Reports
Actions for Country towns water supply and sewerage program
Country towns water supply and sewerage program
The Country Towns Water Supply and Sewerage Program has effectively promoted adoption of better management practices by local water utilities, but will not achieve its objective of eliminating the water supply and sewerage infrastructure backlog in urban areas of country NSW.
The $1.2 billion Program aims to help local water utilities provide appropriate, affordable, cost effective and well-managed water supply and sewerage services in the urban areas of country NSW. It has two broad elements:
- promoting adoption of better practices
- providing financial assistance towards the capital cost of infrastructure backlog works.
Parliamentary reference - Report number #251 - released 4 May 2015
Actions for Northside Storage Tunnel Project
Northside Storage Tunnel Project
The Northside Storage Tunnel was the first major public sector construction project using an alliance approach. In our opinion, the outcome of the project suggests that an alliance approach, when applied to a suitable project and managed appropriately, can support positive project outcomes. And in many respects the Alliance worked well. There are, however, a number of issues that we believe need to be addressed for future alliances.
Parliamentary reference - Report number #113 - released 24 July 2003
Actions for The Police Assistance Line
The Police Assistance Line
We are of the opinion that overall, the Police Assistance Line (PAL) has contributed to improving the efficiency and effectiveness of NSW Police. Through civilianisation of call taking, NSW Police reports that the cost of handling a minor crime report has been reduced by 65 per cent, to around $21 per call. It is also estimated that PAL has contributed to the release of over 200 police to operational duties. There has also been an improvement in customer service since PAL commenced, with the average time taken to answer a call reduced from over two minutes to 42 seconds. However, performance is still outside NSW Police’s goal of answering 80 per cent of calls within 27 seconds. In addition, waiting time increased over the last six months of 2002.
Parliamentary reference - Report number #110 - released 5 June 2003