrate compliance with the EP&A Act, the Commission must be able to show how it considers all matters in section 79C for each decision it makes.
We found that the Commission has access to relevant information to make a decision and consults stakeholders for their views of the development. The level of consultation depends on the size and complexity of an application. If Commissioners decide they need more information to make a decision, they consult local councils, the community, other government agencies and experts as needed.
The Commission’s public meetings are a valuable part of the decision-making process, where new perspectives or issues are often raised. However, some aspects could be improved. For example, many stakeholders thought the five minutes allowed for individual speakers was insufficient. The Commission could be more flexible with this timeframe. Identifying new ways to notify the public of its meetings, other than advertisements on its website and in newspapers, would also ensure it reaches as many interested parties as possible.
Improved transparency and probity but the Commission is not seen by some as impartial
The Commission has sound processes in place to ensure that its decisions are impartial and transparent to the community. It has improved its probity measures over the last two years, following a review by the NSW Ombudsman in 2014. We found that the Commission:
- has probity policies and procedures which are available on its website
- has improved its record keeping of some processes, such as meetings with applicants and stakeholders
- publishes its decision and supporting documentation, such as meeting notes, on its website.
Conflicts of interest are a significant risk for the Commission because they could lead to corruption, abuse of public office, and affect the public’s view of its independence. The Commission manages this risk well. It has a policy in place to address potential, perceived or actual conflicts. Commissioners update their conflicts of interest records annually, and declare any conflicts when the Commission assigns them to a development application. Unlike the Commission’s probity polices, Commissioners’ conflict of interest declarations are not available on its website. Providing a summary of this information on its website when Commissioners are allocated to a development application would further improve transparency around conflicts of interest.
The Commission has been improving how it communicates its decisions to the public. It now produces fact sheets for its decisions on matters that attract a high level of public interest. Its reports on decisions for complex applications also discuss issues raised by the community. However, the level of detail varied in the decisions we reviewed, and it was not always clear how conditions placed on a development would resolve identified issues. Similarly, the reports did not clearly address the matters under section 79C of the EP&A Act. Reporting this would further improve the transparency of its decisions, and clearly demonstrate compliance with the EP&A Act.
While we did not find any issues that would make us question the integrity or independence of Commissioners, there remains a perception among some stakeholders that the Commission is not impartial. Some of these concerns are within the Commission’s control to fix, such as allowing individual speakers at public meetings extra time to discuss their issues, therefore avoiding perceptions of bias.
Other perceptions, such as the Commission being part of the Department and not an independent decision making authority, are outside the Commission’s immediate control. For example, the Commission receives applications at the end of the assessment process, after the Department has prepared an assessment report recommending whether the application should be approved. This means there are effectively two reports on an application; the Department’s assessment report and the Commission’s report on its decision. However, there is only one decision-maker: the Commission. This may cause community confusion about the roles of the Department and the Commission in the decision-making process. Clearer separation of their roles in assessing applications and preparing reports is needed.
To minimise the perception that the Commission is simply ‘rubber stamping’ the Department’s recommendations, assessment reports should not recommend whether or not a project be approved. Instead, they should provide the Department’s views on whether a project meets relevant legislative and policy requirements. The Commission should also be involved earlier in the process, so it can establish key facts and identify relevant issues sooner. It should request that the Department’s assessment report covers matters Commissioners consider particularly important when assessing projects under section 79C. Earlier referral of applications should also help the Commission to plan its work in assessing applications, and may reduce the time taken to reach a decision.
Unless these issues are addressed, stakeholders will continue to believe the Commission does not act in a transparent and impartial manner, which could erode public confidence in the Commission.
The Planning Assessment Commission
The Planning Assessment Commission (the Commission) is a planning authority established in 2008 under the Environmental Planning and Assessment Act 1979 (the EP&A Act). One of its functions is to make decisions on major development applications.
The Commission is independent of the Department of Planning and Environment (the Department) and the Minister for Planning. This means its decisions are not subject to the direction or control of the Department or the Minister.
The Department refers applications for major development to the Commission, including state significant development and infrastructure applications. These projects are generally initiated by the private sector. Applications are referred to the Commission when one or more of the following criteria are met:
- more than 25 objections are received about the proposal
- the local council objects to the proposal
- the applicant has donated $1,000 or more to a political party or member of parliament.
These applications are often controversial and may attract a high level of public interest. Of the 29 development applications the Commission received in 2015–16, almost 40 per cent were in the mining and energy sectors, and another 40 per cent related to urban development.
Section 79C of the EP&A Act outlines the matters the Commission must consider when making decisions about major development applications. These include:
- any relevant environmental and planning instruments
- likely environmental, social and economic impacts of the development
- suitability of the site for the development
- submissions received about the application
- the public interest.
In addition to making decisions about major development applications, the Commission also reviews major developments as part of the planning process, and provides independent expert advice to the government on planning and development matters. Since the Commission’s inception, it has provided advice on 76 matters, conducted 39 reviews, and made 444 decisions on development applications.
Process for approving major development applications
The Commission is one of three bodies that have a role in the planning and approval process for major development applications in New South Wales, as seen in Exhibit 1. The other two bodies are the Department of Planning and Environment, and the Land and Environment Court.
The Department determines the outcomes of major development applications. When an application meets one of the criteria listed above, it refers these to the Commission to make the decision. In certain circumstances, the Land and Environment Court hears appeals against decisions made by either the Department or the Commission.
A Memorandum of Understanding between the Commission and the Department sets out timeframes the Commission must meet when making a decision, specifically:
- two weeks where no stakeholder meetings are required
- three weeks where stakeholder meetings are required
- six weeks when a public meeting is required.
Parliamentary reference - Report number #279 - released 19 January 2017
Actions for Volume Eight 2011 Focus on Transport and Ports
Volume Eight 2011 Focus on Transport and Ports
The report includes comments on financial audits of government agencies in the Transport and Ports sectors. The audit of corporations’ financial statements for the year ended 30 June 2011 resulted in unmodified audit opinions within the Independent Auditor’s Reports. A key recommendation from the report is that Sydney Ports Corporation should continue working with other government authorities and industry stakeholders to improve the effectiveness of program initiatives for increasing container freight movements by rail. The Corporation should review the underlying causes hindering growth in the rail mode and develop and implement strategies to address the unfavourable trend.