Risk

Agencies need to do more to address risks posed by information technology (IT).

Effective internal controls and governance systems help agencies to operate efficiently and effectively and comply with relevant laws, standards and policies. We assessed how well agencies are implementing these systems, and highlighted opportunities for improvement.
 

1. Overall trends

New and repeat findings

The number of reported financial and IT control deficiencies has fallen, but many previously reported findings remain unresolved.

High risk findings

Poor systems implementations contributed to the seven high risk internal control deficiencies that could affect agencies.

Common findings

Poor IT controls are the most commonly reported deficiency across agencies, followed by governance issues relating to cyber security, capital projects, continuous disclosure, shared services, ethics and risk management maturity.

2. Information Technology

IT security

Only two-thirds of agencies are complying with their own policies on IT security. Agencies need to tighten user access and password controls.

Cyber security

Agencies do not have a common view on what constitutes a cyber attack, which limits understanding the extent of the cyber security threat.

Other IT systems

Agencies can improve their disaster recovery plans and the change control processes they use when updating IT systems.

3. Asset Management

Capital investment

Agencies report delays delivering against the significant increase in their budgets for capital projects.

Capital projects

Agencies are underspending their capital budgets and some can improve capital project governance.

Asset disposals

Eleven per cent of agencies were required to sell their real property through Property NSW but didn’t. And eight per cent of agencies can improve their asset disposal processes.

4. Governance

Governance arrangements

Sixty-four per cent of agencies’ disclosure policies support communication of key performance information and prompt public reporting of significant issues.

Shared services

Fifty-nine per cent of agencies use shared services, yet 14 per cent do not have service level agreements in place and 20 per cent can strengthen the performance standards they set.

5. Ethics and Conduct

Ethical framework

Agencies can reinforce their ethical frameworks by updating code‑of‑conduct policies and publishing a Statement of Business Ethics.

Conflicts of interest

All agencies we reviewed have a code of conduct, but they can still improve the way they update and manage their codes to reduce the risk of fraud and unethical behaviour.

6. Risk Management 

Risk management maturity

All agencies have implemented risk management frameworks, but with varying levels of maturity.

Risk management elements

Many agencies can improve risk registers and strengthen their risk culture, particularly in the way that they report risks to their lead agency.

This report covers the findings and recommendations from our 2016–17 financial audits related to the internal controls and governance of the 39 largest agencies (refer to Appendix three) in the NSW public sector. These agencies represent about 95 per cent of total expenditure for all NSW agencies and were considered to be a large enough group to identify common issues and insights.

The findings in this report should not be used to draw conclusions on the effectiveness of individual agency control environments and governance arrangements. Specific financial reporting, controls and service delivery comments are included in the individual 2017 cluster financial audit reports tabled in Parliament from October to December 2017.

This new report offers strategic insight on the public sector as a whole

In previous years, we have commented on internal control and governance issues in the volumes we published on each ‘cluster’ or agency sector, generally between October and December. To add further value, we then commented more broadly about the issues identified for the public sector as a whole at the start of the following year.

This year, we have created this report dedicated to internal controls and governance. This will help Parliament to understand broad issues affecting the public sector, and help agencies to compare their own performance against that of their peers.

Without strong control measures and governance systems, agencies face increased risks in their financial management and service delivery. If they do not, for example, properly authorise payments or manage conflicts of interest, they are at greater risk of fraud. If they do not have strong information technology (IT) systems, sensitive and trusted information may be at risk of unauthorised access and misuse.

These problems can in turn reduce the efficiency of agency operations, increase their costs and reduce the quality of the services they deliver.

Our audits do not review every control or governance measure every year. We select a range of measures, and report on those that present the most significant risks that agencies should mitigate. This report divides these into the following six areas:

  1. Overall trends
  2. Information technology
  3. Asset management
  4. Governance
  5. Ethics and conduct
  6. Risk management.

Internal controls are processes, policies and procedures that help agencies to:

  • operate effectively and efficiently
  • produce reliable financial reports
  • comply with laws and regulations.

This chapter outlines the overall trends for agency controls and governance issues, including the number of findings, level of risk and the most common deficiencies we found across agencies. The rest of this volume then illustrates this year’s controls and governance findings in more detail.

Issues

Recommendations

1.1 New and repeat findings

The number of internal control deficiencies reduced over the past three years, but new higher-risk information technology (IT) control deficiencies were reported in 2016–17.

Deficiencies repeated from previous years still make up a sizeable proportion of all internal control deficiencies.

Recommendation

Agencies should focus on emerging IT risks, but also manage new IT risks, reduce existing IT control deficiencies, and address repeat internal control deficiencies on a more timely basis.

1.2 High risk findings

We found seven high risk internal control deficiencies, which might significantly affect agencies.

Recommendation

Agencies should rectify high risk internal control deficiencies as a priority

1.3 Common findings

The most common internal control deficiencies related to poor or absent IT controls.

We found some common governance deficiencies across multiple agencies.

Recommendation

Agencies should coordinate actions and resources to help rectify common IT control and governance deficiencies.

Information technology (IT) has become increasingly important for government agencies’ financial reporting and to deliver their services efficiently and effectively. Our audits reviewed whether agencies have effective controls in place over their IT systems. We found that IT security remains the source of many control weakness in agencies.

Issues Recommendations

2.1 IT security

User access administration

While 95 per cent of agencies have policies about user access, about two-thirds were compliant with these policies. Agencies can improve how they grant, change and end user access to their systems.

Recommendation

Agencies should strengthen user access administration to prevent inappropriate access to sensitive systems. Agencies should:

  • establish and enforce clear policies and procedures
  • review user access regularly
  • remove user access for terminated staff promptly
  • change user access for transferred staff promptly.

Privileged access

Sixty-eight per cent of agencies do not adequately manage who can access their information systems, and many do not sufficiently monitor or restrict privileged access.

Recommendation

Agencies should tighten privileged user access to protect their information systems and reduce the risks of data misuse and fraud. Agencies should ensure they:

  • only grant privileged access in line with the responsibilities of a position
  • review the level of access regularly
  • limit privileged access to necessary functions and data
  • monitor privileged user account activity on a regular basis.

Password controls

Forty-one per cent of agencies did not meet either their own standards or minimum standards for password controls.

Recommendation

Agencies should review and enforce password controls to strengthen security over sensitive systems. As a minimum, password parameters should include:

  • minimum password lengths and complexity requirements
  • limits on the number of failed log-in attempts
  • password history (such as the number of passwords remembered)
  • maximum and minimum password ages.

2.2 Cyber Security

Cyber security framework

Agencies do not have a common view on what constitutes a cyber attack, which limits understanding the extent of the cyber security threat.

Recommendation

The Department of Finance, Services and Innovation should revisit its existing framework to develop a shared cyber security terminology and strengthen the current reporting requirements for cyber incidents.

Cyber security strategies

While 82 per cent of agencies have dedicated resources to address cyber security, they can strengthen their strategies, expertise and staff awareness.

Recommendations

The Department of Finance, Services and Innovation should:

  • mandate minimum standards and require agencies to regularly assess and report on how well they mitigate cyber security risks against these standards
  • develop a framework that provides for cyber security training.

Agencies should ensure they adequately resource staff dedicated to cyber security.

2.3 Other IT systems

Change control processes

Some agencies need to improve change control processes to avoid unauthorised or inaccurate system changes.

Recommendation

Agencies should consistently perform user acceptance testing before system upgrades and changes. They should also properly approve and document changes to IT systems.

Disaster recovery planning

Agencies can do more to adequately assess critical business systems to enforce effective disaster recovery plans. This includes reviewing and testing their plans on a timely basis.

Recommendation

Agencies should complete business impact analyses to strengthen disaster recovery plans, then regularly test and update their plans.

Agency service delivery relies on developing and renewing infrastructure assets such as schools, hospitals, roads, or public housing. Agencies are currently investing significantly in new assets. Agencies need to manage the scale and volume of current capital projects in order to deliver new infrastructure on time, on budget and realise the intended benefits. We found agencies can improve how they:

  • manage their major capital projects
  • dispose of existing assets.
Issues Recommendations or conclusions

3.1 Capital investment

Capital asset investment ratios

Most agencies report high capital investment ratios, but one-third of agencies’ capital investment ratios are less than one.

Recommendation

Agencies with high capital asset investment ratios should ensure their project management and delivery functions have the capacity to deliver their current and forward work programs.

Volume of capital spending

Most agencies have significant forward spending commitments for capital projects. However, agencies’ actual capital expenditure has been below budget for the last three years.

Conclusion

The significant increase in capital budget underspends warrant investigation, particularly where this has resulted from slower than expected delivery of projects from previous years.

3.2 Capital projects

Major capital projects

Agencies’ major capital projects were underspent by 13 percent against their budgets.

Conclusion

The causes of agency budget underspends warrant investigation to ensure the NSW Government’s infrastructure commitment is delivered on time.

Capital project governance

Agencies do not consistently prepare business cases or use project steering committees to oversee major capital projects.

Conclusion

Agencies that have project management processes that include robust business cases and regular updates to their steering committees (or equivalent) are better able to provide those projects with strategic direction and oversight.

3.3. Asset disposals

Asset disposal procedures

Agencies need to strengthen their asset disposal procedures.

Recommendations

Agencies should have formal processes for disposing of surplus properties.

Agencies should use Property NSW to manage real property sales unless, as in the case for State owned corporations, they have been granted an exemption.

Governance refers to the high-level frameworks, processes and behaviours that help an organisation to achieve its objectives, comply with legal and other requirements, and meet a high standard of probity, accountability and transparency.

This chapter sets out the governance lighthouse model the Audit Office developed to help agencies reach best practice. It then focuses on two key areas: continuous disclosure and shared services arrangements. The following two chapters look at findings related to ethics and risk management.

Issues Recommendations or conclusions

4.1 Governance arrangements

Continuous disclosure

Continuous disclosure promotes improved performance and public trust and aides better decision-making. Continuous disclosure is only mandatory for NSW Government Businesses such as State owned corporations.

Conclusion

Some agencies promote transparency and accountability by publishing on their websites a continuous disclosure policy that provides for, and encourages:

  • regular public disclosure of key performance information
  • disclosure of both positive and negative information
  • prompt reporting of significant issues.

4.2 Shared services

Service level agreements

Some agencies do not have service level agreements for their shared service arrangements.

Many of the agreements that do exist do not adequately specify controls, performance or reporting requirements. This reduces the effectiveness of shared services arrangements.

Conclusion

Agencies are better able to manage the quality and timeliness of shared service arrangements where they have a service level agreement in place. Ideally, the terms of service should be agreed before services are transferred to the service provider and:

  • specify the controls a provider must maintain
  • specify key performance targets
  • include penalties for non-compliance.

Shared service performance

Some agencies do not set performance standards for their shared service providers or regularly review performance results.

Conclusion

Agencies can achieve better results from shared service arrangements when they regularly monitor the performance of shared service providers using key measures for the benefits realised, costs saved and quality of services received.

Before agencies extend or renegotiate a contract, they should comprehensively assess the services received and test the market to maximise value for money.

All government sector employees must demonstrate the highest levels of ethical conduct, in line with standards set by The Code of Ethics and Conduct for NSW government sector employees.

This chapter looks at how well agencies are managing these requirements, and where they can improve their policies and processes.

We found that agencies mostly have the appropriate codes, frameworks and policies in place. But we have highlighted opportunities to improve the way they manage those systems to reduce the risks of unethical conduct.

Issues Recommendations or conclusions

5.1 Ethical framework

Code of conduct

All agencies we reviewed have a code of conduct, but they can still improve the way they update and manage their codes to reduce the risk of fraud and unethical behaviour.

Recommendation

Agencies should regularly review their code-of-conduct policies and ensure they keep their codes of conduct up-to-date.

Statement of business ethics

Most agencies maintain an ethical framework, but some can enhance their related processes, particularly when dealing with external clients, customers, suppliers and contractors.

Conclusion

Agencies can enhance their ethical frameworks by publishing a Statement of Business Ethics, which communicates their values and culture.

5.2 Potential conflicts of interest

Conflicts of interest

All agencies have a conflicts-of-interest policy, but most can improve how they identify, manage and avoid conflicts of interest.

Recommendation

Agencies should improve the way they manage conflicts of interest, particularly by:

  • requiring senior executives to make a conflict-of-interest declaration at least annually
  • implementing processes to identify and address outstanding declarations
  • providing annual training to staff
  • maintaining current registers of conflicts of interest.

Gifts and benefits

While all agencies already have a formal gifts-and-benefits policy, we found gaps in the management of gifts and benefits by some that increase the risk of unethical conduct.

Recommendation

Agencies should improve the way they manage gifts and benefits by promptly updating registers and providing annual training to staff.

Risk management is an integral part of effective corporate governance. It helps agencies to identify, assess and prioritise the risks they face and in turn minimise, monitor and control the impact of unforeseen events. It also means agencies can respond to opportunities that may emerge and improve their services and activities.

This year we looked at the overall maturity of the risk management frameworks that agencies use, along with two important risk management elements: risk culture and risk registers.

Issues Recommendations or conclusions

6.1 Risk management maturity

All agencies have implemented risk management frameworks, but with varying levels of maturity in their application.

Agencies’ averaged a score of 3.1 out of five across five critical assessment criteria for risk management. While strategy and governance fared best, the areas that most need to improve are risk culture, and systems and intelligence.

Conclusion

Agencies have introduced risk management frameworks and practices as required by the Treasury’s:

  • 'Risk Management Toolkit for the NSW Public Sector'
  • 'Internal Audit and Risk Management Policy for the NSW Public Sector'.

However, more can be done to progress risk management maturity and embed risk management in agency culture.

6.2 Risk management elements

Risk culture

Most agencies have started to embed risk management into the culture of their organisation. But only some have successfully done so, and most agencies can improve their risk culture.

 

 

Conclusion

Agencies can improve their risk culture by:

  • setting an appropriate tone from the top
  • training all staff in effective risk management
  • ensuring desired risk behaviours and culture are supported, monitored, and reinforced through business plans, or the equivalent and employees' performance assessments.

Risk registers and reporting

Some agencies do not report their significant risks to their lead agency, which may impair the way resources are allocated in their cluster. Some agencies do not integrate risk registers at a divisional and whole-of-enterprise level.

Conclusion

Agencies not reporting significant risks at the cluster level increases the likelihood that significant risks are not being mitigated appropriately.

Effective risk management can improve agency decision-making, protect reputations and lead to significant efficiencies and cost savings. By embedding risk management directly into their operations, agencies can also derive extra value for their activities and services.

Published

Actions for Managing demand for ambulance services 2017

Managing demand for ambulance services 2017

Health
Information technology
Management and administration
Risk
Service delivery
Shared services and collaboration
Workforce and capability

NSW Ambulance has introduced several initiatives over the past decade to better manage the number of unnecessary ambulance responses and transports to hospital emergency departments. However, there is no overall strategy to guide the development of these initiatives nor do NSW Ambulance's data systems properly monitor their impact. As a result, the Audit Office was unable to assess whether NSW Ambulance's approach to managing demand is improving the efficiency of ambulance services.

Demand for ambulance services is increasing. Demographic factors including population growth and ageing have contributed to this and ongoing growth in demand is likely. It is important that NSW Ambulance finds ways to respond to this demand more efficiently, while maintaining patient safety standards and meeting community expectations.

Most triple zero calls to NSW Ambulance do not involve medical issues that require an emergency response. NSW Ambulance has introduced a range of initiatives to change the way it manages these less urgent requests for assistance. Its major demand management initiatives include using a telephone advice line, referring some patients to services other than hospital emergency departments and using specialist paramedics to respond to less urgent cases.

The role of NSW Ambulance has changed in recent years. It is aiming to become a ‘mobile health service’ that identifies the needs of patients and provides or refers them to the most appropriate type of care. This change involves a significant expansion of the clinical decision-making role of paramedics. Considerable strategic and organisational efforts are required to make this work. The successful implementation of demand management initiatives is important to NSW Ambulance's ability to continue to meet demand for its services.

This audit assessed NSW Ambulance's major demand management initiatives that aim to reduce unnecessary demand for ambulance responses and unnecessary transport to hospital emergency departments. It aimed to assess the extent to which these initiatives have improved the efficiency of its services.

Conclusion

NSW Ambulance has introduced several initiatives that aim to manage demand for its services from less urgent cases more efficiently. There is no overall strategy for these initiatives and NSW Ambulance’s data systems do not measure their outputs or outcomes. As a result, we are unable to assess the impact of NSW Ambulance's demand management initiatives on the efficiency of ambulance services. More focus is needed to ensure these initiatives achieve the efficiency improvements necessary to help NSW Ambulance meet future increases in demand.

Increasing demand for ambulance services is a key issue for NSW Ambulance. Demand has increased at a faster rate than population growth in recent years and continued growth is expected. NSW Ambulance has introduced several initiatives that aim to manage demand for its services from people with less urgent medical issues more efficiently and align its approach with the rest of the health system in New South Wales.

These individual initiatives lack a broader strategy to guide their development. NSW Ambulance’s demand management initiatives also lack clear goals and performance targets, with insufficient organisational resources allocated to support their implementation. NSW Ambulance does not have a data system that allows it to conduct accurate routine monitoring of the activity and performance of these initiatives.

More effort is required to make demand management initiatives a core part of NSW Ambulance's work. Key relationships with other health services to support demand management initiatives have only recently been established. NSW Ambulance has not communicated proactively with the public about its demand management initiatives. To ensure paramedics are as well prepared as possible for their expanded roles, they need better professional development and up to date technology.

Demand for ambulance services in New South Wales is increasing steadily. Forecast future increases in demand due to population growth and ageing mean that NSW Ambulance must improve its efficiency to maintain its performance.

Demand for ambulance services is growing at a rate higher than population growth. The increase in demand is likely to continue as the population continues to grow and age. NSW Ambulance has made several recent changes to remove large parts of demand for its services, including moving non-emergency patient transport to a separate government agency and changing the way triple zero calls are categorised.

These changes were expected to improve emergency response time performance, but the anticipated improvements have not been achieved. If demand continues to increase as forecast, NSW Ambulance will need to find more efficient ways to manage demand to maintain its performance.

NSW Ambulance has introduced initiatives to change the way it manages demand from patients who have less urgent medical issues. These have the potential to achieve positive results, but we were unable to fully assess their impact because of weaknesses in data systems and monitoring. More needs to be done to demonstrate progress toward the efficiency improvements required.

NSW Ambulance uses a telephone referral system to manage triple zero calls from people with medical issues that do not require an ambulance. This has the potential to achieve efficiency improvements but there are weaknesses in NSW Ambulance's use and monitoring of this system. Paramedics are now able to make decisions about whether patients need transport to a hospital emergency department. NSW Ambulance does not routinely measure or monitor the decisions paramedics make, so it does not know whether these decisions are improving efficiency. Extended Care Paramedics who have additional skills in diagnosing and treating patients with less urgent medical issues were introduced in 2007. NSW Ambulance analysis indicates that these paramedics have the potential to improve efficiency, but have not been used as effectively as possible.

Our 2013 audit of NSW Ambulance found that accurate monitoring of activity and performance was not being conducted. More than four years later, this remains the case. 

NSW Ambulance has recognised the need to change the way it manages demand and has developed initiatives that have the potential to improve efficiency. However, there are significant weaknesses in the strategy for and implementation of its demand management initiatives.

