Actions for Newcastle Urban Transformation and Transport Program

Newcastle Urban Transformation and Transport Program

Transport
Planning
Compliance
Infrastructure
Management and administration
Procurement
Project management

The urban renewal projects on former railway land in the Newcastle city centre are well targeted to support the objectives of the Newcastle Urban Transformation and Transport Program (the Program), according to a report released today by the Auditor-General for New South Wales, Margaret Crawford. The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the government. However, the evidence that the cost of the light rail will be justified by its contribution to the Program is not convincing.

The Newcastle Urban Transformation and Transport Program (the Program) is an urban renewal and transport program in the Newcastle city centre. The Hunter and Central Coast Development Corporation (HCCDC) has led the Program since 2017. UrbanGrowth NSW led the Program from 2014 until 2017. Transport for NSW has been responsible for delivering the transport parts of the Program since the Program commenced. All references to HCCDC in this report relate to both HCCDC and its predecessor, the Hunter Development Corporation. All references to UrbanGrowth NSW in this report relate only to its Newcastle office from 2014 to 2017.

This audit had two objectives:

  1. To assess the economy of the approach chosen to achieve the objectives of the Program.
  2. To assess the effectiveness of the consultation and oversight of the Program.

We addressed the audit objectives by answering the following questions:

a) Was the decision to build light rail an economical option for achieving Program objectives?
b) Has the best value been obtained for the use of the former railway land?
c) Was good practice used in consultation on key Program decisions?
d) Did governance arrangements support delivery of the program?

Conclusion
1. The urban renewal projects on the former railway land are well targeted to support the objectives of the Program. However, there is insufficient evidence that the cost of the light rail will be justified by its contribution to Program objectives.

The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the Government. HCCDC, and previously UrbanGrowth NSW, identified and considered options for land use that would best meet Program objectives. Required probity processes were followed for developments that involved financial transactions. Our audit did not assess the achievement of these objectives because none of the projects have been completed yet.

Analysis presented in the Program business case and other planning documents showed that the light rail would have small transport benefits and was expected to make a modest contribution to broader Program objectives. Analysis in the Program business case argued that despite this, the light rail was justified because it would attract investment and promote economic development around the route. The Program business case referred to several international examples to support this argument, but did not make a convincing case that these examples were comparable to the proposed light rail in Newcastle.

The audited agencies argue that the contribution of light rail cannot be assessed separately because it is a part of a broader Program. The cost of the light rail makes up around 53 per cent of the total Program funding. Given the cost of the light rail, agencies need to be able to demonstrate that this investment provides value for money by making a measurable contribution to the Program objectives.

2. Consultation and oversight were mostly effective during the implementation stages of the Program. There were weaknesses in both areas in the planning stages.

Consultations about the urban renewal activities from around 2015 onward followed good practice standards. These consultations were based on an internationally accepted framework and met their stated objectives. Community consultations on the decision to close the train line were held in 2006 and 2009. However, the final decision in 2012 was made without a specific community consultation. There was no community consultation on the decision to build a light rail.

The governance arrangements that were in place during the planning stages of the Program did not provide effective oversight. This meant there was not a single agreed set of Program objectives until 2016 and roles and responsibilities for the Program were not clear. Leadership and oversight improved during the implementation phase of the Program. Roles and responsibilities were clarified and a multi-agency steering committee was established to resolve issues that needed multi-agency coordination.
The light rail is not justified by conventional cost-benefit analysis and there is insufficient evidence that the indirect contribution of light rail to achieving the economic development objectives of the Program will justify the cost.
Analysis presented in Program business cases and other planning documents showed that the light rail would have small transport benefits and was expected to make a modest contribution to broader Program objectives. Analysis in the Program business case argued that despite this, the light rail was justified because it would attract investment and promote economic development around the route. The Program business case referred to several international examples to support this argument, but did not make a convincing case that these examples were comparable to the proposed light rail in Newcastle.
The business case analysis of the benefits and costs of light rail was prepared after the decision to build light rail had been made and announced. Our previous reports, and recent reports by others, have emphasised the importance of completing thorough analysis before announcing infrastructure projects. Some advice provided after the initial light rail decision was announced was overly optimistic. It included benefits that cannot reasonably be attributed to light rail and underestimated the scope and cost of the project.
The audited agencies argue that the contribution of light rail cannot be assessed separately because it is part of a broader Program. The cost of the light rail makes up around 53 per cent of the total Program funding. Given the high cost of the light rail, we believe agencies need to be able to demonstrate that this investment provides value for money by making a measurable contribution to the Program objectives.

Recommendations
For future infrastructure programs, NSW Government agencies should support economical decision-making on infrastructure projects by:
  • providing balanced advice to decision makers on the benefits and risks of large infrastructure investments at all stages of the decision-making process
  • providing scope and cost estimates that are as accurate and complete as possible when initial funding decisions are being made
  • making business cases available to the public.​​​​​​
The planned uses of the former railway land achieve a balance between the economic and social objectives of the Program at a reasonable cost to the government.

The planned uses of the former railway land align with the objectives of encouraging people to visit and live in the city centre, creating attractive public spaces, and supporting growth in employment in the city. The transport benefits of the activities are less clear, because the light rail is the major transport project and this will not make significant improvements to transport in Newcastle.

The processes used for selling and leasing parts of the former railway land followed industry standards. Options for the former railway land were identified and assessed systematically. Competitive processes were used for most transactions and the required assessment and approval processes were followed. The sale of land to the University of Newcastle did not use a competitive process, but required processes for direct negotiations were followed.

Recommendation
By March 2019, the Hunter and Central Coast Development Corporation should:
  • work with relevant stakeholders to explore options for increasing the focus on the heritage objective of the Program in projects on the former railway land. This could include projects that recognise the cultural and industrial heritage of Newcastle.
Consultations about the urban renewal activities followed good practice standards, but consultation on transport decisions for the Program did not.

Consultations focusing on urban renewal options for the Program included a range of stakeholders and provided opportunities for input into decisions about the use of the former railway land. These consultations received mostly positive feedback from participants. Changes and additions were made to the objectives of the Program and specific projects in response to feedback received. 

There had been several decades of debate about the potential closure of the train line, including community consultations in 2006 and 2009. However, the final decision to close the train line was made and announced in 2012 without a specific community consultation. HCCDC states that consultation with industry and business representatives constitutes community consultation because industry representatives are also members of the community. This does not meet good practice standards because it is not a representative sample of the community.

There was no community consultation on the decision to build a light rail. There were subsequent opportunities for members of the community to comment on the implementation options, but the decision to build it had already been made. A community and industry consultation was held on which route the light rail should use, but the results of this were not made public. 

Recommendation
For future infrastructure programs, NSW Government agencies should consult with a wide range of stakeholders before major decisions are made and announced, and report publicly on the results and outcomes of consultations. 

The governance arrangements that were in place during the planning stages of the Program did not provide effective oversight. Project leadership and oversight improved during the implementation phase of the Program.

Multi-agency coordination and oversight were ineffective during the planning stages of the Program. Examples include: multiple versions of Program objectives being in circulation; unclear reporting lines for project management groups; and poor role definition for the initial advisory board. Program ownership was clarified in mid-2016 with the appointment of a new Program Director with clear accountability for the delivery of the Program. This was supported by the creation of a multi-agency steering committee that was more effective than previous oversight bodies.

The limitations that existed in multi-agency coordination and oversight had some negative consequences in important aspects of project management for the Program. This included whole-of-government benefits management and the coordination of work to mitigate impacts of the Program on small businesses.

Recommendations
For future infrastructure programs, NSW Government agencies should: 

  • develop and implement a benefits management approach from the beginning of a program to ensure responsibility for defining benefits and measuring their achievement is clear
  • establish whole-of-government oversight early in the program to guide major decisions. This should include:
    • agreeing on objectives and ensuring all agencies understand these
    • clearly defining roles and responsibilities for all agencies
    • establishing whole-of-government coordination for the assessment and mitigation of the impact of major construction projects on businesses and the community.

By March 2019, the Hunter and Central Coast Development Corporation should update and implement the Program Benefits Realisation Plan. This should include:

  • setting measurable targets for the desired benefits
  • clearly allocating ownership for achieving the desired benefits
  • monitoring progress toward achieving the desired benefits and reporting publicly on the results.

Appendix one - Response from agencies    

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary reference - Report number #310 - released 12 December 2018

Published

Actions for Transport 2018

Transport 2018

Transport
Asset valuation
Compliance
Financial reporting
Infrastructure
Management and administration
Procurement
Risk
Service delivery
Workforce and capability

The Auditor-General for New South Wales, Margaret Crawford released her report today on key observations and findings from the 30 June 2018 financial statement audits of agencies in the Transport cluster. Unqualified audit opinions were issued for all agencies' financial statements. However, assessing the fair value of the broad range of transport related assets creates challenges.

This report analyses the results of our audits of financial statements of the Transport cluster for the year ended 30 June 2018. The table below summarises our key observations.

This report provides Parliament and other users of the Transport cluster’s financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Transport cluster for 2018.

Observation Conclusions and recommendations
2.1 Quality of financial reporting
Unqualified audit opinions were issued for all agencies' financial statements Sufficient audit evidence was obtained to conclude the financial statements were free of material misstatement.
2.2 Key accounting issues
Valuation of assets continues to create challenges. Although agencies complied with the requirements of the accounting standards and Treasury policies on valuations, we identified some opportunities for improvements at RMS.

RMS incorporated data from its asset condition assessments for the first time in the valuation methodology which improved the valuation outcome. Overall, we were satisfied with the valuation methodology and key assumptions, but we noted some deficiencies in the asset data in relation to asset component unit rates and old condition data for some components of assets. 

Also, a bypass and tunnel were incorrectly excluded from RMS records and valuation process since 2013. This resulted in an increase for these assets’ value by $133 million.

The valuation inputs for Wetlands and Moorings were revised this year to better reflect the assets' characteristics resulting in a $98.0 million increase.

2.3 Timeliness of financial reporting
Residual Transport Corporation did not submit its financial statements by the statutory reporting deadline. Residual Transport Corporation remained a dormant entity with no transactions for the year ended 30 June 2018.
With the exception of Residual Transport Corporation, all agencies completed early close procedures and submitted financial statements within statutory timeframes. Early close procedures allow financial reporting issues and risks to be addressed early in the reporting and audit process.
2.4 Financial sustainability
NSW Trains and the Chief Investigator of the Office of Transport Safety Investigations reported negative net assets of $75.7 million and $89,000 respectively at 30 June 2018.  NSW Trains and the Chief Investigator of the Office of Transport Safety Investigations continue to require letters of financial support to confirm their ability to pay liabilities as they fall due. 
2.5 Passenger revenue and patronage
Transport agencies revenue growth increased at a higher rate than patronage. Public transport passenger revenue increased by $114 million (8.3 per cent) in 2017–18, and patronage increased by 37.1 million (5.1 per cent) across all modes of transport based on data provided by TfNSW. 
Negative balance Opal Cards resulted in $3.8 million in revenue not collected in 2017–18 and $7.8 million since the introduction of Opal. A total of 1.1 million Opal cards issued since its introduction have negative balances. Transport for NSW advised it is liaising with the ticketing vendor to implement system changes and are investigating other ways to reduce the occurrences.
2.6 Cost recovery from public transport users
Overall cost recovery from users has decreased. Overall cost recovery from public transport users (on rail and bus services by STA) decreased from 23.2 per cent to 22.4 per cent between 2016–17 and 2017–18. The main reason for the decrease is due to expenditure increasing at a faster rate than revenue in 2017–18.


 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from:

  • our financial statement audits of agencies in the Transport cluster for 2018
  • the areas of focus identified in the Audit Office annual work program.

The Audit Office Annual Work Program provides a summary of all audits to be conducted within the proposed time period as well as detailed information on the areas of focus for each of the NSW Government clusters. 

Observation Conclusions and recommendations
3.1 Internal controls 
There was an increase in findings on internal controls across the Transport cluster. Key themes related to information technology, employee leave entitlements and asset management. Eighteen per cent of all issues were repeat issues.
3.2 Audit Office Annual work program
The Transport cluster wrote-off over $200 million of assets which were replaced by new assets or technology.

Majority of this write-off was recognised by RMS, with $199 million relating to the write-off of existing assets which have been replaced during the year. 

RailCorp is expected to convert to TAHE from 1 July 2019. Several working groups are considering different aspects of the TAHE transition including its status as a for-profit Public Trading Enterprise and which assets to transfer to TAHE. We will continue to monitor developments on TAHE for any impact to the financial statements.
RMS' estimated maintenance backlog at 30 June 2018 of $3.4 billion is lower than last year. Sydney Trains' estimated maintenance backlog at 30 June 2018 increased by 20.6 per cent to $434 million. TfNSW does not quantify its backlog maintenance. TfNSW advised it is liaising with Infrastructure NSW to develop a consistent definition of maintenance backlog across all transport service providers. 
Not all agencies monitor unplanned maintenance across the Transport cluster. Unplanned maintenance can be more expensive than planned maintenance. TfNSW should develop a consistent approach to define, monitor and track unplanned maintenance across the cluster.

This chapter outlines certain service delivery outcomes for 2017–18. The data on activity levels and performance is provided by Cluster agencies. The Audit Office does not have a specific mandate to audit performance information. Accordingly, the information in this chapter is unaudited. 

We report this information on service delivery to provide additional context to understand the operations of the Transport cluster and to collate and present service information for different modes of transport in one report. 

In our recent performance audit, Progress and measurement of Premier's Priorities, we identified 12 limitations of performance measurement and performance data. We recommended that the Department of Premier and Cabinet ensure that processes to check and verify data are in place for all agency data sources.

Published

Actions for Internal Controls and Governance 2018

Internal Controls and Governance 2018

Education
Community Services
Finance
Health
Industry
Justice
Planning
Premier and Cabinet
Transport
Treasury
Whole of Government
Environment
Compliance
Cyber security
Financial reporting
Fraud
Information technology
Internal controls and governance
Management and administration
Procurement
Project management

The Auditor-General for New South Wales Margaret Crawford found that as NSW state government agencies’ digital footprint increases they need to do more to address new and emerging information technology (IT) risks. This is one of the key findings to emerge from the second stand-alone report on internal controls and governance of the 40 largest NSW state government agencies.

This report analyses the internal controls and governance of the 40 largest agencies in the NSW public sector for the year ended 30 June 2018.

This report covers the findings and recommendations from our 2017–18 financial audits that relate to internal controls and governance at the 40 largest agencies (refer to Appendix three) in the NSW public sector.

This report offers insights into internal controls and governance in the NSW public sector

This is our second report dedicated to internal controls and governance at NSW State Government agencies. The report provides insights into the effectiveness of controls and governance processes in the NSW public sector by:

  • highlighting the potential risks posed by weaknesses in controls and governance processes
  • helping agencies benchmark the adequacy of their processes against their peers
  • focusing on new and emerging risks, and the internal controls and governance processes that might address those risks.

Without strong governance systems and internal controls, agencies increase the risks associated with effectively managing their finances and delivering services to citizens. The way agencies deliver services increasingly relies on contracts and partnerships with the private sector. Many of these arrangements deliver front line services, but others provide less visible back office support. For example, an agency may rely on an IT service provider to manage a key system used to provide services to the community. The contract and service level agreements are only truly effective where they are actively managed to reduce risks to continuous quality service delivery, such as interruptions caused by system outages, cyber security attacks and data security breaches.

Our audits do not review all aspects of internal controls and governance every year. We select a range of measures, and report on those that present heightened risks for agencies to mitigate. This report divides these into the following five areas:

  1. Internal control trends
  2. Information technology (IT), including IT vendor management
  3. Transparency and performance reporting
  4. Management of purchasing cards and taxis
  5. Fraud and corruption control.

The findings in this report should not be used to draw conclusions on the effectiveness of individual agency control environments and governance arrangements. Specific financial reporting, controls and service delivery comments are included in the individual 2018 cluster financial audit reports, which will be tabled in Parliament from November to December 2018.

