Actions for Design and administration of the WestInvest program

Design and administration of the WestInvest program

Premier and Cabinet
Treasury
Infrastructure
Management and administration

What this report is about

WestInvest is a $5 billion funding program announced in September 2021 to provide ‘local infrastructure to help communities hit hard by COVID-19’ in 15 local government areas (LGAs) selected by the government. It was divided into three parts: $3 billion for NSW government agency projects; $1.6 billion for competitive grants to councils and community groups; and $400 million for non-competitive grants to councils.

Following the change of government at the 2023 election, the program was renamed the Western Sydney Infrastructure Grants Program. Funding decisions made for the community and local government grants were retained, but multiple funding decisions for the NSW government projects were changed.

The audit objective was to assess the integrity of the design and implementation of the program and the award of program funding.

Findings

The design of the program lacked integrity because it was not informed by robust research or analysis to justify the commitment of public money to a program of this scale.

The then government did not have sufficient regard to the implications for the state's credit rating. A risk to the credit rating arose because the government may have been perceived to be using proceeds from major asset sales to fund new expenditure, rather than pay down its debt.

Decisions about program design were made by the then Treasurer's office without consultation with affected communities. The rationale for these decisions was not documented or made public.

For the NSW government projects, funding allocations did not follow advice from departments. Many funded projects did not meet the objectives of the program.

The two other rounds of the program were administered effectively, except for some gaps in documentation and quality assurance. The program guidelines did not require an equitable or needs-based distribution of funding across LGAs and there was a significant imbalance in funding between the 15 LGAs.

Recommendations

Our recommendations for the administration of future funding programs included:

  • considering whether competitive grants are the best way to achieve the program's purpose
  • completing program design and guidelines before announcements
  • ensuring adequate quality assurance.

We also recommended that when providing advice for submissions by Ministers to Cabinet, agencies should ensure that departmental advice is clearly identified and is distinct from other advice or political considerations. 

 

WestInvest is a $5 billion funding program that was announced in September 2021. The program was established with the stated aim of building ‘new and improved facilities and local infrastructure to help communities hit hard by COVID-19’.

WestInvest was divided into three funding streams:

  • $3 billion NSW government projects round open to NSW government agencies
  • $1.6 billion community projects competitive round administered as a competitive grant program that was open to local councils, non-government organisations, Local Aboriginal Land Councils, and educational institutions in the 15 eligible LGAs
  • $400 million local government projects round administered as a non-competitive grant round only open to the 15 eligible councils, with each council receiving a pre-determined share of the $400 million.

The WestInvest program was administered by NSW Treasury and the Premier's Department (previously the Department of Premier and Cabinet). Decisions about funding allocations were made by the former Treasurer in his role as the statutory decision-maker and announced by the former government in the lead up to the March 2023 NSW State election, but no funding was paid prior to the election.

Following the change of government, the funding decisions for the community projects competitive round and local government projects round were confirmed and negotiation of funding deeds commenced. The current government reviewed the decisions for the NSW government projects round and made changes to multiple decisions as part of the 2023–24 NSW Budget process. The current government has also changed the name of the program to the Western Sydney Infrastructure Grants Program.

The objective of the audit was to assess the integrity of the design and administration of the WestInvest program. This included assessing the processes used in the design and implementation of the program and award of funding.

The audit did not re-assess the merits of individual projects that were submitted for funding consideration and did not examine the implementation of projects that were allocated funding.

Decisions about the objectives and focus areas for the program were made without advice or analysis from the agencies that administered the program

The WestInvest program involved the commitment of $5 billion as a stimulus measure linked to economic recovery from the COVID-19 pandemic. However, there was no business case or other economic analysis conducted to support consideration of the potential benefits and costs of the program. Media releases and the public guidelines for WestInvest stated that western Sydney was affected by the COVID-19 pandemic more severely than other parts of Sydney and regional NSW. These assertions were not supported by evidence or analysis.

Evidence from NSW Treasury provided for this audit indicates that it was asked to prepare the initial proposal for the WestInvest program within a very short timeframe. This limited its ability to conduct research, analysis and consultation that could have informed the development of the program. This is particularly important for the integrity of decisions involving large-scale spending. Staff from NSW Treasury and the Premier's Department advised the audit team that the areas of focus for WestInvest were decided by Ministers and their staff without advice from the audited agencies. There is no documented analysis justifying the decision to focus the program on community infrastructure, or the six ‘areas of focus’ that were selected. The Premier's Department commissioned research from Western Sydney University after the areas of focus for the program had been decided. This did not inform decisions about the program focus but aimed to provide baseline information about community infrastructure in the 15 eligible LGAs which could be used in program evaluation.

The rationale for making 15 LGAs eligible for the program was not clear

It is not clear how the government decided which LGAs would be eligible for WestInvest funding. Public communication about the program referred to the western Sydney region and commented on areas that had been ‘hit hard’ by the COVID-19 pandemic. The specific factors that were used to decide which LGAs were eligible were not explained publicly or documented.

In the 2019–20 NSW Budget papers, "western Sydney" was defined as 12 LGAs. All of these were included as eligible for the WestInvest program. The additional three LGAs that were made eligible for the WestInvest program (Burwood, Canterbury-Bankstown, and Strathfield) were not within the NSW Budget papers definition but were designated "areas of concern" during the COVID-19 pandemic, which meant they were subject to more restrictions than other LGAs at certain points.

Georges River and Bayside LGAs both made public statements that drew attention to the fact that they were not made eligible for the WestInvest program despite being designated areas of concern. Several of the 15 LGAs that were made eligible for WestInvest had not been designated areas of concern during the pandemic, including Penrith, The Hills, and Blue Mountains. 

There was no consultation with eligible councils or other key stakeholders before the program design was decide

The program design had not been subject to consultation with councils or other relevant organisations in western Sydney. This meant that the views of eligible councils and community organisations on strategic priorities in their respective communities were not considered before decisions on program design were made.

Staff from some councils interviewed by the audit team indicated that while funding for community infrastructure is welcome, some councils had other priority areas for infrastructure development that were at least as high as new community infrastructure. As independent entities, each council has its own strategic planning processes to identify and plan for infrastructure projects and other areas of need. These were not considered in the design of the WestInvest program.

Staff at several councils we spoke to highlighted delivery risks to the projects for which they had been allocated funding. These included:

  • the short timetable set by the then government (considering the amount of funding available and the requirements for applications) meant that full project development and assurance processes were not completed for most applications when they were submitted
  • difficulty complying with the government’s administrative and assurance requirements for funding recipients, such as detailed planning and reporting.

When early planning for WestInvest was being done, both NSW Treasury and the Premier's Department identified the risk that applicants may not be able to deliver funded projects on time or within budget. The absence of consultation, research and analysis before the program design was finalised meant that these factors were not considered before the government had committed to the program. We did not see evidence that the then government had considered the cumulative impact of an additional $5 billion in infrastructure projects on the costs of materials and skilled labour concentrated in the eligible LGAs.

The Premier's Department conducted an online survey (WestInvest 'Have Your Say'), between 23 February 2022 and 31 March 2022. This was open to the public and asked questions about which of the six ‘areas of focus’ were most important to them and what type of community infrastructure projects they would like to see. This found higher levels of community support for two of the six areas (community infrastructure and green and open space).

On 18 April 2022, the Premier's Department released a summary report on the findings of the WestInvest ‘Have Your Say’ Survey. The Premier's Department noted that the survey was for consultation purposes only and did not form part of the application process for the WestInvest program. The Premier's Department stated in its summary report that the survey results 'will feed into the assessment process across the WestInvest Program'.

However, the Premier's Department staff interviewed by the audit team told us that the survey results did not play any formal role in the assessment process or funding recommendations for projects. The survey did not provide data that could be used to inform assessment decisions because:

  • responses could be submitted by any member of the public who accessed the survey, not just those living in the LGAs that were eligible for the program, so the data could not be taken as representative of the views of the residents of eligible LGAs
  • many survey responses were ruled ineligible as they were deemed to be associated with a community campaign that related to projects outside the focus areas of WestInvest.

The government did not have sufficient regard to risks to the State's credit rating when establishing the WestInvest program

The NSW Government has a policy of maintaining a AAA credit rating for the State of New South Wales. This is codified in the Fiscal Responsibility Act 2012. The NSW Government did not have sufficient regard to the implications and risks of committing $5 billion of funding to the WestInvest program to its credit rating. A risk to the State's credit rating arose because the government may have been perceived to be using proceeds from major asset sales to fund new expenditure, rather than paying down State debt.

The $3 billion NSW government projects round was open to NSW government agencies and administration of the round was led by NSW Treasury. Funding allocated through this round was not subject to the NSW Grants Administration Guide. This is because the funding was awarded to NSW government agencies rather than organisations external to government, so it did not meet the definition of a grant program. Projects were submitted by NSW government agencies to NSW Treasury and were assessed against program criteria by staff from NSW Treasury and the Premier's Department. Each project received a score and advice on whether it was suitable for funding or not. The WestInvest steering committee considered these and provided advice to the then Treasurer.

NSW Treasury prepared guidelines for the $3 billion NSW government projects round, but these were not approved by the then Treasurer until after the program assessment had commenced

NSW Treasury prepared guidelines for the NSW government projects round in September 2021. These were submitted to the then Treasurer for approval in December 2021 but were not approved. This meant that the process for assessing applications for NSW government projects was not agreed between government agencies and the then Treasurer, who was the statutory decision-maker of the allocations of funding. NSW Treasury subsequently prepared an assessment plan based on the unapproved guidelines, which set out more details about the process to be used for assessing applications for the NSW government projects round. The program guidelines were not published, which meant there was no public information about the process for assessing the largest component of the WestInvest program.

In May 2022, the then Treasurer’s Office requested that NSW Treasury make changes to the unapproved guidelines so that projects that delivered 'business as usual' state government infrastructure such as schools, roads, and health infrastructure were no longer considered ineligible for the program. These revised guidelines were approved in June 2022, but were not published. The changes were not consistent with the initial purpose of the WestInvest program which was to fund ‘transformational’ community infrastructure.

The funding advice from the WestInvest steering committee was not followed by the then Treasurer and the justifications for the funding allocation decisions were not documented

One-third of the projects that were allocated funding (9 out of 27) had been assessed by the WestInvest steering committee as having low or moderate merit. These projects were allocated combined funding of $1.1 billion. Reasons that the steering committee gave for assessing these projects as not suitable for funding through the WestInvest program included the absence of completed business cases, incomplete project development, and poor alignment to the objectives and criteria for the WestInvest program as outlined in the original program guidelines.

Staff from NSW Treasury and the Premier's Department put considerable resources into preparing guidelines and assessing and providing advice on the merits and eligibility of applications against these guidelines, but in most cases the advice was not followed by the then Treasurer. There was no documentation of reasons for the departures from steering committee advice. The NSW government projects round was not subject to the NSW Grants Administration Guide, so the requirement under those guidelines for documenting reasons for departures from advice on funding decisions did not apply. However, when the WestInvest program was established, it was noted that any departures from the funding advice from the steering committee would be documented by the then Treasurer. This applied to the entire WestInvest program. None of the projects that were allocated funding through the NSW government projects round were actually given funding, as only allocations of funding were approved by the then Treasurer.

Most of the funding was allocated to projects that did not align with the purpose of WestInvest or meet the assurance requirements of the program

Of the 27 projects that were allocated funding (Exhibit 3), 12 were from the Department of Education and seven from Transport for NSW. This resulted in over $2 billion, or 69% of the funding available through the NSW government projects round, being allocated to state school and road projects. Most of these projects were not aligned with any of the six focus areas of the WestInvest program. In addition, these projects were examples of ‘business as usual’ activities of NSW government agencies that did not clearly align with the initial purpose of the program to deliver transformational community infrastructure that would improve liveability in the 15 eligible LGAs.

Exhibit 3: NSW government projects round funding allocations announced prior to the 2023 NSW State election

State schools

  • Upgrade nine public schools across western Sydney ($478 million)
  • Improve cooling in 84 public schools across western Sydney ($131 million
  • Westmead Education Campus ($308 million)
  • Box Hill (Terry Road) new school ($112 million)

State roads

  • M7 Motorway connections - Townson Road and Richmond Road ($285 million)
  • Elizabeth Drive upgrade ($200 million)
  • Henry Lawson Drive stage 1B ($200 million)
  • Richmond Road Marsden Park ($100 million)
  • Garfield Road east ($100 million)
  • Pitt Town bypass ($100 million)
  • Londonderry Road flood evacuation improvements ($15 million)

Health

  • Integrated community health hubs in Liverpool and Glenfield ($243 million)

Open spaces

  • Australian Botanic Garden Mount Annan masterplan stage 1 ($204 million)
  • Salt Pan Creek parklands ($86 million)
  • Fernhill Estate transformation ($65 million)
  • The People's Loop Parramatta ($56 million)
  • Penrith Lakes parkland ($15 million)

Arts and community infrastructure

  • Transforming Parramatta's Roxy Theatre ($122 million)
  • Western Sydney Stadium precinct community-based asset ($111 million).

