The Auditor-General, Margaret Crawford, has released her report on the State Finances for the year ended 30 June 2019.

‘I am pleased to once again report that I issued an unmodified audit opinion on the State’s consolidated financial statements,’ the Auditor-General said.

The report acknowledges NSW Treasury and agency efforts to reduce the number and value of errors compared with the previous year. ‘Strong financial management and transparent reporting are key elements of our system of government. Treasury and agency finance teams need to be consulted on major business decisions at the time of their execution. This will ensure agencies assess the accounting implications earlier and support accurate financial statements being presented for audit on a timely basis,’ said the Auditor-General.

The report summarises the financial audit result of the Total State Sector Accounts. The Total State Sector comprises 304 entities controlled by the NSW Government with total assets of $468 billion and total liabilities of $218 billion.

The General Government sector comprises 212 entities that provide goods and services that are funded centrally by the State. General Government expenditure grew by 5.5 per cent in 2018-19, which was below the long-term revenue growth of 5.6 per cent target established by the Fiscal Responsibility Act 2012.

Download PDF of State Finances 2019 report

Pursuant to the Public Finance and Audit Act 1983, I present my Report on State Finances 2019.

Strong financial management and transparent reporting are key elements of our system of government.

I am pleased to once again report that I issued an unmodified audit opinion on the State’s consolidated financial statements. 

The number of errors in agencies’ 2018–19 financial statements fell to six compared to the 23 recorded in 2017–18. This reflects Treasury’s focus on early close and the resolution of complex accounting matters before submission. Agency finance teams need to be consulted on major business decisions and commercial transactions to assess their accounting impacts at the time of their execution, rather than at the end of a financial year. This would improve the quality of financial reporting and avoid the need for extensions for agencies to submit their financial statements for audit.

To further increase transparency, a Key Audit Matters section was included in my Independent Auditor Report on the Total State Sector Accounts this year. This explains those matters considered most significant to the conduct of the audit and requiring significant management judgement.

Looking forward, certain factors have the potential to impact the accuracy and completeness of the Total State Sector Accounts in coming years. First, three new accounting standards are effective from 1 July 2019 and a fourth from 1 July 2020. Transitioning to new standards requires significant planning and resources to ensure the impacts are appropriately assessed and accounted for. Second, the Government Sector Finance Act 2018 will be implemented in stages over three years to 2020–21. This Act is intended to focus on performance, transparency, accountability, and efficiency of financial management in the government sector. I encourage agencies to build their awareness of this important reform and ensure their alignment with the principles of the Act. 

I want to thank Treasury staff for the way they engaged with my staff in the conduct of the audit. Our partnership is critical to ensuring the quality of financial management and reporting.

Margaret Crawford
Auditor-General, 10 October 2019

Our audit opinion on the State’s 2018–19 financial statements was unmodified. There were fewer reported errors but earlier resolution of accounting matters is still required.

Our audit opinion on the State’s 2018–19 financial statements was unmodified.

This year, six errors exceeding $20 million were found in agencies’ 2018–19 financial statements that make up the State’s consolidated financial statements. The total value of these errors was $927 million compared to $3.8 billion in 2017–18. The errors identified in 2018–19 resulted from:

  • incorrectly applying Australian Accounting Standards and Treasury Policies
  • using inappropriate assumptions and inaccurate data
  • incorrectly assessing the fair value of non-current physical assets.

The introduction of mandatory ‘early close procedures’ in 2011–12, saw the number of errors in agencies’ financial statements fall progressively, to a low of five in 2015–16.

In 2016–17, Treasury narrowed the scope of its mandatory early close procedures to focus on non-current physical asset valuations and pro-forma financial statements. Following this, the number of significant errors increased to 23 in 2017–18, the

highest number in six years and similar to the numbers identified before mandatory early close procedures were introduced.

In 2018–19, Treasury and agencies’ refocused their efforts around early close procedures and other year-end processes resulting in this year’s lower error total of six.

Errors in agency financial statements exceeding $20m (2015–2019)

Correction of prior year’s reported values    

Correction of earthwork assets ($2.1 billion)

Some of the State’s earthworks were first valued in 2016–17. These included earth excavations and embankments for the Country Rail and Metropolitan Network created before the year 2000 and dating back to the early 1900s.

For many years, the State did not account for earthworks because it believed the value could not be reliably measured. In 2016–17, the State engaged an external valuer who identified a methodology showing the earthworks could be valued. That valuer performed a valuation using topography maps for the Country Rail Network (CRN) because information in this earthworks database was of poor quality and incomplete. The valuation resulted in the State recognising $7.5 billion of earthworks for the first time in 2016–17. This was disclosed as a prior period error.

Over the following years, the State improved the quality of the CRN earthworks database by engaging an engineering firm to perform more detailed earthworks surveys. The work involved the use of technology to survey most of the CRN lines.

In 2018–19, the State once again engaged an external valuer to assess the fair value of the CRN earthworks. The valuer determined that incorrect assumptions were used in the 2016–17 valuation. These primarily related to land elevations, which were corrected in the earthworks database and this resulted in a new fair value of $5.4 billion, $2.1 billion less than the previous valuation. The error reported in the 2017–18 value has been corrected in the 2018–2019 financial statements to reflect the revised value.

Previously reported value for earthworks reduced from $7.5 billion to $5.4 billion.

Correction of museum collection assets ($27 million)

The Australian Museum’s collection assets were restated by $27 million to $800 million in 2017–18.

After the 2017–18 financial statements were published, the Australian Museum identified additional collection assets that were not included in the original valuation. This resulted in a $27 million error relating to collection asset values. As last year’s valuation was based on an incomplete listing of collection assets, the 2017-18 value has been corrected in the 2018–19 financial statements to reflect the revised value.

Correction of lease liability ($46.2 million)

On 1 July 1995, the Department of Justice entered into a 25-year lease arrangement with an option to extend for a further 15 years.

The Department accounted for the arrangement as a finance lease by recognising a building asset and a corresponding finance lease liability for the period of 25 years. The Department depreciated the leased asset based on a useful life of 40 years.

As it was reasonably certain the Department would exercise the lease option at inception, it should have recognised a liability that reflected the entire 40 year lease period. To correct the prior year error and properly reflect the extended lease period, the Department of Justice increased the lease liability and decreased retained earnings by $46.2 million as at 1 July 2017.

Abuse Claims remain a significant contingent liability of the State

The State discloses a contingent liability in its financial statements when the possibility of settling the liability in the future is considered less than probable, but more likely than remote, or the amount of the obligation cannot be measured with sufficient reliability.

If the expected settlement subsequently becomes probable and reliably estimable, a provision is recognised.

The State has numerous contingent liabilities. Some are quantifiable while others are not. As contingent liabilities are potentially material future liabilities of the State, every effort should be made to quantify these as accurately as possible. They also need to be monitored closely to ensure that they are recognised and brought on balance sheet as they crystallise.

At 30 June 2019, NSW Self Insurance Corporation (SiCorp) could not reliably measure the claims liability arising from past incidences of abuse that occurred within NSW Government institutions which have not yet been reported. These are referred to as incurred but not reported claims (IBNR).

Since 1 July 2018, victims of child sexual abuse can opt to claim compensation through the National Redress Scheme, or to lodge a civil claim. Civil claims for incidents that occurred within NSW Government institutions may be covered by SiCorp. An estimate of an IBNR for child abuse claims within SiCorp will be impacted by the extent that victims claim compensation through redress as compared to civil claims.

Recent legislative changes have added further uncertainty to estimating the extent of IBNR claims. SiCorp requires more reliable data on the number of IBNR child abuse claims and the expected average size of the related payments. As such, the liabilities presented in the SiCorp and the State financial statements do not include an allowance for IBNR abuse claims.

As more information becomes available it may be possible for SiCorp to reasonably estimate the value of abuse claim liabilities. It is possible that such an estimate may be material to SiCorp and the State’s financial statements. 

TAFE update

In prior years we reported on information system limitations at TAFE NSW, specifically relating to its student administration system. TAFE NSW continues to implement additional processes to verify the accuracy and completeness of revenue from student fees for the 2018–19 financial year.

In 2017–18 TAFE NSW started implementing a new student management system. Significant delays have occurred in implementing this system, mainly due to the complexity of integrating the vendor solution with the requirements of TAFE. TAFE will now bring the final commissioning and operation of the system in house. Final project delivery timeframes and estimated completion costs are being reviewed. Costs incurred to date amount to $67 million. The original budget for this new system is $89.4 million.

Light Rail settlement

The CBD and South East Light Rail is a new twelve kilometre light rail network for Sydney, currently under construction. Passenger trips are set to begin on the light rail by December between Circular Quay and Randwick. The second stage from Randwick to Kingsford is planned to open in March 2020. The original budget for construction work of $1.6 billion was revised to $2.1 billion in 2014.

The State Government has been in dispute with the firm responsible for delivering and operating the CBD and South East light rail project. In May 2019, the parties reached a Settlement Arrangement resulting in the State agreeing to pay a settlement amount of $576 million, which is in addition to the revised budget. Transport has advised a final cost is still to be determined following project completion.

The Audit Office has commenced a follow up audit on the CBD South East Light Rail. This audit will consider whether recommendations of our previous audit have been implemented. We will also review the current status and budget of this project.

Sydney Metro Northwest project commissioning

The Sydney Metro North West officially opened in May 2019.

In constructing the metro, some assets were built to facilitate its operation. These included pavements, roadworks, and electricity
and water connections.