NSW Ambulance has identified the goal of moving from an emergency transport provider to a mobile health service and developed several initiatives to support this. Its demand management initiatives have the potential to contribute to the broader policy directions for the health system in New South Wales. However, there is no clear overall strategy guiding these initiatives and their implementation has been poor.

NSW Ambulance's reasons for changing its approach to demand management have not been communicated proactively to the community. Demand management initiatives that have been operating for over a decade still do not have clear performance measures or targets. Project management of new initiatives has been inadequate, with insufficient organisational resources to oversee them and inadequate engagement with other healthcare providers.

NSW Ambulance uses an in-house Vocational Education and Training course to recruit some paramedics, as well as recruiting paramedics who have completed a university degree. No other Australian ambulance services continue to provide their own Vocational Education and Training qualifications. Paramedics will need more support in several key areas to be able to fulfil their expanded roles in providing a mobile health service. Performance and development systems for paramedics are not used effectively. Up to date technology would help paramedics make better decisions and improve NSW Ambulance's ability to monitor demand management activity.

There are gaps in NSW Ambulance's oversight of the risks of some of the initiatives it has introduced, particularly its lack of information on the outcomes for patients who are not transported to hospital. Weaknesses in the way NSW Ambulance uses its data limit its ability to properly assess the risks of the demand management initiatives it has introduced.

Appendix one - Response from agency

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary reference - Report number #295 - released 13 December 2017

Published

Actions for Health 2017

Health 2017

Health
Asset valuation
Compliance
Financial reporting
Fraud
Information technology
Internal controls and governance
Management and administration
Procurement
Project management

The following report highlights results of the financial audits of entities in the NSW health cluster. The report focuses on key observations and findings from the most recent audits of these entities.

The report also includes a range of findings on service delivery. Overall, NSW Health is achieving most of their targets. Some local health districts are continuing to experience increased demand for their services and are finding it more difficult to meet their targets. For example, three local health districts had not achieved some emergency department response time targets for three consecutive years.

1. Financial reporting and controls

Financial Reporting

All health cluster entities received unqualified audit opinions and the quality of financial reporting remains high across the cluster.

Early close procedures were largely completed and all financial statements were submitted by the deadlines.

Financial performance

Overall, NSW Health recorded an operating surplus of $407 million in 2016–17. Eleven local health districts/specialty networks recorded operating deficits in 2016–17, four more than 2015–16.

Expenses across NSW Health increased by 4.4 per cent in 2016–17 (6.0 per cent in 2015–16), lower than the expected long term annual expense growth rate.

Excess annual leave Managing excess annual leave is a continual challenge for NSW Health, with thirty–five per cent of the workforce having excess balances.
Overtime payments NSW Health entities are generally managing overtime well; however NSW Ambulance’s overtime payments, $74.6 million in 2016–17, remain significantly higher than other health entities.
Time and leave recording practices Unapproved employee timesheets continue to be a problem for health entities. Weak timesheet approval controls increase the risk of staff claiming and being paid for hours they have not worked. There is also an increased risk of high volumes of roster adjustments, manual pays, salary overpayments and leave not being recorded accurately.

2. Service Delivery

Service Agreements Most of the service agreements between the Secretary of NSW Health and health entities were signed earlier than prior years.
Performance monitoring Five NSW Health entities are not meeting the Ministry of Health’s performance expectations at 30 June 2017.
Emergency department performance Data provided by the Ministry indicates NSW Health, on average, met emergency department triage response time targets across all triage categories for the fourth consecutive year.
Ambulance response times Data provided by the Ministry shows NSW Ambulance response times for imminently life‑threatening incidents of 7.5 minutes in 2016–17 was within the Ministry’s target of 10.0 minutes.

Data provided by the Ministry indicates NSW Ambulance response times for potentially life‑threatening incidents did not improve in 2016–17. The median response time of 11.1 minutes in 2016–17 was similar to 2015–16 (11.0 minutes). This is despite the number of Priority 1 responses reducing by 4.3 per cent.
Unplanned hospital re-admissions Data provided by the Ministry shows eight local health districts achieved the Ministry of Health’s unplanned hospital re‑admissions target in 2016–17. The target is for local health districts to reduce re‑admission rates from the previous financial year.

This report sets out the results of the 30 June 2017 financial statement audits of Health cluster entities.

The report has been structured into two chapters focusing on:

  • Financial reporting and controls
  • Service delivery.

This chapter outlines audit observations, conclusions and recommendations related to financial reporting and internal controls of entities for 2016-17.

Observation Conclusion or recommendation

2.1 Quality of financial reporting

All cluster entities received unqualified audit opinions and misstatements identified in financial statements fell. The quality of financial reporting remains high across the cluster.

2.2 Timeliness of financial reporting

Early close procedures were largely completed and all financial statements were submitted by the deadlines. Health entities controlled by the Ministry of Health continued submitting their financial statements well ahead of the statutory deadlines.

2.4 Financial and sustainability analysis

NSW Health recorded an operating surplus of $407 million in 2016–17.



Eleven local health districts/specialty networks recorded operating deficits in 2016–17, four more than 2015–16.


Expenses across NSW Health increased by 4.4 per cent in 2016–17 (6.0 per cent in
2015–16).

The capital replacement ratio of local health districts/specialty networks ranged from 0.5 to 5.7 in 2016–17. Seven local health districts had capital replacement ratio higher than one.

The statewide operating surplus was $84 million higher than 2015–16. Net surpluses contribute to NSW Health’s ability to invest in new facilities, upgrades and redevelopments.

The 2016–17 financial results were once again impacted by the NSW Government initiative to improve cash management across the sector.

The expense growth rate for NSW Health is 1.6 percentage points lower than the expected long term annual expense growth rate.

Substantial ongoing investment in hospitals and other assets across NSW Health is evidenced by high capital replacement ratios for some health entities in 2016–17.

2.5 Performance against budget
Ten local health districts/specialty networks’ expense budget variance was outside performance expectations agreed with the Ministry at the beginning of 2016–17. The Ministry continues to manage performance across NSW Health to improve the accuracy of budgeting practices.
2.7 Human Resources    

Thirty-five per cent of NSW Health’s workforce have excess annual leave balances.

 

 

 

 

 

 

NSW Ambulance had the highest average sick leave rate in NSW Health of 85.2 hours per FTE in 2016–17 (78.7 hours in 2015–16). This was higher than the statewide average of 62.1 hours (62.0 hours in 2015–16).

NSW Ambulance’s overtime payments in 2016–17 totalled $74.6 million; $2.8 million more than 2015–16 and significantly higher than other health entities

Other NSW Health entities are generally managing overtime well.

 

Unapproved employee timesheets continue to be a problem for health entities. Weak timesheet approval controls increase the risk of staff claiming and being paid for hours they have not worked.

 

Managing excess annual leave is a continual challenge for health entities.

Recommendation: Health entities should further review the approach to managing excess annual leave in 2017–18. They should:

  • monitor current and projected leave balances to the end of the financial year on a monthly basis
  • agree formal leave plans with employees to reduce leave balances over an acceptable timeframe.


NSW Ambulance continues to face significant challenges in managing sick leave.

Recommendation: NSW Ambulance should further implement and monitor targeted human resource strategies to address the high rates of sick leave taken

Recommendation: NSW Ambulance should further review the effectiveness of its rostering practices to identify strategies to reduce excessive overtime payments.

Recommendation: Health entities should conduct a risk‑based review of time and leave recording practices to ensure control weaknesses are identified and fixed.

This chapter outlines our audit observations, conclusions and recommendations relating to service delivery for 2016–17.

Observation Conclusion or recommendation
3.1 Service agreements in NSW Health

Most of the service agreements between the Secretary of NSW Health and health entities were signed earlier than prior years.

Thirteen local health districts/specialty networks signed their service agreements by the 31 July 2017 due date. This is a significant improvement with only seven local health districts/specialty networks meeting the date in 2015–16.

Having service agreements signed as close as possible to the start of each year provides the Ministry and NSW Health entities with clarity around roles, responsibilities, performance measures, budgets, and service volumes and levels.
3.2 Performance of NSW Health entities
Five NSW Health entities were not meeting the Ministry’s performance expectations at 30 June 2017. The Ministry is managing the five entities in accordance with its performance review process.
3.4 Emergency department response times

Data provided by the Ministry indicates NSW Health again, on average, met emergency department triage response time targets across all triage categories for the fourth consecutive year.

The Ministry manages performance across NSW Health to ensure patients presenting at emergency departments receive care in a clinically appropriate timeframe.

Based on the Ministry’s data, local health districts/specialty networks are, on average, meeting triage targets despite increasing emergency department attendances.

The data shows eleven local health districts met all triage targets in 2016–17, compared to eight in
2015–16. 

3.5 Emergency treatment performance

The Ministry manages public patient access to emergency services in public hospitals.

It has an emergency treatment performance target of 81 per cent of patients leaving emergency departments within four hours.

Data provided by the Ministry indicates NSW Health maintained its overall emergency treatment performance in 2016–17, but did not achieve its target. The State average emergency treatment performance was 74.2 per cent (74.2 per cent in 2015–16).

Based on the Ministry’s data, only four local health districts achieved the target in 2016–17, five in
2015–16.

3.6 Ambulance response times
NSW Ambulance has a response time target of 10.0 minutes for imminently life‑threatening incidents in New South Wales. Data provided by the Ministry indicates NSW Ambulance response times for imminently life-threatening incidents of 7.5 minutes in 2016–17 was within the Ministry’s target.
 
3.7 Transfer of care
The Ministry has a target of 90 per cent for the number of ambulance arrivals within a 30 minute ‘transfer of care’ timeframe. Data provided by the Ministry indicates the rate of ambulance arrivals within a 30 minute 'transfer of care' timeframe improved from 87.6 per cent in
2015–16 to 91.7 per cent in 2016–17, exceeding the Ministry’s target.
3.8 Average length of stay in hospital
Based on the Ministry’s 2016–17 data, the average length of stay for acute episodes was 3.0 days. The average length of stay in New South Wales hospitals is lower than the national average of 3.2 days (in 2015–16). The Ministry’s data shows the average length of stay by patients for acute episodes has remained stable in New South Wales hospitals for four years. 
3.9 Elective surgery access performance
Data provided by the Ministry indicates NSW Health continues to manage waiting times for elective surgery in public hospitals. The Ministry’s data shows NSW Health improved on‑time admission of patients for elective surgery in 2016–17 despite a 1.8 per cent increase in admissions. While the result improved, only one of the three targets for elective surgery waiting times was met in 2016–17.
3.10 Unplanned hospital re-admissions

Data provided by the Ministry indicates NSW Health, on average, did not reduce the rate of unplanned hospital re‑admissions in 2016–17. The Ministry has a target of reducing unplanned hospital re‑admissions compared to the previous financial year.

Low re‑admission rates may indicate good patient management practices and post-discharge care.

The Ministry’s data shows eight local health district met the target to reduce the rate of re‑admissions compared to the previous financial year. The statewide average rate increased from 6.3 per cent to 6.4 per cent.
3.11 Post discharge care for acute mental health patients
NSW Health has a goal to increase community-based care to acute mental health patients after they are discharged. Continuity of care in the community can lead to reduced symptom severity, lower re‑admission rates, and improved quality of life. The Ministry’s 2016–17 data shows the statewide average for post discharge follow-up of acute mental health patients within seven days was 70.0 per cent (66.0 per cent in 2015–16). The statewide average improved and met the NSW Health target of 70 per cent. Nine local health districts exceeded the NSW Health target.
3.12 Mental health acute re-admissions
NSW Health has a goal to reduce acute public sector mental health re-admissions. High re‑admission rates may indicate deficiencies in inpatient treatment and follow up care. The Ministry’s data shows twelve local health districts did not achieve the NSW Health target of 13 per cent mental health acute re‑admissions in 2016–17.
3.13 Unplanned and emergency re‑presentations

NSW Health aims to reduce the number of unplanned and emergency re‑presentations to emergency departments.

The Ministry’s 2016–17 data shows the State average of emergency department re‑presentations decreased marginally from 5.0 per cent in 2015–16 to 4.9 per cent.

Patients attending rural emergency departments are more likely to re‑present within 48 hours of being discharged than those in regional or metropolitan emergency departments.
3.14 Healthcare associated infection
The national target for the rate of Staphylococcus aureus (golden staph) bloodstream infection is two cases per 10,000 bed days. Data provided by the Ministry indicates the rate of golden staph bloodstream infection in New South Wales hospitals continues to be well below the target and national benchmark at 0.72 cases per 10,000 bed days in 2016–17 (0.75 in 2015–16).
3.15 Patient experience and satisfaction

The Bureau of Health Information analyses and reports on the results of patient surveys.

The Bureau’s survey shows 65 per cent of adult admitted patients rated the care they received in hospital as ‘very good’ and 29 per cent rated it as ‘good’.

NSW Health recognises that patient surveys are an important feedback mechanism on the health care system that can only come from personal experiences.

Published

Actions for State Finances 2017

State Finances 2017

Finance
Health
Industry
Justice
Local Government
Planning
Premier and Cabinet
Treasury
Universities
Whole of Government
Environment
Asset valuation
Financial reporting
Information technology
Internal controls and governance

Total State Sector Accounts received an unqualified audit opinion for the fifth consecutive year.

There was a $5.7 billion State budget surplus and continued investment in new infrastructure, in part funded by the long-term leases of Ausgrid and Endeavour Energy assets. This report also comments on key accounting matters, including the correction of some previously reported balances and the first time reporting of combined Cabinet members’ compensation in the Total State Sector Accounts.

Pursuant to the Public Finance and Audit Act 1983, I present my Report on State Finances 2017.

You will note that the format of this report has changed from previous years.

The intent of this change is to draw attention to the key matters that have been the focus of our audit and highlight significant factors that have contributed to the outcome.

First, it is pleasing to report once again that I issued a clear audit opinion on the State’s consolidated financial statements. This outcome demonstrates the Government’s continued focus on the quality of financial reporting across the NSW public sector.

High quality financial management and reporting are crucial to properly inform the public and build community confidence in our system of government.

The Treasury’s Financial Management Transformation program also aims to improve financial governance, budgeting and reporting arrangements across the sector. My Office is working collaboratively with The Treasury on reforms to reduce the burden of reporting, without weakening established safeguards.

The reforms should include measures to provide independent assurance of the budget process, of outcome reporting by agencies, and the power to “follow the dollar” given the increasing use of non-government organisations to deliver Government programs.

This Report also highlights another year of strong financial performance. The State’s budget result was a $5.7 billion surplus, and investment in new infrastructure has continued, in part funded by the long-term leases of Ausgrid and Endeavour Energy assets.

Finally, could I take this opportunity to thank the staff of The Treasury for the way they approached this audit. Our partnership is critical to ensuring NSW is an exemplar of quality financial management and reporting.

02_Margaret_signature.jpg

Margaret Crawford 
24 October 2017

A clear audit opinion on the State’s consolidated financial statements was issued.

Timely and accurate financial reporting is essential for informed decision making, effective management of public funds and enhancing public accountability.

This year’s clear audit opinion reflects the Government’s continued efforts to improve the quality of financial reporting across the NSW public sector.

Since the introduction of ‘early close procedures’ in 2011-12, the number of significant errors in financial statements of agencies has generally fallen largely due to identifying and resolving complex accounting issues early. Agencies’ 2016-17 financial statements submitted for audit contained nine errors exceeding $20 million. All errors were subsequently corrected in the individual agencies financial statements.

Agencies should continue to respond to key accounting issues as soon as they are identified. Where issues are identified, accounting position papers should be prepared for consideration by the Audit Office, their Audit and Risk Committee members, and when relevant, The Treasury.

The State addressed the following key accounting matters during 2016-17. 

The State recognised rail tunnels and earthworks valued at $8.5 billion.

Some rail tunnels and earthworks have never been valued by the State. These include the City Circle, the country rail network and other tunnels and earthworks built before the year 2000. Some of these tunnels and earthworks date back to the early 1900s.

For many years, the State did not account for these assets as they believed that their value could not be reliably measured. This year an independent valuer was engaged to perform a comprehensive valuation. The methodology used demonstrated
that the assets could have been reflected in the financial statements earlier.

The State recorded an additional $8.5 billion to correct the value of infrastructure assets at 1 July 2016.

Cabinet member’s compensation and related party transactions were reviewed.

Due to changes in Accounting Standards, the State had to consider 'related party information' in the financial statements. Previously this only applied to for-profit entities.

This year, requirements to report related party information extended to members of Cabinet, considered to be “key management personnel” of the State, as defined by Accounting Standards.

The Treasury implemented a process to assess and report Cabinet member’s compensation, and transactions between Cabinet members and/or their close family members, and government agencies.

Collectively, Cabinet members’ remuneration was $8.8 million, which was mainly salaries and allowances, and $3.5 million of non-monetary benefits such as security and drivers. The Treasury determined there were no other specific “related party” transactions or balances that required disclosure in the State’s financial statements.

Information system limitations continue at TAFE NSW.

TAFE NSW has experienced ongoing issues with its student administration system.

TAFE NSW has again implemented additional processes to verify the accuracy and completeness of revenue from sales of goods and services.

TAFE NSW expects to spend up to $89 million on a new information system to address these issues. Modules of the new student enrolment system are expected to be in place for the 2018 enrolment period.

Restatements relating to the General Government Sector's investment in the commercial sector.

The State corrected two previously reported balances relating to the General Government Sector’s investment in the commercial sector.

Accounting Standards require the General Government Sector to effectively store gains or losses related to its investment in the commercial sector in reserves until the investment is derecognised.

When these investments are disposed of, the cumulative gains and losses must be cleared and recognised in the operating result. However, the Government had previously cleared the cumulative gains and losses directly to Accumulated Funds within equity.

To comply with Accounting Standards, a total of $6 billion previously reported as a movement in equity  at 30 June 2016, has now been corrected to the operating result.

In addition, Accounting Standards only allow gains or losses on its investments to be stored in reserves. In past years, the State recognised all changes in the value of its investment in Available for Sale Reserves, including the capital contributed to establish the State’s investment. In 2016-17, a total of $23.4 billion of contributed capital was corrected to accumulated funds at 1 July 2015.

The State’s budget result was a $5.7 billion surplus, $2.0 billion higher than the budget estimate.

The Total State Sector comprises 310 entities controlled by the NSW Government.

Of the total, the General Government Sector comprises 215 entities that provide goods and services not directly paid for by consumers.

The non-General Government Sector comprises 95 Government businesses that provide goods and services such as water and electricity, or financial services.

A principal measure of a Government’s overall performance is its Net Operating Balance, or Budget Result. The Net Operating Balance reports the difference between the cost of General Government service delivery and the revenue earned to fund these sectors.

The State has recorded budget surpluses and exceeded the original budget result in nine of the last ten years.

The State maintained its AAA credit rating.

The object of the Act is to maintain the AAA credit rating.

NSW’s finances are managed in alignment with the Fiscal Responsibility Act 2012 (the Act).

The Act established the framework for fiscal responsibility and strategy needed to protect the State’s AAA credit rating and service delivery to the people of NSW.

The purpose of maintaining the AAA credit rating is to reduce the cost of, and ensure the broadest access to, borrowings.

A triple-A credit rating also helps maintain business and consumer confidence so economic activity and employment are sustained. The legislation sets out targets and principles for financial management to achieve this.

New South Wales has credit ratings of AAA/Negative from Standard & Poor’s and Aaa/Stable from Moody’s Investors Service.

The fiscal targets for achieving this objective are:

General Government expenditure growth is lower than long term revenue growth.

