Refine search Expand filter

Reports

Published

Actions for Transport 2020

Transport 2020

Transport
Asset valuation
Cyber security
Financial reporting
Information technology
Infrastructure
Project management

1. Financial Reporting

Audit opinion Unmodified audit opinions issued for the financial statements of all Transport cluster entities.
Quality and timeliness of financial reporting All cluster agencies met the statutory deadlines for completing the early close and submitting the financial statements.

Transport cluster agencies continued to experience some challenges with accounting for land and infrastructure assets. The former Roads and Maritime Services and Sydney Metro recorded prior period corrections to property, plant and equipment balances.
Impact of COVID-19 on passenger revenue and patronage Total patronage and revenue for public transport decreased by approximately 18 per cent in 2019–20 due to COVID-19.

The Transport cluster received additional funding from NSW Treasury during the year to support the reduced revenue and additional costs incurred such as cleaning on all modes of public transport and additional staff to manage physical distancing.
Completion of the CBD and South East Light Rail The CBD and South East Light Rail project was completed and commenced operations in this financial year. At 30 June 2020, the total cost of the project related to the CBD and South East Light Rail was $3.3 billion. Of this total cost, $2.6 billion was recorded as assets, whilst $700 million was expensed.

2. Audit Observations

Internal control While internal controls issues raised in management letters in the Transport cluster have decreased compared to the prior year, control weaknesses continue to exist in access security for financial systems. We identified 56 management letter findings across the cluster and 43 per cent of all issues were repeat issues. The majority of the repeat issues relate to information technology controls around user access management.

There were three high risk issues identified - two related to financial reporting of assets and one for implementation of TAHE (see below).
Agency responses to emergency events Transport for NSW established the COVID-19 Taskforce in March 2020 to take responsibility for the overall response of planning and coordination for the Transport cluster. It also implemented the COVIDSafe Transport Plan which incorporates guidance on physical distancing, increasing services to support social distancing and cleaning.
RailCorp transition to TAHE On 1 July 2020, RailCorp was renamed Transport Asset Holding Entity of New South Wales (TAHE) and converted to a for-profit statutory State-Owned Corporation. TAHE is a commercial for-profit Public Trading Entity with the intent to provide a commercial return to its shareholders.

A plan was established by NSW Treasury to transition RailCorp to TAHE which covered the period 1 July 2015 to 1 July 2019. A large portion of the planned arrangements were not implemented by 1 July 2020. As at the time of this report, the TAHE operating model, Statement of Corporate Intent (SCI) and other key plans and commercial agreements are not finalised. The State Owned Corporations Act 1989 generally requires finalisation of an SCI three months after the commencement of each financial year. However, under the Transport Administration Act 1988, TAHE received an extension from the voting shareholders, the Treasurer and Minister for Finance and Small Business, to submit its first SCI by 31 December 2020. In accordance with the original plan, interim commercial access arrangements were supposed to be in place with RailCorp prior to commencement of TAHE.

Under the transitional arrangements, TAHE is continuing to operate in accordance with the asset and safety management plans of RailCorp. The final operating model is expected to include considerations of safety, operational, financial and fiscal risks. This should include a consideration of the potential conflicting objectives of a commercial return, and maintenance and safety measures.

This matter has been included as a high risk finding in our management letter due to the significance of the financial reporting impacts and business risks for TAHE.

Recommendation: TAHE management should:
  • establish an operating model in line with the original intent of a commercial return
  • finalise commercial agreements with the public rail operators
  • confirm forecast financial information to assess valuation of TAHE infrastructure
  • finalise asset and safety management plans.

Resolution of the above matters are critical as they may significantly impact the financial reporting arrangements for TAHE for 2020–21, in particular, accounting policies adopted as well as measurement principles of its significant infrastructure asset base.

Completeness and accuracy of contracts registers Across the Transport cluster, contracts and agreements are maintained by the transport agencies using disparate registers.

Recommendation (repeat): Transport agencies should continue to implement a process to centrally capture all contracts and agreements entered. This will ensure:
  • agencies are fully aware of contractual and other obligations
  • appropriate assessment of financial reporting implications
  • ongoing assessments of accounting standards, in particular AASB 16 ‘Leases’, AASB 15 'Revenue from Contract with Customers', AASB 1058 'Income of Not-for-Profit Entities' and new accounting standard AASB 1059 'Service Concession Arrangements: Grantors' are accurate and complete.

 

This report provides parliament and other users of the Transport cluster’s financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations
  • the impact of emergencies and the pandemic.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Transport cluster for 2020, including any financial implications from the recent emergency events.

Section highlights

  • Total patronage and revenue for public transport decreased by approximately 18 per cent in 2019–20 due to COVID-19.
  • Unqualified audit opinions were issued on all Transport agencies' financial statements.
  • Transport cluster agencies continued to experience challenges with accounting of land and infrastructure assets.

 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our:

  • observations and insights from our financial statement audits of agencies in the Transport cluster
  • assessment of how well cluster agencies adapted their systems, policies and procedures, and governance arrangements in response to recent emergencies.

Section highlights

  • While there was a decrease in findings on internal controls across the Transport cluster, 43 per cent of all issues were repeat issues. Many repeat issues related to information technology controls around user access management.
  • RailCorp transitioned to TAHE on 1 July 2020. TAHE's operating model and commercial arrangements with public rail operators has not been finalised despite government original plans to be operating from 1 July 2019. TAHE management should finalise its operating model and commercial agreements with public rail operators as they may significantly impact the financial reporting arrangements for TAHE for 2020–21.
  • Completeness and accuracy of contracts registers remains an ongoing issue for the Transport cluster.

Appendix one – List of 2020 recommendations

Appendix two – Status of 2019, 2018 and 2017 recommendations

Appendix three – Management letter findings

Appendix four – Financial data

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Their Futures Matter

Their Futures Matter

Justice
Community Services
Education
Health
Whole of Government
Cross-agency collaboration
Internal controls and governance
Management and administration
Project management

The Auditor-General for New South Wales, Margaret Crawford, released a report today examining whether the Department of Communities and Justice had effective governance and partnership arrangements in place to deliver ‘Their Futures Matter’.

Their Futures Matter was intended to place vulnerable children and families at the heart of services, and direct investment to where funding and programs deliver the greatest social and economic benefits. It was a four-year whole-of-government reform in response to the 2015 Tune Review of out-of-home care.

The Auditor-General found that while important foundations were put in place, and new programs trialled, the key objective to establish an evidence-based whole-of-government early intervention approach for vulnerable children and families in NSW was not achieved.

Governance and cross-agency partnership arrangements to deliver Their Futures Matter were found to be ineffective. 'Their Futures Matter lacked mechanisms to secure cross portfolio buy‑in and did not have authority to drive reprioritisation of government investment', the Auditor-General said.

At the reform’s close, the majority of around $380 million in investment funding remains tied to existing agency programs, with limited evidence of their comparative effectiveness or alignment with Their Futures Matter policy objectives. The reform concluded on 30 June 2020 without a strategy or plan in place to achieve its intent.

The Auditor-General made four recommendations to the Department of Communities and Justice, aimed at improving implementation of outstanding objectives, revising governance arrangements, and utilising the new human services data set to address the intent of the reform. However, these recommendations respond only in part to the findings of the audit.

According to the Auditor-General, ‘Cross-portfolio leadership and action is required to ensure a whole-of-government response to delivering the objectives of Their Futures Matter to improve outcomes for vulnerable children, young people and their families in New South Wales.’

Read full report (PDF)

In 2016, the NSW Government launched 'Their Futures Matter' (TFM) - a whole-of-government reform aimed at delivering improved outcomes for vulnerable children, young people and their families. TFM was the government's key response to the 2015 Independent Review of Out of Home Care in New South Wales (known as 'the Tune Review').

The Tune Review found that, despite previous child protection reforms, the out of home care system was ineffective and unsustainable. It highlighted that the system was not client-centred and was failing to improve the long-term outcomes for vulnerable children and families. The review found that the greatest proportion of relevant expenditure was made in out of home care service delivery rather than in evidence-based early intervention strategies to support children and families when vulnerabilities first become evident to government services (such as missed school days or presentations to health services).

The then Department of Family and Community Services (FACS) designed the TFM reform initiatives, in consultation with central and human services agencies. A cross-agency board, senior officers group, and a new unit in the FACS cluster were established to drive the implementation of TFM. In the 2016–17 Budget, the government allocated $190 million over four years (2016–17 to 2019–20) to the reform. This resourced the design and commissioning of evidence-based pilots, data analytics work, staffing for the implementation unit and secretariat support for the board and cross-agency collaboration.

As part of the TFM reform, the Department of Premier and Cabinet, NSW Treasury and partnering agencies (NSW Health, Department of Education and Department of Justice) identified various existing programs that targeted vulnerable children and families (such as the preceding whole-of-government ‘Keep Them Safe’ reform coming to an end in June 2020). Funding for these programs, totalling $381 million in 2019–20, was combined to form a nominal ‘investment pool’. The government intended that the TFM Implementation Board would use this pool to direct and prioritise resource allocation to evidence-based interventions for vulnerable children and families in NSW.

