Refine search
Reports
Published
Actions for Signal failures on the metropolitan rail network
Signal failures on the metropolitan rail network
Transport
Information technology
Infrastructure
Internal controls and governance
Project management
Risk
Service delivery
Between 2004 and 2006, the number of signalling failures, signalling downtime and the number of trains delayed as a result of signal failures all fell. RailCorp’s on-time running performance improved over the same period. The fall in failures is a clear indication of improved performance. Changes in the definition of on-time and to the timetable during 2005 and 2006 however make it difficult to determine whether improvements in response downtime and sign