Actions for Enterprise, Investment and Trade 2022

Enterprise, Investment and Trade 2022

Finance
Asset valuation
Compliance
Cyber security
Financial reporting
Information technology
Internal controls and governance
Management and administration
Procurement
Regulation
Risk

What the report is about

Result of the Enterprise, Investment and Trade cluster agencies' financial statement audits for the year ended 30 June 2022.

What we found

The Machinery of Government changes within the Enterprise, Investment and Trade cluster resulted in the creation of the Department of Enterprise, Investment and Trade and the transfer of $1.0 billion of net assets into the new department.

Unmodified audit opinions were issued for all completed cluster agencies' 2021–22 financial statements audits. Two audits are ongoing.

An 'Other Matter' paragraph was included in the audit opinion for the Jobs for NSW Fund's 30 June 2021 financial report to reflect the non-compliance with the Jobs for NSW Act 2015 (the Act) and Government Sector Finance Act 2018. The Act requires the board to consist of seven members that include the Secretary of the Treasury, the Secretary of the Department of Premier and Cabinet, and five ministerial appointments. The board has consisted of two secretaries since 24 May 2019 when the independent members resigned. The remaining five members have not been appointed by the ministers as required by section 5(2) of the Act.

Three cluster agencies accepted changes to their office leasing arrangements managed by Property NSW. This has resulted in the collective derecognition of $24.8 million of right-of-use assets and $26.7 million in lease liabilities, and recognition of $1.9 million of other gains.

What the key issues were

The number of issues we reported to management decreased from 108 in 2020–21 to 103 in 2021–22. Thirty per cent of issues were repeated from the prior year.

Six high-risk issues were identified across the cluster related to the quality and timeliness of financial reporting, governance processes and internal controls.

Recommendations were made to address these deficiencies.

This report provides Parliament and other users of the Enterprise, Investment and Trade cluster's financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Enterprise, Investment and Trade cluster (the cluster) for 2022.

Section highlights

  • Unqualified audit opinions were issued for all completed cluster agencies 2021–22 financial statements audits. The Jobs for NSW Fund and Responsible Gambling Fund audits are ongoing.
  • An 'Emphasis of Matter' paragraph was included in the Australian Institute of Asian Culture and Visual Arts Limited's 30 June 2022 financial statements to draw attention to management’s disclosures that the entity's financial statements for the year ended 30 June 2022 were prepared on a non-going concern basis following cessation of its operations and resolution by the directors in October 2021 to deregister the entity.
  • An 'Other Matter' paragraph was included in the Jobs for NSW Fund's 30 June 2021 financial report to reflect the non-compliance with the Jobs for NSW Act 2015 and Government Sector Finance Act 2018.
    The Act requires the board to consist of seven members that include the Secretary of the Treasury, the Secretary of the Department of Premier and Cabinet (or their nominees) and five ministerial appointments, one of whom is to be appointed as Chair of the board. The board has consisted of the two secretaries since 24 May 2019 when the independent members resigned. The remaining five members have not been appointed by the ministers as required by section 5(2) of the Act.
  • An 'Emphasis of Matter' paragraph was included in the Jobs for NSW Fund's 30 June 2021 financial report to draw attention to the financial report being prepared for the purpose of fulfilling the Jobs for NSW Fund's financial reporting responsibilities as requested by the Treasurer's delegate.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Enterprise, Investment and Trade cluster.

Section highlights

  • In 2021–22, there were 103 findings raised across the cluster, a decrease from 2020–21.
  • In total, six high-risk findings were identified during 2021–22. Two related to 2021–22 whilst four were related to the audit of Jobs for NSW Fund's 30 June 2021 financial report.
  • Thirty per cent of all findings during 2021–22 were repeat issues. The most common repeat issues related to information technology controls and accounting for property plant and equipment notably fair value assessment and valuation.

Appendix one – Misstatements in financial statements submitted for audit 

Appendix two – Early close procedures 

Appendix three – Timeliness of financial reporting 

Appendix four – Financial data 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Customer Service 2022

Customer Service 2022

Finance
Asset valuation
Compliance
Cyber security
Financial reporting
Information technology
Internal controls and governance
Management and administration
Procurement
Regulation
Risk
Service delivery
Shared services and collaboration

What the report is about

Result of the Customer Service cluster agencies' financial statement audits for the year ended 30 June 2022.

What we found

Unmodified audit opinions were issued for Customer Service cluster agencies.

What the key issues were

The number and size of Service NSW's administered grant programs have increased significantly in response to emergency events. Improvements are required to address gaps in Service NSW's policies, systems and processes in administering and financial reporting of grant programs.

The Department of Customer Service (the department) reported a retrospective correction of a prior period error of $33.3 million understatement of the land titling database, which is a service concession asset managed by a private operator.

The 2021–22 audits identified five high-risk issues across the cluster:

  • the department:
    • control weaknesses in user access to GovConnect systems
    • significant control deficiencies in information technology change management controls
  • Rental Bond Board:
    • legislation amendment required to better support the accounting treatment of rental bonds
    • no delegation instrument to government officers authorising them to approve expenditures
  • Service NSW:
    • improvements required in the timeliness and quality of grant administration revenue assessment and controls over the recovery of grant administration costs.

Recommendations were made to address these deficiencies.

This report provides Parliament and other users of the Customer Service cluster's financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Customer Service cluster (the cluster) for 2022.

Section highlights

  • Unqualified audit opinions were issued on the financial statements of cluster agencies.
  • Reported corrected misstatements decreased from 33 in 2020–21 to 30 with a gross value of $406 million in 2021–22 ($418.9 million in 2020–21). Reported uncorrected misstatements decreased from 13 in 2020–21 to nine with a gross value of $31.8 million in 2021–22 ($78 million).
  • Seven of nine cluster agencies did not submit or complete certain mandatory early close procedures on time.
  • Service NSW's late resolution of the accounting of $256 million revenue from administering COVID-19 and flood grant programs resulted in misstatements and delays in financial reporting and audit.
  • The Department of Customer Service corrected prior period errors retrospectively related to the valuation of a service concession asset (land titling database) which reduced the prior year comparative for service concession asset by $33.3 million in the financial statements.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Customer Service cluster.

Section highlights

  • The 2021–22 audits identified five high risks (three in 2020–21) and 36 moderate risk issues (59 in 2020–21) across the cluster. Fifty-three per cent of the issues (42% in 2020–21) were repeat issues. Many repeat issues related to information technology controls around user access management.
  • While improvement was noted in the number of control deficiencies in GovConnect ASAE 3402 controls assurance reports, internal control qualification and control deviation issues continued to occur in 2021–22. Ineffective controls at service providers increase the risk of fraud, error and security to data.
  • Cyber security governance and management requires improvement. The department is yet to fully implement Essential 8 Mitigation Strategies and the maturity level for several Essential 8 strategies is at Level Zero in the current maturity model. The department is in the process of completing the roll out of some long outstanding system patches.
  • Significant gaps were identified in Service NSW's policies, systems and processes in administering and financial reporting of grant programs.

Appendix one – Misstatements in financial statements submitted for audit 

Appendix two – Early close procedures 

Appendix three – Timeliness of financial reporting 

Appendix four – Financial data

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Audit Insights 2018-2022

Audit Insights 2018-2022

Community Services
Education
Environment
Finance
Health
Industry
Justice
Local Government
Premier and Cabinet
Planning
Transport
Treasury
Universities
Whole of Government
Asset valuation
Cross-agency collaboration
Compliance
Cyber security
Financial reporting
Fraud
Information technology
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management
Regulation
Risk
Service delivery
Shared services and collaboration
Workforce and capability

What the report is about

In this report, we have analysed the key findings and recommendations from our audit reports over the past four years.

This analysis includes financial audits, performance audits, and compliance audits of state and local government entities that were tabled in NSW Parliament between July 2018 and February 2022.

The report is framed by recognition that the past four years have seen significant challenges and emergency events.

The scale of government responses to these events has been wide-ranging, involving emergency response coordination, service delivery, governance and policy.

The report is a resource to support public sector agencies and local government to improve future programs and activities.

What we found

Our analysis of findings and recommendations is structured around six key themes:

  • Integrity and transparency
  • Performance and monitoring
  • Governance and oversight
  • Cyber security and data
  • System planning for disruption
  • Resource management.

The report draws from this analysis to present recommendations for elements of good practice that government agencies should consider in relation to these themes. It also includes relevant examples from recent audit reports.

In this report we particularly call out threats to the integrity of government systems, processes and governance arrangements.

The report highlights the need for balanced advice to government on options and risks, for transparent documentation and reporting of directions and decisions, and for early and open sharing of information with integrity bodies and audit.

A number of the matters highlighted in this report are similar to those described in our previous Insights Report, (Performance Audit Insights: key findings from 2014–2018) specifically in relation to cyber and information security, to performance measurement, reporting and evaluation, and system and workforce planning and capability.

Fast facts

  • 72 audits included in the Audit Insights 2018–2022 analysis
  • 4 years of audits tabled by the Auditor-General for New South Wales
  • 6 key themes for Audit Insights 2018–2022.

picture of Margaret Crawford Auditor-General for New South Wales in black dress with city skyline as backgroundI am pleased to present the Audit Insights 2018–2022 report. This report describes key findings, trends and lessons learned from the last four years of audit. It seeks to inform the New South Wales Parliament of key risks identified and to provide insights and suggestions to the agencies we audit to improve performance across the public sector.

The report is framed by a very clear recognition that governments have been responding to significant events, in number, character and scale, over recent years. Further, it acknowledges that public servants at both state and council levels generally bring their best selves to work and diligently strive to deliver great outcomes for citizens and communities. The role of audit in this context is to provide necessary assurance over government spending, programs and services, and make suggestions for continuous improvement.

A number of the matters highlighted in this report are similar to those described in our previous Insights Report, (Performance Audit Insights: key findings from 2014–2018) specifically in relation to cyber and information security, to performance measurement, reporting and evaluation, and system and workforce planning and capability.

However, in this report we particularly call out threats to the integrity of government systems, processes and governance arrangements. We highlight the need for balanced advice to government on options and risks, for transparent documentation and reporting of directions and decisions, and for early and open sharing of information with integrity bodies and audit. Arguably, these considerations are never more important than in an increasingly complex environment and in the face of significant emergency events and they will be key areas of focus in our future audit program.

While we have acknowledged the challenges of the last few years have required rapid responses to address the short-term impacts of emergency events, there is much to be learned to improve future programs. I trust that the insights developed in this report provide a helpful resource to public sector agencies and local government across New South Wales. I would be pleased to receive any feedback you may wish to offer.

Margaret Crawford
Auditor-General for New South Wales

Integrity and transparency Performance and monitoring Governance and oversight Cyber security and data System planning Resource management
Insufficient documentation of decisions reduces the ability to identify, or rule out, misconduct or corruption. Failure to apply lessons learned risks mistakes being repeated and undermines future decisions on the use of public funds. The control environment should be risk-based and keep pace with changes in the quantum and diversity of agency work. Building effective cyber resilience requires leadership and committed executive management, along with dedicated resourcing to build improvements in cyber security and culture. Priorities to meet forecast demand should incorporate regular assessment of need and any emerging risks or trends. Absence of an overarching strategy to guide decision-making results in project-by-project decisions lacking coordination. Governments must weigh up the cost of reliance on consultants at the expense of internal capability, and actively manage contracts and conflicts of interest.
Government entities should report to the public at both system and project level for transparency and accountability. Government activities benefit from a clear statement of objectives and associated performance measures to support systematic monitoring and reporting on outcomes and impact. Management of risk should include mechanisms to escalate risks, and action plans to mitigate risks with effective controls. In implementing strategies to mitigate cyber risk, agencies must set target cyber maturity levels, and document their acceptance of cyber risks consistent with their risk appetite. Service planning should establish future service offerings and service levels relative to current capacity, address risks to avoid or mitigate disruption of business and service delivery, and coordinate across other relevant plans and stakeholders. Negotiations on outsourced services and major transactions must maintain focus on integrity and seeking value for public funds.
Entities must provide balanced advice to decision-makers on the benefits and risks of investments. Benefits realisation should identify responsibility for benefits management, set baselines and targets for benefits, review during delivery, and evaluate costs and benefits post-delivery. Active review of policies and procedures in line with current business activities supports more effective risk management. Governments hold repositories of valuable data and data capabilities that should be leveraged and shared across government and non-government entities to improve strategic planning and forecasting. Formal structures and systems to facilitate coordination between agencies is critical to more efficient allocation of resources and to facilitate a timely response to unexpected events. Transformation programs can be improved by resourcing a program management office.
Clear guidelines and transparency of decisions are critical in distributing grant funding. Quality assurance should underpin key inputs that support performance monitoring and accounting judgements. Governance arrangements can enable input into key decisions from both government and non-government partners, and those with direct experience of complex issues.     Workforce planning should consider service continuity and ensure that specialist and targeted roles can be resourced and allocated to meet community need.
Governments must ensure timely and complete provision of information to support governance, integrity and audit processes.          
Read more Read more Read more Read more Read more Read more

 

This report brings together a summary of key findings arising from NSW Audit Office reports tabled in the New South Wales Parliament between July 2018 and February 2022. This includes analysis of financial audits, performance audits, and compliance audits tabled over this period.