The focus of the report has changed since last year

Last year's report topics included asset management, ethics and conduct, and risk management. We are reporting on new topics this year. We plan to introduce new topics and re-visit our previous topics in subsequent reports on a cyclical basis. This will provide a baseline against which to measure the NSW public sectors’ progress in implementing appropriate internal controls and governance processes to mitigate existing, new and emerging risks in the public sector.

Agencies selected for the volume account for 95 per cent of the state's expenditure

While we have covered only 40 agencies in this report, those selected are a large enough group to identify common issues and insights. They represent about 95 per cent of total expenditure for all NSW public sector agencies.

Internal controls are processes, policies and procedures that help agencies to:

  • operate effectively and efficiently
  • produce reliable financial reports
  • comply with laws and regulations
  • support ethical government.

This chapter outlines the overall trends for agency controls and governance issues, including the number of findings, level of risk and the most common deficiencies we found across agencies. The rest of this volume presents this year’s controls and governance findings in more detail.

Observation Conclusions and recommendations
2.1 High risk findings
We found six high risk findings (seven in 2016–17), one of which was repeated from both last year and 2015–16. Recommendation: Agencies should reduce risk by addressing high risk internal control deficiencies as a priority.
2.2 Common findings
We found several internal controls and governance findings common to multiple agencies. Conclusion: Central agencies or the lead agency in a cluster can play a lead role in helping ensure agency responses to common findings are consistent, timely, efficient and effective.
2.3 New and repeat findings
Although internal control deficiencies decreased over the last four years, this year has seen a 42 per cent increase in internal control deficiencies. The increase in new IT control deficiencies and repeat IT control deficiencies signifies an emerging risk for agencies.
IT control deficiencies feature in this increase, having risen by 63 per cent since last year. The number of repeat IT control deficiencies has doubled and is driven by the increasing digital footprint left by agencies as government prioritises on-line interfaces with citizens, and the number of transactions conducted through digital channels increases

Recommendation: Agencies should reduce IT risks by:

  • assigning ownership of recommendations to address IT control deficiencies, with timeframes and actions plans for implementation
  • ensuring audit and risk committees and agency management regularly monitor the implementation status of recommendations.

 

Government agencies’ financial reporting is now heavily reliant on information technology (IT). IT is also increasingly important to the delivery of agency services. These systems often provide the data to help monitor the efficiency and effectiveness of agency processes and services they deliver. Our audits reviewed whether agencies have effective controls in place to manage both key financial systems and IT service contracts.

Observation Conclusions and recommendations
3.1 Management of IT vendors
Contract management framework 
Although 87 per cent of agencies have a contract management policy to manage IT vendors, one fifth require review.
 

Conclusion: Agencies can more effectively manage IT vendor contracts by developing policies and procedures to ensure vendor management frameworks are kept up to date, plans are in place to manage vendor performance and risk, and compliance with the framework is monitored by:

  • internal audit focusing on key contracting activities
  • experienced officers who are independent of contract administration performing spot checks or peer reviews
  • targeted analysis of data in contract registers.
Contract risk management
Forty-one per cent of agencies are not using contract management plans and do not assess contract risks. Half of the agencies that did assess contract risks, had not updated the risk assessments since the commencement of the contract.
 
Conclusion: Instead of applying a 'set and forget' approach in relation to management of contract risks, agencies should assess risk regularly and develop a plan to actively manage identified risks throughout the contract lifecycle - from negotiation and commencement, to termination.

Performance management
Eighty-six per cent of agencies meet with vendors to discuss performance. 

Only 24 per cent of agencies sought assurance about the accuracy of vendor reporting against KPIs, yet sixty-seven per cent of the IT contracts allow agencies to determine performance based payments and/or penalise underperformance.

Conclusion: Agencies are monitoring IT vendor performance, but could improve outcomes and more effectively manage under-performance by:

  • a more active, rigorous approach to both risk and performance management
  • checking the accuracy of vendor reporting against those KPIs and where appropriate seeking assurance over their accuracy
  • invoking performance based payments clauses in contracts when performance falls below agreed standards.

Transitioning services
Forty-three per cent of the IT vendor contracts did not contain transitioning-out provisions.

Where IT vendor contracts do make provision for transitioning-out, only 28 per cent of agencies have developed a transitioning-out plan with their IT vendor.

Conclusion: Contract transition/phase out clauses and plans can mitigate risks to service disruption, ensure internal controls remain in place, avoid unnecessary costs and reduce the risk of 'vendor lock-in'.
Contract Registers
Eleven out of forty agencies did not have a contract register, or have registers that are not accurate and/or complete.

Conclusion: A contract register helps to manage an agency’s compliance obligations under the Government Information (Public Access) Act 2009 (the GIPA Act). However, it also helps agencies more effectively manage IT vendors by:

  • monitoring contract end dates and contract extensions, and commence new procurements through their central procurement teams in a timely manner
  • managing their contractual commitments, budgeting and cash flow requirements.

Recommendation: Agencies should ensure their contract registers are complete and accurate so they can more effectively govern contracts and manage compliance obligations.

3.2 IT general controls
Governance
Ninety-five per cent of agencies have established policies to manage key IT processes and functions within the agency, with ten per cent of those due for review.
 
Conclusion: Regular review of IT policies ensures risks are considered and appropriate strategies and procedures are implemented to manage these risks on a consistent basis. An absence of policies can lead to ad-hoc responses to risks, and failure to consider emerging IT risks and changes to agency IT environments. 

User access administration
Seventy-two deficiencies were identified related to user access administration, including:

  • thirty issues related to granting user access across 43 per cent of agencies
  • sixteen issues related to removing user access across 30 per cent of agencies
  • twenty-six issues related to periodic reviews of user access across 50 per cent of agencies.
Recommendation: Agencies should strengthen the administration of user access to prevent inappropriate access to key systems.
Privileged access
Forty per cent of agencies do not periodically review logs of the activities of privileged users to identify suspicious or unauthorised activities.

Recommendation: Agencies should:

  • review the number of, and access granted to privileged users, and assess and document the risks associated with their activities
  • monitor user access to address risks from unauthorised activity.
Password controls
Twenty-three per cent of agencies did not comply with their own policy on password parameters.
Recommendation: Agencies should ensure IT password settings comply with their password policies.
Program changes
Fifteen per cent of agencies had deficient IT program change controls mainly related to segregation of duties and authorisation and testing of IT program changes prior to deployment.
Recommendation: Agencies should maintain appropriate segregation of duties in their IT functions and test system changes before they are deployed.

 

This chapter outlines our audit observations, conclusions and recommendations from our review of how agencies reported their performance in their 2016–17 annual reports. The Annual Reports (Statutory Bodies) Regulation 2015 and Annual Reports (Departments) Regulation 2015 (annual reports regulation) currently prescribes the minimum requirements for agency annual reports.

Observation Conclusion or recommendation
4.1 Reporting on performance

Only 57 per cent of agencies linked reporting on performance to their strategic objectives.

The use of targets and reporting performance over time was limited and applied inconsistently.

Conclusion: There is significant disparity in the quality and consistency of how agencies report on their performance in their annual reports. This limits the reliability and transparency of reported performance information.

Agencies could improve performance reporting by clearly linking strategic objectives to reported outcomes, and reporting on performance against targets over time. NSW Treasury may need to provide more guidance to agencies to support consistent and high-quality performance reporting in annual reports.

There is no independent assurance that the performance metrics agencies report in their annual reports are accurate.

Prior performance audits have noted issues related to the collection of performance information. For example, our 2016 Report on Red Tape Reduction highlighted inaccuracies in how the dollar-value of red tape reduction had been reported.

Conclusion: The ability of Parliament and the public to rely on reported information as a relevant and accurate reflection of an agency's performance is limited.

The relevance and accuracy of performance information is enhanced when:

  • policies and guidance support the consistent and accurate collection of data
  • internal review processes and management oversight are effective
  • independent review processes are established to provide effective challenge to the assumptions, judgements and methodology used to collect the reported performance information.
4.2 Reporting on reports

Agency reporting on major projects does not meet the requirements of the annual reports regulation.

Forty-seven per cent of agencies did not report on costs to date and estimated completion dates for major works in progress. Of the 47 per cent of agencies that reported on major works, only one agency reported detail about significant cost overruns, delays, amendments, deferments or cancellations.

NSW Treasury produce an annual report checklist to help agencies comply with their annual report obligations.

Recommendation: Agencies should comply with the annual reports regulation and report on all mandatory fields, including significant cost overruns and delays, for their major works in progress.

The information the annual reports regulation requires agencies to report deals only with major works in progress. There is no requirement to report on completed works.

Sixteen of 30 agencies reported some information on completed major works.

Conclusion: Agencies could improve their transparency if they reported, or were required to report:

  • on both works in progress and projects completed during the year
  • actual costs and completion dates, and forecast completion dates for major works, against original and revised budgets and original expected completion dates
  • explanations for significant cost overruns, delays and key project performance metrics.

 

This chapter outlines our audit observations, conclusions and recommendations, arising from our review of agency preventative and detective controls over purchasing card and taxi use for 2017–18.

Observation Conclusion or recommendation
5.1 Management of purchasing cards
Volume of credit card spend
Purchasing card expenditure has increased by 76 per cent over the last four years in response to a government review into the cost savings possible from using purchasing cards for low value, high volume procurement.
 
Conclusion: The increasing use of purchasing cards highlights the importance of an effective framework for the use and management of purchasing cards.
Policy framework
We found all agencies that held purchasing cards had a policy in place, but 26 per cent of agencies have not reviewed their purchasing card policy by the scheduled date, or do not have a scheduled revision date stated within their policy.
Recommendation: Agencies should mitigate the risks associated with increased purchasing card use by ensuring policies and purchasing card frameworks remain current and compliant with the core requirements of TPP 17–09 'Use and Management of NSW Government Purchasing Cards'.
Preventative controls
We found that:
  • all agencies maintained purchasing card registers
  • seventy-six per cent provided training to cardholders prior to being issued with a card
  • eighty-nine per cent appointed a program administrator, but only half of these had clearly defined roles and responsibilities
  • thirty-two per cent of agencies place merchant blocks on purchasing cards
  • forty-seven per cent of agencies place geographic restrictions on purchasing cards.

Agencies have designed and implemented preventative controls aimed at deterring the potential misuse of purchasing cards.

Conclusion: Further opportunities exist for agencies to better control the use of purchasing cards, such as:

  • updating purchasing card registers to contain all mandatory fields required by TPP17–09
  • appointing a program administrator for the agency's purchasing card framework and defining their role and responsibility for the function
  • strengthening preventive controls to prevent misuse.

Detective controls
Ninety-two per cent of agencies have designed and implemented at least one control to monitor purchasing card activity.

Major reviews, such as data analytics (29 per cent of agencies) and independent spot checks (49 per cent of agencies) are not widely used.

Agencies have designed and implemented detective controls aimed at identifying potential misuse of purchasing cards.

Conclusion: More effective monitoring using purchasing card data can provide better visibility over spending activity and can be used to:

  • detect misuse and investigate exceptions
  • analyse trends to highlight cost saving opportunities.
5.2 Management of taxis
Policy framework
Thirteen per cent of agencies have not developed and implemented a policy to manage taxi use. In addition:
  • a further 41 per cent of agencies have not reviewed their policies by the scheduled revision date, or do not have a scheduled revision date
  • more than half of all agencies’ policies do not offer alternative travel options. For example, only 36 per cent of policies promoted the use of general Opal cards.
Conclusion: Agencies can promote savings and provide more options to staff where their taxi use policies:
  • limit the circumstances where taxi use is appropriate
  • offer alternate, lower cost options to using taxis, such as general Opal cards and rideshare.
Detective controls
All agencies approve taxi expenditure by expense reimbursement, purchasing card and Cabcharge, and have implemented controls around this approval process. However, beyond this there is minimal monitoring and review activity, such as data monitoring, independent spot checks or internal audit reviews.
Conclusion: Taxi spend at agencies is not significant in terms of its dollar value, but it is significant from a probity perspective. Agencies can better address the probity risk by incorporating taxi use into a broader purchasing card or fraud monitoring program.

 

Fraud and corruption control is one of the 17 key elements of our governance lighthouse. Recent reports from ICAC into state agencies and local government councils highlight the need for effective fraud control and ethical frameworks. Effective frameworks can help protect an agency from events that risk serious reputational damage and financial loss.

Our 2016 Fraud Survey found the NSW Government agencies we surveyed reported 1,077 frauds over the three year period to 30 June 2015. For those frauds where an estimate of losses was made, the reported value exceeded $10.0 million. The report also highlighted that the full extent of fraud in the NSW public sector could be higher than reported because:

  • unreported frauds in organisations can be almost three times the number of reported frauds
  • our 2015 survey did not include all NSW public sector agencies, nor did it include any NSW universities or local councils
  • fraud committed by citizens such as fare evasion and fraudulent state tax self-assessments was not within the scope of our 2015 survey
  • agencies did not estimate a value for 599 of the 1,077 (56 per cent) reported frauds.

Commissioning and outsourcing of services to the private sector and the advancement of digital technology are changing the fraud and corruption risks agencies face. Fraud risk assessments should be updated regularly and in particular where there are changes in agency business models. NSW Treasury Circular TC18-02 NSW Fraud and Corruption Control Policy now requires agencies develop, implement and maintain a fraud and corruption control framework, effective from 1 July 2018. 

Our Fraud Control Improvement Kit provides guidance and practical advice to help organisations implement an effective fraud control framework. The kit is divided into ten attributes. Three key attributes have been assessed below; prevention, detection and notification systems.

This chapter outlines our audit observations, conclusions and recommendations, arising from our review of agency fraud and corruption controls for 2017–18.

Observation Conclusion or recommendation
6.1 Prevention systems

Prevention systems
Ninety-two per cent of agencies have a fraud control plan in place, 81 per cent maintain a fraud database and 79 per cent report fraud and corruption matters as a standing item on audit and risk committee agendas.

Only 54 per cent of agencies have an employment screening policy and all agencies have IT security policies, but gaps in IT security controls could undermine their policies.

Conclusion: Most agencies have implemented fraud prevention systems to reduce the risk of fraud. However poor IT security along with other gaps in agency prevention systems, such as employment screening practices heightens the risk of fraud and inappropriate use of data.

Agencies can improve their fraud prevention systems by:

  • completing regular fraud risk assessments, embedding fraud risk assessment into their enterprise risk management process and reporting the results of the assessment to the audit and risk committee
  • maintaining a fraud database and reviewing it regularly for systemic issues and reporting a redacted version of the database on the agency's website to inform corruption prevention networks
  • developing policies and procedures for employee screening and benchmarking their current processes against ICAC's publication ‘Strengthening Employment Screening Practices in the NSW Public Sector’
  • developing and maintaining up to date IT security policies and monitoring compliance with the policy.
Twenty-three per cent of agencies were not performing fraud risk assessments and some agency fraud risk assessments may not be as robust as they could be.  Conclusion: Agencies' systems of internal controls may be less effective where new and emerging fraud risks have been overlooked, or known weaknesses have not been rectified.
6.2 Detection systems
Detection systems
Several agencies reported they were developing a data monitoring program, but only 38 per cent of agencies had already implemented a program.
 

Studies have shown data monitoring, whereby entire populations of transactional data are analysed for indicators of fraudulent activity, is one of the most effective methods of early detection. Early detection decreases the duration a fraud remains undetected thereby limiting the extent of losses.

Conclusion: Data monitoring is an effective tool for early detection of fraud and is more effective when informed by a comprehensive fraud risk assessment.

6.3 Notification systems
Notification system
All agencies have notification systems for reporting actual or suspected fraud and corruption. Most agencies provide multiple reporting lines, provide training and publicise options for staff to report actual or suspected fraud and corruption.
Conclusion: Training staff about their obligations and the use of fraud notification systems promotes a fraud-aware culture

 

Published

Actions for Mobile speed cameras

Mobile speed cameras

Transport
Compliance
Financial reporting
Information technology
Internal controls and governance
Management and administration
Regulation
Service delivery

Key aspects of the state’s mobile speed camera program need to be improved to maximise road safety benefits, according to a report released today by the Auditor-General for New South Wales, Margaret Crawford. Mobile speed cameras are deployed in a limited number of locations with a small number of these being used frequently. This, along with decisions to limit the hours that mobile speed cameras operate, and to use multiple warning signs, have reduced the broad deterrence of speeding across the general network - the main policy objective of the mobile speed camera program.