General Government expenditure growth was 4.2 per cent in 2016-17, below the long-term revenue growth of 5.6 per cent.

Eliminating unfunded superannuation liabilities by 2030.

The Act sets a target of eliminating unfunded defined benefit superannuation liabilities by 2030. The State’s net superannuation liability was $58.6 billion at 30 June 2017 ($71.2 billion at 30 June 2016).

The Government predicts the 2030 target will be achieved. The State’s funding plan is to contribute amounts escalated by five per cent each year so the schemes will be fully funded by 2030. In 2016-17, the State made employer contributions of $1.5 billion, which is largely consistent with contributions over the past five years.

The liability values in the graph below do not reflect the values recorded in the Total State Sector Accounts. For financial reporting purposes, Accounting Standards (AASB 119 Employee Benefits) require the State to discount its superannuation liability using the government bond rate (refer to page 10 of this report). 

The relevant government bond rate in the current economic climate is 2.62 per cent.

The State’s target for the unfunded superannuation liability is measured using AASB 1056 Superannuation Entities. This is because it adopts a measurement basis that reflects expected earnings on fund assets, which are currently between 5.9 and 7.4 per cent. Using these rates, the liability is $15.0 billion at 30 June 2017 ($16.1 billion at 30 June 2016). The unfunded liability is $2.4 billion less than when the Act was introduced.

The State’s assets grew by $31.6 billion during 2016-17 to $409 billion.

Valuing the State’s physical assets.

When we audit the financial statements, we focus on areas we consider as higher risk. These areas are often complex, and require the use of estimates and judgements.

The State has $307.2 billion of physical assets measured at fair value in accordance with Australian Accounting Standards. Fair value calculations are inherently complex and sensitive to assumptions and estimates, increasing the risk these assets are incorrectly valued.

In our audits, we assess the reasonableness and appropriateness of assumptions used in valuing physical assets. This includes obtaining an understanding of the valuation methodologies applied and judgements made. We also review the completeness of asset registers, and the mathematical accuracy of valuation models.

Net movements between years includes additions, disposals, depreciation and valuations. This year, valuations of physical assets added $16.2 billion to the State’s assets, comprising: 

  • Transport for NSW and Railcorp $8.5 billion

  • New South Wales Land and Housing Corporation $4.8 billion

  • Roads and Maritime Services $930 million

  • Crown Entity $400 million.    

The State’s financial assets increased $27.5 billion in 2016-17

The State’s financial assets have increased by 88 per cent over the past four years. In 2016-17, financial assets increased primarily due to proceeds from the sale of government assets and businesses.

The Government implemented reforms to better use the State’s financial assets. A key element was the creation of an Asset and Liability Committee (ALCO) to provide advice on ways to improve balance sheet management.

Since the creation of the ALCO, reforms include:

  • Establishment of the New South Wales Infrastructure Future Fund (NIFF). The net proceeds from the State’s asset recycling program are invested into the NIFF, which is managed by TCorp, with a balance of $14.6 billion by 30 June 2017. Funds raised are invested through the NIFF until the Government requires them for critical infrastructure projects that are part of the Restart NSW and Rebuilding NSW program of works. ALCO and TCorp provide advice on the NIFF’s performance and management

  • Establishment of the Social and Affordable Housing Fund ($1.1 billion at 30 June 2017). ALCO oversees the Fund to ensure an appropriate investment approach that will maintain funding certainty for new social and affordable housing stock

  • Cash and liquidity management reforms to centralise cash previously held by agencies in the Treasury Banking System. This reform is designed to ensure agencies have adequate levels of liquidity but with surplus funds invested centrally for better returns.

The State’s liabilities decreased by $13.1 billion during 2016-17 to $182 billion.

Valuing the State’s liabilities relies on an actuarial assessment.

Nearly half of the State’s liabilities relate to its employees. This includes unfunded superannuation, and employee benefits, such as long service and recreation leave.

Valuation of these obligations is subject to complex estimation techniques and significant judgements. Small changes in assumptions can materially impact the financial statements.

We address the risk associated with auditing these balances:

  • using actuarial specialists

  • testing controls around underlying employee data used in data models, and testing the accuracy of the calculations

  • evaluating assumptions applied in calculating employee entitlements such as the discount rate and the probability of long service leave vesting conditions being met.

The State’s superannuation obligations reduced by $12.6 billion in 2016-17.

The State’s $58.6 billion superannuation liability represents obligations for past and present employees, less the value of assets set aside to meet those obligations. The superannuation liability decreased from $71.2 billion to $58.6 billion, largely due to an increase in the discount rate from 1.99 per cent to 2.62 per cent. This alone reduced the liability by $9.2 billion

The State’s borrowings totalled $70.6 billion at 30 June 2017.

The State’s borrowings totalled $70.6 billion at 30 June 2017, $9.5 billion less than the previous year. This was largely due to the repayment of borrowings when the assets of Ausgrid and Endeavour Energy were leased to the private sector.

TCorp issues bonds to raise funds for NSW Government agencies. The bonds are actively traded in financial markets providing price transparency and liquidity to public sector borrowers and institutional investors. All TCorp bonds are guaranteed by the NSW Government.

The Government manages its debt liabilities through its balance sheet management strategy. The strategy extends to TCorp, which applies an active risk management strategy to the Government’s debt portfolio.

General Government Sector debt is being restructured by replacing shorter-term debt with longer-term debt. This lengthens the portfolio to better match liabilities with the funding requirements of infrastructure assets and reduces refinancing risks. It also allows the Government to take advantage of the low interest rate environment.

The State recorded revenue of $83.5 billion in  2016-17, an increase of $5.3 billion from 2015-16.

The State’s results are underpinned by revenue growth in taxation, fees and fines.

Taxation, fees, fines and other revenue comprises $30.5 billion of taxation ($28.7 billion in 2015-16) and $5.3 billion of fees, fines and other revenue ($4.6 billion).

Tax revenue for the Total State Sector increased by $1.8 billion, or 6.4 per cent compared to 2015-16, primarily due to:

  • one-off business asset sales and lease transactions, including $718 million in transfer duty from the Ausgrid and Endeavour Energy lease transactions

  • $385 million increase in payroll tax from growth in NSW employment and average employee compensation

  • a $426 million increase in land taxes.

Growth in stamp duty is expected to slow over the next 4 years.

General Government Sector stamp duties have increased from $6.2 billion in 2012-13 to $11.5 billion in 2016-17, an annual average growth rate of 16.5 per cent. The Government’s budget forecasts the growth in stamp duties to decline, to an average annual growth rate of 2.6 per cent between 2016-17 and 2020-21.

The State received Commonwealth grants and subsidies of $30.8 billion in 2016-17.

The State received $30.8 billion from the Commonwealth Government in 2016-17, $1.6 billion more than in 2015-16. This was primarily due to transaction based asset recycling grants of $1.0 billion and a $720 million increase in national land transport grants. This increase was offset by a $435 million decrease in General Purpose Grants, which mainly comprises New South Wales’ share of the Goods and Services Tax (GST). 

The State spent $79.4 billion in 2016-17 to deliver services to the community, an increase of $3.9 billion from 2015-16.

Overall expenses increased 5.2 per cent from last year. Most of the increase was due to higher employee costs and operating costs.

Total salaries and wages increased by 4.2 per cent from 2015-16.

Total salaries and wages increased to $30 billion from $28.8 billion in 2015-16. The Government wages policy aims to limit the growth in remuneration and other employee costs to no more than 2.5 per cent per annum.

Operating expenses increased by 12.4 per cent from 2015-16.

Within operating expenses, payments for supplies, services and other expenses increased, in part, due to the State:

  • reacquiring mining licenses worth $482 million and additional land remediation costs of $101 million

  • spending more on health including additional drug supplies relating to Hepatitis C.

State spend on transport and communications increased by 68.1 per cent since 2012-13.

While spending on health and education remain the largest functional areas provided by Government, expenditure on transport and communication increased, on average, by 13.9 per cent annually between 2012-13 and 2016-17. This increase reflects the Government’s investment in transport infrastructure such as the Sydney Metro and Westconnex. Over the same period, spending on health increased by $3.9 billion.

Expenditure on fuel and energy has decreased by an average of 44.7 per cent since 2012-13, reflecting the State’s leases of electricity network assets.

In 2011, the Government established Restart NSW to fund high priority infrastructure projects.

Restart NSW projects are primarily funded from the proceeds from the asset recycling program enabling Government to deliver new infrastructure investment.

Restart NSW provides funding for the delivery of Rebuilding NSW, which is the Government’s 10-year plan to invest $20 billion in new infrastructure.

The State finalised long-term leases of Ausgrid and Endeavour Energy assets.

In June 2017, the Government finalised its long-term lease of 50.4 per cent of Endeavour Energy. This transaction follows on from the long-term leases of TransGrid in December 2015 and 50.4 per cent of Ausgrid in December 2016. Net proceeds of $15.0 billion were paid into Restart NSW relating to these transactions.

The Government also finalised an arrangement for the private sector to provide land titling and registry services to the public for 35 years. The State, through Restart NSW, received an upfront payment of $2.6 billion from the new operator.

Restart NSW is funding $29.8 billion of new infrastructure.

The Government has detailed its plan to invest $20 billion into the Rebuilding NSW plan from Restart NSW.

At 30 June 2017, around $2.9 billion has already been spent on Rebuilding NSW projects from Restart NSW, with a further $9 billion included in the budget aggregates. The Government has also earmarked a further $8.1 billion in Restart NSW for future projects.

The most significant project is the Sydney Metro. The Government has committed $7.0 billion from Restart NSW to build a 30-kilometre metro line, linking Sydney Metro Northwest at Chatswood, through new stations in the lower North Shore, the Sydney CBD and southwest to Bankstown. At 30 June 2017, $2.4 billion has been spent on this project from Restart NSW.

Other significant projects funded by Restart NSW include a $1.8 billion contribution to WestConnex and reserved funding of $1 billion towards the State’s Major Stadia Network program.

The Treasury initiated the Financial Management Transformation (FMT) program with the aim of changing and improving financial governance, budgeting and reporting arrangements of the New South Wales public sector.

FMT aims to deliver better outcomes for the people of New South Wales and focuses on transparency and accountability for expenditure, and better value for money.

New Financial Management System

PRIME is the Information Technology (IT) solution component of the FMT program, replacing several historical systems. PRIME will provide both financial and performance information within one IT platform for all agencies in the NSW public sector.

It is expected to give Government more timely information to plan and deliver its policy priorities and the budget.

Independent assurance over the budget process would improve confidence in the reliability of the State’s financial information.

Published

Actions for Planning and evaluating palliative care services in NSW

Planning and evaluating palliative care services in NSW

Health
Management and administration
Service delivery
Workforce and capability

NSW Health’s approach to planning and evaluating palliative care is not effectively coordinated. There is no overall policy framework for palliative and end-of-life care, nor is there comprehensive monitoring and reporting on services and outcomes.

Palliative care is an essential component of modern health care services and an increasingly important part of the wider health and social care systems. Palliative care is healthcare and support for people with a life-limiting illness, their families and carers. It is provided by, or informed by, professionals who specialise in palliative care. ‘End of life’ care is provided to people approaching the end of life by health professionals, who may work in the health, community or aged care systems. Not everyone receiving end of life care needs palliative care.

NSW Health has a policy and planning role in palliative and end-of-life care, and it coordinates a wide range of service providers. Local Health Districts (LHDs) provide care services in settings such as homes, hospitals and clinics to patients with varying needs. There are several care providers that can be involved.

Due to this shared nature of palliative care — where many people, services and settings are involved in delivering care to the patient — availability and communication of information is critical. For service planning, data and evidence must be drawn from various sources in a timely and efficient way.

This audit assessed whether NSW Health is effectively planning and evaluating palliative care services, in the context of rising demand, increasingly complex needs, and the diversity of service providers.

Conclusion 

NSW Health’s approach to planning and evaluating palliative care is not effectively coordinated. There is no overall policy framework for palliative and end-of-life care, nor is there comprehensive monitoring and reporting on services and outcomes.  

NSW Health has a limited understanding of the quantity and quality of palliative care services across the state, which reduces its ability to plan for future demand and the workforce needed to deliver it. At the district level, planning is sometimes ad hoc and accountability for performance is unclear.

The capacity of LHDs to use accurate and complete data to plan and deliver services is hindered by multiple disjointed information systems and manual data collections. Further, a data collection on patient outcomes, for benchmarking and quality improvement, is not used universally. This limits the ability of districts to plan, benchmark and improve services based on outcomes data.

NSW Health's engagement with stakeholders is not systematic. The lack of an overall stakeholder engagement strategy puts at risk the sustainability and value of stakeholder input in planning and limits transparency.

Over the last two years, NSW Health has taken steps to improve its planning and support for districts. The Agency for Clinical Innovation has produced an online resource which will assist LHDs in constructing their own, localised models of care. eHealth, which coordinates information communication technology for the state’s healthcare, aims to invest in integrating and improving information systems. These initiatives should help to address many of the issues now inhibiting integrated service delivery, reporting on activity and outcomes, and planning for the future.

1. By July 2018, NSW Health should develop an integrated palliative and end-of-life care policy framework that:

  • clearly articulates the interface between palliative and end of life care and outlines the priorities for the respective areas
  • defines policy goals and objectives, and a performance and evaluation framework for palliative care service planning and delivery
  • informs a related workforce plan which supports the policy framework and is linked to the Health Professional Workforce Plan 2012–2022
  • reviews the funding allocation model to ensure future enhancement funds are distributed equitably and transparently based on the need and population of districts.

By December 2018, NSW Health should:

2. assess how the functionality provided in data collection programs such as the Palliative Care Outcomes Collaboration program can be provided across all palliative care services in NSW

3. complete its statewide review of systems and reporting for end of life management including specialist palliative care, and develop a business case to implement a more integrated set of solutions to:

  • support providers delivering end of life and palliative care
  • help monitor service quality and quantity
  • provide comprehensive data for service planning

4. improve stakeholder engagement by:

  • developing a statewide stakeholder engagement strategy that brings together current activity and good practice, and is transparent and publicly available
  • defining accountability for overseeing and implementing the strategy at state and district levels.

1. Performance monitoring is inadequate

NSW Government policy on palliative care is outlined in the NSW Government Plan to Increase Access to Palliative Care 2012–2016 (the Plan). Under the Plan, the overarching policy is ‘to ensure that everyone has access to quality palliative care regardless of their economic or social circumstances, their geographical location or their medical condition.’ Some initiatives under the Plan are still being implemented.

NSW Health only has measures in place to assess some processes and activities for individual initiatives under the Plan. There is no tracking of outcomes relating to the policy goals set out in the Plan, such as increased choice to die at home or the location of the patient’s choice, and improved access to specialist palliative care services. NSW Health has not conducted an overall assessment of the Plan’s outcomes to guide future priorities.

Further, there is no overall performance and reporting framework for palliative and end of life care, meaning there is no monitoring of performance of palliative care services for NSW as a whole. This lack of evaluation and performance measurement impacts on NSW Health's ability to monitor progress and achievements, address gaps in service, and plan for future service enhancement. 

2. Statewide planning and evaluation lacks coordination

Currently, palliative care services are complex to plan and evaluate. Many policies, strategies, guidelines, directives and data collections currently inform services. Even definitions of services vary. The split of policy functions for palliative care and end-of-life care between different branches within NSW Health adds further complexity. These arrangements create the risk of confusion, gaps in advice and support for LHDs.

Consistency is needed in the use of terminology and planning to achieve an integrated approach at all levels, including:

  • standard definitions of palliative care and end-of-life care
  • planning within a single structured policy framework to help clarify what services are to be delivered, who is accountable for delivering them and how to measure their outcomes.

Workforce planning is also affected. While NSW Health has identified significant gaps in the specialist palliative care workforce (especially in regional and remote areas) and it previously made workforce capacity one of its priorities, limited work has been undertaken in producing a statewide strategy to reduce these gaps.

3. District planning is not systematic and some external providers are poorly managed

An integrated approach would inform district-level service planning for palliative care. Planning in the districts we visited was sometimes ad hoc and accountability for performance unclear. Districts would benefit from:

  • better integrating data collection systems with planning
  • clearer guidelines, easy-to-use tools, monitoring and accountability systems.

The recently developed guide – A Blueprint for Improvement, from the Agency for Clinical Innovation – should help districts plan more effectively and consistently as it rolls out more widely in 2017. This takes an integrated approach to palliative and end-of-life care. Only one district we visited has finalised a comprehensive plan using the Blueprint.

Issues with district planning extend to external agreements with service providers, as these are sometimes poorly managed and do not support improved patient outcomes. Examples we reviewed showed a significant reporting burden with process-focused reporting. We also found little evidence of monitoring or action as a result of these reports.

4. Diverse information systems mean data collection and use are inconsistent

NSW Health gathers a broad range of data from many collection points and systems to inform palliative care services at hospital, ward or unit level, and community teams. However, the current data is limited because: 

  • activity is under-reported, particularly in community-based services
  • collection is not universal across districts and services.

Districts also struggle with evidence-based planning and service delivery because multiple information systems mean data may be incomplete or inaccurate. Too often, clinicians and service managers rely on manual collection and paper-based systems. 

eHealth, which coordinates information communication technology (ICT) for the state’s healthcare, is planning a statewide approach to capture information and report on all palliative care activity. The current plans of eHealth to review and improve systems should make data more complete, robust and accessible for quality improvement and planning.

5. An overarching stakeholder strategy would strengthen engagement

Just as data is central to effective planning and evaluation, so too is stakeholder engagement. However, there is currently no explicit stakeholder strategy, which means consultation is inconsistent across the state and not systematic at a district level.

While NSW Health uses a range of platforms to consult, the purpose and value is often not clear to stakeholders. Individual districts have some good practices, but there are limited mechanisms to identify and share these with other areas. A state-wide strategy would improve the quality and consistency of engagement, which will in turn inform service planning and delivery.

A stakeholder engagement strategy would integrate current initiatives, such as the two major networks that consult with health planning staff and clinicians. But it will also need to extend the feedback gathered from families, carers and volunteers, and from the peak bodies that represent them. 

Published

Actions for Sydney Road Maintenance Contracts

Sydney Road Maintenance Contracts

Transport
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management

In November 2013, Roads and Maritime Services (RMS) outsourced the maintenance of State roads in the Sydney region south and west zones using an innovative contracting approach called the Stewardship Maintenance Contract (SMC). The SMC links risk to reward, and uses a performance framework where outcomes should drive improved performance over time.

RMS’ SMC contract management includes most elements of good practice, including governance and dispute resolution mechanisms. However, key elements are missing which reduces its effectiveness.

Roads and Maritime Services (RMS) is responsible for the Sydney region State roads network This includes over 2,800 kilometres of roads and associated road corridor infrastructure such as bridges, tunnels and drainage structures. RMS divides the network into three geographical areas: south, west and north zones.

In 1995, RMS first outsourced road corridor infrastructure maintenance for the north zone through a Performance Specified Maintenance Contract (PSMC). The current 10-year PSMC for the north zone will expire in October 2018. Prior to November 2013, RMS maintained roads in the south and west zones through its Road and Fleet Services unit. 

In November 2013, RMS outsourced road maintenance services for the south and west zones using Stewardship Maintenance Contracts (SMC). The contracts run for seven years with an option for a further three years at RMS’ discretion. RMS estimated that the annual cost of these contracts was around $240 million in total. In March 2018, the contract prices are due to be reset by negotiation to reflect the contractors’ experience with, and better information about, the road networks and routine maintenance requirements. 