  • Financial audits provide an independent opinion on the financial statements of NSW Government entities, universities and councils and identify whether they comply with accounting standards, relevant laws, regulations, and government directions.
  • Performance audits determine whether government entities carry out their activities effectively, are doing so economically and efficiently, and in accordance with relevant laws. The activities examined by a performance audit may include a selected program or service, all or part of an entity, or more than one government entity. Performance audits can consider issues which affect the whole state and/or the local government sectors.
  • Compliance audits and other assurance reviews are audits that assess whether specific legislation, directions, and regulations have been adhered to.

This report follows our earlier edition titled 'Performance Audit Insights: key findings from 2014–2018'. That report sought to highlight issues and themes emerging from performance audit findings, and to share lessons common across government. In this report, we have analysed the key findings and recommendations from our reports over the past four years. The full list of reports is included in Appendix 1. The analysis included findings and recommendations from 58 performance audits, as well as selected financial and compliance reports tabled between July 2018 and February 2022. The number of recommendations and key findings made across different areas of activity and the top issues are summarised at Exhibit 1.

The past four years have seen unprecedented challenges and several emergency events, and the scale of government responses to these events has been wide-ranging involving emergency response coordination, service delivery, governance and policy. While these emergencies are having a significant impact today, they are also likely to continue to have an impact into the future. There is much to learn from the response to those events that will help the government sector to prepare for and respond to future disruption. The following chapters bring together our recommendations for core elements of good practice across a number of areas of government activity, along with relevant examples from recent audit reports.

This 'Audit Insights 2018–2022' report does not make comparative analysis of trends in public sector performance since our 2018 Insights report, but instead highlights areas where government continues to face challenges, as well as new issues that our audits have identified since our 2018 report. We will continue to use the findings of our Insights analysis to shape our future audit priorities, in line with our purpose to help Parliament hold government accountable for its use of public resources in New South Wales.

Appendix one – Included reports, 2018–2022

Appendix two – About this report

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for COVID-19: response, recovery and impact

COVID-19: response, recovery and impact

Community Services
Education
Health
Justice
Premier and Cabinet
Transport
Treasury
Whole of Government
Cross-agency collaboration
Financial reporting
Management and administration
Service delivery
Shared services and collaboration

What the report is about

This report draws together the financial impact of COVID-19 on the agencies integral to responses across the state government sector of New South Wales.

What we found

Since the COVID-19 pandemic hit NSW in January 2020, and until 30 June 2021, $7.5 billion was spent by state government agencies for health and economic stimulus. The response was largely funded by borrowings.

The key areas of spending since the start of COVID-19 in NSW to 30 June 2021 were:

  • direct health response measures – $2.2 billion
  • personal protective equipment – $1.4 billion
  • small business grants – $795 million
  • quarantine costs – $613 million
  • increases in employee expenses and cleaning costs across most agencies
  • vaccine distribution, including vaccination hubs – $71 million.

The COVID-19 pandemic significantly impacted the financial performance and position of state government agencies.

Decreases in revenue from providing goods and services were offset by increases in appropriations, grants and contributions, for health and economic stimulus funding in response to the pandemic.

Most agencies had expense growth, due to additional operating requirements to manage and respond to the pandemic along with implementing new or expanded stimulus programs and initiatives.

Response measures for COVID-19 have meant the NSW Government is unlikely to meet targets in the Fiscal Responsibility Act 2012 being:

  • annual expense growth kept below long-term average revenue growth
  • elimination of State’s unfunded superannuation liability by 2030.

 Fast facts

  • First COVID-19 case in NSW on 25 January 2020
  • COVID-19 vaccinations commenced on 21 February 2021
  • By 31 December 2021, 25.2 million PCR tests had been performed in NSW and 13.6 million vaccines administered, with 93.6% of the 16 and over population receiving two doses
  • During 2020–21, NSW Health employed an extra 4,893 full-time staff and incurred $28 million in overtime mainly in response to COVID-19
  • During 2020–21, $1.2 billion was spent on direct health COVID-19 response measures and $532 million was spent on quarantine for incoming international travellers

Section highlights

  • Up to 30 June 2021, $7.5 billion has been spent by state government agencies for health and economic stimulus.
  • Revenue increased for most agencies as falling revenue from providing goods and services was offset by additional funding from appropriations, grants and contributions.
  • Expenses increased as most agencies incurred additional costs to manage and respond to the pandemic along with delivering stimulus and support programs.
  • Borrowings of $7.5 billion over the last two years helped to fund the response to COVID-19.

Section highlights

  • NSW Government unlikely to meet targets in Fiscal Responsibility Act 2012.

Published

Actions for Treasury 2021

Treasury 2021

Treasury
Finance
Compliance
Financial reporting
Internal controls and governance
Management and administration

What the report is about

The results of Treasury cluster agencies' financial statement audits for the year ended 30 June 2021. The results of the audit of the NSW Government's consolidated Total State Sector Accounts (TSSA), which are prepared by NSW Treasury, are reported separately in our report on State Finances 2021.

What we found

Unmodified audit opinions were issued for all Treasury cluster agencies.

The number of identified monetary misstatements increased from 16 in 2019–20 to 24 in 2020–21.

Reported corrected monetary misstatements decreased from 15 in 2019–20 to seven with a gross value of $1.1 billion in 2020–21.

The largest corrected misstatement was in NSW Treasury's financial statements and was a $1 billion correction to administered borrowings.

Reported uncorrected monetary misstatements increased from one in 2019–20 to 17 with a gross value of $168 million in 2020–21.

Seven of the 2020–21 uncorrected misstatements related to one common decision relating to investment management funds terminated during the year by the NSW Treasury Corporation (TCorp).

All agencies submitted their 2020–21 financial statements within NSW Treasury's reporting deadlines.

What the key issues were

Significant audit findings were identified with respect to NSW Treasury's processes to prepare the NSW Government's consolidated TSSA (whole of government accounts). This included one extreme finding and several high-risk findings related to NSW Treasury processes. These are reported in our report on State Finances 2021.

Two high-risk issues raised in 2019–20 were also not addressed by NSW Treasury during the year and were repeat issues reported to management. These related to the appropriations framework and resolution of cross cluster payments, and instances where some agencies spent deemed appropriations money without an authorised delegation.

A number of previously reported audit findings and recommendations with respect to icare continue to be ongoing issues, namely:

  • The Workers Compensation Nominal Insurer continues to hold less assets than the estimated present value of its future payment obligations.
  • The Workers Compensation Nominal Insurer's four week return-to-work rate fell from 68% to 64%. This is below icare's 70% target. Contributing factors include COVID-19 lockdowns which have impacted claims handling processes, and increased barriers to claimants returning to work.
  • Instances were noted where inadequate documentation was kept on file to support claims, including pre-injury average weekly earnings (PIAWE) calculations.

The Workers Compensation (Dust Diseases) Authority increased its outstanding claims liability by $93.9 million, which included $39.3 million to remediate historical underpayments, resulting from workers not being paid the rate required by existing legislation.

The icare Board approved a new approach for remediating PIAWE underpayments on 24 September 2021, the date the Workers Compensation Nominal Insurer’s financial statements were approved for issue. The impact of the decision on the financial statements was not discussed with the Audit Office and assessed as an ‘after balance date event’.

What we recommended

Our report on State Finances 2021 made several recommendations to improve NSW Treasury processes. These included:

  • improve processes to ensure information is shared with audit on a timely basis
  • seek legislative amendments to resolve statutory inconsistencies relating to statutory reporting time frames
  • implement effective quality review processes over key accounting information
  • establish a policy to determine the minimum expected rate of return on equity injections in other public sector entities
  • prepare robust financial projections to support accounting decisions
  • re-confirm sector classifications of TAHE, Sydney Trains and NSW Trains
  • ensure sufficient oversight of its use of consultants and assess the risk of an overdependence on consultants at the cost of internal capability
  • improve disclosures of equity injections invested in other public sector entities
  • determine a state-wide policy on when borrowings are recognised in agency financial statements
  • make legislative amendments to ensure expenditure incurred across financial years does not exceed the appropriation authority and assess the financial reporting impact
  • improve the guidance provided to agencies to ensure expenditure of public money is properly supported by authorised delegations.

We also recommended icare should ensure:

  • it has sufficient controls over claim payments including an effective quality assurance program, to minimise claim payment errors
  • that documentation to support injured worker benefit calculations is appropriately maintained, and the documentation requirements are set out in a policy
  • the impact of ‘after balance date events’ on financial statements is appropriately assessed
  • its operational practices are improved to ensure the correct payment of claims in compliance with legislative requirements. icare also needs to act on a timely basis on received legal advice and amend operational practices to ensure correct payments are made.

Fast facts 

NSW Treasury notes that it is the Government's principal financial and economic adviser to guide the State’s growth for the benefit of the people who live, work and study in NSW.

  • $111b funds under management as at 30 June 2021
  • 100% unqualified audit opinions were issued on agencies’ 30 June 2021 financial statements
  • 24 monetary misstatements were reported in 2020–21
  • $17b total expenditure incurred in 2020–21
  • 12 extreme and high-risk findings were identified
  • 30% of reported issues were repeat issues

This report focuses on agencies within the Treasury cluster and provides parliament and other users of the Treasury cluster's financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

NSW Treasury also prepares the consolidated NSW whole of government financial statements (the Total State Sector Accounts), which is reported in the report on State Finances 2021.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making is enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Treasury cluster (the cluster) for 2021.

Section highlights

  • Unmodified audit opinions were issued on all the cluster agencies 2020–21 financial statements.
  • The number of identified monetary misstatements increased from 16 in 2019–20 to 24 in 2020–21.
  • Reported corrected monetary misstatements decreased from 15 in 2019–20 to seven with a gross value of $1.1 billion in 2020–21. The largest corrected misstatement was in NSW Treasury's financial statements resulting in a $1 billion correction to its administered borrowings. The correction was to address an understatement by NSW Treasury which did not recognise a liability for funds raised by NSW Treasury Corporation (TCorp) on its behalf as it applied settlement date accounting rather than trade date when recognising these borrowings. A corresponding receivable from TCorp was also recognised to reflect that funds were to be received on 1 July 2021.
  • The number of uncorrected misstatements increased from one in 2019–20 to 17 in 2020–21. Two of the misstatements above $5 million related to investment valuations within the SAS Trustee Corporation Pooled Fund, two related to premium income overstatements within the Workers Compensation Nominal Insurer, and one related to NSW Treasury administered liabilities and expenses where it recognised a provision for remediation costs when it had no present obligation. A further seven related to investment management funds that were terminated during the year by TCorp.
  • Nine agencies that were required to perform early close procedures did not complete a total of 25 mandatory procedures. The most common incomplete early close procedures include inter and intra (cluster) agency balances and transactions not confirmed with the counterparty agency and significant management judgements and assumptions made when estimating transactions and balances not documented.
  • To ensure compliance with Australian Accounting Standards, transactions and balances that were formerly reported in the Crown Entity’s financial statements are now reported by NSW Treasury as it primarily controls or administers the transactions and balances on behalf of the State.
  • icare changed the risk margin applied to measure the Workers Compensation Nominal Insurer's outstanding claims liability. If the risk margin used when valuing its 2019–20 outstanding claims liability had been retained, its net asset deficiency would have worsened compared to the prior year. The change in risk margin aligns the Nominal Insurer’s ‘probability of adequacy’ with the Australian Prudential Regulation Authority’s minimum reporting requirements for general insurers.
  • The icare Board approved a new approach for remediating pre-injury average weekly earnings underpayments (subject to legal advice, and assessment by a wage remediation expert), on 24 September 2021 and announced on 11 November 2021. The impact of the decision on the Nominal Insurer's financial statements was not assessed by icare as an ‘after balance date event’ and was not raised with the Audit Office prior to icare finalising its 2021 financial statements on 24 September 2021.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Treasury cluster.

