The Auditor-General for New South Wales, Margaret Crawford, released a report today on whether the Department of Communities and Justice (the department) effectively supports the efficient operation of the District Criminal Court system.

The audit found that in the provision of data and technology services, the department is not effectively supporting the efficient operation of the District Criminal Court system. The department has insufficient controls in place to ensure that data in the system is always accurate.

The department is also using outdated technology and could improve its delivery of technical support to courts.

The audit also assessed the implementation of the Early Appropriate Guilty Pleas reform. This reform aims to improve court efficiency by having more cases resolved earlier with a guilty plea in the Local Court. The audit found that the department effectively governed the implementation of the reform but is not measuring achievement of expected benefits, placing the objectives of the reform at risk.

The Auditor-General made seven recommendations to the department, aimed at improving the controls around courts data, reporting on key performance indicators, improving regional technical support and measuring the success of the Early Appropriate Guilty Pleas reform. 

The District Court is the intermediate court in the New South Wales court system. It hears most serious criminal matters, except murder, treason and piracy. The Department of Communities and Justice (the Department) provides support to the District Court in a variety of ways. For example, it provides security services, library services and front-desk services. This audit examined three forms of support that the Department provides to the District Court:

  • data collection, reporting and analysis - the Department collects data from cases in its case management system, JusticeLink, based on the orders Judges make in court and court papers
  • technology - the Department provides technology to courts across New South Wales, as well as technical support for this technology
  • policy - the Department is responsible for proposing and implementing policy reforms.

Recent years have seen a worsening of District Court efficiency, as measured in the Productivity Commission's Report on Government Services (RoGS). Efficiency in the court system is typically measured through timeliness of case completion. There is evidence that timeliness has worsened. For example, the median time from arrest to finalisation of a case in the District Court increased from 420 days in 2012–13 to 541 days in 2017–18.

As a result, the government has announced a range of measures to improve court performance, particularly in the District Court. These measures included the Early Appropriate Guilty Pleas (EAGP) reform. One of the objectives of EAGP is to improve court efficiency, which would be achieved by having more cases resolve with a guilty plea in the Local Court.

This audit assessed whether the Department of Communities and Justice effectively supports the efficient operation of the District Criminal Court system. We assessed this with the following lines of inquiry:

  • Does the Department effectively collect, analyse and report performance information relevant to court efficiency?
  • Does the Department effectively provide technology to support the efficient working of the courts?
  • Does the Department have effective plans, governance and monitoring for the Early Appropriate Guilty Pleas reform?

The audit did not consider other support functions provided by the Department. Further information on the audit, including detailed audit criteria, may be found in Appendix two.

Conclusion
In the provision of data and technology services, the Department is not effectively supporting the efficient operation of the District Criminal Court system. The Department has insufficient controls in place to ensure accurate data in the District Criminal Court system. The Department is also using outdated technology in significant numbers and could improve its delivery of technical support to meet agreed targets.
The Department effectively governed the implementation of the Early Appropriate Guilty Pleas reform. However, it is not ensuring that the benefits stated in the business case are being achieved, placing its objectives at risk.
The impact of inaccurate court data can be severe, and the Department does not have sufficient controls in place to ensure that its court data is accurate. Recent Bureau of Crime Statistics and Research reviews have identified data inaccuracies, and this demonstrates the Department needs strong controls in place to ensure that its court data is accurate.
The Department does not have a policy for data quality and has not formally assigned responsibility for data quality to any individual or branch. The Department also does not have a data dictionary outlining all the fields in its case management system. While the Department validates the highest risk items, such as warrants, to ensure that they are accurate, most data is not validated. The Department has recently commenced setting up a data unit for the Courts, Tribunals and Service Delivery branch. It is proposed that this unit will address most of the identified shortcomings.
The Department did not provide timely technical support to the court system in 2017 and is using outdated technology in significant numbers. The Digital and Technology Services branch of the Department had agreed a Service Level Agreement with the rest of the Department, outlining the expected speed of technical support responses. The branch did not meet response times in 2017. Performance improved in 2018, though DTS fell short of its targets for critical and moderate priority incidents. Critical incidents are particularly important to deal with in a timely manner as they include incidents which may delay a court sitting.
Requests for technical support rose significantly in 2018 compared to 2017, which may be related to the number of outdated pieces of technology. As at April 2019, the whole court system had 2,389 laptops or desktop computers outside their warranty period. The Department was also using other outdated technology. Outdated technology is more prone to failure and continuing to use it poses a risk of court delays.
The Department is not measuring all the expected benefits from the Early Appropriate Guilty Pleas reform, placing the objectives of the program at risk. The Early Appropriate Guilty Pleas business case outlined nine expected benefits from the reform. The Department is not measuring one of these benefits and is not measuring the economic benefits of a further five business case benefits. Not measuring the impact of the reform means that the Department does not know if it is achieving its objectives and if the reform had the desired impact.

The Department is responsible for providing technology to the courts, which can improve the efficiency of court operations by making them faster and cheaper. The Department is also responsible for providing technical support to courtrooms and registries. It is important that technical support is provided in a timely manner because some technical incidents can delay court sittings and thus impact on court efficiency. A 2013 Organisation for Economic Co‑operation and Development report emphasised the importance of technology and digitisation for reducing trial length.

While the Department may provide technology to the courts, they are not responsible for deciding when, how or if the technology is used in the courtroom.

The Department is using a significant amount of outdated technology, risking court delays

As of April 2019, the whole court system had 2,389 laptops or desktop computers out of warranty, 56.0 per cent of the court system's fleet. The court system also had 786 printing devices out of their normal warranty period, 75.1 per cent of all printers in use. The Department also advised that many of its court audio transcription machines are out of date. These machines must be running for the court to sit and thus it is critical that they are maintained to a high degree. The then Department of Justice estimated the cost of aligning its hardware across the whole Department with desired levels at $14.0 million per year for three years. Figures for the court system were not calculated but they are likely to be a significant portion of this figure.

Using outdated technology poses a risk to the court system as older equipment may be more likely to break down, potentially delaying courts or slowing down court services. In the court system throughout 2018, hardware made up 30.8 per cent of all critical incidents reported to technical support and 41.9 per cent of all high priority incidents. In addition, 16.2 per cent of all reported issues related to printing devices or printing.

From 2017 to 2018, technical support incidents from courts or court services increased. There were 4,379 technical support incidents in 2017, which increased significantly to 9,186 in 2018. The Department advised that some outside factors may have contributed to this increase. The Department was rolling out its new incident recording system throughout 2017, meaning that there would be an under‑reporting of incidents in that year. The Department also advised that throughout 2018 there was a greater focus on ensuring that every issue was logged, which had not previously been the case. Despite these factors, the use of outdated technology has likely increased the risk of technology breakages and may have contributed to the increase in requests for technical support.

Refreshing technology on a regular basis would reduce the risk of hardware failures and ensure that equipment is covered by warranty.

The Department did not meet all court technical support targets in 2017 and 2018

The Digital and Technology Services branch (DTS) was responsible for providing technical support to the courts and the Courts and Tribunal Services branch prior to July 2019. DTS provided technical support in line with a Service Level Agreement (SLA) with the Department. In 2017, DTS did not provide this support in a timely manner. Performance improved in 2018, though DTS fell short of its targets for critical and moderate priority incidents. Exhibit 7 outlines DTS' targets under the SLA.

Exhibit 7: Digital and Technology Services' Service Level Agreement
Priority Target resolution time Target percentage in time (%)
1. Critical 4 hours 80
2. High 1 day 80
3. Moderate 3 days 85
4. Low 5 days 85
Source: Department of Communities and Justice, 2019.

