Reports
Actions for Volume Ten 2013 focusing on Health
Volume Ten 2013 focusing on Health
Unqualified opinions were issued for all agencies audited in the following report. Some of the reports findings include: Most cultural bodies rely heavily on government grants to fund services The Sydney Opera House Trust earns most of its revenue from commercial operations Less than half of the 2014-16 service agreements between HealthShare NSW and its customers have been signed. HealthShare NSW and health entities should finalise t
Actions for Volume Eight 2013 focusing on Transport and Ports
Volume Eight 2013 focusing on Transport and Ports
Unqualified audit opinions were issued on the above corporations’ 30 June 2013 financial statements. During the year, Treasury issued TC 13/01 ‘Mandatory early close procedures for 2013’. This Circular aimed to improve the quality and timeliness of agencies’ annual financial statements. In 2012-13, application of the circular was made mandatory for State owned corporations. As a result, the port corporations were required to perform the early close proce
Actions for Volume Nine 2013 focusing on Environment, Water and Infrastructure
Volume Nine 2013 focusing on Environment, Water and Infrastructure
Volume Nine focuses on our financial audits of New South Wales government agencies in the environment, water, planning and infrastructure and family and community services. Some agencies in the Department of Premier and Cabinet are also included.
Actions for Volume Seven 2013 focusing on Superannuation and Insurance
Volume Seven 2013 focusing on Superannuation and Insurance
Unqualified audit opinions were issued on the NSW Government controlled insurance and compensation entities’ 30 June 2013 financial statements, except the NSW Self Insurance Corporation (SICorp). SICorp’s audit opinion was qualified due to non-compliance with Australian Accounting Standards applicable to general insurance contracts. The auditor’s reports drew attention to the significant uncertainty in estimating outstanding claims liabilities of $14.0 b
Actions for Volume Four 2013 focusing on Electricity
Volume Four 2013 focusing on Electricity
During the year, Treasury issued TC 13/01 ‘Mandatory early close procedures for 2013’. This circular aimed to improve the quality and timeliness of agencies’ annual financial statements. In 2012-13, application of the circular was made mandatory for State owned corporations. As a result, the NSW Generators, Distributors and Transgrid were required to perform the early close procedures. All the electricity entities were broadly successful in performing th
Actions for Signal failures on the metropolitan rail network
Signal failures on the metropolitan rail network
Between 2004 and 2006, the number of signalling failures, signalling downtime and the number of trains delayed as a result of signal failures all fell. RailCorp’s on-time running performance improved over the same period. The fall in failures is a clear indication of improved performance. Changes in the definition of on-time and to the timetable during 2005 and 2006 however make it difficult to determine whether improvements in response downtime and sign
Actions for Connecting with public transport
Connecting with public transport
We see considerable potential for the Ministry of Transport to plan and manage interchanges more effectively, so as to make better use of our public transport network. We believe that the Ministry now needs to focus more on multi-modal transport planning and interchange performance. It needs to assign responsibility for the coordination and oversight of inter-modal operations to an entity resourced for the purpose. Without this it will continue to b
Actions for Readiness to respond: Follow-up audit
Readiness to respond: Follow-up audit
The Ambulance Service of New South Wales has substantially implemented the 28 recommendations of the 2001 audit report that it accepted. It has also introduced significant new initiatives to improve performance that were not part of the 2001 recommendations. It has made substantial changes to its organisation and operations to implement these changes. Many of the changes are still proceeding. The Service has addressed a key finding of the 2001 audit
Actions for Responding to homelessness
Responding to homelessness
Many projects, both Partnership Against Homelessness and by individual agencies, have shown good results or led to improvements. One example is helping mental health patients maintain stable housing. Another is providing street outreach services to homeless people in inner Sydney. Despite these efforts, we were unable to determine how well the government is responding to homelessness statewide. This is because there are no statewide performance measures
Actions for The Millennium Train Project
The Millennium Train Project
State Rail has made significant improvements since the purchase of the Tangara. It improved measures necessary for handling contracts dealing with technically complex and innovative projects, although some other problems have been encountered, with new lessons to learn. The design and manufacture of new trains requires a significant investment in both time and cost. The Millennium Train has come at a considerably higher price than originally expected. An