Section highlights

  • The 2020–21 audits identified one new Extreme Risk and 11 High Risk findings. The extreme risk finding related to the incomplete provision and timely access to information to the Total State Sector Accounts (TSSA) audit and the accounting for the General Government Sector's investment in TAHE. Findings related to the TSSA audit are reported in the report on State Finances 2021. Of the 11 high risk findings, two were repeat findings relating to cross cluster payments and authorisation to spend deemed funds. High risk repeat findings need to be addressed with greater priority.
  • There were 21 moderate risk findings reported to management in 2020–21, ten of which were repeat findings. The most common repeat finding related to claims processing, information technology user access administration. Repeat findings, particularly those that relate to data protection, need greater prioritisation and should be implemented on a timely basis.
  • icare is in the process of implementing organisational reform in response to findings in recent external reviews. These reviews identified 151 recommendations for icare to improve in the areas of risk and governance, performance, and culture and accountability. All of the recommendations were accepted by icare and are expected to be addressed through their ‘Improvement Program’. A number of the observations referred to in this report were also identified in the external reviews.
  • The Nominal Insurer's four week return-to-work rate fell from 68% at 30 June 2020 to 64% at 30 June 2021 and was at 63% at 30 September 2021. This is below icare's target of 70%.
  • The Nominal Insurer overpaid, and underpaid claims to policyholders due to claims processing weaknesses. There was also insufficient documentation to support key inputs to weekly benefit payments, thereby further increasing the risk of claims being overpaid, and underpaid.
  • The Home Building Compensation Fund's net liability position reduced from $746 million at 30 June 2020 to $534 million at 30 June 2021 due to increases in premium rates and increased building activity from stimulus measures.
  • The Nominal Insurer's provision for errors in pre-injury average weekly earnings decreased from $21 million to 30 June 2020, to $11.6 million at 30 June 2021. The provision was not reassessed for icare’s decision to proactively remediate PIAWE underpayments.
  • The NSW Self Insurance Corporation also recognised a $12.8 million provision at 30 June 2021 to remediate past underpayments.

Findings reported to management

The number of findings reported to management has decreased, but 30% of all issues were repeat issues and these need greater focus and prioritisation

Breakdowns and weaknesses in internal controls increase the risk of fraud and error. Deficiencies in internal controls, matters of governance interest and unresolved issues were reported to management and those charged with governance of agencies. The Audit Office does this through management letters, which include observations, related implications, recommendations and risk ratings.

In 2020–21, there were 57 findings raised across the cluster (71 in 2019–20), 30% of which were repeat issues (32% in 2019–20).

The most common repeat issues related to claims processing and information technology user access administration.

A delay in implementing audit recommendations increases the risk of intentional and accidental errors in processing information, producing management reports and generating financial statements. This can impair decision-making, affect service delivery and expose agencies to fraud, financial loss and reputational damage. Poor controls may also mean agency staff are less likely to follow internal policies, inadvertently causing the agency not to comply with legislation, regulation and central agency policies.

The table below describes the common issues identified across the cluster by category and risk rating.

Risk rating Issue
Information technology

Moderate2
4 new
2 repeat

Low1
6 new
4 repeat

The financial audits identified the need for agencies to improve information technology processes and controls that support the integrity of financial data used to prepare agencies' financial statements. Of particular concern are issues associated with:
  • poor user access administration and monitoring of privileged user activities
  • lack of disaster recovery planning.
Internal control deficiencies or improvements

High3
1 repeat

Moderate2
5 new
7 repeat

Low1
9 new
 

 

The financial audits identified internal control weaknesses across key business processes, including:
  • lack of controls to ensure cluster expenditure does not exceed a minister's appropriation authority received under the annual Appropriations Act and the GSF Act
  • inadequate procurement controls including purchase orders not being used and policy documents not stipulating thresholds which require minimum quotations or tenders
  • inadequate claim processing controls leading to documentation not kept to support claims, and errors in payments.
High risk issues are discussed later in this chapter.
Financial reporting

High3
2 new

Moderate2
2 new
1 repeat

Low1
2 new 

The financial audits identified opportunities for agencies to strengthen financial reporting, including:
  • need to review significant judgements, and continue to assess whether assets are controlled
  • grants being incorrectly accounted for leading to errors
  • provisions not including costs to settle the obligation and errors in the accuracy and completeness of underlying data used in valuations.
High risk issues are discussed later in this chapter.
Governance and oversight

Extreme4
1 new

High3
7 new

Low1
1 new
 

The financial audits identified the need for agencies to improve governance and oversight processes, including:
  • documentation was inadequate and key documents were either not provided to the Audit Office, or were not provided on a timely basis, or their existence was not made known to the Audit Office
  • inconsistencies in the GSF Act and GSA Act relating to statutory timeframes
  • numerous versions of working papers were submitted all of which contained errors, omissions and/or poor logic
  • no formal policy or benchmark on expected investment returns from other government sectors
  • addressing significant uncertainty relating to access fees to be paid by rail operators raised in the Total State Sector Accounts audit opinion
  • the sector classification of certain Public Non-Financial Corporations needs to be confirmed with the Australian Bureau of Statistics
  • external consultants were used extensively to advise government agencies on matters related to TAHE
  • there is no state-wide policy about borrowings which provides guidance around performance obligations arising under trades between government agencies.
Extreme and high risk issues are discussed later in this chapter and in the report on State Finances 2021.
Non-compliance with key legislation and/or central agency policies

High3
1 repeat

Low1
1 new
1 repeat

The financial audits identified the need for agencies to improve its compliance with key legislation and central agency policies, including:
  • non-compliance with the GSA Act and expenditure of public monies not supported by authorised delegations or spent for an authorised and valid purpose
  • input tax credits were not always claimed correctly.
High risk issues are discussed later in this chapter.

 Extreme risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
3 High risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
2 Moderate risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
1 Low risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.

 Note: Management letter findings are based either on final management letters issued to agencies, or draft letters where findings have been agreed with management.

The number of moderate risk findings decreased from prior year

There were 21 moderate risk findings reported in 2020–21, representing a 30% decrease from 2019–20. Of these, ten were repeat findings, and 11 were new issues.

Moderate risk repeat findings include:

  • claims processing weaknesses including claim payment errors, and inadequate documentation to support calculations and evidence claims were reviewed by someone with appropriate delegation
  • inadequate review of user access and higher risks of unintended or unauthorised system access
  • controls assurance reports from an outsourced service provider did not cover the services it provided to the government agency
  • failure to review procurement contracts register to ensure it is accurate and complete
  • ongoing control deficiencies with grant application and approval processes
  • key policies including delegations not being reviewed in a number of years and do not incorporate new requirements from more recent legislation
  • quality review processes failing to identify material classification errors associated with grant funding.

NSW Treasury related matters

Accounting for the Government's investment in Transport Asset Holding Entity

A total of seven recommendations were made with respect to NSW Treasury's processes to prepare the NSW Government's consolidated whole of government accounts (the TSSA). This included one extreme risk finding and six high risk findings. The extreme finding related to NSW Treasury needing to significantly improve its processes to ensure all key information is identified and shared with the Audit Office on a timely basis. Other high-risk findings were identified which resulted in the following recommendations for NSW Treasury:

  • establishing a policy to determine the minimum expected rate of return on the GGS equity injections in other public sectors entities and report on the performance of these GGS investments in the TSSA, including how much and what type of returns the government is obtaining from its investments compared to its targeted return
  • facilitate revised commercial agreements to reflect access and license fees that were agreed in the 18 December 2021 Heads of Agreement between Transport for NSW, TAHE and the operators Sydney Trains and NSW Trains
  • with TAHE, prepare robust projections and business plans to support GGS investment returns beyond FY2031.
  • liaising with the ABS to re-confirm the classification of TAHE, NSW Trains and Sydney Trains as entities within the PNFC sector
  • monitoring the risk that control of TAHE assets could change in future reporting periods and the implications on the TSSA
  • consider whether there is sufficient competent oversight of its use of consultants and assess the risk of an over dependence on consultants at the cost of internal capability.

More details on the recommendations to NSW Treasury relating to its accounting for the GGS investment in TAHE are included on pages 7 to 24 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. 

Borrowings of $1 billion were understated by NSW Treasury

NSW Treasury, a GGS agency, made agreements to borrow $1 billion from New South Wales Treasury Corporation (TCorp), a PFC sector agency. Some of these agreements were entered as early as 17 May 2021 and all agreements for borrowings were entered into before 30 June 2021. However, NSW Treasury requested that settlement of those additional borrowings be deferred until 1 July 2021.

As TCorp raised the funds before 30 June 2021, it recognised a financial asset and liability to NSW Treasury on 30 June 2021. Despite TCorp having raised the funds by 30 June 2021 under the mutually agreed trade deal, NSW Treasury did not recognise any borrowings at year end on the basis that it requested the settlement date and receipt of cash to be deferred to past the balance sheet date. This led to an understatement of debt liabilities of $1 billion by NSW Treasury, and an inconsistent accounting treatment between the two agencies. NSW Treasury subsequently corrected the misstatement after the matter was raised by the audit, resulting in the GGS recognising $1 billion in financial assets and borrowings at 30 June 2021.

More detail on these inconsistencies is on page 37 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. We recommended NSW Treasury seek develop a state-wide accounting policy for borrowings which ensure correct and consistent accounting treatment between agencies and sectors.

Inconsistencies exist in the GSF Act and GSA Act related to key statutory timeframes

There are inconsistencies between key statutory reporting timeframes imposed on the Treasurer and Auditor-General for the Consolidated State Financial Statements (the Statements) in the Government Sector Finance Act 2018 (GSF Act) and Government Sector Audit Act 1983 (GSA Act). Ambiguity in the statutory reporting timeframes could impact on the future timely provision of this information to Parliament. More detail on these inconsistencies is on page 54 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. We recommended NSW Treasury seek legislative amendments in Parliament to resolve these inconsistencies.

NSW Treasury lacks a framework to monitor and provide assurance to ministers that they are in compliance with their appropriation authority

In July 2021, NSW Treasury highlighted a potential issue associated with certain cross-cluster payments which was based on advice received from the Crown Solicitor in January 2021. After being made aware of the issue, the Audit Office obtained its own advice on matters related to the appropriations framework under relevant state legislation. In the advice to the Audit Office, the Crown Solicitor advised that an agency is not subject to its own legally appropriated expenditure limit (assuming it is not subject to any annual spending limit imposed through an instrument of delegation or a budget control authority issued by the Treasurer under section 5.1 of the GSF Act). In effect, because responsible ministers are given appropriations, these legal expenditure limits, rest in aggregate, with the principal department and agencies the minister is responsible for. It is not possible for an individual agency to monitor or determine at what ‘point in time’ expenditure has been incurred in excess of the minister’s appropriation authority and there is currently no framework to monitor this.

Further detail on this matter is on pages 54 to 56 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. In this report, we recommended that NSW Treasury:

  • ensure a framework exists to monitor and provide assurance to ministers that expenditure incurred across a financial year by agencies under the relevant minister's coordination does not exceed the appropriation authority conferred by the annual Appropriations Act and the GSF Act
  • assess how the requirement to prepare a Summary of Compliance under Australian Accounting Standards impacts relevant principal departments and cluster agencies financial statement disclosures.

Agencies have again spent monies without an authorised delegation

In the State Finances NSW Auditor-General's Report to Parliament for 2020 and 2021 we reported instances where agencies spent money received from an annual appropriation and/or deemed appropriation money without an authorised delegation from the relevant minister(s) as required by sections 4.6(1) and 5.5(3) of the GSF Act. Further detail on this matter is on pages 56 to 57 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. In this report, we recommended NSW Treasury promptly improve the guidance it provides agencies to ensure that expenditure of public monies is properly supported by authorised delegations.

Control deficiencies at NSW Treasury's service providers

NSW Treasury's business processes and information technology services were provided by Infosys, Unisys and the Department of Customer Service during 2020–21. Together this constitutes the GovConnect environment.

The GovConnect information technology general controls (ITGC) were qualified in 2020–21. The key controls over user access, system changes and batch process failed in all ITGC reports. Most of these deviations were not mitigated or sufficiently mitigated to address the risk of unauthorised user access.

In response to the internal control qualifications, the audit teams performed data analytics over payroll and accounts payable to obtain reasonable assurance that these control deficiencies did not materially impact on relevant agencies' financial statements.

Refer to the Customer Service 2021 NSW Auditor-General’s Report to Parliament for further details.

Insurance related matters

icare is in the process of implementing organisational reform in response to findings in recent external reviews. These reviews have identified 151 recommendations for icare to improve in the areas of risk and governance, performance, and culture and accountability. The reviews include the April 2021 McDougall Review, and the February 2021 ‘Independent Review of icare governance, accountability and culture’ which was recommended by SIRA in the Dore Report.

