Actions for Managing demand for ambulance services 2017
Managing demand for ambulance services 2017
NSW Ambulance has introduced several initiatives over the past decade to better manage the number of unnecessary ambulance responses and transports to hospital emergency departments. However, there is no overall strategy to guide the development of these initiatives nor do NSW Ambulance's data systems properly monitor their impact. As a result, the Audit Office was unable to assess whether NSW Ambulance's approach to managing demand is improving the efficiency of ambulance services.
NSW Ambulance uses a telephone referral system to manage triple zero calls from people with medical issues that do not require an ambulance. This has the potential to achieve efficiency improvements but there are weaknesses in NSW Ambulance's use and monitoring of this system. Paramedics are now able to make decisions about whether patients need transport to a hospital emergency department. NSW Ambulance does not routinely measure or monitor the decisions paramedics make, so it does not know whether these decisions are improving efficiency. Extended Care Paramedics who have additional skills in diagnosing and treating patients with less urgent medical issues were introduced in 2007. NSW Ambulance analysis indicates that these paramedics have the potential to improve efficiency, but have not been used as effectively as possible.
Our 2013 audit of NSW Ambulance found that accurate monitoring of activity and performance was not being conducted. More than four years later, this remains the case.
NSW Ambulance has recognised the need to change the way it manages demand and has developed initiatives that have the potential to improve efficiency. However, there are significant weaknesses in the strategy for and implementation of its demand management initiatives.
NSW Ambulance has identified the goal of moving from an emergency transport provider to a mobile health service and developed several initiatives to support this. Its demand management initiatives have the potential to contribute to the broader policy directions for the health system in New South Wales. However, there is no clear overall strategy guiding these initiatives and their implementation has been poor.
NSW Ambulance's reasons for changing its approach to demand management have not been communicated proactively to the community. Demand management initiatives that have been operating for over a decade still do not have clear performance measures or targets. Project management of new initiatives has been inadequate, with insufficient organisational resources to oversee them and inadequate engagement with other healthcare providers.
NSW Ambulance uses an in-house Vocational Education and Training course to recruit some paramedics, as well as recruiting paramedics who have completed a university degree. No other Australian ambulance services continue to provide their own Vocational Education and Training qualifications. Paramedics will need more support in several key areas to be able to fulfil their expanded roles in providing a mobile health service. Performance and development systems for paramedics are not used effectively. Up to date technology would help paramedics make better decisions and improve NSW Ambulance's ability to monitor demand management activity.
There are gaps in NSW Ambulance's oversight of the risks of some of the initiatives it has introduced, particularly its lack of information on the outcomes for patients who are not transported to hospital. Weaknesses in the way NSW Ambulance uses its data limit its ability to properly assess the risks of the demand management initiatives it has introduced.
Parliamentary reference - Report number #295 - released 13 December 2017
Actions for Family and Community Services 2017
Family and Community Services 2017
The following report focuses on key observations and findings from the most recent audits of agencies in the Family and Community Services cluster.
The report includes a range of findings on service delivery. The Department of Family and Community Services' data indicates that family preservation programs are having a positive impact on children and young people entering statutory care. On the other hand, waiting times for social housing applicants increased in 2016-17.
1. Financial reporting and controls
Quality of financial reporting | Unqualified audit opinions were issued for all cluster agencies' financial statements. |
Timeliness of financial reporting | Agencies completed mandatory early close procedures and all but one agency submitted financial statements by the statutory deadline. |
Internal controls | The 2016–17 audits reported 29 internal control improvements to cluster agencies’ management. None of these findings were high risk. Eleven related to information technology control weaknesses in key financial business systems. |
2. Service Delivery
Commissioning | Non-government organisations (NGOs) received $2.6 billion in 2016–17 to deliver services. |
Children and young people |
The Department of Family and Community Services data indicates that family preservation programs are reducing the number of children and young people entering statutory care. The Department's data shows 86 per cent of children and young people in statutory care had their placements reviewed in the 12 months to 30 June 2017. Legislation requires all placements are reviewed at least every 12 months. |
Social Housing | The Department's data shows waiting times for social housing applicants are longer than last year. |
People with disability | Under the current timetable for implementing the National Disability Insurance Scheme, the Department plans to transfer direct disability services to NGOs by 30 June 2018. |
This report provides Parliament and others with the audit results, observations, conclusions and recommendations for Family and Community Services cluster agencies. The report has been structured into two chapters focusing on financial reporting and controls and service delivery.