Source: NSW Treasury documents.

Conditions were attached to the approval of funding allocations for 21 of the 27 projects. Most of these conditions related to the completion of a business case and other project assurance requirements, which were required under the program guidelines.

Projects approved through the WestInvest program were to receive funding from the Community Services and Facilities Fund (CSFF), which is a legislative fund created under the NSW Generations Funds Act 2018 (the Act). The Act states that the purpose of the CSFF is to provide funding for ‘cost-effective facilities and services’ (s.12(1)). The absence of business cases and other assurance requirements from most of the projects approved created the risk of legislative non-compliance, as many of the projects that had been allocated funding could not clearly demonstrate that they would be cost-effective.

NSW Treasury and the Premier's Department’s assessment of the first group of projects submitted for the NSW government projects round indicated that agencies applying for funding did not understand the purpose or requirements of the program. NSW Treasury and the Premier's Department received 153 applications after the first call for proposals. Most did not align with the stated purpose of WestInvest or meet the assurance requirements that had been set for the program. For example:

  • 90 project proposals (59% of those submitted) were assessed as ineligible. Thirty-five of the 90 did not include any infrastructure, which was the main purpose of the WestInvest program. The other 55 proposed infrastructure projects were not consistent with any of six areas of focus for the program.
  • 118 proposals (77% of proposals submitted) did not have a business case, which was a requirement of the WestInvest program guidelines.

As the first request for project proposals did not generate enough suitable applications, the then Treasurer made a second request to NSW government agencies in August 2022 seeking additional project proposals. This occurred after the guidelines for the NSW government projects round had been broadened to allow more projects to be considered for funding (discussed above).

Multiple state school projects were allocated funding after being assessed by the WestInvest steering committee as ineligible or unsuitable for funding

The Westmead Education Campus project, valued at $308 million, was rated as ineligible by NSW Treasury and the Premier's Department because it did not address any of the six specified focus areas for the WestInvest program. This meant it did not go through a full assessment against the program criteria and was not submitted to the then Treasurer for funding consideration.

The project was later re-submitted and the then Treasurer subsequently approved it for funding allocation. This occurred after the guidelines for the NSW government projects round had been broadened (discussed above). NSW Treasury's advice on this submission noted that the project had not been fully developed, with key decisions about the delivery model not made, and it did not have a final business case.

The Box Hill (Terry Road) new school project, valued at $112 million was rated as ‘moderate – not suitable for funding consideration at this time’ by the WestInvest steering committee. It was subsequently approved for funding by the then Treasurer.

Nine school upgrade projects with a total value of $478 million were allocated funding by the then Treasurer. Each of these had been assessed as ineligible by NSW Treasury and the Premier's Department against the original program guidelines because they did not meet any of the WestInvest focus areas and were not considered 'transformational'. There were a further 14 similar proposals for school upgrades that were also assessed as ineligible but were not allocated funding.

Funding allocations from the WestInvest program were changed after the 2023 NSW State election

Following the change of government at the 2023 NSW state election, most of the funding decisions announced by the former government were changed. The new government had announced during the election campaign that, if elected, it would redirect some WestInvest funding 'to rebuild Western Sydney schools and Western Sydney hospitals'. Eleven of the 27 projects that had been announced by the former government were not funded by the new government. The combined value of these projects was at around $1.5 billion (Exhibit 4). The seven roads projects that had been allocated funding through WestInvest, valued at $1 billion, were also removed from the WestInvest funding allocation but these still received funding from a different source.

Exhibit 4: Projects from the NSW government projects round not funded post-2023 NSW State election

State schools

  • Improve cooling in 84 public schools across western Sydney ($131 million)
  • Westmead Education Campus ($308 million)
  • Box Hill (Terry Road) new school ($112 million)

Health

  • Integrated community health hubs in Liverpool and Glenfield ($243 million)

Open spaces

  • Australian Botanic Garden Mount Annan masterplan stage 1 ($204 million)
  • Salt Pan Creek parklands ($86 million)
  • Fernhill Estate transformation ($65 million)
  • The People's Loop Parramatta ($56 million)
  • Penrith Lakes parkland ($15 million)

Arts and community infrastructure

  • Transforming Parramatta's Roxy Theatre ($122 million)
  • Western Sydney Stadium precinct community-based asset ($111 million).

Source: NSW Treasury documents.

The funding was reallocated to 17 projects that the new government had announced as election commitments during the 2023 State election campaign. This comprised ten school infrastructure projects, five health infrastructure projects, and two transport infrastructure projects. All of these projects had a cost of more than $10 million each, which means they are subject to NSW Government business case and gateway assurance requirements. Business cases had been completed for the two transport projects. The other 15 projects did not have business cases.

Exhibit 5: Election commitments funded through WestInvest, post-2023 NSW State election

State schools

  • New primary school near Sydney Olympic Park ($71 million)
  • New high school for Melrose Park ($98 million)
  • Convert Eagle Vale High School into a sports high school ($4 million)
  • Build new high school in Jordan Springs ($132 million)
  • Dundas Public School upgrade ($6 million)
  • New high school for Schofields and Tallawong ($130 million)
  • The Ponds High School upgrade ($15 million)
  • New public high school in Gledswood and Gregory Hills ($118 million)
  • New high school in Leppington/Denham Court ($125 million)
  • Kingswood Public School upgrades ($13 million)

Health

  • Additional beds at Mt Druitt Hospital ($60 million)
  • Additional beds at Blacktown Hospital ($60 million)
  • Expansion of Scope of new Rouse Hill Hospital ($400 million)
  • Canterbury Hospital extension and upgrade ($350 million)
  • Fairfield Hospital extension and upgrade ($350 million)

Transport

  • More accessible, safe and secure train stations ($300 million)
  • Active Transport ($60 million)

Source: NSW Treasury documents.

After these changes, the $3 billion NSW government projects round funding distribution was:

  • Nine school upgrades, valued at $478 million, that had been allocated funding by the former government (see Exhibit 3).
  • 17 new projects, with a total value of around $2.3 billion, that had been announced as election commitments by the new government (Exhibit 5). All of these are state school, health, or transport infrastructure.
  • Three projects that covered administrative costs associated with the WestInvest program, with a total value of around $230 million (not previously announced).

The $1.6 billion community project grants - competitive round was open to local councils, NGOs, Local Aboriginal Land Councils, and educational institutions, across 15 eligible LGAs in western Sydney. Exhibit 6 shows a timeline of key dates for the community project grants - competitive round.

The $400 million local government projects round was administered as a non-competitive grant round that was only open to the 15 eligible councils. Each council was allocated a portion of the $400 million funding via a formula that provided a base allocation and an additional amount based on the population of each LGA. Each council received between $21 million and $35 million.

Applications for funding were submitted to the Premier's Department for assessment. Proposed projects were required to be eligible for the program and be rated as having merit against the published program criteria, which were the same as those for the competitive round. Exhibit 12 shows a timeline of key dates for the Local government projects competitive round.

Appendix one – Responses from audited agencies

Appendix two – About the audit

Appendix three – Performance auditing

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary reference - Report number #391 - released 28 February 2024.

 

 

Published

Actions for State Finances 2023

State Finances 2023

Treasury
Whole of Government
Asset valuation
Compliance
Cyber security
Financial reporting
Infrastructure
Internal controls and governance
Management and administration
Regulation

What this report is about

Results of the audit of the Consolidated State Financial Statements of the New South Wales General Government Sector (GGS) and Total State Sector (TSS) for the year ended 30 June 2023.

Findings

The audit opinion on the 2022–23 Consolidated State Financial Statements was qualified in relation to two issues and included an emphasis of matter.

The first qualification matter is a continuation of the prior year limitation of scope on the audit relating to the Catholic Metropolitan Cemeteries Trust (CMCT), a controlled state entity, who continued to deny access to its management, books and records for the purposes of a financial audit. As a result, the Audit Office was unable to obtain sufficient appropriate audit evidence to support the assets, liabilities, income and expenses relating to CMCT recorded in the TSS and the equity investment recognised in the GGS relating to the net assets of CMCT.

The second qualification matter relates to the limitations on the accuracy and reliability of financial information relating to Statutory Land Managers (SLMs) and Common Trust entities (CTs) controlled by the State and were either exempted from requirements to prepare financial reports, or who were required to submit financial reports and have not done so. The Audit Office was unable to obtain sufficient appropriate audit evidence to determine the impact on the value of non-land assets and liabilities, income and expenses that should be recognised in the 2022–23 Consolidated State Financial Statements and which have not been recorded in the Consolidated State Financial Statements.

The independent audit opinion also includes an emphasis of matter drawing attention to key decisions made by the NSW Government regarding the future of the Transport Asset Holding Entity of New South Wales (TAHE).

Recommendations

The report includes recommendations for NSW Treasury to address several high-risk findings, including:

  • ensuring accurate and reliable financial information is available to recognise the non-land balances of SLMs and CTs
  • ensuring the CMCT, SLMs and CTs meet their statutory reporting obligations
  • conducting a broader review of the financial reporting exemption framework
  • continued monitoring of TAHE's control over its assets
  • providing timely guidance to the sector relating to legislative or policy changes that impact financial reporting
  • developing an accounting policy for the reimbursement of unsuccessful tender bid cost contributions.

 

Read the PDF report

Published

Actions for Treasury 2023

Treasury 2023

Treasury
Compliance
Cyber security
Financial reporting
Information technology
Internal controls and governance
Management and administration
Procurement
Regulation
Risk
Service delivery
Shared services and collaboration

What this report is about

Result of the Treasury portfolio of agencies’ financial statement audits for the year ended 30 June 2023.

The results of the audit of the NSW Government’s consolidated Total State Sector Accounts (TSSA), which are prepared by NSW Treasury, will be reported separately in our report on ‘State Finances 2023’.

The audit found

Unqualified audit opinions were issued on all general purpose financial statement audits.

Qualified audit opinions were issued on two of the 24 other engagements prepared by portfolio agencies. These related to payments made from Special Deposit Accounts that did not comply with the relevant legislation.

The number of monetary misstatements identified in our audits increased from 29 in 2021–22 to 39 in 2022–23.

The new parental leave policy impacted agencies across all portfolios. NSW Treasury should perform annual assessments to identify changes in legislation and regulation and provide timely guidance to the sector.

Transport for NSW and Sydney Metro have capitalised over $300 million of tender bid costs paid to unsuccessful tender bidders relating to significant infrastructure projects. Whilst NSW Treasury policy provides clarity on the reimbursement of unsuccessful bidders’ costs, clearer guidance on how to account for these costs in agencies’ financial statements is required.

The key audit issues were

Five high-risk issues were reported in 2022–23. Three were new findings on contract management, accounting treatments for workers compensation renewal premium adjustments and the management and oversight of a Special Deposit Account. Two repeat issues referred to the need to improve quality review processes over financial reporting and the timely approval of administration costs.

Portfolio agencies should prioritise and action recommendations to address internal control deficiencies.

 

This report provides Parliament and other users of the Treasury portfolio of agencies’ financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Treasury portfolio of agencies (the portfolio) for 2023.

Section highlights

  • Unqualified audit opinions were issued on all Treasury portfolio agencies’ 2022–23 financial statements.
  • Two qualified audit opinions were issued on special purpose financial reports, relating to whether payments from the Electricity Retained Interest Corporation – Ausgrid (ERIC-A) Fund and the Electricity Retained Interest Corporation – Endeavour (ERIC-E) Fund, complied with the relevant legislation.
  • The total number of errors (both corrected and uncorrected) in the financial statements increased from 29 in 2021–22 to 39 in 2022–23.
    Reported corrected misstatements increased from 15 in 2021–22 to 25 with a gross value of $7.1 billion in 2022–23. Reported uncorrected misstatements increased from 13 in 2021–22 to 14 in 2022–23, with a gross value of $277.6 million in 2022–23.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Treasury portfolio.

Section highlights

  • Five high-risk issues were reported in 2022–23. Three were new findings on contract management, accounting treatments for workers compensation renewal premium adjustments and the management and oversight of a Special Deposit Account.
  • A further 35 moderate risk findings were reported in 2022–23, of which ten were repeat findings.
  • Some agencies have again spent monies without an authorised delegation.
  • The quality of information provided for audit purposes needs to improve.

 

Appendix one – Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

Appendix five – Acquittals and other opinions

 

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Health 2023

Health 2023

Health
Whole of Government
Asset valuation
Compliance
Financial reporting
Information technology
Internal controls and governance
Project management
Regulation
Risk
Shared services and collaboration
Workforce and capability

What this report is about

Results of the Health portfolio of agencies' financial statement audits for the year ended 30 June 2023.

The audit found

Unmodified audit opinions were issued for all Health portfolio agencies' financial statements. 

The number of monetary misstatements increased in 2022–23, driven by key accounting issues, including the first-time recognition of paid parental leave and plant and equipment fair value adjustments. 

The key audit issues were 

NSW Health identified errors regarding the recognition and calculation of long service leave entitlements for employees with ten or more years of service that had periods of part time service in the first ten years, resulting in prior period restatements. 