When the project was completed, the assets and the responsibility for maintaining them transferred to third parties, primarily Councils and utility providers. In 2018–19, the State expensed (derecognised) the assets, valued at $306 million, because it no longer controlled them.

Financial Reporting by Crown Land Reserve Trusts

Approximately 700 reserve trusts, managed by Trust Boards, did not prepare the financial statements at 30 June 2019 as required by the
Public Finance and Audit Act 1983.

These Crown reserves contain showgrounds, cemeteries, racecourses, local parks, and other community facilities and public areas. Some of the Crown reserves have independent streams of revenue from user charges.

In 2016–17, Treasury determined that NSW cemetery trusts and a holiday park reserve trust were controlled entities of the State. As such, the Public Finance and Audit Act 1983 requires them to prepare financial statements and have these audited by the Auditor-General.

In 2017–18, three reserve trusts accepted NSW Treasury’s view, prepared financial statements and had them audited by the Auditor-General.

However, three cemetery reserve trusts continue to maintain they are not controlled by the State and therefore their financial statements are not audited by the Audit Office. These cemeteries shared their unaudited financial statements with Treasury so they could be incorporated into the State’s financial statements. At 30 June 2019, the value of their combined assets and liabilities, which are not audited by the Audit Office, was $564 million.

The State included an additional $319 million in assets that relate to Crown land values of approximately 700 reserve trusts that did not prepare or submit financial statements.

We performed additional audit procedures to obtain some assurance over the value of these crown lands. The nature and extent of the limitations to the scope of these procedures was not significant enough to impact our audit opinion. Treasury should ensure these trusts comply with the requirements of the Public Finance and Audit Act.

Derecognition of investment in City West Housing

In 2017–18, the State had an equity investment of $680 million in a community housing provider, City West Housing Pty Limited (CWH).

During 2018–19, CWH amended its constitution to ensure alignment with its charitable status. The unintended impact of this change was that on windup the net assets would not be distributed to the State. The accounting implications to the State’s investment was not considered by Treasury at the time of approving the amended constitution. Consequently, the State wrote off its $680 million investment in CWH in 2018–19.

It is important that accounting impacts of such changes are discussed and agreed upon early. At the time of approving the decision to change the constitution, all accounting implications should be made available and understood. Such information is relevant when approving decisions. The theme of what is relevant
information will be explored further in our Performance Audit of ‘Advice on Major Decisions’.

Machinery of government (MoG) changes refers to how the government reorganises agency structures and functions and realigns ministerial responsibilities.

Cluster changes

On 2 April 2019, the Government reorganised public sector agencies into eight clusters (ten in 2017–18) with effect from 1 July 2019.

Prior to 30 June 2019, two subsequent administrative arrangement orders were made to amend and finalise the MoG changes.

The key MoG changes included:

  • abolishing the following five departments:
    • Finance, Services and Innovation
    • Industry
    • Planning and Environment
    • Family and Communities
    • Justice
  • transferring their functions into three new departments:
    • Department of Customer Service
    • Department of Planning, Industry and Environment
    • Department of Communities and Justice
The State’s consolidated financial statements at 30 June 2019 were not impacted by the changes, as they were effective from 1 July 2019.

The chart below shows the cluster arrangements before and after the MoG changes to the General Government Sector. It compares total budgeted expenses presented in the 2018–19 and 2019–20 Budget Papers (1).

Each cluster’s share of the General Government Sector’s (GGS) total expenditure remains relatively unchanged after the MoG changes. Further details on other functions transferred between clusters are detailed in the 2019–20 Budget Papers.

Of the clusters, Education is affected most by the MoG changes from the perspective of increased expenditure in the 2019–20 budget. This is because the TAFE Commission transferred into this cluster from the former Department of Industry on 1 July 2019, resulting in a corresponding decrease in the new Planning, Industry and Environment cluster’s expenditure.

(1) The 2018–19 Budget Paper 3 (unaudited) and 2019–20 Budget Paper 3 (unaudited).

Cluster expenses

2018-19
Before MoG Changes

2019-20
After MoG Changes

Industry 6% Planning, Industry and Environment 7%
Planning and Environment 4%
Education 18% Education 21%
Premier and Cabinet 1% Premier and Cabinet 2%
Finance, Service and Innovation 4% Customer Service 3%
Family and Community Services 8% Stronger Communities 18%
Justice 10%
Transport 9% Transport 9%
Treasury 14% Treasury 14%
Health 26% Health 26%

 

$1.2 billion surplus, $0.2 billion below 2018–19 budget of $1.4 billion

The Total State Sector comprises 304 entities controlled by the NSW Government.

The General Government Sector, which comprises 212 entities, generally provides goods and services funded centrally by the State.
The non-General Government Sector, which comprises 92 Government businesses, generally provides goods and services, such as water, electricity and financial services that consumers pay for directly.

A principal measure of a Government’s overall performance is its Net Operating Balance (Budget Result). This is the difference
between the cost of General Government service delivery and the revenue earned to fund these sectors.

What changed from 2018 to 2019?

The State maintained its AAA credit rating.

The object of the Fiscal Responsibility Act 2012 is to maintain the State’s AAA credit rating.

The Government manages NSW’s finances in accordance with the Fiscal Responsibility Act 2012 (the Act).

The Act establishes the framework for fiscal responsibility and the strategy to protect the State’s AAA credit rating and service delivery to the people of New South Wales.

The legislation sets out targets and principles for financial management to achieve this.

New South Wales has credit ratings of AAA/Stable from Standard & Poor’s and Aaa/Stable from Moody’s Investors Service.

The fiscal targets for achieving this objective are:

General Government annual expenditure growth is lower than long term average revenue growth.

General Government expenditure grew by 5.5 per cent in 2018–19 (5.1 per cent in 2017–18 based on restated balances). This was slightly below the long-term revenue growth rate of 5.6 per cent.

Eliminating unfunded superannuation liabilities by 2030.

The Act sets a target to eliminate unfunded superannuation liabilities by 2030.

The State’s funding plan is to contribute amounts escalated by five per cent each year so the schemes will be fully funded by 2030. In 2018–19, the State made employer contributions of $1.73 billion ($1.67 billion in 2017–18), an increase of $64 million or 3.8 per cent ($52 million or 3.2 per cent in 2017–18). This was under the five per cent target by $19.5 million.

For fiscal responsibility purposes, the State uses AASB 1056: Superannuation Entities. This accounting standard discounts superannuation liabilities using the expected return from the assets backing the liability.

Using this method, the State’s unfunded superannuation liability was $13.2 billion at 30 June 2019 ($14.0 billion).

Superannuation funding position since inception of the Act - AASB 1056 Valuation

State revenues fell $604 million to $86.1 billion in 2018–19    

In the prior years, revenue growth was underpinned by cyclical increases in land tax, payroll tax and one-off large stamp duty receipts from the lease of the State’s electricity network assets. In 2018–19, the State’s revenue fell by $604 million to $86.1 billion ($86.7 million in 2017–18).

Taxation revenue remained relatively stable

Taxation revenue only grew slightly, mainly due to:

  • a $517 million increase in payroll tax from NSW wages growth
  • a $469 million increase in land tax from growth in land values
  • offset by a $1.2 billion decrease in stamp duty due to lower than expected growth in the property market. This decrease would have been higher had the State not received $555 million in stamp duty from the new 51 per cent owner of WestConnex.

The gap between payroll tax and stamp duty reduced significantly in 2018–19. Stamp duty still remains the largest source of revenue for the State at $9.2 billion, only $42 million above payroll tax.

Australian Government grants and subsidies

The State received $31.8 billion in grants and subsidies from the Australian Government, $158 million less than the previous year. This was due to falls in other grants and subsidies of $98 million and GST revenues of $48 million.

GST revenues fell due to weaker growth in national consumption expenditure and a smaller GST pool. The GST pool represents funds made available by the Commonwealth for transfer to the States as untied financial assistance. The allocation of GST is determined by the Commonwealth, not the State.

A $392 million decrease in National Partnership Payments was offset by a $380 million increase in Specific Purpose Payments.
 
In 2018–19, sales of goods and services fell $395 million mainly due to the sale of WestConnex.

Other dividends and distributions fell by $122 million due to lower distributions from associates. This reflected weaker performance in the electricity sector (Ausgrid and Endeavour) resulting in lower distributions paid to the State following changes in the Electricity Network Service Providers regulatory environment and the sale of Snowy Hydro Pty Ltd in 2017–18.

Fines, regulatory fees and other revenues increased by $242 million largely from mineral royalties. The increase was attributed to strong demand across Asian markets for coal exports, which the State expects will continue to experience steady growth.

Expenses increased $4 billion to $87.9 billion in 2018–19    

Overall, the State’s expenses increased 4.8 per cent in 2018–19 compared to 2017–18. Most of the increase was due to higher employee expenses, operating costs and grants and subsidies.

Employee expenses, including superannuation, increased by 3.9 per cent to $40.3 billion.

Salaries and wages increased to $40.3 billion in 2018–19 from $38.8 billion 2017–18. This was mainly due to salary and wage increases. The Government wages policy aims to limit growth in employee remuneration and other employee related costs to no more than 2.5 per cent per annum.

Operating expenses increased 6.1 per cent from 2017–18.

Within operating expenses, payments for supplies, services and other expenses increased due to:

  • increased operating costs associated with the commencement of the new Sydney Metro
  • higher operating activity levels experienced in the Health sector resulting in higher visiting medical officer costs, surgical supplies and information management costs
  • higher school operating expenses in Education, mainly relating to teaching cloud tools and purchase of computer equipment.
Health costs remain the highest expense of the State.