The Family and Community Services cluster works with children, adults, families and communities to improve lives and help people realise their potential.
This chapter outlines audit observations, conclusions and recommendations related to the financial reporting and controls of agencies in the Family and Community Services cluster for 2016–17.
Financial reporting is an important element of good governance. Confidence in public sector decision making and transparency is enhanced when financial reporting is accurate and timely.
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.
Observation | Conclusion or recommendation |
2.1 Quality of financial reporting | |
Unqualified audit opinions were issued for all cluster agencies' financial statements. | The quality of financial reporting remains high across the cluster. |
2.2 Timeliness of financial reporting | |
Agencies completed mandatory early close procedures and all but one submitted financial statements by the deadline. | Early close procedures continue to allow issues and financial reporting risk areas to be addressed early in the audit process. There are opportunities to improve effectiveness of early close procedures. |
2.3 Internal controls | |
The 2016–17 audits reported 29 internal control weaknesses. While none were high risk, the Department had five repeat issues. |
Management accepted the audit findings and advised they are actioning recommendations. Timely action is important to ensure internal controls operate effectively. |
Eleven of these internal control weaknesses were related to IT system user access administration and security over financial systems. |
Controls weaknesses may compromise the integrity and security of financial data. Recommendation Agencies should:
|
Government outcomes can be improved by delivering the right mix of services, whether from the public, private or not for profit sectors. Service delivery reform will be most successful if there is clear accountability for service delivery outcomes, decisions are aligned to strategic direction and performance is monitored and evaluated.
This chapter outlines our audit observations, conclusions and recommendations related to service delivery by agencies in the Family and Community Services cluster for 2016–17.
Observation | Conclusion or recommendation |
3.1 Commissioning |
|
Non-government organisations (NGOs) received $2.6 billion funding in 2016–17 to deliver services. | Commissioning of service delivery can change the profile of risks that need to be managed. The Department has established a Commissioning Division and developed its ‘Commissioning for Better Outcomes Framework’. |
3.2 Children and young people |
|
All the Department's Districts are accredited to provide out-of-home care services. The Department's data indicates 66 more children and young people were in statutory care at 30 June 2017 compared to 30 June 2016. This contrasts to the previous year where 1,150 more children were in statutory care at 30 June 2016 than at 30 June 2015. |
The Department is complying with out-of-home care service standards, but one District has an additional condition attached to its accreditation. Department’s data indicates that family preservation programs are having a positive impact.. |
The Department's data shows 86 per cent of children and young people in statutory care had their placement reviewed at 30 June 2017. The Department’s data shows, at 30 June 2017, 41 per cent of children and young people with closed case plans for the 12 months ended 30 June 2016 were re-reported at risk of significant harm. |
The Department did not meet the legislative requirement to review the placement of all children and young people in statutory care annually. The number of children being re-reported at risk of significant harm is above the Premier’s Priority target of 34 per cent by June 2019. |
3.3. Social Housing |
|
Waiting time for priority and non-priority social housing applicants increased in 2016–17, by 19 per cent and 3 per cent respectively. | Some factors impacting waiting time for social housing applicants are outside the control of the Department. |
3.4 People with disability |
|
A Bilateral Agreement between the Australian and NSW Governments sets out how eligible persons access the National Disability Insurance Scheme (NDIS) between 1 July 2016 and 30 June 2018. |
Under the timetable for the NDIS, the Department plans to transfer direct disability services to NGOs. |
Actions for Health 2017
Health 2017
The following report highlights results of the financial audits of entities in the NSW health cluster. The report focuses on key observations and findings from the most recent audits of these entities.