Comprehensive revaluation of buildings at the Graythwaite Charitable Trust found errors in the previous year's valuation, resulting in prior period restatements. 

New parental leave legislation increased employee liabilities for portfolio agencies. The Ministry of Health corrected the consolidated financial statements to record parental leave liabilities for all agencies within the Health portfolio.   

A repeat high-risk issue relates to processing time records by administrators that have not been reviewed prior to running the pay cycle.   

Thirty per cent of reported issues were repeat issues. 

The audit recommended 

Portfolio agencies should ensure any changes to employee entitlements are assessed for their potential financial statements impact under the relevant Australian Accounting Standards. 

Portfolio agencies should address deficiencies that resulted in qualified reports on:   

  • the design and operation of shared service controls
  • prudential non-compliance at residential aged care facilities.

 

This report provides Parliament and other users of the Health portfolio of agencies’ financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Health portfolio of agencies (the portfolio) for 2023.

Section highlights

  • Unqualified audit opinions were issued for all portfolio agencies required to prepare general purpose financial statements.
  • The total number of errors (including corrected and uncorrected) in the financial statements increased compared to the prior year.
  • The Ministry of Health retrospectively corrected an $18.9 million adjustment in its financial statements relating to long service leave entitlements for certain employees.
  • Graythwaite Charitable Trust retrospectively corrected a $4.2 million adjustment in its financial statements related to prior period valuations. 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.

This chapter outlines observations and insights from our financial statement audits of agencies in the Health portfolio.  

 Section highlights 

  • The 2022–23 audits identified one high-risk and 57 moderate risk issues across the portfolio.
  • The high-risk matter related to the forced-finalisation of time records.
  • The total number of findings increased from 67 to 111 in 2022–23.
  • Thirty per cent of the issues were repeat issues. Most repeat issues related to internal control deficiencies or non-compliance with key legislation and/or central agency policies.
  • Forced-finalisation of time records, accounting for the new paid parental leave provision and user access review deficiencies were the most commonly reported issues.
  • Qualified Assurance Practitioner's reports were issued on:
    • the design and operation of controls as documented by HealthShare NSW
    • the Ministry's Annual Prudential Compliance Statements in relation to residential aged care facilities.

Appendix one – Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

 

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

 

Published

Actions for Management of the Critical Communications Enhancement Program

Management of the Critical Communications Enhancement Program

Finance
Health
Justice
Whole of Government
Cyber security
Information technology
Infrastructure
Internal controls and governance
Project management
Risk
Service delivery
Shared services and collaboration

What the report is about

Effective radio communications are crucial to NSW's emergency services organisations.

The Critical Communications Enhancement Program (CCEP) aims to deliver an enhanced public safety radio network to serve the five emergency services organisations (ESOs), as well as a range of other users.

This report assesses whether the NSW Telco Authority is effectively managing the CCEP.

What we found

Where it has already been delivered (about 50% of the state), the enhanced network meets most of the requirements of ESOs.

The CCEP will provide additional infrastructure for public safety radio coverage in existing buildings agreed to with ESOs. However, radio coverage inside buildings constructed after the CCEP concludes will be at risk because building and fire regulations do not address the need for in-building public safety radio coverage.

Around 98% of radios connected to the network can be authenticated to protect against cloning, though only 42% are.

The NSW Telco Authority has not settled with ESOs on how call encryption will be used across the network. This creates the risk that radio interoperability between ESOs will not be maximised.

When completed, the public safety radio network will be the only mission critical radio network for ESOs. It is unclear whether governance for the ongoing running of the network will allow ESOs to participate in future network operational decisions.

The current estimated capital cost for the NSW Telco Authority to complete the CCEP is $1.293 billion. This is up from an estimated cost of $400 million in 2016. The estimated capital cost was not publicly disclosed until $1.325 billion was shown in the 2021–22 NSW Budget Papers.

We estimate that the full cost to government, including costs to the ESOs, of implementing the enhanced network is likely to exceed $2 billion.

We made recommendations about

  • The governance of the enhanced Public Safety Network (PSN) to support agency relationships.
  • The need to finalise a Traffic Mitigation Plan for when the network is congested.
  • The need to provide advice to the NSW Government about the regulatory gap for ensuring adequate network reach in future buildings.
  • The need to clarify how encryption and interoperability will work on the enhanced network.
  • The need for the NSW Telco Authority to comply with its policy on Infrastructure Capacity Reservation.
  • Expediting measures to protect against the risk of cloning by unauthenticated radios.

Public safety radio networks are critical for operational communications among Emergency Services Organisations (ESOs), which in New South Wales include:

  • NSW Ambulance
  • Fire and Rescue NSW
  • NSW Police Force
  • NSW Rural Fire Service
  • NSW State Emergency Service.1

Since 1993, these five ESOs have had access to a NSW Government owned and operated radio communications network, the Public Safety Network (PSN), to support their operational communications. Around 60 to 70 other entities also have access to this network, including other NSW government entities, Commonwealth government entities, local councils, community organisations, and utility companies.

Pursuant to the Government Telecommunications Act 2018 ('the Act'), the New South Wales Government Telecommunications Authority ('NSW Telco Authority') is responsible for the establishment, control, management, maintenance and operation of the PSN.2

Separate to the PSN, all ESOs and other government entities have historically maintained their own radio communication capabilities and networks. Accordingly, the PSN has been a supplementary source of operational radio communications for these entities.

These other radio networks maintained by ESOs and other entities are of varying size and capability, with many ageing and nearing their end-of-life. There was generally little or no interoperability between networks, infrastructure was often co-located and duplicative, and there were large gaps in geographic coverage.

In 2016, the NSW Telco Authority received dedicated NSW Government funding to commence the Critical Communications Enhancement Program (CCEP).

According to NSW Telco Authority's 2021–22 annual report, the CCEP is a transformation program for operational communications for NSW government agencies. The CCEP '…aims to deliver greater access to public safety standard radio communications for the State’s first responders and essential service agencies'. The objective of CCEP is to consolidate the large number of separate radio networks that are owned and operated by various NSW government entities and to enhance the state’s existing shared PSN. The program also aims to deliver increased PSN coverage throughout New South Wales.

The former NSW Government intended that as the enhanced PSN was progressively rolled-out across NSW, ESOs would migrate their radio communications to the enhanced network, before closing and decommissioning their own networks.

About this Audit

This audit assessed whether the CCEP is being effectively managed by the NSW Telco Authority to deliver an enhanced PSN that meets ESOs' requirements for operational communications.

We addressed the audit objective by answering the following two questions:

  1. Have agreed ESO user requirements for the enhanced PSN been met under day-to-day and emergency operational conditions?
  2. Has there been adequate transparency to the NSW Government and other stakeholders regarding whole-of-government costs related to the CCEP?

In answering the first question, we also considered how the agreed user requirements were determined. This included whether they were supported by evidence, whether they were sufficient to meet the intent of the CCEP (including in considering any role for new or alternative technologies), and whether they met any relevant technical standards and compliance obligations (including for cyber security resilience).

While other NSW government agencies and entities use the PSN, we focused on the experience of the five primary ESOs because these will be the largest users of the enhanced PSN.

Both the cost and time required to complete the CCEP roll-out have increased since 2016. While it was originally intended to be completed in 2020, this is now forecast to be 2027. Infrastructure NSW has previously assessed the reasons for the increases in time and cost. A summary of the findings made by Infrastructure NSW is presented in Chapter 1 of this report. Accordingly, as these matters had already been assessed, we did not re-examine them in this performance audit.

The auditee for this performance audit is the NSW Telco Authority, which is a statutory authority within the Department of Customer Service portfolio.

In addition to being responsible for the operation of the PSN, section 5 of the Act also prescribes that the NSW Telco Authority is:

  • to identify, develop and deliver upgrades and enhancements to the government telecommunications network to improve operational communications for government sector agencies
  • to develop policies, standards and guidelines for operational communications using telecommunications networks.

The NSW Telco Authority Advisory Board is established under section 10 of the Act. The role of the board is to advise the NSW Telco Authority and the minister on any matter relating to the telecommunications requirements of government sector agencies and on any other matter relating to the functions of the Authority. As of 2 June 2023, the responsible minister is the Minister for Customer Service and Digital Government.

The five identified ESOs are critical stakeholders of the CCEP and therefore they were consulted during this audit. However, the ESOs were not auditees for this performance audit.

Conclusion

In areas of New South Wales where the enhanced Public Safety Network has been implemented under the Critical Communications Enhancement Program, the NSW Telco Authority has delivered a radio network that meets most of the agreed requirements of Emergency Services Organisations for routine and emergency operations.
In April 2023, the enhanced Public Safety Network (PSN) was approximately 50% completed. In areas where it is used by Emergency Services Organisations (ESOs), the PSN generally meets agreed user requirements. This is demonstrated through extensive performance monitoring and reporting, which shows that agreed performance standards are generally achieved. Reviews by the NSW Government and the NSW Telco Authority found that the PSN performed effectively during major flood events in 2021 and 2022.

Where it is completed, PSN coverage is generally equal to or better than each ESO's individual pre-existing coverage. The NSW Telco Authority has a dedicated work program to address localised coverage gaps (or 'blackspots') in those areas where coverage has otherwise been substantively delivered. Available call capacity on the network far exceeds demand in everyday use. Any operational issues that may occur with the PSN are transparent to ESOs in real time.

The NSW Telco Authority consulted extensively with ESOs on requirements for the enhanced PSN, with relatively few ESO requirements not being included in the specifications for the enhanced PSN. Lessons from previous events, including the 2019–20 summer bushfires, have informed the design and implementation of the enhanced PSN (such as the need to ensure adequate backup power supply to inaccessible sites). The network is based on the Project 25 technical standards for mission-critical radio communications, which is widely-accepted in the public safety radio community throughout Australia and internationally.

There is no mechanism to ensure adequate radio coverage within new building infrastructure after the CCEP concludes, but the NSW Telco Authority and ESOs have agreed an approach to prioritise existing in-building sites for coverage for the duration of the CCEP.
The extent to which the PSN works within buildings and other built structures (such as railway tunnels) is of crucial importance to ESOs, especially the NSW Police Force, NSW Ambulance, and Fire and Rescue NSW. This is because a large proportion of their operational communications occurs within buildings.

There is no mechanism to ensure the adequacy of future in-building coverage for the PSN in new or refurbished buildings after the CCEP concludes. Planning, building, and fire regulations are silent on this issue. We note there are examples in the United States of how in-building coverage for public safety radio networks can be incorporated into building or fire safety codes.

In regard to existing buildings, it is not possible to know whether a building requires its own in-building PSN infrastructure until nearby outside radio sites, including towers and antennae, have been commissioned into the network. Only then can it be determined whether their radio transmissions are capable of penetrating inside nearby buildings. Accordingly, much of this work for in-building coverage cannot be done until outside radio sites are finished and operating.

In March 2023, the NSW Telco Authority and ESOs agreed on a list of 906 mandatory and 7,086

non-mandatory sites for in-building PSN coverage. Most of these sites will likely be able to receive radio coverage via external antennae and towers, however this cannot be confirmed until those nearby external PSN sites are completed. The parties also agreed on an approach to prioritising those sites where coverage is needed but not provided by antennae and towers. Available funding will likely only extend to ensuring coverage in sites deemed mandatory, which is nonetheless expected to meet the overall benchmark of achieving 'same or better' coverage than what ESOs had previously.

There is a risk that radio interoperability between ESOs will not be maximised because the NSW Telco Authority has not settled with ESOs how encryption will be used across the enhanced PSN.
End-to-end encryption of radio transmissions is a security feature that prevents radio transmissions being intercepted or listened to by people who are not meant to. The ability of the PSN to provide end-to-end encryption of operational communications is of critical importance to the two largest prospective users of the PSN: the NSW Police Force and NSW Ambulance. Given that encryption excludes other parties that do not have the requisite encryption keys, its use creates an obstacle to achieving a key intended benefit of the CCEP, that is a more interoperable PSN, where first responders are better able to communicate with other ESOs.

Further planning and collaboration between PSN participants are necessary to consider how these dual benefits can be achieved, including in what operational circumstances encrypted interoperability is necessary or appropriate.

The capital cost to the NSW Telco Authority of the CCEP, originally estimated at $400 million in 2016, was not made public until the 2021–22 NSW Budget disclosed an estimate of $1.325 billon.
The estimated capital cost to complete all stages of the CCEP increased over time. This increasing cost was progressively disclosed to the NSW Government through Cabinet processes between 2015–16 and 2021–22.

In 2016, the full capital cost to the NSW Telco Authority of completing the CCEP was estimated to be $400 million. This estimated cost was not publicly disclosed, nor were subsequent increases, until the cost of $1.325 billion was publicly disclosed in the 2021–22 NSW Budget (revised down in the 2022–23 NSW Budget to $1.293 billion).