The primary goal of speed cameras is to reduce speeding and make the roads safer. Our 2011 performance audit on speed cameras found that, in general, speed cameras change driver behaviour and have a positive impact on road safety.

Transport for NSW published the NSW Speed Camera Strategy in June 2012 in response to our audit. According to the Strategy, the main purpose of mobile speed cameras is to reduce speeding across the road network by providing a general deterrence through anywhere, anytime enforcement and by creating a perceived risk of detection across the road network. Fixed and red-light speed cameras aim to reduce speeding at specific locations.

Roads and Maritime Services and Transport for NSW deploy mobile speed cameras (MSCs) in consultation with NSW Police. The cameras are operated by contractors authorised by Roads and Maritime Services. MSC locations are stretches of road that can be more than 20 kilometres long. MSC sites are specific places within these locations that meet the requirements for a MSC vehicle to be able to operate there.

This audit assessed whether the mobile speed camera program is effectively managed to maximise road safety benefits across the NSW road network.

Conclusion

The mobile speed camera program requires improvements to key aspects of its management to maximise road safety benefits. While camera locations have been selected based on crash history, the limited number of locations restricts network coverage. It also makes enforcement more predictable, reducing the ability to provide a general deterrence. Implementation of the program has been consistent with government decisions to limit its hours of operation and use multiple warning signs. These factors limit the ability of the mobile speed camera program to effectively deliver a broad general network deterrence from speeding.

Many locations are needed to enable network-wide coverage and ensure MSC sessions are randomised and not predictable. However, there are insufficient locations available to operate MSCs that meet strict criteria for crash history, operator safety, signage and technical requirements. MSC performance would be improved if there were more locations.

A scheduling system is meant to randomise MSC location visits to ensure they are not predictable. However, a relatively small number of locations have been visited many times making their deployment more predictable in these places. The allocation of MSCs across the time of day, day of week and across regions is prioritised based on crash history but the frequency of location visits does not correspond with the crash risk for each location.

There is evidence of a reduction in fatal and serious crashes at the 30 best-performing MSC locations. However, there is limited evidence that the current MSC program in NSW has led to a behavioural change in drivers by creating a general network deterrence. While the overall reduction in serious injuries on roads has continued, fatalities have started to climb again. Compliance with speed limits has improved at the sites and locations that MSCs operate, but the results of overall network speed surveys vary, with recent improvements in some speed zones but not others.
There is no supporting justification for the number of hours of operation for the program. The rate of MSC enforcement (hours per capita) in NSW is less than Queensland and Victoria. The government decision to use multiple warning signs has made it harder to identify and maintain suitable MSC locations, and impeded their use for enforcement in both traffic directions and in school zones. 

Appendix one - Response from agency

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary reference - Report number #308 - released 18 October 2018

Published

Actions for Performance audit insights: key findings from 2014-2018

Performance audit insights: key findings from 2014-2018

Whole of Government
Compliance
Fraud
Information technology
Internal controls and governance
Procurement
Project management

A report released today by the Auditor-General for New South Wales, Margaret Crawford, presents key findings from four years of performance audits. The report findings are presented around six areas of government activity including planning for the future, meeting community expectations for key services, investment in infrastructure, managing natural resources, ensuring good governance and digital disruption.

In this report, we present common findings and lessons from the past four years of performance audits, and offer insights to the public sector on elements of effective performance. We have analysed the key findings and recommendations from 61 performance audits tabled in the NSW Parliament between July 2014 and June 2018, spanning varied areas of government activity. We will also use this report to help determine areas of unaddressed risk across all parts of government, and to shape our future audit priorities.

Governments play an important stewardship role. Their decisions need to consider intergenerational equity by ensuring that investment strategies are sustainable. Governments also need to consider the impact of their decisions on different parts of the community. We recognise that governments face challenges in delivering programs and services, targeting complex social issues with finite resources.

Governments are changing how they deliver services to respond to citizen needs and deliver greater value for money. In this section, we reflect on audits that looked at how government entities are planning their activities to meet the needs of the community into the future.

State and local government exist to provide services to citizens, and citizens are playing a greater role in defining what services they want or need. Expectations about consultation, ease of access, timeliness, and customisation of services are rising. Governments face challenges to continually improve the way they plan and deliver services to meet these expectations. Governments also need to provide quality services for a growing and ageing population whilst working within a constrained financial environment.

Over the past four years, our performance audits have assessed aspects of State and local government services, including education, health services, disability support, corrective services, and many others. In this section, we draw together common findings that government entities should reflect on when providing services to the community.

The NSW Government’s 2018–19 Budget forecasts an $87.2 billion infrastructure investment program over the next four years. Infrastructure investment of this size carries significant opportunities and risks. Competition for resources is high and maintaining the capability to manage and deliver projects effectively is challenging. Governments also need to plan effectively to ensure infrastructure built today will meet future needs.

Over the past four years, we have looked at some of the ways NSW Government agencies justify and prioritise projects for funding, work with contractors to deliver projects, and track and report on progress. In this section, we draw together common findings from our audits that government entities should consider when planning future infrastructure projects.

Governments face challenges in balancing the use of natural resources to meet diverse interests, while supporting a sustainable natural environment for the future. They need to supply communities with water, produce energy, protect natural habitats, and support farming, industry, and economic development.

Some of our recent audits have considered how government agencies are managing natural resources and protecting the environment for future generations. In this section, we have drawn together common findings across our audits that government entities should consider in managing the environment and natural resources.

A range of checks and balances is needed to support public confidence in government decision making. To maintain trust, government agencies should act transparently, and in accordance with relevant legislation and policy. This is particularly important as the public sector increasingly engages with external partners to deliver services and provide a more contestable environment.

Good governance arrangements should result in improved service delivery and more effective and efficient use of resources. Our audits have looked at many different elements of governance, including making sure the necessary processes and workplace cultures are in place to help government entities achieve their aims. In this section, we have drawn together various aspects of governance that government entities should consider.

The global increase in digital technology provides governments with opportunities to interact with citizens in more immediate and responsive ways than was previously possible. Data can be used in powerful ways such as predicting future demand for services, targeting interventions, responding to crises, and evaluating outcomes. Governments face challenges in doing this while maintaining secure digital environments that protect citizen interests, privacy, and autonomy.

Our audits have assessed some of the ways that government entities are incorporating digital change into their work. In this section, we draw together common themes that governments could consider in protecting their digital assets, or expanding their digital capabilities.
 

Published

Actions for Agency compliance with NSW Government travel policies

Agency compliance with NSW Government travel policies

Education
Community Services
Finance
Health
Industry
Justice
Local Government
Planning
Premier and Cabinet
Transport
Treasury
Universities
Whole of Government
Compliance
Internal controls and governance
Procurement

Overall, agencies materially complied with NSW Government travel policies.

However, the Auditor-General found some agencies:

  • did not always book official travel through the approved supplier
  • had weaknesses in their travel approval processes
  • had travel policies that were inconsistent with the NSW Government policy
  • did not adequately manage their travel records.   

Last year the NSW Government spent almost $250 million on travel. The government’s travel policies aim to help agencies make better travel decisions and reduce costs. The Department of Finance, Services and Innovation (DFSI) is responsible for the government’s travel policy and manages the government contract with an approved private sector provider to procure travel services.

This audit assessed how effective agency processes were to ensure compliance with:

  • the ‘Policy on Official Travel within Australia and Overseas’ issued by the Department of Premier and Cabinet in Circular OFS-2014–07 ‘Official Travel in Australia and Overseas’ (the former policy)
  • the ‘NSW Government Travel and Transport Policy’ issued by DFSI (the new policy), effective from 28 September 2016.

We examined 15 agencies from different NSW Government clusters with significant travel expenditure. For a list of participating agencies, refer to the Appendix two.

Conclusion

We found that overall, agencies materially complied with NSW Government travel policies. However, some agencies:

  • did not always book official travel through the approved supplier
  • had weaknesses in their travel approval processes
  • had travel policies that were inconsistent with the government policy
  • did not adequately manage their travel records.

Self-assessments indicate agencies comply with most aspects of the new policy. Agencies also believe more guidance from DFSI about certain aspects of the policy would increase compliance.

We asked the 15 participating agencies to complete a self assessment of the processes they have implemented to comply with the new policy. The key observations are summarised below.

Published

Actions for Sydney Road Maintenance Contracts

Sydney Road Maintenance Contracts

Transport
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management

In November 2013, Roads and Maritime Services (RMS) outsourced the maintenance of State roads in the Sydney region south and west zones using an innovative contracting approach called the Stewardship Maintenance Contract (SMC). The SMC links risk to reward, and uses a performance framework where outcomes should drive improved performance over time.

RMS’ SMC contract management includes most elements of good practice, including governance and dispute resolution mechanisms. However, key elements are missing which reduces its effectiveness.

Roads and Maritime Services (RMS) is responsible for the Sydney region State roads network This includes over 2,800 kilometres of roads and associated road corridor infrastructure such as bridges, tunnels and drainage structures. RMS divides the network into three geographical areas: south, west and north zones.

In 1995, RMS first outsourced road corridor infrastructure maintenance for the north zone through a Performance Specified Maintenance Contract (PSMC). The current 10-year PSMC for the north zone will expire in October 2018. Prior to November 2013, RMS maintained roads in the south and west zones through its Road and Fleet Services unit. 

In November 2013, RMS outsourced road maintenance services for the south and west zones using Stewardship Maintenance Contracts (SMC). The contracts run for seven years with an option for a further three years at RMS’ discretion. RMS estimated that the annual cost of these contracts was around $240 million in total. In March 2018, the contract prices are due to be reset by negotiation to reflect the contractors’ experience with, and better information about, the road networks and routine maintenance requirements. 

The SMC model adopted stewardship principles to improve value for money. RMS defined stewardship principles as a broad set of values, attitudes and behaviours, required of the contractor to effectively manage the assets on behalf of RMS. The SMC also includes commercial principles, such as linking risk to reward, and a performance framework where outcomes drive performance.

This audit assessed whether RMS had effectively managed the outsourcing of road maintenance in the Sydney region south and west zones. In making this assessment, we answered the following questions:

  1. Did RMS justify the decision to adopt the SMC model?
  2. Do SMCs include key performance indicators (KPIs) and incentives which promote efficiency and effectiveness? 
  3. Does RMS collect high quality information on contractor performance and take action to correct performance deficiencies?
  4. Are the expected benefits being achieved?

Conclusion

RMS developed an innovative contracting approach with the SMC. RMS has realised some benefits in the first year, including savings, from outsourcing road maintenance in the Sydney region south and west zones using the SMC. However, RMS’ management of the SMC has key elements missing which reduces its effectiveness.

The SMC includes performance measures and incentives to drive efficiency and effectiveness improvements over time.  

RMS has established a contract management framework which includes most elements of good practice, including governance and dispute resolution mechanisms. However, it does not have procedures to guide its contract managers in managing specific provisions of the SMC. Consequently, RMS has not exercised several significant SMC requirements, such as having the contractor account for an efficiency dividend in its pricing at the start of each three-year works period. It also has not done enough to assure itself that the contractor provided performance and financial data are correct. This is important because the data is used to measure performance and calculate contractor payments.  

RMS assessed that it had achieved around 80 per cent of the expected cost benefit in the initial year of the SMC. However, it has not tracked its achievement of benefits since then.

The Stewardship Maintenance Contract

RMS justified adopting the SMC model and included KPIs to drive efficiency and effectiveness

The SMC model includes features that RMS had not previously used for road maintenance contracts. These included adopting stewardship principles and transferring price risk to the contractor over time as the contractor becomes familiar with the assets being maintained.

The SMC model meets RMS’ requirements for flexibility in pricing models, the need for collaboration in asset maintenance planning, promoting innovation and effective performance management.

RMS used many good practices to develop the SMC model, including:

  • preparing a robust business case comparing the SMC model to RMS maintaining the road network itself, as well as assessing whether two other contracting models
    (traditional and alliance) would meet its requirements
  • assessing experiences with similar arrangements in other jurisdictions and identifying elements that worked to get the best outcomes
  • developing a robust performance framework, which included a mix of efficiency and effectiveness KPIs that reflected NSW Government policy and RMS priorities
  • incorporating risk and reward incentives delivered through cost sharing arrangements which change as the contract matures
  • using a contract duration that supports RMS priorities and provides an incentive for better quality outcomes.

RMS uses data provided by the contractor to measure performance and calculate payments to the contractor. The SMC includes a specific sanction if RMS finds that the contractor provided incorrect performance data, but no specific sanction if the contractor provides incorrect financial data. If RMS finds that the contactor provided incorrect performance or financial data, RMS can only recover over-payments which may have been made using the incorrect data.  

To provide a stronger incentive for the contractor to ensure data it provides is accurate, RMS should consider whether to incorporate stronger sanctions when negotiating the commercial reset due in mid-2018 for south and west zones. RMS should also consider this for the new contract for the north zone when the current PSMC contract expires in October 2018.

RMS' contract management approach and benefits realization

RMS can improve the effectiveness of its oversight and management of the SMC

RMS does not have SMC specific contract procedures to guide its contract managers. Consequently, RMS has not exercised several significant SMC requirements, such as having the contractors account for an efficiency dividend in their pricing at the start of each three-year works period. Effective contract management should be supported by contract specific procedures, with explanations of, and allocation of responsibility for, the various interventions that RMS may be required to exercise in the SMC.

Performance and financial reporting under the SMC is based on a mix of RMS and contractor provided data. While there are a range of audits of contractor provided performance and financial data that RMS can conduct each year under the SMC, it does not have a schedule of audits it will conduct and when.  
During the first year of the SMC, RMS commissioned some limited audits of financial data. In the first three years of the SMC, RMS did not conduct any audits of performance data. Had there been SMC specific procedures in place, this would have reduced the risk of RMS not implementing a systematic audit program to give it reasonable assurance on the quality of the data that the contractor has provided. This is important because the data is used to measure performance and calculate contractor payments.

RMS has been aware of data quality issues since 2015. While RMS advised that it commenced addressing some data quality issues in response to a series of reviews conducted in 2015, a recent internal audit report indicates that RMS has not resolved the data quality issues.  

RMS achieved benefits in the first year, but has not tracked benefits since

As part of the business case, RMS agreed to implement a benefits realisation strategy, including a benefits tracking tool. RMS commenced tracking benefits, but did not establish a comparative baseline pre-SMC on non-financial benefits, and has not tracked benefits past year one.

In 2015, a benchmarking study commissioned by RMS found that it had achieved 80 per cent of the expected recurrent cost savings and other benefits, such as improved workplace safety, in the first full year of the SMC. However, there was no clear baseline to measure
non-financial performance. The study was qualified due to gaps in available data. The study also did not reconcile the actual one-off transition costs to the business case estimate.

During the course of the audit, RMS advised that it intends to repeat this type of study to determine whether it has achieved all expected benefits (and their value), and that it would use the results to inform its negotiation with the SMC contractors as part of the commercial reset due in mid-2018.

Roads and Maritime Services is responsible for the State Roads network in the Sydney region

Roads and Maritime Services (RMS) is responsible for the Sydney region State roads network. This includes over 2,800 kilometres of roads and associated road corridor infrastructure such as bridges, tunnels and drainage structures. The network is divided into three geographical areas: south, west and north zones. Prior to November 2013, RMS maintained roads in the Sydney region south and west zones through its Road and Fleet Services unit.  

In 1995, RMS first outsourced road corridor infrastructure maintenance for the north zone through a Performance Specified Maintenance Contract (PSMC). The current 10-year PSMC for the north zone will expire in October 2018. This contract is worth around $35 million per annum.  

NSW Government priorities and road maintenance

Efficient and effective road maintenance contributes to the following NSW Government priorities:

  • improving road travel reliability
  • ensuring on-time running of public transport
  • reducing road fatalities
  • improving government services
  • keeping our environment clean.

The NSW Commission of Audit recommended outsourcing the maintenance of State roads

The NSW Commission of Audit in its Final Report on Government Expenditure (May 2012) recommended contestability as an appropriate strategy to consider for improving road maintenance service delivery for State roads.  

