Actions for Improving the Performance of Metropolitan Bus Services
Improving the Performance of Metropolitan Bus Services
The 2004 Review of Bus Services in NSW always envisaged that there would be a transition period as the new bus contracts were introduced. NSWTI has developed and implemented the new arrangements, and pursued a range of new initiatives including the network improvement program, strategic corridors and uniform bus fares and concessions. The new contracts provided for a performance management regime to hold operators accountable. But this is still being developed four years after the bus contracts came into effect and it remains unproven as a basis for ensuring value for money from the contracts - each of which guarantees monopoly rights to the operators.
Parliamentary reference - Report number #198 - released 10 March 2010
Actions for Improving Road Safety: School Zones
Improving Road Safety: School Zones
Overall, speed cameras change driver behaviour and improve road safety. Fixed speed cameras reduce crashes and speeding. While the overall impact of speed cameras has been positive, 38 of the 141 fixed speed cameras need to be closely examined as they appear to have no significant road safety benefit. Other road safety measures may be needed for these sites.
Parliamentary reference - Report number #197 - released 10 March 2010
Actions for Managing Forensic Analysis: Fingerprints and DNA
Managing Forensic Analysis: Fingerprints and DNA
Fingerprints and DNA play a critical role in solving crime and serving justice, but DNA evidence can result in more arrests, more prosecutions and more convictions. We found that while police effectively prioritise fingerprint evidence, it could better manage the screening and analysis of both fingerprint and DNA evidence to reduce delays.
Parliamentary reference - Report number #195 - released 10 February 2010
Actions for Code Red: Hospital Emergency Departments
Code Red: Hospital Emergency Departments
All three hospitals followed the Department of Health’s guidelines for judging capacity and had systems in place to notify hospital staff and ambulance crews of changes in status. We found discrepancies in the records kept by all three hospitals when compared to the records maintained by the Department of Health. Our view however, is that these records do not need to be a perfect match for the intended purpose, which is to guide ambulance crews to the shortest queue.
Parliamentary reference - Report number #121 - released 15 December 2003
Actions for Waiting Times for Elective Surgery in Public Hospitals
Waiting Times for Elective Surgery in Public Hospitals
We recognise that managing waiting times is a difficult and complex task. Waiting times are influenced by many factors, some of which are outside the control of NSW Health. There are, however, steps which NSW Health could, and should, take to ensure that the processes to manage waiting times are efficient and effective. By all measures used by NSW Health, patients are waiting longer for elective treatment today than six or seven years ago. In March 2003 patients admitted to elective medical or surgical treatment had waited, on average, 1.8 months, whereas in March 1997 they would have waited on average 1.1 months.
Parliamentary reference - Report number #116 - released 18 September 2003
Actions for Freedom of Information
Freedom of Information
Freedom of Information (FOI) Coordinators and their staff were supportive of the legislation. However, the agencies examined can do considerably more to fully achieve the intentions of the Act. On the positive side, all three agencies had processes in place to handle requests and had made a number of changes to improve the effectiveness of the FOI process. Fees and charges had also been kept to a minimum. No processing fees were requested in the majority of cases, and if charged, were not unreasonable.
Parliamentary reference - Report number #114 - released 28 August 2003
Actions for The Millennium Train Project
The Millennium Train Project
State Rail has made significant improvements since the purchase of the Tangara. It improved measures necessary for handling contracts dealing with technically complex and innovative projects, although some other problems have been encountered, with new lessons to learn. The design and manufacture of new trains requires a significant investment in both time and cost. The Millennium Train has come at a considerably higher price than originally expected. And it is very late compared to the Government’s original announcements, as the development/design took longer than planned.
Parliamentary reference - Report number #112 - released 17 June 2003
Actions for Delivering Services Online
Delivering Services Online
A staged, systematic and careful approach and extensive business re-engineering effort underpinned the Roads and Traffic Authority's (RTA) steady progress in providing customers with a range of reliable and secure online registration services. The RTA’s consistent and disciplined pursuit of new and challenging e-business opportunities is commendable.
Parliamentary reference - Report number #111 - released 11 June 2003
Actions for CityRail Passenger Security
CityRail Passenger Security
StateRail has invested significantly over the last five years in passenger safety and security. Security guards on trains from 7.00 pm were introduced in 1998. More recently, additional lighting, 5,700 closed circuit television cameras (CCTV) and emergency help points have been installed on CityRail stations. In addition, CityRail has employed some 100 transit officers to patrol its network and intends to employ another 200 transit officers in 2003. While substantial steps have been taken to reduce crime and improve passenger safety and security, the results have been mixed. Overall, the risk of a passenger becoming a victim of a crime on CityRail has increased.
Parliamentary reference - Report number #106 - released 12 February 2003
Actions for Planning statewide services
Planning statewide services
The Audit Office is of the view that:
-
there is no system wide plan for the location of emergency departments. This function is undertaken by each Area Health Service
-
coordination between the Department and the NSW Ambulance Service could be improved in aspects such as the collocation of facilities and direct communications between ambulances and emergency departments
-
there is no policy framework that recognises the increasing role and impact of private providers
-
the Department’s guidelines do not take into account demographic factors, the number of patients treated or the acuity of presentations as criteria for determining the size of an emergency department or the level and scope of emergency services that should be available at that location.
-
the Department has introduced a range of initiatives over a period of time to improve the performance of emergency departments such as the establishment of the Integrated Bed Management Committee. Some have been quite effective, whilst others have had mixed success. There has been an overall improvement in emergency department waiting times for urgent cases. However, there has been little improvement in waiting times for less urgent cases and a decline in performance for access block (the time taken to be admitted to a hospital ward from the emergency department after a decision has been made that this is required).
Parliamentary reference - Report number #54 - released 21 October 1998