This audit assessed whether TFM had effective governance and partnership arrangements in place to enable an evidence-based early intervention investment approach for vulnerable children and families in NSW. We addressed the audit objective with the following audit questions:

  • Was the TFM reform driven by effective governance arrangements?
  • Was the TFM reform supported by effective cross-agency collaboration?
  • Has the TFM reform generated an evidence base to inform a cross-agency investment approach in the future?

The audit did not seek to assess the outcomes for children, young people and families achieved by TFM programs and projects.

Conclusion

The governance and cross-agency partnership arrangements used to deliver the Their Futures Matter reform were ineffective. Important foundations were put in place, and new programs trialled over the reform's four years. However, an evidence-based whole-of-government early intervention approach for vulnerable children and families in NSW − the key objective of the reform − was not established. The reform concluded in June 2020 without a strategy or plan in place to achieve its intent.

The governance arrangements established for the Their Futures Matter (TFM) reform did not provide sufficient independence, authority and cross-agency clout to deliver on the reform’s intent. This hindered delivery of the reform's key elements, particularly the redirection of funding to evidence-based earlier intervention supports, and limited the impact that TFM could have on driving system change.

TFM increased focus on the contribution that other agencies outside of the former Family and Community Services portfolio could make in responding to the needs of vulnerable children and families, and in reducing the demand costs of related government service delivery. Despite being a whole-of-government reform, TFM lacked mechanisms to secure cross-portfolio buy-in and lacked the powers to drive reprioritisation of government investment in evidence-based and earlier intervention supports across agencies. At the reform’s close, the majority of the reform's investment pool funding remained tied to existing agency programs, with limited evidence of their comparative effectiveness or alignment with Their Futures Matter policy objectives.

TFM began building an evidence base about ‘what works’, including piloting programs and creating a new dataset to identify risk factors for vulnerability and future costs to government. However, this evidence base does not yet comprehensively map how existing services meet needs, identify system duplications or gaps, nor demonstrate which government funded supports and interventions are most effective to make a difference to life outcomes for vulnerable children and families in NSW.
Despite these issues, the need, intent and vision for Their Futures Matter remains relevant and urgent, as issues identified in the Tune Review remain pertinent.

Their Futures Matter (TFM) is a whole-of-government reform to deliver improved outcomes for vulnerable children, young people and their families.

Supported by a cross-agency TFM Board, and the TFM Unit in the then Department of Family and Community Services (FACS), the reform aimed to develop whole-of-government evidence-based early intervention investment approaches for vulnerable children and families in NSW.

Governance refers to the structures, systems and practices that an organisation has in place to:

  • assign decision-making authorities and establish the organisation's strategic direction
  • oversee the delivery of its services, the implementation of its policies, and the monitoring and mitigation of its key risks
  • report on its performance in achieving intended results, and drive ongoing improvements.

We examined whether the TFM reform was driven by effective governance arrangements and cross-agency collaboration.

The reform agenda and timeframe set down for Their Futures Matter (TFM) were ambitious. This chapter assesses whether the TFM Board and TFM Unit had the capability, capacity and clout within government to deliver the reform agenda.

Creating a robust evidence base was important for Their Futures Matter, in order to:

  • identify effective intervention strategies to improve supports and outcomes for vulnerable children and families
  • make efficient use of taxpayer money to assist the maximum number of vulnerable children and families
  • inform the investment-based approach for future funding allocation.

This chapter assesses whether the TFM reform has developed an evidence base to inform cross-agency investment decisions.

Appendix one – Response from agency

Appendix two – TFM governance entities

Appendix three – TFM Human Services Data Set

Appendix four – TFM pilot programs

Appendix five – About the audit

Appendix six – Performance auditing

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary reference - Report number #337 - released 24 July 2020

Published

Actions for CBD South East Sydney Light Rail: follow-up performance audit

CBD South East Sydney Light Rail: follow-up performance audit

Transport
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management
Risk
Service delivery

This is a follow-up to the Auditor-General's November 2016 report on the CBD South East Sydney Light Rail project. This follow-up report assessed whether Transport for NSW has updated and consolidated information about project costs and benefits.

The audit found that Transport for NSW has not consistently and accurately updated project costs, limiting the transparency of reporting to the public.

The Auditor-General reports that the total cost of the project will exceed $3.1 billion, which is above the revised cost of $2.9 billion published in November 2019. $153.84 million of additional costs are due to omitted costs for early enabling works, the small business assistance package and financing costs attributable to project delays.

The report makes four recommendations to Transport for NSW to publicly report on the final project cost, the updated expected project benefits, the benefits achieved in the first year of operations and the average weekly journey times.

Read full report (PDF)

The CBD and South East Light Rail is a 12 km light rail network for Sydney. It extends from Circular Quay along George Street to Central Station, through Surry Hills to Moore Park, then to Kensington and Kingsford via Anzac Parade and Randwick via Alison Road and High Street.

Transport for NSW (TfNSW) is responsible for planning, procuring and delivering the Central Business District and South East Light Rail (CSELR) project. In December 2014, TfNSW entered into a public private partnership with ALTRAC Light Rail as the operating company (OpCo) responsible for delivering, operating and maintaining the CSELR. OpCo engaged Alstom and Acciona, who together form its Design and Construct Contractor (D&C).

On 14 December 2019, passenger services started on the line between Circular Quay and Randwick. Passenger services on the line between Circular Quay and Kingsford commenced on 3 April 2020.

In November 2016, the Auditor-General published a performance audit report on the CSELR project. The audit found that TfNSW would deliver the CSELR at a higher cost with lower benefits than in the approved business case, and recommended that TfNSW update and consolidate information about project costs and benefits and ensure the information is readily accessible to the public.

In November 2018, the Public Accounts Committee (PAC) examined TfNSW's actions taken in response to our 2016 performance audit report on the CSELR project. The PAC recommended that the Auditor-General consider undertaking a follow-up audit on the CSELR project. The purpose of this follow-up performance audit is to assess whether TfNSW has effectively updated and consolidated information about project costs and benefits for the CSELR project.

Conclusion

Transport for NSW has not consistently and accurately updated CSLER project costs, limiting the transparency of reporting to the public. In line with the NSW Government Benefits Realisation Management Framework, TfNSW intends to measure benefits after the project is completed and has not updated the expected project benefits since April 2015.

Between February 2015 and December 2019, Transport for NSW (TfNSW) regularly updated capital expenditure costs for the CSELR in internal monthly financial performance and risk reports. These reports did not include all the costs incurred by TfNSW to manage and commission the CSELR project.

Omitted costs of $153.84 million for early enabling works, the small business assistance package and financing costs attributable to project delays will bring the current estimated total cost of the CSELR project to $3.147 billion.

From February 2015, TfNSW did not regularly provide the financial performance and risk reports to key CSELR project governance bodies. TfNSW publishes information on project costs and benefits on the Sydney Light Rail website. However, the information on project costs has not always been accurate or current.

TfNSW is working with OpCo partners to deliver the expected journey time benefits. A key benefit defined in the business plan was that bus services would be reduced owing to transfer of demand to the light rail - entailing a saving. However, TfNSW reports that the full expected benefit of changes to bus services will not be realised due to bus patronage increasing above forecasted levels.

Appendix one – Response from agency

Appendix two – Governance and reporting arrangements for the CSELR

Appendix three – 2018 CSELR governance changes

Appendix four – About the audit

Appendix five – Performance auditing

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #335 - released 11 June 2020

Published

Actions for Funding enhancements for police technology

Funding enhancements for police technology

Justice
Community Services
Information technology
Management and administration
Procurement
Project management

This report focuses on how the NSW Police Force managed a $100 million program to acquire new technology. The program invested in technologies intended to make police work safer and quicker. These included body-worn video (BWV) cameras, smart phone devices, mobile fingerprint scanners and hand-held drug testing devices.

The audit found that while the NSW Police Force mostly managed the ‘Policing for Tomorrow’ program effectively, investment decision making could be improved in the future. The NSW Police Force missed an opportunity to take a whole-of-organisation approach to identify capability gaps and target the acquired technologies to plug these.

The NSW Police Force has processes in place to monitor the benefits of some of the larger technology, but it does not do this consistently for all procured technology. It could not demonstrate that smaller projects are improving the efficiency or effectiveness of policing.

The audit also found that the NSW Police Force does not routinely engage with external stakeholders on the use or impacts of new technology that changes how officers interact with the public, noting that this will not always be possible for particularly sensitive procurements that involve covert technologies or methodologies.

The Auditor-General made three recommendations to guide improvement of NSW Police Force ICT procurement, benefits management and stakeholder engagement processes.

Read full report (PDF)

Ahead of the March 2015 election, the NSW Government announced a $100 million Policing for Tomorrow fund for the NSW Police Force to acquire technology intended to make police work safer and quicker. The announcement committed the NSW Police Force to several investment priorities, including body-worn video (BWV) cameras, smart phone devices (MobiPOL), mobile fingerprint scanners and hand-held drug testing devices. Otherwise, the NSW Police Force was allowed flexibility in identifying and resourcing suitable projects.

This audit assessed whether the Policing for Tomorrow fund was effectively managed to improve policing in New South Wales. We addressed the audit objective with the following audit questions:

  • Did the NSW Police Force efficiently and effectively identify, acquire, implement and maintain technology resourced by the fund?
  • Did the NSW Police Force establish effective governance arrangements for administering the fund, and for monitoring expected benefits and unintended consequences?
  • Did technology implemented under the fund improve the efficiency and effectiveness of policing in New South Wales?

