Reports
Actions for Development assessment: pre-lodgement and lodgement in Camden Council and Randwick City Council
Development assessment: pre-lodgement and lodgement in Camden Council and Randwick City Council
The report found that both councils could do more to monitor and assess the effectiveness of their pre-lodgement and lodgement stages. The audit highlighted that Randwick City Council closely follows guidance designed to encourage good practice in these initial stages of its development assessments. It also demonstrated it was timely when processing lodgements. Camden Council is partially following the guidance and could not demonstrate that its lodgement stage was timely.
A development application is a formal application for development that requires consent under the NSW Environmental Planning and Assessment Act 1979. It is usually lodged with the local council for processing and determination, and consists of standard application forms, supporting technical reports and plans.
In March 2017, the NSW Department of Planning and Environment (DPE)1 released the ‘Development Assessment Best Practice Guide' designed to help councils assess development applications in a timely manner and provide a better experience for applicants.
DPE's guide describes the development assessment process in five stages.
According to the Guidance, councils should systematically measure, monitor and review development assessment outcomes and timeframes against performance targets to ensure the process is transparent, accountable and outcome-focused.
Appendix one – Response from agencies
Appendix two – Council's alignment with the guidance
Appendix three – About the audit
Appendix four – Performance auditing
Parliamentary Reference: Report number #322 - released 20 June 2019
Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Domestic waste management in Campbelltown City Council and Fairfield City Council
Domestic waste management in Campbelltown City Council and Fairfield City Council
The Auditor-General for New South Wales, Margaret Crawford, today released a report on Domestic waste management in Campbelltown City Council and Fairfield City Council.The report found that both Councils collect and transport domestic kerbside waste effectively and process it at a low cost. The Councils also effectively process waste placed in green-lid and yellow-lid bins, but neither Council has been able to enforce their contracts for processing red-lid bin waste. As a result, almost all such waste goes straight to landfill.
Local councils provide waste management services to their residents. They collect domestic waste primarily through kerbside services, but also at council drop off facilities. Waste management is one of the major services local councils deliver. Each year, councils collectively manage an estimated 3.5 million tonnes of waste generated by New South Wales residents.
Waste disposed of in landfills attracts a NSW Government waste levy. Councils’ kerbside services help residents to separate recyclable and non recyclable waste. This reduces the cost of waste disposed to landfill. These services typically provide yellow-lid bins for dry recyclables, green-lid bins for garden organics and red-lid bins for residual waste. To increase the level of recycling, some councils deliver residual waste to alternative waste treatment facilities for processing. This can involve composting and the recovery of resources, including plastics and metals, which can be recycled.
Appendix one - Responses from local councils
Appendix two - About the audit
Appendix three - Performance auditing
Parliamentary Reference: Report number #320 - released 5 June 2019
Actions for Transport Access Program
Transport Access Program
The following report is available in an Easy English version that is intended to meet the needs of some people with lower literacy skills, some people with an intellectual disability and some people from different cultural backgrounds.
View the Easy English version of the Transport Access Program report
Transport for NSW’s process for selecting and prioritising projects for the third stage of its Transport Access Program balanced compliance with national disability standards with broader customer outcomes. Demographics, deliverability and value for money were also considered. However, Transport for NSW does not know the complete scope of work required for full compliance, limiting its ability to demonstrate that its approach is effective, according to a report released today by the Auditor-General for New South Wales, Margaret Crawford.
Access to transport is critical to ensuring that people can engage in all aspects of community life, including education, employment and recreation. People with disability can encounter barriers when accessing public transport services. In 2015, there were 1.37 million people living with disability in New South Wales.
Accessible public transport is about more than physical accessibility. It also means barrier-free access for people who have vision, hearing or cognitive impairments. All users, not just people with disability, benefit from improvements to the accessibility and inclusiveness of transport services.