All of these recommendations were accepted by icare and are expected to be addressed through their ‘Improvement Program’. As at February 2022, icare report that 21 have been addressed, 139 are in progress, and 15 still to commence.

A number of the observations referred to in this report were also identified in the above reviews and are expected to be actioned as part of the improvement program.

Workers Compensation Nominal Insurer (the Nominal Insurer)

The Nominal Insurer’s net asset deficiency at 30 June 2021

Last year's Central Agencies Report to Parliament reported that the Workers Compensation Nominal Insurer (the Nominal Insurer), the NSW Self Insurance Corporation and the Lifetime Care and Support Authority of New South Wales all had negative net assets at 30 June 2020. After strong investment returns in 2020–21, only the Nominal Insurer continued to have negative net assets at 30 June 2021.

The Nominal Insurer's negative net assets of $252.9 million at 30 June 2021 ($316.2 million at 30 June 2020) means that it still does not hold sufficient capital to meet the estimated present value of its future payment obligations, when measured in accordance with the accounting framework. The financial statements continued to be prepared on a going concern basis because the future payment obligations are not all due for settlement within the next 12 months.

As noted in section 2.4 ‘Key accounting issues’, icare changed from an 'Accounting Ratio', to an 'Insurance Ratio', to assess the Nominal Insurer’s capital position from 2020–21. The insurance ratio uses a (higher) discount rate based on the expected earnings rate on the Nominal Insurer’s assets, rather the ‘risk free’ rate which is used for financial reporting.

Last year's Report to Parliament also noted that the deterioration in the value of the Nominal Insurer’s net assets has resulted in its funding ratio at 30 June 2020 being outside of the ‘target operating zone’ set by the Board of icare. The Insurance Ratio at 30 June 2021 is 122%, which is less than icare's target operating zone of over 130%.

icare is assessing how it can increase the Nominal Insurer’s funding ratio, and advises that actions taken to date include the execution of the Nominal Insurer Improvement Program (the Improvement Program) and an increase in premium rates.

icare were given approval by the State Insurance Regulatory Authority (SIRA) to increase workers compensation premium rates from 1.4% to 1.44%  of wages (2.9%) for the 2021–22 policy year. icare advises that their pricing strategy for workers compensation premiums is for ‘modest increases over the medium term’.

Return-to-work rates have worsened

Last year's Central Agencies Report to Parliament noted that the Nominal Insurer has experienced deteriorating return-to-work rates since late 2017. According to data published by SIRA, the Nominal Insurer’s monthly four week return-to-work rate has continued to decline, falling from 68% at 30 June 2020 to 64% at 30 June 2021, and down to 63% at 30 September 2021.

A key assumption when measuring the Nominal Insurer’s outstanding claims liability, is the amount of time that injured workers will remain on benefits (i.e. continuance rates). This assumption is significantly aligned with return-to-work rate measures. At 30 June 2021, the liability was increased by $296 million due to changes in continuance rate assumptions, with workers expected to remain on benefits longer. This change is consistent with the fall in four week return-to-work rates.

The four week return-to-work rate trend since August 2017 is shown in the graph below.

Appendix one - Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

Appendix five – Acquittals and other opinions

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Published

Actions for State Finances 2021

State Finances 2021

Whole of Government
Finance
Asset valuation
Compliance
Financial reporting
Internal controls and governance
Management and administration

What the report is about

The results of the consolidated General Government Sector (GGS) and Total State Sector (TSS) financial statements audits for the year ended 30 June 2021.

What we found

The Independent Auditor’s Report on the 2020–21 GGS and TSS financial statements was unqualified but contained an emphasis of matter. The resolution of significant issues delayed signing until 24 December 2021.

The emphasis of matter draws attention to significant uncertainties associated with key assumptions related to the recognition by the GGS of a $2.4 billion investment in the Transport Asset Holding Entity (TAHE).

The Audit Office advised NSW Treasury that it intended to issue a qualified audit opinion, but actions by the NSW Government avoided this outcome. All evidence provided prior to 14 December indicated that the GGS’s return on the $2.4 billion cash contributed to TAHE was insufficient to support accounting for it as an investment. Projected returns were below the long term inflation rate and were insufficient to recover:

  • TAHE's revaluation loss of $20.3 billion in 2020–21
  • an average rate of return of at least 2.5 per cent of equity invested in TAHE.

In these circumstances, the $2.4 billion contributed to TAHE should have been expensed. This could have impacted the GGS’s budget result.

The NSW Government’s actions to avoid a qualified audit opinion included:

  • a government decision made on 14 December approving TAHE’s shareholding ministers communicating that their expectation of a return had increased to 2.5 per cent
  • reflecting the revised shareholding ministers’ expectations in the 2021–22 ‘NSW Half-Yearly Review’ on 16 December. The NSW Government provided an additional $1.1 billion to fund increased access and license fees to TAHE from the public sector operators (Sydney Trains and NSW Trains)
  • signing a Heads of Agreement (HoA) on 18 December between Transport for NSW (TfNSW),TAHE and the public sector operators. The HoA reflected the parties’ intent to renegotiate contracts to increase TAHE’s licence and access fees by $5.2 billion.

The uncertainty raised in our emphasis of matter relates to:

  • TAHE’s future estimated access and licence fees, which remain subject to re-negotiation and must meet or exceed the indicative future access and licence fees set out in the HoA
  • continued funding for TAHE's key customers (Sydney Trains and NSW Trains) to meet the price increases outlined in the HoA
  • the 2021–22 'NSW Budget Half Yearly Review', which provides for $1.1 billion of the additional funding over the forward estimates period to 2024–25. A further $4.1 billion is required over the following six years (2026–31), which are outside the forward estimates period
  • further significant cash flows required to support the funding model are outside the 10-year contract period. That is, beyond 30 June 2031.

There remains a risk that:

  • TAHE will not be able to re-contract with the rail operators for access and licence fees at a level that is consistent with current projections
  • future government's funding to TAHE’s key customers, the rail operators, may not be consistent with the current shareholding ministers’ expectations
  • TAHE will be unable to grow its non-government revenues.

The audit found a risk of undue reliance on consultants, a need to improve quality controls on materials submitted to audit and an extreme risk finding raised with respect to providing key information on a timely basis.

The GGS Budget Result for the 2020–21 financial year was a deficit of $7.1 billion compared to an original forecast budget deficit of $16 billion.

The State did not achieve its fiscal target of maintaining annual expenditure growth below the long-term revenue growth target of 5.6 per cent. In 2020–21, the GGS expenditure grew by 6.9 per cent mainly due to grants and subsidies paid from the COVID-19 stimulus packages received from the Commonwealth.

What we recommended

Significant matters concerning TAHE

We recommend NSW Treasury:

  • implement effective quality review processes over key accounting information
  • establish a policy to determine the minimum expected rate of return on its equity injections into public sector entities
  • report on the performance of investments in TAHE and all other public sector entities
  • ensure the revised commercial agreements between TAHE and NSW rail operators reflect access and licence fees set out in the Heads of Agreement
  • with TAHE, prepare robust projections and business plans to support returns beyond FY2031
  • liaise with the Australian Bureau of Statistics (ABS) and reconfirm the sector classifications of TAHE, NSW Trains and Sydney Trains
  • with TAHE, monitor the risk that control of TAHE assets could change in future reporting periods
  • significantly improve its processes to ensure all key information is identified and shared on a timely basis
  • consider whether there is sufficient competent oversight of its use of consultants and assess the risk of an overdependence on consultants at the cost of internal capability.

A number of other non-TAHE related recommendations have been raised in Section 6 ‘Key Audit Findings’.

Fast facts 

The Total State Sector comprises the General Government Sector, the Public Non-Financial Corporation (PNFC) Sector and the Public Financial Corporation (PFC) Sector.

The 2020–21 consolidated financial statements of the General Government and Total State Sectors provide the financial performance and position of the NSW Government.

  • $391b government property, plant and equipment in the Total State Sector as at 30 June 2021
  • $3.3b government net contributions to other public sectors in 2020–21. $2.4 billion was contributed to TAHE
  • $19.3b net holding losses from the GGS's investment in other public sector entities recognised outside of the 2020–21 budget result
  • $7.1b budget deficit of the General Government Sector in 2021
  • 7 - six high risk and one extreme risk management letter findings related to the General Government Sector's investment into TAHE
  • 24 monetary misstatements exceeding $20 million were identified in agencies financial statements in 2020–21
Image
Margaret Crawford, Auditor-General for New South Wales

Pursuant to the Government Sector Audit Act 1983 I present my report on State Finances 2021. My independent auditor’s opinion on the State’s consolidated financial statements, albeit delayed, is unqualified. My independent auditor’s report however, does include an emphasis of matter drawing attention to significant uncertainties remaining in relation to the State’s equity investment in the Transport Asset Holding Entity (TAHE).

The 2020–21 year was challenging from many perspectives, not least being the continuing impact of and response to the COVID-19 pandemic. Once again, NSW Treasury provided government agencies extensions of time to submit financial statements for audit. Finance staff and management right across government must be congratulated for their responsiveness in meeting their financial reporting obligations in such challenging circumstances.

The General Government’s 2020–21 budget result, reflected within the Total State Sector Accounts, was a deficit of $7.1 billion. This compares with the original budgeted deficit of $16 billion. The factors that contributed to this outcome are presented in this Report to Parliament along with other significant matters related to the audit of the Total State Sector Accounts.

One section of my report is dedicated to issues related to the accounting for TAHE. This year’s audit was significantly delayed by protracted disagreement over the treatment of the government’s cash contribution to TAHE. This matter was further frustrated by the fact that information was withheld and not shared with my Office on a timely basis. This has warranted an extreme risk finding for NSW Treasury to significantly improve governance processes to ensure complete and timely sharing of information. This is key to preserving trust, which is one of the foundations that underpins my Office’s engagement with agencies in the conduct of their audits.

The challenges encountered in completing this year’s audit were extraordinary and tested the constructive partnership between the Audit Office and NSW Treasury. I want to acknowledge the enormous efforts of staff of both agencies to correct material errors and ultimately achieve my unmodified audit opinion. I saw first-hand the professionalism, resilience and dedication of my staff. A commitment to accurate and transparent financial reporting is a key basis upon which confidence in the financial management of New South Wales’ resources can be assured.

Margaret Crawford

Auditor-General for New South Wales

9 February 2022

The Independent Auditor's Report, which includes an emphasis of matter was issued on 24 December 2021

While the audit opinion on the State's 2020–21 financial statements was ultimately unmodified, NSW Treasury delayed signing the NSW Total State Sector Accounts (TSSA) in order to resolve significant accounting issues that were material to the TSSA, in particular the treatment of the General Government Sector's (GGS) investment in the Transport Asset Holding Entity (TAHE) during 2020–21.

The Treasurer and NSW Treasury signed the consolidated financial statements on 24 December 2021, eleven weeks later than the 2018–19 pre-pandemic timetable.

The Audit Office advised NSW Treasury that the 2020–21 TSSA would be qualified with respect to TAHE

Our review of all evidence received prior to 14 December indicated the GGS's expected returns were below the long-term inflation rate and that there was no expectation it should recover a significant asset revaluation loss. The levels of projected returns did not support the accounting treatment of the GGS's cash contribution of $2.4 billion to TAHE as an equity injection.

The TSSA are prepared in accordance with Australian Accounting Standards and particularly AASB 1049 ‘Whole-of-Government and General Government Sector Financial Reporting’. This standard requires contributions from owners to comply with the Australian Bureau of Statistics (ABS) Government Finance Statistics Manual 20151 (GFSM) where it would not conflict with Australian Accounting Standards.

The ABS GFSM states that an equity contribution is recognised unless there is no reasonable expectation that a sufficient rate of return can be generated by that investment, in which case the transfer is expensed. A realistic rate of return is defined in the ABS GFSM as the intention to earn a rate of return that is sufficient to generate dividends (including income tax equivalents) and holding gains or losses at a later date. Holding losses include the final asset revaluation decrement of $20.3 billion, which TAHE incurred on its property plant and equipment assets when it became a for-profit entity and was required to value its assets on the basis of the cash flows they are expected to generate. The lower the commercial returns (cashflows), the greater the potential valuation losses of a for-profit entity's assets. This $20.3 billion valuation loss is disclosed within notes 1 'Significant Accounting policies - TAHE Reform in 2020–21', Note 11 'Equity Investments in Other Public Sector Entities' and Note 14 'Property, Plant & Equipment of the Total State Sector and GGS' financial statements.