There has been no transparency about the whole-of-government cost of implementing the enhanced PSN through the CCEP.
In addition to the capital costs incurred directly by the NSW Telco Authority for the CCEP, ESOs have incurred costs to maintain their own networks due to the delay in implementing the CCEP. The ESOs will continue to incur these costs until they are able to fully migrate to the enhanced PSN, which is expected to be in 2027. These costs have not been tracked or reported as part of transparently accounting for the whole-of-government cost of the enhanced PSN. This is despite Infrastructure NSW in 2019 recommending to the NSW Telco Authority that it conduct a stocktake of such costs so that a whole-of-government cost impact is available to the NSW Government.

1 The definition of 'emergency services organisation' is set out in the State Emergency and Rescue Management Act 1989 (NSW). In addition to the five ESOs discussed in this report, the definition also includes: Surf Life Saving New South Wales; New South Wales Volunteer Rescue Association Inc; Volunteer Marine Rescue NSW; an agency that manages or controls an accredited rescue unit; and a non-government agency that is prescribed by the regulations for the purposes of this definition.
2 Section 15(1) of the Government Telecommunications Act 2018 (NSW).

The NSW Telco Authority established and tracked its own costs for the CCEP

Over the course of the program from 2016, the NSW Telco Authority prepared a series of business cases and program reviews that estimated its cost of implementing the program in full, including those shown in Exhibit 6 below.

Exhibit 6: Estimated costs to fully implement the CCEP
Source Capital cost ($ million) Operating cost
($ million)
Completion date
March 2016 business case 400 37.3 2020
November 2017 internal review 476.7 41.7 2022
March 2020 business case 950–1,050 -- 2025
October 2020 business case 1,263.1 56.1 2026

Source: CCEP business cases as identified.

In response to the 2016 CCEP business case, the then NSW Government approved the NSW Telco Authority implementing the CCEP in full, with funding provided in stages. The NSW Telco Authority tracked its costs against approved funding, with monthly reports provided to the multi-agency Program Steering Committee

Throughout the program, the NSW Government was informed of increasing costs being incurred by the NSW Telco Authority for the CCEP

The various business cases, program updates, and program reviews prepared by the NSW Telco Authority were provided to the NSW Government through the required Cabinet process when seeking approval for the program proceeding and requests for both capital and operational funding. These provided clear indication of the changing overall cost of the CCEP to the NSW Telco Authority, as well as the delays that were being experienced.

There was no transparency to the Parliament and community about changes in the capital cost of the CCEP until the 2021–22 NSW Budget

As the business cases for the CCEP were not publicly available, the only sources of information about capital cost were NSW Budget papers and media releases. The information provided in the annual Budget papers prior to the 2021–22 NSW Budget provided no visibility of the estimated full capital cost to complete all stages of the CCEP. As shown in Exhibit 7 below, this information was fragmented and complex.

Media releases about the progress of the CCEP did not provide the estimated total cost to the NSW Telco Authority of $1.325 billion to complete all stages of the CCEP until June 2021. Prior to this date, media releases only provided funding for the initial stages of the program or for the stages subject to a funding announcement.

Even during the September 2019 and March 2020 Parliamentary Estimate Committee hearings where the costings and delays to the CCEP were raised, the estimated full cost of the CCEP was not revealed.

Exhibit 7: CCEP funding in NSW Budget papers from 2015–16 to 2022–23
Financial year Type of major work Description of expenditure Forecast estimate to complete ($ million) Estimated duration
2015–16 New work Infrastructure Rationalisation Program: Planning and Pilot 18.3 2015–16
2016–17 Work in progress CCEP Planning and Pilot 18.3 2015–17
New work CCEP 45 2016–17
2017–18 New work CCEP 190.75 2017–21
2018–19 Work in progress CCEP North Coast and State-wide Detailed Design 190.75 2017–21
New work CCEP Greater Metropolitan Area 236 2018–22
2019–20 Work in progress CCEP 426.9 2018–22
2020–21 Work in progress CCEP 664.8 2018–22
2021–22 Work in progress CCEP 1,325 2018–26
2022–23 Work in progress CCEP 1,292.8 2018–26

Source: NSW Treasury, Annual State Budget Papers.

The original business case for the CCEP included estimated ESO costs, though these costs were not tracked throughout the program

Estimates for ESO costs for operating and maintaining their own radio networks over the four years from 2016–17 were included in the original March 2016 business case. They included $75.2 million for capital expenditure and $95 million for one-off operating costs. These costs, as well as costs incurred by ESOs due to the delay in the program, were not subsequently tracked by the NSW Telco Authority.

In January 2017, Infrastructure NSW reviewed the CCEP business case of March 2016. In this review, Infrastructure NSW recommended that the NSW Telco Authority identify combined and apportioned costs and cashflow for all ESOs over the CCEP funding period reflecting all associated costs to deliver the CCEP. These to include additional incidental capital costs accruing to ESOs, transition and migration to the new network and the cost (capital and operational) of maintaining existing networks. This recommendation was implemented in the November 2017 program review, with ESO capital costs estimated as $183 million.

In 2019, Infrastructure NSW conducted a Deep Dive Review on the progress of the CCEP. In this review, Infrastructure NSW made what it described as a 'critical recommendation' that the NSW Telco Authority:

…coordinate a stocktake of the costs of operational bridging solutions implemented by PSAs [ESOs] as a result of the 18-month delay, so that a whole-of-government cost impact is available to the NSW Government.  

It should be noted that the delay to CCEP completion now is seven years and that further ‘operational bridging solutions’ have been needed by the ESOs.

'Stay Safe and Keep Operational' costs incurred by ESOs will be significantly higher than originally estimated

Stay Safe and Keep Operational (SSKO) funding was established to provide funding to ESOs to maintain their legacy networks while the CCEP was refreshing and enhancing the PSN. This recognised that much of the network infrastructure relied on by ESOs had reached – or was reaching – obsolescence and would either require extensive maintenance or replacement before the PSN was available for ESOs to migrate to it. ESOs may apply to NSW Treasury for SSKO funding, with their specific proposals being reviewed (and endorsed, where appropriate) by the NSW Telco Authority. Accordingly, SSKO expenditure does not fall within the CCEP budget allocation.

As shown in the table below, extracted from the March 2016 CCEP business case, the total expected cost for SSKO purposes over the course of the CCEP was originally $40 million, assuming the enhanced PSN would be fully available by 2020.

Exhibit 8: Stay Safe and Keep Operational forecast costs, 2017 to 2020
Year 2017 2018 2019 2020 Total
SSKO forecast ($ million) 12.5 15 10 2.5 40

Source: March 2016 CCEP business case.

In October 2022, the expected completion date for the CCEP was re-baselined to August 2027. Accordingly, ESOs will be required to continue to maintain their radio networks using legacy equipment for seven years longer than the original 2020 forecast. This will likely become progressively more expensive and require additional SSKO funding. For example, NSW Telco Authority endorsed SSKO bids for 2022–23 exceeded $35 million for that year alone.

Compared to the original forecast made in the March 2016 CCEP business case of $40 million, we found ESOs had estimated SSKO spending to 2027 will be $292.5 million.

A refresh of paging network used by ESOs and the decommissioning of redundant sites were both removed from the original 2016 scope of the CCEP

Paging

A paging network is considered an important user requirement by the Fire and Rescue NSW, NSW Rural Fire Service, and NSW State Emergency Service. The 2016 CCEP business case included a paging network refresh within the program scope of works. This was reiterated in the November 2017 internal review of the program. These documents did not estimate a cost for this refresh. The March 2020 and October 2020 business cases excluded paging from the program scope. The audit is unable to identify when, why or by whom the decision was made to remove paging from the program scope, something that was also not well communicated to the affected ESOs.

In 2021, after representations from the affected ESOs, the NSW Telco Authority prepared a separate business case for a refresh of the paging network at an estimated capital cost of $60.31 million. This program was subsequently approved by the NSW Government and included in the 2022–23 NSW Budget.

In determining an estimated full whole-of-government cost of delivering the enhanced PSN, we have included the budgeted cost of the paging network refresh on the basis that:

  • it was expressly included in the original approved March 2016 business case
  • the capability is deemed essential to the needs of three ESOs.

Decommissioning costs

The 2016 CCEP business case included cost estimates for decommissioning surplus sites (whether ‘old’ GRN sites or sites belonging to ESOs’ own networks). These estimates were provided for both the NSW Telco Authority ($38 million) and for the ESOs ($55 million). However, while these estimates were described, they were not included as part of the NSW Telco Authority's estimated capital cost ($400 million) or (more relevantly) operating cost ($37.3 million) for the CCEP. This is despite decommissioning being included as one of eight planned activities for the rollout of the program.

In the October 2020 business case, an estimate of $201 million was included for decommissioning agency networks based on a model whereby:

  • funding would be coordinated by the NSW Telco Authority
  • scheduling and reporting through an inter-agency working group and
  • where appropriate, agencies would be appointed as the most appropriate decommissioning party.

This estimated cost is not included in the CCEP budget.

In determining an estimated full whole-of-government cost of the enhanced PSN, we have included the estimated cost of decommissioning on the basis that:

  • decommissioning was included in the 2016 CCEP business case as one of eight 'planned activities for the rollout of the program'
  • effective decommissioning of surplus sites and equipment (including as described in the business case as incorporating asset decommissioning, asset re-use, and site make-good) is an inherent part of the program management for an enhanced PSN
  • costs incurred in decommissioning are entirely a consequence of the CCEP program.

The estimated minimum cost of building an enhanced PSN consistent with the original proposal is over $2 billion

We have derived two estimated minimum whole-of-government costs for delivering an enhanced PSN. These are:

  • $2.04 billion when calculated from NSW Telco Authority data – shown as estimate A in Exhibit 9 below.
  • $2.26 billion when calculated from ESO supplied data – shown as estimate B in Exhibit 9.

Both totals include:

  • budgeted amounts for both CCEP capital expenditure ($1,292.8 million) and operating expenditure ($139 million)
  • the NSW Telco Authority's 2020 estimated cost for decommissioning ($201 million)
  • the NSW Telco Authority's approved funding for paging refresh ($60.3 million).

The two estimated totals primarily vary around the capital expenditure of ESOs (particularly SSKO funding). To determine these costs, we used ESO provided actual SSKO costs to date, as well as their estimates for maintaining their legacy radio networks through to 2027.

The equivalent cost estimates from the NSW Telco Authority were sourced from the November 2017 internal review and the October 2020 business case for CCEP. It should be noted that the amounts for both estimates are not audited, or verified, but do provide an indication of how whole-of-government costs have grown over the course of the program.

The increase in and reasons for the increase in total CCEP costs (capital and one-off operating) incurred or forecast by the NSW Telco Authority (from $437.3 million in 2016 to $1,431.8 million in 2022) have been provided to the NSW Government through various business cases and reviews prepared by the NSW Telco Authority, as well as by reviews conducted by Infrastructure NSW as part of its project assurance responsibilities.

However, the growth in ESO costs and other consequential costs, such as paging and decommissioning, from around $263 million in the 2016 CCEP business case to between $600 million and $800 million, has to a large degree remained invisible and unexplained to the NSW Government and other stakeholders

Exhibit 9: Estimated whole-of-government costs of the enhanced PSN
  Estimated whole-of-government cost, over time
Cost type 20161 20172 20203 2023–Estimate A4 2023–Estimate B5
$ million $ million $ million $ million $ million
CCEP capital expenditure 400a 476.7b 1,263.1c 1,292.8d 1,292.8d
CCEP operating expenditure 37.3a 41.7b 41.5e 139d 139d
CCEP total 437.3 518.4 1,304.6 1,431.8 1,431.8
ESO capital expenditure 75.2a,f 183b,e 75.4e 258.4g 292.5
ESO one-off operating expenditure 93a n.a.l 86.5e 86.5h 273
ESO total 168.2 183 161.9 344.9 565.5
Paging n.a.i n.a.i n.a.j 60.3k 60.3k
Decommissioning 93 n.a.l 201.0 201h 201
Paging and decommissioning total 93 n.a. 201 261.3 261.3
Whole-of-government total 698.5 701.4 1,667.5 2,038 2,258.6

Notes:
  1. Financial year 2016 to Financial year 2020.
  2. Financial year 2016 to Financial year 2021.
  3. Financial year 2016 to Financial year 2025.
  4. Financial year 2016 to Financial year 2026.
  5. Financial year 2022 to Financial year 2025.
  6. Stay Safe and Keep Operational (SSKO) costs plus terminals costs.
  7. November 2017 internal review and October 2020 Business case.
  8. October 2020 Business case.
  9. Included in CCEP capital expenditure at that time.
  10. By 2020, a refresh of the paging network had been removed from the CCEP scope.
  11. A separate business case for a refresh of the paging network was approved by government in 2022.
  12. Figure not included in the source document.
Sources:
  1. March 2016 CCEP business case.
  2. November 2017 Internal Review conducted by the NSW Telco Authority.
  3. October 2020 CCEP business case.
  4. Derived from business cases, with ESO costs drawn from NSW Telco Authority data.
  5. Derived from business cases, with ESO costs based on data provided to the Audit Office of New South Wales by each of the five ESOs.