The report also includes a range of findings on service delivery. Overall, NSW Health is achieving most of their targets. Some local health districts are continuing to experience increased demand for their services and are finding it more difficult to meet their targets. For example, three local health districts had not achieved some emergency department response time targets for three consecutive years.
1. Financial reporting and controls
Financial Reporting |
All health cluster entities received unqualified audit opinions and the quality of financial reporting remains high across the cluster. Early close procedures were largely completed and all financial statements were submitted by the deadlines. |
Financial performance |
Overall, NSW Health recorded an operating surplus of $407 million in 2016–17. Eleven local health districts/specialty networks recorded operating deficits in 2016–17, four more than 2015–16. Expenses across NSW Health increased by 4.4 per cent in 2016–17 (6.0 per cent in 2015–16), lower than the expected long term annual expense growth rate. |
Excess annual leave | Managing excess annual leave is a continual challenge for NSW Health, with thirty–five per cent of the workforce having excess balances. |
Overtime payments | NSW Health entities are generally managing overtime well; however NSW Ambulance’s overtime payments, $74.6 million in 2016–17, remain significantly higher than other health entities. |
Time and leave recording practices | Unapproved employee timesheets continue to be a problem for health entities. Weak timesheet approval controls increase the risk of staff claiming and being paid for hours they have not worked. There is also an increased risk of high volumes of roster adjustments, manual pays, salary overpayments and leave not being recorded accurately. |
2. Service Delivery
Service Agreements | Most of the service agreements between the Secretary of NSW Health and health entities were signed earlier than prior years. |
Performance monitoring | Five NSW Health entities are not meeting the Ministry of Health’s performance expectations at 30 June 2017. |
Emergency department performance | Data provided by the Ministry indicates NSW Health, on average, met emergency department triage response time targets across all triage categories for the fourth consecutive year. |
Ambulance response times | Data provided by the Ministry shows NSW Ambulance response times for imminently life‑threatening incidents of 7.5 minutes in 2016–17 was within the Ministry’s target of 10.0 minutes. Data provided by the Ministry indicates NSW Ambulance response times for potentially life‑threatening incidents did not improve in 2016–17. The median response time of 11.1 minutes in 2016–17 was similar to 2015–16 (11.0 minutes). This is despite the number of Priority 1 responses reducing by 4.3 per cent. |
Unplanned hospital re-admissions | Data provided by the Ministry shows eight local health districts achieved the Ministry of Health’s unplanned hospital re‑admissions target in 2016–17. The target is for local health districts to reduce re‑admission rates from the previous financial year. |
This report sets out the results of the 30 June 2017 financial statement audits of Health cluster entities.
The report has been structured into two chapters focusing on:
- Financial reporting and controls
- Service delivery.
This chapter outlines audit observations, conclusions and recommendations related to financial reporting and internal controls of entities for 2016-17.
Observation | Conclusion or recommendation |
2.1 Quality of financial reporting |
|
All cluster entities received unqualified audit opinions and misstatements identified in financial statements fell. | The quality of financial reporting remains high across the cluster. |
2.2 Timeliness of financial reporting |
|
Early close procedures were largely completed and all financial statements were submitted by the deadlines. | Health entities controlled by the Ministry of Health continued submitting their financial statements well ahead of the statutory deadlines. |
2.4 Financial and sustainability analysis |
|
NSW Health recorded an operating surplus of $407 million in 2016–17.
|
The statewide operating surplus was $84 million higher than 2015–16. Net surpluses contribute to NSW Health’s ability to invest in new facilities, upgrades and redevelopments. The 2016–17 financial results were once again impacted by the NSW Government initiative to improve cash management across the sector. |
2.5 Performance against budget | |
Ten local health districts/specialty networks’ expense budget variance was outside performance expectations agreed with the Ministry at the beginning of 2016–17. | The Ministry continues to manage performance across NSW Health to improve the accuracy of budgeting practices. |
2.7 Human Resources | |
Thirty-five per cent of NSW Health’s workforce have excess annual leave balances.
NSW Ambulance had the highest average sick leave rate in NSW Health of 85.2 hours per FTE in 2016–17 (78.7 hours in 2015–16). This was higher than the statewide average of 62.1 hours (62.0 hours in 2015–16).