Conclusion

The NSW Police Force's management of the Policing for Tomorrow fund was mostly effective. There are measures in place to assess the impact of the technologies on the efficiency and effectiveness of policing in NSW. However, these measures are not in place for all technologies funded by Policing for Tomorrow. A strategic whole-of-organisation approach to identifying and filling technology capability gaps may have assisted in better targeting funds and managing expected benefits.

The NSW Police Force identified, acquired, implemented and maintained a range of technologies resourced by the fund in an efficient and effective way. The election announcement committed the NSW Police Force to four specific projects which made up over three quarters of the fund value. Investment decisions for remaining funds were driven by the availability of funding and individual technology requirements rather than targeting improved policing outcomes and the capability necessary to achieve these.

The NSW Police Force missed an opportunity to take a whole-of-organisation approach to selecting technology projects for the remainder of the funds where it had discretion. This may have included considering less obvious back office technology or making different investment decisions driven by gaps in the agency's technology capabilities.

The NSW Police Force used effective governance arrangements for administering the Policing for Tomorrow fund, including using its existing ICT Executive Board. The NSW Police Force has adequate processes in place to drive benefits and monitor the impact of technology on the efficiency and effectiveness of policing for the larger projects funded by Policing for Tomorrow. Further work is required to ensure this for smaller projects.

The NSW Police Force tends to consider only impacts on the organisation in managing benefits and identifying unintended consequences. It does not routinely engage proactively with stakeholders, including partner criminal justice agencies and members of the community, on new technology that changes how police interact with the public.

We examined how effectively the NSW Police Force governed the Policing for Tomorrow fund, to ensure that key accountability and decision-making arrangements were in place to direct the $100 million spend to appropriate technologies. We also assessed how the NSW Police Force acquired, implemented and maintained technology funded by Policing for Tomorrow to determine the effectiveness of the relevant asset management.

The Policing for Tomorrow election commitment aimed to invest in technology to ‘make police work safer and quicker – meaning more time on the street combatting crime’. We assessed whether the NSW Police Force ensured that funded technologies have improved policing efficiency and effectiveness. We did not seek to independently assure the benefits or outcomes resulting from the technologies.

Appendix one – Response from agency

Appendix two – Policing for Tomorrow projects and expenditure

Appendix three – About the audit

Appendix four – Performance auditing

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #334 - released 2 June 2020

Published

Actions for Internal Controls and Governance 2017

Internal Controls and Governance 2017

Finance
Education
Community Services
Health
Justice
Whole of Government
Asset valuation
Compliance
Cyber security
Information technology
Internal controls and governance
Project management
Risk

Agencies need to do more to address risks posed by information technology (IT).

Effective internal controls and governance systems help agencies to operate efficiently and effectively and comply with relevant laws, standards and policies. We assessed how well agencies are implementing these systems, and highlighted opportunities for improvement.
 

1. Overall trends

New and repeat findings

The number of reported financial and IT control deficiencies has fallen, but many previously reported findings remain unresolved.

High risk findings

Poor systems implementations contributed to the seven high risk internal control deficiencies that could affect agencies.

Common findings

Poor IT controls are the most commonly reported deficiency across agencies, followed by governance issues relating to cyber security, capital projects, continuous disclosure, shared services, ethics and risk management maturity.

2. Information Technology

IT security

Only two-thirds of agencies are complying with their own policies on IT security. Agencies need to tighten user access and password controls.

Cyber security

Agencies do not have a common view on what constitutes a cyber attack, which limits understanding the extent of the cyber security threat.

Other IT systems

Agencies can improve their disaster recovery plans and the change control processes they use when updating IT systems.

3. Asset Management

Capital investment

Agencies report delays delivering against the significant increase in their budgets for capital projects.

Capital projects

Agencies are underspending their capital budgets and some can improve capital project governance.

Asset disposals

Eleven per cent of agencies were required to sell their real property through Property NSW but didn’t. And eight per cent of agencies can improve their asset disposal processes.

4. Governance

Governance arrangements

Sixty-four per cent of agencies’ disclosure policies support communication of key performance information and prompt public reporting of significant issues.

Shared services

Fifty-nine per cent of agencies use shared services, yet 14 per cent do not have service level agreements in place and 20 per cent can strengthen the performance standards they set.

5. Ethics and Conduct

Ethical framework

Agencies can reinforce their ethical frameworks by updating code‑of‑conduct policies and publishing a Statement of Business Ethics.

Conflicts of interest

All agencies we reviewed have a code of conduct, but they can still improve the way they update and manage their codes to reduce the risk of fraud and unethical behaviour.

6. Risk Management 

Risk management maturity

All agencies have implemented risk management frameworks, but with varying levels of maturity.

Risk management elements

Many agencies can improve risk registers and strengthen their risk culture, particularly in the way that they report risks to their lead agency.

This report covers the findings and recommendations from our 2016–17 financial audits related to the internal controls and governance of the 39 largest agencies (refer to Appendix three) in the NSW public sector. These agencies represent about 95 per cent of total expenditure for all NSW agencies and were considered to be a large enough group to identify common issues and insights.

The findings in this report should not be used to draw conclusions on the effectiveness of individual agency control environments and governance arrangements. Specific financial reporting, controls and service delivery comments are included in the individual 2017 cluster financial audit reports tabled in Parliament from October to December 2017.

This new report offers strategic insight on the public sector as a whole

In previous years, we have commented on internal control and governance issues in the volumes we published on each ‘cluster’ or agency sector, generally between October and December. To add further value, we then commented more broadly about the issues identified for the public sector as a whole at the start of the following year.

This year, we have created this report dedicated to internal controls and governance. This will help Parliament to understand broad issues affecting the public sector, and help agencies to compare their own performance against that of their peers.

Without strong control measures and governance systems, agencies face increased risks in their financial management and service delivery. If they do not, for example, properly authorise payments or manage conflicts of interest, they are at greater risk of fraud. If they do not have strong information technology (IT) systems, sensitive and trusted information may be at risk of unauthorised access and misuse.

These problems can in turn reduce the efficiency of agency operations, increase their costs and reduce the quality of the services they deliver.

Our audits do not review every control or governance measure every year. We select a range of measures, and report on those that present the most significant risks that agencies should mitigate. This report divides these into the following six areas:

  1. Overall trends
  2. Information technology
  3. Asset management
  4. Governance
  5. Ethics and conduct
  6. Risk management.

Internal controls are processes, policies and procedures that help agencies to:

  • operate effectively and efficiently
  • produce reliable financial reports
  • comply with laws and regulations.

This chapter outlines the overall trends for agency controls and governance issues, including the number of findings, level of risk and the most common deficiencies we found across agencies. The rest of this volume then illustrates this year’s controls and governance findings in more detail.

Issues

Recommendations

1.1 New and repeat findings

The number of internal control deficiencies reduced over the past three years, but new higher-risk information technology (IT) control deficiencies were reported in 2016–17.

Deficiencies repeated from previous years still make up a sizeable proportion of all internal control deficiencies.

Recommendation

Agencies should focus on emerging IT risks, but also manage new IT risks, reduce existing IT control deficiencies, and address repeat internal control deficiencies on a more timely basis.

1.2 High risk findings

We found seven high risk internal control deficiencies, which might significantly affect agencies.

Recommendation

Agencies should rectify high risk internal control deficiencies as a priority

1.3 Common findings

The most common internal control deficiencies related to poor or absent IT controls.

We found some common governance deficiencies across multiple agencies.

Recommendation

Agencies should coordinate actions and resources to help rectify common IT control and governance deficiencies.

Information technology (IT) has become increasingly important for government agencies’ financial reporting and to deliver their services efficiently and effectively. Our audits reviewed whether agencies have effective controls in place over their IT systems. We found that IT security remains the source of many control weakness in agencies.

Issues Recommendations

2.1 IT security

User access administration

While 95 per cent of agencies have policies about user access, about two-thirds were compliant with these policies. Agencies can improve how they grant, change and end user access to their systems.

Recommendation

Agencies should strengthen user access administration to prevent inappropriate access to sensitive systems. Agencies should:

  • establish and enforce clear policies and procedures
  • review user access regularly
  • remove user access for terminated staff promptly
  • change user access for transferred staff promptly.

Privileged access

Sixty-eight per cent of agencies do not adequately manage who can access their information systems, and many do not sufficiently monitor or restrict privileged access.

Recommendation

Agencies should tighten privileged user access to protect their information systems and reduce the risks of data misuse and fraud. Agencies should ensure they:

  • only grant privileged access in line with the responsibilities of a position
  • review the level of access regularly
  • limit privileged access to necessary functions and data
  • monitor privileged user account activity on a regular basis.

Password controls

Forty-one per cent of agencies did not meet either their own standards or minimum standards for password controls.

Recommendation

Agencies should review and enforce password controls to strengthen security over sensitive systems. As a minimum, password parameters should include:

  • minimum password lengths and complexity requirements
  • limits on the number of failed log-in attempts
  • password history (such as the number of passwords remembered)
  • maximum and minimum password ages.