Critical incidents are particularly important for the Department to deal with in a timely manner because these include incidents which may delay a court sitting until resolved or incidents which impact on large numbers of staff. Some of the critical incidents raised with DTS specifically stated that they were delaying a court sitting, often due to transcription machines not working. High priority incidents include those where there is some impact on the functions of the business, which may in turn affect the efficiency of the court system. High priority incidents also include those directly impacting on members of the Judiciary. 

This audit examined DTS' performance against its SLA in the 2017 and 2018 calendar years across the whole court system, not just the District Court. The total number of incidents, as well as critical and high priority incidents, can be seen in Exhibit 8.

Exhibit 8: Number of incidents in 2017 and 2018
Priority 2017 2018
All 4,379 9,186
1. Critical 48 91
2. High 128 315
Source: Audit Office of NSW analysis of Department of Communities and Justice data, 2019.

The Department's results against its SLA in 2017 and 2018 are shown in Exhibit 9.

The Early Appropriate Guilty Pleas (EAGP) reform consists of five main elements:

  • early disclosure of evidence from NSW Police Force to the prosecution and defence
  • early certification of what the accused is going to be charged with to minimise changes
  • mandatory criminal case conferencing between the prosecutor and accused's representation
  • changes to Local Court case management
  • more structured sentence discounts.

More detailed descriptions of each of these changes can be found in the Introduction. These reform elements are anticipated to have three key effects:

  • accelerate the timing of guilty pleas
  • increase the overall proportion of guilty pleas
  • decrease the average length of contested trials.

Improving District Court efficiency is one of the stated aims of EAGP, which would be achieved by having more cases resolve in the Local Court and having fewer defendants plead guilty on the day of their trial in the District Court. The reform commenced in April 2018 and it is too early to state the impact of this reform on District Court efficiency.

The Department is responsible for delivering EAGP in conjunction with other justice sector agencies. They participated in the Steering Committee and the Working Groups, as well as providing the Project Management Office (PMO).

The Department is not measuring the economic benefits stated in the EAGP business case

The business case for EAGP listed nine quantifiable benefits which were expected to be derived from the achievement of the three key effects listed above. The Department is not measuring one of these benefits and is not measuring the economic benefits for five more, as shown in Exhibit 12.

Benefit Economic benefit (over ten years) Being measured?
Accelerated timing of guilty pleas $54.6m yellow circle with minus in the center
Increased guilty plea rate $90.7m yellow circle with minus in the center
Decreased average trial length $27.5m yellow circle with minus in the center
A reduction in the delay of indictable matters proceeding to trial N/A check circle mauve
Increase the number of finalised matters per annum N/A check circle mauve
Reduction of the current backlog of criminal trials in the District Court N/A check circle mauve
Reduction in bed pressure on the correction system due to reduced
average time in custody
$13.7m Exclamation circle red
Productivity improvements due to reduction in wasted effort $53.3m yellow circle with minus in the center
Bankable cost savings due to jury empanelment avoided $2.5m yellow circle with minus in the center

 

Exhibit 12: The Department's measurement of quantifiable benefits
Key check circle mauve Measuring yellow circle with minus in the center Not measuring economic benefit Exclamation circle red Not measuring
Source: Audit Office of NSW analysis.

While it is too early to comment on the overall impact of EAGP, better practice in benefits realisation involves an ongoing effort to monitor benefits to ensure that the reform is on target and determine whether any corrective action is needed.

The Department is measuring the number of finalised matters per annum and while the Department is not measuring the reduction in the backlog as part of this program, this measure is reported as part of the Department's internal reporting framework. The Department is not monitoring the reduction in delay of indictable matters proceeding to trial directly as part of this reform, but this does form part of the monthly Operational Performance Report which the Department sends to the EAGP Steering Committee.

The Department is not monitoring any of the economic benefits stated in the business case. These economic benefits are a mixture of bankable savings and productivity improvements. This amounts to a total of $242.3 million over ten years which was listed in the business case as potential economic benefits from the implementation of this reform against the total cost of $206.9 million over ten years. The Department is collecting proxy indicators which would assist in these calculations for several indicators, but it is not actively monitoring these savings. For example, the Department is monitoring average trial length, but is not using this information to calculate economic benefits derived from changes in trial length.

The Department is also not collecting information related to the average length of custody as part of this program. This means that it is unable to determine if EAGP is putting less pressure on the correctives system and it is not possible for the Department to calculate the savings from this particular benefit.

While stakeholders are optimistic about the impact of EAGP, not measuring the expected benefits stated in the business case means that the Department does not know if the reform is achieving what it was designed to achieve. Further, the Department does not know if it must take corrective action to ensure that the program achieves the stated benefits. These two things put the overall program benefits at risk.

The Department has not assigned responsibility for the realisation of each benefit, potentially risking the success of the program

The Department has not assigned responsibility for the realisation of each benefit stated in the business case. The Department holds the Steering Committee responsible for the realisation of all benefits. Benefits realisation is the process which ensures that the agency reaches benefits as stated in the business case. Assigning responsibility for benefits realisation to the Steering Committee rather than individuals is not in line with good practice.

Good practice benefits realisation involves assigning responsibility for the realisation of each benefit to an individual at the business unit level. This ensures there is a single point of accountability for each part of the program with knowledge of the benefit and the ability to take corrective action if it looks like that benefit will not be realised. This responsibility should sit at the operational level where detailed action can most easily be undertaken. The role of a Steering Committee in benefits realisation is to ensure that responsible parties are monitoring their benefits and taking appropriate corrective action.

The Department advised that it believes the Steering Committee should have responsibility for the realisation of benefits due to the difficulty of attributing the achievement of each benefit to one part of the reform alone. Given the Steering Committee meets only quarterly, it is not well placed to take action in response to variances in performance.

A BOCSAR evaluation is planned, however data errors make some of the information unreliable

BOCSAR are planning to undertake an overall evaluation of EAGP which is planned for release in 2021. Undertaking this evaluation will require high quality data to gain an understanding of the drivers of the reform. However, data captured throughout the first year of EAGP has proven unreliable, which may reduce the usefulness of BOCSAR's evaluation. These data issues were discussed in Exhibit 5 in Chapter 2, above. Access to accurate data is vital for conducting any program evaluation and inaccurate data raises the risk that the BOCSAR evaluation will not be able to provide an accurate evaluation of the impact of EAGP.

In addition to the BOCSAR evaluation, the Department had plans for a series of 'snapshot' evaluations for some of the key elements of the reform to ensure that they were operating effectively. These were initially delayed due to an efficiency dividend which affected EAGP. In August 2019, the Department commissioned a review of the implementation of several key success factors for EAGP.

There was clear governance throughout the implementation of EAGP

The implementation stage of EAGP had clear governance, lines of authority and communication. The Steering Committee, each Working Group and each agency had clear roles and responsibilities, and these were organised through a Project Management Office (PMO) provided by the former Department of Justice. The governance structure throughout the implementation phase can be seen at Exhibit 13.

The Steering Committee was established in December 2016 and met regularly from March 2017. It comprised senior members of key government agencies, as well as the Chief Judge and the Chief Magistrate for most of the duration of the implementation period. The Steering Committee met at least monthly throughout the life of the program. The Steering Committee was responsible for overseeing the delivery of EAGP and making key decisions relating to implementation, including spending decisions. The Chief Judge and the Chief Magistrate abstained from financial decisions. The Steering Committee updated the governance and membership of the Steering Committee as appropriate throughout the life of the reform.

Appendix one – Response from agency
 
Appendix two – About the audit 

Appendix three – Performance auditing 

 

Copyright Notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary Reference: Report number #329 - released 18 December 2019

Published

Actions for Ensuring teaching quality in NSW public schools

Ensuring teaching quality in NSW public schools

Education
Management and administration
Regulation
Service delivery
Workforce and capability

The Auditor-General for New South Wales, Margaret Crawford, has released a report on how the New South Wales Education and Standards Authority (NESA) and the Department of Education (the Department) ensure teaching quality in NSW public schools.