Transport for NSW has an obligation under Australian Government legislation to provide accessible services to people with disabilities in a manner which is not discriminatory. Under the Disability Standards for Accessible Public Transport 2002 (the DSAPT - an instrument of the Disability Discrimination Act 1992 (the Act) (Commonwealth)), there is a requirement to modify and develop new infrastructure, means of transport and services to provide access for people with disabilities. All public transport operators are required to ensure that at least 90 per cent of their networks met DSAPT by December 2017 and the networks will need to be 100 per cent compliant with all parts of the standards by 31 December 2022. Trains are not required to be fully compliant with DSAPT until December 2032.
The Transport Access Program (TAP) is Transport for NSW's largest program with a specific focus on improving access to public transport for people with disability. The TAP is a series of projects to upgrade existing public transport infrastructure across four networks: Sydney Trains, Intercity Trains, Regional Trains and Sydney Ferries. Transport for NSW established the TAP as a rolling program and, to date, it has delivered the first tranche of TAP (TAP 1) and is completing the final projects for the second tranche (TAP 2). NSW budget papers estimate that by 30 June 2018, Transport for NSW had spent $1.2 billion in the TAP since its commencement in 2011-12.
After the completion of TAP 1 and TAP 2 (as well as through other transport infrastructure programs), Transport for NSW estimates that 58.5 per cent of the Sydney Trains, Regional Trains and Intercity Trains networks, and 66 per cent of the Sydney Ferries network, will be accessible. To close the significant gap in compliance with the DSAPT target, the objective for TAP 3 is ‘to contribute to Disability Discrimination Act 1992 related targets through DSAPT compliance upgrades’.
The audit assessed whether Transport for NSW has an effective process to select and prioritise projects as part of the TAP, with a specific focus on the third tranche of TAP funding.
In August 2018, at the commencement of this audit, Transport for NSW intended to complete the selection of projects for the TAP 3 final business case in December 2018. Transport for NSW advise that it now intends to complete the development stage and final business case in the first quarter of 2019, prior to the final investment decision of the TAP program. This report is based on the TAP 3 strategic business case and information provided by Transport for NSW up to December 2018.
Transport for NSW’s process for selecting and prioritising projects for TAP 3 balanced DSAPT compliance goals with broader customer outcomes. It also considered demographics, deliverability and value for money. However, Transport for NSW does not know the complete scope of work required for full DSAPT compliance, and this limits its ability to demonstrate that its approach is effective.
In 2015, there were 1.37 million people living with disability in New South Wales. Access to transport is critical to ensuring that people can engage in all aspects of community life, including education, employment and recreation. People with disability can encounter barriers when accessing public transport services.
The social model of disability, outlined in the United Nations Convention on the Rights of Persons with Disabilities, views people with disability as not disabled by their impairment but by the barriers in the community and environment that restrict their full and effective participation in society on an equal basis with others.
Accessible public transport is more than the provision of physical access to premises and conveyances, it provides barrier-free access for people who have vision, hearing or cognitive impairments. All users, not just people with disability, benefit from improvements to the accessibility and inclusiveness of transport services.
According to the Australian Bureau of Statistics, the main types of difficulties experienced by people with disability when using public transport relate to steps (39.9 per cent), difficulty getting to stops and stations (25 per cent), fear and anxiety (23.3 per cent) and lack of seating or difficulty standing (20.7 per cent).
Transport for NSW has a Disability Inclusion Action Plan (the Action Plan) 2018-2022 that sets an overall framework for planning, delivering and reporting on initiatives to increase accessibility of the transport network. It covers all elements of the journey experienced when using public transport, including journey planning, staff training, customer services and interaction between the physical environment and modes of transport. Appendix five outlines the guiding principles of the Action Plan.
Transport for NSW's Transport Social Policy branch developed the Action Plan in consultation with internal and external stakeholders. The director of the Transport Social Policy branch is a member of the TAP executive steering committee, which supports alignment between the Action Plan and TAP.