The following clusters have the highest expenses as a percentage of total government expenses:

  • Health - 25.8 per cent (24.6 per cent in 2017–18)
  • Education - 20 per cent (18.5 per cent)
  • Transport - 14.7 per cent (17.6 per cent).

Other, mainly relates to Economic Affairs, Housing and Community, Recreation and Culture functions of the State.

Transport expenses have decreased in 2018–19 mainly due to the sale of WestConnex. This is partially offset by costs associated with the new Sydney Metro, which commenced operations from 1 July 2018. The graph highlights annual expenditure by function in 2018–19 compared to 2017–18.

Grants and subsidies increased by $782 million to $11.7 billion.

This was mainly due to:

  • the $239 million Emergency Drought Relief Package
  • a $226 million increase in funding to the Human Services sector to deliver key election commitments, including 5,000 more nurses and midwives
  • $123 million in funding for sporting facilities and creating NSW Centre's of Excellence.

Assets grew by $26.7 billion to $468 billion in 2018–19    

Overall, the States total assets increased by $26.7 billion to $468 billion in 2018–19. This is a six per cent increase compared to 2017–18. Most of this was due to increases in carrying value of the State’s physical assets and investments.

Valuing the State's physical assets

The State’s physical assets were valued at $352 billion at 30 June 2019.

The State’s physical assets include land and buildings ($166 billion) and infrastructure ($168 billion). The value of the State’s physical assets at 30 June 2018 was restated from $339 billion to $337 billion. The restatement was required to correct errors in the fair value of earthworks previously reported at $7.5 billion and subsequently corrected to $5.4 billion.

Our audits assess the reasonableness and appropriateness of assumptions used to value physical assets. This includes
obtaining an understanding of the valuation methodologies used and judgements made. We also review the completeness of asset registers and the mathematical accuracy of valuation models.

Net movements between years include additions, disposals, depreciation and valuations. The State’s physical assets increased by $15.2 billion compared with 2017–18.

Movement in the State's physical assets

Liabilities increased $28.6 billion to $217.5 billion in 2018–19    

The State relies on actuarial assessments to value its liabilities

Nearly half of the State’s liabilities relate to its employees. They include unfunded superannuation and employee benefits, such as long service and recreation leave.

Valuing these obligations involves complex estimation techniques and significant judgements. Small changes in assumptions can materially impact balances in the financial statements, such as a lower discount rate.

Superannuation obligations rose by $14.3 billion.

The State’s $70.7 billion unfunded superannuation liability represents obligations to past and present employees less the value of assets set aside to meet those obligations. The unfunded superannuation liability rose by $14.3 billion from $56.4 billion at 30 June 2018 to $70.7 billion at 30 June 2019. This was mainly due to a lower discount rate.

Borrowings totalled $79.9 billion at 30 June 2019.

The State’s borrowings of $79.9 billion at 30 June 2019 were $8.6 billion higher than they were at 30 June 2018.

TCorp issues bonds to raise funds for NSW Government agencies. These are actively traded in financial markets, which provides price transparency and liquidity to public sector borrowers and institutional investors. All TCorp bonds are guaranteed by the NSW Government.

The Government manages its debt liabilities through its balance sheet management strategy. The strategy extends to TCorp, which applies an active risk management strategy to the Government’s debt portfolio.

General Government Sector debt has been restructured by replacing shorter-term debt with longer-term debt. This lengthens the portfolio to match liabilities with the funding requirements for infrastructure assets.

Implementing the requirements of new accounting standards will be challenging

Risks to the quality and timeliness of financial reporting

The State and its agencies will be implementing the requirements of new accounting standards shortly. These are likely to have a major impact on the financial positions and operating results of agencies across the sector.

Accounting standards require agencies to assess and disclose where possible, the impact of the new standards in their 2018–19 financial statements.

Our review found agencies needed to do more work on their impact assessments to minimise the risk of errors in the financial statement disclosures. Some agencies disclosed that the new standards would not have a material impact on their reported financial position and performance, but had little evidence to support this.

Each agency is unique and implementing the new standards is not straight forward as many new principles apply. Management judgement is needed to interpret how the principles apply to each agency. As a result, agencies face the following risks and challenges:

  • having the required technical skills in house
  • having accurate data to assess the impacts
  • correctly and consistently interpreting the new requirements
  • adequately planning and preparing for their application
  • implementing new systems to capture the information needed to meet the new reporting obligations.

To help agencies implement the new standards consistently across the sector, Treasury:

  • issued guidance to agencies
  • prepared position papers on proposed accounting treatments
  • provided briefing sessions to agencies
  • mandated which option in the new standards agencies had to adopt on transition.

Key dates

Section 45 of the Public Finance and Audit Act 1983 requires the Auditor-General to perform audits of the financial statements of entities prescribed for the purposes of that section.
The following were prescribed entities as at 30 June 2019:

Entity/Fund Latest financial statements audited Type of audit opinion issued
Agricultural Scientific Collections Trust 30 June 2019 Unmodified
AustLII Foundation Limited 31 December 2018 Unmodified
Belgenny Farm Agricultural Heritage Centre Trust 30 June 2019 Unmodified
The Brett Whiteley Foundation 30 June 2019 Unmodified
Buroba Pty Ltd 30 June 2018* Unmodified
C. B. Alexander Foundation 30 June 2018 Unmodified
City West Housing Pty Ltd 30 June 2019 Unmodified
The Commissioner for Uniform Legal Services Regulation 30 June 2019 N/A (a)
Cowra Japanese Garden Maintenance Foundation Limited 31 March 2019 Unmodified
Cowra Japanese Garden Trust 31 March 2019 Unmodified
Crown Employees (NSW Fire Brigades Firefighting Staff Death and Disability) Superannuation Fund 30 June 2019 Unmodified
Eif Pty Limited 30 June 2019 Unmodified
Energy Investment Fund 30 June 2019 Unmodified
Central Coast Council Water Supply Authority (formerly Gosford City and Wyong City Council Water Supply Authorities) 30 June 2018 Unmodified
Home Building Compensation Fund 30 June 2019 Unmodified
The funds for the time being under the management of the New South Wales Treasury Corporation, as trustee 30 June 2019 Unmodified
The Illawarra Health and Medical Research Institute Limited 30 June 2019 Unmodified
The Legal Services Council 30 June 2019 Unmodified
Macquarie University Professorial Superannuation Scheme 30 June 2019 Unmodified
Planning Ministerial Corporation 30 June 2019 Unmodified
Corporation Sole 'Minister administering the Heritage Act 1977' (a corporation) 30 June 2019 Unmodified
National Art School 31 December 2018 Unmodified
NSW Fire Brigades Superannuation Pty Limited 30 June 2019 Unmodified
Parliamentary Contributory Superannuation Fund 30 June 2019 Unmodified
Sydney Education Broadcasting Limited 31 December 2018 Unmodified
The superannuation fund amalgamated under the Superannuation Administration Act 1991 and continued to be amalgamated under the Superannuation Administration 30 June 2019 Unmodified
Act 1996 (known as the SAS Trustee Corporation Pooled Fund) 30 June 2019 Unmodified
The trustees for the time being of each superannuation scheme established by a trust deed as referred to in section 127 of the Superannuation Administration Act 1996 30 June 2019 Unmodified
The Art Gallery of New South Wales Foundation 30 June 2019 Unmodified
Trustee of the Home Purchase Assistance Fund 30 June 2019 Unmodified
Trustees of the Farrer Memorial Research Scholarship Fund 31 December 2018 Unmodified
United States Studies Centre 31 December 2018 Unmodified
Universities Admissions Centre (NSW and ACT) Pty Limited 30 June 2018 Unmodified
University of Sydney Professorial Superannuation System 31 December 2018 Unmodified
Valley Commerce Pty Ltd 30 June 2018* Unmodified
     
(a) Included as part of the Legal Services Council.
*Entities exempt from preparing financial statements at 30 June 2019.
aa


 

Published

Actions for Biosecurity risk management

Biosecurity risk management

Industry
Risk

The report focuses on the Department of Primary Industries’ (DPI) as the lead agency for biosecurity in New South Wales. It examines how well the department responds to biosecurity emergencies and manages compliance activities. DPI’s state partners include NSW Health, the NSW Environment Protection Authority, Local Land Services, and Local Control Authorities to manage biosecurity risks in New South Wales.

Biosecurity is the protection of the economy, environment, and community from the negative impacts of pests, diseases, weeds, and contaminants.

National and State governments have defined roles and responsibilities for biosecurity in Australia, reflecting the allocation of powers in the Australian Constitution. The Australian Government has direct responsibility for biosecurity (quarantine) at the international border, and works jointly with the states and territories to set the legislative framework and policy direction for managing biosecurity nationally. It also works with state and territory governments to ensure there is a national approach to biosecurity. State governments manage their biosecurity activities within the national framework.

The Department of Primary Industries (DPI), within the Department of Industry, is the lead agency for biosecurity in NSW. This audit was conducted with the Department of Industry as the auditee. On 2 April 2019 the NSW Government announced it will abolish the Department of Industry. From 1 July 2019 the Department of Planning, Industry and Environment, will have responsibility for biosecurity activities described in this report.

The NSW Biosecurity Strategy 2013–2021 (the Strategy) articulates the NSW Government’s responsibilities for biosecurity within the national legislative framework. Achieving the outcomes of the strategy relies on DPI fulfilling two key responsibilities. Firstly, undertaking direct actions, such as implementing strong regulatory compliance and licensing activities, and managing biosecurity emergency responses. Secondly, leading the response to biosecurity risks by fostering effective collaboration with stakeholders across government, industry, and the wider community.