The Commission benchmarked RMS’ road surface quality and cost per lane kilometre against those of Western Australia, Victoria, and Queensland. This showed that New South Wales lagged the other states on both these measures.  

Exhibit 1: Interjurisdictional comparison of road maintenance outcomes 2009–10
  WA VIC QLD NSW
Roads managed (lane kms) 52,659 50,510 71,353 80,348
Estimated spend ($/lane km) 5,000 4,500 6,000 7,000
Road quality measure (%) 99 99 94 91

Source: NSW Commission of Audit Final Report May 2012.

The Commission noted that RMS had conducted two independent reviews to examine the potential for extending road maintenance contestability. The Commission found that there was inadequate and inconclusive benchmarking to establish the efficiency of RMS’ Road and Fleet Services unit when compared to outsourcing. It recommended that RMS bring forward a proposal to conduct a competitive tender for the road maintenance of the Sydney region south zone road network to inform the feasibility of a progressive rollout of road maintenance contestability across other areas of the State. In August 2012, the NSW Government adopted the Commission’s recommendation.

The NSW Government introduced road maintenance contestability through Stewardship Maintenance Contracts

In April 2013, the NSW Government announced that it would introduce road maintenance contestability across the Sydney region, using a Stewardship Maintenance Contract (SMC) model to improve value for money. In doing so, it excluded RMS’ Road and Fleet Services unit from tendering.  

The SMC model is based on the following key commercial and performance principles set by RMS:

  • performance driven by outcomes
  • flexible and adaptable
  • transparent and measurable
  • linking risk to reward
  • continuous improvement
  • criteria for selection of, and transition to, different payment models.

The following key stewardship principles underpin the SMC’s broad set of values, attitudes and behaviours, which are required of the contractor to effectively manage the assets on behalf of RMS:

  • putting RMS’ customers (road users and the general public) first and being responsive to them
  • being responsible and accountable for the outcomes resulting from the management of the assets
  • managing the assets diligently, efficiently and effectively with limited direction from RMS
  • working collaboratively with RMS to deliver services that are tailored to meet RMS’ evolving needs
  • acting with integrity and transparency in performing the services
  • performing the services in the best interests of RMS and asset users.

Other key features of the SMC include:

  • service requirements which describe the scope of the services, and the standards the contractor must meet
  • a commercial framework which defines how payments are structured, how performance assessment will impact on payments and outlines the key commercial principles. SMCs primarily divide payments into two main mechanisms, these being the priced component (or fixed price) and the target cost calculated as follows:
    • fixed price – the contractor is paid a pre-agreed amount for specific services being provided, regardless of the actual costs incurred
    • target cost – RMS and the contractor agree on a target cost for a project, and any cost overruns or underruns are shared between them
  • a performance framework which provides mechanisms for assessing contractor performance. This includes a comprehensive listing of the key result areas (KRAs) and key performance indicators (KPIs) against which RMS measures the contractor’s performance. The framework also outlines the scoring methodology that RMS uses to determine whether the contractor’s bid margin (profit and overheads) is reduced due to less than satisfactory performance or whether a bonus is paid if a threshold performance score is exceeded.

Road maintenance under SMCs for Sydney region south and west zones commenced in November 2013

In November 2013, RMS awarded SMCs to the Leighton Boral Amey consortium, now named Ventia Boral Amey (VBA), for the south zone and the DownerMouchel (DM) consortium for the west zone. The contracts run for seven years with an option for a further three years at RMS’ discretion. In April 2014, full services commenced following a four-month transition period. RMS estimated that the annual cost of these contracts was around $240 million in total. In March 2018, the contract prices are due to be reset by negotiation to reflect the contractors’ experience with, and better information about, the road networks and routine maintenance requirements. 

  1. Roads and Maritime Services should consider whether to incorporate stronger sanctions in the Stewardship Maintenance Contract if the contractor provides incorrect performance or financial data to RMS, when:
     
    1. negotiating the commercial reset for the next works period with the Sydney region south and west zone contractors due in July 2018.
    2. finalising a new SMC contract for the Sydney region north zone, due to commence in October 2018.

Roads and Maritime Services should, by September 2017:

2.  Review its contract management framework for SMCs to ensure that all authorities and accountabilities of
     contract managers are clearly defined, including:

a) accountability and procedures for exercising all operational clauses in the SMC where RMS may opt to, or be required to intervene, or make a decision

b) authority to approve or initiate the interventions RMS is required to, or may, exercise under the SMC

c) the audits that RMS will conduct to systematically validate the performance and financial data that the SMC contractors provide

d) the accountabilities of RMS contract managers to systematically review audits and quality reviews that the SMC contractors must conduct to demonstrate compliance with their service plans

e) the accountabilities of RMS contract managers to check that the monthly and annual reports provided by SMC contractors do not contain errors, omissions or inaccuracies.

3.  Improve its management of benefits realisation by:

a) initiating a further benefits realisation review and record the benefits delivered against those
    estimated following the tender process, including the one-off transition costs

b) identify any benefits, including savings, not yet attained and develop strategies to address any short-falls

c) establish a tool to track the ongoing realisation of benefits.

Published

Actions for NorthConnex

NorthConnex

Premier and Cabinet
Treasury
Transport
Compliance
Infrastructure
Internal controls and governance
Management and administration
Procurement

The processes used to assess NorthConnex adequately considered value for money for taxpayers.This report also found that the impact of tolling concessions on road users and the motorway network was consistent with policy objectives described in the 2012 NSW Long Term Transport Master Plan.

NorthConnex is a nine-kilometre tolled motorway tunnel between the M1 Pacific motorway at Wahroonga and the M2 Hills motorway at West Pennant Hills. The total cost for the project is $3.1 billion. NorthConnex will be funded through toll charges, and contributions from the NSW and Australian Governments of up to $405 million each. In January 2015, the NSW Roads Minister signed the final contracts for NorthConnex.

By December 2017, the Department of Premier and Cabinet should:

1. publish an updated ‘Unsolicited Proposals – Guide for Submission and Assessment’ which clarifies obligations with requirements in other NSW Government policies such as the NSW PPP guideline and Infrastructure Investor Assurance Framework. The update should require:

a) a business case to be prepared, and a business case gateway review completed, as part of the assessment of the detailed proposal (currently stage 2)

b) probity reports must be completed and considered before the decision to proceed to the next stage.
 

The Department of Premier and Cabinet and NSW Treasury should immediately:

2. improve record keeping to ensure compliance with the State Records Act 1998 and the NSW Government Standard on Records Management.

 

Published

Actions for Passenger Rail Punctuality

Passenger Rail Punctuality

Transport
Information technology
Infrastructure
Service delivery

Rail agencies are well placed to manage the forecast increase in passengers up to 2019, including joining the Sydney Metro Northwest to the network at Chatswood. Their plans and strategies are evidence-based, and mechanisms to assure effective implementation are sound.

Based on forecast patronage increases, the rail agencies will find it hard to maintain punctuality after 2019 unless the capacity of the network to carry trains and people is increased significantly. If recent higher than forecast patronage growth continues, the network may struggle to maintain punctuality before 2019.

A NSW Government priority is to ‘maintain or improve reliability of public transport services over the next four years’. Punctuality is a key element of reliability, and the level of patronage is a critical factor in the ability to maintain punctuality. Increasing patronage places pressure on the length of time trains need to wait at stations to load and offload passengers which can lead to delays. The NSW Long Term Transport Master Plan forecasts that rail patronage could increase by 26 per cent between 2012 and 2031.  

Passenger rail services in NSW are provided under a purchaser-provider model. Transport for NSW enters contracts with:

  • Sydney Trains for Sydney suburban passenger rail services
  • NSW Trains for services that commence or terminate outside Sydney, including intercity services that operate between Central station and the South Coast, Southern Highlands, Blue Mountains and Central Coast and Newcastle.

Transport for NSW sets performance targets and standards for these services, develops the timetables, procures trains for the service providers, and is responsible for long term planning.

This audit assessed whether these rail agencies have plans and strategies to maintain or improve performance in getting the growing number of suburban and intercity rail passengers to their destinations on time.

Conclusion:

Rail agencies are well placed to manage the forecast increase in passengers up to 2019, including joining the Sydney Metro Northwest to the network at Chatswood. Their plans and strategies are evidence-based, and mechanisms to assure effective implementation are sound.

Based on forecast patronage increases, the rail agencies will find it hard to maintain punctuality after 2019 unless the capacity of the network to carry trains and people is increased significantly. If recent higher than forecast patronage growth continues, the network may struggle to maintain punctuality before 2019.

Transport for NSW has undertaken considerable work on developing strategies to increase capacity and maintain punctuality after 2019, but remains some way from putting a costed plan to the government. There is a significant risk that investments will not be made soon enough to handle future patronage levels. Ideally, planning and investment decisions should have been made already.

Punctuality measurement is satisfactory, but agencies could publish more information

Passenger rail punctuality indicators adopted in NSW are good practice. The key train punctuality indicator is better than indicators used by many other rail operators. It is also better than the on-time-running indicator that it replaced. Unlike the on-time-running indicator, the punctuality indicator classifies trains that have been cancelled or skipped stations as late and results are not adjusted to take account of delays caused by factors such as extreme weather or police operations.

NSW also has a customer delay measure which represents good practice. Work has started on refining and embedding customer delay as a key performance measure for the planned new Rail Operations Centre.

As train frequency approaches a ‘turn up and go’ level of service, rather than running to a timetable, more emphasis will need to be placed on excess waiting time and customer delay when assessing performance.

Measurement of punctuality is reasonably precise. There are some measurement inaccuracies which should be addressed, such as the estimated arrival time of a train being incorrect at some destination stations, but these do not affect punctuality results materially.  

Train punctuality is reported publicly, but not to the detail of the indicators in the contracts between Transport for NSW and Sydney Trains and NSW Trains. There is very limited public reporting of customer delay.

Overall punctuality is good, but some services are relatively poor

System-wide train punctuality has usually exceeded target since 2005, but some services suffer from poor punctuality compared to the rest of the network.  

The part of the network around North Sydney is creating problems for the punctuality of afternoon peak services heading through it and out to Western Sydney and to Hornsby via Strathfield. Transport for NSW and Sydney Trains are well advanced with strategies to address this up to 2019.  

The East Hills express trains in the afternoon peak also performed well below target. The rail agencies recently analysed this issue and believe it relates to the train timetable and signalling which restricts how close trains can run behind each other into Campbelltown. It further advises that this will be corrected over the next three years.  

Intercity train punctuality is below that of suburban trains and there was an extended period of declining punctuality between 2011 and 2014. Transport for NSW suggested that the old age of trains is a factor, and the recently announced intercity fleet acquisition may help address this. Apart from ensuring that train crew and station staff are available and perform their duties adequately, NSW Trains can do little to impact the punctuality of its intercity services directly. Train maintenance, track and signal maintenance, and management of trains on the rail network are performed by Sydney Trains. NSW Trains’ ability to influence improvement is hampered by key indicators in some contracts being undefined. Transport for NSW, Sydney Trains and NSW Trains are now working collaboratively to make improvements to the contracts.

Initiatives are in place or are planned to deliver good punctuality until 2019

Patronage increases, which can lead to overcrowding and trains having to wait longer at stations, are likely to present a significant challenge to maintaining punctuality into the future.

Based on patronage projections, the rail agencies have strategies to maintain punctuality up to and including joining the Sydney Metro Northwest to the network at Chatswood in 2019. These include improving infrastructure at particular parts of the network, increasing staff training, reducing the number of speed restrictions, and a new Rail Operations Centre. The projects are being managed by experienced staff, with good governance arrangements, quality assurance processes and planning systems in place. New timetables should provide more services and cater for more passengers, including off peak. They should increase network efficiency through better utilisation of capacity, but some passengers may face longer journey times and more may need to change trains mid-journey.  

The planned Rail Operations Centre has the potential to make operational decision-making more customer-focussed, by placing more emphasis on minimising customer delay during disruptions. If implemented well, it will also generate information to help agencies better identify the root cause of incidents that delay trains and improve communication with passengers so they can make better real-time travel decisions.

Predicted passenger growth presents a risk to punctuality after 2019

The rail system will struggle to maintain punctuality much beyond 2019 based on current patronage forecasts and system limitations.

From 2024, the Sydney Metro City and Southwest will help by extending the metro network from Chatswood under Sydney Harbour, through the city and out to Bankstown. Announced fleet upgrades will also help. Transport for NSW advises that it is also working with the Greater Sydney Commission to ensure network capacity constraints are considered in future urban planning.

In addition to investment in new metro networks, sustained and substantial investment needs to be made into the existing heavy rail network to meet demand and ensure its ongoing reliability. Transport for NSW has been developing strategies for this purpose, including an Advanced Train Control system. Its aim is to put a costed plan to the government by the third quarter of this (2017) calendar year. Given the likely lead times involved with major infrastructure projects, there remains a significant risk of poor punctuality after 2019.

Punctuality could be at risk sooner if recent patronage growth continues

If patronage continues to increase at a faster rate than forecast, particularly during the morning peak, the network will struggle to cope before 2019. Transport for NSW forecast that between 2011 and 2026 morning peak rail patronage would increase each year by approximately 3.3 per cent. Between 2011 and 2016 the number of passengers travelling to the city during the morning peak grew by an average of 4.4 per cent each year, including annual growth of 6.6 per cent since May 2014.

A good understanding of patronage levels, trends and drivers is critical to effective planning. The audit identified some shortcomings in measurement of peak passenger loads. Transport for NSW advised that measurement approaches have been improved recently, and this will soon flow into improved data quality.  

Given the increasing flexibility in work practices available to many city workers, the relatively new field of behavioural insights may offer opportunities to ‘nudge’ some passengers away from travelling at the height of the peak with benefits for them and the network.

  1. Transport for NSW should ensure that programs to address rail patronage growth over the next five to ten years are provided to the government for Cabinet consideration as soon as possible.
     
  2. Sydney Trains and Transport for NSW should:
    a) maintain effective oversight and resourcing for all strategies designed to address rail patronage growth
    b) adjust strategies for any patronage growth above projection.
     
  3. Sydney Trains, NSW Trains and Transport for NSW should publish Customer Delay results by June 2018.
     
  4. Transport for NSW, Sydney Trains and NSW Trains should agree by December 2017:
    a) specific performance requirements for intercity train, track and signal availability and reliability
    b) guidelines for train priorities during disruptions and indicators of control centre performance in implementing these guidelines.
     
  5. Sydney Trains, NSW Trains and Transport for NSW should by June 2018:
    a) improve the accuracy of patronage measurement and develop a better understanding of patronage growth trends
    b) address small errors in the adjustment factors used for determining a train’s punctuality status
    c) improve their understanding of the factors impacting on intercity punctuality.
     
  6. Transport for NSW should, commencing June 2017, explore the potential to use behavioural insights to encourage more passengers to travel outside the height of the morning peak (8 am to 9 am).

Published

Actions for 2016 - An overview

2016 - An overview

Education
Community Services
Finance
Health
Industry
Justice
Local Government
Planning
Premier and Cabinet
Transport
Treasury
Universities
Whole of Government
Environment
Asset valuation
Compliance
Cyber security
Financial reporting
Fraud
Information technology
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management
Regulation
Risk
Service delivery
Shared services and collaboration
Workforce and capability

This report focuses on key observations and findings from 2016 audits and highlights key areas of focus for financial and performance audits in 2017.

The quality and timeliness of financial reporting continued to improve across the NSW public sector in 2016. Only one qualified audit opinion was issued and most agencies signed their financial statements on time.

We found the Government’s cluster governance arrangements were unclear and inconsistently implemented across the sector in 2016. Clearer arrangements would improve cooperation and coordination amongst cluster agencies and help deliver government priorities that cut across agencies.

This report focuses on key observations and common issues identified from our financial, performance and compliance audits in 2016, and identifies examples of good practice. It also looks forward to where we will focus our efforts in 2017.

We have summarised our observations and findings for 2016 in four chapters:

  • Financial Performance and Reporting
  • Financial Controls
  • Governance
  • Service Delivery.