Appendix one – Response from agency

Appendix two – Trunked public safety radio networks

Appendix three – About the audit

Appendix four – Performance auditing

 

 

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #383 - released 23 June 2023

 

Published

Actions for Natural disasters

Natural disasters

Community Services
Environment
Finance
Local Government
Planning
Transport
Treasury
Whole of Government
Asset valuation
Compliance
Financial reporting
Infrastructure
Regulation
Risk
Service delivery

What this report is about

This report draws together the financial impact of natural disasters on agencies integral to the response and impact of natural disasters during 2021–22.

What we found

Over the 2021–22 financial year $1.4 billion from a budget of $1.9 billion was spent by the NSW Government in response to natural disasters.

Total expenses were less than the budget due to underspend in the following areas:

  • clean-up assistance, including council grants
  • anticipated temporary accommodation support
  • payments relating to the Northern Rivers Business Support scheme for small businesses.

Natural disaster events damaged council assets such as roads, bridges, waste collection centres and other facilities used to provide essential services. Additional staff, contractors and experts were engaged to restore and repair damaged assets and minimise disruption to service delivery.

At 30 June 2022, the estimated damage to council infrastructure assets totalled $349 million.

Over the first half of the 2022–23 financial year, councils experienced further damage to infrastructure assets due to natural disasters. NSW Government spending on natural disasters continued with a further $1.1 billion spent over this period.

Thirty-six councils did not identify climate change or natural disaster as a strategic risk despite 22 of these having at least one natural disaster during 2021–22.

Section highlights

  • $1.4 billion from a budget of $1.9 billion was spent by the NSW Government in response to natural disasters during 2021–22.
  • Budget underspent for temporary housing and small business support as lower than expected need.

Section highlights

  • 83 local council areas were impacted by natural disasters during 2021–22, with 58 being impacted by more than one type of natural disaster.
  • $349 million damage to council infrastructure assets at 30 June 2022.

 

Published

Actions for Universities 2022

Universities 2022

Universities
Compliance
Cyber security
Financial reporting
Information technology
Internal controls and governance
Service delivery

What this report is about

Results of the financial statement audits of the public universities in NSW for the year ended 31 December 2022.

What we found

Unmodified audit opinions were issued for all ten universities.

Nine universities reported net deficits in 2022, and all showed a decline from their 2021 results.

Results were impacted by a decline in investment income and government grants.

Wage remediation provisions across the universities increased by 116% to $110 million at 31 December 2022.

Expenditure increased as universities transitioned back to face-to-face teaching with the lifting of most COVID-19 restrictions.

Revenue from overseas students decreased by 0.5% overall in 2022, although not all universities were impacted equally.

Nearly 42% of fees and charges revenue came from overseas student revenue from three countries of origin (43% in 2021).

What the key issues were

We reported 88 findings to universities on internal control deficiencies (105 in 2021).

Six high risk findings were identified (four in 2021), relating to:

  • IT control deficiencies in monitoring privileged user access
  • password configuration
  • cyber security process improvements
  • lack of security over access to EFT payment files
  • the status of a university's work in assessing its liability for underpayment of staff
  • inadequate review of contracts leading to incorrect accounting treatments.

Two out of 13 entities reported financial losses from cyber incidents in 2022.

Retention policies on personally identifiable information (PII) vary and universities can further reduce their PII exposure risk from cyber attack.

What we recommended

Universities should:

  • conduct a comprehensive assessment of their employment agreements and historical pay practices to identify potential underpayments
  • prioritise actions to address repeat findings on internal control deficiencies in a timely manner
  • review their PII retention policies to ensure PII stored is limited to the entity's needs, held only for the minimum duration it is legally and operationally required, and access is strictly limited.

This report provides Parliament with the results of our financial audits of universities in New South Wales and their controlled entities in 2022, including our analysis, observations and recommendations in the following areas:

  • financial reporting
  • internal controls and governance
  • teaching and research.

Financial reporting is an important element of good governance. Confidence and transparency in university sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of universities in NSW for 2022.

Section highlights

  • The 2022 financial statements of all ten universities received unmodified audit opinions.
  • Wage remediation provisions across the NSW universities increased by 116% to $110 million at 31 December 2022.
  • Nine universities reported net deficits in 2022, and all showed a decline from 2021 results.
  • Revenue from overseas students decreased by 0.5% in 2022, as overseas student enrolments decreased by 1.2%. Almost 42% of universities' fees and charges revenue in 2022 came from overseas students from three countries (down from 43% in 2021).
  • Revenue from domestic students decreased by 0.7% in 2022, as domestic student enrolments decreased by 5.3%.
  • Combined expenditure for universities increased by 6.6% to $11.2 billion in 2022. Most of this was attributed to employee related expenses, which increased by 4.9%. 

Appropriate financial controls help to ensure the efficient and effective use of resources and administration of policies. They are essential for quality and timely decision-making.

This chapter outlines our observations and insights from our financial statement audits of NSW universities.

Our audits do not review all aspects of internal controls and governance every year. The more significant issues and risks are included in this chapter. These, along with the less significant matters, are reported to universities for management to address.

Section highlights

  • The 2022 audits identified six high risk and 36 moderate risk issues across NSW universities. Sixteen of the moderate risk issues were repeat issues. Many repeat issues related to information technology controls around user access management.
  • The number of repeat deficiencies has decreased with 41 reported in 2022 compared to 45 in 2021.
  • Two out of 13 entities reported financial losses from cyber incidents during 2022.
  • Retention policies on personally identifiable information (PII) vary across entities and opportunities exist for entities to further limit their PII exposure risk from cyber attack.

Universities' primary objectives are teaching and research. They invest most of their resources aiming to achieve quality outcomes in academia and student experience. Universities have committed to achieving certain government targets and compete to advance their reputation and their standing in international and Australian rankings.

This chapter outlines teaching and research outcomes for universities in NSW for 2022.

Section highlights

  • Seven universities were reported as having full-time employment rates of their domestic undergraduates in 2022 that were greater than the national average.
  • Enrolments at NSW universities decreased the most in Science related courses in 2022. The largest increase in enrolments was in Health courses.
  • On average, universities delivered 21% of their courses primarily through online means in 2022, a decrease from 59% in 2021.
  • Five universities in 2021 were reported as meeting the target enrolment rate for students from low socio-economic status (SES) backgrounds.
  • Seven universities reported increased enrolments of Aboriginal and Torres Strait Islander students in 2021.

Appendix one – List of 2022 recommendations

Appendix two – Status of 2021 recommendations

Appendix three – Universities' controlled entities 

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Design and implementation of the Transport Asset Holding Entity

Design and implementation of the Transport Asset Holding Entity

Transport
Treasury
Asset valuation
Financial reporting
Infrastructure
Procurement
Risk
Service delivery

What the report is about

The Transport Asset Holding Entity (TAHE) is the State's custodian of rail assets. It is a state owned corporation and commenced operating on 1 July 2020.

This audit assessed the effectiveness of NSW Government agencies' design and implementation of TAHE. We audited TAHE, Transport for NSW (TfNSW) and NSW Treasury.

Separate and related audits on TAHE are reported in 'State Finances 2022', 'State Finances 2021' and 'Transport and Infrastructure 2022' reports.

What we found

The design and implementation of TAHE, which spanned seven years, was not effective.

The process was not cohesive or transparent. It delivered an outcome that is unnecessarily complex in order to support an accounting treatment to meet the NSW Government's short-term Budget objectives, while creating an obligation for future governments.

The benefits of TAHE were claimed in the 2015–16 NSW Budget before the enabling legislation was passed by Parliament in 2017. This committed the agencies to implement a solution that justified the 2015–16 Budget impacts, regardless of any challenges that arose.

Rail safety arrangements were a priority throughout TAHE's design and implementation, and risks were raised and addressed.

Agencies relied heavily on consultants on matters related to the creation of TAHE, but failed to effectively manage these engagements. Agencies failed to ensure that consultancies delivered independent advice as an input to decision-making. A small number of firms were used repeatedly to provide advice on the same topic. The final cost of TAHE-related consultancies was $22.6 million compared to the initial estimated cost of $12.9 million.

What we recommended

We recommended that the audited agencies should:

  • improve accountability and transparency for major new fiscal transformation initiatives
  • ensure entities do not reflect the financial impact of significant initiatives in the Budget when there is uncertainty, or it creates perverse incentives
  • review record keeping practices, systems and policies to ensure compliance with the State Records Act 1998, and the NSW Government Information Classification, Labelling and Handling Guidelines
  • review procurement policies to ensure that consultant use complies with all NSW Government policy requirements.

The NSW Government established the Transport Asset Holding Entity (TAHE), a statutory State Owned Corporation (SOC), on 1 July 2020 to replace the former rail infrastructure owner – RailCorp. It is the State's custodian of rail network assets, including rail tracks and other infrastructure, rolling stock, land, train stations and facilities, retail space, and signal and power systems, within metropolitan and regional New South Wales. It is responsible for $2.8 billion of major capital projects in 2022–23.

TAHE was established under Part 2 of the Transport Administration Act 1988 and is governed by a decision-making board. The Treasurer and the Minister for Finance and Employee Relations are the Shareholding Ministers of TAHE, and they annually agree performance expectations articulated in a Statement of Corporate Intent.

Whereas TAHE is the custodian of rail assets, Sydney Trains and NSW Trains operate public rail services. TAHE does not have responsibility for the operation of the heavy rail network or train services, nor does it have network control functions. TAHE, Sydney Trains and NSW Trains are in the Transport and Infrastructure cluster in the public sector (formerly the Transport cluster and renamed in April 2022), which also includes Sydney Metro and Transport for NSW (TfNSW).

TfNSW leads the Transport and Infrastructure cluster. Its role is to set the strategic direction for transport across the State. This involves the shaping of planning, policy, strategy, regulation, resource allocation and other service and non-service delivery functions for all modes of transport.

TAHE's Operating Licence is granted by the Portfolio Minister and authorises the entity to perform the functions required to acquire, develop, finance, divest and hold assets, pursuant to the Transport Administration Act 1988. The Portfolio Minister also issues a Statement of Expectations which outlines the government’s expectation for the business for the next three to five years.

TAHE's original Portfolio Minister was the Minister for Transport who approved, on 30 June 2020, the issuing of an interim 12-month Operating Licence to enable TAHE to commence operating on 1 July 2020. The Portfolio Minister then granted TAHE's current Operating Licence in 2021. After TAHE requested a 12-month extension to its current Operating Licence, its next Operating Licence is due on 1 July 2024. The current Portfolio Minister is the Minister for Infrastructure, Cities and Active Transport.

About this audit

This audit assessed the effectiveness of NSW Government agencies' design and implementation of TAHE. In making this assessment, we considered whether: 

  • the process of designing and implementing TAHE was cohesive and transparent, and delivered an effective outcome
  • agencies' roles and responsibilities were clear in the planning of TAHE
  • agencies effectively identified and managed certain risks.

Conclusion

The design and implementation of TAHE was not effective. The process was not cohesive or transparent. It delivered an outcome that is unnecessarily complex in order to meet the NSW Government's short-term Budget objectives, while creating an obligation for future governments to sustain TAHE through continuing investment, and funding of the state owned rail operators. The ineffective process to design TAHE delivered a model that entails significant uncertainty as to whether the anticipated longer-term financial improvements to the Budget position can be achieved or sustained.

NSW Treasury and TfNSW had different objectives for TAHE

Up to June 2013, RailCorp had been the owner and operator of rail services and maintainer of the metropolitan rail network for almost a decade. It had been operating as a not-for-profit Public Non-Financial Corporation (PNFC).

In 2012, NSW Treasury (hereafter Treasury) decided there was a risk that the Australian Bureau of Statistics (ABS) would reclassify RailCorp to the General Government Sector (GGS), meaning depreciation expenses of approximately $870 million would be reflected in the GGS Budget. Treasury wanted to avoid this impact on the GGS Budget, and considered the establishment of a transport asset holding entity as a means to do so. Capital grants to RailCorp were being treated as an expense to the GGS Budget.

TfNSW also wanted an asset holding entity – but one that would be a non-trading ‘shell’ company with no staff that would hold and manage all public transport assets. TfNSW's concept envisaged the entity would have a structure that would enable future public transport reforms and strategic directions while ensuring vertical integration of operations between asset owners and the rail operators to maintain rail safety.

However, Treasury pursued its objective to improve the GGS Budget result, and sought to expand on TfNSW's 'shell' asset holding entity concept. Treasury wanted an entity that could generate a return on investment, as this meant that government investment in transport assets could be treated as equity investments, rather than a Budget expense, and in turn improve the GGS Budget position. As an example of the potential impact of creating this new entity, capital grants of $2.3 billion were paid to RailCorp in 2013–14. If Treasury's objective was met, grants of this significance would then be treated as an equity investment, rather than an expense in the GGS Budget.

In 2017, Treasury's preferred option was progressed through legislation, but both agencies' central objectives for the proposed asset holding entity would continue to prove difficult to reconcile. To achieve Treasury's objective to improve the Budget result, the entity would need to generate a return on investment (this is further discussed below). However, TfNSW expressed concerns that the prioritisation of rail safety, and the effective management of governance, regulation and operations would be more complex in an entity with commercial imperatives.

