Reports
Actions for Improving Literacy and Numeracy in Public Schools
Improving Literacy and Numeracy in Public Schools
During the course of the audit we were impressed by the dedication and efforts of teachers in NSW public schools, particularly when dealing with the needs of students with learning difficulties. Although NSW schools perform well nationally and internationally, NSW has a high concentration of poor outcomes in some schools and some regions. Each year a group of between 5 and 15 per cent of children are at risk of not reaching the minimum level of achievement needed to progress at school. In this group, indigenous students are over represented.
Parliamentary reference - Report number #183 - released 22 October 2008
Actions for Signal failures on the metropolitan rail network
Signal failures on the metropolitan rail network
Between 2004 and 2006, the number of signalling failures, signalling downtime and the number of trains delayed as a result of signal failures all fell. RailCorp’s on-time running performance improved over the same period. The fall in failures is a clear indication of improved performance. Changes in the definition of on-time and to the timetable during 2005 and 2006 however make it difficult to determine whether improvements in response downtime and signalling delays are due to a true performance improvement. To build upon this strong base, RailCorp needs to determine with more confidence the number and duration of signalling failures the network can tolerate without impacting on service levels.
Parliamentary reference - Report number #170 - released 15 August 2007
Actions for Connecting with public transport
Connecting with public transport
We see considerable potential for the Ministry of Transport to plan and manage interchanges more effectively, so as to make better use of our public transport network. We believe that the Ministry now needs to focus more on multi-modal transport planning and interchange performance. It needs to assign responsibility for the coordination and oversight of inter-modal operations to an entity resourced for the purpose. Without this it will continue to be very difficult to identify and address unmet needs, seek and secure stakeholder funding, and monitor and evaluate system performance.
Parliamentary reference - Report number #168 - released 6 June 2007