Around 2,200 NSW public school principals are responsible for accrediting their teachers in line with the Australian Professional Standards for Teachers. The report found that NESA does not oversight principals’ decisions to ensure that minimum standards for teaching quality are consistently met.

The Department does not effectively monitor teaching quality across the state. With limited data, it is difficult for the Department to ensure its strategies to improve teaching quality are appropriately targeted to improve teaching quality.

The Department’s Performance and Development Framework does not adequately support principals and supervisors to effectively manage and improve teacher performance or actively improve teaching quality. The Department manages those teachers formally identified as underperforming through teacher improvement programs. Only 53 of over 66,000 teachers employed by the Department were involved in these programs in 2018.

The report makes three recommendations towards NESA to improve accreditation processes, and four recommendations to the Department to improve its systems and processes for ensuring teaching quality across the State.

Australian research has shown that quality teaching is the greatest in-school influence on student engagement and outcomes, accounting for 30 per cent of the variance in student performance. An international comparative study of 15-year-old students showed the performance of New South Wales students in reading, mathematics and science has declined between 2006 and 2015.

The Australian Professional Standards for Teachers (the Standards) describe the knowledge, skills and understanding expected of effective teachers at different career stages. Teachers must be accredited against the Standards to be employed in NSW schools. The NSW Education Standards Authority (NESA) is responsible for ensuring all teachers in NSW schools are accredited. As part of the accreditation process the NSW Department of Education (The Department) assesses whether public school teachers meet proficient accreditation standards and advises NESA of its decisions.

The School Excellence Framework provides a method for the Department to monitor teaching quality at a school level across four elements of effective teaching practice. The Performance and Development Framework provides a method for teachers and their supervisors to monitor and improve teaching quality through setting professional goals to guide their performance and development.

The Department has a strategic goal that every student, every teacher, every leader and every school improves every year. In line with this goal, the Department has a range of strategies targeted to improving teaching quality at different career stages. These include additional resources to support new teachers, a program to support teachers to gain higher-level accreditation, support for principals to manage underperforming teachers, and a professional learning program where teachers observe and discuss each other's practice.

The objective of this audit was to assess the effectiveness of the NSW Department of Education's and the NSW Education Standards Authority's arrangements to ensure teaching quality in NSW public schools. To address this objective, the audit examined whether:

  • agencies effectively monitor the quality of teaching in NSW public schools
  • strategies to improve the quality of teaching are planned, communicated, implemented and monitored well.
The NSW Education Standards Authority does not oversight principals’ decisions to accredit teachers as proficient. This means it is not ensuring minimum standards for teaching quality are consistently met.
NESA does not have a process to ensure principals’ decisions to accredit teachers are in line with the Standards. The decision to accredit teachers is one of the main ways to ensure teaching quality. In New South Wales public schools, around 2,200 principals are tasked with making decisions to accredit their teachers as proficient. NESA provides training and guidelines for principals to encourage consistent accreditation decisions but regular turnover of principals makes it difficult to ensure that all principals are adequately supported. NESA has more oversight of provisional and conditional accreditation for beginning teachers, as well as higher-level accreditation for highly effective teachers. That said, there are only limited numbers of teachers with higher-level accreditation across the state.
The Department of Education does not effectively monitor teaching quality at a system level. This makes it difficult to ensure strategies to improve teaching quality are appropriately targeted.
The Department is not collecting sufficient information to monitor teaching quality across the state. No information on teacher assessment against the Performance and Development Framework is collected centrally. Schools self-assess their performance against the School Excellence Framework but this does not assess teaching quality for all teachers. The Department also surveys students about their experiences of teaching quality but schools opt-in to this survey, with 65 per cent of public schools participating in 2018. These factors limit the ability of the Department to target efforts to areas of concern.
We examined five key strategies that support the critical parts of a teacher’s career. Most strategies were based on research and consultation, planned, trialled, reviewed and adjusted before wider rollout. Guidance and training is provided to communicate requirements and help schools implement strategies at a local level. Monitoring of strategies implemented at a local level is variable. We identified several instances where Quality Teaching, Successful Students funding was used outside guidelines. Two strategies have not yet been evaluated, which prevents the Department from determining whether they are having the desired impact.
The Performance and Development Framework is not structured in a way that supports principals and supervisors to actively improve teacher performance and teaching quality.
There is limited opportunity for supervisors to set goals, conduct observations of teaching practice, or provide constructive written feedback on a teacher’s progress towards achieving their goals under this framework. Guidance on how to use the Standards to construct quality goals, observe teaching practice and provide valuable feedback is also insufficient. The framework focuses on teachers’ self-identified development goals but there is no requirement to align these with the Standards. These limitations reduce the ability of supervisors to use this framework to effectively manage teacher performance and improve teaching quality.
The Department manages those teachers formally identified as underperforming through teacher improvement programs. Only 53 of over 66,000 teachers employed by the Department were involved in these programs in 2018. By comparison, a report on inspections conducted in the United Kingdom assessed the quality of teaching as ‘inadequate’ in three per cent of schools.

Appendix one – Response from agencies

Appendix two – About the audit

Appendix three – Performance auditing

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary Reference: Report number #327 - released 26 September 2019

36

Published

Actions for Ensuring contract management capability in government - Department of Education

Ensuring contract management capability in government - Department of Education

Education
Compliance
Internal controls and governance
Management and administration
Procurement
Workforce and capability

This report examines whether the Department of Education has the required contract management capability to effectively manage high-value goods and services contracts (over $250,000). In 2017–18, the department managed high-value goods and services contracts worth $3.08 billion, with most of the contracts running over multiple years.

NSW government agencies are increasingly delivering services and projects through contracts with third parties. These contracts can be complex and governments face challenges in negotiating and implementing them effectively.

Contract management capability is a broad term, which can include aspects of individual staff capability as well as organisational capability (such as policies, frameworks and processes).

In 2017–18, the Department of Education (the Department) managed high-value (over $250,000) goods and services contracts worth $3.08 billion, with most of the contracts running over multiple years. The Department delivers, funds and regulates education services for NSW students from early childhood to secondary school.

This audit examined whether the Department has the required capability to effectively manage high-value goods and services contracts.

We did not examine infrastructure, construction or information communication and technology contracts. We assessed the Department against the following criteria:

  1. The Department’s policies and procedures support effective contract management and are consistent with relevant frameworks, policies and guidelines.
  2. The Department has capable personnel to effectively conduct the monitoring activities throughout the life of the contract.

The NSW Public Service Commission and the Department of Finance, Services and Innovation are included as auditees as they administer policies which directly affect contract management capability, including:

  • NSW Procurement Board Directions and policies
  • NSW Procurement Agency Accreditation Scheme
  • NSW Public Sector Capability Framework.

The Department of Finance, Services and Innovation's responsibility for NSW Procurement will transfer to NSW Treasury on 1 July 2019 as part of changes to government administrative arrangements announced on 2 April 2019 and amended on 1 May 2019.

Conclusion

The Department of Education's procedures and policies for goods and services contract management are consistent with relevant guidance. It also has a systemic approach to defining the capability required for contract management roles. That said, there are gaps in how well the Department uses this capability to ensure its contracts are performing. We also found one program (comprising 645 contracts) that was not compliant with the Department's policies.

The Department has up-to-date policies and procedures that are consistent with relevant guidance. The Department also communicates changes to procurement related policies, monitors compliance with policies and conducts regular reviews aiming to identify non-compliance.

The Department uses the NSW Public Service Commission's capability framework to support its workforce management and development. The capability framework includes general contract management capability for all staff and occupation specific capabilities for contract managers. The Department also provides learning and development for staff who manage contracts to improve their capability.