2.2 Cyber Security

Cyber security framework

Agencies do not have a common view on what constitutes a cyber attack, which limits understanding the extent of the cyber security threat.

Recommendation

The Department of Finance, Services and Innovation should revisit its existing framework to develop a shared cyber security terminology and strengthen the current reporting requirements for cyber incidents.

Cyber security strategies

While 82 per cent of agencies have dedicated resources to address cyber security, they can strengthen their strategies, expertise and staff awareness.

Recommendations

The Department of Finance, Services and Innovation should:

  • mandate minimum standards and require agencies to regularly assess and report on how well they mitigate cyber security risks against these standards
  • develop a framework that provides for cyber security training.

Agencies should ensure they adequately resource staff dedicated to cyber security.

2.3 Other IT systems

Change control processes

Some agencies need to improve change control processes to avoid unauthorised or inaccurate system changes.

Recommendation

Agencies should consistently perform user acceptance testing before system upgrades and changes. They should also properly approve and document changes to IT systems.

Disaster recovery planning

Agencies can do more to adequately assess critical business systems to enforce effective disaster recovery plans. This includes reviewing and testing their plans on a timely basis.

Recommendation

Agencies should complete business impact analyses to strengthen disaster recovery plans, then regularly test and update their plans.

Agency service delivery relies on developing and renewing infrastructure assets such as schools, hospitals, roads, or public housing. Agencies are currently investing significantly in new assets. Agencies need to manage the scale and volume of current capital projects in order to deliver new infrastructure on time, on budget and realise the intended benefits. We found agencies can improve how they:

  • manage their major capital projects
  • dispose of existing assets.
Issues Recommendations or conclusions

3.1 Capital investment

Capital asset investment ratios

Most agencies report high capital investment ratios, but one-third of agencies’ capital investment ratios are less than one.

Recommendation

Agencies with high capital asset investment ratios should ensure their project management and delivery functions have the capacity to deliver their current and forward work programs.

Volume of capital spending

Most agencies have significant forward spending commitments for capital projects. However, agencies’ actual capital expenditure has been below budget for the last three years.

Conclusion

The significant increase in capital budget underspends warrant investigation, particularly where this has resulted from slower than expected delivery of projects from previous years.

3.2 Capital projects

Major capital projects

Agencies’ major capital projects were underspent by 13 percent against their budgets.

Conclusion

The causes of agency budget underspends warrant investigation to ensure the NSW Government’s infrastructure commitment is delivered on time.

Capital project governance

Agencies do not consistently prepare business cases or use project steering committees to oversee major capital projects.

Conclusion

Agencies that have project management processes that include robust business cases and regular updates to their steering committees (or equivalent) are better able to provide those projects with strategic direction and oversight.

3.3. Asset disposals

Asset disposal procedures

Agencies need to strengthen their asset disposal procedures.

Recommendations

Agencies should have formal processes for disposing of surplus properties.

Agencies should use Property NSW to manage real property sales unless, as in the case for State owned corporations, they have been granted an exemption.

Governance refers to the high-level frameworks, processes and behaviours that help an organisation to achieve its objectives, comply with legal and other requirements, and meet a high standard of probity, accountability and transparency.

This chapter sets out the governance lighthouse model the Audit Office developed to help agencies reach best practice. It then focuses on two key areas: continuous disclosure and shared services arrangements. The following two chapters look at findings related to ethics and risk management.

Issues Recommendations or conclusions

4.1 Governance arrangements

Continuous disclosure

Continuous disclosure promotes improved performance and public trust and aides better decision-making. Continuous disclosure is only mandatory for NSW Government Businesses such as State owned corporations.

Conclusion

Some agencies promote transparency and accountability by publishing on their websites a continuous disclosure policy that provides for, and encourages:

  • regular public disclosure of key performance information
  • disclosure of both positive and negative information
  • prompt reporting of significant issues.

4.2 Shared services

Service level agreements

Some agencies do not have service level agreements for their shared service arrangements.

Many of the agreements that do exist do not adequately specify controls, performance or reporting requirements. This reduces the effectiveness of shared services arrangements.

Conclusion

Agencies are better able to manage the quality and timeliness of shared service arrangements where they have a service level agreement in place. Ideally, the terms of service should be agreed before services are transferred to the service provider and:

  • specify the controls a provider must maintain
  • specify key performance targets
  • include penalties for non-compliance.

Shared service performance

Some agencies do not set performance standards for their shared service providers or regularly review performance results.

Conclusion

Agencies can achieve better results from shared service arrangements when they regularly monitor the performance of shared service providers using key measures for the benefits realised, costs saved and quality of services received.

Before agencies extend or renegotiate a contract, they should comprehensively assess the services received and test the market to maximise value for money.

All government sector employees must demonstrate the highest levels of ethical conduct, in line with standards set by The Code of Ethics and Conduct for NSW government sector employees.

This chapter looks at how well agencies are managing these requirements, and where they can improve their policies and processes.

We found that agencies mostly have the appropriate codes, frameworks and policies in place. But we have highlighted opportunities to improve the way they manage those systems to reduce the risks of unethical conduct.

Issues Recommendations or conclusions

5.1 Ethical framework

Code of conduct

All agencies we reviewed have a code of conduct, but they can still improve the way they update and manage their codes to reduce the risk of fraud and unethical behaviour.

Recommendation

Agencies should regularly review their code-of-conduct policies and ensure they keep their codes of conduct up-to-date.

Statement of business ethics

Most agencies maintain an ethical framework, but some can enhance their related processes, particularly when dealing with external clients, customers, suppliers and contractors.

Conclusion

Agencies can enhance their ethical frameworks by publishing a Statement of Business Ethics, which communicates their values and culture.

5.2 Potential conflicts of interest

Conflicts of interest

All agencies have a conflicts-of-interest policy, but most can improve how they identify, manage and avoid conflicts of interest.

Recommendation

Agencies should improve the way they manage conflicts of interest, particularly by:

  • requiring senior executives to make a conflict-of-interest declaration at least annually
  • implementing processes to identify and address outstanding declarations
  • providing annual training to staff
  • maintaining current registers of conflicts of interest.

Gifts and benefits

While all agencies already have a formal gifts-and-benefits policy, we found gaps in the management of gifts and benefits by some that increase the risk of unethical conduct.

Recommendation

Agencies should improve the way they manage gifts and benefits by promptly updating registers and providing annual training to staff.

Risk management is an integral part of effective corporate governance. It helps agencies to identify, assess and prioritise the risks they face and in turn minimise, monitor and control the impact of unforeseen events. It also means agencies can respond to opportunities that may emerge and improve their services and activities.

This year we looked at the overall maturity of the risk management frameworks that agencies use, along with two important risk management elements: risk culture and risk registers.

Issues Recommendations or conclusions

6.1 Risk management maturity

All agencies have implemented risk management frameworks, but with varying levels of maturity in their application.

Agencies’ averaged a score of 3.1 out of five across five critical assessment criteria for risk management. While strategy and governance fared best, the areas that most need to improve are risk culture, and systems and intelligence.

Conclusion

Agencies have introduced risk management frameworks and practices as required by the Treasury’s:

  • 'Risk Management Toolkit for the NSW Public Sector'
  • 'Internal Audit and Risk Management Policy for the NSW Public Sector'.

However, more can be done to progress risk management maturity and embed risk management in agency culture.

6.2 Risk management elements

Risk culture

Most agencies have started to embed risk management into the culture of their organisation. But only some have successfully done so, and most agencies can improve their risk culture.

 

 

Conclusion

Agencies can improve their risk culture by:

  • setting an appropriate tone from the top
  • training all staff in effective risk management
  • ensuring desired risk behaviours and culture are supported, monitored, and reinforced through business plans, or the equivalent and employees' performance assessments.

Risk registers and reporting

Some agencies do not report their significant risks to their lead agency, which may impair the way resources are allocated in their cluster. Some agencies do not integrate risk registers at a divisional and whole-of-enterprise level.

Conclusion

Agencies not reporting significant risks at the cluster level increases the likelihood that significant risks are not being mitigated appropriately.

Effective risk management can improve agency decision-making, protect reputations and lead to significant efficiencies and cost savings. By embedding risk management directly into their operations, agencies can also derive extra value for their activities and services.

Published

Actions for Transport 2017

Transport 2017

Transport
Asset valuation
Information technology
Internal controls and governance
Project management

The following report focuses on key observations and findings from the most recent financial statement audits of agencies in the Transport cluster.

Unqualified audit opinions were issued for all agencies' financial statements. However, the report notes the agencies can improve their asset revaluation processes.

1. Financial reporting and controls

Audit opinions

Unqualified audit opinions were issued for all agencies' financial statements.

Early close

Early close procedures continue to facilitate timely preparation of financial statements and completion of audits, but agencies can improve their asset revaluation processes. The revaluations were not completed by the early close deadline.
Key audit matters The cluster corrected the value of rail tunnels and earthworks by recording an additional $8.5 billion in infrastructure assets.
Passenger revenue and patronage Revenue increased by seven per cent at a similar rate to patronage. Opal fare structure changes came into effect on 5 September 2016. Continued rises in patronage can increase pressure on public transport punctuality.
Negative balances on Opal Cards

There was $2.6 million in revenue not collected during 2016–17 financial year through negative balance Opal Cards. This represents 0.2 per cent of total annual passenger revenue. Transport advise the cumulative balance of negative balance Opal Cards is $4.2 million as at 30 June 2017.