Unapproved employee timesheets continue to be a problem for health entities. Weak timesheet approval controls increase the risk of staff claiming and being paid for hours they have not worked.
|
Managing excess annual leave is a continual challenge for health entities.
Recommendation: NSW Ambulance should further review the effectiveness of its rostering practices to identify strategies to reduce excessive overtime payments. Recommendation: Health entities should conduct a risk‑based review of time and leave recording practices to ensure control weaknesses are identified and fixed. |
This chapter outlines our audit observations, conclusions and recommendations relating to service delivery for 2016–17.
Observation | Conclusion or recommendation |
3.1 Service agreements in NSW Health | |
Most of the service agreements between the Secretary of NSW Health and health entities were signed earlier than prior years. Thirteen local health districts/specialty networks signed their service agreements by the 31 July 2017 due date. This is a significant improvement with only seven local health districts/specialty networks meeting the date in 2015–16. |
Having service agreements signed as close as possible to the start of each year provides the Ministry and NSW Health entities with clarity around roles, responsibilities, performance measures, budgets, and service volumes and levels. |
3.2 Performance of NSW Health entities | |
Five NSW Health entities were not meeting the Ministry’s performance expectations at 30 June 2017. | The Ministry is managing the five entities in accordance with its performance review process. |
3.4 Emergency department response times | |
Data provided by the Ministry indicates NSW Health again, on average, met emergency department triage response time targets across all triage categories for the fourth consecutive year. The Ministry manages performance across NSW Health to ensure patients presenting at emergency departments receive care in a clinically appropriate timeframe. |
Based on the Ministry’s data, local health districts/specialty networks are, on average, meeting triage targets despite increasing emergency department attendances. The data shows eleven local health districts met all triage targets in 2016–17, compared to eight in |
3.5 Emergency treatment performance | |
The Ministry manages public patient access to emergency services in public hospitals. It has an emergency treatment performance target of 81 per cent of patients leaving emergency departments within four hours. |
Data provided by the Ministry indicates NSW Health maintained its overall emergency treatment performance in 2016–17, but did not achieve its target. The State average emergency treatment performance was 74.2 per cent (74.2 per cent in 2015–16). Based on the Ministry’s data, only four local health districts achieved the target in 2016–17, five in |
3.6 Ambulance response times | |
NSW Ambulance has a response time target of 10.0 minutes for imminently life‑threatening incidents in New South Wales. | Data provided by the Ministry indicates NSW Ambulance response times for imminently life-threatening incidents of 7.5 minutes in 2016–17 was within the Ministry’s target. |
3.7 Transfer of care | |
The Ministry has a target of 90 per cent for the number of ambulance arrivals within a 30 minute ‘transfer of care’ timeframe. | Data provided by the Ministry indicates the rate of ambulance arrivals within a 30 minute 'transfer of care' timeframe improved from 87.6 per cent in 2015–16 to 91.7 per cent in 2016–17, exceeding the Ministry’s target. |
3.8 Average length of stay in hospital | |
Based on the Ministry’s 2016–17 data, the average length of stay for acute episodes was 3.0 days. The average length of stay in New South Wales hospitals is lower than the national average of 3.2 days (in 2015–16). | The Ministry’s data shows the average length of stay by patients for acute episodes has remained stable in New South Wales hospitals for four years. |
3.9 Elective surgery access performance | |
Data provided by the Ministry indicates NSW Health continues to manage waiting times for elective surgery in public hospitals. | The Ministry’s data shows NSW Health improved on‑time admission of patients for elective surgery in 2016–17 despite a 1.8 per cent increase in admissions. While the result improved, only one of the three targets for elective surgery waiting times was met in 2016–17. |
3.10 Unplanned hospital re-admissions | |
Data provided by the Ministry indicates NSW Health, on average, did not reduce the rate of unplanned hospital re‑admissions in 2016–17. The Ministry has a target of reducing unplanned hospital re‑admissions compared to the previous financial year. Low re‑admission rates may indicate good patient management practices and post-discharge care. |