Multiple versions of models estimating the GGS's expected rate of return were submitted to the Audit Office by NSW Treasury attempting to demonstrate the commerciality of the GGS's investment in TAHE. Until 14 December 2021, our review of all calculations indicated the existing access and licence fees set up under commercial arrangements effective 1 July 2021 did not support a reasonable expectation that a sufficient rate of return would be earned on the equity injections to TAHE. The existing revenue arrangements reflected a shareholders' expected rate of return of only 1.5 per cent per annum of contributed equity and did not include recovery of the revaluation loss of $20.3 billion incurred in 2020–21.

Having reviewed all evidence provided, the Audit Office communicated to NSW Treasury that unless corrected, the State's accounts would be qualified as the $2.4 billion transfer made by the GGS to TAHE should have been reported as a grant expense instead of an investment. The GGS's estimated rate of return was not sufficient to cover:

  • TAHE's final revaluation loss of $20.3 billion in 2020–21
  • a dollar value equal to, or exceeding a 2.5 per cent rate of return on the equity invested in TAHE (ie: at least equal to the long term inflation rate).

Action was required by the NSW Government to avoid a qualified audit opinion

NSW Government actions avoided a qualified audit opinion related to the GGS’s cash contribution of $2.4 billion to TAHE. To support the TAHE structure as a commercial arrangement earning a sufficient rate of return, the NSW Government agreed to provide additional future funding to TAHE's key government customers (Sydney Trains and NSW Trains) to support increases in access and licence fees to be paid to TAHE.

Shareholding ministers increased their expectations as to TAHE's target average return to the expected long-term inflation rate of 2.5 per cent

On 14 December 2021, a government decision was made resulting in the TAHE shareholding ministers requesting that TAHE re-negotiate the access fees and license fees payable under the Operating Agreements between TAHE and the public operators (Sydney Trains and NSW Trains). The renegotiation was to target an average return to the GGS of 2.5 per cent on the equity contributed. TAHE's existing ten year agreements with the operators provide a mechanism by which the parties meet annually and consult in order to determine the amount of the access fees and licence fees that will be payable in the following financial year.

The revised shareholder expectations for TAHE were published in the 2021–22 'NSW Budget Half Yearly Review' on 16 December 2021. The revised expectations changed the basis of the expected returns on equity from the 10-year Commonwealth bond rate of only 1.5 per cent, to the expected long-term inflation rate of 2.5 per cent. This is consistent with the Reserve Bank's target band and the Commonwealth's Department of Finance's expected return on government investments in other sectors.

The revised shareholder expectations were confirmed in a signed Heads of Agreement

On 18 December 2021, Transport for NSW (TfNSW), TAHE and the operators, Sydney Trains and NSW Trains entered into a Heads of Agreement (HoA). This HoA forms the basis of negotiations to revise the pricing within the existing 10-year contracts and deliver upon the shareholders' expectation of a return of 2.5 per cent per annum of contributed equity. This revised return includes:

  • income earned over the estimated weighted average remaining useful lives of TAHE’s assets
  • recovery of the revaluation losses in 2020–21 on TAHE’s property, plant and equipment assets incurred when TAHE commenced operations as a for-profit entity, albeit the recovery of the revaluation loss is projected to take up to 2052.

The HoA reflects an intention between all parties to revise the contractual agreements to increase future access and license fees by $5.2 billion. This included $1.1 billion for the period FY2023–25, which is reflected in the 2021–22 'NSW Budget Half Yearly Review'. Further detail on the HoA is reported in Section 3 of this report ‘Investment in the Transport Asset Holding Entity’.

NSW Treasury revised its calculations to reflect the increased future returns

Following these changes, NSW Treasury revised its calculations of estimated returns to reflect a cumulative return equivalent to the expected long-term inflation rate, and recovery of the 2021 valuation loss by 2052. The rate of return period is consistent with the weighted average remaining useful life of TAHE's assets. The changes supported the financial reporting treatment of the $2.4 billion transfer from the GGS to TAHE as an investment rather than an expense, even though TAHE is currently heavily reliant on revenues from the public rail operators, Sydney Trains and NSW Trains. If the cash contribution had to be treated as a capital grant expense, it would have reduced the GGS's budget result by $2.4 billion.

The Independent Auditor’s Report includes an emphasis of matter drawing attention to uncertainty relating to the General Government Sector's investment in the Transport Asset Holding Entity (TAHE)

Despite the investment in TAHE being better supported, and the independent auditor's opinion being unqualified, the Independent Auditor’s Report includes an emphasis of matter, which draws attention to the significant uncertainties remaining in relation to the GGS’s equity investment in TAHE. The significant uncertainty is associated with key assumptions that support the recognition by the GGS of its $2.4 billion investment in TAHE during 2020–21.

As at the time of signing the Independent Auditor's Report, there was significant uncertainty with regards to judgements around the commerciality of TAHE's operations because:

  • TAHE’s future estimated access and licence fees, which are critical to its ability to earn a realistic rate of return, remain subject to re-negotiation and re-signing of the current access agreements. The proposed indicative future access and licence fees, which are set out in the HoA are intended to form the basis of the re-negotiation.
  • $1.1 billion in additional funding for TAHE's key customers, Sydney Trains and NSW Trains, was provided in the 2021–22 'NSW Budget Half Yearly Review' consistent with the terms in the HoA. However, this funding only extends to the end of the forward estimates period in 2024–25. There is an additional $4.1 billion required over the following six years, which falls outside of the forward estimates period (up to the end of the 10-year contract period). While this has been communicated to the government's Expenditure Review Committee, it is yet to be provided for in government's budget figures. As TAHE's projections are currently highly dependent on its government customers, it is critical that the government continue to provide sufficient funding to the GGS to support increases in the prices government customers will pay for access to TAHE's assets.
  • A further significant portion of the required returns is earned outside of the 10-year contract period (terminating 30 June 2031). NSW Treasury has estimated $37.9 billion in returns from its investment in TAHE over the period from 1 July 2022 to 30 June 2052, but has not identified the source or means of these returns beyond 2031. Currently, TAHE derives the majority of its revenue from access and licence fee agreements with Sydney Trains and NSW trains, who in turn are both funded by grants to Transport for NSW from the GGS. The projected returns calculated by NSW Treasury beyond 2031 are calculated by assuming a 2.5 per cent growth rate. About 87 per cent of these estimated returns are being earned beyond the ten years, with $32.9 billion estimated over the period 2032–52. There remains risk that:
    • TAHE will not be able to re-contract for access and licence fees at a level that is consistent with current projections
    • future governments' funding to TAHE's key customers will not be sufficient to fund payment of access and licence fees at a level that is consistent with current projections
    • TAHE will be unable to grow its non-government revenues.

Significant accounting issues relating to TAHE are detailed in Section 3 to this report titled ‘Investment in the Transport Asset Holding Entity’. Other significant matters related to the TSSA audit are covered in section 6 to this report titled ‘Key Audit findings’.

Other financial reporting matters

The State extended the date for submission of agency financial statements for audit to provide relief to agencies impacted by the New South Wales' COVID-19 lockdowns

All agencies were given a one-week extension (two weeks in 2019–20) to prepare their financial statements and submit them for audit by 2 August 2021. Further extensions were subsequently approved for the following ten agencies and funds (11 in 2019–20) to submit completed financial statements for audit:

  • Department of Communities and Justice (9 August 2021 for disclosures related to cloud computing costs)
  • Investment NSW (13 August 2021)
  • Jobs for NSW (13 August 2021)
  • TCorp IM Funds (19 August 2021)
  • Lord Howe Island Board (22 October 2021)
  • Department of Customer Service (31 August 2021 for disclosures related to AASB 1059 'Service Concession Arrangements: Grantors')
  • Department of Transport (20 August 2021)
  • Sydney Olympic Park Authority (12 August 2021)
  • Planning Ministerial Corporation (12 August 2021)
  • Transport Asset Holding Entity (16 August 2021).

Additional extensions provided agencies with more time to resolve accounting issues relating to:

  • asset valuations
  • first time implementation of AASB 1059
  • asset transfers and treatment of software as service costs.

The extensions outlined above resulted in a two-week delay submitting the State’s draft consolidated financial statements for audit.

In 2020–21, agency financial statements presented for audit contained 24 errors exceeding $20 million (19 in 2019–20). The total value of these errors was $6.6 billion, a significant increase from the previous year ($1.4 billion in 2019–20)

The graph below shows the number of reported errors exceeding $20 million over the past five years in agencies’ financial statements presented for audit.

The errors resulted from:

  • incorrect application of Australian Accounting Standards and NSW Treasury Policies
  • incorrect judgements and assumptions when valuing non-current physical assets and liabilities
  • human error or lack of oversight.

The completion of the 2020–21 Total State Sector Accounts was significantly delayed as material accounting issues were resolved. These issues related to how the General Government Sector’s (GGS)2 investment in the Transport Asset Holding Entity was accounted for. The key areas of audit concern, which required considerable effort to satisfactorily resolve, included our assessment of:

  • the accounting treatment of funds transferred to TAHE from the GGS, specifically:
    • whether funds transferred to TAHE from the GGS should be considered an equity investment or capital grant expense, with the latter having implication to the presentation of the NSW Government Budget positions. Funds are expensed unless, as an investment, there is a reasonable expectation to generate a sufficient rate of return
    • forming a view as to what a ‘reasonable expectation of a sufficient rate of return on investment3’ should be with respect to the Australian Bureau of Statistics' Government Finance Statistics Manual 2015 (GFSM)
    • the valuation of TAHE’s property, plant and equipment at 30 June 2021
  • whether TAHE was correctly classified as a Public Non-Financial Corporation (PNFC) entity
  • whether, under the agreements in place for the use and price of TAHE's assets, TAHE controlled its property, plant and equipment.

Our assessments were hindered by errors and omissions in information and models provided by NSW Treasury to demonstrate expected returns from TAHE, as well as a lack of timeliness and completeness in their responses to requests for documentation to support NSW Treasury's proposed accounting of government's contributions to TAHE.

Up until 13 December 2021, evidence provided by NSW Treasury to support the treatment of a $2.4 billion equity transfer from the GGS to TAHE did not demonstrate a sufficient rate of return on the State's investment. Instead, the evidence suggested the transfer was of the nature of a capital grant expense, which would impact the GGS budget result. Unless corrected, by either reversing the equity investment to a capital grant expense (impacting the GGS budget result) or providing additional resources to the rail operators to support additional TAHE access and licence fees (adding additional expenses to future GGS budget results), this matter would have caused the State's accounts to have been qualified.

After the Audit Office communicated the likely audit outcome to NSW Treasury, significant changes were made by government from 14 December 2021. Government decisions that avoided qualification of the TSSA included:

  • On 14 December, a government decision approved communicating revised shareholders' expectations of rate of return of 2.5 per cent being the long-term inflation rate, and increased grants to Transport for NSW for the rail operators to pay increased access and licence fees to TAHE to support of the new rate of return (previously 1.5 per cent).
  • On 16 December, the 2021–22 'NSW Budget Half Yearly Review' included an increase in expected returns to be derived through higher access and license fees charged by TAHE. To facilitate these returns, an increased allocation of funds of $1.1 billion was made to Transport for NSW (TfNSW) from 1 July 2022 as part of the forward estimates for the period 2022–25. This was to pay for the proposed increased access and licence fees the operators would be required to pay TAHE.
  • On 18 December, TfNSW, TAHE and the operators Sydney Trains and NSW Trains signed a Heads of Agreement (HoA) forming the basis of negotiations to revise annual operating agreements to facilitate the shareholders’ expected returns of 2.5 per cent of contributed equity. The HoA included indicative access and licence charges to be used as a basis of renegotiation, increasing access fees and licence fees to be paid by Sydney Trains and NSW Trains over the 10-year period from 2022–2031 by a further $5.2 billion. Most of this increase occurs outside the forward estimates. The majority of the additional funding may need to be funded by future governments.

NSW Treasury has projected returns to be earned to 2052 (a period covering the weighted average remaining useful lives of TAHE's assets) as sufficient to recover the revaluation loss of $20.3 billion which arose when TAHE revalued its assets under the income approach. These assets were valued on a discounted cash flow basis as at 30 June 2021.

These key decisions and the circumstances leading up to these changes are detailed later in this section.