In NSW, 11 regional Local Land Services (LLS) are the key partners for DPI in meeting its biosecurity responsibilities. Each LLS develops and implements strategies to manage invasive pests and diseases within their regions. They also investigate new reports of pests or diseases in their regions and staff local emergency control centres when an emergency response is triggered.

Local Control Authorities (LCAs) also have a role in biosecurity management. LCAs include local councils and a small number of specialist regional agencies. Their role focuses on strategies to manage weeds within their local areas.

This audit assessed the effectiveness and economy of DPI’s biosecurity emergency response and prevention activities. It looks at DPI’s emergency response practice and its compliance program as a key prevention activity for which DPI has primary responsibility. DPI sets policy and procedural compliance standards for management of biosecurity risks in NSW and also conducts an annual program of property inspections and investigations that ensure that its compliance policies and procedures are being applied effectively.

Appendix one - Response from agency

Appendix two - Location of selected biosecurity emergency responses

Appendix three - About the audit

Appendix four - Performance auditing

 

Parliamentary Reference: Report number #321 - released 18 June 2019

Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Banner image: ‘Yellow crazy ant’, supplied and permitted for use by NSW Department of Primary Industries under Creative Commons Attribution-ShareAlike 3.0 Unported Licence. Full terms.

Published

Actions for Universities 2018 audits

Universities 2018 audits

Universities
Cyber security
Financial reporting
Information technology
Internal controls and governance

The Acting Auditor General of New South Wales, Ian Goodwin, released a report today on the results of financial audits of NSW universities for the year ended 31 December 2018.

All ten NSW universities received unqualified audit opinions.

This report analyses the results of our audits of financial statements of the ten NSW universities for the year ended 31 December 2018. The table below summarises our key observations.

This report provides Parliament with the results of our financial audits of New South Wales universities and their controlled entities in 2018, including our analysis, observations and recommendations in the following areas:

  • financial reporting
  • internal controls and governance
  • teaching and research.

Financial reporting is an important element of governance. Confidence and transparency in university sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations on the financial reporting of NSW universities for 2018.

Appropriate and robust internal controls help reduce risks associated with managing finances, compliance and administration of NSW universities.

This chapter outlines the internal controls related observations and insights across NSW universities for 2018, including overall trends in findings, level of risk and implications.

Our audits do not review all aspects of internal controls and governance every year. The more significant issues and risks are included in this chapter. These along with the less significant ones are reported to universities for them to address.

Universities' primary objectives are teaching and research. They invest most of their resources to achieve quality outcomes in academia and student experience. Universities have committed to achieving certain government targets and compete to advance their reputation and international and Australian rankings.

This chapter outlines teaching and research outcomes for NSW universities for 2018.

Published

Actions for Transport Access Program

Transport Access Program

Transport
Infrastructure
Project management
Service delivery

The following report is available in an Easy English version that is intended to meet the needs of some people with lower literacy skills, some people with an intellectual disability and some people from different cultural backgrounds.

View the Easy English version of the Transport Access Program report

Transport for NSW’s process for selecting and prioritising projects for the third stage of its Transport Access Program balanced compliance with national disability standards with broader customer outcomes. Demographics, deliverability and value for money were also considered. However, Transport for NSW does not know the complete scope of work required for full compliance, limiting its ability to demonstrate that its approach is effective, according to a report released today by the Auditor-General for New South Wales, Margaret Crawford.

Access to transport is critical to ensuring that people can engage in all aspects of community life, including education, employment and recreation. People with disability can encounter barriers when accessing public transport services. In 2015, there were 1.37 million people living with disability in New South Wales.

Accessible public transport is about more than physical accessibility. It also means barrier-free access for people who have vision, hearing or cognitive impairments. All users, not just people with disability, benefit from improvements to the accessibility and inclusiveness of transport services. 

Transport for NSW has an obligation under Australian Government legislation to provide accessible services to people with disabilities in a manner which is not discriminatory. Under the Disability Standards for Accessible Public Transport 2002 (the DSAPT - an instrument of the Disability Discrimination Act 1992 (the Act) (Commonwealth)), there is a requirement to modify and develop new infrastructure, means of transport and services to provide access for people with disabilities. All public transport operators are required to ensure that at least 90 per cent of their networks met DSAPT by December 2017 and the networks will need to be 100 per cent compliant with all parts of the standards by 31 December 2022. Trains are not required to be fully compliant with DSAPT until December 2032. 

The Transport Access Program (TAP) is Transport for NSW's largest program with a specific focus on improving access to public transport for people with disability. The TAP is a series of projects to upgrade existing public transport infrastructure across four networks: Sydney Trains, Intercity Trains, Regional Trains and Sydney Ferries. Transport for NSW established the TAP as a rolling program and, to date, it has delivered the first tranche of TAP (TAP 1) and is completing the final projects for the second tranche (TAP 2). NSW budget papers estimate that by 30 June 2018, Transport for NSW had spent $1.2 billion in the TAP since its commencement in 2011-12.

After the completion of TAP 1 and TAP 2 (as well as through other transport infrastructure programs), Transport for NSW estimates that 58.5 per cent of the Sydney Trains, Regional Trains and Intercity Trains networks, and 66 per cent of the Sydney Ferries network, will be accessible. To close the significant gap in compliance with the DSAPT target, the objective for TAP 3 is ‘to contribute to Disability Discrimination Act 1992 related targets through DSAPT compliance upgrades’. 

The audit assessed whether Transport for NSW has an effective process to select and prioritise projects as part of the TAP, with a specific focus on the third tranche of TAP funding.

In August 2018, at the commencement of this audit, Transport for NSW intended to complete the selection of projects for the TAP 3 final business case in December 2018. Transport for NSW advise that it now intends to complete the development stage and final business case in the first quarter of 2019, prior to the final investment decision of the TAP program. This report is based on the TAP 3 strategic business case and information provided by Transport for NSW up to December 2018.

Conclusion
Transport for NSW’s process for selecting and prioritising projects for TAP 3 balanced DSAPT compliance goals with broader customer outcomes. It also considered demographics, deliverability and value for money. However, Transport for NSW does not know the complete scope of work required for full DSAPT compliance, and this limits its ability to demonstrate that its approach is effective. 
Transport for NSW has applied most of the external review recommendations from previous funding rounds to the implementation of the third round of TAP funding (TAP3), with positive results. Changes made include a clear objective for TAP 3 to focus on improving compliance, improved governance arrangements, and better consideration of deliverability and design during project planning. 
Through TAP 3, Transport for NSW is also trying to better address disability access in a way that balances DSAPT compliance with other considerations - such as population demographics, access to services and value for money. Transport for NSW developed an objective prioritisation and selection methodology to assess projects for TAP 3 funding. 
Transport for NSW cannot quantify the work needed to meet DSAPT compliance targets across the rail and ferry networks as it has not completed a comprehensive audit of compliance. This information is needed to ensure the effective targeting of funding, and to measure the contribution of TAP 3 work to meeting the DSAPT compliance targets. Instead, Transport for NSW has undertaken a phased approach to completing a comprehensive audit of compliance across the networks, with a focus on first assessing compliance at locations that are not wheelchair accessible. This creates two problems. First, Transport for NSW does not know the complete scope of work required to achieve DSAPT compliance. Second, not all wheelchair accessible locations fully meet DSAPT standards.
Transport for NSW's proposed communication plan for the schedule of TAP 3 funded works does not align with its Disability Inclusion Action Plan 2018-2022. The Disability Inclusion Action Plan commits Transport for NSW to providing a full list of stations and wharves to be upgraded with their estimated time of construction when the next round of funding, TAP 3, is announced. Given the long timeframes associated with improving transport infrastructure, this information is important as it allows people to make informed decisions about where they live, work or study. Instead, Transport for NSW plans to communicate information to customers on a project by project basis.

In 2015, there were 1.37 million people living with disability in New South Wales. Access to transport is critical to ensuring that people can engage in all aspects of community life, including education, employment and recreation. People with disability can encounter barriers when accessing public transport services. 

The social model of disability, outlined in the United Nations Convention on the Rights of Persons with Disabilities, views people with disability as not disabled by their impairment but by the barriers in the community and environment that restrict their full and effective participation in society on an equal basis with others. 

Accessible public transport is more than the provision of physical access to premises and conveyances, it provides barrier-free access for people who have vision, hearing or cognitive impairments. All users, not just people with disability, benefit from improvements to the accessibility and inclusiveness of transport services.

According to the Australian Bureau of Statistics, the main types of difficulties experienced by people with disability when using public transport relate to steps (39.9 per cent), difficulty getting to stops and stations (25 per cent), fear and anxiety (23.3 per cent) and lack of seating or difficulty standing (20.7 per cent).

Transport for NSW has a Disability Inclusion Action Plan (the Action Plan) 2018-2022 that sets an overall framework for planning, delivering and reporting on initiatives to increase accessibility of the transport network. It covers all elements of the journey experienced when using public transport, including journey planning, staff training, customer services and interaction between the physical environment and modes of transport. Appendix five outlines the guiding principles of the Action Plan.

Transport for NSW's Transport Social Policy branch developed the Action Plan in consultation with internal and external stakeholders. The director of the Transport Social Policy branch is a member of the TAP executive steering committee, which supports alignment between the Action Plan and TAP.