The Ministry’s data shows eight local health district met the target to reduce the rate of re‑admissions compared to the previous financial year. The statewide average rate increased from 6.3 per cent to 6.4 per cent. |
3.11 Post discharge care for acute mental health patients | |
NSW Health has a goal to increase community-based care to acute mental health patients after they are discharged. Continuity of care in the community can lead to reduced symptom severity, lower re‑admission rates, and improved quality of life. | The Ministry’s 2016–17 data shows the statewide average for post discharge follow-up of acute mental health patients within seven days was 70.0 per cent (66.0 per cent in 2015–16). The statewide average improved and met the NSW Health target of 70 per cent. Nine local health districts exceeded the NSW Health target. |
3.12 Mental health acute re-admissions | |
NSW Health has a goal to reduce acute public sector mental health re-admissions. High re‑admission rates may indicate deficiencies in inpatient treatment and follow up care. | The Ministry’s data shows twelve local health districts did not achieve the NSW Health target of 13 per cent mental health acute re‑admissions in 2016–17. |
3.13 Unplanned and emergency re‑presentations | |
NSW Health aims to reduce the number of unplanned and emergency re‑presentations to emergency departments. The Ministry’s 2016–17 data shows the State average of emergency department re‑presentations decreased marginally from 5.0 per cent in 2015–16 to 4.9 per cent. |
Patients attending rural emergency departments are more likely to re‑present within 48 hours of being discharged than those in regional or metropolitan emergency departments. |
3.14 Healthcare associated infection | |
The national target for the rate of Staphylococcus aureus (golden staph) bloodstream infection is two cases per 10,000 bed days. | Data provided by the Ministry indicates the rate of golden staph bloodstream infection in New South Wales hospitals continues to be well below the target and national benchmark at 0.72 cases per 10,000 bed days in 2016–17 (0.75 in 2015–16). |
3.15 Patient experience and satisfaction | |
The Bureau of Health Information analyses and reports on the results of patient surveys. The Bureau’s survey shows 65 per cent of adult admitted patients rated the care they received in hospital as ‘very good’ and 29 per cent rated it as ‘good’. |
NSW Health recognises that patient surveys are an important feedback mechanism on the health care system that can only come from personal experiences. |
Actions for Agency compliance with NSW Government travel policies
Agency compliance with NSW Government travel policies
Overall, agencies materially complied with NSW Government travel policies.
However, the Auditor-General found some agencies:
- did not always book official travel through the approved supplier
- had weaknesses in their travel approval processes
- had travel policies that were inconsistent with the NSW Government policy
- did not adequately manage their travel records.
We asked the 15 participating agencies to complete a self assessment of the processes they have implemented to comply with the new policy. The key observations are summarised below.
Actions for Planning and evaluating palliative care services in NSW
Planning and evaluating palliative care services in NSW
NSW Health’s approach to planning and evaluating palliative care is not effectively coordinated. There is no overall policy framework for palliative and end-of-life care, nor is there comprehensive monitoring and reporting on services and outcomes.
Parliamentary reference - Report number #291 - released 17 August 2017
Actions for Office of Strategic Lands
Office of Strategic Lands
The Office of Strategic Lands effectively fulfils most aspects of its defined role, however, it could do more to support strategic land planning by identifying and acquiring land for future public use proactively rather than waiting for agencies or landholders to approach it. It may also have greater impact if it expanded its activities beyond greater Sydney.
The Office of Strategic Lands (OSL) was established under the Environmental Planning and Assessment Act 1979 (EP&A Act) to identify, acquire, manage and divest land required for long-term planning by the NSW Government, particularly for open space and public purposes.
OSL is a Corporation Sole acting on behalf of the Minister for Planning and is run within the Department of Planning and Environment (DPE). OSL is a self-funding entity, and is responsible for administering the Sydney Region Development Fund (SRDF), a statutory fund used for ongoing land acquisition and management. OSL currently only operates within greater Sydney and holds over a billion dollars in land assets in this region.
This audit assessed whether OSL effectively fulfils its role to identify, acquire, manage and dispose of land, and whether OSL ensures it is sustainable over the long-term to meet its objectives.