Background

On 1 July 2020, the former Rail Corporation of New South Wales (RailCorp), a not-for-profit entity, was renamed the Transport Asset Holding Entity of New South Wales (TAHE) transitioning to a for-profit statutory State-Owned Corporation under the Transport Administration Act 1988. There was no change in the structure of TAHE as a new entity was not created. Ownership remains fully with the government. TAHE, and the former RailCorp, were both classified as Public Non-Financial Corporation (PNFC) entities within the Total State Sector Accounts. TAHE was not a newly created entity, nor was it the result of a change in administrative re-arrangements (such as Machinery of Government change).

Prior to 1 July 2015, the government paid appropriations to TfNSW, a GGS agency, to construct transport assets. When completed, these assets were granted to RailCorp, a not for-profit entity within the PNFC sector. The grants to RailCorp were recorded as an expense in the State’s GGS budget result and in the NSW Total State Sector Accounts (TSSA).

From 1 July 2015, the government announced the creation of TAHE (a dedicated asset manager). Funding for new capital projects was to be provided through equity injections, even though the business model was yet to be determined. NSW Treasury initially set a timetable for finalising the business model, operating model and contracts for the use of TAHE's assets of 1 July 2019.

Contributions paid to TAHE by the GGS were treated as equity investments from July 2015 forward. This treatment continued, despite delays in settling the business model. In 2020, the Audit Office raised a high risk finding due to the significance of the financial reporting impacts and business risks for NSW Treasury and TAHE.

The business model eventually adopted was one whereby:

  • The GGS invests in TAHE with an expectation of a sufficient rate of return.
  • TAHE charges the operators (predominantly Sydney Trains and NSW Trains) to use network and rolling stock to deliver services. The operators remain responsible for both the delivery of the services and the maintenance and safe operation of the assets. The operators are primarily funded by TfNSW through grants.
  • The GGS grants funds to operators, which allows them to pay access fees to TAHE. The amount of these grants impacts the budget result.
  • TAHE pays a return back to GGS by way of dividends and tax equivalents. The return may also include holding gains and losses on the fair value of the net assets of TAHE.

TAHE earns relatively small amounts of income from transactions with the private sector. While the TAHE Board envisages that, over time, they will enhance the commerciality of TAHE’s operations, it is currently highly dependent on revenues from government contracts (over 80 per cent). The circularity in flow of funds between transport agencies in the GGS and PNFC sectors is shown in the diagram below:

The government continues to respond to the impacts of the COVID-19 pandemic on New South Wales through its economic stimulus measures

The COVID-19 pandemic continues to significantly impact the State’s finances, reducing revenue and increasing expenses especially in sectors directly responsible for responding to the COVID-19 pandemic, such as Health. Over 2020–21, the government allocated an additional $5.6 billion to agencies as part of its economic stimulus and pandemic response. Measures included:

  • $1.8 billion in health measures including essential medical equipment purchases, vaccine distribution, quarantine, contract tracing and maintaining clinical health capacity (such as intensive care units)
  • $508 million in additional cleaning services primarily to the Department of Education and Transport for NSW
  • $500 million as part of the ‘Dine & Discovery NSW’ voucher program to the Department of Customer Service
  • $350 million in combined land tax relief and small business recovery grants to Department of Customer Service and NSW Treasury respectively.

Around $4.5 billion of this package was spent in 2020–21, leaving $1.1 billion unspent and carried forward into 2021–22. The graph below shows the total allocation and spend by cluster for 2021 compared to their target spend.

Deficit of $7.1 billion compared with a budgeted deficit of $16 billion

The outcomes of the government’s overall activity and policies are reflected its net operating balance (Budget Result). This is the difference between the cost of general government service delivery and the revenue earned to fund these sectors.

The General Government Sector, which comprises 204 entities, generally provides goods and services funded centrally by the State.

In addition to the 204 entities within the General Government Sector, a further 98 government controlled businesses are included within the consolidated Total State Sector financial statements. These businesses generally provide goods and services, such as water, electricity and financial services for which consumers pay for directly.

The Budget Result for the 2020–21 financial year was a deficit of $7.1 billion compared to an original forecast of a budget deficit of $16 billion.

Revenues increased $5.6 billion to $91.8 billion

In 2020–21, the State’s total revenues increased by $5.6 billion to $91.8 billion, 6.5 per cent higher than previous year. A decrease of 0.3 per cent was recorded in 2019–20. The main contributors to the increase in the State's revenues were an increase in taxation revenue of $4.6 billion and an increase in grants and subsidies of $1.4 billion when compared to the prior financial year.

Taxation revenue increased by 15.3 per cent

Taxation revenue increased by $4.6 billion, mainly due to:

  • $2.9 billion higher stamp duties collected from property sales driven by:
    • $2.7 billion increase in contracts and conveyance duties (transfer duties) from both higher transaction volumes and strong property price growth during 2020–21
    • $200 million increase in motor vehicle registration duty driven by increases in new vehicle sales
  • $520 million higher Gambling and Betting Taxes was earned as 2019–20. The previous year's revenues were impacted by club and hotel closures due to COVID-19. The operation of these venues in 2020–21 returned to normal for most of the year resulting in higher club gaming tax revenue of $216 million and hotel gaming taxes of $265 million
  • $439 million higher collections of payroll taxes. The previous year's revenues were impacted by tax relief measures implemented by the government in response to COVID-19. Lower payroll tax was collected in 2019–20 as employment levels dropped during the State’s first lock down
  • $416 million higher land tax revenues, driven by an average 3.2 per cent increase in valuer general land values, which are the basis for determining land tax values.

Stamp duties of $11.7 billion remains the largest source of taxation revenue, $2.9 billion higher than payroll tax of $8.8 billion, the second-largest source of taxation revenue.

Expenses increased $4.1 billion to $101 billion

The State’s expenses increased 4.3 per cent compared with 2019–20. Most of the increase was due to higher employee expenses, depreciation and amortisation, other operating costs and grants and subsidies expense.

Employee expenses, including superannuation, increased 3.6 per cent to $44.1 billion

Salaries and wages increased to $36.3 billion ($34.8 billion in 2019–20). This was mainly due to increases in staff numbers and an average increase of approximately three per cent in the cost of NSW's employees across the sector. Salaries and wages for the Education and Health sectors increased by $511 million and $619 million respectively.

The Health sector employed an additional 4,893 full time staff in 2020–21 (2,763 in 2019–20) and incurred an extra $28 million in overtime mainly in response to COVID-19. Education increased staff numbers by 2,418 full time equivalents in 2020–21 (4,866 in 2019–20). This year, the health and education sectors received a 0.3 per cent award increase in pay rates.

The Public Service Commission (PSC) noted in the ‘State of the NSW Public Sector Report, 2021’ that the government sector senior executive headcount increased by 347 to 3,680 (3,333 in 2019–20). The Transport cluster represented the majority of the increase in the government sector's senior executive headcount, with an increase of 182. The PSC report noted the increase was due to the growing portfolio of major transport infrastructure projects.

Historically, the government wages policy aims to limit growth in employee remuneration and other employee related costs to no more than 2.5 per cent per annum.

Depreciation and amortisation expense increased 7.6 per cent to $10.3 billion

Depreciation and amortisation increased to $10.3 billion in 2020–21 ($9.6 billion in 2019–20). This increase was mainly driven by the depreciation of completed infrastructure projects including the State’s WestConnex M8 and M5 East Motorways, and other road projects such as Woolgoolga to Ballina project. This year also includes twelve months of depreciation relating to the CBD and South-East Light Rail versus six months in the previous financial year.

Furthermore, the first time adoption of AASB 1059 ‘Service Concession Arrangements’ resulted in the State recognising $45.4 billion of service concession assets in its capacity as grantor under arrangements with operators. More than 87 per cent of this balance was recognised by the Transport cluster. These assets are valued at current replacement cost and are depreciated on an annual basis. A service concession arrangement is an arrangement whereby the government as grantor, contracts with an operator to develop (or upgrade), operate and maintain the grantor's public service assets such as roads, bridges or hospitals. The grantor controls or regulates what services the operator must provide using the assets, to whom, and at what price. The grantor also retains any significant residual interest in the assets at the end of the arrangement. Further details about AASB 1059 are included in the ‘Implementation of new accounting standards’ section of this report.

Grants and subsidies increased $1.5 billion to $15.6 billion

The increase in grants and subsidies is due to payments made by the State in supporting businesses and local communities in response to COVID-19. These mainly included $240 million in Dine & Discover voucher payments, $156 million in land tax relief assistance, $160 million increase in grants to non-government schools (including $31 million to support Covid intensive learning support programs), and $109 million relating to small business grant payments.

The State also transferred $592 million in newly constructed assets to local councils. These mainly related to $378 million in assets transferred following completion of WestConnex stage 2 and $180 million from Northern Roads.

Other operating expenses increased two per cent to $27.5 billion

Operating expenses increased to $27.5 billion in 2020–21 ($26.9 billion in 2019–20) due to higher operating activities as agencies responded to the pandemic.

Supplies and Other Services increased by $1.7 billion. This was mainly due to funding of $533 million in hotel quarantine and associated services, and $495 million in medical equipment for the health sector.

Inventories consumed increased by $266 million. This included $217 million in COVID-19 medical equipment that was written off because it had expired or did not meet the TGA regulatory standards. Contractor expenses increased by $306 million because of increased capital works activity, primarily in the Transport sector.

The increase was offset by $1.6 billion in lower insurance claims expense. In 2019–20 financial year, higher claims were made in respect to natural disaster events, including bush fires.

Health costs remain the State’s highest expense

Total expenses of the State were $101 billion ($96.4 billion in 2019–20). In 2020–21, Health remains the highest contributor of expenses for the State with $25.7 billion ($24.2 billion in 2019–20). Education remains the second highest contributor of expenses reporting $18.4 billion in 2020–21 ($17.5 billion in 2019–20).

The following sectors have the highest expenses as a percentage of total State expenses:

  • Health – 25.6 per cent (25.1 per cent in 2019–20)
  • Education – 18.3 per cent (18.2 per cent in 2019–20)
  • Transport – 14.5 per cent (13.3 per cent in 2019–20).

Assets grew by $12.3 billion to $526 billion

The State’s assets include physical assets such as land, buildings and infrastructure, and financial assets such as cash, and other financial instruments and equity investments. The value of total assets increased by $12.3 billion to $526 billion. This was a 2.4 per cent increase compared with 2019–20, mostly due to changes in asset carrying values.

Valuing the State’s physical assets

State’s physical assets valued at $391 billion

The value of the State’s physical assets increased by $1.7 billion to $391 billion in 2020–21 ($37.9 billion increase in 2019–20). The State’s physical assets include land and buildings ($172 billion), infrastructure systems ($202 billion) and plant and equipment ($16.7 billion).

The movement in physical asset values between years includes additions, disposals, depreciation and valuation adjustments. Other movements include assets reclassified to held for sale and other opening balance adjustments.

Liabilities increased $16.4 billion to $291 billion

The State borrowed additional funds in response to COVID-19

The State’s borrowings rose by $15.8 billion to $134 billion at 30 June 2021. This accounted for most of the increase in the State’s total liabilities.

The value of TCorp bonds on issue increased by $16.8 billion to $114 billion, which largely funded the State's capital expenditure and response to the COVID-19 pandemic.

TCorp bonds are traded in financial markets and are guaranteed by the NSW Government.

Over 2020–21, TCorp continued to take advantage of lower interest rates, buying back short-term bonds and replacing them with longer dated debt. This lengthens the portfolio matching liabilities with the funding requirements for infrastructure assets.

The State’s fiscal objective published in the 2021–22 Budget Papers is to repair the operating position by returning the budget to surplus by 2024–25 and rebuilding balance sheet capacity by bringing net debt down towards seven per cent of Gross State Product (GSP) over the medium-term. The State measures net debt as the sum of deposits held, government securities, loans payable and other borrowings, less the sum of cash and deposits, advances paid and investments, loans receivable and placements.

The chart below shows the actual net debt to GSP for NSW compared to the Commonwealth net debt to Gross Domestic Product (GDP) over the past six years. The trend shows an increase in net debt, particularly in the past two years, which is mainly driven by additional borrowings needed to fund stimulus measures when responding to COVID-19 and natural disaster relief.

GSF Act and GSF Regulation

Financial reporting provisions in the Government Sector Finance Act 2018 (GSF Act) have now commenced

From 1 July 2021, the Public Finance and Audit Act 1983 (PF&A Act) financial reporting provisions were repealed. Agencies prepared their 2020–21 financial statements under Part 7 of the GSF Act. They were audited under the Government Sector Audit Act (GSA Act). The GSF Act requires the timeframe for annual financial statement submission be specified in the Treasurer’s Directions.