Recommendation: Transport for NSW (TfNSW) should implement measures to prevent loss of revenue from passengers tapping off with negative balance Opal Cards.

Investment in infrastructure Agencies spent $8.5 billion on assets in 2016–17 and have contractual capital commitments of $11.3 billion over the next five years.
Internal controls IT systems user access administration remains an area of weakness.


2. Service Delivery

Punctuality According to Transport data, average punctuality is above target for Sydney Trains, Ferries and Light Rail, but below target for NSW Trains services. State Transit Authority of NSW (STA) is not meeting punctuality targets. STA continued working with TfNSW on delivering improved punctuality.
Public transport capacity Passenger crowding is above benchmark for many morning peak suburban rail services, as indicated by Transport data. Eleven of the 14 bus contract regions had full buses.

Bus crowding

There are no target measures on crowding for bus operators in any contract region.

Recommendation: TfNSW should develop target measures on crowding for bus operators in all contract regions and publish the results.

Customer satisfaction

Surveys conducted by Transport indicate customer satisfaction exceeded target for all modes of public transport.

This report provides Parliament and other users of Transport cluster agencies' financial statements with audit results, observations, conclusions and recommendations in the following areas:

  • Financial reporting and controls
  • Service delivery.

Confidence in public sector decision-making and transparency is enhanced when financial reporting is accurate and timely. Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies.

This chapter outlines our audit observations, conclusions or recommendations related to financial reporting and controls of Transport cluster agencies for 2016–17.

Observation Conclusion or recommendation
Quality of financial reporting
Unqualified opinions were issued for all agencies’ financial statements. Unqualified audit opinions were issued on the 2016–17 financial statements of all agencies in the Transport cluster. Agencies complied with the new disclosure requirements required under accounting standard AASB 124 'Related Party Disclosures'.
Old tunnels and earthworks valued. The cluster corrected the value of rail tunnels and earthworks by recording an additional $8.5 billion in infrastructure assets.
Timeliness of financial reporting  
Most agencies complied with the statutory timeframes for completion of early close procedures and preparation and audit of financial statements. Early close procedures continue to facilitate timely preparation of financial statements and completion of audits, but agencies can make further improvement in the revaluation process.
TfNSW and RailCorp completed asset revaluations after the early close deadline. While all revaluation matters were resolved and corrected, completing the revaluation process earlier would enable more timely review, identification and resolution of matters.
Passenger revenue, patronage and cost recovery
Revenue increased by 7 per cent at a similar rate to patronage. Public transport passenger revenue increased by $93 million (seven per cent) in 2016–17, and patronage increased by 49 million (seven per cent) across all modes of transport. There were some changes in the method of calculating reported patronage between 2015–16 and 2016–17. If the methods had been consistent, the patronage increase would be 6.5 per cent. Opal fare structure changes came into effect on 5 September 2016.
Value of negative balance Opal Cards doubled since last year.

There was $2.6 million in revenue not collected during 2016–17 financial year through negative balance Opal Cards. This represents 0.2 per cent of total annual passenger revenue. Transport advise the cumulative balance of negative balance Opal Cards is $4.2 million as at 30 June 2017.

Recommendation: TfNSW should implement measures to prevent the loss of revenue from passengers tapping off with negative balance Opal cards.

The overall cost recovery from users of public transport increased slightly to 21.3 per cent. Cost of service per passenger journey for buses and ferries decreased. Revenue per passenger journey for all modes remained fairly stable.
Investment in infrastructure
There was a significant investment in transport assets in 2016–17. Agencies spent $8.5 billion on assets in 2016–17, including $3.8 billion on rail systems and $3.8 billion on road and maritime infrastructure systems.
Transport cluster have capital commitment of $11.3 billion over the next five years.
 
The transport cluster has significant contractual commitments over the next five years on rail and road infrastructure projects.
 

Internal controls

User access administration over systems remains an area of weakness. We identified six moderate and eight low risk issues related to user systems access administration across four agencies. This included review of highly privileged/super user account transactions not performed effectively and user access reviews not performed. These weaknesses increase the risk of users having excessive or unauthorised access to critical financial systems and information.

Achievement of government outcomes can be improved through effective delivery of the right mix of services, whether from the public, private or not‑for‑profit sectors. Service delivery reform will be most successful if there is clear accountability for service delivery outcomes, decisions are aligned to strategic direction and performance is monitored and evaluated.

This chapter outlines our audit observations, conclusions or recommendations related to service delivery in the Transport cluster agencies for 2016–17.

Observations Conclusion or recommendation

Punctuality

Average punctuality is above target for Sydney Trains, but below target for NSW Trains services. Punctuality targets are not met by all bus operators. Meeting punctuality targets is a continuing challenge for NSW Trains’ and STA bus services.
The 2017 performance audit 'Passenger Rail Punctuality' reported that based on forecast patronage increases, rail agencies will find it hard to maintain punctuality after 2019 unless the capacity of the network to carry trains and people is increased significantly. The 2017 performance audit found that given the likely lead times involved with major infrastructure projects, there remains a significant risk of poor punctuality after 2019. Transport advised it is currently either delivering or planning rail network upgrades to address current growth and longer-term future demand. This includes investments such as procurement of suburban and intercity trains, Sydney Metro services and further timetable planning into the 2020s.
 
After reaching its punctuality target in 2015–16 for the first time in 13 years, NSW Trains regional services was below the target in 2016–17. NSW Trains regional services achieved an average of 75 per cent punctuality in 2016–17, four per cent less than 2015–16.
The bus contracts do not have an option to impose financial penalties on STA for poor punctuality performance. In 2015–16, we recommended TfNSW should consider including financial penalties for not meeting each punctuality KPI in future contracts with bus operators. An opportunity to implement the recommendation requires a contract renewal process to be finalised with STA, which did not occur during 2016–17.

Public transport capacity

There are no target measures on crowding for bus operators in any contract region. Recommendation: TfNSW should develop target measures on crowding for bus operators in all contract regions and publish the results.

Customer Satisfaction

Customers on ferries continued to be most satisfied, followed by those on light rail. Sydney Trains and NSW Trains had fewer complaints in 2016–17. Customer satisfaction exceeded target for all modes of transport.

Project management

Transport cluster manages many of the State high profile/high risk projects. Major Transport projects include WestConnex, Sydney Metro Northwest, Sydney Metro City and Southwest, Woolgoolga to Ballina - Pacific Highway upgrade, NorthConnex, CBD and South East Light Rail and Newcastle Light Rail.
Safety performance
Road fatalities decreased by eight per cent between July 2016 and June 2017, from 390 to 359 deaths. Road fatalities mainly involved speed, fatigue and vehicle occupants not wearing available restraints.
 

Maintenance

RMS’ maintenance backlog of $3.7 billion is higher than the $3.4 billion reported in 2016. Transport cluster agencies manage $134 billion in property, plant and equipment. The total backlog maintenance of $4.1 billion at 30 June 2017 represents 3.1 per cent of those assets.

Published

Actions for Family and Community Services 2017

Family and Community Services 2017

Community Services
Asset valuation
Compliance
Financial reporting
Information technology
Internal controls and governance
Procurement
Project management

The following report focuses on key observations and findings from the most recent audits of agencies in the Family and Community Services cluster.

The report includes a range of findings on service delivery. The Department of Family and Community Services' data indicates that family preservation programs are having a positive impact on children and young people entering statutory care. On the other hand, waiting times for social housing applicants increased in 2016-17.
 

1. Financial reporting and controls

Quality of financial reporting Unqualified audit opinions were issued for all cluster agencies' financial statements.   
Timeliness of financial reporting Agencies completed mandatory early close procedures and all but one agency submitted financial statements by the statutory deadline.
Internal controls The 2016–17 audits reported 29 internal control improvements to cluster agencies’ management. None of these findings were high risk. Eleven related to information technology control weaknesses in key financial business systems.

2. Service Delivery

Commissioning Non-government organisations (NGOs) received $2.6 billion in 2016–17 to deliver services.
Children and young people

The Department of Family and Community Services data indicates that family preservation programs are reducing the number of children and young people entering statutory care.

The Department's data shows 86 per cent of children and young people in statutory care had their placements reviewed in the 12 months to 30 June 2017. Legislation requires all placements are reviewed at least every 12 months.

Social Housing The Department's data shows waiting times for social housing applicants are longer than last year.
People with disability Under the current timetable for implementing the National Disability Insurance Scheme, the Department plans to transfer direct disability services to NGOs by 30 June 2018.

This report provides Parliament and others with the audit results, observations, conclusions and recommendations for Family and Community Services cluster agencies. The report has been structured into two chapters focusing on financial reporting and controls and service delivery.

The Family and Community Services cluster works with children, adults, families and communities to improve lives and help people realise their potential.

This chapter outlines audit observations, conclusions and recommendations related to the financial reporting and controls of agencies in the Family and Community Services cluster for 2016–17.