Conclusion:
OSL effectively fulfils most aspects of its defined role, but is not supporting strategic land planning through proactive identification and acquisition of land for future public use. OSL is diligent in its financial management over the short and medium terms. However, it has identified that relying on the sale of surplus land to continue funding its ongoing operations is not sustainable, and it is yet to finalise a strategy to address this.
OSL does not currently have a strategic or proactive focus to improve land planning outcomes. This is primarily due to the lack of a clear strategy and business plan to direct its work which defines OSL’s purpose, objectives, goals and performance targets.
OSL expects to finalise and implement a Strategic Business Plan to guide its future direction and long-term sustainability, in late 2017.
OSL has three primary sources of funding. The largest source is Treasury loans which it needs to repay. The next most significant source of funding is from sales of land no longer required for government’s long-term needs. OSL has identified that it is likely to run out of surplus land within ten years. This is a significant financial risk for OSL, which should be addressed through a long-term financial strategy.
Contributions by Sydney councils into the SRDF are OSL’s only regular and consistent income stream. The formula to calculate these contributions has not been reviewed for over 25 years, and recent council mergers and border changes have increased the need to review the formula.
OSL is not used as extensively as it could be by other NSW Government agencies. It has the potential to play a much bigger role in assisting NSW Government agencies with longer term planning by partnering with them to identify, acquire, hold and manage land for future needs. For example, it could acquire land in future residential growth areas for needed public services such as schools, hospitals and transport corridors. There is also potential for OSL to expand its operations beyond the greater Sydney region into other parts of NSW to provide a statewide benefit from its unique role in government.
OSL has a unique role amongst government agencies, and could be used across NSW
NSW Government agencies we spoke with consider OSL fulfils an important role for the state that no other government agency performs. As a self-funding long-term land holder and manager, OSL can acquire and manage land beyond the four-year budget cycle that other government agencies face. Consideration should be given to expanding to other growth areas in NSW, where its unique role could assist in longer term land planning.
OSL has established good processes and procedures for most aspects of its role. This includes governance processes that we found to have been applied effectively. There was also adequate oversight and approvals for land transactions.
OSL has yet to finalise a business strategy to ensure long-term sustainability
OSL has shown that it is financially and operationally viable in the short to medium term. However, it does not have an overarching business strategy to guide its operations and ensure it is financially sustainable for the long-term. With a unique role in government, it is important for OSL to clarify its direction and implement a strategic business plan to drive its progress.
While there is no overarching long-term strategy, OSL has documented operating plans which guide its land acquisition and land divestment activities over the short to medium term. It has not developed a plan for its ongoing land management activities.
OSL advised that its Strategic Business Plan will be finalised and implemented in late 2017. This Plan should clarify OSL’s long-term direction, and guide its business to ensure it is financially sustainable.
OSL does not have adequate performance targets and measures
OSL has four key deliverables as part of DPE’s business plan. These deliverables cover land management, working with other agencies, and ensuring the SRDF is sustainable. There was no evidence that OSL or DPE monitor whether OSL achieves all key deliverables.
Currently, OSL’s performance targets are limited to meeting dollar values. OSL does not have any measures to demonstrate the achievement of outcomes that align with its core business, such as its success in land management or in working with other agencies. OSL staff also said that dollar targets were not always adequate or appropriate to measure its business performance.
With the development of its Strategic Business Plan, OSL has the opportunity to clarify its future business direction. This includes ensuring it has a range of relevant goals and performance measures that will support it becoming a strategic land planning partner with NSW Government agencies and local councils, and a land holder for the long-term.
OSL’s current financial management approach may impact long-term sustainability
OSL has valued the land that it needs to purchase on behalf of government to meet long-term strategic land needs in the Greater Sydney region, at $1.2 billion. However, OSLs annual budget for purchasing land is only between $40 million and $50 million until 2021. Also, in each of the last four years, OSL has not spent more than $30 million on land purchases because it relies on landowners to initiate contact when they are ready to sell their land.