The Department provides some guidance on different ways that contract managers can validate performance information provided by suppliers. However, the Department does not provide guidance to assist contract managers to choose the best validation strategy according to contract risk. This could lead to inconsistent practice and contracts not delivering what they are supposed to.

We found that none of the 645 contracts associated with the Assisted Schools Travel Program (estimated value of $182 million in 2018–19) have contract management plans. This is contrary to the Department's policies and increases the risk that contract managers are not effectively reviewing performance and resolving disputes.

Appendix one - Response from agencies

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary Reference: Report number #325 - released 28 June 2019

Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Managing native vegetation

Managing native vegetation

Environment
Management and administration
Project management
Regulation
Service delivery

The report found the clearing of native vegetation on rural land is not effectively regulated and managed. The processes supporting the regulatory framework are weak and there is no evidence-based assurance that clearing of native vegetation is carried out in accordance with approvals. 

In 2014 an expert panel completed a review of biodiversity legislation in NSW. The panel’s recommendations included repealing the Native Vegetation Act 2003, proposing a new Act with the goal of maintaining a healthy, productive and resilient environment for the greatest wellbeing of the community, and recommending that management of native vegetation in the context of existing agricultural management would be assisted and supervised by Local Land Services (LLS).

Following the panel report, the NSW Government undertook major biodiversity conservation and land management reforms which saw the introduction of the Biodiversity Conservation Act 2016 (NSW) and the Local Land Services Amendment Act 2016 (NSW). The reforms commenced in August 2017. The Native Vegetation Act 2003, the Threatened Species Conservation Act 1995, the Nature Conservation Trust Act 2001, and parts of the National Parks and Wildlife Act 1974 were repealed.

Under the legislative reforms, the Biodiversity Conservation Act 2016 and Local Land Services Amendment Act 2016, which amended the Local Land Services Act 2013, aim to ensure a balanced approach to land management and biodiversity conservation in NSW.

A core objective of the Biodiversity Conservation Act 2016 is to conserve biodiversity at bioregional and state scales. A core objective of the Local Land Service Act 2013 is to ensure the proper management of natural resources in the social, economic and environmental interests of the state, consistently with the principles of ecologically sustainable development.

The integrated package of reforms included:

  • new arrangements that allow land owners to improve productivity while responding to environmental risks
  • new ways to assess and manage the biodiversity impacts of development
  • a new state Environmental Planning Policy for managing impacts on native vegetation in urban areas
  • significant investment in conservation of private land
  • a risk-based system for regulating human and business interactions with native plants and animals
  • streamlined approvals and dedicated resources to help reduce the regulatory burden.

Transition to this land management framework began on 25 August 2017 with the commencement of the Land Management (Native Vegetation) Code.

The overall objectives of the reforms are:

  • to arrest and ultimately reverse the current decline in the state’s biodiversity while facilitating ecologically sustainable development, in particular efficient and sustainable agricultural development
  • enable landholders to improve the efficiency of their agricultural systems and take a more active role in providing incentive and supporting landholders to improve the condition and function of their ecological systems. 

The objective of this audit is to assess whether the clearing of native vegetation in rural areas is effectively regulated and managed by the Office of Environment and Heritage (OEH) and LLS under these legislative frameworks. The audit also examined the progress of the Biodiversity Conservation Trust in implementing the Biodiversity Conservation Investment Strategy as a counterbalance to rural land clearing. 

At the time of this audit OEH was responsible for preparing the Native Vegetation Regulatory map and for compliance enforcement in relation to unlawful land clearing. Post 1 July 2019, under machinery of government changes, OEH will be abolished and its activities relevant to this audit will be moved to the new Department of Planning, Industry and Environment. For the purposes of this audit we will continue to refer to it as OEH. 

Conclusion
The clearing of native vegetation on rural land is not effectively regulated and managed because the processes in place to support the regulatory framework are weak. There is no evidence-based assurance that clearing of native vegetation is being carried out in accordance with approvals. Responses to incidents of unlawful clearing are slow, with few tangible outcomes. Enforcement action is rarely taken against landholders who unlawfully clear native vegetation. 

There are processes in place for approving land clearing but there is limited follow-up to ensure approvals are complied with.
Procedures and systems are in place for assessing applications and issuing approvals for land clearing. Approvals contain conditions for managing clearing and setting aside land for conservation as a counterbalance to permitted clearing. 
There is limited follow-up or capacity to gauge whether landholders are complying with the conditions of approvals and effectively managing areas of their land that have been set aside for conservation (i.e. 'set asides'). 
Certificate assessments are used to grant landholders permission to clear. All assessments we reviewed generally complied with the Land Management (Native Vegetation) Code 2018 (the Code). 
The rules around land clearing may not be responding adequately to environmental risks.
The Code, which contains conditions under which the thinning or clearing of native vegetation can be approved on regulated land, is intended to allow landholders to improve productivity while responding to environmental risks. That said, it may not be achieving this balance. For example, the Code allows some native species to be treated as ‘invasive’ when they may not be invading an area, provides little protection for groundcover and limited management requirements for set asides. There is also limited ability under the Code to reject applications for higher risk clearing proposals.
The release of the Native Vegetation Regulatory (NVR) map has been delayed, limiting landholders' ability to determine if their plans for clearing are lawful.
OEH has applied significant effort in developing a native vegetation regulatory map to guide landholders on which land they can and can’t clear without approval. However, in November 2016 the then Minister for Primary Industries advised Parliament that the two largest land categories of the NVR map will not come into effect until the relevant Ministers are satisfied stakeholders have sufficient confidence in the maps’ accuracy. Not releasing the map has made it harder for landholders to identify the portions of their land that are regulated and ensure they comply with land clearing rules. It has also limited OEH’s ability to consult on and improve the accuracy of the map.
There are significant delays in identifying unlawful clearing and few penalties imposed.
Unexplained land clearing can take over two years to identify and analyse, making it difficult to minimise environmental harm or gather evidence to prosecute unlawful clearing. Despite around 1,000 instances of unexplained clearing identified by OEH and over 500 reports to the environmental hotline each year, with around 300 investigations in progress at any one time, there are only two to three prosecutions, three to five remediation orders and around ten penalty notices issued each year for unlawful clearing. Further, OEH is yet to commence any prosecutions under the current legislation which commenced in August 2017.
Land clearing and private land conservation investment have both increased.
Clearing of native vegetation has increased in recent years. At the same time, the government is also investing in properties with high environmental value with a focus on improving the mix of endangered ecological communities conserved in perpetuity. Processes are in place for identifying and prioritising areas of land for investment but the funding provided to each region is not always consistent with these priorities. 

Local Land Services (LLS) is responsible for processing notifications and issuing certificates to landholders for managing the thinning or clearing of native vegetation on rural land through the ‘Land Management (Native Vegetation) Code 2018’ (the Code). This work includes monitoring and reporting on the implementation of the Code, including the establishment and management of set asides.

OEH is responsible for compliance and enforcement in relation to unlawful land clearing. It is also responsible for producing the NVR map, designed to show landholders where land clearing can occur without approval, where approval is required, and where land clearing is not permitted. Post 1 July 2019, under machinery of government changes, OEH will be abolished and its activities relevant to this audit will be moved to the new Department of Planning, Industry and Environment.

Appendix one - Response from agencies

Appendix two - Authorisations for thinning and clearing, and restoration initiatives under the Native Vegetation Act 2003

Appendix three - About the audit

Appendix four - Performance auditing

 

Parliamentary Reference: Report number #324 - released 27 June 2019

Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Contracting non-government organisations

Contracting non-government organisations

Community Services
Compliance
Fraud
Management and administration
Procurement
Regulation
Service delivery

This report found the Department of Family and Community Services (FACS) needs to do more to demonstrate it is effectively and efficiently contracting NGOs to deliver community services in the Permanency Support Program (a component of out-of-home-care services) and Specialist Homelessness Services. It notes that FACS is moving to an outcomes-based commissioning model and recommends this be escalated consistent with government policy.