Key observations and common issues identified across several agencies will often apply more broadly across the NSW public sector. For this reason, we hope this report is a useful tool for agency management and Audit and Risk Committees to assess our observations and common issues and consider the impact on their agencies. The report provides links to other reports and refers to other useful reference material.

Our financial audits provide independent opinions on NSW agencies’ financial statements. They consider whether agencies have complied with accounting standards, relevant laws, regulations and government directions. They also identify and report internal control weaknesses and matters of governance interest, and make recommendations to address deficiencies.

Our performance and compliance audits build on the financial audits by reviewing and concluding on whether taxpayers’ money is being spent efficiently, effectively, economically and in accordance with the law.

Financial Reporting
Financial Reporting The quality and timeliness of financial reporting
continued to improve across the NSW public sector.
NSW Treasury’s early close procedures helped
facilitate this.
Financial Controls
Internal Controls More needs to be done to implement audit
recommendations on a timely basis.
Information Technology Agencies continue to face challenges in managing information security.
Internal controls at shared service providers Clients of ServiceFirst and GovConnect were unable to rely on the service providers’ internal controls increasing the risks of fraud, error and inappropriate access to data.
Governance
Cluster governance Cluster governance arrangements that support cluster accountability, performance monitoring, risk and compliance management are unclear.
Management oversight We identified deficiencies in the oversight and management of Crown Land, specifically sale and lease transactions.
Project governance Project cost and time overruns continue to occur.
Service Delivery
Premiers and State Priorities

According to agency data, which we have not audited, some Premier's and State Priorities are at risk of not being achieved.

A comprehensive report of performance against the State Priorities is not published.

Delivering Government Services The NSW Government's program evaluation initiative has been largely ineffective. We found government decision makers are not always receiving enough information to make evidence based decisions.
Reporting on Performance We found agencies’ performance was not routinely measured, evaluated or publicly reported.

Financial performance and reporting

The quality and timeliness of financial reporting continues to improve

Only one qualified opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. The audit opinion for the Office of the NSW State Emergency Service was qualified because effective controls over fundraising activities did not operate for the entire year.

Since NSW Treasury introduced its ‘early close procedures’ initiative in 2011–12, the number of reported misstatements and significant matters have fallen considerably across the NSW public sector. The number of misstatements has fallen from 1,077 in 2011–12 to 298 in  2015–16.

Most agencies submitted and signed their financial statements on time, which enabled more audits to be completed within three months of year end. In 2015–16, 204 of 286 agencies’ financial statements and audit opinions were signed within three months of the year end, compared to only 67 in 2010–11.  

NSW Treasury has narrowed the scope of mandatory early close procedures 

NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues. For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures, which may diminish the good performance achieved in recent years.   

To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years. These include:

  • resolving all past audit issues
  • performing key account reconciliations
  • agreeing and confirming inter and intra (cluster) agency balances and transactions
  • identifying material, complex and one-off transactions
  • preparing quality workpapers to support balances with variance analysis and meaningful explanations for movements
  • adequate review by management and Audit and Risk Committees.

Financial controls

More needs to be done to implement audit recommendations

More needs to be done to implement audit recommendations on a timely basis. Internal control issues were identified in previous audits, but had not been adequately addressed. Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner.

Agencies continue to face challenges managing information security

Our financial audits identified opportunities to improve IT control environments, with most information technology issues relating to information security. We also found service level arrangements with IT service providers did not always adequately address information security risks.

Agencies should ensure information security controls and contractual arrangements with IT service providers adequately protect their data.

Internal controls at GovConnect were ineffective in 2015–16

GovConnect provides information technology and transactional services to agencies within the NSW Public Sector. Service levels fell during the transition of shared services from ServiceFirst to GovConnect and NSW public sector agencies using these services were unable to rely on controls over financial transactions and information. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect did not ensure effective control over client transactions and data. This increased the risk of fraud and error, and inappropriate access to information.

Governance

Cluster governance arrangements are unclear

Currently, cluster governance arrangements are unclear and inconsistently implemented across the NSW public sector. Implementing cluster governance frameworks is complex because clusters bring together entities with different enabling legislation, organisational and legal structures, information systems and processes, risk profiles and governance frameworks.  

Clear cluster governance arrangements would improve cooperation and coordination amongst cluster agencies, help deliver government priorities that cut across agencies and improve service delivery outcomes.  

We recommended the Department of Premier and Cabinet release a revised NSW Public Sector Governance Framework that clearly articulates cluster governance arrangements, the role of the cluster Secretary, Chief Finance Officer, Chief Information Officer and Chief Risk Officer. The Department of Premier and Cabinet has indicated the framework will be updated to provide guidance on cluster governance, and how accountability and performance information are monitored and reported.  

The sale and lease of Crown land is not being managed effectively

Our 2016 performance audit found limited oversight of sales and leases of Crown land by the Department of Industry - Lands. The Department has only just started monitoring whether tenants are complying with lease conditions, and does not have a clear view of what is happening on most leased Crown land.  

Most guidance to staff had not been updated for a decade, contributing to staff sometimes incorrectly implementing policies on rental rebates, unpaid rent, rent redeterminations and the direct negotiation of sales and leases on Crown land. Between 2012 and 2015, 97 per cent of leases and 50 per cent of sales were negotiated directly between the Department and individuals, without a public expression of interest process.  

Project cost and time overruns continue to occur

Our audits continue to highlight project management, cost and time issues. The Government’s 2016–17 Infrastructure Statement forecasts a $73.3 billion investment program to 2019–20. Good governance of individual projects is critical to ensure the investment program delivers the intended outcomes to the desired quality, on time and on budget.   

A strong risk culture is fundamental to successful risk management

Our assessment of a sample of 33 agencies found that while agencies have risk management governance structures in place, they need to focus on developing stronger risk cultures and fit-for-purpose systems to capture risks and incidents.

Agencies are not fully complying with the GIPA Act

Our review of 13 agencies from across each cluster found varying degrees of non-compliance with recording and disclosure aspects of the GIPA Act by each agency. Our 2016 Special Report 'Compliance with the GIPA Act' details our findings and makes recommendations to help agencies comply with the requirements of the Act.

Service delivery

Some Premier's and State Priorities at risk of not being achieved

Agency data, which we have not audited, indicates some Premier's and State Priorities are at risk of not being achieved. We found that although performance reporting against the Premier’s Priorities is publicly reported, comprehensive performance reporting against the 18 State Priorities is not.  

We will continue to report on performance against the targets to assess whether agency initiatives are delivering intended outcomes.

Government does not always get enough information for evidence-based decisions 

The NSW Government’s program evaluation initiative has been largely ineffective. A performance audit looked at the Justice, Industry, Skills and Regional Development, Planning and Environment, Premier and Cabinet and Treasury clusters and made recommendations for improvements to program evaluation.

Performance is not always measured, evaluated or publicly reported

Inadequate performance measures and reporting that is primarily internal reduces the transparency of agency performance and makes it hard for the public to assess if the agencies are doing a good job. Our audits found instances where performance outcomes were not being measured, evaluated or publicly reported.  

Agencies need to consider whether their performance measurement frameworks adequately measure performance and outcomes so they can make evidence-based decisions and be publicly accountable.

Commissioning and contestability continues to increase

New ways of delivering services across NSW Government are being developed and implemented, including commissioning and contestability arrangements. Commissioning services and introducing new systems can be challenging and it is important for this to be managed well. The learnings from decommissioning ServiceFirst and commissioning GovConnect should be applied to future commissioning arrangements.

NSW Treasury has developed a 'Government Commissioning and Contestability Policy', which is supported by the 'NSW Government Commissioning and Contestability Practice Guide'.

In 2017, we will build on our 2016 financial audits and continue to report our observations and findings as they relate to financial performance and reporting, financial controls, governance and service delivery. We also plan to review agencies' compliance with government travel policies at key agencies in each cluster.

In 2017, we will restructure our financial audit volumes to report our observations and findings on agencies’ financial controls and governance in one cross-sector report to Parliament in September. This will provide the Parliament with more timely reporting on these aspects of our audits. Our observations and findings on agencies’ financial performance and reporting, and service delivery will continue to be reported on a cluster by cluster basis through November and early December.

Our 2017 performance audits will have regard to what we see as key risks and opportunities for the NSW Government, and the Premier's and State Priorities. The program will aim to cover each NSW Government cluster, and focus on how efficiently, effectively and economically they deliver services and other outcomes.

Legislative reforms in the Local Government Amendment (Governance and Planning) Act 2016 have extended the Auditor-General's mandate to the Local Government sector. The expanded mandate includes auditing all NSW local council financial statements and conducting performance audits across the local government sector. The reforms generally bring NSW in line with most other Australian States.

We will report financial audit outcomes and our observations after the 30 June 2017 council audits are completed. Most are expected to complete by the end of October 2017. Our 2017 performance audits will examine and report on whether councils are operating efficiently, effectively, economically and in accordance with the law. In 2017–18, our performance audits will consider how councils are reporting on service delivery, managing shared services and the risk of fraud.

2017 – Issues, risks and opportunities impacting the NSW Government

Our 2017 audits will consider some of the following issues, risks and opportunities impacting the NSW Government.

In mid-2017, we will publish our rolling three-year performance audit program. This will include the performance audits we expect to perform in 2017–18 and the next two financial years. The program can be located at http://www.audit.nsw.gov.au/audit-program

Area of focus  Considerations Audit Office response
Ensuring services meet citizen needs The primary role of state and local government is to provide services to citizens. Today's society is less satisfied with one-size-fits-all services and its citizens want to have a say on the services they need and how they are delivered. This challenges governments to improve engagement with citizens, design services with them and support them in selecting the services that best meet their needs. At the same time, governments have to provide the services within constrained financial environments, and cater for ageing populations and strong population growth, particularly in metropolitan areas.

We will:

  • focus our work on services that are important to citizens
  • keep abreast of best practice and strategies used elsewhere to create more citizen centric services
  • develop our understanding of the key trends putting pressure on government service delivery
  • seek opportunities to engage with citizens in undertaking our work.
Leveraging digital opportunities We live in a digital world, and government is no exception. Digital technologies and the mass of data now available to governments presents opportunities to deliver better services more efficiently and economically. Services can be delivered through digital channels, and data analytics can inform demand, the supply of services and identify potential efficiencies. These opportunities come with risks, including cyber-attacks and privacy breaches.

We will:

  • examine how well state agencies and councils are taking advantage of digital opportunities and managing risks
  • use data analytics to enhance the quality of our audit work
  • use technology to improve how we communicate our key messages.
Having good checks and balances Citizens put faith in government agencies to make decisions in their best interests. It is imperative for government agencies to be clear about what they are trying to achieve and inform citizens on how they are meeting these objectives. While ethics, transparency, and effective governance and stewardship are critical, it is important for the checks and balances not to be so directive or cumbersome they hamper innovation, efficiency and agility.

We will consider the usual issues in our financial audits of agencies and councils. New areas and areas of focus will include:

  • asset management processes,including quality and timeliness of asset valuations and the management of surplus land and property assets
  • oversight and administration of significant grant programs
  • standby assets, the cost to maintain them and their readiness for use
  • benefits realisation for major projects and programs
  • the financial and administrative impact of machinery of government changes
  • engaging with state agencies and councils through workshops and seminars to promote good practices
  • examining governance and internal controls
  • publishing better practice guidance and promoting our Governance Lighthouse.
Getting value from commissioning

Governments, including the NSW Government, are increasingly outsourcing to or partnering with private and non-government organisations to deliver government services. Because outsourced service providers are not directly accountable to the NSW Parliament for their use of public resources, independent assurance that they are using tax payers’ funds efficiently and effectively would improve accountability. In other jurisdictions Auditors-General have been given powers to ‘go beyond’ the boundaries of agencies commissioning services and into the entities providing the services (‘follow the dollar’ powers). This is not the case in New South Wales.

Commissioning brings with it new challenges needing different skills, such as developing and nurturing markets, and transitioning services into and out of government. The NSW Government's recently released Commissioning and Contestability Policy supports agencies entering into commissioning arrangements.

We will:

  • audit agency and council commissioning arrangements and assess whether they are delivering the intended outcomes
  • assess the capability of agencies entering into commissioning arrangements to manage them effectively.
  • report the impact of not being able to provide assurance on the use of taxpayers’ dollars by non-government organisations
  • identify and communicate lessons identified in our audits
  • apply commissioning to our own activities.
Breaking down the silos Government agencies working in silos can diminish service quality through inefficient duplication and overlap. Silos also increase the risk of people falling through the cracks. To achieve best value, silos can be broken down through a clear focus on outcomes and better collaboration, coordination, partnerships, shared services and joined-up government. This has been recognised for many years, but now with both the commitment and tools, inroads can be made to improve citizens' experiences. Governance arrangements, incentives and culture are critical to success.

We will:

  • focus our efforts on areas where there are opportunities to break down silos
  • identify barriers and enablers to joined-up-government, partnerships and collaboration
  • promote good practice and publicise the benefits, both potential and realised
  • work collaboratively and constructively with those we audit
  • partner with and learn from private sector organisations we engage to provide audit services on our behalf.
Looking after future generations and the vulnerable Governments need to plan for the long-term and consider future generations. They have an important stewardship role. Their decisions need to ensure inter-generational equity and prevent environmental degradation.
A core role of government is to look after the vulnerable. Governments intervene in various ways to provide a social safety net. When they do so, it is critical that these interventions are equitable and deliver desired outcomes at a reasonable cost. Increasingly, it is about giving vulnerable people a bigger say in the services they receive.

We will:

  • review the efficacy of projections upon which services are planned
  • adopt a future focus in our work to identify emerging risks and encourage action before they materialise
  • examine the effectiveness and efficiency of interventions designed to address disadvantage and improve equity
  • identify emerging trends and good practice in designing and delivering services to the vulnerable.
A capable and diverse public sector The public sector's lifeblood is its workforce. The effectiveness and efficiency of organisations comes directly from the good ideas, effort, commitment and ethics of the people they employ. Workforce management and succession planning, constructive and respected leaders, and diverse backgrounds and thoughts can enhance agency and council performance and customers' experiences. These attributes require good frameworks to develop key capabilities, manage staff performance and clarify responsibilities and accountabilities.

We will:

  • monitor progress in delivering the NSW Government’s priority to have a diverse workforce
  • examine strategies and programs designed to enhance key capabilities in councils and agencies
  • identify areas where capability and diversity are lagging or are at risk,and offer practical improvement opportunities
  • promote diversity in our own organisation through our diversity and inclusion plan, which includes strategies to increase female representation at all levels and participation in an Aboriginal internship program.
Investing in infrastructure to meet the needs of a growing population

The Government’s 2016–17 Infrastructure Statement forecasts a $73.3 billion investment program to 2019–20. Infrastructure investments of this magnitude carry significant risks. In light of weaknesses we identified in the past with the management of significant infrastructure projects, the Government needs to ensure it has the capability to manage project risks effectively.

Governments also need to make sure infrastructure built today will meet future needs without creating an ongoing burden for future generations.

We will:

  • review infrastructure planning and approval processes
  • examine alternative financing and partnership models, including philanthropic and private sector involvement through vehicles such as social benefit bonds
  • assess risk frameworks and project governance arrangements
  • monitor maintenance spending and asset management practices
  • identify and promote good practice and innovation.
Improving performance through transparency and accountability

NSW Treasury is implementing its Financial Management Transformation (FMT) program to replace ‘service group’ budgeting and reporting with program based budgeting and reporting. A project of this scale and complexity has many risks, which need to be carefully managed if the desired benefits are to be realised.

The NSW Government's move to program budgeting and performance measurement will require appropriate key performance measures and indicators to track whether the programs are delivering the intended outcomes.

Independent assurance over the appropriateness and accuracy of agency key performance measures and indicators would improve confidence in the reliability of the NSW Government performance data.

We will:

  • review and assess the implementation and report on the impact of NSW Treasury's Financial Management Transformation program
  • encourage transparency in reporting,and be transparent in our own practices, performance and reporting.
Preparing for changes to Australian Accounting Standards

For the first time, not-for-profit entities in the NSW public sector need to make disclosures about related parties in their 2017 financial statements. Identifying who the related parties are, and collecting and collating relevant information will be challenging.