Asset holding entities are a common approach to the management of transport assets in Australia and internationally, and there are a range of approaches to how they are structured and used. Such structures should be driven by the goal of improved asset management. Ultimately, TfNSW's objectives could have been delivered through a simpler entity structure. However, reconciling TfNSW's objectives with Treasury's imperative to deliver and justify a Budget improvement in the short-term resulted in an overly lengthy process and an unnecessarily complex outcome that places an obligation on future governments to sustain. There is still significant uncertainty as to whether the short-term improvements to the Budget can continue to be realised in the longer-term.

The Budget benefits of TAHE were claimed before the entity was legislated, committing the agencies to deliver, regardless of the complexities that subsequently arose

The 2015–16 GGS Budget treated the government's investment in TAHE (still known at this time as RailCorp) as an equity contribution. This had the immediate impact of improving the Budget result by $1.8 billion per annum. However, the legislation to enable the establishment of TAHE had not yet been passed by Parliament, key elements of the operating model were still under development, and imminent changes in accounting standards had the potential to impact TAHE's financial model. The decision to book the benefits in the Budget early committed the involved agencies to implement a solution that justified the 2015–16 Budget impacts, irrespective of the challenges that arose. 

TAHE's financial structure requires circular government investment to work

For the NSW Government to continue to treat its investment in TAHE as an equity contribution, rather than an expense to the Budget, there must be a reasonable expectation that TAHE will generate a sufficient rate of return as required by the Government Finance Statistics (GFS) framework. In doing so, it needs to recover a revaluation loss created by a $20.3 billion reduction in the value of its assets which was incurred in its first full year of operation. This loss occurred as a result of a revaluation of TAHE's assets when RailCorp (a not-for profit entity) became TAHE (a for-profit commercial entity) – and is discussed further in the 'Key findings' below.

TAHE generates a small portion of its income from transactions with the private sector but, as noted in our report 'State Finances 2021', TAHE receives the majority of its revenue (more than 80%) from access and licence fee agreements with Sydney Trains and NSW Trains. Both of these entities are funded by grants (a Budget expense) to TfNSW from the GGS Budget.

Based on Treasury’s correspondence with the ABS in 2015, TAHE was initially expected to pay a return on equity of 7% in 2016–17. The assumption of a 7% return persisted through to 2018, after the legislation enabling the establishment of TAHE was passed by Parliament. However, when the initial access and licence fees were agreed on 1 July 2020, this figure had been revised to an expected rate of return of 1.5% excluding the revaluation loss. This was below the long-term inflation target and did not include the recovery of the revaluation loss – risking the government's ability to treat its investment in TAHE as an equity contribution. Importantly, as TAHE is primarily reliant on fees paid by the state owned rail operators that, in turn, are funded by the GGS Budget (as an expense), the decision to change the returns model from 7% to 1.5% would in its own right have had a positive impact on the GGS Budget. However, the decision to use a 1.5% return would ultimately be problematic as it made it difficult to treat the government's contributions to TAHE as an equity investment, as discussed below.

On 14 December 2021, to avoid a qualified audit opinion, the NSW Government made the decision to increase TAHE's expected rate of return to 2.5%, equal to the Reserve Bank’s long-term inflation target.

In 2021-22, TAHE needed to start charging rail operators higher access and licence fees in order to generate a return of 2.5%, so as to support the government's treatment of its investment in TAHE as an equity contribution in the GGS Budget. This meant the government needed to provide additional grant (expense) funding to the state owned rail operators so they could pay the increased access and licence fees to TAHE. Based on current projections, TAHE is not expected to recover the revaluation loss until 2046.

There remains a risk that TAHE will not be able to generate a sufficient return on the NSW Government's investment without relying on increased funding to state owned rail operators so that they can in turn pay the higher access and licence fees. TAHE's ability to generate returns on government investment from other sources are uncertain and may not be achievable or sustainable. Current modelling highlights that TAHE remains largely reliant, through to 2046, on increasing fees (which are assumed to increase at 2.5% per annum from 2031 onwards when the current 10 year contracts with rail operators expire) paid by the state owned rail operators that remain principally reliant on GGS Budget grants.

The process of designing and implementing TAHE was not transparent to independent scrutiny

Our report 'State Finances 2021' commented that Treasury did not always provide this Office with information relating to TAHE on a timely basis. Similarly, during this performance audit, there were also multiple instances where auditees were unable to provide documentation regarding key activities in the process to deliver TAHE. Agencies also applied higher sensitivity classifications to large tranches of documents than was justified or required by policy. Of particular concern is the incorrect classification of documents as Cabinet sensitive information. The incorrect or over-classification of documentation as Cabinet sensitive delayed this Office's ability to provide scrutiny or independent assurance.

There was a lack of clarity around the roles and responsibilities of governance structures set up to oversee the design and implementation of TAHE

From 2014, multiple workstreams and advisory committees were established to progress the design and implementation of TAHE. For some of these committees and workstreams, there is limited information on what they were tasked to do and what they achieved. Most had ceased meeting by 2018, before significant work needed to deliver TAHE was completed.

The lack of clarity around the roles and responsibilities of these governance structures reduced opportunities for TfNSW and Treasury to reconcile their differing objectives for TAHE, and resolve key questions earlier in the process.

There was a heavy reliance on consulting firms throughout the process to establish TAHE, and the management of consultant engagements failed to ensure that agencies received independent advice to support objective decision-making

In 2020, Treasury and TfNSW failed to prevent, identify, or adequately manage a conflict of interest when they engaged the same 'Big 4' consulting firm to work on separate TAHE-related projects. Both agencies used the firm's work to further their respective views with regard to the financial implications of TAHE's operating model. At this time those views were still unreconciled.

Treasury engaged the firm to provide a fiscal risk management strategy and advice on the impact of changes to accounting standards. TfNSW engaged the same firm to develop operating and financial models for TAHE, which raised concerns regarding the viability of TAHE. Disputes arose around the findings of these reports. Treasury disagreed with some of the outcomes of the work commissioned by TfNSW, relating to accounting treatment and fiscal advice.

The management of this conflict (real or perceived) was left to the 'Big 4' consulting firm when it was more appropriate for it to be managed by Treasury and TfNSW. If these agencies had communicated more effectively, used available governance structures consistently, and shared information openly about their use of the firm and the nature of their respective engagements, these disputes might have been avoided. This issue, coupled with deficiencies in procurement by both agencies, reflected and further perpetuated the lack of cohesion in the design and implementation of TAHE.

More broadly, over the period 2014 – 2021, 16 separate consulting firms were employed to work on 36 contracts, valued at over $22.56 million, relating to TAHE ranging from accounting and legal advice, project management, and the provision of administrative support and secretariat services.

Consultants are legitimately used by agencies to provide advice on how to achieve the outcomes determined by government, including advising agencies on the risks and challenges in achieving those outcomes. Similarly, consultants can provide expert knowledge in the service of achieving those outcomes and managing the risks. However, the heavy reliance on consulting firms during the design and implementation of TAHE heightened the risk that agencies were not receiving value for money, were outsourcing tasks that should be performed by the public service, and did not mitigate the risk that the advice received was not objective and impartial. The risk that the role of consultants could have been blurred between providing independent advice to government on options and facilitating a pre-determined outcome was not effectively treated or mitigated. This risk was amplified because a small number of firms were used repeatedly to provide advice on one topic. The effective procurement and management of consultants is an obligation of government agencies.

Appendix one – Responses from audited agencies, and Audit Office clarification of matters raised in the TAHE formal response 

Appendix two – Classification of government entities 

Appendix three – About the audit 

Appendix four – Performance auditing

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #372 - released 24 January 2023

 

Published

Actions for Treasury 2022

Treasury 2022

Treasury
Asset valuation
Compliance
Cyber security
Financial reporting
Information technology
Internal controls and governance
Management and administration
Procurement
Regulation
Risk
Service delivery
Shared services and collaboration

What the report is about

Results of the Treasury cluster agencies' financial statement audits for the year ended 30 June 2022.

The results of the audit of the NSW Government's consolidated Total State Sector Accounts (TSSA), which is prepared by NSW Treasury, are reported separately in our report on 'State Finances 2022'.

What we found

Unmodified audit opinions were issued on all 30 June 2022 general purpose financial statement audits.

Qualified audit opinions were issued on three of the 25 other engagements prepared by cluster agencies. These related to payments made from Special Deposit Accounts (SDA) that did not comply with the relevant legislation.

What the key issues were

Commercial agreements were signed between TAHE, the operators and Transport for NSW in June 2022, which reflected an expected rate of return of 2.5% on contributed equity. However, it remains critical that the government continue to provide sufficient funding to the operators so they can pay for access and use TAHE assets. These findings are reported in our report on 'State Finances 2022'.

Eight high-risk issues were raised in 2021–22, of which five relate to NSW Treasury.

A number of previously reported audit findings and recommendations with respect to icare continue to be ongoing issues. This includes the Workers Compensation Nominal Insurer continuing to hold less assets than the estimated present value of its future payment obligations, when measured in accordance with the accounting framework.

What we recommended

Our report on 'State Finances 2022' made several recommendations to improve NSW Treasury's processes.

In this report, we recommended icare should ensure:

  • it has sufficient controls in place over claim payments, including an effective quality assurance program, to minimise claim payment errors
  • that documentation to support PIAWE calculations is appropriately maintained, and that the minimum documentation requirements are set out in a policy.

This report provides Parliament and other users of the Treasury cluster’s financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Treasury cluster (the cluster) for 2022.

Section highlights

  • Unqualified audit opinions were issued on the general purpose financial statements of all cluster agencies.
  • A qualified opinion was issued on the NSW Government's consolidated Total State Sector Accounts (TSSA), which are prepared by NSW Treasury. This is reported separately in our 'State Finances 2022' NSW Auditor-General's Report to Parliament.
  • Three qualified audit opinions were issued on special purpose financial reports, relating to whether payments from the funds complied with the relevant legislation.
  • Reported corrected misstatements increased from seven in 2020–21 to ten in 2021–22 with a gross value of $808.6 million. Reported uncorrected misstatements decreased from 17 in 2020–21 to 11 in 2021–22 with a gross value of $85.7 million.
  • Nine of 15 cluster agencies either did not submit or did not complete certain mandatory early close procedures on time.
  • NSW Treasury corrected a $39.7 million prior period error retrospectively in the financial statements as it overstated its accrual at 30 June 2021 relating to hotel quarantine costs.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Treasury cluster.

Section highlights

  • Eight high-risk issues were identified in 2021–22, an increase from four high-risk and one extreme risk in 2020–21. A further 31 moderate risk findings were reported in 2021–22, of which 12 were repeat findings.
  • Inconsistencies in the Government Sector Finance Act 2018 (GSF Act) and Government Sector Audit Act 1983 (GSA Act) relating to key statutory timeframes have been addressed.
  • Further to last year's reporting, some agencies have again spent moneys without an authorised delegation. 
  • There was a lack of quality review of submissions for audit by NSW Treasury.
  • The Nominal Insurer's net assets decreased from a $2.5 billion surplus at 30 June 2018, to a $1.2 billion deficiency at 30 June 2022.
  • The Nominal Insurer's return-to-work rates stabilised, but remain below the performance levels prior to the COVID-19 pandemic.
  • The Nominal Insurer paid $29.5 million in 2021–22 to remediate historical underpayment of compensation benefits to workers (Pre-Injury Average Weekly Earnings (PIAWE) payments), and a further $8.5 million was payable at 30 June 2022.
  • During its review of historical PIAWE errors, icare found that indexation may have been incorrectly applied, or failed to have been applied when determining injured worker entitlements within the Nominal Insurer between 2012 and 2019. Based on calculations provided by icare, the Audit Office reported an uncorrected judgemental misstatement of $28.5 million (understatement).

Appendix one – Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

Appendix five – Acquittals and other opinions

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for State Finances 2022

State Finances 2022

Treasury
Whole of Government
Asset valuation
Compliance
Cyber security
Financial reporting
Infrastructure
Internal controls and governance
Management and administration
Regulation
Risk

What the report is about

Results of the 2021–22 consolidated General Government Sector (GGS) and Total State Sector (TSS) financial statements audits.

What we found

The Independent Auditor’s Report on the 2021–22 GGS and TSS financial statements was modified with a limitation of scope and also contained an emphasis of matter.

The opinion in the TSS Independent Auditor’s Report was modified with a limitation of scope on certain balances consolidated in the TSS financial statements because the Catholic Metropolitan Cemeteries Trust (CMCT) denied access to its management, books and records for the purpose of conducting a financial audit.