Under the GSF Act, all reporting GSF agencies are required to prepare annual financial statements, unless exempt from the definition of a reporting agency under the Government Sector Finance Regulation 2018 (GSF Regulation). Those agencies exempt from preparing financial statements include certain small agencies, Crown Land Managers, special purpose staff agencies and retained State interests. These agencies must meet prescribed requirements or thresholds and self-assess each year to determine whether they remain exempt against the criteria in the GSF Regulation.

Most of the financial reporting provisions of the GSF Act have now commenced except for requirements concerning special deposit accounts (SDA) and special purpose financial reports, which are scheduled to commence on 1 July 2023, subject to approval from the Governor.

The GSF Act now includes most of the provisions applicable to GSF agencies, as requirements for appropriations, expenditure, financial services, and other matters were enacted on 1 December 2018 and 1 July 2019.

Once fully commenced, the GSF Act will consolidate and replace reporting provisions of four Acts:

  • PF&A Act
  • Public Authorities (Financial Arrangements) Act 1987
  • Annual Reports (Departments) Act 1985
  • Annual Reports (Statutory Bodies) Act 1984.

GSA Act and GSA Regulation

The PF&A Act was renamed the GSA Act on 1 July 2021 and now only contains provisions relating to the Auditor-General and the Audit Office, the audit of government sector finances and governance of the Public Accounts Committee.

Of note in the renamed GSA Act is that:

  • a new principal object was added that specifically provides the Auditor-General is an independent and accountable statutory officer
  • the previous financial reporting provisions in the PF&A Act were repealed as the financial reporting provisions are contained in Part 7 of the GSF Act. As a result, there are no longer financial reporting provisions in the GSA Act
  • a new section 34 was added, which contains the requirements for the audit of State sector agencies’ financial statements. These were previously contained in two separate sections.

The GSA Regulation commenced on 1 July 2021, replacing the Public Finance and Audit Regulation 2015 (PF & A Regulation). The GSA Regulation contains the list of entities, funds and accounts prescribed for the purpose of audits under the GSA Act.

Inconsistencies exist in the GSF Act and GSA Act related to key statutory timeframes

There are inconsistencies between key statutory timeframes imposed on the Treasurer and Auditor-General in the GSF Act and GSA Act which has been brought to the attention of NSW Treasury. The inconsistencies identified include:

  • Section 34(3)(a) of the GSA Act defines the audit period for the Statements be as soon as practicable after the Auditor-General is given the Statements. This appears to be inconsistent with section 49(3) of the GSA Act, which requires that the Auditor-General, on or before 22 October transmit the Statements and audit report to the Treasurer. Neither provision is a paramount provision.
  • Section 49(3) of the GSA Act also appears to be inconsistent with section 52(1) of the GSA Act which provides that the Statements are to be given to the Auditor-General in accordance with section 7.17 of the GSF Act. Section 7.17 of the GSF Act requires that the Statements are to be prepared and given to the Auditor-General by an agreed date to enable the audit of the Statements. Part 7 of the GSF Act is a paramount provision under section 1.8 of the GSF Act, which means the requirements in section 7.17 of the GSF Act prevail.

There are also inconsistencies in key statutory reporting timeframes imposed on the Treasurer under the GSF Act.

The audited Statements are a key accountability mechanism that provides information on the State’s financial performance and position. Ambiguity in the statutory reporting timeframes could impact on the future timely provision of this information to Parliament. As noted at the beginning of this report, the delay in issuing the audit report for the 30 June 2021 Statements was due to NSW Treasury’s resolution of accounting issues that were material to the Statements, in particular the treatment of the General Government Sectors investment in TAHE during 2020–21. NSW Treasury's management letter will include a high risk finding with regards to the inconsistencies between the GSF Act and GSA Act.

Recommendation

NSW Treasury should seek legislative amendments in Parliament to resolve the inconsistencies in the GSF Act and GSA Act relating to key statutory reporting time frames.

Appropriations framework

NSW Treasury lacks a framework to monitor and provide assurance to ministers that they are in compliance with their appropriation authority

The GSF Act requires that money not be paid out of the Consolidated Fund except under the authority of an Act, such as the annual Appropriation Act or GSF Act. This means a minister is only authorised to spend out of the Consolidated Fund the amount they have been appropriated by the relevant Act(s).

Generally, money is authorised to be paid out of the Consolidated Fund either through:

  • The Annual Appropriation Act - this is an act to appropriate out of the Consolidated Fund sums for the services of the government for the relevant financial year. These appropriations are made to the responsible ministers of principal departments, Special Offices and certain SDAs.
  • The GSF Act - this act allows the responsible minister of a GSF agency to be given an appropriation out of the Consolidated Fund, at the time the agency receives or recovers any deemed appropriation money. Deemed appropriation money is defined in section 4.7(3) of the GSF Act.

Ministers can delegate and sub-delegate appropriation expenditure functions to accountable authorities and officers of GSF agencies. Any spending by accountable authorities and officers of GSF agencies in excess of the amount appropriated to their relevant minister would be made contrary to section 4.6(1) of the GSF Act.

The Budget Papers are an additional mechanism by which the government controls the level of expenditure by agencies both at the individual and departmental administrative cluster level. The Budget Papers set an administrative limit imposed by the government. Separately, the Treasurer can issue a Budget control authority under section 5.1 of the GSF Act. A Budget control authority can regulate expenditure of money by GSF agencies in a variety of ways, as set out in section 5.1(2) of the GSF Act.

In July 2021, NSW Treasury advised the Audit Office that it had received advice from the Crown Solicitor's Office, in January 2021, that payments between agencies in different administrative clusters would not meet the definition of a 'deemed appropriation' under the GSF Act by the receiving agency. This applies to money paid and received by two agencies across different administrative clusters that continue to hold the money in the Consolidated Fund. These intra-government receipts increase the amount an agency has available to spend, without there being a corresponding increase in the responsible minister’s appropriated expenditure limits, thus increasing the risk an agency’s expenditure could cause a minister to exceed their appropriated expenditure authority.

After being made aware of the issue, the Audit Office worked with NSW Treasury officers to clarify potential implications. The Audit Office also obtained further advice from the Crown Solicitor’s Office to clarify certain aspects of the appropriations framework more broadly. In the advice to the Audit Office, the Crown Solicitor advised that an agency is not subject to its own legally appropriated expenditure limit (assuming it is not subject to any annual spending limit imposed through an instrument of delegation or a budget control authority issued by the Treasurer under section 5.1 of the GSF Act). In effect, because responsible ministers are given appropriations, these legal expenditure limits, rest in aggregate, with the principal department and agencies the minister is responsible for. The advice also confirmed:

  • a deemed appropriation for the services of an agency would ordinarily be available for the services of other agencies, if the officers of the other agencies had a delegation from the minister(s) to expend the deemed appropriation and funds remained available under those deemed appropriations
  • that the ‘exhaustion’ of a minister’s appropriation may be precipitated by one agency’s level of expenditure in the financial year, but the effect is that the relevant appropriation is exhausted for all agencies (and their officers) that may otherwise rely on it
  • whether expenditure by an agency occurred beyond the scope of its authority would require a progressive examination of the total amounts expended from the minister’s appropriation
  • amounts expended from the Consolidated Fund without the authority of an appropriation are spent contrary to section 4.6(1) of the GSF Act
  • a minister is responsible to Parliament for (i) the manner in which appropriations are expended, and (ii) any ‘overspends’ (that is, expenditure without authority) by agencies for which they are responsible.

Determining whether expenditure has occurred without the authority of an appropriation is complex and it is not possible for an individual agency to monitor or determine at what ‘point in time’ expenditure has been incurred in excess of the minister’s appropriation authority. As noted earlier, there are mechanisms in place to manage agencies' administrative expenditure limits set by the Budget Papers, but there is no mechanism in place to ensure expenditure by agencies does not exceed a minister’s appropriation authority received under the annual Appropriations Act and GSF Act.

Recommendation

NSW Treasury should ensure a framework exists to monitor and provide assurance to ministers that expenditure incurred across a financial year by agencies under the relevant minister’s coordination does not exceed the appropriation authority conferred by the annual Appropriation Act and the GSF Act.

In addition, principal departments and agencies that hold money in the Consolidated Fund are required by Australian Accounting Standard AASB 1058 'Income of Not-for-Profit Entities' and NSW Treasury Circular TC20/08 'Mandates of options and major policy decisions under Australian Accounting Standards' to prepare a Summary of Compliance in their financial statements. The Summary of Compliance applies to agencies that obtain part or all of their spending authority from a Parliamentary appropriation. It is intended to provide information on the amounts appropriated or authorised for an agency’s use and whether those expenditures were authorised. There remains uncertainty around how the Crown Solicitor’s Office advice received by the Audit Office impacts these disclosures, as the total spending authority given by Parliamentary appropriations and expenditure against these appropriations cannot generally be attributed to an individual agency. Such a scenario is not contemplated by the relevant Australian Accounting Standard. NSW Treasury's management letter will include high risk findings about improving mechanisms in place to manage agencies administrative expenditure limits, uncertainties related to appropriation spending authority on agencies summary of compliance disclosures.

Recommendation

NSW Treasury should assess how the requirement to prepare a Summary of Compliance under Australian Accounting Standards impacts relevant principal departments and agencies' financial statement disclosures.

Delegations to incur expenditure

Further to last year's reporting, some agencies have again spent monies without an authorised delegation

The delegation to incur expenditure is an important accountability mechanism of responsible government.

Last year’s Report on State Finances reported instances where government agencies did not understand or correctly apply the requirements of the GSF Act for deemed appropriations, resulting in some agencies spending deemed appropriations money without an authorised delegation from the relevant minister(s) as required by sections 4.6(1) and 5.5(3) of the GSF Act.

This year’s financial audits identified that further agencies: TAFE Commission, Multicultural NSW and the Office of the Ageing and Disability Commissioner spent money received from an annual Appropriation and/or deemed appropriation money without an authorised delegation from the relevant minister(s), as required by sections 4.6(1) and 5.5(3) of the GSF Act. NSW Treasury's management letter will include high risk issues about improving mechanisms in place to ensure agencies have appropriate delegations in place to spend Appropriation and/or deemed appropriation money.

In addition, the audit of the Jobs for NSW Fund (the Fund) special purpose statements identified that five payments from the Fund were authorised by an officer without the necessary delegation from the minister as required by section 14 of the Jobs for NSW Act 2015 and sections 5.5(2) and 5.5(3) of the GSF Act.

Recommendation

Given the continued instances of non-compliance, NSW Treasury needs to promptly improve the guidance it provides agencies to ensure that expenditure of public monies is properly supported by authorised delegations.

Implementation of new accounting standards

This year, the State implemented the requirements of AASB 1059

AASB 1059 ‘Service Concession Arrangements: Grantors’

AASB 1059 is an Australian Accounting Standard that requires public sector entities (grantors) that enter service concession arrangements with private sector operators for the delivery of public services recognise service concession assets and liabilities in their financial statements. The standard was effective from 1 July 2020.

AASB 1059 requires a grantor to:

  • recognise an asset provided by the operator as a service concession asset if the grantor controls the asset
  • initially measure the service concession asset at current replacement cost (CRC) in accordance with AASB 13 ‘Fair Value Measurement’
  • recognise a corresponding liability measured initially at the fair value (CRC) of the service concession asset, adjusted for any consideration between the grantor and the operator
  • make sufficient disclosure in the financial statements so that users can understand the nature, amount and timing of assets, liabilities, revenue and cash flows arising from these.

The adoption of AASB 1059 increased the State’s total assets and liabilities by $19.5 billion and $19.6 billion respectively, with net worth reducing by $131 million at 1 July 2019

The State adopted a modified retrospective approach when adopting AASB 1059 and recognised and measured service concession assets and liabilities at the date of initial application of 1 July 2019, with any net adjustments recognised in accumulated funds at that date. This means comparatives were restated to reflect the impact of AASB 1059.

Most of the service concession assets recognised by the State related to Property, Plant & Equipment, in particular infrastructure assets.

Agencies had to devote significant effort to implement AASB 1059 and ensure their 2020–21 financial statements materially complied with the standard's requirements. Last year, the Audit Office highlighted advance preparation was key to ensuring agencies effectively transitioning to this new standard. Despite the new standard being issued well in advance of its commencement date, Sydney Water Corporation, Department of Customer Service, Transport for NSW (TfNSW) and TAHE did not prepare sufficiently for their respective implementations.

Whilst most agencies in 2019–20 had commenced assessing their existing commercial arrangements to determine whether they were within the scope of AASB 1059, calculating and posting the accounting entries to support the implementation of this standard was delayed for TfNSW. TfNSW had not finalised its opening balance adjustments in time for the Audit Office’s early close review. Critical assessments of AASB 1059 to identify the accounting implications for the Transport sector, in particular TfNSW and TAHE were still being considered as late as 30 September 2021.