Government agencies, such as the Department of Family and Community Services (FACS), are increasingly contracting non-government organisations (NGOs) to deliver human services in New South Wales. In doing so, agencies are responsible for ensuring these services are achieving expected outcomes. Since the introduction of the Commissioning and Contestability Policy in 2016, all NSW Government agencies are expected to include plans for customer and community outcomes and look for ways to use contestability to raise standards.

Two of the areas receiving the greatest funding from FACS are the Permanency Support Program and Specialist Homelessness Services. In the financial year 2017–18, nearly 500 organisations received $784 million for out-of-home care programs, including the Permanency Support Program. Across New South Wales, specialist homelessness providers assist more than 54,000 people each year and in the financial year 2017–18, 145 organisations received $243 million for providing short term accommodation and homelessness support, including Specialist Homelessness Services.

In the financial year 2017–18, FACS entered into 230 contracts for out-of-home care, of which 49 were for the Permanency Support Program, representing $322 million. FACS also entered into 157 contracts for the provision of Specialist Homelessness Services which totalled $170 million. We reviewed the Permanency Support Program and Specialist Homelessness Services for this audit.

This audit assessed how effectively and efficiently FACS contracts NGOs to deliver community services. The audit could not assess how NGOs used the funds they received from FACS as the Audit Office does not have a mandate that could provide direct assurance that NGOs are using government funds effectively.

Conclusion
FACS cannot demonstrate it is effectively and efficiently contracting NGOs to deliver community services because it does not always use open tenders to test the market when contracting NGOs, and does not collect adequate performance data to ensure safe and quality services are being provided. While there are some valid reasons for using restricted tenders, it means that new service providers are excluded from consideration - limiting contestability. In the service delivery areas we assessed, FACS does not measure client outcomes as it has not yet moved to outcomes-based contracts. 
FACS' procurement approach sometimes restricts the selection of NGOs for the Permanency Support Program and Specialist Homelessness Services
FACS has a procurement policy and plan which it follows when contracting NGOs for the provision of human services. This includes the option to use restricted tenders, which FACS sometimes uses rather than opening the process to the market. The use of restricted tenders is consistent with its procurement plan where there is a limited number of possible providers and the services are highly specialised. However, this approach perpetuates existing arrangements and makes it very difficult for new service providers to enter the market. The recontracting of existing providers means FACS may miss the opportunity to benchmark existing providers against the whole market. 
FACS does not effectively use client data to monitor the performance of NGOs funded under the Permanency Support Program and Specialist Homelessness Services
FACS' contract management staff monitor individual NGO performance including safety, quality of services and compliance with contract requirements. Although FACS does provide training materials on its intranet, FACS does not provide these staff with sufficient training, support or guidance to monitor NGO performance efficiently or effectively. FACS also requires NGOs to self-report their financial performance and contract compliance annually. FACS verifies the accuracy of the financial data but conducts limited validation of client data reported by NGOs to verify its accuracy. Instead, FACS relies on contract management staff to identify errors or inaccurate reporting by NGOs.
FACS' ongoing monitoring of the performance of providers under the Permanency Support Program is particularly limited due to problems with timely data collection at the program level. This reduces FACS' ability to monitor and analyse NGO performance at the program level as it does not have access to ongoing performance data for monitoring service quality.
In the Specialist Homelessness Services program, FACS and NGOs both provide the data required for the National Minimum Data Set on homelessness and provide it to the Australian Institute of Health and Welfare, as they are required to do. However, this data is not used for NGO performance monitoring or management.
FACS does not yet track outcomes for clients of NGOs
FACS began to develop an approach to outcomes-based contracting in 2015. Despite this, none of the contracts we reviewed are using outcomes as a measure of success. Currently, NGOs are required to demonstrate their performance is consistent with the measures stipulated in their contracts as part of an annual check of their contract compliance and financial accounts. NGOs report against activity-based measures (Key Performance Indicators) and not outcomes.
FACS advises that the transition to outcomes-based contracting will be made with the new rounds of funding which will take place in 2020–2021 for Specialist Homelessness Services and 2023 for the Permanency Support Program. Once these contracts are in place, FACS can transition NGOs to outcomes based reporting.
Incomplete data limits FACS' effectiveness in continuous improvement for the Permanency Support Program and Specialist Homelessness Services
FACS has policies and procedures in place to learn from past experiences and use this to inform future contracting decisions. However, FACS has limited client data related to the Permanency Support Program which restricts the amount of continuous improvement it can undertake. In the Specialist Homelessness Support Program data is collected to inform routine contract management discussions with service providers but FACS is not using this data for continuous improvement. 

Appendix one – Response from agency

Appendix two – About the audit

Appendix three – Performance auditing

 

Parliamentary Reference: Report number #323 - released 26 June 2019

Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Biosecurity risk management

Biosecurity risk management

Industry
Risk

The report focuses on the Department of Primary Industries’ (DPI) as the lead agency for biosecurity in New South Wales. It examines how well the department responds to biosecurity emergencies and manages compliance activities. DPI’s state partners include NSW Health, the NSW Environment Protection Authority, Local Land Services, and Local Control Authorities to manage biosecurity risks in New South Wales.

Biosecurity is the protection of the economy, environment, and community from the negative impacts of pests, diseases, weeds, and contaminants.

National and State governments have defined roles and responsibilities for biosecurity in Australia, reflecting the allocation of powers in the Australian Constitution. The Australian Government has direct responsibility for biosecurity (quarantine) at the international border, and works jointly with the states and territories to set the legislative framework and policy direction for managing biosecurity nationally. It also works with state and territory governments to ensure there is a national approach to biosecurity. State governments manage their biosecurity activities within the national framework.

The Department of Primary Industries (DPI), within the Department of Industry, is the lead agency for biosecurity in NSW. This audit was conducted with the Department of Industry as the auditee. On 2 April 2019 the NSW Government announced it will abolish the Department of Industry. From 1 July 2019 the Department of Planning, Industry and Environment, will have responsibility for biosecurity activities described in this report.

The NSW Biosecurity Strategy 2013–2021 (the Strategy) articulates the NSW Government’s responsibilities for biosecurity within the national legislative framework. Achieving the outcomes of the strategy relies on DPI fulfilling two key responsibilities. Firstly, undertaking direct actions, such as implementing strong regulatory compliance and licensing activities, and managing biosecurity emergency responses. Secondly, leading the response to biosecurity risks by fostering effective collaboration with stakeholders across government, industry, and the wider community.

In NSW, 11 regional Local Land Services (LLS) are the key partners for DPI in meeting its biosecurity responsibilities. Each LLS develops and implements strategies to manage invasive pests and diseases within their regions. They also investigate new reports of pests or diseases in their regions and staff local emergency control centres when an emergency response is triggered.

Local Control Authorities (LCAs) also have a role in biosecurity management. LCAs include local councils and a small number of specialist regional agencies. Their role focuses on strategies to manage weeds within their local areas.

This audit assessed the effectiveness and economy of DPI’s biosecurity emergency response and prevention activities. It looks at DPI’s emergency response practice and its compliance program as a key prevention activity for which DPI has primary responsibility. DPI sets policy and procedural compliance standards for management of biosecurity risks in NSW and also conducts an annual program of property inspections and investigations that ensure that its compliance policies and procedures are being applied effectively.