Other imminent changes to accounting standards have significant financial reporting implications for Government entities. Entities will need to plan and implement changes to systems and processes well in advance of the new requirements becoming effective.

We will:

  • review and assess policies, systems and processes entities use to identify related parties and transactions, and the completeness and accuracy of the disclosures in the financial statements of agencies and councils
  • work with NSW Treasury, the Office of Local Government, agencies and councils to determine the implications of the accounting standard changes and assess entities’ preparedness to implement them
  • work with the Office of Local Government to streamline the Code of Accounting Practice.
Working together with local councils Legislative reforms have resulted in significant changes to the Local Government sector. These include merging certain councils and extending the Auditor-General's mandate to audit all NSW local council financial statements and conduct performance audits across the Local Government sector.

We will:

  • use our mandate to encourage consistency and promote learnings that enhance financial management,fiscal responsibility and public accountability across the local government sector
  • use findings from our financial audits to inform our performance audit program
  • work alongside councils and their audit committees as they implement changes to governance structures and business planning processes
  • build our internal capacity, capability and knowledge of the Local Government sector to deliver a valuable and cost-effective service.

Financial performance and reporting are important elements of good governance. Confidence in public sector decision making and transparency is enhanced when financial and performance reporting are accurate and timely.  

The preparation of accurate and timely financial statements by agencies is an important tool to ensure accountability and transparency in the use of public resources. As the NSW Government moves to program budgeting with a greater focus on performance and outcomes it will need to ensure the key performance indicators and data used to measure the outcomes are relevant, accurate and reliable. The NSW Government’s Financial Management Transformation (FMT) program aims to address this.

In 2015–16, our audit teams made the following key observations on the financial reporting of NSW public sector agencies.

 

Financial reporting
Observation Conclusion
Only one qualified audit opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. The quality of financial reporting continued to improve across the NSW public sector.
More 2015–16 financial statements and audit opinions were signed within three months of the year end. Timely financial reporting was facilitated by more agencies resolving significant accounting issues early, completing asset valuations on time and compiling sufficient evidence to support financial statement balances.

NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues.

For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures.

The narrowed scope of mandatory early close procedures may diminish the good performance in ensuring the quality and timeliness of financial reporting achieved in recent years.

To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years.

Although most agencies complied with NSW Treasury’s early close asset revaluation procedures we identified areas where they can improve. Asset revaluations need to commence early enough to ensure all assets are identified and the results are analysed, recorded and reflected accurately in the early close financial statements.

Financial reporting

The quality and timeliness of financial reporting continues to improve across the NSW public sector.

Quality of financial reporting

Only one qualified audit opinion was issued on 2015–16 financial statements

Only one qualified opinion was issued on the 2015–16 financial statements of NSW public sector agencies, down from two in 2014–15. The audit opinion for the Office of the NSW State Emergency Service was qualified because effective controls over fundraising activities did not operate for the entire year. For further details, refer to page 16 in our Report on Law and Order, Emergency Services and the Arts.

Unqualified audit opinion issued for TAFE NSW after remediation

TAFE NSW’s audit opinion on its financial statements was qualified in 2014–15 due to system limitations, which prevented it from providing sufficient evidence to support its student revenue, student receivables, accrued income and unearned revenue balances. TAFE NSW dedicated considerable resources to address this issue in the short term.

Management resolved over 250,000 data exceptions and found revenue had been understated by $138 million in 2014–15. This was recorded as a prior-period error in the 2015–16 financial statements. For further details, refer to pages 17–18 in our Report on Industry, Skills, Electricity and Water.

The quality of financial reporting continues to improve

Since NSW Treasury introduced its mandatory ‘early close procedures’ initiative in 2011–12, the number of reported misstatements and significant matters in agency financial statements submitted for audit have fallen considerably across the NSW public sector. This is largely attributed to the early resolution of accounting issues, which helps agencies meet earlier reporting deadlines and improve the quality and accuracy of financial reporting. Whilst the quality and timeliness of financial reporting has continued to improve, the NSW Government will need to continue focusing on strong financial management across the NSW public sector to maximise performance and effectively manage assets and liabilities.

The table below shows the fall in misstatements over five years across NSW public sector agencies since mandatory early close procedures were introduced in 2011–12.

Number of misstatements
Year ended 30 June 2015-16 2014-15 2013-14 2012-13 2011-12
Total reported misstatements 298 396 459 661 1,077

All material misstatements identified by agencies and audit teams were corrected before the financial statements and audit opinions were signed. A material misstatement relates to an incorrect amount, classification, presentation or disclosure in the financial statements that could reasonably be expected to influence the economic decisions of users.  

Significant matters reported to the portfolio Minister, Treasurer and Agency Head

In 2015–16, we reported the following significant matters to the portfolio Minister, Treasurer and agency head in our Statutory Audit Reports:

  • Transport for NSW needs to assess whether a $179 million fall in the carrying value of the bus fleet leased from the State Transit Authority has similar implications for the value of the bus fleet leased from private operators
  •  issues were identified with how the Northern NSW Local Health District implemented its new rostering system, including rosters being 'force approved' by the system administrator, users having inappropriate access, no review of payroll exceptions and inadequate project governance over the system’s rollout
  • the Aboriginal and Torres Strait Islander Health Practice Council of New South Wales’ financial statements were not prepared on a ‘going concern’ basis because it had insufficient funding to continue operating
  • the Department of Industry, Skills and Regional Development needs to improve the recording and accounting for Crown Land (repeat issue)
  • the financial reporting requirements for Local Land Services local boards, established under the Local Land Service Act 2013, need to be clarified (repeat issue)
  • significant limitations exist in TAFE NSW’s student administration system (repeat issue)
  • Hunter Water Corporation contracted to sell Kooragang Island Advanced Water Treatment Plant, which is conditional on the purchaser obtaining a water licence for use of the plant, for $35.5 million. This resulted in a $20.5 million decrease in the revaluation reserve
  • Hunter Water Corporation received $28.1 million from the sale of land impacted by the NSW Government’s decision not to construct Tillegra Dam. This was $62.4 million less than the carrying value of the land
  • Sydney Water Corporation needs to ensure it has robust governance over the development and implementation of a new customer billing system and an integrated enterprise resource planning system, budgeted to cost $184 million and $54.5 million respectively.

Timeliness of financial reporting

More financial statements and audit opinions signed within three months of year end

Most agencies submitted and signed their financial statements on time, which enabled more audits to be completed within three months of year end.

In 2015–16, 204 of 286 agencies’ financial statements and audit opinions were signed within three months of the year end. This compares to only 67 in 2010–11, the year before NSW Treasury introduced mandatory early close procedures.

Early close procedures improved the timeliness of financial reporting

Agencies were broadly successful in performing early close procedures in 2015–16. However, we did identify opportunities for improvement across the NSW public sector.  

The timeliness of financial reporting can be improved further if agencies:

  • resolve all significant accounting issues during the early close process, or document a clear path towards timely resolution
  • establish internal timetables and work with their service providers to ensure supporting work papers are prepared on time
  • assess and document the impact of new and revised accounting standards effective in the current or future years
  • prepare reconciliations, which are properly supported and reviewed
  • analyse and clear suspense accounts on a timely basis
  • complete asset valuations on time (also refer below).

Agencies will not always be able to fully resolve significant and complex accounting issues as part of the early close process. If this is the case, it is important they document a clear path towards timely resolution and ensure relevant stakeholders, including NSW Treasury, are kept informed. The documentation should set out the issue, status, key aspects needing resolution, and who is responsible for the expected deliverables.

Changes in accounting standards can materially impact agencies’ financial statements. Agencies will need to ensure they review the impact of, and have appropriate systems and processes in place to address these changes. Because of the lead time required, agencies need to start preparing for imminent changes now. The more significant changes that will come into effect over the next two years include:

  • service concession arrangements - where private sector entities design, build, finance and/or operate infrastructure to provide public services, such as toll roads, utilities, prisons and hospitals
  • the classification, measurement, recognition and de-recognition of financial instruments
  • leasing arrangements - lessees will no longer classify leases as operating or finance leases; leases will be ‘capitalised’ with financial liabilities being recognised for future lease payments.

NSW Treasury has narrowed the scope of mandatory early close procedures

NSW Treasury Circular 16-13 'Agency guidelines for the 2016–17 Mandatory Early Close' has narrowed the scope of mandatory early close procedures to non-financial asset valuations and proforma financial statements. Early close procedures that are no longer mandatory, but considered to be good practice by NSW Treasury, include:

  • resolving all past audit issues
  • performing key account reconciliations
  • agreeing and confirming inter and intra (cluster) agency balances and transactions
  • identifying material, complex and one-off transactions
  • preparing quality workpapers to support balances with variance analysis and meaningful explanations for movements
  • adequate review by management and Audit and Risk Committees.

If agencies do not perform the good practice procedures, the early close process may not be as effective in ensuring the quality and timeliness of financial reporting. We will monitor and report on the impact of this change on the timeliness and quality of the 2016–17 financial statements.

NSW Treasury piloted a hard-close initiative

NSW Treasury conducted a ‘hard-close pilot’ with nine agencies in 2015–16 to assess the benefits, and whether they should be applied more widely across the NSW public sector. While NSW Treasury has evaluated the results of the pilot, it has not mandated agencies complete hard close procedures in 2016–17. NSW Treasury Circular 16–13 gives agencies the option to complete hard close procedures.  

Hard close procedures involve applying year-end procedures to the fullest extent practicable at a preliminary month end date to further improve the quality and timeliness of financial reporting.

Processes for asset valuations can be improved

Although most agencies complied with NSW Treasury’s early close asset revaluation procedures, we identified areas where they can be improved.  

Asset valuations can be complex. They can involve the valuation of a large, geographically dispersed asset base, require significant judgement to estimate fair value and require substantial resources to complete.

Asset revaluations are successful when:

  • revaluation projects commence early enough to obtain the results and to reflect this in the early close pro forma financial statements, fixed asset register and general ledger
  • all assets are identified, recorded and reconciled before being provided to the valuer and the valuation methodology is agreed and documented
  • quality work papers are prepared setting out management’s proposed accounting treatments, judgements and assumptions
  • management engages with the valuers and interrogates the valuation results with scepticism
  • valuation issues are resolved before preparing the year-end financial statements.

NSW Treasury Policy Paper TPP14-01 also provides guidance to agencies to help manage the revaluation process.

Performance reporting

In 2017 and 2018, NSW Treasury is implementing its Financial Management Transformation (FMT) program. The program will replace the current ‘service group’ budgeting and reporting structure with program based budgeting and reporting. The program expects to have the legislation, policy framework and financial reporting system rolled out for the 2017–18 financial year.  

The program will implement a modern IT system, PRIME, as NSW Treasury's key tool to support whole-of-government budgeting and reporting. PRIME is expected to give the NSW Government strategic, relevant and timely information to plan and deliver its policy priorities and the Budget. It is expected to capture and monitor financial and non-financial performance data, and provide business intelligence and analytics. The roll-out of PRIME commenced in November 2016 and the 2017–18 Budget will be delivered using PRIME.

A project of this scale and complexity has many risks, which need to be carefully managed if the desired benefits are to be realised. To manage the risks, NSW Treasury is running PRIME in parallel with the existing IT systems for an extended period that covers preparation of the 2017–18 budget.

Independent assurance over the appropriateness and accuracy of agency key performance measures and indicators would improve confidence in the reliability of the NSW Government performance data.

Monitoring and guiding program performance will mean:

  • developing and implementing high level frameworks, policies and guidance
  • establishing measures and setting targets for performance
  • ensuring the availability of and access to high quality data and other information
  • obtaining independent assurance over the quality of the data.

The FMT program aims to achieve:

  • better performance and outcomes management
  • improved management of the State’s balance sheet, revenues and expenditures
  • stronger interagency collaboration
  • clearer accountabilities
  • better reporting of performance and outcomes.

This should give the NSW Government greater visibility on whether programs are delivering value for money, with emphasis not just on whether they are meeting compliance requirements, but whether they are also meeting performance expectations. This will require agencies to have the expertise they need to analyse how programs are performing and meeting expected outcomes.

 Appropriate financial controls help ensure the efficient and effective use of resources and the implementation and administration of agency policies. They are essential for quality and timely decision making.  

In 2015–16, our audit teams made the following key observations on the financial controls of NSW public sector agencies.

Financial controls
Observation Conclusion
More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016.

Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making.

Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner.

Agencies continue to face challenges managing information security. Most information technology issues we identified related to poor IT user administration in areas like password controls and inappropriate access. Agencies should review the design and effectiveness of information security controls to ensure data is adequately protected.

We found shared service provider agreements did not always adequately address information security requirements.

Where agencies use shared service providers they should consider whether the service level arrangements adequately address information security.

Thirteen of 108 agencies required to attest to having a minimum set of information security controls did not do so in their 2015 annual reports. The 'NSW Government Digital Information Security Policy' recognises the growing need for effective information security. With cyber security threats continuing to increase as digital services expand we plan to look at cyber security as part of our 2017–18 performance audit program.
We identified instances where service level agreements with shared service providers were outdated, signed too late or did not exist. Corporate and shared service arrangements are more effective when service level arrangements are negotiated and signed in time, clearly detail rights and responsibilities and include meaningful KPIs, fee arrangements and dispute resolution processes.
Internal controls at GovConnect, the private sector provider of transactional and information technology services to many NSW public sector agencies were ineffective in 2015–16. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector.
Maintenance backlogs exist in several NSW public sector agencies, including Roads and Maritime Services, Sydney Trains, NSW Health, the Department of Education and the Department of Justice. To address backlog maintenance it is important for agencies to have asset lifecycle planning strategies that ensure newly built and existing assets are funded and maintained to a desired service level.

Internal controls

Agency internal controls

We report deficiencies in internal controls, matters of governance interest and unresolved issues identified during our audits to management and those charged with governance of the agencies. We do this through management letters, which include our observations, related implications, recommendations and risk ratings.

We identified and reported 837 issues during our 30 June 2016 audits. Common internal control weaknesses identified during these audits included: 

  • non-compliance with processes and legislation
  • incomplete and inaccurate central registers, such as those for managing conflicts of interest, legislative compliance and contract management
  • weaknesses in information technology controls (see further details below)
  • financial performance and reporting issues, such as inadequate review of manual journals and poor quality and review of general ledger account reconciliations
  • deficiencies in purchasing and payables processes, such as poor review of vendor master file changes, limited use of purchase orders and inadequate payment approval processes.

Fewer internal control weaknesses were assessed as being high risk than in previous years. High risk internal control deficiencies should be addressed by the relevant agencies as a matter of urgency.

More needs to be done to implement audit recommendations

More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016. The highest proportion of these issues were in the following clusters:

  • Family and Community Services cluster - 11 of 31 issues were repeat issues.
  • Planning and Environment cluster - 26 of 88 issues were repeat issues
  • Finance, Services and Innovation cluster - 31 of 111 issues were repeat issues
  • Justice cluster - 33 of 124 issues were repeat issues
  • Transport cluster - 18 of 68 issues were repeat issues
  • Health cluster - 33 of 126 issues were repeat issues.

Two of the 212 issues were classified as high risk and related to:

  • an agency’s lack of effective controls over fundraising activities
  • recognition of a loan and the agency’s capacity to repay the loan

Of the remainder, 126 were classified as moderate risk and 84 as low risk. Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. They expose agencies to reputational risks and financial loss.

Some issues can take longer to address due to resource constraints and/or the complexity of the issue. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner. Audit and Risk Committees play an important role in monitoring and advising agency heads on how agencies are implementing measures to address audit findings and recommendations.

Internal controls at shared service providers

Cluster corporate and shared service models are common across NSW Government

Corporate and shared service models are common across NSW Government, with most clusters having moved to or planning to move to some form of shared service arrangement. Shared service arrangements are designed to achieve efficiencies and reduce costs by centralising service delivery in areas such as human resources, governance and risk, procurement, finance and information technology. Corporate and shared service models can:

  • consolidate information systems and standardise processes through common policies and procedures. This should provide greater transparency to the cluster lead agency of agencies' and cluster-wide performance
  • deliver better information management and decision support services
  • increase efficiencies and reduce costs.