The Independent Auditor’s Report also includes an emphasis of matter drawing attention to the significant uncertainties associated with the GGS’s equity investment in Transport Asset Holding Entity (TAHE). The significant uncertainty relates to key assumptions and estimates used to forecast a 2.5% return from GGS investments into TAHE that supports the accounting treatment as an equity injection, including:

  • funding to support the Rail Operators to pay TAHE’s contracted and forecast access and licence fees up until 2045–46. The Rail Operators are dependent on funding from the GGS to pay access and licence fees. Forecast modelling notes a requirement of a further $10.2 billion in budget funding to pay TAHE to the end of the ten-year contract period in 2030–31, in addition to the $5.5 billion allocated in the forward estimates and up to $50.8 billion for the period 2032 to 2046
  • a significant portion of the projected returns are earnt outside of the ten-year contract period and there is a risk that TAHE may not be able to recontract fees at levels consistent with current projections.

What we recommended

The report includes a number of recommendations including:

  • continued monitoring that TAHE controls the reported assets ensuring the CMCT, Category 2 Statutory Land Managers (SLM) and Commons Trusts meet their statutory reporting obligations
  • ensuring accounting and audit position papers are sufficiently consulted with key stakeholders and are concluded on a timely basis
  • ensuring agencies support the timely conclusion of audits by bringing to the auditors' attention key Cabinet records and identifying references relating to accounting issues impacting the financial statements
  • for Special Deposit Accounts (SDA) responsible managers should ensure amounts appropriated under any Act or law for payment into the account are appropriately recorded, ensuring payments from SDAs are allowable and made in accordance with Treasurer's delegations and standing authorisation.
Image
Margaret Crawford, Auditor-General for New South Wales

Pursuant to section 52A of the Government Sector Audit Act 1983 I am pleased to present my Auditor-General’s Report on State Finances 2022.

Once again this year has presented considerable challenges for the state sector and my Office as we collectively grapple with uncertainties related to COVID-19 and the disruption of emergency events impacting New South Wales. In addition, there were many recommendations arising from last year’s audit to be addressed.

While there is more to do to ensure good financial stewardship of the State, resolution of matters was helped by constructive engagement with the NSW Treasury at the most senior levels. Personally I wish to thank the Treasurer and Secretary for their commitment to instilling integrity in financial management systems and processes. The support Treasury provided for recent amendments to the Government Sector Audit Act 1983 to provide ‘follow the dollar’ powers and other changes recommended by the Public Accounts Committee quadrennial review of my Office is also acknowledged.

Finally I want to thank the teams that contributed to this year’s audit of the Total State Accounts for their diligence, professionalism and commitment. I am very proud of your work.

Margaret Crawford

Auditor-General for New South Wales

The Independent Auditor's Report was qualified and also included an emphasis of matter

The audit opinion on the State's 2021–22 financial statements was modified. The delayed signing of the NSW Total State Sector Accounts (TSSA) by NSW Treasury was in order to resolve significant accounting issues that were material to the TSSA. The key areas requiring significant audit effort included reviewing the State's accounting for TCorp Investment Management (IM) Funds and responding to the risks related to the Catholic Metropolitan Cemeteries Trust (CMCT) denying access to its management and books and records, which is detailed in this Report.

NSW Treasury aimed to sign the TSSA by 19 October 2022. This was delayed by nearly six weeks and the TSSA audit opinion was subsequently signed on the statutory deadline imposed on the Treasurer for tabling of the TSSA in the Legislative Assembly of 30 November 2022.

The Independent Auditor’s Report was modified due to a limitation of scope on the balances consolidated in the TSSA relating to the CMCT

The opinion in the Independent Auditor’s Report was modified with a limitation of scope due to the inability to access management, books and records of a controlled entity, the CMCT.

This year, NSW Treasury, after reconsidering all facts and the perspectives of the CMCT, reconfirmed that the CMCT is a controlled entity of the State for financial reporting purposes. This means CMCT is a GSF agency under the provisions of the Government Sector Finance Act 2018 (GSF Act). As such NSW Treasury is required by Australian Accounting Standards to consolidate the CMCT into the Total State Sector Accounts (TSSA). The value of assets and liabilities of CMCT consolidated into the TSSA is $310.3 million and $15.1 million, respectively, and the loss of CMCT consolidated into the TSSA for the year is $2.4 million.

To date, CMCT has not met its statutory obligations to prepare financial statements under the GSF Act and give them to the Auditor-General. CMCT has not submitted its financial statements to the Auditor-General for audit as required despite repeated requests and has not provided access to its books and records for the purposes of a financial audit. The Secretary of the Department of Planning and Environment wrote to CMCT to request it work with, and offer full assistance to, the Auditor-General in the exercise of her duties.

NSW Treasury has met with and considered CMCT's perspectives. NSW Treasury’s position remains that CMCT is a controlled entity of the State for financial reporting purposes. Consequently, CMCT has not met its statutory obligations as a controlled entity to submit its financial statements for audit and provide access to its books and records. Therefore, the Audit Office was unable to obtain sufficient appropriate audit evidence about the carrying amount of assets and liabilities consolidated into the Total State Sector Accounts as at 30 June 2022 and of the amount of income and expenses for the year then ended. Accordingly a modified audit opinion was issued on the NSW Government's 2021–22 consolidated financial statements.

Section 3 of this report titled 'Limitation of Scope relating to CMCT' discusses this matter in further detail.

An emphasis of matter drawing attention to uncertainty relating to the General Government Sector's investment in the Transport Asset Holding Entity (TAHE) remains

The Independent Auditor’s Report also includes an emphasis of matter, drawing attention to the significant uncertainties associated with the General Government Sector's (GGS) equity investment in TAHE. The significant uncertainty relates to key assumptions used to forecast returns from investments into TAHE in order to support the recognition of the government's funding of TAHE as an equity injection.

At the time of signing the Independent Auditor's Report, there was significant uncertainty with regards to assumptions and estimates used to forecast a return from the GGS investment into TAHE, which supports the recognition of an equity injection. There is significant uncertainty relating to:

  • the 2022–23 Budget committed $5.5 billion to fund TAHE's key customers, Sydney Trains and NSW Trains (the operators), to support their payment of access and licence fees agreed on 23 June 2022. However, this funding only extends out to the end of the forward estimates period in 2025–26, which falls short of the ten-year contractual periods to 2030–31 and the projected period to 2045–46 to achieve a 2.5% return from the government's equity investment. The government will need to fund the operators an additional $10.2 billion in Budget funding so that they can meet their contractual obligations to TAHE from 2026–27 to 2030–31, and a further projected funding of $50.8 billion from 2031 to 2046. This additional funding is not within the government's published Budget figures, leading to uncertainty on whether the government-funded operators can pay access and licence fees beyond the forward estimates period of 2025–26
  • a significant portion of the projected returns are earnt outside the ten-year contract period (terminating 30 June 2031) and there is a risk that TAHE will not be able to recontract for access and licence fees at a level that is consistent with current projections. There is also a risk that funding for TAHE's key customers will not be sufficient to fund payment of access and licence fees at a level that is consistent with current projections.

The 'State Finances 2021' report made recommendations regarding the significant accounting issues relating to TAHE. The State's response to these recommendations are detailed in Section 4 of this report titled ‘Investment in the Transport Asset Holding Entity’. Other significant matters related to the TSSA audit are covered in Section 8 titled ‘Key audit findings’.

Other financial reporting matters

All government agencies were granted an extra week to submit financial statements for audit

A one-week extension provided agencies across the sector with additional time to resolve key accounting issues and submit financial statements for audit by 1 August 2022.

Further extensions were approved for the following seven agencies (ten in 2020–21):

  • State Insurance Regulatory Authority (3 August 2022)
  • Dams Safety NSW (8 August 2022)
  • Jenolan Caves Reserve Trust (8 August 2022)
  • Transport for NSW (8 August 2022)
  • Department of Enterprise, Investment and Trade (22 August 2022)
  • Transport Asset Holding Entity (22 August 2022)
  • Department of Transport (26 August 2022).

Additional extensions provided agencies with more time to complete:

  • asset valuations
  • valuations of actuarially assessed liabilities.

An initial draft of the TSSA was provided to audit on 15 September 2022. This version was incomplete and excluded the impact of consolidating the State's TCorp IM funds under the correct Australian Accounting Standards. An additional three versions of the draft TSSA were provided to audit progressively to update the TCorp IM fund consolidated balances. The final complete version of the TSSA was submitted on 27 October 2022 which included all adjustments relating to the TCorp IM fund consolidation. Refer to section 8.1 for more details on the material restatements relating to the consolidation of the TCorp IM funds.

In 2021–22, agency financial statements presented for audit contained 20 errors exceeding $20 million (24 in 2020–21). The total value of these errors was $973 million, a decrease from the previous year ($6.6 billion in 2020–21).

The graph below shows the number of reported errors exceeding $20 million over the past five years in agencies’ financial statements presented for audit.

The errors resulted from:

  • incorrect application of Australian Accounting Standards and NSW Treasury policies
  • incorrect judgements and assumptions when valuing non-current physical assets and liabilities.

NSW Treasury concluded CMCT is a controlled entity of the State

In response to our recommendation in the ‘State Finances 2021’ report, NSW Treasury reconfirmed that the Catholic Metropolitan Cemeteries Trust (CMCT) is a controlled entity of the State. The Audit Office accepted the position of NSW Treasury.

The reaffirmation of this position means CMCT is a GSF agency under the provisions of the Government Sector Finance Act 2018 (GSF Act). Section 7.6 of the GSF Act places an obligation on CMCT to prepare financial statements and give them to the Auditor-General. Further, section 34 of the Government Sector Audit Act 1983 (the GSA Act) requires the Auditor-General to furnish an audit report on these financial statements.

To date, CMCT has not met its statutory obligations to prepare financial statements under the GSF Act and give them to the Auditor-General. CMCT has not submitted their financial statements to the Auditor-General for audit despite repeated requests and has not provided access to its books and records for the purposes of a financial audit. There was extensive correspondence between the Audit Office of NSW, CMCT, NSW Treasury and the Department of Planning and Environment in 2022 regarding this matter.

Recommendation

NSW Treasury and the Department of Planning and Environment should ensure the Catholic Metropolitan Cemeteries Trust meets its statutory reporting obligations.

In addition, on 10 December 2021, the then Minister for Water, Property and Housing wrote to the Auditor-General requesting a financial and performance audit be performed pursuant to section 27B(3)(c) of the GSA Act. The audit would cover the financial affairs of CMCT, including whether funds have been used for the proper purpose. The Audit Office of New South Wales has written to CMCT on a number of occasions to request the provision of documentation and access to management in order to conduct the performance audit. CMCT has not provided the Audit Office of New South Wales access to its management, books and records for the purpose of the required performance audit.

NSW Treasury has met with and considered CMCT's perspectives. NSW Treasury’s position remains that CMCT is a controlled entity of the State for financial reporting purposes. Consequently, CMCT did not meet its statutory obligations as a controlled entity to submit its financial statements for audit and provide access to its books and records.

The TSSA audit opinion included a limitation of scope

The opinion in the TSSA Independent Auditor’s Report was modified with a limitation of scope due to an inability to access management and the books and records of CMCT. This limitation was appropriately disclosed in Note 1 'Statement of Significant Accounting Policies' of the TSSA. The Statement of Compliance signed by the Secretary of Treasury and the Treasurer on 29 November 2022 was also updated to acknowledge the disclosure in Note 1 regarding CMCT.

The Audit Office was unable to obtain sufficient appropriate audit evidence about the carrying amount of assets and liabilities consolidated into the Total State Sector Accounts as at 30 June 2022 and of the amount of income and expenses for the year then ended. Accordingly a modified audit opinion was issued on the NSW Government's 2021–22 consolidated financial statements.

The process of information sharing by NSW Treasury continues to require improvement

In last year’s ‘State Finances 2021’ report an extreme risk management letter finding was reported for NSW Treasury to ensure it significantly improve its processes so that all relevant information is identified and shared with the Audit Office to support material transactions and balances of the State.

A number of events reconfirmed that NSW Treasury needs to continue improving its process with respect to information sharing with the Audit Office. Notably, NSW Treasury’s finance team had not demonstrated that all available information (on their systems) was considered by them when assessing the State’s control over CMCT.

Critical information relating to CMCT was in the possession of NSW Treasury since late October 2021 but not considered when reconfirming their accounting position on the State's control of CMCT this year. A further reconfirmation of the State's control over CMCT was needed by NSW Treasury to ensure this information was considered in their accounting assessment.

The above demonstrates that more effective consultation is required by NSW Treasury with key stakeholders to ensure all information relevant to forming an accounting position relating to the TSSA is captured. This will ensure new information is not identified late in the audit process and NSW Treasury considers all information when concluding on the accounting position of the State.

Recommendation

NSW Treasury should ensure when drafting position papers and concluding on accounting issues impacting the State, these are provided to audit on a timely basis and reflect a complete and accurate understanding of the key public sector issues being considered.

Last year's report highlighted that NSW Government actions avoided a qualified opinion in 2020–21 relating to the General Government Sector's $2.4 billion cash contribution to Transport Asset Holding Entity (TAHE). These actions included the NSW Government agreeing to provide additional future funding to TAHE's key government customers Sydney Trains and NSW Trains (the operators) to support increases in access and licence fees to be paid to TAHE.

