Actions for Signal failures on the metropolitan rail network

Signal failures on the metropolitan rail network

Transport
Information technology
Infrastructure
Internal controls and governance
Project management
Risk
Service delivery

Between 2004 and 2006, the number of signalling failures, signalling downtime and the number of trains delayed as a result of signal failures all fell. RailCorp’s on-time running performance improved over the same period. The fall in failures is a clear indication of improved performance. Changes in the definition of on-time and to the timetable during 2005 and 2006 however make it difficult to determine whether improvements in response downtime and signalling delays are due to a true performance improvement. To build upon this strong base, RailCorp needs to determine with more confidence the number and duration of signalling failures the network can tolerate without impacting on service levels.

 

Parliamentary reference - Report number #170 - released 15 August 2007

Published

Actions for Connecting with public transport

Connecting with public transport

Transport
Information technology
Infrastructure
Internal controls and governance
Management and administration
Project management
Service delivery
Workforce and capability

We see considerable potential for the Ministry of Transport to plan and manage interchanges more effectively, so as to make better use of our public transport network. We believe that the Ministry now needs to focus more on multi-modal transport planning and interchange performance. It needs to assign responsibility for the coordination and oversight of inter-modal operations to an entity resourced for the purpose. Without this it will continue to be very difficult to identify and address unmet needs, seek and secure stakeholder funding, and monitor and evaluate system performance.

 

Parliamentary reference - Report number #168 - released 6 June 2007

Published

Actions for Sale of the TAB

Sale of the TAB

Treasury
Internal controls and governance
Procurement

The Audit Office is of the opinion that:

  • the sale was delivered with reasonable efficiency and effectiveness

  • the sale yielded a satisfactory return to the NSW Government. The possibility for a higher return was limited to about 2% to 4% on gross proceeds of $936m. It would have required setting a higher share price for all investors and adopting a more flexible approach to share allocation

  • the Government’s objective to promote community and investor support was achieved. The scale of the demand for script added to costs and was not fully translated into higher proceeds  

  • generally satisfactory accountability frameworks were put in place for the sale and no probity concerns were identified

  • the frameworks to achieve the Government’s wider reforms of the racing and wagering industries have substantially been implemented.

 

Parliamentary reference - Report number #61 - released 23 December 1998

Published

Actions for The levying and collection of Land Tax

The levying and collection of Land Tax

Treasury
Information technology
Management and administration
Service delivery

Land tax has a significantly higher cost to collection ratio than other State taxes. In part this is because of its design. But there are opportunities to reduce collection costs within current policy constraints. The Office of State Revenue (OSR) has been actively pursuing better practice initiatives for some time and a substantial range of improvements has been made. OSR is continuing these efforts. However, inadequate systems and continued difficulties with the quality of land information remains as an impediment to efforts to increase efficiency and effectiveness and reduce collection costs.

Improvements canvassed in this Report (a number of which OSR had already been addressing before the audit commenced) would provide reduced collection costs (through greater efficiency) and improved collection results (through better education of taxpayers and better use of penalties and incentives). Notwithstanding these improvements, the long standing issues of land information standards and land ownership data compatibility between NSW agencies (largely outside OSR’s control) remain to be satisfactorily resolved.

 

Parliamentary reference - Report number #51 - released 5 August 1998