Without a more proactive approach, it is not possible for OSL to make needed purchases in a timely manner. OSL acknowledges the substantial gap between these values, but has not established a budget or plan for how it will purchase all the identified land.
OSL has developed a Divestment Strategy which provides a five-year schedule of planned divestments. This is land OSL owns which has been identified as no longer required for government purposes. OSL has established an approach to generate the best and highest price for these sales. While funds are generated through the sale of surplus land, it also means that OSL holds fewer land assets to sell. OSL has identified it will run out of surplus land within ten years.
OSL needs to finalise and implement a business model to ensure it is financially and operationally capable to sustain and grow its business for the long-term.
OSL is working to improve transparency and engagement with key stakeholders
To deliver on its role, OSL needs to be able to effectively engage and work with its stakeholders, including NSW Government agencies, local councils, and people selling or buying land.
NSW Government agencies we spoke with are generally satisfied with OSL’s level of engagement and consultation. However, it would be beneficial for all parties to clarify and document their expectations of each other through a formal arrangement. OSL could also be more proactive in promoting its services, and working with additional NSW Government agencies to identify strategic lands.
The local councils in the Sydney region we spoke with are not as satisfied with OSL’s engagement and communication. The councils advised that they do not consider they are well-informed of OSL’s plans for their area, or how their contributions to the SRDF are spent.
More broadly, the activities of OSL are not reported transparently to stakeholders or the general public. OSL is developing a communication package for local councils and the community. This is an opportunity for OSL to improve the transparency of its role, operations, projects, and the SRDF, as well as promote its services and achievements.
The Office of Strategic Lands (OSL) was established in 1951 to identify, acquire, manage and divest land required for the NSW Government's long term planning purposes. OSL acts on behalf of the Minister for Planning, as a Corporation Sole, under the Environmental Planning and Assessment Act 1979 (EP&A Act).
OSL acquires and manages land identified for long-term strategic needs, and then transfers or sells it to other government agencies for ultimate use. It also sells land identified as surplus to government’s long term strategic requirements. Surplus land can also be transferred to local councils. OSL operates only in the greater Sydney region (from Wyong in the north, to the base of the Blue Mountains in the west, and south to Wollondilly). OSL has 20 staff who manage over 6,000 parcels of land.
Parliamentary reference - Report number #290 - released 10 August 2017
Actions for Sydney Road Maintenance Contracts
Sydney Road Maintenance Contracts
In November 2013, Roads and Maritime Services (RMS) outsourced the maintenance of State roads in the Sydney region south and west zones using an innovative contracting approach called the Stewardship Maintenance Contract (SMC). The SMC links risk to reward, and uses a performance framework where outcomes should drive improved performance over time.
WA | VIC | QLD | NSW | |
---|---|---|---|---|
Roads managed (lane kms) | 52,659 | 50,510 | 71,353 | 80,348 |
Estimated spend ($/lane km) | 5,000 | 4,500 | 6,000 | 7,000 |
Road quality measure (%) | 99 | 99 | 94 | 91 |
Parliamentary reference - Report number #288 - released 15 June 2017
Actions for NorthConnex
NorthConnex
The processes used to assess NorthConnex adequately considered value for money for taxpayers.This report also found that the impact of tolling concessions on road users and the motorway network was consistent with policy objectives described in the 2012 NSW Long Term Transport Master Plan.
Parliamentary reference - Report number #287 - released 8 June 2017
Actions for Universities 2016 Audits
Universities 2016 Audits
No qualified opinions were issued on the universities’ financial statements and the quality and timeliness of financial reporting continued to improve. The report found that all NSW universities recorded a surplus in 2016 with combined revenue growth exceeding expense growth by 1.1 per cent. Universities have diversified revenue sources and are now less reliant on government grants. Combined overseas student income exceeded domestic student income for the first time in 2016.
This report focuses on key observations and common issues identified from our financial audits of the ten NSW universities and their controlled entities in 2016. The universities are listed in Appendix Three.
In this report, parliament and other users of universities’ financial statements are provided with an analysis of universities’ results and key observations in the following areas:
- Financial Performance and Reporting
- Financial Controls
- Governance
- Teaching and Research.