Appendix one - Response from agency

Appendix two - Location of selected biosecurity emergency responses

Appendix three - About the audit

Appendix four - Performance auditing

 

Parliamentary Reference: Report number #321 - released 18 June 2019

Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Banner image: ‘Yellow crazy ant’, supplied and permitted for use by NSW Department of Primary Industries under Creative Commons Attribution-ShareAlike 3.0 Unported Licence. Full terms.

Published

Actions for Wellbeing of secondary school students

Wellbeing of secondary school students

Education
Management and administration
Service delivery
Shared services and collaboration
Workforce and capability

The Department of Education has a strong focus on supporting secondary school students’ wellbeing. However, it is difficult to assess how well the Department is progressing as it is yet to measure or report on the outcomes of this work at a whole-of-state level.

The Department of Education’s (the Department) purpose is to prepare young people for rewarding lives as engaged citizens in a complex and dynamic society. The Department commits to creating quality learning opportunities for children and young people, including a commitment to student wellbeing, which is seen as directly linked to positive learning outcomes. Wellbeing is defined broadly by the Department as “the quality of a person’s life…It is more than the absence of physical or psychological illness”. Student wellbeing can be supported by everything a school does to enhance a student's learning—from curriculum to teacher quality to targeted policies and programs to whole-school approaches to wellbeing.

Several reforms have aimed to support student wellbeing in recent years. 'Local Schools, Local Decisions' gave NSW schools more local authority to make decisions, including schools' approaches to support student wellbeing. In 2016, the 'Supported Students, Successful Students' initiative provided $167 million over four years to support the wellbeing of students. From 2018, the 'Every Student is Known, Valued and Cared For' initiative provides a principal led mentoring program, and a website with policies, procedures and resources to support student wellbeing.

This audit assessed how well the Department of Education supports secondary schools to promote and support the wellbeing of their students and how well secondary schools are promoting and supporting the wellbeing of their students.

Conclusion

The Department has implemented a range of programs and reforms aimed at supporting student wellbeing. However, the outcomes of this work have yet to be measured or reported on at a system level, making it difficult to assess the Department's progress in improving student wellbeing.

Secondary schools have generally adopted a structured approach to deliver wellbeing support and programs, using both Department and localised resources. The approaches have been tailored to meet the needs of their school community. That said, public reporting on wellbeing improvement measures via annual school reports is of variable quality and needs to improve.

The Department’s wellbeing initiatives are supported by research and consultation, but outcomes have not been reported on

The Department’s development of wellbeing policy, guidance, tools and resources has been transparent, consultative and well researched. It has drawn on international and domestic evidence to support its aim to deliver a fundamental shift from welfare to wellbeing at the school and system level.

However, the key performance indicator to monitor and track progress in wellbeing has yet to be reported on despite the strategic plan including this as a priority for the period 2018 to 2022. This includes not yet reporting a baseline for the target, nor how it will be measured.

The Department’s wellbeing resources are mostly well targeted but there is room for improvement

The Department’s allocation of resources to deliver wellbeing initiatives in schools is mostly well targeted, reflects a needs basis and supports current strategic directions. This could be improved with some changes to formula allocations and clearer definitions of the resourcing required for identified wellbeing positions in schools. The workforce modelling for forecasting supply and demand, specifically for school counsellors and psychologists, needs to separately identify these positions as they are currently subsumed in general teacher numbers.

Schools' reporting on wellbeing improvement measures is of variable quality and needs to improve

Schools we visited demonstrated a variety of approaches to wellbeing depending on their local circumstances and student populations. They make use of Department policies, guidelines, and resources, particularly mandatory policies and data collections, which have good compliance and take-up at school level. Professional learning supports specific wellbeing initiatives and online systems for monitoring and reporting have contributed to schools’ capacity and capabilities.

Schools report publicly on wellbeing improvement measures through annual school reports but this reporting is of variable quality. The Department plans to improve the capability of schools in data analysis and we recommend that this include the setting and evaluation of improvement targets for wellbeing.

The implementation of the 2015 Wellbeing Framework in schools is incomplete and the Department has not effectively prioritised and consolidated tools, systems and reporting for wellbeing

Schools' take up of the 2015 Wellbeing Framework is hindered by it not being linked to the school planning and reporting policy and tools—the School Excellence Framework. At some schools we visited, this disconnect has led to a lack of knowledge and confidence in using it in schools. The Department has identified the need to improve alignment of policies, frameworks and plans and has commenced work on this.

We found evidence of overburdening in schools for addressing student wellbeing—in the number of tools, online systems for information collection, and duplication in reporting. Following the significant reforms of recent years, the Department should consolidate its efforts by reinforcing existing effective programs and systems and addressing identified gaps and equity issues, rather than introducing further change for schools. In particular, methods and processes for complex case coordination need improvement.

The NSW Department of Education commits to creating quality learning opportunities for students. This includes strengthening students’ physical, social, emotional and spiritual development. The Department sets out to enable students to be healthy, happy, engaged and successful.

Welfare and wellbeing

The Department’s approach has significantly shifted from student welfare to wellbeing of the whole child and young person. Wellbeing is defined in departmental policy and strategy documents broadly, and as directly linked to learning and positive learning outcomes. “Wellbeing can be described as the quality of a person’s life…It is more than the absence of physical or psychological illness…Wellbeing, or the lack of it, can affect a student’s engagement and success in learning…”

Student wellbeing can be supported by everything a school does to enhance a student's learning—from curriculum to teacher quality to targeted policies and programs to whole-school approaches to wellbeing. Distinctions between wellbeing and welfare in the school context are outlined below.

Exhibit 1: Welfare and wellbeing
Welfare Wellbeing
Operates from a basis of student need and doesn't always take into account a whole child view. For all students.
Rather than building on the strengths of students, operates from a deficit model of individual student problems or negative behaviours. Goes beyond just welfare needs of a few students and aims for all students to be healthy, happy, successful and productive individuals who are active and positive contributors to the school and society in which they live.

Source: Department of Education 2018 'Wellbeing is here' presentation.

Published

Actions for Transport Access Program

Transport Access Program

Transport
Infrastructure
Project management
Service delivery

The following report is available in an Easy English version that is intended to meet the needs of some people with lower literacy skills, some people with an intellectual disability and some people from different cultural backgrounds.

View the Easy English version of the Transport Access Program report

Transport for NSW’s process for selecting and prioritising projects for the third stage of its Transport Access Program balanced compliance with national disability standards with broader customer outcomes. Demographics, deliverability and value for money were also considered. However, Transport for NSW does not know the complete scope of work required for full compliance, limiting its ability to demonstrate that its approach is effective, according to a report released today by the Auditor-General for New South Wales, Margaret Crawford.

Access to transport is critical to ensuring that people can engage in all aspects of community life, including education, employment and recreation. People with disability can encounter barriers when accessing public transport services. In 2015, there were 1.37 million people living with disability in New South Wales.

Accessible public transport is about more than physical accessibility. It also means barrier-free access for people who have vision, hearing or cognitive impairments. All users, not just people with disability, benefit from improvements to the accessibility and inclusiveness of transport services. 

Transport for NSW has an obligation under Australian Government legislation to provide accessible services to people with disabilities in a manner which is not discriminatory. Under the Disability Standards for Accessible Public Transport 2002 (the DSAPT - an instrument of the Disability Discrimination Act 1992 (the Act) (Commonwealth)), there is a requirement to modify and develop new infrastructure, means of transport and services to provide access for people with disabilities. All public transport operators are required to ensure that at least 90 per cent of their networks met DSAPT by December 2017 and the networks will need to be 100 per cent compliant with all parts of the standards by 31 December 2022. Trains are not required to be fully compliant with DSAPT until December 2032. 