The SMC model adopted stewardship principles to improve value for money. RMS defined stewardship principles as a broad set of values, attitudes and behaviours, required of the contractor to effectively manage the assets on behalf of RMS. The SMC also includes commercial principles, such as linking risk to reward, and a performance framework where outcomes drive performance.

This audit assessed whether RMS had effectively managed the outsourcing of road maintenance in the Sydney region south and west zones. In making this assessment, we answered the following questions:

  1. Did RMS justify the decision to adopt the SMC model?
  2. Do SMCs include key performance indicators (KPIs) and incentives which promote efficiency and effectiveness? 
  3. Does RMS collect high quality information on contractor performance and take action to correct performance deficiencies?
  4. Are the expected benefits being achieved?

Conclusion

RMS developed an innovative contracting approach with the SMC. RMS has realised some benefits in the first year, including savings, from outsourcing road maintenance in the Sydney region south and west zones using the SMC. However, RMS’ management of the SMC has key elements missing which reduces its effectiveness.

The SMC includes performance measures and incentives to drive efficiency and effectiveness improvements over time.  

RMS has established a contract management framework which includes most elements of good practice, including governance and dispute resolution mechanisms. However, it does not have procedures to guide its contract managers in managing specific provisions of the SMC. Consequently, RMS has not exercised several significant SMC requirements, such as having the contractor account for an efficiency dividend in its pricing at the start of each three-year works period. It also has not done enough to assure itself that the contractor provided performance and financial data are correct. This is important because the data is used to measure performance and calculate contractor payments.  

RMS assessed that it had achieved around 80 per cent of the expected cost benefit in the initial year of the SMC. However, it has not tracked its achievement of benefits since then.

The Stewardship Maintenance Contract

RMS justified adopting the SMC model and included KPIs to drive efficiency and effectiveness

The SMC model includes features that RMS had not previously used for road maintenance contracts. These included adopting stewardship principles and transferring price risk to the contractor over time as the contractor becomes familiar with the assets being maintained.

The SMC model meets RMS’ requirements for flexibility in pricing models, the need for collaboration in asset maintenance planning, promoting innovation and effective performance management.

RMS used many good practices to develop the SMC model, including:

  • preparing a robust business case comparing the SMC model to RMS maintaining the road network itself, as well as assessing whether two other contracting models
    (traditional and alliance) would meet its requirements
  • assessing experiences with similar arrangements in other jurisdictions and identifying elements that worked to get the best outcomes
  • developing a robust performance framework, which included a mix of efficiency and effectiveness KPIs that reflected NSW Government policy and RMS priorities
  • incorporating risk and reward incentives delivered through cost sharing arrangements which change as the contract matures
  • using a contract duration that supports RMS priorities and provides an incentive for better quality outcomes.

RMS uses data provided by the contractor to measure performance and calculate payments to the contractor. The SMC includes a specific sanction if RMS finds that the contractor provided incorrect performance data, but no specific sanction if the contractor provides incorrect financial data. If RMS finds that the contactor provided incorrect performance or financial data, RMS can only recover over-payments which may have been made using the incorrect data.  

To provide a stronger incentive for the contractor to ensure data it provides is accurate, RMS should consider whether to incorporate stronger sanctions when negotiating the commercial reset due in mid-2018 for south and west zones. RMS should also consider this for the new contract for the north zone when the current PSMC contract expires in October 2018.

RMS' contract management approach and benefits realization

RMS can improve the effectiveness of its oversight and management of the SMC

RMS does not have SMC specific contract procedures to guide its contract managers. Consequently, RMS has not exercised several significant SMC requirements, such as having the contractors account for an efficiency dividend in their pricing at the start of each three-year works period. Effective contract management should be supported by contract specific procedures, with explanations of, and allocation of responsibility for, the various interventions that RMS may be required to exercise in the SMC.

Performance and financial reporting under the SMC is based on a mix of RMS and contractor provided data. While there are a range of audits of contractor provided performance and financial data that RMS can conduct each year under the SMC, it does not have a schedule of audits it will conduct and when.  
During the first year of the SMC, RMS commissioned some limited audits of financial data. In the first three years of the SMC, RMS did not conduct any audits of performance data. Had there been SMC specific procedures in place, this would have reduced the risk of RMS not implementing a systematic audit program to give it reasonable assurance on the quality of the data that the contractor has provided. This is important because the data is used to measure performance and calculate contractor payments.

RMS has been aware of data quality issues since 2015. While RMS advised that it commenced addressing some data quality issues in response to a series of reviews conducted in 2015, a recent internal audit report indicates that RMS has not resolved the data quality issues.  

RMS achieved benefits in the first year, but has not tracked benefits since

As part of the business case, RMS agreed to implement a benefits realisation strategy, including a benefits tracking tool. RMS commenced tracking benefits, but did not establish a comparative baseline pre-SMC on non-financial benefits, and has not tracked benefits past year one.

In 2015, a benchmarking study commissioned by RMS found that it had achieved 80 per cent of the expected recurrent cost savings and other benefits, such as improved workplace safety, in the first full year of the SMC. However, there was no clear baseline to measure
non-financial performance. The study was qualified due to gaps in available data. The study also did not reconcile the actual one-off transition costs to the business case estimate.

During the course of the audit, RMS advised that it intends to repeat this type of study to determine whether it has achieved all expected benefits (and their value), and that it would use the results to inform its negotiation with the SMC contractors as part of the commercial reset due in mid-2018.

Roads and Maritime Services is responsible for the State Roads network in the Sydney region

Roads and Maritime Services (RMS) is responsible for the Sydney region State roads network. This includes over 2,800 kilometres of roads and associated road corridor infrastructure such as bridges, tunnels and drainage structures. The network is divided into three geographical areas: south, west and north zones. Prior to November 2013, RMS maintained roads in the Sydney region south and west zones through its Road and Fleet Services unit.  

In 1995, RMS first outsourced road corridor infrastructure maintenance for the north zone through a Performance Specified Maintenance Contract (PSMC). The current 10-year PSMC for the north zone will expire in October 2018. This contract is worth around $35 million per annum.  

NSW Government priorities and road maintenance

Efficient and effective road maintenance contributes to the following NSW Government priorities:

  • improving road travel reliability
  • ensuring on-time running of public transport
  • reducing road fatalities
  • improving government services
  • keeping our environment clean.

The NSW Commission of Audit recommended outsourcing the maintenance of State roads

The NSW Commission of Audit in its Final Report on Government Expenditure (May 2012) recommended contestability as an appropriate strategy to consider for improving road maintenance service delivery for State roads.  

The Commission benchmarked RMS’ road surface quality and cost per lane kilometre against those of Western Australia, Victoria, and Queensland. This showed that New South Wales lagged the other states on both these measures.  

Exhibit 1: Interjurisdictional comparison of road maintenance outcomes 2009–10
  WA VIC QLD NSW
Roads managed (lane kms) 52,659 50,510 71,353 80,348
Estimated spend ($/lane km) 5,000 4,500 6,000 7,000
Road quality measure (%) 99 99 94 91

Source: NSW Commission of Audit Final Report May 2012.

The Commission noted that RMS had conducted two independent reviews to examine the potential for extending road maintenance contestability. The Commission found that there was inadequate and inconclusive benchmarking to establish the efficiency of RMS’ Road and Fleet Services unit when compared to outsourcing. It recommended that RMS bring forward a proposal to conduct a competitive tender for the road maintenance of the Sydney region south zone road network to inform the feasibility of a progressive rollout of road maintenance contestability across other areas of the State. In August 2012, the NSW Government adopted the Commission’s recommendation.

The NSW Government introduced road maintenance contestability through Stewardship Maintenance Contracts

In April 2013, the NSW Government announced that it would introduce road maintenance contestability across the Sydney region, using a Stewardship Maintenance Contract (SMC) model to improve value for money. In doing so, it excluded RMS’ Road and Fleet Services unit from tendering.  

The SMC model is based on the following key commercial and performance principles set by RMS:

  • performance driven by outcomes
  • flexible and adaptable
  • transparent and measurable
  • linking risk to reward
  • continuous improvement
  • criteria for selection of, and transition to, different payment models.

The following key stewardship principles underpin the SMC’s broad set of values, attitudes and behaviours, which are required of the contractor to effectively manage the assets on behalf of RMS:

  • putting RMS’ customers (road users and the general public) first and being responsive to them
  • being responsible and accountable for the outcomes resulting from the management of the assets
  • managing the assets diligently, efficiently and effectively with limited direction from RMS
  • working collaboratively with RMS to deliver services that are tailored to meet RMS’ evolving needs
  • acting with integrity and transparency in performing the services
  • performing the services in the best interests of RMS and asset users.

Other key features of the SMC include:

  • service requirements which describe the scope of the services, and the standards the contractor must meet
  • a commercial framework which defines how payments are structured, how performance assessment will impact on payments and outlines the key commercial principles. SMCs primarily divide payments into two main mechanisms, these being the priced component (or fixed price) and the target cost calculated as follows:
    • fixed price – the contractor is paid a pre-agreed amount for specific services being provided, regardless of the actual costs incurred
    • target cost – RMS and the contractor agree on a target cost for a project, and any cost overruns or underruns are shared between them
  • a performance framework which provides mechanisms for assessing contractor performance. This includes a comprehensive listing of the key result areas (KRAs) and key performance indicators (KPIs) against which RMS measures the contractor’s performance. The framework also outlines the scoring methodology that RMS uses to determine whether the contractor’s bid margin (profit and overheads) is reduced due to less than satisfactory performance or whether a bonus is paid if a threshold performance score is exceeded.

Road maintenance under SMCs for Sydney region south and west zones commenced in November 2013

In November 2013, RMS awarded SMCs to the Leighton Boral Amey consortium, now named Ventia Boral Amey (VBA), for the south zone and the DownerMouchel (DM) consortium for the west zone. The contracts run for seven years with an option for a further three years at RMS’ discretion. In April 2014, full services commenced following a four-month transition period. RMS estimated that the annual cost of these contracts was around $240 million in total. In March 2018, the contract prices are due to be reset by negotiation to reflect the contractors’ experience with, and better information about, the road networks and routine maintenance requirements. 

  1. Roads and Maritime Services should consider whether to incorporate stronger sanctions in the Stewardship Maintenance Contract if the contractor provides incorrect performance or financial data to RMS, when:
     
    1. negotiating the commercial reset for the next works period with the Sydney region south and west zone contractors due in July 2018.
    2. finalising a new SMC contract for the Sydney region north zone, due to commence in October 2018.

Roads and Maritime Services should, by September 2017:

2.  Review its contract management framework for SMCs to ensure that all authorities and accountabilities of
     contract managers are clearly defined, including:

a) accountability and procedures for exercising all operational clauses in the SMC where RMS may opt to, or be required to intervene, or make a decision

b) authority to approve or initiate the interventions RMS is required to, or may, exercise under the SMC

c) the audits that RMS will conduct to systematically validate the performance and financial data that the SMC contractors provide

d) the accountabilities of RMS contract managers to systematically review audits and quality reviews that the SMC contractors must conduct to demonstrate compliance with their service plans

e) the accountabilities of RMS contract managers to check that the monthly and annual reports provided by SMC contractors do not contain errors, omissions or inaccuracies.

3.  Improve its management of benefits realisation by:

a) initiating a further benefits realisation review and record the benefits delivered against those
    estimated following the tender process, including the one-off transition costs

b) identify any benefits, including savings, not yet attained and develop strategies to address any short-falls

c) establish a tool to track the ongoing realisation of benefits.

Published

Actions for NorthConnex

NorthConnex

Premier and Cabinet
Treasury
Transport
Compliance
Infrastructure
Internal controls and governance
Management and administration
Procurement

The processes used to assess NorthConnex adequately considered value for money for taxpayers.This report also found that the impact of tolling concessions on road users and the motorway network was consistent with policy objectives described in the 2012 NSW Long Term Transport Master Plan.

NorthConnex is a nine-kilometre tolled motorway tunnel between the M1 Pacific motorway at Wahroonga and the M2 Hills motorway at West Pennant Hills. The total cost for the project is $3.1 billion. NorthConnex will be funded through toll charges, and contributions from the NSW and Australian Governments of up to $405 million each. In January 2015, the NSW Roads Minister signed the final contracts for NorthConnex.

By December 2017, the Department of Premier and Cabinet should:

1. publish an updated ‘Unsolicited Proposals – Guide for Submission and Assessment’ which clarifies obligations with requirements in other NSW Government policies such as the NSW PPP guideline and Infrastructure Investor Assurance Framework. The update should require:

a) a business case to be prepared, and a business case gateway review completed, as part of the assessment of the detailed proposal (currently stage 2)

b) probity reports must be completed and considered before the decision to proceed to the next stage.
 

The Department of Premier and Cabinet and NSW Treasury should immediately:

2. improve record keeping to ensure compliance with the State Records Act 1998 and the NSW Government Standard on Records Management.

 

Published

Actions for Mining Rehabilitation Security Deposits

Mining Rehabilitation Security Deposits

Planning
Industry
Environment
Infrastructure
Management and administration
Project management

The Department of Planning and Environment requires mining companies to rehabilitate sites according to conditions set in the mining development approval. The Department holds mining rehabilitation security deposits that are meant to cover the full cost of rehabilitation if a mining company defaults on its rehabilitation obligations.

The total value of security deposits held has increased from $500 million in 2005 to around $2.2 billion in 2016, covering around 450 mine sites in New South Wales.

While there have been substantial increases in total deposits held, mine rehabilitation security deposits are still not likely to be sufficient to cover the full costs of each mine's rehabilitation in the event of a default.

This audit was undertaken when the Department of Industry, Skills and Regional Development was responsible for ensuring land disturbed by mining activities is rehabilitated in accordance with the relevant development approval, including the administration of mining rehabilitation security deposits. On 1 April 2017, this responsibility was transferred to the Department of Planning and Environment (the Department).  

This audit assessed whether the Department maintains adequate security deposits to cover the liabilities associated with mine closures, including rehabilitation. Companies authorised by the Department to undertake mining activities must provide a security deposit to cover the full costs of rehabilitation in the event of default by the company. Rehabilitation is the treatment of disturbed land or water to establish a safe, stable, non-polluting and sustainable environment.

Mining companies must provide an estimate of rehabilitation costs for each site. The Department provides a Rehabilitation Cost Calculation tool to assist companies calculate the deposit amount. Companies are also required to ensure that the cost estimate is in accordance with the approved Mining Operations Plan (MOP). The MOP is intended to be a mine rehabilitation and closure plan, and forms the basis for the estimation of the security deposit. The Department reviews the estimates and determines the deposit for each site.  

Security deposits are an option of last resort. The Department has other legislative and regulatory tools which it normally uses to promote compliance with rehabilitation requirements before accessing a security deposit. It can direct action by the mining company, issue fines and even have the Minister revoke a mining lease. To date, the Department has never had to access a security deposit for a state significant development mine site.

Conclusion

The Department holds security deposits for mining rehabilitation consistent with the amounts it has requested from mining companies, and it should be able to claim on a deposit if a mining company defaults on its rehabilitation obligations. The total value of deposits has increased from $500 million in 2005 to around $2.2 billion in 2016, covering around 450 mine sites. The Department’s management of the security deposit process has improved in recent years, and it has well advanced plans for further improvement, including a revised cost calculation tool.

The Department’s policy is that each mine’s security deposit should cover the full costs of rehabilitation for that mine. The security deposits the Department holds are not likely to be sufficient to cover the full costs of each mine’s rehabilitation in the event of a default. The rates and allowances in the current cost calculation tool have not been updated since 2013 and some activities required for effective rehabilitation are not covered, or not covered adequately.

Security deposits also do not include sufficient contingency given the substantial risks and uncertainties associated with mine rehabilitation and closure, particularly in the absence of a detailed closure plan. This risk is exacerbated by the limited independent verification of mining company claims about the size of the outstanding rehabilitation task, which remains the case despite recent improvements to monitoring and review procedures and practices.  

There is also no financial assurance held over the risk of significant unexpected environmental degradation in the long-term after a mine is deemed to be rehabilitated and the security deposit is returned. A security deposit is not an appropriate vehicle for covering this risk.

Security deposits are close to calculated value and should be accessible if needed

The value of securities held by the Department aligns with the latest approved rehabilitation cost estimates. This contrasts with the situation found by investigations in Victoria and Queensland, where deposit amounts held fell below the calculated costs.

The security deposits are usually in the form of a bank guarantee or cash. The Department has obtained legal advice indicating that it should be able to claim on these bank guarantees if the need arises. As the guarantee is between the financial institution and the Department, if a mining company goes into liquidation the Department should still be able to access the funds.  

When the latest estimate of rehabilitation costs is higher than the existing deposit, the Department will request additional security. It has experienced extensive delays in obtaining additional security for some sites, increasing the risk that available funds will be insufficient if needed.

Rehabilitation cost estimates are not yet adequate, but improvements are planned

The Department’s policy is for security deposits to cover the full cost of rehabilitation. No discounts are provided to mining companies for past good behaviour or low likelihood of default, unlike in some other states. Discounting could undermine the policy position.  

Current security deposits are unlikely to cover the full cost of rehabilitation on each mine site. The Department provides a rehabilitation cost calculation tool to help mining companies calculate the cost of rehabilitation and the required deposit amount, but:

  • several activities required to effect closure are not included and others underestimated
  • it does not make provision for industry cost changes over time
  • the rates used in the tool have not been updated since 2013
  • it was not able to provide the basis for the rates and allowances in the tool.

The Department reviews cost estimates provided by mining companies, but its verification of the extent of rehabilitation work on which these estimates are based is limited. It relies instead on section 387C of the Mining Act 1992 which makes it an offence for mining companies to provide false or misleading information. It is not evident how the Department would establish that information provided was false or misleading without more verification work, and six of the 14 cost estimates we reviewed were not signed by the mine manager, making enforcement more difficult.  

The Department has developed a new calculation tool, and recently released it for industry consultation. The new tool should improve rehabilitation estimates. It updates rates and allowances, and includes additional items to better cover required rehabilitation tasks. While a substantial improvement, the new tool could be further improved by providing additional coverage for stakeholder engagement, additional planning approvals, insurance costs, and any additional design, research and verification work required for successful closure.

There is no financial assurance over long-term environmental risks

The Department does not hold any financial assurance to cover the costs associated with mitigating any future environmental degradation once a mine closes and the security deposit is relinquished to the mining company. Security deposits are probably not the appropriate mechanism to cover these long-term risks but the risk of potential post-closure environmental degradation still needs to be costed and covered. A fund to cover the state-wide risk, to which all mines would contribute, is a possible mechanism.

Rehabilitation and closure outcomes are vague, particularly for unplanned closure

Rehabilitation outcomes in the MOPs we reviewed were generally not specific. Any lack of specificity in MOPs translates into uncertainty about rehabilitation work required if a mining company defaults. Part of the problem is that rehabilitation outcomes established in planning approvals are usually not specific and may not address all closure requirements. The Department has recognised there is scope to improve the clarity and specificity of rehabilitation requirements in planning approvals, and has started a review focusing on open-cut mines.

Rehabilitation outcomes are even less specific in the event of an unexpected early closure because they will probably be different from that achievable from a planned closure.  

MOP guidelines do not cover management of some key closure matters, such as the requirements of environment protection licences issued by the Environment Protection Authority and the management of heritage sites during closure.