Snapshot of NSW universities
A snapshot of NSW universities for the year ended 31 December 2016 is shown below.
Financial performance and reporting are important elements of good governance. Confidence in public sector decision making and transparency is enhanced when financial reporting is accurate and timely.
This chapter outlines audit findings on financial performance and reporting of NSW universities for 2016.
Appropriate financial controls help ensure the efficient and effective use of resources and the implementation and administration of university policies. They are essential for quality and timely decision making.
In 2016, our audit teams made the following key observations on the financial controls of NSW universities.
Teaching and research are core activities of universities. The quality of teaching is a key driver for growth and attracting students. Through research, universities contribute to economic growth, lead innovation and improve their global rankings.
This chapter reports on teaching and research in NSW universities for 2016.
Actions for 2016 - An overview
2016 - An overview
This report focuses on key observations and findings from 2016 audits and highlights key areas of focus for financial and performance audits in 2017.
Financial reporting | |
Observation | Conclusion |
Only one qualified audit opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. | The quality of financial reporting continued to improve across the NSW public sector. |
More 2015–16 financial statements and audit opinions were signed within three months of the year end. | Timely financial reporting was facilitated by more agencies resolving significant accounting issues early, completing asset valuations on time and compiling sufficient evidence to support financial statement balances. |
NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues. For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures. |
The narrowed scope of mandatory early close procedures may diminish the good performance in ensuring the quality and timeliness of financial reporting achieved in recent years. To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years. |
Although most agencies complied with NSW Treasury’s early close asset revaluation procedures we identified areas where they can improve. | Asset revaluations need to commence early enough to ensure all assets are identified and the results are analysed, recorded and reflected accurately in the early close financial statements. |
Number of misstatements | |||||
Year ended 30 June | 2015-16 | 2014-15 | 2013-14 | 2012-13 | 2011-12 |
Total reported misstatements | 298 | 396 | 459 | 661 | 1,077 |
All material misstatements identified by agencies and audit teams were corrected before the financial statements and audit opinions were signed. A material misstatement relates to an incorrect amount, classification, presentation or disclosure in the financial statements that could reasonably be expected to influence the economic decisions of users.
Significant matters reported to the portfolio Minister, Treasurer and Agency Head
In 2015–16, we reported the following significant matters to the portfolio Minister, Treasurer and agency head in our Statutory Audit Reports:
Appropriate financial controls help ensure the efficient and effective use of resources and the implementation and administration of agency policies. They are essential for quality and timely decision making.
In 2015–16, our audit teams made the following key observations on the financial controls of NSW public sector agencies.
Financial controls | |
Observation | Conclusion |
More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016. |
Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner. |
Agencies continue to face challenges managing information security. Most information technology issues we identified related to poor IT user administration in areas like password controls and inappropriate access. | Agencies should review the design and effectiveness of information security controls to ensure data is adequately protected. |
We found shared service provider agreements did not always adequately address information security requirements. |
Where agencies use shared service providers they should consider whether the service level arrangements adequately address information security. |
Thirteen of 108 agencies required to attest to having a minimum set of information security controls did not do so in their 2015 annual reports. | The 'NSW Government Digital Information Security Policy' recognises the growing need for effective information security. With cyber security threats continuing to increase as digital services expand we plan to look at cyber security as part of our 2017–18 performance audit program. |
We identified instances where service level agreements with shared service providers were outdated, signed too late or did not exist. | Corporate and shared service arrangements are more effective when service level arrangements are negotiated and signed in time, clearly detail rights and responsibilities and include meaningful KPIs, fee arrangements and dispute resolution processes. |
Internal controls at GovConnect, the private sector provider of transactional and information technology services to many NSW public sector agencies were ineffective in 2015–16. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. | The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector. |
Maintenance backlogs exist in several NSW public sector agencies, including Roads and Maritime Services, Sydney Trains, NSW Health, the Department of Education and the Department of Justice. | To address backlog maintenance it is important for agencies to have asset lifecycle planning strategies that ensure newly built and existing assets are funded and maintained to a desired service level. |