Transport for NSW's Disability Inclusion Action Plan describes a customer focussed approach to accessibility
One of the guiding principles of the Action Plan is ‘intelligent compliance’. Transport for NSW describes this as compliance that prioritises customer-focused outcomes over a narrow focus on legal compliance with accessibility standards. As well as being compliant, infrastructure should be practical, usable, fit for purpose and convenient.
The TAP prioritisation and selection methodology reflects Transport for NSW’s focus on intelligent compliance. We consider this a reasonable approach as had Transport for NSW focussed exclusively on achieving compliance with the DSAPT targets by upgrading the most affordable infrastructure, some locations, that are used by more customers, would remain inaccessible to people with disability. However, this approach should not be seen as an alternative to Transport for NSW meeting its DSAPT compliance obligations.
TAP program staff consult with the Accessible Transport Advisory Committee
The Accessible Transport Advisory Committee (ATAC) has representatives from disability and ageing organisations, who provide expert guidance to Transport for NSW on access and inclusion. The ATAC provide guidance and feedback on projects and project solutions, including user testing where appropriate. TAP program staff provide regular updates at ATAC meetings, which include briefings on progress. The ATAC also provides feedback and suggestions to TAP program staff, which is considered and sometimes included in current and future projects.For example, in March 2017 the TAP program team briefed the ATAC on the challenges with respect to a number of ferry wharves and sought support for DSAPT exemptions proposed in the TAP 3 strategic business case.
In June 2018, the Program team sought feedback on a variety of lift button options to improve accessibility on future TAP projects. In September 2018, during the ATAC meeting attended by the Audit Office, the program team sought feedback on the standard designs for TAP 3. Some ATAC members noted that the standard design included Braille lettering on the lift buttons, and that this was not good practice because people can accidently press the button while reading it. As a result, Transport for NSW are incorporating this feedback into design requirements for the lifts for TAP 3, which will consider larger buttons, clearer Braille and Braille signage adjacent to the button. |
Transport for NSW has not briefed the Advisory Committee on the outcome of the prioritisation and selection process
TAP program staff briefed the Advisory Committee about the prioritisation and selection methodology, after the Minister approved it in 2016. However, Transport for NSW have not briefed or consulted the Advisory Committee on the outcome of the prioritisation process. Infrastructure NSW noted this issue during its review of the strategic business case.
Transport for NSW advised us that it established the ATAC as an advisory group, and that Transport for NSW does not disclose sensitive information to it. Transport for NSW intends to share the outcome of the prioritisation process following the completion of the TAP 3 development stage and final investment decision.
The TAP communication plan does not fully meet the requirements of the Disability Inclusion Action Plan
The Disability Inclusion Action Plan includes an action item to ‘provide a listing of stations and wharves to be upgraded with estimated time of construction as each new tranche of the Transport Access Program is announced’ The TAP Communication Plan that we reviewed does not include this provision instead focussing on communication on a per project basis. Given the long timeframes associated with improving transport infrastructure, this information is important as it allows people to make informed decisions about where they live, work or study.
Appendix one - Response from agency
Appendix two - Compliance requirements of Disability Standards for Accessible Public Transport
Appendix three - TAP 1 and TAP 2 sub-programs
Appendix four - Prioritisation Assessment for the TAP 3 Strategic Business Case
Appendix five - The guiding principles of Transport for NSW's Disability Inclusion Action Plan
Appendix six - Transport projects and programs that contribute to DSAPT compliance
Appendix seven - About the audit
Appendix eight - Performance auditing
Parliamentary Reference - Report number #314 - released 19 February 2019.
Actions for Newcastle Urban Transformation and Transport Program
Newcastle Urban Transformation and Transport Program
The urban renewal projects on former railway land in the Newcastle city centre are well targeted to support the objectives of the Newcastle Urban Transformation and Transport Program (the Program), according to a report released today by the Auditor-General for New South Wales, Margaret Crawford. The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the government. However, the evidence that the cost of the light rail will be justified by its contribution to the Program is not convincing.