There were significant variations in quality of MOPs we reviewed and the way closure risks and uncertainties were identified and addressed. The Department plans to improve the quality of rehabilitation programs through enhanced guidance and oversight.

Monitoring is not adequate to effectively gauge rehabilitation progress

The Department was not able to show it has been monitoring operational mine sites effectively to gauge the progress of ongoing site rehabilitation and the management of closure risks. There was no protocol for site inspections and limited evidence of inspections for the sites we reviewed.

The Department receives annual environmental management reports from mining companies, with most describing the areas of disturbance and rehabilitation occurring at each mine site. The Department recently established procedures for reviewing these annual reports, and has developed a risk-based process for prioritising reviews.

Most annual reports we reviewed did not explain environmental changes over time, nor the risks to mine closure and the measures required to mitigate them. For example, analysis of changes to surface water and groundwater quality was limited despite its relevance for assessing future contamination risks.

The Department does not currently have adequate processes in place to effectively verify the reported areas of disturbance and rehabilitation. It is developing geographic information system-based tools to better measure areas of disturbance and rehabilitation, new rehabilitation guidelines, and a procedure for determining whether rehabilitation has been successful. These initiatives should improve the monitoring and reporting of rehabilitation progress at mine sites.

There is no mechanism to prevent a mine being in ‘care and maintenance’ indefinitely

The Department does not have a clear policy on the length of time and circumstances under which a mine can remain in ‘care and maintenance’. Indefinite postponement of rehabilitation and closure is therefore possible. 'Care and maintenance' is the period following temporary cessation of operations when infrastructure remains largely intact and the site continues to be managed. There are a range of valid reasons for a mining company to put a mine in ‘care and maintenance’, but it is also reasonable for the community to expect a limit to how long it has to wait for proper rehabilitation.

Mining operations make a significant contribution to the NSW economy, including over $1.3 billion in royalties each year. Around 400 mine sites throughout NSW provide over 40,000 jobs and are a major source of economic activity for many communities. Despite these benefits, it is important to ensure that mining companies fulfil their obligations to rehabilitate land disturbed as a result of mining activity.

We recommend that the Department should, by January 2018:

1. Improve the quality of rehabilitation and closure plans by:

  • ensuring plans submitted by mining companies include robust mine rehabilitation and closure risk assessments
  • clarifying the level of detail required in plans at each stage of a mine’s operation
  • specifying how requirements set under other legislative instruments (e.g. environment protection licences, heritage assets) should be addressed.

2. Improve assurance that security deposits are sufficient by:

  • ensuring its new cost calculation tool adequately covers all works needed for rehabilitation and closure
  • increasing the contingency for uncertainties associated with mine rehabilitation and closure, at least until the mining company provides a detailed closure plan
  • verifying the cost estimates for a sample of high risk sites annually
  • ensuring that when mining companies are required to provide increased security deposits, they do so with minimal delay.

3. Enhance oversight of mine rehabilitation by:

  • developing a protocol to ensure sufficient and adequate site inspections
  • ensuring mining companies report performance against rehabilitation targets and environmental changes clearly, including an analysis of long-term surface water and groundwater trends in terms of levels, flow and quality
  • improving how it determines the progress and success of mine rehabilitation
  • developing clear policy and procedures for ensuring a mine cannot be put into ‘care and maintenance’ indefinitely.

4. Collaborate with relevant agencies to establish a financial assurance mechanism, such as a sinking fund, to cover the risk of long-term environmental degradation after mines are closed and security deposits returned.

Appendix One - Response from the Department

Appendix Two - About the audit

 

Parliamentary reference - Report number #285 - released 11 May 2017

Published

Actions for Passenger Rail Punctuality

Passenger Rail Punctuality

Transport
Information technology
Infrastructure
Service delivery

Rail agencies are well placed to manage the forecast increase in passengers up to 2019, including joining the Sydney Metro Northwest to the network at Chatswood. Their plans and strategies are evidence-based, and mechanisms to assure effective implementation are sound.

Based on forecast patronage increases, the rail agencies will find it hard to maintain punctuality after 2019 unless the capacity of the network to carry trains and people is increased significantly. If recent higher than forecast patronage growth continues, the network may struggle to maintain punctuality before 2019.

A NSW Government priority is to ‘maintain or improve reliability of public transport services over the next four years’. Punctuality is a key element of reliability, and the level of patronage is a critical factor in the ability to maintain punctuality. Increasing patronage places pressure on the length of time trains need to wait at stations to load and offload passengers which can lead to delays. The NSW Long Term Transport Master Plan forecasts that rail patronage could increase by 26 per cent between 2012 and 2031.  

Passenger rail services in NSW are provided under a purchaser-provider model. Transport for NSW enters contracts with:

  • Sydney Trains for Sydney suburban passenger rail services
  • NSW Trains for services that commence or terminate outside Sydney, including intercity services that operate between Central station and the South Coast, Southern Highlands, Blue Mountains and Central Coast and Newcastle.

Transport for NSW sets performance targets and standards for these services, develops the timetables, procures trains for the service providers, and is responsible for long term planning.

This audit assessed whether these rail agencies have plans and strategies to maintain or improve performance in getting the growing number of suburban and intercity rail passengers to their destinations on time.

Conclusion:

Rail agencies are well placed to manage the forecast increase in passengers up to 2019, including joining the Sydney Metro Northwest to the network at Chatswood. Their plans and strategies are evidence-based, and mechanisms to assure effective implementation are sound.

Based on forecast patronage increases, the rail agencies will find it hard to maintain punctuality after 2019 unless the capacity of the network to carry trains and people is increased significantly. If recent higher than forecast patronage growth continues, the network may struggle to maintain punctuality before 2019.

Transport for NSW has undertaken considerable work on developing strategies to increase capacity and maintain punctuality after 2019, but remains some way from putting a costed plan to the government. There is a significant risk that investments will not be made soon enough to handle future patronage levels. Ideally, planning and investment decisions should have been made already.

Punctuality measurement is satisfactory, but agencies could publish more information

Passenger rail punctuality indicators adopted in NSW are good practice. The key train punctuality indicator is better than indicators used by many other rail operators. It is also better than the on-time-running indicator that it replaced. Unlike the on-time-running indicator, the punctuality indicator classifies trains that have been cancelled or skipped stations as late and results are not adjusted to take account of delays caused by factors such as extreme weather or police operations.

NSW also has a customer delay measure which represents good practice. Work has started on refining and embedding customer delay as a key performance measure for the planned new Rail Operations Centre.

As train frequency approaches a ‘turn up and go’ level of service, rather than running to a timetable, more emphasis will need to be placed on excess waiting time and customer delay when assessing performance.

Measurement of punctuality is reasonably precise. There are some measurement inaccuracies which should be addressed, such as the estimated arrival time of a train being incorrect at some destination stations, but these do not affect punctuality results materially.  

Train punctuality is reported publicly, but not to the detail of the indicators in the contracts between Transport for NSW and Sydney Trains and NSW Trains. There is very limited public reporting of customer delay.

Overall punctuality is good, but some services are relatively poor

System-wide train punctuality has usually exceeded target since 2005, but some services suffer from poor punctuality compared to the rest of the network.  

The part of the network around North Sydney is creating problems for the punctuality of afternoon peak services heading through it and out to Western Sydney and to Hornsby via Strathfield. Transport for NSW and Sydney Trains are well advanced with strategies to address this up to 2019.  

The East Hills express trains in the afternoon peak also performed well below target. The rail agencies recently analysed this issue and believe it relates to the train timetable and signalling which restricts how close trains can run behind each other into Campbelltown. It further advises that this will be corrected over the next three years.  

Intercity train punctuality is below that of suburban trains and there was an extended period of declining punctuality between 2011 and 2014. Transport for NSW suggested that the old age of trains is a factor, and the recently announced intercity fleet acquisition may help address this. Apart from ensuring that train crew and station staff are available and perform their duties adequately, NSW Trains can do little to impact the punctuality of its intercity services directly. Train maintenance, track and signal maintenance, and management of trains on the rail network are performed by Sydney Trains. NSW Trains’ ability to influence improvement is hampered by key indicators in some contracts being undefined. Transport for NSW, Sydney Trains and NSW Trains are now working collaboratively to make improvements to the contracts.

Initiatives are in place or are planned to deliver good punctuality until 2019

Patronage increases, which can lead to overcrowding and trains having to wait longer at stations, are likely to present a significant challenge to maintaining punctuality into the future.

Based on patronage projections, the rail agencies have strategies to maintain punctuality up to and including joining the Sydney Metro Northwest to the network at Chatswood in 2019. These include improving infrastructure at particular parts of the network, increasing staff training, reducing the number of speed restrictions, and a new Rail Operations Centre. The projects are being managed by experienced staff, with good governance arrangements, quality assurance processes and planning systems in place. New timetables should provide more services and cater for more passengers, including off peak. They should increase network efficiency through better utilisation of capacity, but some passengers may face longer journey times and more may need to change trains mid-journey.  

The planned Rail Operations Centre has the potential to make operational decision-making more customer-focussed, by placing more emphasis on minimising customer delay during disruptions. If implemented well, it will also generate information to help agencies better identify the root cause of incidents that delay trains and improve communication with passengers so they can make better real-time travel decisions.

Predicted passenger growth presents a risk to punctuality after 2019

The rail system will struggle to maintain punctuality much beyond 2019 based on current patronage forecasts and system limitations.

From 2024, the Sydney Metro City and Southwest will help by extending the metro network from Chatswood under Sydney Harbour, through the city and out to Bankstown. Announced fleet upgrades will also help. Transport for NSW advises that it is also working with the Greater Sydney Commission to ensure network capacity constraints are considered in future urban planning.

In addition to investment in new metro networks, sustained and substantial investment needs to be made into the existing heavy rail network to meet demand and ensure its ongoing reliability. Transport for NSW has been developing strategies for this purpose, including an Advanced Train Control system. Its aim is to put a costed plan to the government by the third quarter of this (2017) calendar year. Given the likely lead times involved with major infrastructure projects, there remains a significant risk of poor punctuality after 2019.

Punctuality could be at risk sooner if recent patronage growth continues

If patronage continues to increase at a faster rate than forecast, particularly during the morning peak, the network will struggle to cope before 2019. Transport for NSW forecast that between 2011 and 2026 morning peak rail patronage would increase each year by approximately 3.3 per cent. Between 2011 and 2016 the number of passengers travelling to the city during the morning peak grew by an average of 4.4 per cent each year, including annual growth of 6.6 per cent since May 2014.

A good understanding of patronage levels, trends and drivers is critical to effective planning. The audit identified some shortcomings in measurement of peak passenger loads. Transport for NSW advised that measurement approaches have been improved recently, and this will soon flow into improved data quality.  

Given the increasing flexibility in work practices available to many city workers, the relatively new field of behavioural insights may offer opportunities to ‘nudge’ some passengers away from travelling at the height of the peak with benefits for them and the network.

  1. Transport for NSW should ensure that programs to address rail patronage growth over the next five to ten years are provided to the government for Cabinet consideration as soon as possible.
     
  2. Sydney Trains and Transport for NSW should:
    a) maintain effective oversight and resourcing for all strategies designed to address rail patronage growth
    b) adjust strategies for any patronage growth above projection.
     
  3. Sydney Trains, NSW Trains and Transport for NSW should publish Customer Delay results by June 2018.
     
  4. Transport for NSW, Sydney Trains and NSW Trains should agree by December 2017:
    a) specific performance requirements for intercity train, track and signal availability and reliability
    b) guidelines for train priorities during disruptions and indicators of control centre performance in implementing these guidelines.
     
  5. Sydney Trains, NSW Trains and Transport for NSW should by June 2018:
    a) improve the accuracy of patronage measurement and develop a better understanding of patronage growth trends
    b) address small errors in the adjustment factors used for determining a train’s punctuality status
    c) improve their understanding of the factors impacting on intercity punctuality.
     
  6. Transport for NSW should, commencing June 2017, explore the potential to use behavioural insights to encourage more passengers to travel outside the height of the morning peak (8 am to 9 am).

Published

Actions for 2016 - An overview

2016 - An overview

Education
Community Services
Finance
Health
Industry
Justice
Local Government
Planning
Premier and Cabinet
Transport
Treasury
Universities
Whole of Government
Environment
Asset valuation
Compliance
Cyber security
Financial reporting
Fraud
Information technology
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management
Regulation
Risk
Service delivery
Shared services and collaboration
Workforce and capability

This report focuses on key observations and findings from 2016 audits and highlights key areas of focus for financial and performance audits in 2017.

The quality and timeliness of financial reporting continued to improve across the NSW public sector in 2016. Only one qualified audit opinion was issued and most agencies signed their financial statements on time.

We found the Government’s cluster governance arrangements were unclear and inconsistently implemented across the sector in 2016. Clearer arrangements would improve cooperation and coordination amongst cluster agencies and help deliver government priorities that cut across agencies.

This report focuses on key observations and common issues identified from our financial, performance and compliance audits in 2016, and identifies examples of good practice. It also looks forward to where we will focus our efforts in 2017.

We have summarised our observations and findings for 2016 in four chapters:

  • Financial Performance and Reporting
  • Financial Controls
  • Governance
  • Service Delivery.

Key observations and common issues identified across several agencies will often apply more broadly across the NSW public sector. For this reason, we hope this report is a useful tool for agency management and Audit and Risk Committees to assess our observations and common issues and consider the impact on their agencies. The report provides links to other reports and refers to other useful reference material.

Our financial audits provide independent opinions on NSW agencies’ financial statements. They consider whether agencies have complied with accounting standards, relevant laws, regulations and government directions. They also identify and report internal control weaknesses and matters of governance interest, and make recommendations to address deficiencies.

Our performance and compliance audits build on the financial audits by reviewing and concluding on whether taxpayers’ money is being spent efficiently, effectively, economically and in accordance with the law.

Financial Reporting
Financial Reporting The quality and timeliness of financial reporting
continued to improve across the NSW public sector.
NSW Treasury’s early close procedures helped
facilitate this.
Financial Controls
Internal Controls More needs to be done to implement audit
recommendations on a timely basis.
Information Technology Agencies continue to face challenges in managing information security.
Internal controls at shared service providers Clients of ServiceFirst and GovConnect were unable to rely on the service providers’ internal controls increasing the risks of fraud, error and inappropriate access to data.
Governance
Cluster governance Cluster governance arrangements that support cluster accountability, performance monitoring, risk and compliance management are unclear.
Management oversight We identified deficiencies in the oversight and management of Crown Land, specifically sale and lease transactions.
Project governance Project cost and time overruns continue to occur.
Service Delivery
Premiers and State Priorities

According to agency data, which we have not audited, some Premier's and State Priorities are at risk of not being achieved.

A comprehensive report of performance against the State Priorities is not published.

Delivering Government Services The NSW Government's program evaluation initiative has been largely ineffective. We found government decision makers are not always receiving enough information to make evidence based decisions.
Reporting on Performance We found agencies’ performance was not routinely measured, evaluated or publicly reported.

Financial performance and reporting

The quality and timeliness of financial reporting continues to improve

Only one qualified opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. The audit opinion for the Office of the NSW State Emergency Service was qualified because effective controls over fundraising activities did not operate for the entire year.

Since NSW Treasury introduced its ‘early close procedures’ initiative in 2011–12, the number of reported misstatements and significant matters have fallen considerably across the NSW public sector. The number of misstatements has fallen from 1,077 in 2011–12 to 298 in  2015–16.

Most agencies submitted and signed their financial statements on time, which enabled more audits to be completed within three months of year end. In 2015–16, 204 of 286 agencies’ financial statements and audit opinions were signed within three months of the year end, compared to only 67 in 2010–11.  

NSW Treasury has narrowed the scope of mandatory early close procedures 

NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues. For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures, which may diminish the good performance achieved in recent years.   

To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years. These include:

  • resolving all past audit issues
  • performing key account reconciliations
  • agreeing and confirming inter and intra (cluster) agency balances and transactions
  • identifying material, complex and one-off transactions
  • preparing quality workpapers to support balances with variance analysis and meaningful explanations for movements
  • adequate review by management and Audit and Risk Committees.

Financial controls

More needs to be done to implement audit recommendations

More needs to be done to implement audit recommendations on a timely basis. Internal control issues were identified in previous audits, but had not been adequately addressed. Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner.

Agencies continue to face challenges managing information security

Our financial audits identified opportunities to improve IT control environments, with most information technology issues relating to information security. We also found service level arrangements with IT service providers did not always adequately address information security risks.

Agencies should ensure information security controls and contractual arrangements with IT service providers adequately protect their data.

Internal controls at GovConnect were ineffective in 2015–16

GovConnect provides information technology and transactional services to agencies within the NSW Public Sector. Service levels fell during the transition of shared services from ServiceFirst to GovConnect and NSW public sector agencies using these services were unable to rely on controls over financial transactions and information. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect did not ensure effective control over client transactions and data. This increased the risk of fraud and error, and inappropriate access to information.

Governance

Cluster governance arrangements are unclear

Currently, cluster governance arrangements are unclear and inconsistently implemented across the NSW public sector. Implementing cluster governance frameworks is complex because clusters bring together entities with different enabling legislation, organisational and legal structures, information systems and processes, risk profiles and governance frameworks.  

Clear cluster governance arrangements would improve cooperation and coordination amongst cluster agencies, help deliver government priorities that cut across agencies and improve service delivery outcomes.  

We recommended the Department of Premier and Cabinet release a revised NSW Public Sector Governance Framework that clearly articulates cluster governance arrangements, the role of the cluster Secretary, Chief Finance Officer, Chief Information Officer and Chief Risk Officer. The Department of Premier and Cabinet has indicated the framework will be updated to provide guidance on cluster governance, and how accountability and performance information are monitored and reported.  

The sale and lease of Crown land is not being managed effectively

Our 2016 performance audit found limited oversight of sales and leases of Crown land by the Department of Industry - Lands. The Department has only just started monitoring whether tenants are complying with lease conditions, and does not have a clear view of what is happening on most leased Crown land.  

Most guidance to staff had not been updated for a decade, contributing to staff sometimes incorrectly implementing policies on rental rebates, unpaid rent, rent redeterminations and the direct negotiation of sales and leases on Crown land. Between 2012 and 2015, 97 per cent of leases and 50 per cent of sales were negotiated directly between the Department and individuals, without a public expression of interest process.  

Project cost and time overruns continue to occur

Our audits continue to highlight project management, cost and time issues. The Government’s 2016–17 Infrastructure Statement forecasts a $73.3 billion investment program to 2019–20. Good governance of individual projects is critical to ensure the investment program delivers the intended outcomes to the desired quality, on time and on budget.   

A strong risk culture is fundamental to successful risk management

Our assessment of a sample of 33 agencies found that while agencies have risk management governance structures in place, they need to focus on developing stronger risk cultures and fit-for-purpose systems to capture risks and incidents.

Agencies are not fully complying with the GIPA Act

Our review of 13 agencies from across each cluster found varying degrees of non-compliance with recording and disclosure aspects of the GIPA Act by each agency. Our 2016 Special Report 'Compliance with the GIPA Act' details our findings and makes recommendations to help agencies comply with the requirements of the Act.

Service delivery

Some Premier's and State Priorities at risk of not being achieved

Agency data, which we have not audited, indicates some Premier's and State Priorities are at risk of not being achieved. We found that although performance reporting against the Premier’s Priorities is publicly reported, comprehensive performance reporting against the 18 State Priorities is not.  