Transport for NSW's Disability Inclusion Action Plan describes a customer focussed approach to accessibility

One of the guiding principles of the Action Plan is ‘intelligent compliance’. Transport for NSW describes this as compliance that prioritises customer-focused outcomes over a narrow focus on legal compliance with accessibility standards. As well as being compliant, infrastructure should be practical, usable, fit for purpose and convenient. 

The TAP prioritisation and selection methodology reflects Transport for NSW’s focus on intelligent compliance. We consider this a reasonable approach as had Transport for NSW focussed exclusively on achieving compliance with the DSAPT targets by upgrading the most affordable infrastructure, some locations, that are used by more customers, would remain inaccessible to people with disability. However, this approach should not be seen as an alternative to Transport for NSW meeting its DSAPT compliance obligations.

TAP program staff consult with the Accessible Transport Advisory Committee

The Accessible Transport Advisory Committee (ATAC) has representatives from disability and ageing organisations, who provide expert guidance to Transport for NSW on access and inclusion. The ATAC provide guidance and feedback on projects and project solutions, including user testing where appropriate. TAP program staff provide regular updates at ATAC meetings, which include briefings on progress. The ATAC also provides feedback and suggestions to TAP program staff, which is considered and sometimes included in current and future projects.For example, in March 2017 the TAP program team briefed the ATAC on the challenges with respect to a number of ferry wharves and sought support for DSAPT exemptions proposed in the TAP 3 strategic business case.

Case study: Feedback on Braille lettering for lift buttons
In June 2018, the Program team sought feedback on a variety of lift button options to improve accessibility on future TAP projects. In September 2018, during the ATAC meeting attended by the Audit Office, the program team sought feedback on the standard designs for TAP 3. Some ATAC members noted that the standard design included Braille lettering on the lift buttons, and that this was not good practice because people can accidently press the button while reading it. As a result, Transport for NSW are incorporating this feedback into design requirements for the lifts for TAP 3, which will consider larger buttons, clearer Braille and Braille signage adjacent to the button.

Transport for NSW has not briefed the Advisory Committee on the outcome of the prioritisation and selection process

TAP program staff briefed the Advisory Committee about the prioritisation and selection methodology, after the Minister approved it in 2016. However, Transport for NSW have not briefed or consulted the Advisory Committee on the outcome of the prioritisation process. Infrastructure NSW noted this issue during its review of the strategic business case. 

Transport for NSW advised us that it established the ATAC as an advisory group, and that Transport for NSW does not disclose sensitive information to it. Transport for NSW intends to share the outcome of the prioritisation process following the completion of the TAP 3 development stage and final investment decision.

The TAP communication plan does not fully meet the requirements of the Disability Inclusion Action Plan

The Disability Inclusion Action Plan includes an action item to ‘provide a listing of stations and wharves to be upgraded with estimated time of construction as each new tranche of the Transport Access Program is announced’ The TAP Communication Plan that we reviewed does not include this provision instead focussing on communication on a per project basis. Given the long timeframes associated with improving transport infrastructure, this information is important as it allows people to make informed decisions about where they live, work or study.

Published

Actions for Planning and Environment 2018

Planning and Environment 2018

Planning
Environment
Asset valuation
Financial reporting
Information technology
Infrastructure
Internal controls and governance
Service delivery

The Auditor-General for New South Wales, Margaret Crawford, released her report today on the NSW Planning and Environment cluster. The report focuses on key observations and findings from the most recent financial audits of these agencies. Unqualified audit opinions were issued for all agencies' financial statements. However, some cultural institutions had challenges valuing collection assets in 2017–18. These issues were resolved before the financial statements were finalised.

This report analyses the results of our audits of financial statements of the Planning and Environment cluster for the year ended 30 June 2018. The table below summarises our key observations.

This report provides parliament and other users of the Planning and Environment cluster agencies' financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations
  • service delivery.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making is enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Planning and Environment cluster for 2018.

Observation Conclusions and recommendations
2.1 Quality of financial reporting
Unqualified audit opinions were issued for all agencies' financial statements. The quality of financial reporting remains high across the cluster.
2.2 Key accounting issues
There were errors in some cultural institutions' collection asset valuations. Recommendation: Collection asset valuations could be improved by:
  • early engagement with key stakeholders regarding the valuation method and approach
  • completing revaluations, including quality review processes earlier 
  • improving the quality of asset data by registering all items in an electronic database. 
2.3 Timeliness of financial reporting
Except for two agencies, the audits of cluster agencies’ financial statements were completed within the statutory timeframe.  Issues with asset revaluations delayed the finalisation of two environment and heritage agencies' financial statement audits. 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from:

  • our financial statement audits of agencies in the Planning and Environment cluster for 2018
  • the areas of focus identified in the Audit Office work program.

The Audit Office annual work program provides a summary of all audits to be conducted within the proposed time period as well as detailed information on the areas of focus for each of the NSW Government clusters.

Observation Conclusions and recommendations
3.1 Internal controls
One in five internal control weaknesses reported in 2017–18 were repeat issues. Delays in implementing audit recommendations can prolong the risk of fraud and error.
Recommendation (repeat issue): Management letter recommendations to address internal control weaknesses should be actioned promptly, with a focus on addressing repeat issues.
One extreme risk was identified relating to the National Art School. The School does not have an occupancy agreement for the Darlinghurst campus. Lack of formal agreement creates uncertainty over the School's continued occupancy of the Darlinghurst site.

The School should continue to liaise with stakeholders to formalise the occupancy arrangement. 
 
3.2 Information technology controls
The controls and governance arrangements when migrating payroll data from the Aurion system to SAP HR system were effective. Data migration from the Aurion system to SAP HR system had no significant issues.
The Department can improve controls over user access to SAP system. The Department needs to ensure the SAP user access controls are appropriate, including investigation of excess access rights and resolving segregation of duties issues. 
3.3 Annual work program
Agencies used different benchmarks to monitor their maintenance expenditure. The cluster agencies under review operate in different industries. As a result, they do not use the same benchmarks to assess the adequacy of their maintenance spend. 

This chapter outlines certain service delivery outcomes for 2017–18. The data on activity levels and performance is provided by cluster agencies. The Audit Office does not have a specific mandate to audit performance information. Accordingly, the information in this chapter is unaudited. 

We report this information on service delivery to provide additional context to understand the operations of the Planning and Environment cluster, and to collate and present service information for different segments of the cluster in one report. 

In our recent performance audit, ‘Progress and measurement of Premier's Priorities’, we identified 12 limitations of performance measurement and performance data. We recommended the Department of Premier and Cabinet ensure that processes to check and verify data are in place for all relevant agency data sources.

Published

Actions for Newcastle Urban Transformation and Transport Program

Newcastle Urban Transformation and Transport Program

Transport
Planning
Compliance
Infrastructure
Management and administration
Procurement
Project management

The urban renewal projects on former railway land in the Newcastle city centre are well targeted to support the objectives of the Newcastle Urban Transformation and Transport Program (the Program), according to a report released today by the Auditor-General for New South Wales, Margaret Crawford. The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the government. However, the evidence that the cost of the light rail will be justified by its contribution to the Program is not convincing.

The Newcastle Urban Transformation and Transport Program (the Program) is an urban renewal and transport program in the Newcastle city centre. The Hunter and Central Coast Development Corporation (HCCDC) has led the Program since 2017. UrbanGrowth NSW led the Program from 2014 until 2017. Transport for NSW has been responsible for delivering the transport parts of the Program since the Program commenced. All references to HCCDC in this report relate to both HCCDC and its predecessor, the Hunter Development Corporation. All references to UrbanGrowth NSW in this report relate only to its Newcastle office from 2014 to 2017.

This audit had two objectives:

  1. To assess the economy of the approach chosen to achieve the objectives of the Program.
  2. To assess the effectiveness of the consultation and oversight of the Program.

We addressed the audit objectives by answering the following questions:

a) Was the decision to build light rail an economical option for achieving Program objectives?
b) Has the best value been obtained for the use of the former railway land?
c) Was good practice used in consultation on key Program decisions?
d) Did governance arrangements support delivery of the program?

Conclusion
1. The urban renewal projects on the former railway land are well targeted to support the objectives of the Program. However, there is insufficient evidence that the cost of the light rail will be justified by its contribution to Program objectives.

The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the Government. HCCDC, and previously UrbanGrowth NSW, identified and considered options for land use that would best meet Program objectives. Required probity processes were followed for developments that involved financial transactions. Our audit did not assess the achievement of these objectives because none of the projects have been completed yet.

Analysis presented in the Program business case and other planning documents showed that the light rail would have small transport benefits and was expected to make a modest contribution to broader Program objectives. Analysis in the Program business case argued that despite this, the light rail was justified because it would attract investment and promote economic development around the route. The Program business case referred to several international examples to support this argument, but did not make a convincing case that these examples were comparable to the proposed light rail in Newcastle.

The audited agencies argue that the contribution of light rail cannot be assessed separately because it is a part of a broader Program. The cost of the light rail makes up around 53 per cent of the total Program funding. Given the cost of the light rail, agencies need to be able to demonstrate that this investment provides value for money by making a measurable contribution to the Program objectives.

2. Consultation and oversight were mostly effective during the implementation stages of the Program. There were weaknesses in both areas in the planning stages.

Consultations about the urban renewal activities from around 2015 onward followed good practice standards. These consultations were based on an internationally accepted framework and met their stated objectives. Community consultations on the decision to close the train line were held in 2006 and 2009. However, the final decision in 2012 was made without a specific community consultation. There was no community consultation on the decision to build a light rail.