The Newcastle Urban Transformation and Transport Program (the Program) is an urban renewal and transport program in the Newcastle city centre. The Hunter and Central Coast Development Corporation (HCCDC) has led the Program since 2017. UrbanGrowth NSW led the Program from 2014 until 2017. Transport for NSW has been responsible for delivering the transport parts of the Program since the Program commenced. All references to HCCDC in this report relate to both HCCDC and its predecessor, the Hunter Development Corporation. All references to UrbanGrowth NSW in this report relate only to its Newcastle office from 2014 to 2017.
This audit had two objectives:
- To assess the economy of the approach chosen to achieve the objectives of the Program.
- To assess the effectiveness of the consultation and oversight of the Program.
We addressed the audit objectives by answering the following questions:
a) Was the decision to build light rail an economical option for achieving Program objectives?
b) Has the best value been obtained for the use of the former railway land?
c) Was good practice used in consultation on key Program decisions?
d) Did governance arrangements support delivery of the program?
1. The urban renewal projects on the former railway land are well targeted to support the objectives of the Program. However, there is insufficient evidence that the cost of the light rail will be justified by its contribution to Program objectives.
The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the Government. HCCDC, and previously UrbanGrowth NSW, identified and considered options for land use that would best meet Program objectives. Required probity processes were followed for developments that involved financial transactions. Our audit did not assess the achievement of these objectives because none of the projects have been completed yet.
Analysis presented in the Program business case and other planning documents showed that the light rail would have small transport benefits and was expected to make a modest contribution to broader Program objectives. Analysis in the Program business case argued that despite this, the light rail was justified because it would attract investment and promote economic development around the route. The Program business case referred to several international examples to support this argument, but did not make a convincing case that these examples were comparable to the proposed light rail in Newcastle.
The audited agencies argue that the contribution of light rail cannot be assessed separately because it is a part of a broader Program. The cost of the light rail makes up around 53 per cent of the total Program funding. Given the cost of the light rail, agencies need to be able to demonstrate that this investment provides value for money by making a measurable contribution to the Program objectives.
2. Consultation and oversight were mostly effective during the implementation stages of the Program. There were weaknesses in both areas in the planning stages.
Consultations about the urban renewal activities from around 2015 onward followed good practice standards. These consultations were based on an internationally accepted framework and met their stated objectives. Community consultations on the decision to close the train line were held in 2006 and 2009. However, the final decision in 2012 was made without a specific community consultation. There was no community consultation on the decision to build a light rail.
The governance arrangements that were in place during the planning stages of the Program did not provide effective oversight. This meant there was not a single agreed set of Program objectives until 2016 and roles and responsibilities for the Program were not clear. Leadership and oversight improved during the implementation phase of the Program. Roles and responsibilities were clarified and a multi-agency steering committee was established to resolve issues that needed multi-agency coordination.
Recommendations
For future infrastructure programs, NSW Government agencies should support economical decision-making on infrastructure projects by:
- providing balanced advice to decision makers on the benefits and risks of large infrastructure investments at all stages of the decision-making process
- providing scope and cost estimates that are as accurate and complete as possible when initial funding decisions are being made
- making business cases available to the public.
The planned uses of the former railway land align with the objectives of encouraging people to visit and live in the city centre, creating attractive public spaces, and supporting growth in employment in the city. The transport benefits of the activities are less clear, because the light rail is the major transport project and this will not make significant improvements to transport in Newcastle.
The processes used for selling and leasing parts of the former railway land followed industry standards. Options for the former railway land were identified and assessed systematically. Competitive processes were used for most transactions and the required assessment and approval processes were followed. The sale of land to the University of Newcastle did not use a competitive process, but required processes for direct negotiations were followed.
Recommendation
By March 2019, the Hunter and Central Coast Development Corporation should:
- work with relevant stakeholders to explore options for increasing the focus on the heritage objective of the Program in projects on the former railway land. This could include projects that recognise the cultural and industrial heritage of Newcastle.