Financial reporting is an important element of good governance. Confidence in public sector decision making and transparency is enhanced when financial reporting is accurate and timely.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

Observation Conclusion or recommendation
2.1 Quality of financial reporting
Unqualified audit opinions were issued for all cluster agencies' financial statements. The quality of financial reporting remains high across the cluster.
2.2 Timeliness of financial reporting
Agencies completed mandatory early close procedures and all but one submitted financial statements by the deadline. Early close procedures continue to allow issues and financial reporting risk areas to be addressed early in the audit process. There are opportunities to improve effectiveness of early close procedures.
2.3 Internal controls
The 2016–17 audits reported 29 internal control weaknesses. While none were high risk, the Department had five repeat issues.

 
Management accepted the audit findings and advised they are actioning recommendations. Timely action is important to ensure internal controls operate effectively.
Eleven of these internal control weaknesses were related to IT system user access administration and security over financial systems.

Controls weaknesses may compromise the integrity and security of financial data.

Recommendation

Agencies should:

  • ensure policies for creating, modifying and deactivating user access are documented
  • enhance the current user access review process
  • log and monitor highly privileged user account activity
  • ensure timely removal of access to business systems for terminated and casual employees
  • ensure password parameters comply with internal policies.

Government outcomes can be improved by delivering the right mix of services, whether from the public, private or not for profit sectors. Service delivery reform will be most successful if there is clear accountability for service delivery outcomes, decisions are aligned to strategic direction and performance is monitored and evaluated.

This chapter outlines our audit observations, conclusions and recommendations related to service delivery by agencies in the Family and Community Services cluster for 2016–17.

Observation Conclusion or recommendation

3.1 Commissioning

Non-government organisations (NGOs) received $2.6 billion funding in 2016–17 to deliver services. Commissioning of service delivery can change the profile of risks that need to be managed. The Department has established a Commissioning Division and developed its ‘Commissioning for Better Outcomes Framework’. 

3.2 Children and young people

All the Department's Districts are accredited to provide out-of-home care services.

The Department's data indicates 66 more children and young people were in statutory care at 30 June 2017 compared to 30 June 2016. This contrasts to the previous year where 1,150 more children were in statutory care at 30 June 2016 than at 30 June 2015.

The Department is complying with out-of-home care service standards, but one District has an additional condition attached to its accreditation.

Department’s data indicates that family preservation programs are having a positive impact..

The Department's data shows 86 per cent of children and young people in statutory care had their placement reviewed at 30 June 2017.

The Department’s data shows, at 30 June 2017, 41 per cent of children and young people with closed case plans for the 12 months ended 30 June 2016 were re-reported at risk of significant harm.

The Department did not meet the legislative requirement to review the placement of all children and young people in statutory care annually.

The number of children being re-reported at risk of significant harm is above the Premier’s Priority target of 34 per cent by June 2019.
 

3.3. Social Housing

Waiting time for priority and non-priority social housing applicants increased in 2016–17, by 19 per cent and 3 per cent respectively. Some factors impacting waiting time for social housing applicants are outside the control of the Department.

3.4 People with disability

A Bilateral Agreement between the Australian and NSW Governments sets out how eligible persons access the National Disability Insurance Scheme (NDIS) between 1 July 2016 and 30 June 2018.
 
Under the timetable for the NDIS, the Department plans to transfer direct disability services to NGOs.
 

Published

Actions for Central Agencies 2017

Central Agencies 2017

Finance
Premier and Cabinet
Asset valuation
Compliance
Financial reporting
Fraud
Information technology
Internal controls and governance
Project management

This report highlights the results of the financial audits of NSW Government central agencies. The report focuses on key observations and findings from the most recent financial statement audits of agencies in the Treasury, Premier and Cabinet, and Finance, Services and Innovation clusters.

The report includes a range of findings in respect to service delivery. One repeat finding is that while the Government regularly reports on the 12 Premier's priorities, there is no comprehensive reporting on the 18 State priorities. 

1. Financial reporting and controls

Audit Opinions Unqualified audit opinions were issued for all agencies' 30 June 2017 financial statements.
Early close Early close procedures continue to facilitate the timely preparation of financial statements and completion of audits, but agencies can make further improvement.
Deficient user administration access User access administration over financial systems remains an area of weakness. Agencies need to strengthen user access administration to critical systems.
Transitioning to outsourced service providers Transitioning of services to outsourced service providers can be improved. Outsourcing services can lead to better outcomes, which may include lower transaction costs and improved services, but it also introduces new risks.

2. Service delivery

Premier and State Priorities   A comprehensive report of performance against the 18 State Priorities is yet to be published. While some measures are publicly reported through agency annual reports or other sources, a comprehensive report of performance against the 18 State Priorities would ensure all State Priorities are publicly reported, provide a single and easily accessible source of reference and improve transparency.
ICT and digital government The Digital Government Strategy was released in May 2017. Targets will need to be set to assess and monitor progress against the Strategy.
Digital information security Not all agencies are complying with the NSW Government's information security policy. This increases the risk of noncompliance with legislation, information security breaches and difficulty restoring data or maintaining business continuity in the event of a disaster or disruption.
Property and asset utilisation Property NSW's performance reporting would be enhanced by developing and reporting on customer satisfaction, reporting against set targets and benchmarking cost of service to the private sector.

3. Government financial services

Prudential oversight
of NSW Government superannuation
funds  
Prudential oversight of SAS Trustee Corporation Pooled Fund and Parliamentary Contributory Superannuation Fund has not been prescribed. Structured and comprehensive prudential oversight of these funds remains important as they operate in a specialised, complex and continuously changing investment market sector, have over 106,000 members and manage investments in excess of $42.4 billion.
Green slip scheme affordability Currently, Green Slips in NSW are the most expensive in Australia. However, CTP reforms are expected to reduce the cost of Green Slips.

This report sets out the results of the 30 June 2017 financial statement audits of NSW Government's central agencies and their cluster agencies.

Central agencies play a key role in ensuring policy coordination, good administrative and people management practices and prudent fiscal management. The central agencies and their key responsibilities are set out below.

Confidence in public sector decision‑making and transparency is enhanced when financial reporting is accurate and timely. Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. This chapter outlines our audit observations, conclusions or recommendations related to financial reporting and controls of agencies for 2016–17.

Observation Conclusion or recommendation
2.1 Quality of financial reporting
Unqualified audit opinions were issued for all agency financial statements. The quality of financial reporting continues to remain strong across the clusters.
2.2 Timeliness of financial reporting
Most agencies complied with the statutory timeframes for completion of early close procedures and preparation and audit of financial statements. Early close procedures continue to facilitate the timely preparation of financial statements and completion of audits, but agencies can make further improvement.
2.3 Financial performance and sustainability
We assessed the performance of agencies listed in Appendix six against some key financial sustainability indicators. This highlighted two agencies with negative operating margins of more than ten per cent and one agency with a liquidity ratio of less than 0.5. These agencies have strategies in place to remain financially sustainability and manage their liquidity. Our analysis found that, overall, the agencies are not at high risk of sustainability concerns.
2.4 Internal Controls

User access administration over financial systems remains an area of weakness. Sixteen moderate risk and ten low risk issues related to user access administration across eight agencies were identified. 

Recommendation: Agencies should review user access administration to critical systems to ensure:

  • policies for user access creation, modification and deactivation are documented
  • approval is being obtained to establish, modify or delete user accounts
  • regular user access reviews are performed and highly privileged user account activity is logged and monitored
  • evidence of review is maintained.

Transitioning of services to outsourced service providers can be improved. Our 2016–17 audits identified one high risk issue relating to Property NSW's outsourcing of property and facility management services to the private sector.

While a high risk issue was identified in 2015–16 from the Department of Finance, Services and Innovation's outsourcing of transactional and information technology services to GovConnect there has been an improvement in GovConnect's internal control environment throughout
2016–17.

Outsourcing services can lead to better outcomes, which may include lower transaction costs and improved services, but it also introduces new risks. The transition needs to be carefully managed and requires thorough planning and effective project governance. This should be supported by oversight and direction from senior management and independent project assurance.
2.5 Human Resources    
The percentage of full‑time equivalent staff with annual leave greater than 30 days in the Finance, Services and Innovation, Premier and Cabinet and the Treasury clusters is 7.9 per cent, 17.1 per cent and 18.4 per cent respectively. Agencies have strategies in place to reduce annual leave balances that are greater than 30 days. The effectiveness of these strategies will need to be monitored to ensure they are helping to achieve the desired outcome.

This chapter outlines our audit observations, conclusions and recommendations relating to service delivery for 2016–17. 

Observation Conclusion or recommendation
3.1 Premier and State priorities

The Department of Premier and Cabinet monitors the achievement of targets and the implementation of initiatives to deliver the 12 Premier’s Priorities.

Responsible ministers and agencies manage the 18 State Priorities. A comprehensive report of performance against the 18 State Priorities is yet to be published.

While some measures are publicly reported through agency annual reports or other sources, a comprehensive report of performance against the 18 State Priorities would ensure all State Priorities are publicly reported, provide a single and easily accessible source of reference and improve transparency.
Where possible, independent sources are used to measure performance, however without independent assurance there is an increased risk that the target measures are inaccurate, not relevant or do not fairly represent actual performance.

Performance against the State Priority to make NSW the easiest state to start a business is not currently published.

A key aspect of making NSW the easiest state to start a business is making regulatory obligations easier to understand and implement.