The governance arrangements that were in place during the planning stages of the Program did not provide effective oversight. This meant there was not a single agreed set of Program objectives until 2016 and roles and responsibilities for the Program were not clear. Leadership and oversight improved during the implementation phase of the Program. Roles and responsibilities were clarified and a multi-agency steering committee was established to resolve issues that needed multi-agency coordination.
The light rail is not justified by conventional cost-benefit analysis and there is insufficient evidence that the indirect contribution of light rail to achieving the economic development objectives of the Program will justify the cost.
Analysis presented in Program business cases and other planning documents showed that the light rail would have small transport benefits and was expected to make a modest contribution to broader Program objectives. Analysis in the Program business case argued that despite this, the light rail was justified because it would attract investment and promote economic development around the route. The Program business case referred to several international examples to support this argument, but did not make a convincing case that these examples were comparable to the proposed light rail in Newcastle.
The business case analysis of the benefits and costs of light rail was prepared after the decision to build light rail had been made and announced. Our previous reports, and recent reports by others, have emphasised the importance of completing thorough analysis before announcing infrastructure projects. Some advice provided after the initial light rail decision was announced was overly optimistic. It included benefits that cannot reasonably be attributed to light rail and underestimated the scope and cost of the project.
The audited agencies argue that the contribution of light rail cannot be assessed separately because it is part of a broader Program. The cost of the light rail makes up around 53 per cent of the total Program funding. Given the high cost of the light rail, we believe agencies need to be able to demonstrate that this investment provides value for money by making a measurable contribution to the Program objectives.

Recommendations
For future infrastructure programs, NSW Government agencies should support economical decision-making on infrastructure projects by:
  • providing balanced advice to decision makers on the benefits and risks of large infrastructure investments at all stages of the decision-making process
  • providing scope and cost estimates that are as accurate and complete as possible when initial funding decisions are being made
  • making business cases available to the public.​​​​​​
The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the government.

The planned uses of the former railway land align with the objectives of encouraging people to visit and live in the city centre, creating attractive public spaces, and supporting growth in employment in the city. The transport benefits of the activities are less clear, because the light rail is the major transport project and this will not make significant improvements to transport in Newcastle.

The processes used for selling and leasing parts of the former railway land followed industry standards. Options for the former railway land were identified and assessed systematically. Competitive processes were used for most transactions and the required assessment and approval processes were followed. The sale of land to the University of Newcastle did not use a competitive process, but required processes for direct negotiations were followed.

Recommendation
By March 2019, the Hunter and Central Coast Development Corporation should:
  • work with relevant stakeholders to explore options for increasing the focus on the heritage objective of the Program in projects on the former railway land. This could include projects that recognise the cultural and industrial heritage of Newcastle.
Consultations about the urban renewal activities followed good practice standards, but consultation on transport decisions for the Program did not.

Consultations focusing on urban renewal options for the Program included a range of stakeholders and provided opportunities for input into decisions about the use of the former railway land. These consultations received mostly positive feedback from participants. Changes and additions were made to the objectives of the Program and specific projects in response to feedback received. 

There had been several decades of debate about the potential closure of the train line, including community consultations in 2006 and 2009. However, the final decision to close the train line was made and announced in 2012 without a specific community consultation. HCCDC states that consultation with industry and business representatives constitutes community consultation because industry representatives are also members of the community. This does not meet good practice standards because it is not a representative sample of the community.

There was no community consultation on the decision to build a light rail. There were subsequent opportunities for members of the community to comment on the implementation options, but the decision to build it had already been made. A community and industry consultation was held on which route the light rail should use, but the results of this were not made public. 

Recommendation
For future infrastructure programs, NSW Government agencies should consult with a wide range of stakeholders before major decisions are made and announced, and report publicly on the results and outcomes of consultations. 

The governance arrangements that were in place during the planning stages of the Program did not provide effective oversight. Project leadership and oversight improved during the implementation phase of the Program.

Multi-agency coordination and oversight were ineffective during the planning stages of the Program. Examples include: multiple versions of Program objectives being in circulation; unclear reporting lines for project management groups; and poor role definition for the initial advisory board. Program ownership was clarified in mid-2016 with the appointment of a new Program Director with clear accountability for the delivery of the Program. This was supported by the creation of a multi-agency steering committee that was more effective than previous oversight bodies.

The limitations that existed in multi-agency coordination and oversight had some negative consequences in important aspects of project management for the Program. This included whole-of-government benefits management and the coordination of work to mitigate impacts of the Program on small businesses.

Recommendations
For future infrastructure programs, NSW Government agencies should: 

  • develop and implement a benefits management approach from the beginning of a program to ensure responsibility for defining benefits and measuring their achievement is clear
  • establish whole-of-government oversight early in the program to guide major decisions. This should include:
    • agreeing on objectives and ensuring all agencies understand these
    • clearly defining roles and responsibilities for all agencies
    • establishing whole-of-government coordination for the assessment and mitigation of the impact of major construction projects on businesses and the community.

By March 2019, the Hunter and Central Coast Development Corporation should update and implement the Program Benefits Realisation Plan. This should include:

  • setting measurable targets for the desired benefits
  • clearly allocating ownership for achieving the desired benefits
  • monitoring progress toward achieving the desired benefits and reporting publicly on the results.

Appendix one - Response from agencies    

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary reference - Report number #310 - released 12 December 2018

Published

Actions for Health 2018

Health 2018

Health
Financial reporting

The Auditor-General, Margaret Crawford, released a report today on the New South Wales Health Cluster. The report focuses on key observations and findings from the most recent financial audits of thirty health entities in New South Wales. Unqualified audit opinions were issued for all health entities’ financial statements. However, assessing the fair value of health entities’ property, plant and equipment created challenges, particularly for local health districts.

This report analyses the results of our audits of financial statements of the Health cluster for the year ended 30 June 2018. The table below summarises our key observations.

This report provides parliament and other users of the Health cluster’s financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Health cluster for 2018.

Observation Conclusions and recommendations
2.1 Quality of financial reporting
We issued unqualified audit opinions for all health entities. We identified fewer misstatements than last year, but they were more significant. The Ministry of Health sets significant accounting policies centrally and provides a template for the preparation of health entities' financial statements. These processes promote consistent quality in the financial reports of health entities.

Significant errors identified in 2017–18 predominantly related to revaluations of property, plant and equipment.
 
2.2 Timeliness of financial reporting
Entities' continue to bring forward financial statement procedures to 31 March where possible. All entities submitted their financial statements on time. Health entities continue to meet statutory deadlines. 
2.3 Financial and sustainability analysis
NSW Health recorded an operating surplus of $377.7 million in 2017–18. Fewer health entities recorded operating deficits in 2017–18. The operating surplus was $123 million less than budgeted, and $29.0 million less than the surplus recorded for 2016–17. NSW Health budgets for surpluses to help it invest in new facilities, upgrades and redevelopments.
Expenses across NSW Health increased by 5.5 per cent in 2017–18 (4.4 per cent in 2016–17). The expense growth rate for NSW Health is 0.5 percentage points lower than the projected long-term annual expense growth rate of six per cent.
The capital replacement ratio (investment in new assets divided by depreciation) for NSW Health is 2.0. NSW Health's high capital replacement ratios for ten health entities in 2017–18 is driven by its substantial ongoing investment in hospitals and other assets.
2.4 Performance against budget
This year, four out of 17 (ten out of 17 in 2016–17) local health districts and specialty networks reported a budget variance outside of performance expectations. Health entities' budgets are revised frequently throughout the year by the Ministry of Health. In 2017–18 the budgeted expenses of health entities were incrementally increased throughout the year by a total of $807 million.

The Ministry of Health expects health entities not to exceed their revised budgeted expenses by more than 0.5 per cent. Four of the local health districts did not meet this requirement.
 
2.5 Financial impact of health entity employees
Thirty-four per cent of NSW Health’s workforce has excess annual leave balances, compared to 35 per cent in 2016–17.

Managing excess annual leave continues to challenge health entities.
Recommendation: Health entities should further review the approach to managing excess annual leave in 2018–19, and:

  • monitor current and projected leave balances to the end of the financial year on a monthly basis
  • agree formal leave plans with employees to reduce leave balances over an acceptable timeframe
  • encourage staff that perform key control functions to take a minimum of two consecutive weeks' leave a year as a fraud mitigation strategy.
The Ambulance Service of NSW reported an average sick leave rate of 88.9 hours per FTE in 2017–18, an increase from 85.2 hours per FTE in 2016–17. Managing sick leave continues to challenge the Ambulance Service of NSW.
Recommendation: The Ambulance Service of NSW should further implement and monitor targeted human resource strategies to address the high rates of sick leave taken.
The Ambulance Service of NSW reported overtime payments of $74.8 million ($74.6 million in 2016–17). This continues to be significantly higher than other health entities. Recommendation: The Ambulance Service of NSW should further review the effectiveness of its rostering practices to identify strategies to reduce excessive overtime payments.
Weak timesheet approval controls mean unapproved employee timesheets continue to be a problem for health entities. Recommendation: Health entities should, as part of the benefits realisation of HealthRoster, continue to rectify time and leave recording control weaknesses, to reduce the risk of timesheet errors and fraud.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from:

  • our financial statement audits of agencies in the Health cluster for 2018
  • the areas of focus identified in the Audit Office annual work program.

The Audit Office Annual Work Program provides a summary of all audits to be conducted within the proposed time period as well as detailed information on the areas of focus for each of the NSW Government clusters.