The additional funding by the government was necessary to demonstrate that a reasonable expectation of a sufficient rate of return would be earned on its equity invested in TAHE. Last year, there was no government policy on what the minimum return should be on investments in other public sector entities, so the long-term inflation rate was used as a benchmark. A recommendation was made in last year's State Finances report that NSW Treasury establish a policy on the minimum expected return from its investments.

On 6 September 2022, NSW Treasury finalised its policy relating to the government’s returns on equity investments. The application of this policy is limited to State Owned Corporations and similar to the Commonwealth framework for commercial businesses, which requires the expected return be at least equal to the long-term inflation rate.

The government's commitment to additional funding was conveyed last year through revised shareholder expectations being published in the 2021–22 'NSW Budget-Half yearly Review' on 16 December 2021, increasing the expected returns on equity from 1.5% to the expected long-term inflation rate of 2.5%. On 18 December 2021, Transport for NSW (TfNSW) and the operators entered into a Heads of Agreement (HoA). This formed the basis of negotiations to revise the pricing within the existing ten-year contracts and deliver upon the shareholders’ expected return of 2.5% on contributed equity to be earned over the estimated weighted average remaining useful lives of TAHE's assets.

Further information on last year's audit of the government’s investment in TAHE can be found in our 'State Finances 2021' report.

Ten-year commercial agreements were signed between TAHE, operators and TfNSW

Last year's State Finances report recommended that NSW Treasury facilitate revised commercial agreements to reflect the access and licence fees detailed in the HoA. As these agreements were not executed by 30 June 2021, last year's audit opinion of the Total State Sector Accounts (TSSA) included an Emphasis of Matter drawing attention to the uncertainty that existed at balance date as these agreements were not finalised.

On 23 June 2022, commercial agreements were signed between TAHE, the operators and Transport for NSW through a deed of variation. The revised access and licence fees for the ten-year period 2021–22 to 2030–31 was $16.6 billion, which is $520 million less than the HoA fees of $17.1 billion.

Comparison FY22
$m
FY23
$m
FY24
$m
FY25
$m
FY26
$m
FY27
$m
FY28
$m
FY29
$m
FY30
$m
FY31
$m
Total
$m
Revised commercial agreements 641.1 911.8 1,298.1 1,585 1,807.3 1,921.8 1,992 2,065.4 2,139.1 2,252.8 16,614.4
HoA 679.9 1,081.4 1,236 1,398.9 1,645.8 1,826.1 2,023.3 2,209.4 2,404.5 2,629.2 17,134.6
Difference (38.8) (169.6) 62.1 186.1 161.5 95.7 (31.3) (144) (265.4) (376.4) (520.2)

TAHE's main customers principally rely on government funding to pay access and licence fees

Whilst TAHE has agreed ten-year access and licence fees of $16.6 billion with its two main customers Sydney Trains and NSW Trains, these two operators significantly rely on government funding when making these payments to TAHE. At 30 June 2022, TAHE's expected return of 2.5% is contingent upon the GGS funding the operators to support their payment of access and licence fees that have been agreed with TAHE for the ten-year contracted period and for non-contracted periods from 2031–32 to 2045–46.

The 2022–23 NSW Budget has allocated $5.5 billion to fund the operators, to support their payment of access and licence fees. However, this funding extends to the end of the forward estimates period in 2025–26, which falls short of the ten-year contractual period to 2030–2031 and the projected period to 2045–46 to achieve the 2.5% return.

  2022–261
$b
2027–20312
$b
2032–46
$b
Total
$b
Access and licence fees3 5.5 10.2 50.8 66.5

1 Represents the 2022–23 Budget year and three-year forward estimates which includes: FY2024–26.
2 Whilst excluded from the 2022–23 NSW Budget, these access and licence fees are included in the ten-year commercial agreement between TAHE, operators and TfNSW.
3 Represents cumulative access and licence fees for the period stated.

The government will need to fund the operators an additional $10.2 billion in budget funding to meet their contractual obligations to TAHE from 2026–27 to 2030–2031, and a further projected funding of $50.8 billion from 2032 to 2046. This is needed to ensure the government continues to demonstrate its expected return on investment of 2.5%. This additional funding is not within the government's published 2022–23 NSW Budget figures, leading to uncertainty on whether the government funded operators can pay access and licence fees beyond the forward estimate period of 2025–26.

Significant funding uncertainties remain

While the ten-year access and licence fee agreements were communicated to the NSW Government's Expenditure Review Committee, it is yet to be fully provided for in the government's budget figures. As TAHE's projections are highly dependent on the operators as its key customers, it remains critical that the government continue to provide sufficient funding to the operators so they can pay for access and use of TAHE assets. This means the significant funding uncertainties reported in last year's TSSA audit opinion remain for 2021–22.

The government has estimated $37.9 billion in returns (equivalent to 2.5% on contributed equity) is to be earned from its investment in TAHE over the period from 1 July 2022 to 30 June 2046. As previously reported, TAHE derives most of its revenue from access and licence fee agreements from the operators, who in turn are both funded by grants through TfNSW from the GGS. More than 95% of these returns are estimated to be earned outside of the ten-year contract period (terminating 30 June 2031).

  2022–261
$b
2027–20312
$b
2032–46
$b
Total
$b
Returns to GGS 1.8 4.7 31.5 37.9

1 Represents the 2022–23 budget year and three-year forward estimates which includes: 2023–24, 2024–25 and 2025–26.
2 Whilst excluded from the 2022–23 NSW Budget, these access and licence fees are included in the ten-year commercial agreement between TAHE, operators and TfNSW.

There remains risk that:

  • TAHE will not be able to recontract for access and licence fees at a level that is consistent with current projections
  • future governments' funding to TAHE's key customers will not be sufficient to fund payment of access and licence fees at a level that is consistent with current projections
  • TAHE will be unable to grow its non-government revenues.

This significant funding uncertainty was also reported in last year's TSSA audit opinion and will remain for 2021–22.

In 2021–22, TAHE and NSW Treasury prepared further modelling to support the Government's intent to earn a 2.5% return inclusive of recovering the holding (revaluation) loss of $20.3 billion on its investment in TAHE

Last year's State Finances report highlighted that NSW Treasury, with TAHE, should prepare robust projections and business plans to support the expected returns forecast beyond FY2031.

This year TAHE engaged an expert to help develop a model demonstrating the government's expected returns from its investment in TAHE. The model mathematically forecasts that returns of 2.5% will be achieved by 2046 and this will include recovery of the revaluation losses of $20.3 billion relating to 2020–21.

The current model includes some key assumptions:

  • The main source of revenue is the access and licence fees expected from the two public rail operators (Sydney Trains and NSW Trains) contributing to more than 80% of TAHE's projected revenue. The rail operators are largely funded by the government when paying access and licence fees to TAHE.
  • For the first ten years, the access and licence fees are based on the signed agreements between TAHE and the public rail operators.
  • Beyond the ten-year contracted period, the model assumes existing contractual terms for access and licence fees will continue unchanged allowing for an annual rise for inflation (2.5% per annum), and increased fees to enable a 7.62% return for renewed assets.
  • The capital expenditure included in the model is only the amounts approved by the Expenditure Review Committee (ERC) as part of the ten-year forecast. The model beyond ten years includes expected investment in renewed and replacement assets but excludes any forecasts relating to growth capex that is not approved by the ERC, and any related depreciation expenses for growth capex.

While management has developed a 35-year long term financial model to support the returns, we note this will need to be refined over the next few years. Furthermore, these are forecasted figures and we have not seen sufficient evidence of whether this reflects reality (that is, the achievement of dividends representing a return on equity) as it is still very early. Therefore, this will remain a high-risk matter until we have seen sufficient evidence of reality to the forecasted figures.

There is negative net impact on the budget after 2024–25 and this will grow in the future

There are some key points to highlight with this modelling and these are best conveyed with the graph below. This graph shows total cash injections made by the GGS since the government first announced the creation of TAHE as a for-profit entity in the 2015–16 NSW Budget. It also conveys the forecast returns from TAHE to the GGS and the level of funding operators will need from the GGS to pay TAHE's access and licence fees over the 30-year period. These cash flows are key inputs used in the modelling which calculates a 2.5% return from TAHE inclusive of recovering the holding (revaluation) loss of $20.3 billion.

The government continues to respond to the impact of the COVID-19 pandemic on New South Wales through its economic stimulus measures

The COVID-19 pandemic continued to significantly impact the State’s finances, reducing revenue and increasing expenses especially in sectors directly responsible for responding to the COVID-19 pandemic, such as Health. In October 2021, the government announced through the 'COVID-19 Economic Recovery Strategy' an additional $2.8 billion in economic stimulus and response measures following the conclusion of the three-month lockdown due to the Delta COVID-19 outbreak. Measures included:

  • $739 million in household and social support, including housing support for Aboriginal communities and survivors of domestic violence, and vouchers to thank parents for their efforts to support learning from home
  • $500 million to consumers and businesses including expansion of the 'Dine & Discover' and 'Stay & Rediscover' voucher programs
  • $495 million in education support addressing learning gaps for children and helping schools prepare for future learning disruptions
  • $487 million in combined funding for tourism, events, sports, and recreation throughout New South Wales
  • $130 million to fund mental health services for individuals whose mental health was impacted by the pandemic.

The 2021–22 financial year included $21.9 billion for pandemic response and economic stimulus measures. Of this, $17.9 billion was spent in 2021–22 while a further $1 billion of the budgeted amount from 2021–22 was carried forward into 2022–23. The graph below shows the total allocation and spend by cluster for 2022 compared to target spend.

There were 14 natural disaster declarations including four severe weather events in 2021–22

Natural disasters such as bushfires, storms, floods, and other adverse weather events can have a significant impact on the State's finances. Costs associated with natural disasters include direct response costs such as clean-up and recovery, temporary accommodation, and as well as financial assistance provided to impacted communities such as recovery and business support grants.

The NSW Government can make a natural disaster declaration allowing eligible individuals and communities from impacted Local Government Areas access to a range of special financial assistance measures.

In 2021–22, there were 14 natural disaster declarations announced comparable to 14 in the previous year. These natural disaster declarations largely related to storms and floods throughout the State. In 2021–22, there was a larger number of 'severe weather' events declared, with four in 2021–22 (nil in 2020–21).

Natural disaster expenses increased 143% to $1.4 billion in 2021–22, up from $569 million last year

Over 2021–22, the budgeted cost for declared natural disasters was $1.9 billion ($725 million in 2020–21). Actual expenditure by the State on disaster response increased by $815 million to $1.4 billion. The graph below shows the total allocation and spend by cluster for 2022 compared to their budget spend.

Deficit of $15.3 billion compared with a budgeted deficit of $8.6 billion

The outcomes of the government’s overall activity and policies are reflected in its net operating balance (budget result). This is the difference between the cost of general government service delivery and the revenue earned to fund these sectors.

The General Government Sector, which comprises 196 entities, generally provides goods and services funded centrally by the State.

In addition to the 196 entities within the General Government Sector, a further 85 government controlled businesses are included within the consolidated Total State Sector financial statements. These businesses generally provide goods and services, such as water, electricity and financial services for which consumers pay for directly, and form part of the PNFC (31) and PFC (54) sectors.

The budget result for the 2021–22 financial year was a deficit of $15.3 billion compared to an original forecast of a budget deficit of $8.6 billion.

Revenues increased $16.1 billion to $106.7 billion

The State’s total revenues increased $16.1 billion to $106.7 billion, an increase of 17.8% compared to the previous year. Total revenue growth in 2020–21 was 5.1%. The State's increase in revenue was mostly from $9.2 billion in grants and subsidies and $4.6 billion in taxation.

Taxation revenue increased by 13.3%

Taxation revenue increased by $4.6 billion, mainly due to the net of:

  • $4.9 billion higher stamp duties collected from property sales driven by growth in property transaction volumes and prices during 2021–22. This was growth was experienced across residential and commercial property markets
  • $296 million lower gambling and betting taxes compared to 2020–21. Decrease was primarily attributed to the ongoing effects of COVID-19 restrictions and venue closures within the first half of 2021–22.

Stamp duties of $16.6 billion remains the largest source of taxation revenue, $7.7 billion higher than payroll tax of $8.9 billion, the second-largest source of taxation revenue.

Assets grew by $53 billion to $571 billion

The State’s assets include physical assets such as land, buildings and infrastructure, and financial assets such as cash, and other financial instruments and equity investments. The value of total assets increased by $53.2 billion or 10.3% to $571 billion. The increase was largely due to increases in the carrying value of land, buildings and infrastructure systems.

Valuing the State’s physical assets

State’s physical assets valued at $437 billion

The value of the State’s physical assets increased by $46.8 billion to $437 billion in 2021–22 ($724 million increase in 2020–21). The State’s physical assets include land and buildings ($198 billion), infrastructure systems ($221 billion), and plant and equipment ($18 billion).

The movement in physical asset values between years includes additions, disposals, depreciation and valuation adjustments. Other movements include assets reclassified to held for sale and other opening balance adjustments.

Appendix one – Prescribed entities

Appendix two – Legal opinions

Appendix three – TSS sectors and entities

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.