Consultations focusing on urban renewal options for the Program included a range of stakeholders and provided opportunities for input into decisions about the use of the former railway land. These consultations received mostly positive feedback from participants. Changes and additions were made to the objectives of the Program and specific projects in response to feedback received.
There had been several decades of debate about the potential closure of the train line, including community consultations in 2006 and 2009. However, the final decision to close the train line was made and announced in 2012 without a specific community consultation. HCCDC states that consultation with industry and business representatives constitutes community consultation because industry representatives are also members of the community. This does not meet good practice standards because it is not a representative sample of the community.
There was no community consultation on the decision to build a light rail. There were subsequent opportunities for members of the community to comment on the implementation options, but the decision to build it had already been made. A community and industry consultation was held on which route the light rail should use, but the results of this were not made public.
Recommendation
For future infrastructure programs, NSW Government agencies should consult with a wide range of stakeholders before major decisions are made and announced, and report publicly on the results and outcomes of consultations.
The governance arrangements that were in place during the planning stages of the Program did not provide effective oversight. Project leadership and oversight improved during the implementation phase of the Program.
Multi-agency coordination and oversight were ineffective during the planning stages of the Program. Examples include: multiple versions of Program objectives being in circulation; unclear reporting lines for project management groups; and poor role definition for the initial advisory board. Program ownership was clarified in mid-2016 with the appointment of a new Program Director with clear accountability for the delivery of the Program. This was supported by the creation of a multi-agency steering committee that was more effective than previous oversight bodies.
The limitations that existed in multi-agency coordination and oversight had some negative consequences in important aspects of project management for the Program. This included whole-of-government benefits management and the coordination of work to mitigate impacts of the Program on small businesses.
Recommendations
For future infrastructure programs, NSW Government agencies should:
- develop and implement a benefits management approach from the beginning of a program to ensure responsibility for defining benefits and measuring their achievement is clear
- establish whole-of-government oversight early in the program to guide major decisions. This should include:
- agreeing on objectives and ensuring all agencies understand these
- clearly defining roles and responsibilities for all agencies
- establishing whole-of-government coordination for the assessment and mitigation of the impact of major construction projects on businesses and the community.
By March 2019, the Hunter and Central Coast Development Corporation should update and implement the Program Benefits Realisation Plan. This should include:
- setting measurable targets for the desired benefits
- clearly allocating ownership for achieving the desired benefits
- monitoring progress toward achieving the desired benefits and reporting publicly on the results.
Appendix one - Response from agencies
Appendix two - About the audit
Appendix three - Performance auditing
Parliamentary reference - Report number #310 - released 12 December 2018
Actions for Mobile speed cameras
Mobile speed cameras
The primary goal of speed cameras is to reduce speeding and make the roads safer. Our 2011 performance audit on speed cameras found that, in general, speed cameras change driver behaviour and have a positive impact on road safety.
Transport for NSW published the NSW Speed Camera Strategy in June 2012 in response to our audit. According to the Strategy, the main purpose of mobile speed cameras is to reduce speeding across the road network by providing a general deterrence through anywhere, anytime enforcement and by creating a perceived risk of detection across the road network. Fixed and red-light speed cameras aim to reduce speeding at specific locations.
Roads and Maritime Services and Transport for NSW deploy mobile speed cameras (MSCs) in consultation with NSW Police. The cameras are operated by contractors authorised by Roads and Maritime Services. MSC locations are stretches of road that can be more than 20 kilometres long. MSC sites are specific places within these locations that meet the requirements for a MSC vehicle to be able to operate there.
This audit assessed whether the mobile speed camera program is effectively managed to maximise road safety benefits across the NSW road network.
The mobile speed camera program requires improvements to key aspects of its management to maximise road safety benefits. While camera locations have been selected based on crash history, the limited number of locations restricts network coverage. It also makes enforcement more predictable, reducing the ability to provide a general deterrence. Implementation of the program has been consistent with government decisions to limit its hours of operation and use multiple warning signs. These factors limit the ability of the mobile speed camera program to effectively deliver a broad general network deterrence from speeding.