Observation Conclusions and recommendations
3.1 Internal control deficiencies
The number of internal control deficiencies decreased. However, almost a quarter of control deficiencies are repeat issues and over a quarter relate to managing employees' leave and time recording. Control deficiencies that relate to managing employees' leave, employees' time recording or information system limitations can be difficult for entities to resolve in a timely manner. Nonetheless, the longer the deficiency remains unaddressed the more likely the vulnerability will contribute to error or fraud.
 
3.2 Audit Office annual work program
Revaluation of property, plant and equipment
Three health entities did not effectively oversee the asset revaluations performed by the experts they engaged in 2017–18. All three entities made material adjustments to their draft financial statements. Valuation of health property, plant and equipment is complex and subjective. Health entities and the Ministry of Health rely on the experts they engage, but needed to do more to review and oversee their work.
Capital projects
NSW Health manages a significant capital program ($1.7 billion in 2017–18). We noted significant revisions to completion dates and budgeted costs for some projects. NSW Health complied with approval requirements for business cases, initial budgets and budget variations for the projects we reviewed. For some projects revisions to planned completion dates and budgeted costs impact on the ability to assess the timeliness and cost effectiveness of projects. Combining stages of projects for simplicity of reporting, as a project progresses also makes it difficult to see how the project is tracking to the original plan.
Asset maintenance
The five health entities with the highest maintenance expense used different methods to estimate budgets for maintenance expense. Entities that calculated maintenance budgets by applying CPI factors to prior year expenses were less likely to deliver within budget. Maintenance budgets are more accurately predicted when estimates are made of expected costs and prepared with the input of asset maintenance staff.
 
Two of the five entities recorded significantly higher unplanned maintenance expenditure. Planned maintenance expenditure for these entities was lower than other entities.

The entities plan to address this by performing condition audits of their assets, increasing planned maintenance and replacing assets.

All five of the entities were using assets that have been fully depreciated. The replacement cost of each entities' fully depreciated assets represented between 3–7 per cent total replacement cost. While entities are now regularly reassessing the useful lives of their assets, they continue to use some assets that were fully depreciated prior to the implementation of these processes.

Published

Actions for Industry 2018

Industry 2018

Industry
Asset valuation
Cyber security
Financial reporting
Information technology
Internal controls and governance
Service delivery

The Auditor-General for New South Wales, Margaret Crawford, released her report today on the Industry cluster. The report focuses on key observations and findings from the most recent financial audits of agencies in the cluster. Cluster agencies received unqualified audit opinions for 41 out of the 47 financial statements presented for audit for 30 June 2018. Six audits remain incomplete. 'While it is pleasing to note that unqualified audit opinions have been issued, the timeliness of financial reporting needs to be improved through better oversight, prompt resolution of issues, and an increased focus on early close procedures', the Auditor-General said.

This report analyses the results of our audits of financial statements of the Industry cluster for the year ended 30 June 2018. The table below summarises our key observations.

This report provides parliament and other users of the Industry cluster agencies' financial statements with the results of our audits, including our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations
  • service delivery.

The Department of Industry (the Department) is the lead agency in a cluster of 50 agencies. Other significant agencies in the cluster include Local Land Services, New South Wales Rural Assistance Authority, Technical and Further Education Commission (TAFE NSW), various sporting agencies, Forestry Corporation NSW and Water NSW.

The cluster:

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Industry cluster for 2018.
 

Observation Conclusions and recommendations
2.1 Quality of financial reporting
Unqualified audit opinions were issued for 41 out of 47 financial statement audits. Six audits are continuing.

The number of misstatements identified in financial statements submitted for audit increased from 73 in 2016–17 to 92 in 2017–18.
Conclusion: Agencies continue to address financial reporting issues and ensure significant matters that may impact the audit opinion are appropriately dealt with. The increase in the number of misstatements indicates a renewed focus on quality is required.
2.2 Timeliness of financial reporting
Nineteen out of 37 audit opinions were issued within the statutory deadline. Delays occurred due to the time required to resolve issues identified during the audit, or to obtain appropriate evidence to support balances or disclosures in the financial statements. There were also delays in receiving the signed certification from the agency, required before we can issue an audit opinion.

We reviewed the conduct of early close procedures at 17 agencies. Fifteen of these agencies were assessed as not fully addressing mandatory early close procedures.
Recommendation: Timeliness of financial reporting should be improved through better oversight of the preparation of financial statements, prompt resolution of issues, and an increased focus on early close procedures.
2.3 Key financial reporting issues
Information system limitations continue at TAFE NSW. TAFE NSW implemented additional processes to verify the accuracy and completeness of revenue from student fees. Conclusion: Procedures to address system limitations are costly, causing delays in financial reporting and increased resource commitments for staff, contractors and audit.
Misstatements and internal control issues continue to be identified in accounting for Crown land. The information system used to record Crown land was not designed to facilitate efficient financial reporting. These limitations and other control weaknesses impacted the completeness and accuracy of the Department's financial statements.
Recommendation: The Department should address system limitations and control weaknesses to ensure complete and accurate reporting for Crown land.
Unprocessed Aboriginal land claims continue to increase. Recommendation (repeat issue): The Department should reduce unprocessed Aboriginal land claims.
2.4 Financial information and sustainability
Cluster agencies recorded a combined surplus of $58.0 million compared to a combined deficit of $86.0 million in the previous year.

 

We identified five agencies with potential sustainability issues such as low liquidity or negative net assets. Conclusion: Adequate arrangements are in place to mitigate potential sustainability issues. These arrangements include a commitment from the Department to provide financial support if required. 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from:

  • our financial statement audits of agencies in the Industry cluster for 2018
  • the areas of focus identified in the Audit Office work program.

The Audit Office Annual Work Program provides a summary of all audits to be conducted within the proposed time period as well as detailed information on the areas of focus for each of the NSW Government clusters.

Observation Conclusions and recommendations
3.1 Internal control
Almost one in three internal control issues identified in 2017–18 were repeat issues. Recommendation (repeat issue): Recommendations to management to address internal control issues from prior years should be addressed promptly to reduce risks and improve processes.
3.2 Information technology controls
User access administration over financial systems remains an area of weakness. Two high risk and 18 moderate risk issues related to user access administration across nine agencies were identified. Recommendation (repeat issue): Agencies' controls over administration of user access to critical systems should:
  • retain documentation of approvals to create, modify and deactivate user access
  • allocate appropriate access rights
  • perform and document regular user access reviews
  • log and monitor privileged/super user account activity
  • deactivate terminated user access on a timely basis.
3.3 Annual work program
Errors continue to be identified in the Crown land database.

Instances were identified where Crown land was not recognised by the appropriate entity, or was recognised by more than one entity.
Recommendation: The Department should ensure the Crown land database is complete and accurate so state agencies and local government councils are better informed about the Crown land they control.
Approximately 700 managers of Crown land do not submit financial statements required by the Public Finance and Audit Act 1983. NSW Treasury and the Department are continuing work to clarify reporting arrangements for these entities.
3.4 Managing maintenance
Some cluster agencies do not monitor their backlog maintenance. Consequently, the total backlog maintenance in the Industry cluster is unknown. This impacts the reliability and consistency of information about assets and their condition. When backlog maintenance is unknown, it is difficult for agencies to develop an accurate and effective maintenance plan that focuses on areas of highest need. It also means agencies' maintenance plans are reactive rather than preventative.
Effective maintenance planning helps agencies to:
  • quantify and budget asset maintenance costs
  • support service delivery at the lowest possible long-term cost
  • reduce service disruptions and losses due to asset failure
  • identify and respond to risks posed by the age and condition of assets.
Recommendation: Cluster agencies should develop an asset maintenance plan and complete an assessment of the condition of their assets to identify any maintenance backlogs. 
Maintenance budgets in some cluster agencies are not set based on actual maintenance needs. Recommendation: Cluster agencies should set their maintenance budgets based on identified maintenance needs to more accurately budget and prioritise expenditure.

Agencies in the Industry cluster provide services across a wide variety of areas. This chapter outlines certain service delivery outcomes for 2017–18 for the Industry cluster. It provides important contextual information about the cluster's operation, but the data on activity levels and performance is provided by Cluster agencies. The Audit Office does not have a specific mandate to audit performance information. Accordingly, the information in this chapter is unaudited. 

In our recent performance audit, Progress and measurement of Premier's Priorities, we identified 12 limitations of performance measurement and performance data. We recommended that the Department of Premier and Cabinet ensure that processes to check and verify data are in place for all agency data sources.

Published

Actions for Family and Community Services 2018

Family and Community Services 2018

Community Services
Compliance
Financial reporting
Information technology
Management and administration
Project management
Risk
Service delivery
Workforce and capability

The Auditor-General for New South Wales, Margaret Crawford released her report today on the Family and Community Services cluster. The report focuses on key observations and findings from the most recent financial audits of agencies in the cluster. Cluster entities received unqualified audit opinions for their 30 June 2018 financial statements. Opportunities to improve the quality of financial reporting were identified and reported to management.

This report analyses the results of our audits of financial statements of the Family and Community Services cluster for the year ended 30 June 2018. The table below summarises our key observations.

This report provides NSW Parliament and other users of the financial statements of Family and Community Services' agencies with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations
  • service delivery.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Family and Community Services cluster for 2018.

Observation Conclusions and recommendations
2.1 Quality of financial reporting
Unqualified audit opinions were issued for all cluster agencies' financial statements. Conclusion: Sufficient audit evidence was obtained to conclude the financial statements were free of material misstatement.
Agencies complied with NSW Treasury’s mandatory early close requirements.