Agencies need to carefully manage the risks associated with these arrangements, such as:

  • failing to deliver integrated systems and processes across the cluster
  • limiting flexibility, which may hinder agencies from implementing fit for purpose frameworks, such as those for governance and risk
  • sub-optimal performance by service providers and/or ineffective controls at the service provider
  • poor governance, strategic leadership and direction over shared service arrangements.

The NSW Commission of Audit, in its May 2012 report on ‘Government Expenditure’, recommended improvements in the delivery of corporate and shared services across the NSW Government sector.

Service level arrangements are not always in place or are signed too late

We found instances where service level agreements with shared service providers were outdated, signed too late or did not exist. For example:

  • service agreements, which include performance requirements for safety and quality, service access and patient flow, finance and activity, population health and people between the Secretary of NSW Health and local health districts/specialty networks, need to be signed earlier to clarify roles, responsibilities, performance measures, budgets and service volumes and levels
  •  the NSW Department of Industry, Skills and Regional Development and the Department of Justice did not always have service agreements in place with agencies to which they provide financial and corporate services.

Corporate and shared service agreements are more effective when:

  • Service level agreements are negotiated and signed on time
  • the services provided and the rights and responsibilities of each party are clear
  • meaningful KPIs are agreed and there is a process to monitor performance against the KPIs
  • security over data and information is maintained and rights of access to information are established
  • fee arrangements are agreed
  • dispute resolution processes are in place

Agencies need to seek internal control certifications from service providers

NSW Treasury Policy TPP 14–05 'Certifying the Effectiveness of Internal Controls Over Financial Information' requires agencies to obtain certification on the effectiveness of internal controls from outsourced service providers. We found:

  • agencies using the services of GovConnect were unable to rely on controls over financial transactions and information (further details below), which negated the certification process over controls at the service provider. This required the impacted agencies to implement controls to mitigate the control deficiencies at the service provider
  • the Department of Justice did not always provide written certifications on the design and effectiveness of internal controls to client agencies
  • some private sector service providers do not provide independent certifications on the effectiveness of their controls to agencies.

The NSW Treasury Policy notes that, in some instances, client agencies may consider it appropriate to seek additional assurance in the form of an independent opinion on the design and operating effectiveness of controls in the service organisation. Agencies should consider the nature and extent of the services provided by their service provider when determining whether independent assurance is required.

Internal controls at GovConnect were ineffective in 2015–16

GovConnect provides information technology and transactional services to agencies within the NSW Public Sector. Service levels fell during the transition of shared services from ServiceFirst to GovConnect and NSW public sector agencies using these services were unable to rely on controls over financial transactions and information.  

We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. This increased the risk of fraud and error, and inappropriate access to information.  

The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies identified in GovConnect’s Independent Auditor’s Assurance reports. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector. Refer to pages 19-20 in our Report on Finance, Services and Innovation for further details.

Information technology

Digital Information Security

Agencies continue to face challenges managing information security

We audited the information systems of 72 agencies in 2016. The audits focused on the information technology (IT) processes and controls supporting the integrity, availability and security of financial data used to prepare the financial statements.

The audits identified opportunities to improve IT control environments, with a large proportion of our findings relating to information security. We recommended agencies review and strengthen information security controls. The key control weaknesses we found related to user administration, password parameters and privileged access.

Over the last three years the number of information systems issues we identified has improved, as shown below: 

  • 2015–16: 72 audits - 121 issues reported
  • 2014–15: 73 audits - 169 issues reported
  • 2013–14: 77 audits - 198 issues reported.

Of the 121 issues reported in 2015–16, two were classified as high risk, 80 as moderate risk and 39 as low risk. The two high risk issues related to:

  • poor password configuration management
  • inappropriate user access accounts and inadequate review of users’ access to the agency’s network, finance applications, database and servers.

Twenty-three per cent of the issues reported in 2014–15 were repeated in 2015–16. The percentage of repeat issues has fallen compared to 2013–14. 

Governance refers to the high-level frameworks, processes and behaviours established to ensure an entity meets its intended purpose, conforms with legislative and other requirements, and meets the expectations of probity, accountability and transparency.  

Governance models need to be adapted for the specific goals and outcomes required for different situations; one size does not fit all. High standards of public sector governance and accountability enable effective and efficient use of public resources. They also help to ensure agencies act impartially and lawfully, deliver program/project benefits within expected costs and timeframes and provide useful information about their activities and achievements.

In 2015–16, our audit teams made the following key observations on governance in NSW public sector agencies

Governance
Observation Conclusion
Cluster governance arrangements that support cluster accountability, performance monitoring, risk and compliance management are unclear.

Currently, cluster governance arrangements are unclear and inconsistently implemented across the NSW public sector. Implementing cluster governance frameworks is complex.

The Department of Premier and Cabinet (DPC) has indicated the NSW Public Sector Governance Framework will be updated to give guidance on cluster governance and how accountability and performance are monitored and reported.

The ‘whole-of-government’ does not have a dedicated audit and risk committee. NSW Government agencies would benefit from a dedicated independent audit and risk committee for the ‘whole-of-government’ that focuses on common issues and risks across the NSW public sector, and recommends and oversights coordinated responses to sector wide issues.

We identified many deficiencies in the oversight and management of Crown Land, including the sale and lease of such land.

We recommended the Department of Industry-Lands improve its processes for the sale and lease of Crown Land.

Our assessment of a sample of 33 agencies found that agencies have risk management governance structures in place, but need to focus on developing stronger risk cultures and fit-for-purpose systems to capture risks and incidents. Agencies need to focus on developing strong risk cultures and fit-for-purpose systems to capture risks and incidents.
We found project cost and time overruns continue to occur. In 2016–17, we will assess risk management maturity and processes focusing on effective risk management in project governance.
Our 2015–16 fraud survey indicates fraud controls are improving, but highlighted areas where agencies can do more. Agencies can review their fraud control measures against our Fraud Control Improvement Kit.
Our review of 13 agencies’ compliance with reporting and disclosure aspects of the GIPA Act found varying degrees of non-compliance at each. Our 2016 Special Report 'Compliance with the GIPA Act' makes recommendations to help agencies comply with the requirements of the Act.

Governance and Accountability

With the NSW public sector changing and becoming more complex, good governance becomes more important so the public's confidence in government and its agencies is maintained. Governance across the NSW public sector is complex and needs to accommodate risks arising from:

  • the Government’s cluster arrangements having no legal basis
  • many agencies not having conventional board structures
  • agencies only being able to do what their enabling legislation allows
  • agencies having for profit or not-for-profit objectives, and/or only being established to achieve a particular purpose
  • capability limitations that may exist in governing bodies
  • stakeholders having high expectations around accountability, transparency and conflicts of interest in public sector agencies.

Adding to this complexity is the continually changing nature of the public sector and the way it delivers services. Often, governance arrangements are impacted by:

  • changes in service delivery models, such as commissioning and contestability arrangements
  • machinery of government changes, leading to agencies being formed, amalgamated or abolished
  • complex financing and other contractual arrangements, such as public private partnerships impacting the structure and risks agencies face.

Those charged with governance are accountable for the decisions they make and need relevant, accurate and up-to-date information on which to base their decisions. Consequently, they need to satisfy themselves the governance frameworks, and the design and effectiveness of internal systems and controls provides sufficient assurance the agency’s activities are in line with expectations and comply with standards and legal requirements.  

Our audits identified deficiencies in some agencies’ governance frameworks, including:

  • not having frameworks to manage and ensure compliance with legislation
  • outdated policies and procedures, including those for fraud and corruption
  • inconsistent risk management frameworks
  • not having effective internal audit functions
  • some smaller agencies not having an Audit and Risk Committee
  • poor frameworks for identifying and managing conflicts of interest and gifts and benefits.

Agencies can assess their governance frameworks against our Governance Lighthouse.

Effective cluster/agency and program/project governance is characterised by:

  • leaders who set the right tone from the top, that shapes the culture and demonstrates the desired values and ethics through the behaviours they model when working with management and external stakeholders
  • a clear strategic purpose and direction, based on a clear understanding of stakeholder expectations, realistic medium and long-term outcomes, short-term priorities and expenditure/investment choices and budgets
  • a shared and strong understanding of the strategy to inform decisions
    strong oversight of progress against the strategy, significant deviations from it, emerging risks and planned benefits from change programs
  • regular reviews of and updates to the strategy to adapt to changing circumstances
    a clear purpose at specific project/program levels
  • charters with structures that include clearly distinct governance and management roles, principles, and processes
  • clearly defined roles and responsibilities that make differing interests transparent and improve decision-making – these should be revisited periodically
  • visible leadership when agencies/projects/programs face difficult issues
    clearly allocated and delegated decision-making for governance and management
  • different people in the roles of chair, project sponsor, manager of the division responsible for delivering a project, the line manager of the project director
  • the right mix of people with different perspectives and skills, who robustly debate issues, but support agreed decisions
  • independent quality assurance 
  • effective risk management that identifies, analyses, mitigates, monitors and communicates risks
  • a defined risk management framework and register that is widely understood and aligned to the agency’s strategy, risk appetite, objectives, business plan and stakeholder expectations
  • a mature risk management culture and reporting structure that is built into the agency or project governance framework
  • clear roles for Audit and Risk Committees, with competent and independent members who have a clear purpose
  • governance arrangements and practices that continually evolve to manage risk and conflicts of interest.

Cluster governance

Cluster governance arrangements, including accountability, are unclear

Currently, cluster governance arrangements are unclear and inconsistently implemented across the NSW public sector. Implementing cluster governance frameworks is complex because clusters bring together entities with different enabling legislation, organisational and legal structures, information systems and processes, risk profiles and governance frameworks. They require Ministers, boards, department Secretaries, agency heads and management to work together to ensure effective cluster governance and accountability arrangements are in place.

Clear cluster governance arrangements would improve cooperation and coordination amongst cluster agencies, help deliver government priorities that cut across agencies and improve service delivery outcomes. We recommended DPC release a revised NSW Public Sector Governance Framework that clearly articulates cluster governance arrangements, the role of the cluster Secretary, Chief Finance Officer, Chief Information Officer and Chief Risk Officer.

DPC has indicated the framework will be updated shortly to provide guidance on governance at a cluster level, including how cluster-level accountability and performance information is monitored and reported. We understand DPC will work with NSW Treasury to revise the framework by mid-2017. It is important for these agencies to collaborate and ensure the outcomes of NSW Treasury's Financial Management Transformation (FMT) program are considered when updating the framework.

The FMT program aims to revise financial governance, budgeting and reporting arrangements in the NSW public sector, and clarify the administrative and accountability arrangements for cluster operations. Further information on FMT is included in the Financial Performance and Reporting and Service Delivery chapters.  

Management oversight and capability

Those charged with governance are ultimately responsible for establishing an appropriate governance framework and system of internal control. However, management is accountable to those charged with governance and their oversight plays an important role in ensuring appropriate policies, procedures and internal controls are designed and working properly.

Sale and lease of Crown land is not being managed effectively

Our 2016 performance audit found limited oversight of sales and leases of Crown land by the Department of Industry - Lands. The Department has only just started monitoring whether tenants were complying with lease conditions, and does not have a clear view of what is happening on most leased Crown land. Most guidance to staff had not been updated for a decade, contributing to staff sometimes incorrectly implementing policies on rental rebates, unpaid rent, rent redeterminations and the direct negotiation of sales and leases on Crown land.  

Decisions on the sale and lease of Crown land were not transparent to the public and the Department has not provided consistent opportunities for the public and interested parties to participate in decisions about Crown land. Between 2012 and 2015, 97 per cent of leases and 50 per cent of sales were negotiated directly between the Department and individuals, without a public expression of interest process.  

Adding to this, our financial audit findings have identified significant deficiencies for several years in recording and accounting for Crown land assets in the Crown Land Information Database and the Department’s general ledger.

A key objective of the Department of Industry - Lands is for Crown land to be occupied, used, sold, leased, licensed or otherwise dealt with in the best interests of the State. A major part of the State’s land holding is Crown land, which had an estimated value of $12 billion in  2015–16. Crown land comprises approximately 42 per cent of all land in New South Wales and supports a wide range of important environmental, economic, social and community activities.  

The Crown Land Management Act 2016 (the Act) received assent from Parliament on 14 November 2016. The Act consolidated eight pieces of legislation. Most of the Act is expected to commence in early 2018. It is expected to reduce complexity and duplication, deliver better social, environmental and economic outcomes and facilitate community involvement in Crown land.

Good progress is being made on implementing public sector management reforms

Our performance audit on ‘Public Sector Management Reforms' found the Public Service Commission was making good progress leading the implementation of public sector management reforms. The Commission developed a sound evidence base for the reforms and gained wide public sector support by engaging with agency heads and using public sector working groups to develop options.  

The Commission needs to do more to report on how the reforms are contributing to better public services and to issue its guidance material to agencies promptly. The audit noted that the capacity and capability of human resource units in some agencies remains an impediment to the successful implementation of the reforms.

In early 2012, the NSW Commission of Audit Interim report identified a range of issues with workforce management in New South Wales. The Public Service Commission (PSC), which was established in late 2011, was tasked to address some of these issues and build the capability of the public sector. The Government Sector Employment Act 2013 (GSE Act), which provides the legislative basis for reforms, commenced in February 2014.

The public sector management reforms are ambitious, covering a substantial workforce and requiring a lot to be done in a short time. To achieve the intended outcomes, the reforms needed to be supported by sound evidence, have clear objectives and performance indicators, and be evaluated at appropriate stages.

Risk Management

The increasing complexity of government business transactions reinforces the need for whole of government approaches to deal with inter-related and inter-dependent risks across government agencies. It is important that safeguards in place to manage these risks are commensurate to the risk posed.

Findings from some of our 2016 performance audits, which looked at how areas of high risk are managed across NSW Government, are detailed below:

Our performance audit on managing unsolicited proposals in New South Wales concluded that governance arrangements for unsolicited proposals were adequate, but greater transparency and public reporting is needed. Unsolicited proposals warrant greater scrutiny and disclosure as they pose a greater risk to value for money than open, competitive and transparent tender processes.

 

Our performance audit on government advertising concluded the peer review process provides sufficient assurance that government advertising programs are needed and are cost effective. Government advertising is an activity that is high risk because of the potential for it to be used for political purposes. In NSW, the Government Advertising Act 2011 requires government advertising campaigns estimated to cost over $50,000 to be independently peer reviewed before launch.  

Cluster-wide risk management

Cluster wide risk management is inconsistent

Agencies within clusters have their own risk profiles and risk management frameworks. We found varying approaches and levels of maturity on how agency risks are captured and escalated to a cluster level so cluster heads can assess how they are being managed, treated and reported. We recommended some clusters review how agency level risks are escalated and reported at a cluster level.

Enterprise-wide risk management

Agency enterprise-wide risk management across the public sector is improving

In 2016, we assessed risk management processes at 33 agencies across the NSW public sector against the criteria in our Risk Assessment Tool. In 2015, we asked 77 agencies to perform a self-assessment of their risk management maturity. The table below compares the overall results of our assessment against the agencies self-assessments. The comparison indicates that risk management is improving.

Our assessments found that agencies have risk management governance structures in place, but need to focus on developing stronger risk cultures and fit-for-purpose systems to capture risks and incidents.

The environment in which services are delivered to the people of NSW is constantly changing. Services need to remain relevant and support the public's changing needs and expectations. People expect high quality services to be delivered in cost effective ways. To do this, agencies need to determine how best to deliver the services. Governments can deliver their services through agencies or through commissioning the right mix of services from public, private and not for profit sector providers.  

Agencies also need to consider how they collaborate with each other to improve the quality of their services and help drive down costs. Changes in innovation and technology can help agencies adapt to changing circumstances and to deliver better services in different ways.

In 2015–16, our audit teams made the following key observations on service delivery by NSW public sector agencies.

Service delivery
Observation Conclusion
New ways of delivering services across NSW Government are being identified, with commissioning and contestability arrangements being introduced or considered.

It is important for accountability to be maintained when services are outsourced.