Initiatives, such as easy to do business and red tape reduction are in place to help achieve this priority.

The regulatory policy framework is under review following an October 2016 performance audit on ‘Red tape reduction’ that found the regulatory burden of legislation had increased.
3.2 Financial management
Revenue NSW earned record crown revenue of $30.0 billion in 2016–17 to support the state's finances. Record crown revenue has been driven by the sustained increase in duties revenue, which has increased by 93.7 per cent over the last five years. This is a consequence of the continued strength in the property market over this time and large one off NSW Government business asset sales and leases.
3.3 ICT and digital government
The Digital Government Strategy (the Strategy) was released in May 2017 to build on reforms set out in previous ICT strategies. The Strategy’s priorities and enablers aim to support digital innovation. Targets and measures will need to be set to assess and monitor progress against the Strategy.
The Digital Information Security Policy (DISP) is a key tool that helps ensure a minimum set of information security controls are implemented across NSW Government agencies.

A review of 2016 annual reports found 15 agencies (13 in 2015) did not attest to compliance with the DISP and of the agencies that attested to compliance, 34 reported issues associated with their compliance.

The Strategy’s priorities and enablers aim to support digital innovation. Targets and measures will need to be set to assess and monitor progress against the Strategy.

Failure to comply with the DISP increases the risk of noncompliance with legislation, information security breaches and difficulty restoring data or maintaining business continuity in the event of a disaster or disruption.

3.4 Property and asset utilisation

Property NSW's performance reporting could be
improved. M2012-20 'Government Property NSW
and Government Property Principles' required
Property NSW to set key performance indicators
to measure property and asset utilisation
performance.
 

Property NSW's performance reporting would be enhanced by developing and reporting on customer satisfaction, reporting against set targets and benchmarking cost of service to the private sector.

This chapter outlines our audit observations, conclusions and recommendations specific to NSW Government agencies providing financial services.

Observation Conclusion or recommendation
4.1 Key issues

The SAS Trustee Corporation (STC) Pooled Fund and the Parliamentary Contributory Superannuation (PCS) Fund are not required to comply with the prudential and reporting standards issued by the Australian Prudential Regulation Authority (APRA). Amendments to relevant legislation allows the Minister for Finance, Services and Property to prescribe applicable prudential standards and audit requirements.

Structured and comprehensive prudential oversight of these funds remains important as they operate in a specialised, complex and continuously changing investment market sector, have over 106,000 members and manage investments of more than $42.4 billion.

Recommendation: The Treasury should liaise with
the respective Trustees to implement appropriate
prudential standards and oversight arrangements for
the exempt public sector superannuation funds.

Currently, Green Slips in NSW are the most expensive in Australia. Average premiums for Sydney Metropolitan vehicles increased by 10.4 per cent between 1 January 2016 and 31 December 2016.

CTP reforms are expected to reduce the cost of Green Slips. The State Insurance Regulatory Authority will need to ensure it has appropriate processes in place to track and report against the expected benefits.
4.2 Financial performance and sustainability
Net unfunded superannuation liabilities were $15.0 billion at 30 June 2017.

Under the Fiscal Responsibility Act 2012, the NSW Government’s target is to eliminate unfunded superannuation liabilities by 2030.
The superannuation funds’ strategic asset allocation and investment strategies are monitored and adjusted to help achieve a fully funded position by 2030.
The Home Warranty Scheme commenced in 2011. Over this time total premiums collected have not been sufficient to cover expected claim costs. Funding arrangements introduced during 2016–17 allow the Home Building Compensation Fund to apply to the Crown for reimbursement of unfunded realised losses from under-pricing of premiums.

Other reforms are planned to address the long term sustainability of the home building compensation scheme.
4.3 Investment performance
The NSW Government’s main superannuation funds have maintained the management expense ratio (MER) at consistent levels over the past two years. The Parliamentary Contributory Superannuation (PCS) Fund does not set an MER target. MER is an industry recognised ratio to measure the performance of funds and investment managers.

Recommendation: The Fund Secretary for the PCS Fund, in conjunction with the Trustee, should consider establishing an appropriate management expense ratio target to measure performance.

Published

Actions for Sydney Road Maintenance Contracts

Sydney Road Maintenance Contracts

Transport
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management

In November 2013, Roads and Maritime Services (RMS) outsourced the maintenance of State roads in the Sydney region south and west zones using an innovative contracting approach called the Stewardship Maintenance Contract (SMC). The SMC links risk to reward, and uses a performance framework where outcomes should drive improved performance over time.

RMS’ SMC contract management includes most elements of good practice, including governance and dispute resolution mechanisms. However, key elements are missing which reduces its effectiveness.

Roads and Maritime Services (RMS) is responsible for the Sydney region State roads network This includes over 2,800 kilometres of roads and associated road corridor infrastructure such as bridges, tunnels and drainage structures. RMS divides the network into three geographical areas: south, west and north zones.

In 1995, RMS first outsourced road corridor infrastructure maintenance for the north zone through a Performance Specified Maintenance Contract (PSMC). The current 10-year PSMC for the north zone will expire in October 2018. Prior to November 2013, RMS maintained roads in the south and west zones through its Road and Fleet Services unit. 

In November 2013, RMS outsourced road maintenance services for the south and west zones using Stewardship Maintenance Contracts (SMC). The contracts run for seven years with an option for a further three years at RMS’ discretion. RMS estimated that the annual cost of these contracts was around $240 million in total. In March 2018, the contract prices are due to be reset by negotiation to reflect the contractors’ experience with, and better information about, the road networks and routine maintenance requirements. 

The SMC model adopted stewardship principles to improve value for money. RMS defined stewardship principles as a broad set of values, attitudes and behaviours, required of the contractor to effectively manage the assets on behalf of RMS. The SMC also includes commercial principles, such as linking risk to reward, and a performance framework where outcomes drive performance.

This audit assessed whether RMS had effectively managed the outsourcing of road maintenance in the Sydney region south and west zones. In making this assessment, we answered the following questions:

  1. Did RMS justify the decision to adopt the SMC model?
  2. Do SMCs include key performance indicators (KPIs) and incentives which promote efficiency and effectiveness? 
  3. Does RMS collect high quality information on contractor performance and take action to correct performance deficiencies?
  4. Are the expected benefits being achieved?

Conclusion

RMS developed an innovative contracting approach with the SMC. RMS has realised some benefits in the first year, including savings, from outsourcing road maintenance in the Sydney region south and west zones using the SMC. However, RMS’ management of the SMC has key elements missing which reduces its effectiveness.

The SMC includes performance measures and incentives to drive efficiency and effectiveness improvements over time.  

RMS has established a contract management framework which includes most elements of good practice, including governance and dispute resolution mechanisms. However, it does not have procedures to guide its contract managers in managing specific provisions of the SMC. Consequently, RMS has not exercised several significant SMC requirements, such as having the contractor account for an efficiency dividend in its pricing at the start of each three-year works period. It also has not done enough to assure itself that the contractor provided performance and financial data are correct. This is important because the data is used to measure performance and calculate contractor payments.  

RMS assessed that it had achieved around 80 per cent of the expected cost benefit in the initial year of the SMC. However, it has not tracked its achievement of benefits since then.

The Stewardship Maintenance Contract

RMS justified adopting the SMC model and included KPIs to drive efficiency and effectiveness

The SMC model includes features that RMS had not previously used for road maintenance contracts. These included adopting stewardship principles and transferring price risk to the contractor over time as the contractor becomes familiar with the assets being maintained.

The SMC model meets RMS’ requirements for flexibility in pricing models, the need for collaboration in asset maintenance planning, promoting innovation and effective performance management.

RMS used many good practices to develop the SMC model, including:

  • preparing a robust business case comparing the SMC model to RMS maintaining the road network itself, as well as assessing whether two other contracting models
    (traditional and alliance) would meet its requirements
  • assessing experiences with similar arrangements in other jurisdictions and identifying elements that worked to get the best outcomes
  • developing a robust performance framework, which included a mix of efficiency and effectiveness KPIs that reflected NSW Government policy and RMS priorities
  • incorporating risk and reward incentives delivered through cost sharing arrangements which change as the contract matures
  • using a contract duration that supports RMS priorities and provides an incentive for better quality outcomes.

RMS uses data provided by the contractor to measure performance and calculate payments to the contractor. The SMC includes a specific sanction if RMS finds that the contractor provided incorrect performance data, but no specific sanction if the contractor provides incorrect financial data. If RMS finds that the contactor provided incorrect performance or financial data, RMS can only recover over-payments which may have been made using the incorrect data.  

To provide a stronger incentive for the contractor to ensure data it provides is accurate, RMS should consider whether to incorporate stronger sanctions when negotiating the commercial reset due in mid-2018 for south and west zones. RMS should also consider this for the new contract for the north zone when the current PSMC contract expires in October 2018.

RMS' contract management approach and benefits realization

RMS can improve the effectiveness of its oversight and management of the SMC

RMS does not have SMC specific contract procedures to guide its contract managers. Consequently, RMS has not exercised several significant SMC requirements, such as having the contractors account for an efficiency dividend in their pricing at the start of each three-year works period. Effective contract management should be supported by contract specific procedures, with explanations of, and allocation of responsibility for, the various interventions that RMS may be required to exercise in the SMC.