We will continue to report on performance against the targets to assess whether agency initiatives are delivering intended outcomes.

Government does not always get enough information for evidence-based decisions 

The NSW Government’s program evaluation initiative has been largely ineffective. A performance audit looked at the Justice, Industry, Skills and Regional Development, Planning and Environment, Premier and Cabinet and Treasury clusters and made recommendations for improvements to program evaluation.

Performance is not always measured, evaluated or publicly reported

Inadequate performance measures and reporting that is primarily internal reduces the transparency of agency performance and makes it hard for the public to assess if the agencies are doing a good job. Our audits found instances where performance outcomes were not being measured, evaluated or publicly reported.  

Agencies need to consider whether their performance measurement frameworks adequately measure performance and outcomes so they can make evidence-based decisions and be publicly accountable.

Commissioning and contestability continues to increase

New ways of delivering services across NSW Government are being developed and implemented, including commissioning and contestability arrangements. Commissioning services and introducing new systems can be challenging and it is important for this to be managed well. The learnings from decommissioning ServiceFirst and commissioning GovConnect should be applied to future commissioning arrangements.

NSW Treasury has developed a 'Government Commissioning and Contestability Policy', which is supported by the 'NSW Government Commissioning and Contestability Practice Guide'.

In 2017, we will build on our 2016 financial audits and continue to report our observations and findings as they relate to financial performance and reporting, financial controls, governance and service delivery. We also plan to review agencies' compliance with government travel policies at key agencies in each cluster.

In 2017, we will restructure our financial audit volumes to report our observations and findings on agencies’ financial controls and governance in one cross-sector report to Parliament in September. This will provide the Parliament with more timely reporting on these aspects of our audits. Our observations and findings on agencies’ financial performance and reporting, and service delivery will continue to be reported on a cluster by cluster basis through November and early December.

Our 2017 performance audits will have regard to what we see as key risks and opportunities for the NSW Government, and the Premier's and State Priorities. The program will aim to cover each NSW Government cluster, and focus on how efficiently, effectively and economically they deliver services and other outcomes.

Legislative reforms in the Local Government Amendment (Governance and Planning) Act 2016 have extended the Auditor-General's mandate to the Local Government sector. The expanded mandate includes auditing all NSW local council financial statements and conducting performance audits across the local government sector. The reforms generally bring NSW in line with most other Australian States.

We will report financial audit outcomes and our observations after the 30 June 2017 council audits are completed. Most are expected to complete by the end of October 2017. Our 2017 performance audits will examine and report on whether councils are operating efficiently, effectively, economically and in accordance with the law. In 2017–18, our performance audits will consider how councils are reporting on service delivery, managing shared services and the risk of fraud.

2017 – Issues, risks and opportunities impacting the NSW Government

Our 2017 audits will consider some of the following issues, risks and opportunities impacting the NSW Government.

In mid-2017, we will publish our rolling three-year performance audit program. This will include the performance audits we expect to perform in 2017–18 and the next two financial years. The program can be located at http://www.audit.nsw.gov.au/audit-program

Area of focus  Considerations Audit Office response
Ensuring services meet citizen needs The primary role of state and local government is to provide services to citizens. Today's society is less satisfied with one-size-fits-all services and its citizens want to have a say on the services they need and how they are delivered. This challenges governments to improve engagement with citizens, design services with them and support them in selecting the services that best meet their needs. At the same time, governments have to provide the services within constrained financial environments, and cater for ageing populations and strong population growth, particularly in metropolitan areas.

We will:

  • focus our work on services that are important to citizens
  • keep abreast of best practice and strategies used elsewhere to create more citizen centric services
  • develop our understanding of the key trends putting pressure on government service delivery
  • seek opportunities to engage with citizens in undertaking our work.
Leveraging digital opportunities We live in a digital world, and government is no exception. Digital technologies and the mass of data now available to governments presents opportunities to deliver better services more efficiently and economically. Services can be delivered through digital channels, and data analytics can inform demand, the supply of services and identify potential efficiencies. These opportunities come with risks, including cyber-attacks and privacy breaches.

We will:

  • examine how well state agencies and councils are taking advantage of digital opportunities and managing risks
  • use data analytics to enhance the quality of our audit work
  • use technology to improve how we communicate our key messages.
Having good checks and balances Citizens put faith in government agencies to make decisions in their best interests. It is imperative for government agencies to be clear about what they are trying to achieve and inform citizens on how they are meeting these objectives. While ethics, transparency, and effective governance and stewardship are critical, it is important for the checks and balances not to be so directive or cumbersome they hamper innovation, efficiency and agility.

We will consider the usual issues in our financial audits of agencies and councils. New areas and areas of focus will include:

  • asset management processes,including quality and timeliness of asset valuations and the management of surplus land and property assets
  • oversight and administration of significant grant programs
  • standby assets, the cost to maintain them and their readiness for use
  • benefits realisation for major projects and programs
  • the financial and administrative impact of machinery of government changes
  • engaging with state agencies and councils through workshops and seminars to promote good practices
  • examining governance and internal controls
  • publishing better practice guidance and promoting our Governance Lighthouse.
Getting value from commissioning

Governments, including the NSW Government, are increasingly outsourcing to or partnering with private and non-government organisations to deliver government services. Because outsourced service providers are not directly accountable to the NSW Parliament for their use of public resources, independent assurance that they are using tax payers’ funds efficiently and effectively would improve accountability. In other jurisdictions Auditors-General have been given powers to ‘go beyond’ the boundaries of agencies commissioning services and into the entities providing the services (‘follow the dollar’ powers). This is not the case in New South Wales.

Commissioning brings with it new challenges needing different skills, such as developing and nurturing markets, and transitioning services into and out of government. The NSW Government's recently released Commissioning and Contestability Policy supports agencies entering into commissioning arrangements.

We will:

  • audit agency and council commissioning arrangements and assess whether they are delivering the intended outcomes
  • assess the capability of agencies entering into commissioning arrangements to manage them effectively.
  • report the impact of not being able to provide assurance on the use of taxpayers’ dollars by non-government organisations
  • identify and communicate lessons identified in our audits
  • apply commissioning to our own activities.
Breaking down the silos Government agencies working in silos can diminish service quality through inefficient duplication and overlap. Silos also increase the risk of people falling through the cracks. To achieve best value, silos can be broken down through a clear focus on outcomes and better collaboration, coordination, partnerships, shared services and joined-up government. This has been recognised for many years, but now with both the commitment and tools, inroads can be made to improve citizens' experiences. Governance arrangements, incentives and culture are critical to success.

We will:

  • focus our efforts on areas where there are opportunities to break down silos
  • identify barriers and enablers to joined-up-government, partnerships and collaboration
  • promote good practice and publicise the benefits, both potential and realised
  • work collaboratively and constructively with those we audit
  • partner with and learn from private sector organisations we engage to provide audit services on our behalf.
Looking after future generations and the vulnerable Governments need to plan for the long-term and consider future generations. They have an important stewardship role. Their decisions need to ensure inter-generational equity and prevent environmental degradation.
A core role of government is to look after the vulnerable. Governments intervene in various ways to provide a social safety net. When they do so, it is critical that these interventions are equitable and deliver desired outcomes at a reasonable cost. Increasingly, it is about giving vulnerable people a bigger say in the services they receive.

We will:

  • review the efficacy of projections upon which services are planned
  • adopt a future focus in our work to identify emerging risks and encourage action before they materialise
  • examine the effectiveness and efficiency of interventions designed to address disadvantage and improve equity
  • identify emerging trends and good practice in designing and delivering services to the vulnerable.
A capable and diverse public sector The public sector's lifeblood is its workforce. The effectiveness and efficiency of organisations comes directly from the good ideas, effort, commitment and ethics of the people they employ. Workforce management and succession planning, constructive and respected leaders, and diverse backgrounds and thoughts can enhance agency and council performance and customers' experiences. These attributes require good frameworks to develop key capabilities, manage staff performance and clarify responsibilities and accountabilities.

We will:

  • monitor progress in delivering the NSW Government’s priority to have a diverse workforce
  • examine strategies and programs designed to enhance key capabilities in councils and agencies
  • identify areas where capability and diversity are lagging or are at risk,and offer practical improvement opportunities
  • promote diversity in our own organisation through our diversity and inclusion plan, which includes strategies to increase female representation at all levels and participation in an Aboriginal internship program.
Investing in infrastructure to meet the needs of a growing population

The Government’s 2016–17 Infrastructure Statement forecasts a $73.3 billion investment program to 2019–20. Infrastructure investments of this magnitude carry significant risks. In light of weaknesses we identified in the past with the management of significant infrastructure projects, the Government needs to ensure it has the capability to manage project risks effectively.

Governments also need to make sure infrastructure built today will meet future needs without creating an ongoing burden for future generations.

We will:

  • review infrastructure planning and approval processes
  • examine alternative financing and partnership models, including philanthropic and private sector involvement through vehicles such as social benefit bonds
  • assess risk frameworks and project governance arrangements
  • monitor maintenance spending and asset management practices
  • identify and promote good practice and innovation.
Improving performance through transparency and accountability

NSW Treasury is implementing its Financial Management Transformation (FMT) program to replace ‘service group’ budgeting and reporting with program based budgeting and reporting. A project of this scale and complexity has many risks, which need to be carefully managed if the desired benefits are to be realised.

The NSW Government's move to program budgeting and performance measurement will require appropriate key performance measures and indicators to track whether the programs are delivering the intended outcomes.

Independent assurance over the appropriateness and accuracy of agency key performance measures and indicators would improve confidence in the reliability of the NSW Government performance data.

We will:

  • review and assess the implementation and report on the impact of NSW Treasury's Financial Management Transformation program
  • encourage transparency in reporting,and be transparent in our own practices, performance and reporting.
Preparing for changes to Australian Accounting Standards

For the first time, not-for-profit entities in the NSW public sector need to make disclosures about related parties in their 2017 financial statements. Identifying who the related parties are, and collecting and collating relevant information will be challenging.

Other imminent changes to accounting standards have significant financial reporting implications for Government entities. Entities will need to plan and implement changes to systems and processes well in advance of the new requirements becoming effective.

We will:

  • review and assess policies, systems and processes entities use to identify related parties and transactions, and the completeness and accuracy of the disclosures in the financial statements of agencies and councils
  • work with NSW Treasury, the Office of Local Government, agencies and councils to determine the implications of the accounting standard changes and assess entities’ preparedness to implement them
  • work with the Office of Local Government to streamline the Code of Accounting Practice.
Working together with local councils Legislative reforms have resulted in significant changes to the Local Government sector. These include merging certain councils and extending the Auditor-General's mandate to audit all NSW local council financial statements and conduct performance audits across the Local Government sector.

We will:

  • use our mandate to encourage consistency and promote learnings that enhance financial management,fiscal responsibility and public accountability across the local government sector
  • use findings from our financial audits to inform our performance audit program
  • work alongside councils and their audit committees as they implement changes to governance structures and business planning processes
  • build our internal capacity, capability and knowledge of the Local Government sector to deliver a valuable and cost-effective service.

Financial performance and reporting are important elements of good governance. Confidence in public sector decision making and transparency is enhanced when financial and performance reporting are accurate and timely.  

The preparation of accurate and timely financial statements by agencies is an important tool to ensure accountability and transparency in the use of public resources. As the NSW Government moves to program budgeting with a greater focus on performance and outcomes it will need to ensure the key performance indicators and data used to measure the outcomes are relevant, accurate and reliable. The NSW Government’s Financial Management Transformation (FMT) program aims to address this.

In 2015–16, our audit teams made the following key observations on the financial reporting of NSW public sector agencies.

 

Financial reporting
Observation Conclusion
Only one qualified audit opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. The quality of financial reporting continued to improve across the NSW public sector.
More 2015–16 financial statements and audit opinions were signed within three months of the year end. Timely financial reporting was facilitated by more agencies resolving significant accounting issues early, completing asset valuations on time and compiling sufficient evidence to support financial statement balances.

NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues.

For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures.

The narrowed scope of mandatory early close procedures may diminish the good performance in ensuring the quality and timeliness of financial reporting achieved in recent years.

To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years.

Although most agencies complied with NSW Treasury’s early close asset revaluation procedures we identified areas where they can improve. Asset revaluations need to commence early enough to ensure all assets are identified and the results are analysed, recorded and reflected accurately in the early close financial statements.

Financial reporting

The quality and timeliness of financial reporting continues to improve across the NSW public sector.

Quality of financial reporting

Only one qualified audit opinion was issued on 2015–16 financial statements

Only one qualified opinion was issued on the 2015–16 financial statements of NSW public sector agencies, down from two in 2014–15. The audit opinion for the Office of the NSW State Emergency Service was qualified because effective controls over fundraising activities did not operate for the entire year. For further details, refer to page 16 in our Report on Law and Order, Emergency Services and the Arts.

Unqualified audit opinion issued for TAFE NSW after remediation

TAFE NSW’s audit opinion on its financial statements was qualified in 2014–15 due to system limitations, which prevented it from providing sufficient evidence to support its student revenue, student receivables, accrued income and unearned revenue balances. TAFE NSW dedicated considerable resources to address this issue in the short term.

Management resolved over 250,000 data exceptions and found revenue had been understated by $138 million in 2014–15. This was recorded as a prior-period error in the 2015–16 financial statements. For further details, refer to pages 17–18 in our Report on Industry, Skills, Electricity and Water.

The quality of financial reporting continues to improve

Since NSW Treasury introduced its mandatory ‘early close procedures’ initiative in 2011–12, the number of reported misstatements and significant matters in agency financial statements submitted for audit have fallen considerably across the NSW public sector. This is largely attributed to the early resolution of accounting issues, which helps agencies meet earlier reporting deadlines and improve the quality and accuracy of financial reporting. Whilst the quality and timeliness of financial reporting has continued to improve, the NSW Government will need to continue focusing on strong financial management across the NSW public sector to maximise performance and effectively manage assets and liabilities.

The table below shows the fall in misstatements over five years across NSW public sector agencies since mandatory early close procedures were introduced in 2011–12.

Number of misstatements
Year ended 30 June 2015-16 2014-15 2013-14 2012-13 2011-12
Total reported misstatements 298 396 459 661 1,077

All material misstatements identified by agencies and audit teams were corrected before the financial statements and audit opinions were signed. A material misstatement relates to an incorrect amount, classification, presentation or disclosure in the financial statements that could reasonably be expected to influence the economic decisions of users.  

Significant matters reported to the portfolio Minister, Treasurer and Agency Head

In 2015–16, we reported the following significant matters to the portfolio Minister, Treasurer and agency head in our Statutory Audit Reports:

  • Transport for NSW needs to assess whether a $179 million fall in the carrying value of the bus fleet leased from the State Transit Authority has similar implications for the value of the bus fleet leased from private operators
  •  issues were identified with how the Northern NSW Local Health District implemented its new rostering system, including rosters being 'force approved' by the system administrator, users having inappropriate access, no review of payroll exceptions and inadequate project governance over the system’s rollout
  • the Aboriginal and Torres Strait Islander Health Practice Council of New South Wales’ financial statements were not prepared on a ‘going concern’ basis because it had insufficient funding to continue operating
  • the Department of Industry, Skills and Regional Development needs to improve the recording and accounting for Crown Land (repeat issue)
  • the financial reporting requirements for Local Land Services local boards, established under the Local Land Service Act 2013, need to be clarified (repeat issue)
  • significant limitations exist in TAFE NSW’s student administration system (repeat issue)
  • Hunter Water Corporation contracted to sell Kooragang Island Advanced Water Treatment Plant, which is conditional on the purchaser obtaining a water licence for use of the plant, for $35.5 million. This resulted in a $20.5 million decrease in the revaluation reserve
  • Hunter Water Corporation received $28.1 million from the sale of land impacted by the NSW Government’s decision not to construct Tillegra Dam. This was $62.4 million less than the carrying value of the land
  • Sydney Water Corporation needs to ensure it has robust governance over the development and implementation of a new customer billing system and an integrated enterprise resource planning system, budgeted to cost $184 million and $54.5 million respectively.

Timeliness of financial reporting

More financial statements and audit opinions signed within three months of year end

Most agencies submitted and signed their financial statements on time, which enabled more audits to be completed within three months of year end.

In 2015–16, 204 of 286 agencies’ financial statements and audit opinions were signed within three months of the year end. This compares to only 67 in 2010–11, the year before NSW Treasury introduced mandatory early close procedures.

Early close procedures improved the timeliness of financial reporting

Agencies were broadly successful in performing early close procedures in 2015–16. However, we did identify opportunities for improvement across the NSW public sector.  

The timeliness of financial reporting can be improved further if agencies:

  • resolve all significant accounting issues during the early close process, or document a clear path towards timely resolution
  • establish internal timetables and work with their service providers to ensure supporting work papers are prepared on time
  • assess and document the impact of new and revised accounting standards effective in the current or future years
  • prepare reconciliations, which are properly supported and reviewed
  • analyse and clear suspense accounts on a timely basis
  • complete asset valuations on time (also refer below).

Agencies will not always be able to fully resolve significant and complex accounting issues as part of the early close process. If this is the case, it is important they document a clear path towards timely resolution and ensure relevant stakeholders, including NSW Treasury, are kept informed. The documentation should set out the issue, status, key aspects needing resolution, and who is responsible for the expected deliverables.

Changes in accounting standards can materially impact agencies’ financial statements. Agencies will need to ensure they review the impact of, and have appropriate systems and processes in place to address these changes. Because of the lead time required, agencies need to start preparing for imminent changes now. The more significant changes that will come into effect over the next two years include:

  • service concession arrangements - where private sector entities design, build, finance and/or operate infrastructure to provide public services, such as toll roads, utilities, prisons and hospitals
  • the classification, measurement, recognition and de-recognition of financial instruments
  • leasing arrangements - lessees will no longer classify leases as operating or finance leases; leases will be ‘capitalised’ with financial liabilities being recognised for future lease payments.

NSW Treasury has narrowed the scope of mandatory early close procedures

NSW Treasury Circular 16-13 'Agency guidelines for the 2016–17 Mandatory Early Close' has narrowed the scope of mandatory early close procedures to non-financial asset valuations and proforma financial statements. Early close procedures that are no longer mandatory, but considered to be good practice by NSW Treasury, include:

  • resolving all past audit issues
  • performing key account reconciliations
  • agreeing and confirming inter and intra (cluster) agency balances and transactions
  • identifying material, complex and one-off transactions
  • preparing quality workpapers to support balances with variance analysis and meaningful explanations for movements
  • adequate review by management and Audit and Risk Committees.

If agencies do not perform the good practice procedures, the early close process may not be as effective in ensuring the quality and timeliness of financial reporting. We will monitor and report on the impact of this change on the timeliness and quality of the 2016–17 financial statements.

NSW Treasury piloted a hard-close initiative

NSW Treasury conducted a ‘hard-close pilot’ with nine agencies in 2015–16 to assess the benefits, and whether they should be applied more widely across the NSW public sector. While NSW Treasury has evaluated the results of the pilot, it has not mandated agencies complete hard close procedures in 2016–17. NSW Treasury Circular 16–13 gives agencies the option to complete hard close procedures.  

Hard close procedures involve applying year-end procedures to the fullest extent practicable at a preliminary month end date to further improve the quality and timeliness of financial reporting.

Processes for asset valuations can be improved

Although most agencies complied with NSW Treasury’s early close asset revaluation procedures, we identified areas where they can be improved.  