Completing other early close procedures was inconsistent and not always supported by adequate evidence.
Conclusion: There are opportunities for agencies to improve the quality of financial reporting by:
  • documenting all significant judgements and assumptions used when preparing the financial statements
  • regularly reconciling inter-agency balances and transactions
  • reconciling key account balances on a timely basis
  • quantifying the impact of new and revised accounting standards.
2.2 Timeliness of financial reporting
Agencies completed revaluations of property, plant and equipment and submitted 31 March 2018 financial statements by the due date as required by NSW Treasury.

Agencies submitted year-end financial statements by the statutory deadline.
Conclusion: Early revaluations of property, plant and equipment contributes to agencies meeting the year-end statutory reporting deadline.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from:

  • our financial statement audits of agencies in the Family and Community Services cluster for 2018
  • the areas of focus identified in the Audit Office annual work program.

The Audit Office Annual Work Program provides a summary of all audits to be conducted within the proposed time period as well as detailed information on the areas of focus for each NSW Government cluster.

Observation Conclusions and recommendations
3.1 Internal controls
The 2017–18 audits reported 47 internal control weaknesses. While none were high risk, there were 15 repeat issues.

Conclusion: Management accepted audit findings and advised they are actioning recommendations. Timely action is important to ensure internal controls operate effectively.

Twenty-two of these internal control weaknesses related to information technology processes and control environment. Conclusion: Control weaknesses in information systems may compromise the integrity and security of financial data used for decision making and financial reporting.

Recommendation: Agencies should strengthen user access administration to prevent inappropriate access to key IT systems by:
  • ensuring privileged user access is limited to those requiring access to maintain the IT systems
  • monitoring privileged user access to address risks from unauthorised activity
  • ensuring IT password settings comply with password policies
  • ensuring timely removal of access to business systems for terminated and casual employees.
The Department, NSW Land and Housing Corporation (LAHC) and three other cluster agencies’ contract registers are incomplete and/or inaccurate. Recommendation: Agencies should ensure their contract registers are complete and accurate so they can more effectively govern contracts and manage compliance obligations.
3.2 Audit Office annual work program
Financial impact of the commissioning approach.

The transfer of disability services to the National Disability Insurance Scheme and other commissioning of service delivery has contributed to a 36 per cent decrease in frontline employee numbers since 2015–16. Similarly, corporate services’ employee numbers reduced by 34 per cent.

The Department’s salary costs have reduced by $232 million or 18 per cent from 2016–17.
Conclusion: The ratio of corporate services employee numbers to support frontline and support services has remained at 1:10 since 2015–16, which indicates restructures have been planned to align with the transfer of disability services.
Impact of the new social housing maintenance contract

Maintenance expenses have increased by about 40 per cent since the new maintenance contract commenced in April 2016. LAHC measures the benefits of the new maintenance contract such as improved tenant satisfaction.
Conclusion: The new maintenance contract has contributed to some positive social outcomes such as tenants being employed by the contractors to conduct maintenance, as call centre operators and in administration. However, more can be done to ensure value for money is being achieved.
ChildStory IT Project

Whilst phase one of the ChildStory IT project went 'live' in 2017–18, the planned timetable has not been met and the revised date for full implementation is end of 2018.

According to the 2014–15 NSW Budget, the budget for ChildStory was $100 million over a four-year period. During the design and implementation stage, this amount was revised to $128 million, with approval of the Expenditure Review Committee. The actual cost incurred over the four years until 30 June 2018, is approximately $131 million.

We identified issues with the data migration from the legacy systems to ChildStory.
Conclusion: To inform future IT projects, we understand the Department is capturing our findings, along with the findings from the Department of Finance, Services and Innovation’s ‘Healthchecks’.

This chapter outlines certain service delivery outcomes for 2017–18. The data on activity levels and performance is provided by Cluster agencies. The Audit Office does not have a specific mandate to audit performance information. Accordingly, the information in this chapter is unaudited.

In our recent performance audit, Progress and measurement of Premier's Priorities, we identified 12 limitations of performance measurement and performance data. We recommended that the Department of Premier and Cabinet ensure that processes to check and verify data are in place for all agency data sources.

Published

Actions for Transport 2018

Transport 2018

Transport
Asset valuation
Compliance
Financial reporting
Infrastructure
Management and administration
Procurement
Risk
Service delivery
Workforce and capability

The Auditor-General for New South Wales, Margaret Crawford released her report today on key observations and findings from the 30 June 2018 financial statement audits of agencies in the Transport cluster. Unqualified audit opinions were issued for all agencies' financial statements. However, assessing the fair value of the broad range of transport related assets creates challenges.

This report analyses the results of our audits of financial statements of the Transport cluster for the year ended 30 June 2018. The table below summarises our key observations.

This report provides Parliament and other users of the Transport cluster’s financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Transport cluster for 2018.

Observation Conclusions and recommendations
2.1 Quality of financial reporting
Unqualified audit opinions were issued for all agencies' financial statements Sufficient audit evidence was obtained to conclude the financial statements were free of material misstatement.
2.2 Key accounting issues
Valuation of assets continues to create challenges. Although agencies complied with the requirements of the accounting standards and Treasury policies on valuations, we identified some opportunities for improvements at RMS.

RMS incorporated data from its asset condition assessments for the first time in the valuation methodology which improved the valuation outcome. Overall, we were satisfied with the valuation methodology and key assumptions, but we noted some deficiencies in the asset data in relation to asset component unit rates and old condition data for some components of assets. 

Also, a bypass and tunnel were incorrectly excluded from RMS records and valuation process since 2013. This resulted in an increase for these assets’ value by $133 million.

The valuation inputs for Wetlands and Moorings were revised this year to better reflect the assets' characteristics resulting in a $98.0 million increase.

2.3 Timeliness of financial reporting
Residual Transport Corporation did not submit its financial statements by the statutory reporting deadline. Residual Transport Corporation remained a dormant entity with no transactions for the year ended 30 June 2018.
With the exception of Residual Transport Corporation, all agencies completed early close procedures and submitted financial statements within statutory timeframes. Early close procedures allow financial reporting issues and risks to be addressed early in the reporting and audit process.
2.4 Financial sustainability
NSW Trains and the Chief Investigator of the Office of Transport Safety Investigations reported negative net assets of $75.7 million and $89,000 respectively at 30 June 2018.  NSW Trains and the Chief Investigator of the Office of Transport Safety Investigations continue to require letters of financial support to confirm their ability to pay liabilities as they fall due. 
2.5 Passenger revenue and patronage
Transport agencies revenue growth increased at a higher rate than patronage. Public transport passenger revenue increased by $114 million (8.3 per cent) in 2017–18, and patronage increased by 37.1 million (5.1 per cent) across all modes of transport based on data provided by TfNSW. 
Negative balance Opal Cards resulted in $3.8 million in revenue not collected in 2017–18 and $7.8 million since the introduction of Opal. A total of 1.1 million Opal cards issued since its introduction have negative balances. Transport for NSW advised it is liaising with the ticketing vendor to implement system changes and are investigating other ways to reduce the occurrences.
2.6 Cost recovery from public transport users
Overall cost recovery from users has decreased. Overall cost recovery from public transport users (on rail and bus services by STA) decreased from 23.2 per cent to 22.4 per cent between 2016–17 and 2017–18. The main reason for the decrease is due to expenditure increasing at a faster rate than revenue in 2017–18.


 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from:

  • our financial statement audits of agencies in the Transport cluster for 2018
  • the areas of focus identified in the Audit Office annual work program.

The Audit Office Annual Work Program provides a summary of all audits to be conducted within the proposed time period as well as detailed information on the areas of focus for each of the NSW Government clusters. 

Observation Conclusions and recommendations
3.1 Internal controls 
There was an increase in findings on internal controls across the Transport cluster. Key themes related to information technology, employee leave entitlements and asset management. Eighteen per cent of all issues were repeat issues.
3.2 Audit Office Annual work program
The Transport cluster wrote-off over $200 million of assets which were replaced by new assets or technology.

Majority of this write-off was recognised by RMS, with $199 million relating to the write-off of existing assets which have been replaced during the year. 

RailCorp is expected to convert to TAHE from 1 July 2019. Several working groups are considering different aspects of the TAHE transition including its status as a for-profit Public Trading Enterprise and which assets to transfer to TAHE. We will continue to monitor developments on TAHE for any impact to the financial statements.
RMS' estimated maintenance backlog at 30 June 2018 of $3.4 billion is lower than last year. Sydney Trains' estimated maintenance backlog at 30 June 2018 increased by 20.6 per cent to $434 million. TfNSW does not quantify its backlog maintenance. TfNSW advised it is liaising with Infrastructure NSW to develop a consistent definition of maintenance backlog across all transport service providers. 
Not all agencies monitor unplanned maintenance across the Transport cluster. Unplanned maintenance can be more expensive than planned maintenance. TfNSW should develop a consistent approach to define, monitor and track unplanned maintenance across the cluster.

This chapter outlines certain service delivery outcomes for 2017–18. The data on activity levels and performance is provided by Cluster agencies. The Audit Office does not have a specific mandate to audit performance information. Accordingly, the information in this chapter is unaudited. 

We report this information on service delivery to provide additional context to understand the operations of the Transport cluster and to collate and present service information for different modes of transport in one report. 

In our recent performance audit, Progress and measurement of Premier's Priorities, we identified 12 limitations of performance measurement and performance data. We recommended that the Department of Premier and Cabinet ensure that processes to check and verify data are in place for all agency data sources.