Actions for Government Advertising 2007
Government Advertising 2007
Since our performance audit in 1995 the government has improved guidance for agencies and introduced a more robust framework for approving advertising campaigns. Greater rigour has been introduced into the process by requiring campaigns to be peer reviewed and approved by Cabinet. This new approach aims to improve the effectiveness and value for money of government advertising. We found however that the current guidelines are not adequate to prevent
Actions for Signal failures on the metropolitan rail network
Signal failures on the metropolitan rail network
Between 2004 and 2006, the number of signalling failures, signalling downtime and the number of trains delayed as a result of signal failures all fell. RailCorp’s on-time running performance improved over the same period. The fall in failures is a clear indication of improved performance. Changes in the definition of on-time and to the timetable during 2005 and 2006 however make it difficult to determine whether improvements in response downtime and sign
Actions for Connecting with public transport
Connecting with public transport
We see considerable potential for the Ministry of Transport to plan and manage interchanges more effectively, so as to make better use of our public transport network. We believe that the Ministry now needs to focus more on multi-modal transport planning and interchange performance. It needs to assign responsibility for the coordination and oversight of inter-modal operations to an entity resourced for the purpose. Without this it will continue to b
Actions for Sale of the TAB
Sale of the TAB
The Audit Office is of the opinion that: the sale was delivered with reasonable efficiency and effectiveness the sale yielded a satisfactory return to the NSW Government. The possibility for a higher return was limited to about 2% to 4% on gross proceeds of $936m. It would have required setting a higher share price for all investors and adopting a more flexible approach to share allocation the Government’s objective to promote community an
Actions for NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 1 Summary and Research Report
NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 1 Summary and Research Report
The Audit Office is of the opinion that there are several features of the current Senior Executive Service (SES) model, or its application, which hinder the capacity of the SES to operate effectively in line with the Government’s stated objectives. The ultimate effect of these features is to reduce the capacity or perceived capacity of the SES to meet the Government’s objectives for the operation of the SES. Taken overall, difficulties in the SES i
Actions for NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 2 SES Research
NSW Senior Executive Service: Professionalism and Integrity Volume 1 Part 2 SES Research
This Performance Audit Report, prepared by the University of Technology, Sydney (UTS) on behalf of The Audit Office of New South Wales (NSW), is a study of the NSW Senior Executive Service (SES). It found the dissonance between where optimal executive performance might take place on a performance spectrum, encompassing the formal SES and less formal political arenas, is canvassed. The critical point here is that this arena, between the informal politica
Actions for Government office accommodation
Government office accommodation
The Audit Office has undertaken an audit on Government Office Accommodation. The audit examined the cost effectiveness of long-term leasing versus ownership and the housing of agencies involved with the delivery of core government activities. Core activities are those intrinsically linked to basic and ongoing functions of Government and Parliament. It recommends that: the Government consider owning office accommodation, as opposed to leasing,
Actions for Lease to Fox Studios Australia
Lease to Fox Studios Australia
The audit found that the process for the lease and development of the Showground site commenced on the basis that no Government moneys would be provided and no theme park activities would be allowed. However despite this a State Government subsidy of between $84.8m and $106.8m (in net present value terms) is to be provided for the development and the area of the Showground to be leased to Fox was extended to comprise 24.3 hectares of the 28.8 hectare sit
Actions for Review of Eastern Distributor
Review of Eastern Distributor
Following a resolution of the Legislative Council, the Audit Office has undertaken a performance audit of the Eastern Distributor. For a number of reasons, The Audit Office is not in the position to determine “whether the proposed toll and concession period represents the best deal”. In part this is the result of time constraints which do not allow a careful analysis of many toll and concession options. Similarly, the audit does not answer “whether