The Transport Access Program (TAP) is Transport for NSW's largest program with a specific focus on improving access to public transport for people with disability. The TAP is a series of projects to upgrade existing public transport infrastructure across four networks: Sydney Trains, Intercity Trains, Regional Trains and Sydney Ferries. Transport for NSW established the TAP as a rolling program and, to date, it has delivered the first tranche of TAP (TAP 1) and is completing the final projects for the second tranche (TAP 2). NSW budget papers estimate that by 30 June 2018, Transport for NSW had spent $1.2 billion in the TAP since its commencement in 2011-12.

After the completion of TAP 1 and TAP 2 (as well as through other transport infrastructure programs), Transport for NSW estimates that 58.5 per cent of the Sydney Trains, Regional Trains and Intercity Trains networks, and 66 per cent of the Sydney Ferries network, will be accessible. To close the significant gap in compliance with the DSAPT target, the objective for TAP 3 is ‘to contribute to Disability Discrimination Act 1992 related targets through DSAPT compliance upgrades’. 

The audit assessed whether Transport for NSW has an effective process to select and prioritise projects as part of the TAP, with a specific focus on the third tranche of TAP funding.

In August 2018, at the commencement of this audit, Transport for NSW intended to complete the selection of projects for the TAP 3 final business case in December 2018. Transport for NSW advise that it now intends to complete the development stage and final business case in the first quarter of 2019, prior to the final investment decision of the TAP program. This report is based on the TAP 3 strategic business case and information provided by Transport for NSW up to December 2018.

Conclusion
Transport for NSW’s process for selecting and prioritising projects for TAP 3 balanced DSAPT compliance goals with broader customer outcomes. It also considered demographics, deliverability and value for money. However, Transport for NSW does not know the complete scope of work required for full DSAPT compliance, and this limits its ability to demonstrate that its approach is effective. 
Transport for NSW has applied most of the external review recommendations from previous funding rounds to the implementation of the third round of TAP funding (TAP3), with positive results. Changes made include a clear objective for TAP 3 to focus on improving compliance, improved governance arrangements, and better consideration of deliverability and design during project planning. 
Through TAP 3, Transport for NSW is also trying to better address disability access in a way that balances DSAPT compliance with other considerations - such as population demographics, access to services and value for money. Transport for NSW developed an objective prioritisation and selection methodology to assess projects for TAP 3 funding. 
Transport for NSW cannot quantify the work needed to meet DSAPT compliance targets across the rail and ferry networks as it has not completed a comprehensive audit of compliance. This information is needed to ensure the effective targeting of funding, and to measure the contribution of TAP 3 work to meeting the DSAPT compliance targets. Instead, Transport for NSW has undertaken a phased approach to completing a comprehensive audit of compliance across the networks, with a focus on first assessing compliance at locations that are not wheelchair accessible. This creates two problems. First, Transport for NSW does not know the complete scope of work required to achieve DSAPT compliance. Second, not all wheelchair accessible locations fully meet DSAPT standards.
Transport for NSW's proposed communication plan for the schedule of TAP 3 funded works does not align with its Disability Inclusion Action Plan 2018-2022. The Disability Inclusion Action Plan commits Transport for NSW to providing a full list of stations and wharves to be upgraded with their estimated time of construction when the next round of funding, TAP 3, is announced. Given the long timeframes associated with improving transport infrastructure, this information is important as it allows people to make informed decisions about where they live, work or study. Instead, Transport for NSW plans to communicate information to customers on a project by project basis.

In 2015, there were 1.37 million people living with disability in New South Wales. Access to transport is critical to ensuring that people can engage in all aspects of community life, including education, employment and recreation. People with disability can encounter barriers when accessing public transport services. 

The social model of disability, outlined in the United Nations Convention on the Rights of Persons with Disabilities, views people with disability as not disabled by their impairment but by the barriers in the community and environment that restrict their full and effective participation in society on an equal basis with others. 

Accessible public transport is more than the provision of physical access to premises and conveyances, it provides barrier-free access for people who have vision, hearing or cognitive impairments. All users, not just people with disability, benefit from improvements to the accessibility and inclusiveness of transport services.

According to the Australian Bureau of Statistics, the main types of difficulties experienced by people with disability when using public transport relate to steps (39.9 per cent), difficulty getting to stops and stations (25 per cent), fear and anxiety (23.3 per cent) and lack of seating or difficulty standing (20.7 per cent).

Transport for NSW has a Disability Inclusion Action Plan (the Action Plan) 2018-2022 that sets an overall framework for planning, delivering and reporting on initiatives to increase accessibility of the transport network. It covers all elements of the journey experienced when using public transport, including journey planning, staff training, customer services and interaction between the physical environment and modes of transport. Appendix five outlines the guiding principles of the Action Plan.

Transport for NSW's Transport Social Policy branch developed the Action Plan in consultation with internal and external stakeholders. The director of the Transport Social Policy branch is a member of the TAP executive steering committee, which supports alignment between the Action Plan and TAP.

Transport for NSW's Disability Inclusion Action Plan describes a customer focussed approach to accessibility

One of the guiding principles of the Action Plan is ‘intelligent compliance’. Transport for NSW describes this as compliance that prioritises customer-focused outcomes over a narrow focus on legal compliance with accessibility standards. As well as being compliant, infrastructure should be practical, usable, fit for purpose and convenient. 

The TAP prioritisation and selection methodology reflects Transport for NSW’s focus on intelligent compliance. We consider this a reasonable approach as had Transport for NSW focussed exclusively on achieving compliance with the DSAPT targets by upgrading the most affordable infrastructure, some locations, that are used by more customers, would remain inaccessible to people with disability. However, this approach should not be seen as an alternative to Transport for NSW meeting its DSAPT compliance obligations.

TAP program staff consult with the Accessible Transport Advisory Committee

The Accessible Transport Advisory Committee (ATAC) has representatives from disability and ageing organisations, who provide expert guidance to Transport for NSW on access and inclusion. The ATAC provide guidance and feedback on projects and project solutions, including user testing where appropriate. TAP program staff provide regular updates at ATAC meetings, which include briefings on progress. The ATAC also provides feedback and suggestions to TAP program staff, which is considered and sometimes included in current and future projects.For example, in March 2017 the TAP program team briefed the ATAC on the challenges with respect to a number of ferry wharves and sought support for DSAPT exemptions proposed in the TAP 3 strategic business case.

Case study: Feedback on Braille lettering for lift buttons
In June 2018, the Program team sought feedback on a variety of lift button options to improve accessibility on future TAP projects. In September 2018, during the ATAC meeting attended by the Audit Office, the program team sought feedback on the standard designs for TAP 3. Some ATAC members noted that the standard design included Braille lettering on the lift buttons, and that this was not good practice because people can accidently press the button while reading it. As a result, Transport for NSW are incorporating this feedback into design requirements for the lifts for TAP 3, which will consider larger buttons, clearer Braille and Braille signage adjacent to the button.

Transport for NSW has not briefed the Advisory Committee on the outcome of the prioritisation and selection process

TAP program staff briefed the Advisory Committee about the prioritisation and selection methodology, after the Minister approved it in 2016. However, Transport for NSW have not briefed or consulted the Advisory Committee on the outcome of the prioritisation process. Infrastructure NSW noted this issue during its review of the strategic business case. 

Transport for NSW advised us that it established the ATAC as an advisory group, and that Transport for NSW does not disclose sensitive information to it. Transport for NSW intends to share the outcome of the prioritisation process following the completion of the TAP 3 development stage and final investment decision.

The TAP communication plan does not fully meet the requirements of the Disability Inclusion Action Plan

The Disability Inclusion Action Plan includes an action item to ‘provide a listing of stations and wharves to be upgraded with estimated time of construction as each new tranche of the Transport Access Program is announced’ The TAP Communication Plan that we reviewed does not include this provision instead focussing on communication on a per project basis. Given the long timeframes associated with improving transport infrastructure, this information is important as it allows people to make informed decisions about where they live, work or study.

