Actions for NorthConnex

NorthConnex

Premier and Cabinet
Treasury
Transport
Compliance
Infrastructure
Internal controls and governance
Management and administration
Procurement

The processes used to assess NorthConnex adequately considered value for money for taxpayers.This report also found that the impact of tolling concessions on road users and the motorway network was consistent with policy objectives described in the 2012 NSW Long Term Transport Master Plan.

NorthConnex is a nine-kilometre tolled motorway tunnel between the M1 Pacific motorway at Wahroonga and the M2 Hills motorway at West Pennant Hills. The total cost for the project is $3.1 billion. NorthConnex will be funded through toll charges, and contributions from the NSW and Australian Governments of up to $405 million each. In January 2015, the NSW Roads Minister signed the final contracts for NorthConnex.

By December 2017, the Department of Premier and Cabinet should:

1. publish an updated ‘Unsolicited Proposals – Guide for Submission and Assessment’ which clarifies obligations with requirements in other NSW Government policies such as the NSW PPP guideline and Infrastructure Investor Assurance Framework. The update should require:

a) a business case to be prepared, and a business case gateway review completed, as part of the assessment of the detailed proposal (currently stage 2)

b) probity reports must be completed and considered before the decision to proceed to the next stage.
 

The Department of Premier and Cabinet and NSW Treasury should immediately:

2. improve record keeping to ensure compliance with the State Records Act 1998 and the NSW Government Standard on Records Management.

 

Published

Actions for Government Advertising 2007

Government Advertising 2007

Premier and Cabinet
Finance
Compliance
Internal controls and governance
Management and administration
Regulation

Since our performance audit in 1995 the government has improved guidance for agencies and introduced a more robust framework for approving advertising campaigns. Greater rigour has been introduced into the process by requiring campaigns to be peer reviewed and approved by Cabinet. This new approach aims to improve the effectiveness and value for money of government advertising. We found however that the current guidelines are not adequate to prevent the use of public funds for party political purposes. We also found it difficult to obtain information on the total amount spent on advertising campaigns. This is because there is no central record of the total expenditure, only the cost of placing advertisements in the media. Greater transparency around what is spent would support more accurate and informed debate.

 

Parliamentary reference - Report number #171 - released 29 August 2007

Published

Actions for NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 1 Summary and Research Report

NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 1 Summary and Research Report

Premier and Cabinet
Internal controls and governance
Workforce and capability

The Audit Office is of the opinion that there are several features of the current Senior Executive Service (SES) model, or its application, which hinder the capacity of the SES to operate effectively in line with the Government’s stated objectives. The ultimate effect of these features is to reduce the capacity or perceived capacity of the SES to meet the Government’s objectives for the operation of the SES.

Taken overall, difficulties in the SES identified by the audit included: uncertainty caused by the way some contracts have been applied in practice, removal for reasons other than poor performance, informal strategies such as using restructuring to “terminate contracts and to move people in and out of positions regardless of their formal reported performance” (Section 5.4), inconsistently applied rules about selection/recruitment, appointment and removal of the SES, an imbalance between CES responsibility to the Minister as the employer/reviewer with their responsibility not to act in a political or partial manner, apparent lack of rigour in, value of and Ministerial accountability for CES performance review processes and failure to implement an adequate system of rewards and sanctions related to performance.

 

Parliamentary reference - Report number #59.1 - released 17 December 1998

Published

Actions for NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 2 SES Research

NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 2 SES Research

Premier and Cabinet
Internal controls and governance
Workforce and capability

This Performance Audit Report, prepared by the University of Technology, Sydney (UTS) on behalf of The Audit Office of New South Wales (NSW), is a study of the NSW Senior Executive Service (SES).

It found the dissonance between where optimal executive performance might take place on a performance spectrum, encompassing the formal SES and less formal political arenas, is canvassed. The critical point here is that this arena, between the informal political actions and the application of formal SES structures, where much of the important decision making takes place, will always be difficult to manage. Transparency in decision making processes where non partisan and partisan actions are clearly defined seems a primary essential element of performance if the integrity of the NSW SES is to be maintained.

 

Parliamentary reference - Report number #59.2 - released 17 December 1998