Commissioning services and introducing new systems can be challenging. It is important for this to be managed well through:

  • strong project governance and leadership to manage risks
  • entering into binding commitments with clear accountabilities
  • good preparation, including adequate training and support for staff
  • sound financial management to control costs.
We found government decision makers are not always receiving enough information to make evidence-based investment decisions. The NSW Government’s program evaluation initiative has been largely ineffective. A performance audit looked at the Justice, Industry, Skills and Regional Development, Planning and Environment, Premier and Cabinet and Treasury clusters and recommended improvements to program evaluation.
We found agencies' performance is not routinely measured, evaluated or publicly reported. Agencies can improve transparency over their performance with a stronger focus on measuring performance and outcomes so they can make evidence-based decisions and maintain public accountability.
According to unaudited agency data, some Premier's and State Priorities are at risk of not being achieved. Independent assurance over the reliability and accuracy of the data would increase confidence in the performance indicators used to measure achievement of the Government’s priorities.
A comprehensive report of performance against the State Priorities is not published. We understand the NSW Government is considering public reporting against the State Priorities and developing reporting options.

Commissioning and Contesting the Delivery of Services

The publics' rising expectations, and rapidly changing and increasingly complex needs mean agencies cannot be complacent even when they deliver good services. To meet changing expectations and needs, agencies need to build on their strengths and leverage opportunities a modern, technology driven and information rich environment provides.

Government outcomes can be achieved through the effective commissioning of the right mix of services from the public, private and not-for-profit sectors. Commissioning involves agencies assessing citizens’ needs, determining priorities, designing and sourcing appropriate services, and monitoring and evaluating performance. NSW Treasury's 'Government Commissioning and Contestability Policy', published in November 2016, aims to provide a clear and consistent policy direction, definition and set of principles to guide NSW Government agencies when commissioning and contesting services.

It is important for agencies to understand the Government's strategic direction and objectives when partnering with others or commissioning the delivery of services. They must be prepared and able to work together and with others in different ways to deliver the best quality public services possible. Agencies face challenges and opportunities when commissioning services. These include:
 
  • determining the size, variety and location of services needed to meet customer needs and expectations
  • doing things differently to ensure public services are delivered efficiently and effectively
  • developing and nurturing markets, and transitioning services into and out of government
  • partnering with other public and private sector entities, and non-government organisations (NGOs)
  • establishing and maintaining clear accountabilities for jointly delivered services
  • using new approaches that leverage improvements in technology
  • involving the people of NSW in designing, planning, and delivering services
  • using, sharing and communicating information about service delivery
  • building agencies' capacity and capability
  • measuring and benchmarking service performance.

Effective commissioning can be achieved through:

  • strong governance and leadership to manage relationships and risks effectively within risk appetite levels
  • good information systems and tools 
  • being well prepared with the right capability and number of employees who are well trained and supported
  • adopting approaches that best fit the circumstances
  • regularly monitoring and assessing if expected outcomes are being achieved 
  • having a common purpose with clear outcomes
  •  being flexible and prepared to make trade-offs
  •  binding commitments with clear accountabilities
  •  sound financial management to control costs
  •  adequate development and testing of new systems before going live.

Commissioning and contestability continues to increase

We continue to see new ways of delivering services across NSW Government agencies. Some examples of commissioning and contestability include:

  • commissioning of GovConnect to provide information technology and transactional services to several agencies within the NSW Public Sector (refer Financial Controls chapter for further detail)
  • contestability testing within NSW Health, including linen services, non-emergency patient transport, warehousing, hospital support services, pathology and radiology
  • commissioning NGOs to provide some services traditionally provided by the Department of Family and Community Services ($2.8 billion received by NGOs in 2015–16 for the delivery of these services).

Our performance audit on franchising of the Sydney Ferries network found the decision to do so was justified and Transport for NSW’s management of the franchise was largely effective. The franchising has resulted in cost savings, good service performance and effective risk transfer from Government to the private sector operator. Scheduled ferry services are now provided under a seven-year contract managed by Transport for NSW.

Our 2016–17 performance audit program includes a review of Roads and Maritime Services' (RMS) Sydney region road maintenance contracts to assess whether RMS has realised the expected benefits of outsourcing road maintenance for the Sydney Region West and South zones under its Stewardship Maintenance Contracts. We also recently tabled a performance audit report, which focused on the Department of Family and Community Services work to build the readiness of the non-government sector for the National Disability Insurance Scheme.

Accountability needs to be maintained when services are outsourced

Generally, contractual arrangements allow an agency that is outsourcing services to review and assess the performance of the service provider. However, outsourced service providers are not directly accountable to the NSW Parliament for their use of public resources.

Governments are increasingly outsourcing to or partnering with private and NGO providers to deliver government services. Consequently, many parliaments now have legislation that enables Auditors-General to ‘go beyond’ the boundaries of the agencies commissioning services and into the entities providing the services to examine how effectively and efficiently they are providing the services (‘follow the money’ powers). New South Wales legislation does not currently provide the Auditor–General with such powers.

Delivering Government Services

Evidence-based decision making

Government services are being delivered by agencies through a variety of programs

To do this effectively agencies need to be able to make evidence based decisions. In August 2013, the NSW Government commenced a program evaluation initiative, which required agencies to periodically evaluate their programs. Since then, NSW Treasury and DPC have worked with agencies to implement the initiative. Agencies are required to prioritise programs for evaluation based on size, strategic significance and degree of risk, recognising their available capability and resources to conduct evaluations.

Our performance audit on 'Implementation of the NSW Government’s program evaluation initiative' showed the initiative was largely ineffective and government decision makers were not receiving enough information to make evidence-based investment decisions. The audit looked at the Justice, Industry, Skills and Regional Development, Planning and Environment, Premier and Cabinet and Treasury clusters.

Our performance audit also recommended NSW Treasury develop an evaluation framework to support the program budgeting and reporting component of the Financial Management Transformation (FMT) program, and ensure the program evaluation initiative is integrated into the new framework.

The FMT program budgeting, reporting and evaluation initiative aims to provide evidence-based information to inform investment decisions on programs. Adopting program budgeting and reporting as a key component of the FMT program requires a proven and systematic evidence-based methodology for measuring the efficiency and effectiveness of the programs.

Service delivery performance

Our performance audits found mixed service delivery performance

Performance audits build on our financial audits by reviewing whether taxpayers' money is spent efficiently, effectively, economically and in accordance with the law. Many of our performance audits focus on whether agencies are delivering good services to citizens at a reasonable cost. Findings from some of our 2016 audits, which focused on service delivery performance, are outlined below:

New South Wales has a lower rate of foodborne illness than the national average. This reflects some good practices in the NSW Food Authority’s approach to monitoring food safety standards. To ensure foodborne illnesses remain low, the Authority needs to better monitor its arrangements with local councils that inspect retail food businesses on its behalf, and receive additional and more timely information from them on compliance with food safety standards.

 

The Department of Education is doing a reasonable job of managing how well students with a disability transition to new schools and in supporting teachers to improve the students’ educational outcomes. We found enrolments in quality early childhood education were increasing, but were still below benchmark and funding could be better targeted to disadvantaged children in long day care.

 

Juvenile Justice NSW prepares and helps young people reintegrate into the community reasonably well after detention, given their complex needs, but access to post-release services is problematic.

 

Citizens will benefit if red tape is reduced. Overall, NSW Government initiatives and processes to prevent and reduce red tape have not been effective. In the absence of an accurate red tape savings figure and a stocktake of regulation, the NSW Government does not have a clear view of the impact its reported savings had on the overall net burden of red tape in New South Wales. Its ‘one-on, two-off’ initiative to reduce legislative regulatory burden achieved its numerical target, but the cost of the total legislative burden increased by $16.1 million over the same period.

Reporting on Service Delivery Performance

As agencies partner and collaborate more, measuring performance becomes more important. Sharing, using and making information available enables agencies to collectively understand and improve their service performance. This also gives agencies an opportunity to achieve efficiencies in collating and using research and performance data within privacy and legislative constraints. Where appropriate, agencies should consider obtaining independent assurance over the reliability and accuracy of the performance data they use.

Complaints are an important and free source of information that can provide valuable insights into poor service, systemic errors or problems with specific processes. How agencies manage and respond to complaints demonstrates their commitment to high standards of service delivery. Complaints also give agencies an opportunity to understand the expectations and experiences of people using their services. Government agencies need to ensure complaints are easy to make, consistently recorded and analysed, and openly reported and actioned.

Transparency over performance

Performance is not always measured, evaluated or publicly reported

A key objective of public sector reform is to improve performance and create a culture of accountability. Inadequate performance measures and primarily internal reporting, reduces transparency of agency performance and makes it hard for the public to assess if agencies are doing a good job. A sample of our audits found:
 
  • the effectiveness of Corrective Services NSWs performance framework was limited because performance information was not readily available to correctional centres to make more informed decisions on how best to manage their centres
  • red tape savings figures were not accurate and there was no central oversight of red tape reduction strategies
  • a lack of detailed costings meant we could not be sure regulation of early childhood education was efficient even though processes appeared to be good
  • while the Department of Family and Community Services has transparent performance reporting which is regularly published, the use and reporting of targets and benchmarks is limited
  • while icare collects performance information it does not use this information to assess the success of the return to work program. The return to work rate has increased from 85.5 per cent to 88.3 per cent since the workers’ compensation reforms were introduced in 2012, but there was no benchmark to assess if this result is meeting the desired objectives of the reforms
  •  the Environment Protection Authority has not developed measures and targets to assess achievement of outcomes associated with illegal dumping initiatives.

Agencies should consider whether their performance measurement frameworks:

  • measure the right things, focus on outcomes and integrate with decision making processes
  • set baselines and establish targets and timeframes for key performance indicators
  • require the use of reliable, up to date and accurate information
  • require information to be publicly reported to increase transparency.

The Government will not get the same level of reliance on performance information as it does for financial statements if that information is not independently assured. We will continue to focus on how well agencies assess and report the performance of their initiatives in achieving desired outcomes.

Premier's and State Priorities

The NSW Government released State Priorities 'NSW: Making it Happen' in September 2015. It includes 12 Premier's Priorities and 18 State Priorities with measures and targets to track the Government's performance in key priority areas.

The Premier's Priorities are detailed below.

  • Protecting our kids
  • Improving service levels in hospitals
  • Improving education results
  • Driving public sector diversity
  • Keeping our environment clear
  • Faster housing approvals
  • Reducing domestic violence
  • Tackling childhood obesity
  • Reducing youth homelessness
  • Improving government services
  • Creating jobs
  • Building infrastructure

Performance against the Premier's and State Priorities is not audited

The Premier's and State Priorities have not been independently audited to provide assurance the performance information is accurate. The Commonwealth, Victorian and Western Australian Auditors-General have varying powers that provide for auditing the appropriateness of agency key performance indicators and determine whether they fairly represent actual performance. NSW legislation does not currently provide the Auditor-General with such powers.

Premier's Priorities

Some Premier's Priorities are at risk of not being achieved

Our 2015–16 reports commented on the Government's performance against some of the Premier’s and State Priorities. Published data, which we have not audited, indicates the following Premier's Priorities may be at risk of not being achieved:

  • the proportion of domestic violence perpetrators re-offending within 12 months was 15.9 per cent, which is 6.7 percentage points higher than the target of 9.2 per cent (refer page 52–53 in Report on Law and Order, Emergency Services and the Arts for further details)
  • the percentage of children and young people re-reported at risk of significant harm was 40 per cent, which is 5.6 percentage points higher than the target of 34.4 per cent (refer page 31–32 in Report on Family and Community Services)
  • in 2015–16, 32.5 per cent of students achieved results in in the top two NAPLAN bands for reading and numeracy, marginally below the baseline of 32.7 per cent and below the 2019 target of 35.2 per cent (refer page 40–41 in Report on Education for further details)
  • the rate of patients leaving emergency departments within four hours was 74.2 per cent, 6.8 percentage points below the target of 81 per cent (refer page 53 in Report on Health for further details).

Published data, which we have not audited, indicates the following Premiers Priorities have been achieved or are on track to be achieved:

Progress against all 12 priorities can be found at https://www.nsw.gov.au/improving-nsw/premiers-priorities.

State Priorities

Some State Priorities at risk of not being achieved

Data, which we have not audited, indicates the following State Priorities may be at risk of not being achieved:

  • journey time reliability was 86 per cent in 2015–16, four percentage points below the 90 per cent target for peak travel on key routes being on time (refer page 48 in Report on Transport for further details)
  • in 2015–16, 9.1 per cent of Aboriginal and Torres Strait Islander students achieved results in the top two NAPLAN bands for reading and numeracy, which shows no improvement on the baseline of 9.1 per cent and is below the 2019 target of 11.6 per cent (refer page 42–43 in Report on Education for further details)
  • reducing the rate of adult re-offending by five per cent by 2019 – the rate increased 2.3 percentage points over the five years since 2010 to 36.7 per cent for the year ended 31 December 2014 (refer page 53–54 in Report on Law and Order, Emergency Services and the Arts for further details).

Data, which we have not audited, indicates the following State Priorities have been achieved or are on track to be achieved:

  • the State maintained its AAA credit rating (refer page 25 in Report on State Finances for further details)
  • general government expenditure growth was 4.4 per cent in 2015–16 and continued to be below long term revenue growth of 5.6 per cent (refer page 25 in Report on State Finances for further details)
  • 70,077 new dwelling approvals were granted in 2015–16, higher than the target of 50,000 approvals (refer page 35 in Report on Planning and Environment for further details)
  • the time taken to assess planning applications for complex state significant developments fell 46 per cent in 2015–16 from the 2013–14 baseline. A further four percentage point reduction is required to meet the target of halving the time to perform these assessments (refer page 35 in Report on Planning and Environment for further details)

A comprehensive report of performance against the State Priorities is not published

The Department of Premier and Cabinet has defined targets and measures in ‘NSW: Making it Happen’ so Ministers and individual agencies know which targets they are accountable for and how they will be measured. While some measures are publicly reported through agency annual reports or other sources, a comprehensive report of performance against the 18 State priorities is not published. We understand the NSW Government is considering this matter and developing reporting options.

Agencies are responsible for the priorities and they report progress at least bi-annually to the Department of Premier and Cabinet for reporting to the Premier. We will continue to report performance against the targets set in the Premier's and State Priorities.

Contract Management

Our audits identified deficiencies in contract management processes

Our audits continue to identify deficiencies in contract management processes, including:

  • agencies not having central contract registers detailing key contractual obligations and commitments
  • incomplete and inaccurate contract registers and/or no policy or procedures to update and maintain contract registers
  • no monitoring of contract performance.

We recommended agencies in the Family and Community Services and Planning and Environment clusters improve contract management processes. A robust contract management framework helps ensure all parties meet their obligations, contractual relationships are well managed, value for money is achieved and deliverables meet the required standards and agreed timeframes.

A 2014 performance audit ‘'Making the most of government purchasing power – telecommunications' developed a Better Practice Contract Management Framework (Framework) with nine key elements. Agencies can refer to this framework when assessing the adequacy of their contract management framework.

Benefits realisation

Benefits realisation approach for the Service NSW initiative is not as effective as it could be

Effective benefits realisation is critical to achieving intended outcomes expected from investments.  

Our performance audit on 'Realising the benefits of the Service NSW initiative' found the benefits realisation approach for the Service NSW initiative is not as effective as it could be. While customers think Service NSW provides a convenient and practical way to access all government transaction services:  

  • it was unclear who should monitor and report on the achievement of whole-of-government benefits and savings anticipated from the initiative
  • there was insufficient data to fully value or identify individual agency and whole-of-government savings and benefits.

This makes it difficult for the NSW Government to demonstrate the expected economic benefits of Service NSW will outweigh costs by the estimated five to one, and that savings will accrue after 2016–17.

The Department of Finance, Services and Innovation has developed a benefits realisation management framework, which can be found at www.finance.nsw.gov.au/publication-and-resources/benefits-realisation-management-framework. The Department of Education has established a benefits realisation plan for the Learning Management and Business Reform Program (LMBR) following our performance audit on the LMBR program. The Department of Planning and Environment is planning a benefits realisation review on the implementation of stage one of the ePlanning system.  

We will continue to review whether agencies have implemented effective benefit realisation frameworks for major projects and programs and examine the outcomes of benefit realisation reviews.