Asset valuations can be complex. They can involve the valuation of a large, geographically dispersed asset base, require significant judgement to estimate fair value and require substantial resources to complete.

Asset revaluations are successful when:

  • revaluation projects commence early enough to obtain the results and to reflect this in the early close pro forma financial statements, fixed asset register and general ledger
  • all assets are identified, recorded and reconciled before being provided to the valuer and the valuation methodology is agreed and documented
  • quality work papers are prepared setting out management’s proposed accounting treatments, judgements and assumptions
  • management engages with the valuers and interrogates the valuation results with scepticism
  • valuation issues are resolved before preparing the year-end financial statements.

NSW Treasury Policy Paper TPP14-01 also provides guidance to agencies to help manage the revaluation process.

Performance reporting

In 2017 and 2018, NSW Treasury is implementing its Financial Management Transformation (FMT) program. The program will replace the current ‘service group’ budgeting and reporting structure with program based budgeting and reporting. The program expects to have the legislation, policy framework and financial reporting system rolled out for the 2017–18 financial year.  

The program will implement a modern IT system, PRIME, as NSW Treasury's key tool to support whole-of-government budgeting and reporting. PRIME is expected to give the NSW Government strategic, relevant and timely information to plan and deliver its policy priorities and the Budget. It is expected to capture and monitor financial and non-financial performance data, and provide business intelligence and analytics. The roll-out of PRIME commenced in November 2016 and the 2017–18 Budget will be delivered using PRIME.

A project of this scale and complexity has many risks, which need to be carefully managed if the desired benefits are to be realised. To manage the risks, NSW Treasury is running PRIME in parallel with the existing IT systems for an extended period that covers preparation of the 2017–18 budget.

Independent assurance over the appropriateness and accuracy of agency key performance measures and indicators would improve confidence in the reliability of the NSW Government performance data.

Monitoring and guiding program performance will mean:

  • developing and implementing high level frameworks, policies and guidance
  • establishing measures and setting targets for performance
  • ensuring the availability of and access to high quality data and other information
  • obtaining independent assurance over the quality of the data.

The FMT program aims to achieve:

  • better performance and outcomes management
  • improved management of the State’s balance sheet, revenues and expenditures
  • stronger interagency collaboration
  • clearer accountabilities
  • better reporting of performance and outcomes.

This should give the NSW Government greater visibility on whether programs are delivering value for money, with emphasis not just on whether they are meeting compliance requirements, but whether they are also meeting performance expectations. This will require agencies to have the expertise they need to analyse how programs are performing and meeting expected outcomes.

 Appropriate financial controls help ensure the efficient and effective use of resources and the implementation and administration of agency policies. They are essential for quality and timely decision making.  

In 2015–16, our audit teams made the following key observations on the financial controls of NSW public sector agencies.

Financial controls
Observation Conclusion
More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016.

Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making.

Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner.

Agencies continue to face challenges managing information security. Most information technology issues we identified related to poor IT user administration in areas like password controls and inappropriate access. Agencies should review the design and effectiveness of information security controls to ensure data is adequately protected.

We found shared service provider agreements did not always adequately address information security requirements.

Where agencies use shared service providers they should consider whether the service level arrangements adequately address information security.

Thirteen of 108 agencies required to attest to having a minimum set of information security controls did not do so in their 2015 annual reports. The 'NSW Government Digital Information Security Policy' recognises the growing need for effective information security. With cyber security threats continuing to increase as digital services expand we plan to look at cyber security as part of our 2017–18 performance audit program.
We identified instances where service level agreements with shared service providers were outdated, signed too late or did not exist. Corporate and shared service arrangements are more effective when service level arrangements are negotiated and signed in time, clearly detail rights and responsibilities and include meaningful KPIs, fee arrangements and dispute resolution processes.
Internal controls at GovConnect, the private sector provider of transactional and information technology services to many NSW public sector agencies were ineffective in 2015–16. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector.
Maintenance backlogs exist in several NSW public sector agencies, including Roads and Maritime Services, Sydney Trains, NSW Health, the Department of Education and the Department of Justice. To address backlog maintenance it is important for agencies to have asset lifecycle planning strategies that ensure newly built and existing assets are funded and maintained to a desired service level.

Internal controls

Agency internal controls

We report deficiencies in internal controls, matters of governance interest and unresolved issues identified during our audits to management and those charged with governance of the agencies. We do this through management letters, which include our observations, related implications, recommendations and risk ratings.

We identified and reported 837 issues during our 30 June 2016 audits. Common internal control weaknesses identified during these audits included: 

  • non-compliance with processes and legislation
  • incomplete and inaccurate central registers, such as those for managing conflicts of interest, legislative compliance and contract management
  • weaknesses in information technology controls (see further details below)
  • financial performance and reporting issues, such as inadequate review of manual journals and poor quality and review of general ledger account reconciliations
  • deficiencies in purchasing and payables processes, such as poor review of vendor master file changes, limited use of purchase orders and inadequate payment approval processes.

Fewer internal control weaknesses were assessed as being high risk than in previous years. High risk internal control deficiencies should be addressed by the relevant agencies as a matter of urgency.

More needs to be done to implement audit recommendations

More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016. The highest proportion of these issues were in the following clusters:

  • Family and Community Services cluster - 11 of 31 issues were repeat issues.
  • Planning and Environment cluster - 26 of 88 issues were repeat issues
  • Finance, Services and Innovation cluster - 31 of 111 issues were repeat issues
  • Justice cluster - 33 of 124 issues were repeat issues
  • Transport cluster - 18 of 68 issues were repeat issues
  • Health cluster - 33 of 126 issues were repeat issues.

Two of the 212 issues were classified as high risk and related to:

  • an agency’s lack of effective controls over fundraising activities
  • recognition of a loan and the agency’s capacity to repay the loan

Of the remainder, 126 were classified as moderate risk and 84 as low risk. Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. They expose agencies to reputational risks and financial loss.

Some issues can take longer to address due to resource constraints and/or the complexity of the issue. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner. Audit and Risk Committees play an important role in monitoring and advising agency heads on how agencies are implementing measures to address audit findings and recommendations.

Internal controls at shared service providers

Cluster corporate and shared service models are common across NSW Government

Corporate and shared service models are common across NSW Government, with most clusters having moved to or planning to move to some form of shared service arrangement. Shared service arrangements are designed to achieve efficiencies and reduce costs by centralising service delivery in areas such as human resources, governance and risk, procurement, finance and information technology. Corporate and shared service models can:

  • consolidate information systems and standardise processes through common policies and procedures. This should provide greater transparency to the cluster lead agency of agencies' and cluster-wide performance
  • deliver better information management and decision support services
  • increase efficiencies and reduce costs.

Agencies need to carefully manage the risks associated with these arrangements, such as:

  • failing to deliver integrated systems and processes across the cluster
  • limiting flexibility, which may hinder agencies from implementing fit for purpose frameworks, such as those for governance and risk
  • sub-optimal performance by service providers and/or ineffective controls at the service provider
  • poor governance, strategic leadership and direction over shared service arrangements.

The NSW Commission of Audit, in its May 2012 report on ‘Government Expenditure’, recommended improvements in the delivery of corporate and shared services across the NSW Government sector.

Service level arrangements are not always in place or are signed too late

We found instances where service level agreements with shared service providers were outdated, signed too late or did not exist. For example:

  • service agreements, which include performance requirements for safety and quality, service access and patient flow, finance and activity, population health and people between the Secretary of NSW Health and local health districts/specialty networks, need to be signed earlier to clarify roles, responsibilities, performance measures, budgets and service volumes and levels
  •  the NSW Department of Industry, Skills and Regional Development and the Department of Justice did not always have service agreements in place with agencies to which they provide financial and corporate services.

Corporate and shared service agreements are more effective when:

  • Service level agreements are negotiated and signed on time
  • the services provided and the rights and responsibilities of each party are clear
  • meaningful KPIs are agreed and there is a process to monitor performance against the KPIs
  • security over data and information is maintained and rights of access to information are established
  • fee arrangements are agreed
  • dispute resolution processes are in place

Agencies need to seek internal control certifications from service providers

NSW Treasury Policy TPP 14–05 'Certifying the Effectiveness of Internal Controls Over Financial Information' requires agencies to obtain certification on the effectiveness of internal controls from outsourced service providers. We found:

  • agencies using the services of GovConnect were unable to rely on controls over financial transactions and information (further details below), which negated the certification process over controls at the service provider. This required the impacted agencies to implement controls to mitigate the control deficiencies at the service provider
  • the Department of Justice did not always provide written certifications on the design and effectiveness of internal controls to client agencies
  • some private sector service providers do not provide independent certifications on the effectiveness of their controls to agencies.

The NSW Treasury Policy notes that, in some instances, client agencies may consider it appropriate to seek additional assurance in the form of an independent opinion on the design and operating effectiveness of controls in the service organisation. Agencies should consider the nature and extent of the services provided by their service provider when determining whether independent assurance is required.

Internal controls at GovConnect were ineffective in 2015–16

GovConnect provides information technology and transactional services to agencies within the NSW Public Sector. Service levels fell during the transition of shared services from ServiceFirst to GovConnect and NSW public sector agencies using these services were unable to rely on controls over financial transactions and information.  

We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. This increased the risk of fraud and error, and inappropriate access to information.  

The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies identified in GovConnect’s Independent Auditor’s Assurance reports. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector. Refer to pages 19-20 in our Report on Finance, Services and Innovation for further details.

Information technology

Digital Information Security

Agencies continue to face challenges managing information security

We audited the information systems of 72 agencies in 2016. The audits focused on the information technology (IT) processes and controls supporting the integrity, availability and security of financial data used to prepare the financial statements.

The audits identified opportunities to improve IT control environments, with a large proportion of our findings relating to information security. We recommended agencies review and strengthen information security controls. The key control weaknesses we found related to user administration, password parameters and privileged access.

Over the last three years the number of information systems issues we identified has improved, as shown below: 

  • 2015–16: 72 audits - 121 issues reported
  • 2014–15: 73 audits - 169 issues reported
  • 2013–14: 77 audits - 198 issues reported.

Of the 121 issues reported in 2015–16, two were classified as high risk, 80 as moderate risk and 39 as low risk. The two high risk issues related to:

  • poor password configuration management
  • inappropriate user access accounts and inadequate review of users’ access to the agency’s network, finance applications, database and servers.

Twenty-three per cent of the issues reported in 2014–15 were repeated in 2015–16. The percentage of repeat issues has fallen compared to 2013–14. 

Governance refers to the high-level frameworks, processes and behaviours established to ensure an entity meets its intended purpose, conforms with legislative and other requirements, and meets the expectations of probity, accountability and transparency.  

Governance models need to be adapted for the specific goals and outcomes required for different situations; one size does not fit all. High standards of public sector governance and accountability enable effective and efficient use of public resources. They also help to ensure agencies act impartially and lawfully, deliver program/project benefits within expected costs and timeframes and provide useful information about their activities and achievements.

In 2015–16, our audit teams made the following key observations on governance in NSW public sector agencies

Governance
Observation Conclusion
Cluster governance arrangements that support cluster accountability, performance monitoring, risk and compliance management are unclear.

Currently, cluster governance arrangements are unclear and inconsistently implemented across the NSW public sector. Implementing cluster governance frameworks is complex.

The Department of Premier and Cabinet (DPC) has indicated the NSW Public Sector Governance Framework will be updated to give guidance on cluster governance and how accountability and performance are monitored and reported.

The ‘whole-of-government’ does not have a dedicated audit and risk committee. NSW Government agencies would benefit from a dedicated independent audit and risk committee for the ‘whole-of-government’ that focuses on common issues and risks across the NSW public sector, and recommends and oversights coordinated responses to sector wide issues.

We identified many deficiencies in the oversight and management of Crown Land, including the sale and lease of such land.

We recommended the Department of Industry-Lands improve its processes for the sale and lease of Crown Land.

Our assessment of a sample of 33 agencies found that agencies have risk management governance structures in place, but need to focus on developing stronger risk cultures and fit-for-purpose systems to capture risks and incidents. Agencies need to focus on developing strong risk cultures and fit-for-purpose systems to capture risks and incidents.
We found project cost and time overruns continue to occur. In 2016–17, we will assess risk management maturity and processes focusing on effective risk management in project governance.
Our 2015–16 fraud survey indicates fraud controls are improving, but highlighted areas where agencies can do more. Agencies can review their fraud control measures against our Fraud Control Improvement Kit.
Our review of 13 agencies’ compliance with reporting and disclosure aspects of the GIPA Act found varying degrees of non-compliance at each. Our 2016 Special Report 'Compliance with the GIPA Act' makes recommendations to help agencies comply with the requirements of the Act.

Governance and Accountability

With the NSW public sector changing and becoming more complex, good governance becomes more important so the public's confidence in government and its agencies is maintained. Governance across the NSW public sector is complex and needs to accommodate risks arising from:

  • the Government’s cluster arrangements having no legal basis
  • many agencies not having conventional board structures
  • agencies only being able to do what their enabling legislation allows
  • agencies having for profit or not-for-profit objectives, and/or only being established to achieve a particular purpose
  • capability limitations that may exist in governing bodies
  • stakeholders having high expectations around accountability, transparency and conflicts of interest in public sector agencies.

Adding to this complexity is the continually changing nature of the public sector and the way it delivers services. Often, governance arrangements are impacted by:

  • changes in service delivery models, such as commissioning and contestability arrangements
  • machinery of government changes, leading to agencies being formed, amalgamated or abolished
  • complex financing and other contractual arrangements, such as public private partnerships impacting the structure and risks agencies face.

Those charged with governance are accountable for the decisions they make and need relevant, accurate and up-to-date information on which to base their decisions. Consequently, they need to satisfy themselves the governance frameworks, and the design and effectiveness of internal systems and controls provides sufficient assurance the agency’s activities are in line with expectations and comply with standards and legal requirements.  

Our audits identified deficiencies in some agencies’ governance frameworks, including:

  • not having frameworks to manage and ensure compliance with legislation
  • outdated policies and procedures, including those for fraud and corruption
  • inconsistent risk management frameworks
  • not having effective internal audit functions
  • some smaller agencies not having an Audit and Risk Committee
  • poor frameworks for identifying and managing conflicts of interest and gifts and benefits.

Agencies can assess their governance frameworks against our Governance Lighthouse.

Effective cluster/agency and program/project governance is characterised by:

  • leaders who set the right tone from the top, that shapes the culture and demonstrates the desired values and ethics through the behaviours they model when working with management and external stakeholders
  • a clear strategic purpose and direction, based on a clear understanding of stakeholder expectations, realistic medium and long-term outcomes, short-term priorities and expenditure/investment choices and budgets
  • a shared and strong understanding of the strategy to inform decisions
    strong oversight of progress against the strategy, significant deviations from it, emerging risks and planned benefits from change programs
  • regular reviews of and updates to the strategy to adapt to changing circumstances
    a clear purpose at specific project/program levels
  • charters with structures that include clearly distinct governance and management roles, principles, and processes
  • clearly defined roles and responsibilities that make differing interests transparent and improve decision-making – these should be revisited periodically
  • visible leadership when agencies/projects/programs face difficult issues
    clearly allocated and delegated decision-making for governance and management
  • different people in the roles of chair, project sponsor, manager of the division responsible for delivering a project, the line manager of the project director
  • the right mix of people with different perspectives and skills, who robustly debate issues, but support agreed decisions
  • independent quality assurance 
  • effective risk management that identifies, analyses, mitigates, monitors and communicates risks
  • a defined risk management framework and register that is widely understood and aligned to the agency’s strategy, risk appetite, objectives, business plan and stakeholder expectations
  • a mature risk management culture and reporting structure that is built into the agency or project governance framework
  • clear roles for Audit and Risk Committees, with competent and independent members who have a clear purpose
  • governance arrangements and practices that continually evolve to manage risk and conflicts of interest.

Cluster governance

Cluster governance arrangements, including accountability, are unclear

Currently, cluster governance arrangements are unclear and inconsistently implemented across the NSW public sector. Implementing cluster governance frameworks is complex because clusters bring together entities with different enabling legislation, organisational and legal structures, information systems and processes, risk profiles and governance frameworks. They require Ministers, boards, department Secretaries, agency heads and management to work together to ensure effective cluster governance and accountability arrangements are in place.

Clear cluster governance arrangements would improve cooperation and coordination amongst cluster agencies, help deliver government priorities that cut across agencies and improve service delivery outcomes. We recommended DPC release a revised NSW Public Sector Governance Framework that clearly articulates cluster governance arrangements, the role of the cluster Secretary, Chief Finance Officer, Chief Information Officer and Chief Risk Officer.

DPC has indicated the framework will be updated shortly to provide guidance on governance at a cluster level, including how cluster-level accountability and performance information is monitored and reported. We understand DPC will work with NSW Treasury to revise the framework by mid-2017. It is important for these agencies to collaborate and ensure the outcomes of NSW Treasury's Financial Management Transformation (FMT) program are considered when updating the framework.

The FMT program aims to revise financial governance, budgeting and reporting arrangements in the NSW public sector, and clarify the administrative and accountability arrangements for cluster operations. Further information on FMT is included in the Financial Performance and Reporting and Service Delivery chapters.  

Management oversight and capability

Those charged with governance are ultimately responsible for establishing an appropriate governance framework and system of internal control. However, management is accountable to those charged with governance and their oversight plays an important role in ensuring appropriate policies, procedures and internal controls are designed and working properly.

Sale and lease of Crown land is not being managed effectively

Our 2016 performance audit found limited oversight of sales and leases of Crown land by the Department of Industry - Lands. The Department has only just started monitoring whether tenants were complying with lease conditions, and does not have a clear view of what is happening on most leased Crown land. Most guidance to staff had not been updated for a decade, contributing to staff sometimes incorrectly implementing policies on rental rebates, unpaid rent, rent redeterminations and the direct negotiation of sales and leases on Crown land.  

Decisions on the sale and lease of Crown land were not transparent to the public and the Department has not provided consistent opportunities for the public and interested parties to participate in decisions about Crown land. Between 2012 and 2015, 97 per cent of leases and 50 per cent of sales were negotiated directly between the Department and individuals, without a public expression of interest process.  

Adding to this, our financial audit findings have identified significant deficiencies for several years in recording and accounting for Crown land assets in the Crown Land Information Database and the Department’s general ledger.

A key objective of the Department of Industry - Lands is for Crown land to be occupied, used, sold, leased, licensed or otherwise dealt with in the best interests of the State. A major part of the State’s land holding is Crown land, which had an estimated value of $12 billion in  2015–16. Crown land comprises approximately 42 per cent of all land in New South Wales and supports a wide range of important environmental, economic, social and community activities.  

The Crown Land Management Act 2016 (the Act) received assent from Parliament on 14 November 2016. The Act consolidated eight pieces of legislation. Most of the Act is expected to commence in early 2018. It is expected to reduce complexity and duplication, deliver better social, environmental and economic outcomes and facilitate community involvement in Crown land.

Good progress is being made on implementing public sector management reforms

Our performance audit on ‘Public Sector Management Reforms' found the Public Service Commission was making good progress leading the implementation of public sector management reforms. The Commission developed a sound evidence base for the reforms and gained wide public sector support by engaging with agency heads and using public sector working groups to develop options.  

The Commission needs to do more to report on how the reforms are contributing to better public services and to issue its guidance material to agencies promptly. The audit noted that the capacity and capability of human resource units in some agencies remains an impediment to the successful implementation of the reforms.