Many locations are needed to enable network-wide coverage and ensure MSC sessions are randomised and not predictable. However, there are insufficient locations available to operate MSCs that meet strict criteria for crash history, operator safety, signage and technical requirements. MSC performance would be improved if there were more locations.
A scheduling system is meant to randomise MSC location visits to ensure they are not predictable. However, a relatively small number of locations have been visited many times making their deployment more predictable in these places. The allocation of MSCs across the time of day, day of week and across regions is prioritised based on crash history but the frequency of location visits does not correspond with the crash risk for each location.
There is evidence of a reduction in fatal and serious crashes at the 30 best-performing MSC locations. However, there is limited evidence that the current MSC program in NSW has led to a behavioural change in drivers by creating a general network deterrence. While the overall reduction in serious injuries on roads has continued, fatalities have started to climb again. Compliance with speed limits has improved at the sites and locations that MSCs operate, but the results of overall network speed surveys vary, with recent improvements in some speed zones but not others.
There is no supporting justification for the number of hours of operation for the program. The rate of MSC enforcement (hours per capita) in NSW is less than Queensland and Victoria. The government decision to use multiple warning signs has made it harder to identify and maintain suitable MSC locations, and impeded their use for enforcement in both traffic directions and in school zones.
Appendix one - Response from agency
Appendix two - About the audit
Appendix three - Performance auditing
Parliamentary reference - Report number #308 - released 18 October 2018
Actions for Council reporting on service delivery
Council reporting on service delivery
New South Wales local government councils’ could do more to demonstrate how well they are delivering services in their reports to the public, according to a report released today by the Auditor-General for New South Wales, Margaret Crawford. Many councils report activity, but do not report on outcomes in a way that would help their communities assess how well they are performing. Most councils also did not report on the cost of services, making it difficult for communities to see how efficiently they are being delivered. And councils are not consistently publishing targets to demonstrate what they are striving for.
I am pleased to present my first local government performance audit pursuant to section 421D of the Local Government Act 1993.
My new mandate supports the Parliament’s objectives to:
- strengthen governance and financial oversight in the local government sector
- improve financial management, fiscal responsibility and public accountability for how councils use citizens’ funds.
Performance audits aim to help councils improve their efficiency and effectiveness. They will also provide communities with independent information on the performance of their councils.
For this inaugural audit in the local government sector, I have chosen to examine how well councils report to their constituents about the services they provide.
In this way, the report will enable benchmarking and provide improvement guidance to all councils across New South Wales.
Specific recommendations to drive improved reporting are directed to the Office of Local Government, which is the regulator of councils in New South Wales.
Councils provide a range of services which have a direct impact on the amenity, safety and health of their communities. These services need to meet the needs and expectations of their communities, as well as relevant regulatory requirements set by state and federal governments. Councils have a high level of autonomy in decisions about how and to whom they provide services, so it is important that local communities have access to information about how well they are being delivered and meeting community needs. Ultimately councils should aim to ensure that reporting performance is subject to quality controls designed to provide independent assurance.
Councils report extensively on the things they have done, but minimally on the outcomes from that effort, efficiency and performance over time.
Councils could improve reporting on service delivery by more clearly relating the resources needed with the outputs produced, and by reporting against clear targets. This would enable communities to understand how efficiently services are being delivered and how well councils are tracking against their goals and priorities.
Across the sector, a greater focus is also needed on reporting performance over time so that communities can track changes in performance and councils can demonstrate whether they are on target to meet any agreed timeframes for service improvements.
The degree to which councils demonstrate good practice in reporting on service delivery varies greatly between councils. Metropolitan and regional town and city councils generally produce better quality reporting than rural councils. This variation indicates that, at least in the near-term, OLG's efforts in building capability in reporting would be best directed toward rural councils.
Recommendation
By mid-2018, OLG should:
- assist rural councils to develop their reporting capability.