Performance and financial reporting under the SMC is based on a mix of RMS and contractor provided data. While there are a range of audits of contractor provided performance and financial data that RMS can conduct each year under the SMC, it does not have a schedule of audits it will conduct and when.  
During the first year of the SMC, RMS commissioned some limited audits of financial data. In the first three years of the SMC, RMS did not conduct any audits of performance data. Had there been SMC specific procedures in place, this would have reduced the risk of RMS not implementing a systematic audit program to give it reasonable assurance on the quality of the data that the contractor has provided. This is important because the data is used to measure performance and calculate contractor payments.

RMS has been aware of data quality issues since 2015. While RMS advised that it commenced addressing some data quality issues in response to a series of reviews conducted in 2015, a recent internal audit report indicates that RMS has not resolved the data quality issues.  

RMS achieved benefits in the first year, but has not tracked benefits since

As part of the business case, RMS agreed to implement a benefits realisation strategy, including a benefits tracking tool. RMS commenced tracking benefits, but did not establish a comparative baseline pre-SMC on non-financial benefits, and has not tracked benefits past year one.

In 2015, a benchmarking study commissioned by RMS found that it had achieved 80 per cent of the expected recurrent cost savings and other benefits, such as improved workplace safety, in the first full year of the SMC. However, there was no clear baseline to measure
non-financial performance. The study was qualified due to gaps in available data. The study also did not reconcile the actual one-off transition costs to the business case estimate.

During the course of the audit, RMS advised that it intends to repeat this type of study to determine whether it has achieved all expected benefits (and their value), and that it would use the results to inform its negotiation with the SMC contractors as part of the commercial reset due in mid-2018.

Roads and Maritime Services is responsible for the State Roads network in the Sydney region

Roads and Maritime Services (RMS) is responsible for the Sydney region State roads network. This includes over 2,800 kilometres of roads and associated road corridor infrastructure such as bridges, tunnels and drainage structures. The network is divided into three geographical areas: south, west and north zones. Prior to November 2013, RMS maintained roads in the Sydney region south and west zones through its Road and Fleet Services unit.  

In 1995, RMS first outsourced road corridor infrastructure maintenance for the north zone through a Performance Specified Maintenance Contract (PSMC). The current 10-year PSMC for the north zone will expire in October 2018. This contract is worth around $35 million per annum.  

NSW Government priorities and road maintenance

Efficient and effective road maintenance contributes to the following NSW Government priorities:

  • improving road travel reliability
  • ensuring on-time running of public transport
  • reducing road fatalities
  • improving government services
  • keeping our environment clean.

The NSW Commission of Audit recommended outsourcing the maintenance of State roads

The NSW Commission of Audit in its Final Report on Government Expenditure (May 2012) recommended contestability as an appropriate strategy to consider for improving road maintenance service delivery for State roads.  

The Commission benchmarked RMS’ road surface quality and cost per lane kilometre against those of Western Australia, Victoria, and Queensland. This showed that New South Wales lagged the other states on both these measures.  

Exhibit 1: Interjurisdictional comparison of road maintenance outcomes 2009–10
  WA VIC QLD NSW
Roads managed (lane kms) 52,659 50,510 71,353 80,348
Estimated spend ($/lane km) 5,000 4,500 6,000 7,000
Road quality measure (%) 99 99 94 91

Source: NSW Commission of Audit Final Report May 2012.

The Commission noted that RMS had conducted two independent reviews to examine the potential for extending road maintenance contestability. The Commission found that there was inadequate and inconclusive benchmarking to establish the efficiency of RMS’ Road and Fleet Services unit when compared to outsourcing. It recommended that RMS bring forward a proposal to conduct a competitive tender for the road maintenance of the Sydney region south zone road network to inform the feasibility of a progressive rollout of road maintenance contestability across other areas of the State. In August 2012, the NSW Government adopted the Commission’s recommendation.

The NSW Government introduced road maintenance contestability through Stewardship Maintenance Contracts

In April 2013, the NSW Government announced that it would introduce road maintenance contestability across the Sydney region, using a Stewardship Maintenance Contract (SMC) model to improve value for money. In doing so, it excluded RMS’ Road and Fleet Services unit from tendering.  

The SMC model is based on the following key commercial and performance principles set by RMS:

  • performance driven by outcomes
  • flexible and adaptable
  • transparent and measurable
  • linking risk to reward
  • continuous improvement
  • criteria for selection of, and transition to, different payment models.

The following key stewardship principles underpin the SMC’s broad set of values, attitudes and behaviours, which are required of the contractor to effectively manage the assets on behalf of RMS:

  • putting RMS’ customers (road users and the general public) first and being responsive to them
  • being responsible and accountable for the outcomes resulting from the management of the assets
  • managing the assets diligently, efficiently and effectively with limited direction from RMS
  • working collaboratively with RMS to deliver services that are tailored to meet RMS’ evolving needs
  • acting with integrity and transparency in performing the services
  • performing the services in the best interests of RMS and asset users.

Other key features of the SMC include:

  • service requirements which describe the scope of the services, and the standards the contractor must meet
  • a commercial framework which defines how payments are structured, how performance assessment will impact on payments and outlines the key commercial principles. SMCs primarily divide payments into two main mechanisms, these being the priced component (or fixed price) and the target cost calculated as follows:
    • fixed price – the contractor is paid a pre-agreed amount for specific services being provided, regardless of the actual costs incurred
    • target cost – RMS and the contractor agree on a target cost for a project, and any cost overruns or underruns are shared between them
  • a performance framework which provides mechanisms for assessing contractor performance. This includes a comprehensive listing of the key result areas (KRAs) and key performance indicators (KPIs) against which RMS measures the contractor’s performance. The framework also outlines the scoring methodology that RMS uses to determine whether the contractor’s bid margin (profit and overheads) is reduced due to less than satisfactory performance or whether a bonus is paid if a threshold performance score is exceeded.

Road maintenance under SMCs for Sydney region south and west zones commenced in November 2013

In November 2013, RMS awarded SMCs to the Leighton Boral Amey consortium, now named Ventia Boral Amey (VBA), for the south zone and the DownerMouchel (DM) consortium for the west zone. The contracts run for seven years with an option for a further three years at RMS’ discretion. In April 2014, full services commenced following a four-month transition period. RMS estimated that the annual cost of these contracts was around $240 million in total. In March 2018, the contract prices are due to be reset by negotiation to reflect the contractors’ experience with, and better information about, the road networks and routine maintenance requirements. 

  1. Roads and Maritime Services should consider whether to incorporate stronger sanctions in the Stewardship Maintenance Contract if the contractor provides incorrect performance or financial data to RMS, when:
     
    1. negotiating the commercial reset for the next works period with the Sydney region south and west zone contractors due in July 2018.
    2. finalising a new SMC contract for the Sydney region north zone, due to commence in October 2018.

Roads and Maritime Services should, by September 2017:

2.  Review its contract management framework for SMCs to ensure that all authorities and accountabilities of
     contract managers are clearly defined, including:

a) accountability and procedures for exercising all operational clauses in the SMC where RMS may opt to, or be required to intervene, or make a decision

b) authority to approve or initiate the interventions RMS is required to, or may, exercise under the SMC

c) the audits that RMS will conduct to systematically validate the performance and financial data that the SMC contractors provide

d) the accountabilities of RMS contract managers to systematically review audits and quality reviews that the SMC contractors must conduct to demonstrate compliance with their service plans

e) the accountabilities of RMS contract managers to check that the monthly and annual reports provided by SMC contractors do not contain errors, omissions or inaccuracies.

3.  Improve its management of benefits realisation by:

a) initiating a further benefits realisation review and record the benefits delivered against those
    estimated following the tender process, including the one-off transition costs

b) identify any benefits, including savings, not yet attained and develop strategies to address any short-falls

c) establish a tool to track the ongoing realisation of benefits.

Published

Actions for NorthConnex

NorthConnex

Premier and Cabinet
Treasury
Transport
Compliance
Infrastructure
Internal controls and governance
Management and administration
Procurement

The processes used to assess NorthConnex adequately considered value for money for taxpayers.This report also found that the impact of tolling concessions on road users and the motorway network was consistent with policy objectives described in the 2012 NSW Long Term Transport Master Plan.

NorthConnex is a nine-kilometre tolled motorway tunnel between the M1 Pacific motorway at Wahroonga and the M2 Hills motorway at West Pennant Hills. The total cost for the project is $3.1 billion. NorthConnex will be funded through toll charges, and contributions from the NSW and Australian Governments of up to $405 million each. In January 2015, the NSW Roads Minister signed the final contracts for NorthConnex.

By December 2017, the Department of Premier and Cabinet should:

1. publish an updated ‘Unsolicited Proposals – Guide for Submission and Assessment’ which clarifies obligations with requirements in other NSW Government policies such as the NSW PPP guideline and Infrastructure Investor Assurance Framework. The update should require:

a) a business case to be prepared, and a business case gateway review completed, as part of the assessment of the detailed proposal (currently stage 2)

b) probity reports must be completed and considered before the decision to proceed to the next stage.
 

The Department of Premier and Cabinet and NSW Treasury should immediately:

2. improve record keeping to ensure compliance with the State Records Act 1998 and the NSW Government Standard on Records Management.