In early 2012, the NSW Commission of Audit Interim report identified a range of issues with workforce management in New South Wales. The Public Service Commission (PSC), which was established in late 2011, was tasked to address some of these issues and build the capability of the public sector. The Government Sector Employment Act 2013 (GSE Act), which provides the legislative basis for reforms, commenced in February 2014.

The public sector management reforms are ambitious, covering a substantial workforce and requiring a lot to be done in a short time. To achieve the intended outcomes, the reforms needed to be supported by sound evidence, have clear objectives and performance indicators, and be evaluated at appropriate stages.

Risk Management

The increasing complexity of government business transactions reinforces the need for whole of government approaches to deal with inter-related and inter-dependent risks across government agencies. It is important that safeguards in place to manage these risks are commensurate to the risk posed.

Findings from some of our 2016 performance audits, which looked at how areas of high risk are managed across NSW Government, are detailed below:

Our performance audit on managing unsolicited proposals in New South Wales concluded that governance arrangements for unsolicited proposals were adequate, but greater transparency and public reporting is needed. Unsolicited proposals warrant greater scrutiny and disclosure as they pose a greater risk to value for money than open, competitive and transparent tender processes.

 

Our performance audit on government advertising concluded the peer review process provides sufficient assurance that government advertising programs are needed and are cost effective. Government advertising is an activity that is high risk because of the potential for it to be used for political purposes. In NSW, the Government Advertising Act 2011 requires government advertising campaigns estimated to cost over $50,000 to be independently peer reviewed before launch.  

Cluster-wide risk management

Cluster wide risk management is inconsistent

Agencies within clusters have their own risk profiles and risk management frameworks. We found varying approaches and levels of maturity on how agency risks are captured and escalated to a cluster level so cluster heads can assess how they are being managed, treated and reported. We recommended some clusters review how agency level risks are escalated and reported at a cluster level.

Enterprise-wide risk management

Agency enterprise-wide risk management across the public sector is improving

In 2016, we assessed risk management processes at 33 agencies across the NSW public sector against the criteria in our Risk Assessment Tool. In 2015, we asked 77 agencies to perform a self-assessment of their risk management maturity. The table below compares the overall results of our assessment against the agencies self-assessments. The comparison indicates that risk management is improving.

Our assessments found that agencies have risk management governance structures in place, but need to focus on developing stronger risk cultures and fit-for-purpose systems to capture risks and incidents.

The environment in which services are delivered to the people of NSW is constantly changing. Services need to remain relevant and support the public's changing needs and expectations. People expect high quality services to be delivered in cost effective ways. To do this, agencies need to determine how best to deliver the services. Governments can deliver their services through agencies or through commissioning the right mix of services from public, private and not for profit sector providers.  

Agencies also need to consider how they collaborate with each other to improve the quality of their services and help drive down costs. Changes in innovation and technology can help agencies adapt to changing circumstances and to deliver better services in different ways.

In 2015–16, our audit teams made the following key observations on service delivery by NSW public sector agencies.

Service delivery
Observation Conclusion
New ways of delivering services across NSW Government are being identified, with commissioning and contestability arrangements being introduced or considered.

It is important for accountability to be maintained when services are outsourced.

Commissioning services and introducing new systems can be challenging. It is important for this to be managed well through:

  • strong project governance and leadership to manage risks
  • entering into binding commitments with clear accountabilities
  • good preparation, including adequate training and support for staff
  • sound financial management to control costs.
We found government decision makers are not always receiving enough information to make evidence-based investment decisions. The NSW Government’s program evaluation initiative has been largely ineffective. A performance audit looked at the Justice, Industry, Skills and Regional Development, Planning and Environment, Premier and Cabinet and Treasury clusters and recommended improvements to program evaluation.
We found agencies' performance is not routinely measured, evaluated or publicly reported. Agencies can improve transparency over their performance with a stronger focus on measuring performance and outcomes so they can make evidence-based decisions and maintain public accountability.
According to unaudited agency data, some Premier's and State Priorities are at risk of not being achieved. Independent assurance over the reliability and accuracy of the data would increase confidence in the performance indicators used to measure achievement of the Government’s priorities.
A comprehensive report of performance against the State Priorities is not published. We understand the NSW Government is considering public reporting against the State Priorities and developing reporting options.

Commissioning and Contesting the Delivery of Services

The publics' rising expectations, and rapidly changing and increasingly complex needs mean agencies cannot be complacent even when they deliver good services. To meet changing expectations and needs, agencies need to build on their strengths and leverage opportunities a modern, technology driven and information rich environment provides.

Government outcomes can be achieved through the effective commissioning of the right mix of services from the public, private and not-for-profit sectors. Commissioning involves agencies assessing citizens’ needs, determining priorities, designing and sourcing appropriate services, and monitoring and evaluating performance. NSW Treasury's 'Government Commissioning and Contestability Policy', published in November 2016, aims to provide a clear and consistent policy direction, definition and set of principles to guide NSW Government agencies when commissioning and contesting services.

It is important for agencies to understand the Government's strategic direction and objectives when partnering with others or commissioning the delivery of services. They must be prepared and able to work together and with others in different ways to deliver the best quality public services possible. Agencies face challenges and opportunities when commissioning services. These include:
 
  • determining the size, variety and location of services needed to meet customer needs and expectations
  • doing things differently to ensure public services are delivered efficiently and effectively
  • developing and nurturing markets, and transitioning services into and out of government
  • partnering with other public and private sector entities, and non-government organisations (NGOs)
  • establishing and maintaining clear accountabilities for jointly delivered services
  • using new approaches that leverage improvements in technology
  • involving the people of NSW in designing, planning, and delivering services
  • using, sharing and communicating information about service delivery
  • building agencies' capacity and capability
  • measuring and benchmarking service performance.

Effective commissioning can be achieved through:

  • strong governance and leadership to manage relationships and risks effectively within risk appetite levels
  • good information systems and tools 
  • being well prepared with the right capability and number of employees who are well trained and supported
  • adopting approaches that best fit the circumstances
  • regularly monitoring and assessing if expected outcomes are being achieved 
  • having a common purpose with clear outcomes
  •  being flexible and prepared to make trade-offs
  •  binding commitments with clear accountabilities
  •  sound financial management to control costs
  •  adequate development and testing of new systems before going live.

Commissioning and contestability continues to increase

We continue to see new ways of delivering services across NSW Government agencies. Some examples of commissioning and contestability include:

  • commissioning of GovConnect to provide information technology and transactional services to several agencies within the NSW Public Sector (refer Financial Controls chapter for further detail)
  • contestability testing within NSW Health, including linen services, non-emergency patient transport, warehousing, hospital support services, pathology and radiology
  • commissioning NGOs to provide some services traditionally provided by the Department of Family and Community Services ($2.8 billion received by NGOs in 2015–16 for the delivery of these services).

Our performance audit on franchising of the Sydney Ferries network found the decision to do so was justified and Transport for NSW’s management of the franchise was largely effective. The franchising has resulted in cost savings, good service performance and effective risk transfer from Government to the private sector operator. Scheduled ferry services are now provided under a seven-year contract managed by Transport for NSW.

Our 2016–17 performance audit program includes a review of Roads and Maritime Services' (RMS) Sydney region road maintenance contracts to assess whether RMS has realised the expected benefits of outsourcing road maintenance for the Sydney Region West and South zones under its Stewardship Maintenance Contracts. We also recently tabled a performance audit report, which focused on the Department of Family and Community Services work to build the readiness of the non-government sector for the National Disability Insurance Scheme.

Accountability needs to be maintained when services are outsourced

Generally, contractual arrangements allow an agency that is outsourcing services to review and assess the performance of the service provider. However, outsourced service providers are not directly accountable to the NSW Parliament for their use of public resources.

Governments are increasingly outsourcing to or partnering with private and NGO providers to deliver government services. Consequently, many parliaments now have legislation that enables Auditors-General to ‘go beyond’ the boundaries of the agencies commissioning services and into the entities providing the services to examine how effectively and efficiently they are providing the services (‘follow the money’ powers). New South Wales legislation does not currently provide the Auditor–General with such powers.

Delivering Government Services

Evidence-based decision making

Government services are being delivered by agencies through a variety of programs

To do this effectively agencies need to be able to make evidence based decisions. In August 2013, the NSW Government commenced a program evaluation initiative, which required agencies to periodically evaluate their programs. Since then, NSW Treasury and DPC have worked with agencies to implement the initiative. Agencies are required to prioritise programs for evaluation based on size, strategic significance and degree of risk, recognising their available capability and resources to conduct evaluations.

Our performance audit on 'Implementation of the NSW Government’s program evaluation initiative' showed the initiative was largely ineffective and government decision makers were not receiving enough information to make evidence-based investment decisions. The audit looked at the Justice, Industry, Skills and Regional Development, Planning and Environment, Premier and Cabinet and Treasury clusters.

Our performance audit also recommended NSW Treasury develop an evaluation framework to support the program budgeting and reporting component of the Financial Management Transformation (FMT) program, and ensure the program evaluation initiative is integrated into the new framework.

The FMT program budgeting, reporting and evaluation initiative aims to provide evidence-based information to inform investment decisions on programs. Adopting program budgeting and reporting as a key component of the FMT program requires a proven and systematic evidence-based methodology for measuring the efficiency and effectiveness of the programs.

Service delivery performance

Our performance audits found mixed service delivery performance

Performance audits build on our financial audits by reviewing whether taxpayers' money is spent efficiently, effectively, economically and in accordance with the law. Many of our performance audits focus on whether agencies are delivering good services to citizens at a reasonable cost. Findings from some of our 2016 audits, which focused on service delivery performance, are outlined below:

New South Wales has a lower rate of foodborne illness than the national average. This reflects some good practices in the NSW Food Authority’s approach to monitoring food safety standards. To ensure foodborne illnesses remain low, the Authority needs to better monitor its arrangements with local councils that inspect retail food businesses on its behalf, and receive additional and more timely information from them on compliance with food safety standards.

 

The Department of Education is doing a reasonable job of managing how well students with a disability transition to new schools and in supporting teachers to improve the students’ educational outcomes. We found enrolments in quality early childhood education were increasing, but were still below benchmark and funding could be better targeted to disadvantaged children in long day care.

 

Juvenile Justice NSW prepares and helps young people reintegrate into the community reasonably well after detention, given their complex needs, but access to post-release services is problematic.

 

Citizens will benefit if red tape is reduced. Overall, NSW Government initiatives and processes to prevent and reduce red tape have not been effective. In the absence of an accurate red tape savings figure and a stocktake of regulation, the NSW Government does not have a clear view of the impact its reported savings had on the overall net burden of red tape in New South Wales. Its ‘one-on, two-off’ initiative to reduce legislative regulatory burden achieved its numerical target, but the cost of the total legislative burden increased by $16.1 million over the same period.

Reporting on Service Delivery Performance

As agencies partner and collaborate more, measuring performance becomes more important. Sharing, using and making information available enables agencies to collectively understand and improve their service performance. This also gives agencies an opportunity to achieve efficiencies in collating and using research and performance data within privacy and legislative constraints. Where appropriate, agencies should consider obtaining independent assurance over the reliability and accuracy of the performance data they use.

Complaints are an important and free source of information that can provide valuable insights into poor service, systemic errors or problems with specific processes. How agencies manage and respond to complaints demonstrates their commitment to high standards of service delivery. Complaints also give agencies an opportunity to understand the expectations and experiences of people using their services. Government agencies need to ensure complaints are easy to make, consistently recorded and analysed, and openly reported and actioned.

Transparency over performance

Performance is not always measured, evaluated or publicly reported

A key objective of public sector reform is to improve performance and create a culture of accountability. Inadequate performance measures and primarily internal reporting, reduces transparency of agency performance and makes it hard for the public to assess if agencies are doing a good job. A sample of our audits found:
 
  • the effectiveness of Corrective Services NSWs performance framework was limited because performance information was not readily available to correctional centres to make more informed decisions on how best to manage their centres
  • red tape savings figures were not accurate and there was no central oversight of red tape reduction strategies
  • a lack of detailed costings meant we could not be sure regulation of early childhood education was efficient even though processes appeared to be good
  • while the Department of Family and Community Services has transparent performance reporting which is regularly published, the use and reporting of targets and benchmarks is limited
  • while icare collects performance information it does not use this information to assess the success of the return to work program. The return to work rate has increased from 85.5 per cent to 88.3 per cent since the workers’ compensation reforms were introduced in 2012, but there was no benchmark to assess if this result is meeting the desired objectives of the reforms
  •  the Environment Protection Authority has not developed measures and targets to assess achievement of outcomes associated with illegal dumping initiatives.

Agencies should consider whether their performance measurement frameworks:

  • measure the right things, focus on outcomes and integrate with decision making processes
  • set baselines and establish targets and timeframes for key performance indicators
  • require the use of reliable, up to date and accurate information
  • require information to be publicly reported to increase transparency.

The Government will not get the same level of reliance on performance information as it does for financial statements if that information is not independently assured. We will continue to focus on how well agencies assess and report the performance of their initiatives in achieving desired outcomes.

Premier's and State Priorities

The NSW Government released State Priorities 'NSW: Making it Happen' in September 2015. It includes 12 Premier's Priorities and 18 State Priorities with measures and targets to track the Government's performance in key priority areas.

The Premier's Priorities are detailed below.

  • Protecting our kids
  • Improving service levels in hospitals
  • Improving education results
  • Driving public sector diversity
  • Keeping our environment clear
  • Faster housing approvals
  • Reducing domestic violence
  • Tackling childhood obesity
  • Reducing youth homelessness
  • Improving government services
  • Creating jobs
  • Building infrastructure

Performance against the Premier's and State Priorities is not audited

The Premier's and State Priorities have not been independently audited to provide assurance the performance information is accurate. The Commonwealth, Victorian and Western Australian Auditors-General have varying powers that provide for auditing the appropriateness of agency key performance indicators and determine whether they fairly represent actual performance. NSW legislation does not currently provide the Auditor-General with such powers.

Premier's Priorities

Some Premier's Priorities are at risk of not being achieved

Our 2015–16 reports commented on the Government's performance against some of the Premier’s and State Priorities. Published data, which we have not audited, indicates the following Premier's Priorities may be at risk of not being achieved:

  • the proportion of domestic violence perpetrators re-offending within 12 months was 15.9 per cent, which is 6.7 percentage points higher than the target of 9.2 per cent (refer page 52–53 in Report on Law and Order, Emergency Services and the Arts for further details)
  • the percentage of children and young people re-reported at risk of significant harm was 40 per cent, which is 5.6 percentage points higher than the target of 34.4 per cent (refer page 31–32 in Report on Family and Community Services)
  • in 2015–16, 32.5 per cent of students achieved results in in the top two NAPLAN bands for reading and numeracy, marginally below the baseline of 32.7 per cent and below the 2019 target of 35.2 per cent (refer page 40–41 in Report on Education for further details)
  • the rate of patients leaving emergency departments within four hours was 74.2 per cent, 6.8 percentage points below the target of 81 per cent (refer page 53 in Report on Health for further details).

Published data, which we have not audited, indicates the following Premiers Priorities have been achieved or are on track to be achieved:

Progress against all 12 priorities can be found at https://www.nsw.gov.au/improving-nsw/premiers-priorities.

State Priorities

Some State Priorities at risk of not being achieved

Data, which we have not audited, indicates the following State Priorities may be at risk of not being achieved:

  • journey time reliability was 86 per cent in 2015–16, four percentage points below the 90 per cent target for peak travel on key routes being on time (refer page 48 in Report on Transport for further details)
  • in 2015–16, 9.1 per cent of Aboriginal and Torres Strait Islander students achieved results in the top two NAPLAN bands for reading and numeracy, which shows no improvement on the baseline of 9.1 per cent and is below the 2019 target of 11.6 per cent (refer page 42–43 in Report on Education for further details)
  • reducing the rate of adult re-offending by five per cent by 2019 – the rate increased 2.3 percentage points over the five years since 2010 to 36.7 per cent for the year ended 31 December 2014 (refer page 53–54 in Report on Law and Order, Emergency Services and the Arts for further details).

Data, which we have not audited, indicates the following State Priorities have been achieved or are on track to be achieved:

  • the State maintained its AAA credit rating (refer page 25 in Report on State Finances for further details)
  • general government expenditure growth was 4.4 per cent in 2015–16 and continued to be below long term revenue growth of 5.6 per cent (refer page 25 in Report on State Finances for further details)
  • 70,077 new dwelling approvals were granted in 2015–16, higher than the target of 50,000 approvals (refer page 35 in Report on Planning and Environment for further details)
  • the time taken to assess planning applications for complex state significant developments fell 46 per cent in 2015–16 from the 2013–14 baseline. A further four percentage point reduction is required to meet the target of halving the time to perform these assessments (refer page 35 in Report on Planning and Environment for further details)

A comprehensive report of performance against the State Priorities is not published

The Department of Premier and Cabinet has defined targets and measures in ‘NSW: Making it Happen’ so Ministers and individual agencies know which targets they are accountable for and how they will be measured. While some measures are publicly reported through agency annual reports or other sources, a comprehensive report of performance against the 18 State priorities is not published. We understand the NSW Government is considering this matter and developing reporting options.

Agencies are responsible for the priorities and they report progress at least bi-annually to the Department of Premier and Cabinet for reporting to the Premier. We will continue to report performance against the targets set in the Premier's and State Priorities.

Contract Management

Our audits identified deficiencies in contract management processes

Our audits continue to identify deficiencies in contract management processes, including:

  • agencies not having central contract registers detailing key contractual obligations and commitments
  • incomplete and inaccurate contract registers and/or no policy or procedures to update and maintain contract registers
  • no monitoring of contract performance.

We recommended agencies in the Family and Community Services and Planning and Environment clusters improve contract management processes. A robust contract management framework helps ensure all parties meet their obligations, contractual relationships are well managed, value for money is achieved and deliverables meet the required standards and agreed timeframes.

A 2014 performance audit ‘'Making the most of government purchasing power – telecommunications' developed a Better Practice Contract Management Framework (Framework) with nine key elements. Agencies can refer to this framework when assessing the adequacy of their contract management framework.

Benefits realisation

Benefits realisation approach for the Service NSW initiative is not as effective as it could be

Effective benefits realisation is critical to achieving intended outcomes expected from investments.  

Our performance audit on 'Realising the benefits of the Service NSW initiative' found the benefits realisation approach for the Service NSW initiative is not as effective as it could be. While customers think Service NSW provides a convenient and practical way to access all government transaction services:  

  • it was unclear who should monitor and report on the achievement of whole-of-government benefits and savings anticipated from the initiative
  • there was insufficient data to fully value or identify individual agency and whole-of-government savings and benefits.

This makes it difficult for the NSW Government to demonstrate the expected economic benefits of Service NSW will outweigh costs by the estimated five to one, and that savings will accrue after 2016–17.

The Department of Finance, Services and Innovation has developed a benefits realisation management framework, which can be found at www.finance.nsw.gov.au/publication-and-resources/benefits-realisation-management-framework. The Department of Education has established a benefits realisation plan for the Learning Management and Business Reform Program (LMBR) following our performance audit on the LMBR program. The Department of Planning and Environment is planning a benefits realisation review on the implementation of stage one of the ePlanning system.  

We will continue to review whether agencies have implemented effective benefit realisation frameworks for major projects and programs and examine the outcomes of benefit realisation reviews.