The Framework which councils are required to use to report on service delivery, is intended to drive good practice in reporting. Despite this, the Framework is silent on a number of aspects of reporting that should be considered fundamental to transparent reporting on service delivery. It does not provide guidance on reporting efficiency or cost effectiveness in service delivery and provides limited guidance on how annual reports link with other plans produced as part of the Framework. OLG's review of the Framework, currently underway, needs to address these issues.
Recommendation
By mid-2018, OLG should:
- issue additional guidance on good practice in council reporting, with specific information on:
- reporting on performance against targets
- reporting on performance against outcome
- assessing and reporting on efficiency and cost effectiveness
- reporting performance over time
- clearer integration of all reports and plans that are required by the Framework, particularly the role of End of Term Reporting
- defining reporting terms to encourage consistency.
The Framework is silent on inclusion of efficiency or cost effectiveness indicators in reports
The guidelines produced by OLG in 2013 to assist councils to implement their Framework requirements advise that performance measures should be included in all plans. However, the Framework does not specifically state that efficiency or cost effectiveness indicators should be included as part of this process. This has been identified as a weakness in the 2012 performance audit report and the Local Government Reform Panel review of reporting by councils on service delivery.
The Framework and supporting documents provide limited guidance on reporting
Councils' annual reports provide a consolidated summary of their efforts and achievements in service delivery and financial management. However, OLG provides limited guidance on:
- good practice in reporting to the community
- how the annual report links with other plans and reports required by the Framework.
Further, the Framework includes both Annual and End of Term Reports. However, End of Term reports are published prior to council elections and are mainly a consolidation of annual reports produced during a council’s term. The relationship between Annual reports and End of Term reports is not clear.
OLG is reviewing the Framework and guidance
OLG commenced work on reviewing of the Framework in 2013 but this was deferred with work re‑starting in 2017. The revised guidelines and manual were expected to be released late in 2017.
OLG should build on the Framework to improve guidance on reporting on service delivery, including in annual reports
The Framework provides limited guidance on how best to report on service delivery, including in annual reports. It is silent on inclusion of efficiency or cost effectiveness indicators in reporting, which are fundamental aspects of performance reporting. Councils we consulted would welcome more guidance from OLG on these aspects of reporting.
Our consultation with councils highlighted that many council staff would welcome a set of reporting principles that provide guidance to councils, without being prescriptive. This would allow councils to tailor their approach to the individual characteristics, needs and priorities of their local communities.
Consolidating what councils are required to report to state agencies would reduce the reporting burden and enable councils to better report on performance. Comparative performance indicators are also needed to provide councils and the public with a clear understanding of councils' performance relative to each other.
Recommendations
By mid-2018, OLG should:
- commence work to consolidate the information reported by individual councils to NSW Government agencies as part of their compliance requirements.
- progress work on the development of a Performance Measurement Framework, and associated performance indicators, that can be used by councils and the NSW Government in sector-wide performance reporting.
Streamlining the reporting burden would help councils improve reporting
The NSW Government does not have a central view of all local government reporting, planning and compliance obligations. A 2016 draft IPART ‘Review of reporting and compliance burdens on Local Government’ noted that councils provide a wide range of services under 67 different Acts, administered by 27 different NSW Government agencies. Consolidating and coordinating reporting requirements would assist with better reporting over time and comparative reporting. It would also provide an opportunity for NSW Government agencies to reduce the reporting burden on councils by identifying and removing duplication.
Enabling rural councils to perform tailored surveys of their communities may be more beneficial than a state-wide survey in defining outcome indicators
Some councils use community satisfaction survey data to develop outcome indicators for reporting. The results from these are used by councils to set service delivery targets and report on outcomes. This helps to drive service delivery in line with community expectations. While some regional councils do conduct satisfaction surveys, surveys are mainly used by metropolitan councils which generally have the resources needed to run them.
