Actions for Handback of the M4 Tollway

Handback of the M4 Tollway

Transport
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management

This audit focuses on the M4 handback. It looks at whether the road will be in good condition when the State gets it back, and whether it will cope with the extra traffic after the toll is removed. These are critical issues for taxpayers and motorists. Taxpayers don’t want to be responsible for a large repair bill and motorists don’t want to be stuck in traffic jams.

To ensure that future private sector partnerships (PPP) deal adequately with handback, we recommend that the Roads and Traffic Authority (RTA):

  • ensure deeds spell out an appropriate inspection and testing program to determine repairs required to bring roads up to a satisfactory condition at handback (p.11)
  • ensure deeds link condition standards and maintenance approaches to changing industry standards and approaches over the life of the PPP (p.11)
  • consider including in deeds a requirement that operators provide a performance bond or similar security over the cost of handback repairs (p.11)
  • review the lessons learnt from the M4 tollway handback and determine whether it should seek to negotiate changes to existing tollway deeds to better deal with handback, by June 2010 (p.11)

 

Parliamentary reference - Report number #193 - released 27 October 2009

Published

Actions for Government Licensing Project

Government Licensing Project

Finance
Information technology
Internal controls and governance
Management and administration
Project management
Shared services and collaboration

The Government Licensing Project (GLP) is standardising and simplifying processes of agencies which issue licences. However, it is currently running over the original anticipated completion date, exceeding the original budget and expected to produce savings less than originally planned.

 

Parliamentary reference - Report number #192 - released 7 October 2009

Published

Actions for Administering Domestic Waterfront Tenancies

Administering Domestic Waterfront Tenancies

Planning
Transport
Management and administration
Service delivery
Shared services and collaboration

The audit’s overall conclusion is that Lands and Maritime are broadly achieving outcomes consistent with the IPART report on administering domestic waterfront tenancies. But a lack of collaboration between the agencies is contributing to poor customer service. Inconsistencies with the IPART report recommendations and operational differences between the two agencies result in different rents and conditions for tenants in the two agencies. The differences are having a significant impact on customer service.

 

Parliamentary reference - Report number #191 - released 23 September 2009

Published

Actions for Tackling Cancer with Radiotherapy

Tackling Cancer with Radiotherapy

Health
Internal controls and governance
Management and administration
Procurement
Service delivery
Workforce and capability

Overall radiotherapy services are managed in a reasonably efficient and effective manner. Much is being done to further improve efficiency and effectiveness, and more can be done. While New South Wales has a number of well-established radiotherapy treatment centres, the high capital cost limits their availability in all hospitals. Some patients need to travel long distances and be away from their homes for up to seven weeks. The projected growth in demand for radiotherapy services will further challenge NSW Health and it needs to more clearly demonstrate how it will have the right facilities in the right place at the right time.

 

Parliamentary reference - Report number #188 - released 23 June 2009

Published

Actions for Delivering Health Care out of Hospitals

Delivering Health Care out of Hospitals

Health
Management and administration
Project management
Service delivery
Workforce and capability

Area Health Services and hospitals have developed programs which can provide clinical outcomes as good for patients as in-hospital care and can reduce the time they spend in hospital. They have operated for several years and show considerable potential. Ageing of the population, increasing costs and higher expectations of health care will continue to challenge health systems. Sometimes, unfortunately, the system struggles to cope. 

 

Parliamentary reference - Report number #182 - released 24 September 2008

Published

Actions for Implementing Successful Amalgamations

Implementing Successful Amalgamations

Finance
Internal controls and governance
Management and administration
Project management
Service delivery
Shared services and collaboration

The Better Practice Guide (BPG) aims to provide guidance for those implementing an amalgamation. It provides a series of questions identifying what needs to be done to achieve a successful amalgamation following the formal announcement of the amalgamation and the Administrative Orders for the new arrangements being finalised. The BPG’s aim is to alert those managing an amalgamation to actions that should be considered. How the Guide is applied will depend on circumstances. A lot will depend on how clear the expectations of the amalgamation are and on how complex it is.

 

Parliamentary reference - Report number #176 - released 5 March 2008

Published

Actions for Managing Departmental Amalgamations

Managing Departmental Amalgamations

Industry
Finance
Internal controls and governance
Management and administration
Project management
Service delivery
Shared services and collaboration

Both Commerce and DPI substantially achieved their stated amalgamation savings objectives as set by government. The departments are expected to achieve savings targets of about $150 million and $190 million respectively over their first four years. Our analysis indicates that there are two key factors in successful amalgamations. The first is effective early planning by departments based on clear objectives, supported by quick action. Second, significant synergies in service delivery can be achieved when departments with similar services and customers are amalgamated. The Department of Primary Industries is an example.

 

Parliamentary reference - Report number #175 - released 5 March 2008

Published

Actions for Code Red: Hospital Emergency Departments

Code Red: Hospital Emergency Departments

Health
Service delivery
Shared services and collaboration

All three hospitals followed the Department of Health’s guidelines for judging capacity and had systems in place to notify hospital staff and ambulance crews of changes in status. We found discrepancies in the records kept by all three hospitals when compared to the records maintained by the Department of Health. Our view however, is that these records do not need to be a perfect match for the intended purpose, which is to guide ambulance crews to the shortest queue.

 

Parliamentary reference - Report number #121 - released 15 December 2003

Published

Actions for Dealing with Unlicensed and Unregistered Driving

Dealing with Unlicensed and Unregistered Driving

Justice
Transport
Information technology
Regulation
Shared services and collaboration

In our opinion there are inadequacies in the current arrangements for detecting unauthorised driving. For example better information is needed on the extent of unlicensed driving. This may require giving the NSW Police power to conduct random licence and registration checks. In addition, there are technological and legal constraints to the efficient and effective detection of unauthorised driving.

 

Parliamentary reference - Report number #115 - released 4 September 2003

Published

Actions for The Millennium Train Project

The Millennium Train Project

Transport
Infrastructure
Procurement
Project management
Service delivery

State Rail has made significant improvements since the purchase of the Tangara. It improved measures necessary for handling contracts dealing with technically complex and innovative projects, although some other problems have been encountered, with new lessons to learn. The design and manufacture of new trains requires a significant investment in both time and cost. The Millennium Train has come at a considerably higher price than originally expected. And it is very late compared to the Government’s original announcements, as the development/design took longer than planned.

 