Published

Actions for Supply of secondary teachers in STEM-related disciplines

Supply of secondary teachers in STEM-related disciplines

Education
Management and administration
Service delivery
Workforce and capability

The NSW Department of Education’s plans and strategies to respond to the demand for secondary teachers in STEM-related disciplines are limited by incomplete data and underperforming scholarship and sponsorship program. The Department does not collect sufficient information to monitor what disciplines teachers actually teach nor does it predict supply and demand for teachers by discipline and location. This restricts the Department’s ability to track and forecast the supply and demand for secondary teachers in STEM-related disciplines.

In recent years, Australian and international education policy has focused on improving outcomes in Science, Technology, Engineering and Mathematics (STEM) subjects. However, research has identified a shortage of qualified secondary teachers in STEM-related disciplines 1. This is projected to worsen due to a combination of student population increases, an ageing workforce, and fewer people going into teaching. Shortfalls are likely to be more acute in rural and remote areas, and areas of low socio-economic status.

The Department of Education (the Department) has a variety of strategies to encourage teachers to practise in locations or disciplines of need. These include scholarships for tertiary students going into teaching, sponsorships for teachers seeking approval to teach additional disciplines, and incentives to attract teachers to rural and remote locations. 

This audit assessed the effectiveness of the Department's workforce plans and strategies in responding to the demand for secondary teachers in STEM-related disciplines. We assessed:

  • how well the Department tracks the supply and demand for secondary teachers in STEM-related disciplines across NSW
  • whether the Department has effective strategies to attract and retain secondary teachers in STEM-related disciplines.
Conclusion
There are two key shortcomings that fundamentally limit the effectiveness of the Department's plans and strategies to respond to the demand for secondary teachers in STEM-related disciplines. First, the Department is not accurately tracking the supply and demand for secondary teachers by discipline due to incomplete data. Second, not all scholarship and sponsorship places are allocated and many scholars withdraw from the programs before completion. The Department has recognised and started to address these problems with a new workforce model, revised incentives and scholarship programs. 

The Department’s current workforce planning model does not provide the information needed to target workforce plans and strategies to areas of need. This is because it does not predict supply and demand for teachers by discipline and location. An internal review in 2017 acknowledged the limitations of this model. In response the Department developed a new model, which it is currently enhancing, to predict supply and demand for teachers by discipline and location. For this to be successful, the Department needs to monitor the level of out-of-field teaching and improve data on the willingness of teachers to work in particular locations. 

The Department does not allocate all available scholarship and sponsorship places and around 30 per cent of recipients do not complete the term of their agreement. An internal review in 2017 highlighted that some programs were not targeting workforce need and that there were no key performance indicators to determine the overall effectiveness of these programs. However, scholarship programs and incentives are promoted well through social media and face-to-face events at Universities. Further, the Department has used findings from internal reviews of incentives and scholarships in 2016 and 2017 to inform recent changes to programs. 

The Department has little oversight of access to practicum placements for pre-service teachers in areas of need. Professional experience agreements were established with each University in 2015 to improve the placement process for disciplines of need. Initial teacher education students must complete several ‘practicum placements’ before they can be qualified to teach in a school. Several universities we consulted reported difficulties finding practicum placements for pre-service teachers specialising in STEM-related disciplines. The Department is now revising the agreements to improve the quality of data it collects on the number, location and subject area of practicum placements. 

1 Australian Council for Educational Research 2015, The teacher workforce in Australia - supply, demand and data issues.

 

The Department is not accurately tracking the supply and demand for secondary teachers by discipline due to incomplete data. 

The Department’s current workforce planning model does not accurately predict supply and demand for teachers by discipline and location. An internal review in 2017 acknowledged the limitations of this model. In response the Department developed a new model which it is currently enhancing to address the findings of the review. For this model to be successful, the Department needs to monitor the level of out-of-field teaching and improve data on the willingness of teachers to work in particular locations. Further work also needs to be undertaken to refine the assumptions that underpin the Department’s workforce planning models as it starts to predict the need for teachers by discipline.

The Department has not publicly reported on the supply and demand for teachers by discipline since 2015. While it does report annually on its current workforce profile, this information is not detailed enough to inform future strategies or programs. More detailed public reporting may help the Department to influence the future supply of teachers by communicating its projected areas of need. Planned improvements to the Department's workforce planning model, as relayed to us, will add to the data available on areas of need. Once available, this should be reported publicly. 

Recommendations
By December 2019, the Department of Education should:

  1. Improve its workforce planning model to better understand and communicate supply and demand for teachers by: 
    • determining the extent, and analysing the impact, of out-of-field teaching by permanent and temporary teachers in each school
    • sourcing additional data to more accurately reflect teacher location preferences
    • projecting supply and demand by subject level and geographic area
    • regularly reporting on the supply and demand for secondary teachers in each discipline to communicate future areas of need to future teacher education students.

The Department's current scholarship and sponsorship programs are not allocating all available places and many scholars withdraw from the programs before completion. An internal review in 2017 raised several issues with the effectiveness of programs and the Department has started to revise its scholarship, sponsorship and incentive programs. 

An internal review in 2017 highlighted that scholarship and sponsorship programs were not targeting workforce need, and that there were no key performance indicators to determine the overall effectiveness of these strategies. In addition, the review found that only 79 per cent of available scholarship placements are allocated each year, and 31 per cent of scholarship recipients withdraw prior to completing their required service period. The Department recently announced changes to its scholarship programs from 2019 onwards.

The Department has incentives to encourage teachers to work in rural and remote areas, including teachers in STEM-related disciplines. Incentives include access to priority transfers, rental subsidies and other allowances. Research conducted in 2016 examined the influence of incentives in encouraging teachers to work in rural and remote areas. The Department used findings of this research when updating its set of rural and remote incentives in 2017.

The Department promotes its scholarship and sponsorship programs through the teach.NSW website. It uses social media to direct applicants to this website. It also promotes its programs through careers fairs, University open days, and professional events. Past applicants have reported that the website clearly communicates eligibility criteria and the terms of agreement for all scholarship programs. 

The Department could strengthen its relationship with universities to attract teachers to areas of need by collecting and analysing data on practicum placements, facilitating placements for scholarship recipients, and communicating predicted teacher needs by discipline. 

Recommendations
By December 2019, the Department of Education should:

2. Implement changes to address the findings of the 'Teacher Scholarship Realignment' report, including by:

  • testing a range of program designs with target candidates to determine the best options to attract more suitable applicants
  • establishing key performance indicators, and setting targets, to better monitor the effectiveness of the programs
  • reducing the number of scholars appointed to over-establishment positions
  • increasing the proportion of scholars appointed to priority locations 
  • further analysing scholarship recipients career paths to inform future improvements to the scholarship programs.

3. Review its role in the practicum placement process of pre-service teachers by:

  • analysing how many students each school accommodates per year, to ensure there are appropriate placements available for students in high needs disciplines
  • working with universities to facilitate practicum placements for scholarship recipients
  • establishing mechanisms for ongoing monitoring of its partnerships with universities to ensure they are meeting their aims.

Appendix one - Response from agency

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary Reference - Report number #313 - released 29 January 2019.

Published

Actions for CBD and South East Light Rail Project

CBD and South East Light Rail Project

Transport
Compliance
Financial reporting
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management
Risk

Transport for NSW did not effectively plan and procure the CBD and South East Light Rail (CSELR) project to achieve best value for money according to a report released today by NSW Auditor-General, Margaret Crawford.

Transport for NSW is on track to deliver the project, but it will come at a higher cost with lower benefits than in the approved business case.

 

Parliamentary reference - Report number #278 - released 30 November 2016