Actions for Handback of the M4 Tollway

Handback of the M4 Tollway

Transport
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management

This audit focuses on the M4 handback. It looks at whether the road will be in good condition when the State gets it back, and whether it will cope with the extra traffic after the toll is removed. These are critical issues for taxpayers and motorists. Taxpayers don’t want to be responsible for a large repair bill and motorists don’t want to be stuck in traffic jams.

To ensure that future private sector partnerships (PPP) deal adequately with handback, we recommend that the Roads and Traffic Authority (RTA):

  • ensure deeds spell out an appropriate inspection and testing program to determine repairs required to bring roads up to a satisfactory condition at handback (p.11)
  • ensure deeds link condition standards and maintenance approaches to changing industry standards and approaches over the life of the PPP (p.11)
  • consider including in deeds a requirement that operators provide a performance bond or similar security over the cost of handback repairs (p.11)
  • review the lessons learnt from the M4 tollway handback and determine whether it should seek to negotiate changes to existing tollway deeds to better deal with handback, by June 2010 (p.11)

 

Parliamentary reference - Report number #193 - released 27 October 2009

Published

Actions for Government Licensing Project

Government Licensing Project

Finance
Information technology
Internal controls and governance
Management and administration
Project management
Shared services and collaboration

The Government Licensing Project (GLP) is standardising and simplifying processes of agencies which issue licences. However, it is currently running over the original anticipated completion date, exceeding the original budget and expected to produce savings less than originally planned.

 

Parliamentary reference - Report number #192 - released 7 October 2009

Published

Actions for Administering Domestic Waterfront Tenancies

Administering Domestic Waterfront Tenancies

Planning
Transport
Management and administration
Service delivery
Shared services and collaboration

The audit’s overall conclusion is that Lands and Maritime are broadly achieving outcomes consistent with the IPART report on administering domestic waterfront tenancies. But a lack of collaboration between the agencies is contributing to poor customer service. Inconsistencies with the IPART report recommendations and operational differences between the two agencies result in different rents and conditions for tenants in the two agencies. The differences are having a significant impact on customer service.

 

Parliamentary reference - Report number #191 - released 23 September 2009

Published

Actions for Tackling Cancer with Radiotherapy

Tackling Cancer with Radiotherapy

Health
Internal controls and governance
Management and administration
Procurement
Service delivery
Workforce and capability

Overall radiotherapy services are managed in a reasonably efficient and effective manner. Much is being done to further improve efficiency and effectiveness, and more can be done. While New South Wales has a number of well-established radiotherapy treatment centres, the high capital cost limits their availability in all hospitals. Some patients need to travel long distances and be away from their homes for up to seven weeks. The projected growth in demand for radiotherapy services will further challenge NSW Health and it needs to more clearly demonstrate how it will have the right facilities in the right place at the right time.

 

Parliamentary reference - Report number #188 - released 23 June 2009

Published

Actions for Delivering Health Care out of Hospitals

Delivering Health Care out of Hospitals

Health
Management and administration
Project management
Service delivery
Workforce and capability

Area Health Services and hospitals have developed programs which can provide clinical outcomes as good for patients as in-hospital care and can reduce the time they spend in hospital. They have operated for several years and show considerable potential. Ageing of the population, increasing costs and higher expectations of health care will continue to challenge health systems. Sometimes, unfortunately, the system struggles to cope. 

 

Parliamentary reference - Report number #182 - released 24 September 2008

Published

Actions for Implementing Successful Amalgamations

Implementing Successful Amalgamations

Finance
Internal controls and governance
Management and administration
Project management
Service delivery
Shared services and collaboration

The Better Practice Guide (BPG) aims to provide guidance for those implementing an amalgamation. It provides a series of questions identifying what needs to be done to achieve a successful amalgamation following the formal announcement of the amalgamation and the Administrative Orders for the new arrangements being finalised. The BPG’s aim is to alert those managing an amalgamation to actions that should be considered. How the Guide is applied will depend on circumstances. A lot will depend on how clear the expectations of the amalgamation are and on how complex it is.

 

Parliamentary reference - Report number #176 - released 5 March 2008

Published

Actions for Managing Departmental Amalgamations

Managing Departmental Amalgamations

Industry
Finance
Internal controls and governance
Management and administration
Project management
Service delivery
Shared services and collaboration

Both Commerce and DPI substantially achieved their stated amalgamation savings objectives as set by government. The departments are expected to achieve savings targets of about $150 million and $190 million respectively over their first four years. Our analysis indicates that there are two key factors in successful amalgamations. The first is effective early planning by departments based on clear objectives, supported by quick action. Second, significant synergies in service delivery can be achieved when departments with similar services and customers are amalgamated. The Department of Primary Industries is an example.

 

Parliamentary reference - Report number #175 - released 5 March 2008

Published

Actions for Review of Walsh Bay

Review of Walsh Bay

Finance
Infrastructure
Management and administration
Procurement
Project management

The decision to seek development of Walsh Bay without a Master Plan and/or detailed study as to the state of the precinct presented significant problems throughout the life of the project. Now, four years later, negotiations still continue on the details of the final scheme. Based on the latest estimates, it will not provide a financial return as was originally expected. The audit found no evidence to indicate why the former Government wished to expedite Walsh Bay, but it is aware that there was an election due. Many of the problems which have been encountered could have been avoided with more careful and more extensive consideration at the start, particularly in the light of Property Services Group's recommendations.

 

Parliamentary reference - Report number #58 - released 17 December 1998

Published

Actions for Management of research - NSW Health: Infrastructure Grants Program

Management of research - NSW Health: Infrastructure Grants Program

Health
Internal controls and governance
Management and administration
Shared services and collaboration

NSW Health has progressed in identifying and addressing key R&D issues in a complex and difficult environment. The Infrastructure Grants Program (IGP) is an innovative program and reflects a commitment by Government to support research infrastructure. The IGP has as its aims the provision of significant funding accompanied by clear research objectives and criteria for accountability and introduces a rational basis for the allocation of infrastructure grants.

While NSW Health has progressed, there is an opportunity to make the IGP more efficient and effective. These opportunities are in the areas of addressing longer term planning issues in health, streamlining and clarifying eligibility and selection criteria, improving decision-making structures and processes and improving accountability.

 

Parliamentary reference - Report number #56 - released 25 November 1998

Published

Actions for Planning statewide services

Planning statewide services

Health
Information technology
Management and administration
Service delivery
Shared services and collaboration

The Audit Office is of the view that:

  • there is no system wide plan for the location of emergency departments. This function is undertaken by each Area Health Service

  • coordination between the Department and the NSW Ambulance Service could be improved in aspects such as the collocation of facilities and direct communications between ambulances and emergency departments

  • there is no policy framework that recognises the increasing role and impact of private providers

  • the Department’s guidelines do not take into account demographic factors, the number of patients treated or the acuity of presentations as criteria for determining the size of an emergency department or the level and scope of emergency services that should be available at that location.

  • the Department has introduced a range of initiatives over a period of time to improve the performance of emergency departments such as the establishment of the Integrated Bed Management Committee. Some have been quite effective, whilst others have had mixed success. There has been an overall improvement in emergency department waiting times for urgent cases. However, there has been little improvement in waiting times for less urgent cases and a decline in performance for access block (the time taken to be admitted to a hospital ward from the emergency department after a decision has been made that this is required).

 

Parliamentary reference - Report number #54 - released 21 October 1998