OLG and the Department of Premier and Cabinet have explored the potential to conduct state-wide resident satisfaction surveys with a view to establishing measures to improve service delivery. This work has drawn from a similar approach adopted in Victoria. Our consultation with stakeholders in Victoria indicated that the state level survey is not sufficiently detailed or specific enough to be used as a tool in setting targets that respond to local circumstances, expectations and priorities. Our analysis of reports and consultation with stakeholders suggest that better use of resident survey data in rural and regional areas may support improvements in performance reporting in these areas. Rural councils may benefit more from tailored surveys of groups of councils with similar challenges, priorities and circumstances than from a standard state-wide survey. These could potentially be achieved through regional cooperation between groups of similar councils or regional groups.
Comparative reporting indicators are needed to enable councils to respond to service delivery priorities of their communities
The Local Government Reform Panel in 2012 identified the need for ‘more consistent data collection and benchmarking to enable councils and the public to gain a clear understanding of how a council is performing relative to their peers’.
OLG commenced work in 2012 to build a new performance measurement Framework for councils which aimed to move away from compliance reporting. This work was also strongly influenced by the approach used in Victoria that requires councils to report on a set of 79 indicators which are reported on the Victorian 'Know your council' website. OLG’s work did not fully progress at the time and several other local government representative bodies have since commenced work to establish performance measurement frameworks. OLG advised us it has recently recommenced its work on this project.
Our consultation identified some desire amongst councils to be able to compare their performance to support improvement in the delivery of services. We also identified a level of frustration that more progress has not been made toward establishment of a set of indicators that councils can use to measure performance and drive improvement in service delivery.
Several councils we spoke with were concerned that the current approaches to comparative reporting did not adequately acknowledge that councils need to tailor their service types, level and mix to the needs of their community. Comparative reporting approaches tend to focus on output measures such as number of applications processed, library loans annually and opening hours for sporting facilities, rather than outcome measures. These approaches risk unjustified and adverse interpretations of performance where councils have made a decision based on community consultation, local priorities and available resources. To mitigate this, it is important to
- adopt a partnership approach to the development of indicators
- ensure indicators measure performance, not just level of activity
- compare performance between councils that are similar in terms of size and location.
It may be more feasible, at least in the short term, for OLG to support small groups of like councils to develop indicators suited to their situation.
Based on our consultations, key lessons from implementing a sector-wide performance indicator framework in Victoria included the benefits of:
- consolidation of the various compliance data currently being reported by councils to provide an initial platform for comparative performance reporting
- adopting a partnership approach to development of common indicators with groups of like councils.
Appendix one - Response from agency
Appendix two - Service delivery categorisation
Appendix three - Reporting targets and performance over time
Appendix four - Performance auditing
Appendix five - About the audit
Parliamentary reference - Report number #296 - released 1 February 2018
Actions for Signal failures on the metropolitan rail network
Signal failures on the metropolitan rail network
Between 2004 and 2006, the number of signalling failures, signalling downtime and the number of trains delayed as a result of signal failures all fell. RailCorp’s on-time running performance improved over the same period. The fall in failures is a clear indication of improved performance. Changes in the definition of on-time and to the timetable during 2005 and 2006 however make it difficult to determine whether improvements in response downtime and signalling delays are due to a true performance improvement. To build upon this strong base, RailCorp needs to determine with more confidence the number and duration of signalling failures the network can tolerate without impacting on service levels.
Parliamentary reference - Report number #170 - released 15 August 2007
Actions for Connecting with public transport
Connecting with public transport
We see considerable potential for the Ministry of Transport to plan and manage interchanges more effectively, so as to make better use of our public transport network. We believe that the Ministry now needs to focus more on multi-modal transport planning and interchange performance. It needs to assign responsibility for the coordination and oversight of inter-modal operations to an entity resourced for the purpose. Without this it will continue to be very difficult to identify and address unmet needs, seek and secure stakeholder funding, and monitor and evaluate system performance.
Parliamentary reference - Report number #168 - released 6 June 2007