Restart NSW

Restart NSW was established in 2011 to fund the State’s major infrastructure projects

Restart NSW funds Rebuilding NSW, the government’s 10-year plan to invest $23 billion in new infrastructure. Its infrastructure projects, including Sydney Metro West and Parramatta Light Rail, are primarily funded by proceeds from the government’s asset recycling program. The Restart Fund had a balance of $12.4 billion at 30 June 2021 ($15 billion in 2019–20).

The Fund paid $3.8 billion for infrastructure projects in 2020–21 ($4.3 billion in 2020–21). The largest payments were for transport projects, including Sydney Metro West, Parramatta Light Rail, and contributed $319 million of the $2.4 billion equity contribution to the Transport Asset Holding Entity (TAHE).

The funds are invested in the NSW Infrastructure Future Fund (NIFF), which is allowed under the Restart NSW Fund Act 2011 (Restart Act). The NIFF is an investment vehicle for the fund to help the NSW Government meet its infrastructure objectives and this fund is managed by TCorp. In 2020–21, the fund earned a net return of 7.9 per cent, higher than its annual benchmark return of 4.2 per cent, benefiting from improved returns in financial markets over 2020–21.

The fund directed 30.1 per cent of its payments towards rural and regional infrastructure projects in 2020–21

The Restart Act requires the fund to report on the percentage of payments directed to rural and regional infrastructure projects and whether this represents at least 30 per cent of the total payments from the fund. The Restart NSW Fund Amendment (Rural and Regional Infrastructure Funding) Bill 2020 introduced in Parliament in 2020 would amend the Restart Act by requiring at least 30 per cent of the total payments each financial year and for the life of the Restart NSW Fund be made on infrastructure projects in rural and regional areas.

This year the fund exceeded its target of directing at least 30 per cent of funding towards rural and regional infrastructure projects. However, since the funds’ commencement, only 23 per cent of total payments went towards rural and regional infrastructure projects. Current projections for the life of the fund indicate only 27.5 per cent of funding will be spent on rural and regional projects, which is below the funds target of 30 per cent target for the life of the fund.

Audit Office’s work plan for 2021–22

The Audit Office’s 2021–22 work plan focuses on the State’s response, recovery and impact from the COVID-19 pandemic and natural disaster emergencies

The COVID-19 pandemic continues to have a significant impact on the people and the public sector of New South Wales. Government continues to assist communities in their recovery from the 2019–20 bushfires and subsequent flooding. The scale of government responses to these events has been significant and has required a wide-ranging response involving emergency response coordination, service delivery, governance and policy.

Significant resources have been directed toward these responses, and in assisting rebuilding and economic recovery. Some systems and processes have changed to reflect the need for quick responses to immediate needs. The increasing and changing risk environment presented by these events has meant that we have recalibrated and focused our efforts on providing assurance on how effectively aspects of these emergency responses have been delivered. This includes financial and governance risks arising from the scale and complexity of government responses to these events.

While these emergencies are having a significant impact today, they are also likely to continue to have an impact into the future. We will take a phased approach to ensuring that our work addresses the following elements of the emergencies and government responses:

Appendix one – Prescribed entities

Appendix two – Legal opinions

Appendix three – TSS sectors and entities
 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Rail freight and Greater Sydney

Rail freight and Greater Sydney

Transport
Information technology
Infrastructure
Management and administration
Project management
Service delivery

What the report is about

The movement of freight contributes $66 billion annually to the NSW economy. Two thirds of all freight in NSW moves through Greater Sydney, and the volume of freight moving through Greater Sydney is expected to increase by 48 per cent by 2036.

This audit assessed the effectiveness of transport agencies in improving the use of rail freight capacity in Greater Sydney, and to meet current and future freight demand.

What we found

Transport agencies do not have strategies or targets in place to improve the efficiency or capacity of the metropolitan shared rail network for freight.

The transport agencies acknowledge that they do not have sufficient information to achieve the most efficient freight outcomes and they do not know how to use the shared rail network to maximise freight capacity without compromising passenger rail services.

The Freight and Ports Plan 2018-2023 contains one target for rail freight - to increase the use of rail at Port Botany to 28 per cent by 2021. However, Transport for NSW (TfNSW)'s data indicates this target will not be met.

Sydney Trains records data on train movements and collects some data on delays and incidents. TfNSW collects data for the construction of the Standard Working Timetable and third-party contracts.

However, a lack of clarity around what data is gathered and who has ownership of the data makes data sharing difficult and limits its analysis and reporting.

The Freight and Ports Plan 2018-2023 includes the goal of 'Reducing avoidable rail freight delays', but the transport agencies do not have any definition for an avoidable delay and, as a result, do not measure or report them.

TfNSW and Sydney Trains are appointed to manage and deliver the Transport Asset Holding Entity of New South Wales (TAHE)'s obligations to allow rail freight operators to use the shared rail network. There are no performance measures in rail freight operator contracts or inter-agency agreements. This limits transport agencies' ability to improve performance.

TfNSW’s Freight Branch is working on four freight-specific strategies; a review of the Plan, a freight rail strategy, a port efficiency strategy and a freight data strategy.

TfNSW has not yet determined the timeframes or intended outcomes of these strategies.

What we recommended

Transport agencies should:

  • commit, as part of the review of Future Transport 2056, to delivering the freight-specific strategies currently in development and develop whole-of-cluster accountability for this work including timeframes, specific targets and clear roles and responsibilities 
  • improve the collection and sharing of freight data
  • develop a plan to reduce avoidable freight delays
  • systematically collect data on the management of all delays involving and/or impacting rail-freight
  • develop and implement key performance indicators for the agreements between the transport agencies.

Fast facts    

  • 288 million tonnes of freight volume predicted to pass through Greater Sydney in 2036, up from 194 million in 2016 (an increase of 48%)

  • 54 trucks that can be replaced by one 600 m long port shuttle freight train    

  • 26,671 freight trains that passed through the metropolitan shared rail network between 1 July 2020 and 30 June 2021

The movement of freight contributes $66.0 billion annually to the New South Wales economy — or 13 per cent of the Gross State Product. Two thirds of all freight in New South Wales moves through Greater Sydney, and the volume of freight moving through Greater Sydney is expected to increase by 48 per cent by 2036. This increasing demand is driven by increasing population and economic growth.

The sequence of activities required to move goods from their point of origin to the eventual consumer (the supply chain) is what matters most to shippers and consumers. Road can provide a single-mode door-to-door service, whereas conveying goods by rail typically involves moving freight onto road at some point. In Greater Sydney, 80 per cent of all freight is moved on road. Freight often passes through intermodal terminals (IMTs) as it transitions from one mode of transport to the next.

In 2016, Transport for NSW (TfNSW) released Future Transport 2056 - the NSW Government's 40-year vision for transport in New South Wales, which is intended to guide investment over the longer term. In Future Transport 2056, TfNSW noted that New South Wales will struggle to meet increasing demand for freight movements unless rail plays a larger role in the movement of freight.

Sydney Trains manages the metropolitan shared rail network, which is made up of rail lines that are used by both passenger and freight trains. The Transport Administration Act 1988 requires that, for the purposes of network control and timetabling, NSW Government transport agencies give ‘reasonable priority’ to passenger trains on shared lines. As the Greater Sydney population and rail patronage continue to grow, so too will competition for access to the shared rail network. See Appendix two for details of the area encompassed by Greater Sydney.

Freight operators can also use dedicated rail freight lines operated by the Australian Rail Track Corporation (ARTC - an Australian Government statutory-owned corporation). As the metropolitan shared rail network connects with dedicated freight lines, freight operators often use both to complete a journey.

TfNSW, Sydney Trains and the Transport Asset Holding Entity (TAHE) work in conjunction with other rail infrastructure owners and private sector entities, including port operators, privately operated IMTs and freight-shipping companies. TfNSW and Sydney Trains are responsible for managing the movement of freight across the metropolitan shared rail network. TAHE is the owner of the rail infrastructure that makes up the metropolitan shared rail network. The NSW Government established TAHE, a NSW Government state-owned corporation, on 1 July 2020 to replace the former rail infrastructure owner - RailCorp. The Auditor-General for New South Wales has commenced a performance audit on TAHE which is expected to table in 2022.

On 1 July 2021, TAHE entered into new agreements with TfNSW and Sydney Trains to operate, manage and maintain the metropolitan shared rail network. Until 30 June 2021, and in accordance with TAHE's Implementation Deed, TAHE operated under the terms of RailCorp's existing arrangements and agreements.

This audit assessed the effectiveness of TfNSW, Sydney Trains and TAHE in improving the use of rail freight capacity in Greater Sydney, and to meet current and future freight demand.

The audit focused on:

  • the monitoring of access to shared rail lines
  • the management of avoidable delays of rail freight movements
  • steps to increase the use of rail freight capacity in Greater Sydney.

Conclusion

Transport agencies do not have clear strategies or targets in place to improve the freight efficiency or capacity of the metropolitan shared rail network. They also do not know how to make best use the rail network to achieve the efficient use of its rail freight capacity. These factors expose the risk that rail freight capacity will not meet anticipated increases in freight demand.

Future Transport 2056 notes that opportunities exist to shift more freight onto rail, and that making this change remains an important priority for the NSW Government. However, the transport agencies acknowledge that they do not have sufficient information to achieve the most efficient freight outcomes. In particular, transport agencies do not know how to use the shared rail network in a way that maximises freight capacity without compromising passenger rail services.

Neither Future Transport 2056 nor the Freight and Ports Plan 2018–2023 give any guidance on how transport agencies will improve the efficiency or capacity of the shared rail network. Other than a target for rail freight movements to and from Port Botany, which TfNSW's data indicates will not be met, there are no targets for improving rail freight capacity across the shared network. The lack of specific strategies, objectives and targets reduces accountability and makes it difficult for transport agencies to effectively improve the use of rail freight capacity in line with their commitment to do so.

Sydney Trains and Transport for NSW do not effectively use data to improve rail freight performance and capacity.

To drive performance improvement when planning for the future, transport agencies need good quality data on freight management and movements. Sydney Trains records data on train movements in real-time and collects some data on delays and incidents. TfNSW collects data for the construction of the Standard Working Timetable (SWTT) and third-party contracts. However, the different types of data gathered and the separation between the teams responsible mean that there is a lack of clarity around what data is gathered and who has ownership it. This lack of coordination prevents best use of the data to develop a single picture of how well the network is operating or how performance could be improved.

Sydney Trains' ability to evaluate the effectiveness of its incident and delay mitigation strategies is also limited by a lack of information on its management of rail-freight related delays or incidents. While Sydney Trains collects data on major incidents, it can only use this to conduct event-specific analysis on the causes of an incident, and to review the operational and management response. The use of complete and accurate incident data would assist to define, identify and reduce avoidable delays. Reducing avoidable delays is a goal of the Freight and Ports Plan 2018–2023. More complete data on all incidents would help TfNSW to have more effective performance discussions with rail freight operators to help improve performance.

TfNSW has started developing strategies to identify how it can use rail freight capacity to achieve efficient freight outcomes, but it has not committed to implementation timeframes for this work.

TfNSW’s Freight Branch has started work on four freight-specific strategies to improve freight efficiency: a review of the Plan, a freight rail strategy, a port efficiency strategy and a freight data strategy. However, none of these strategies will be fully developed before the end of 2022. TfNSW has not yet determined the implementation timeframes or intended outcomes of these strategies, although TfNSW reports that it is taking an iterative approach and some recommendations and initiatives will be developed during 2022. 

Appendix one - Response from agencies

Appendix two - The Greater Sydney region

Appendix three - TfNSW strategic projects 

Appendix four - Sydney Trains path priority principles 

Appendix five - Sydney Trains delay management

Appendix six - About the audit 

Appendix seven - Performance auditing
 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #357 - released (19 October 2021).

Published

Actions for Grants administration for disaster relief

Grants administration for disaster relief

Treasury
Finance
Compliance
Fraud
Management and administration
Project management

What the report is about

The report examined whether NSW Treasury, Service NSW and the Department of Customer Service effectively administered grants programs funded under the $750 million Small Business Support Fund, including:

  • $10,000 Small Business Support Grant
  • $3,000 Small Business Recovery Grant.

What we found

The agencies effectively implemented the grants within required timeframes, reflecting the NSW Government’s decision to deliver urgent financial support to small businesses impacted by the COVID-19 pandemic.

NSW Treasury met urgent timeframes to design the grants and Service NSW made timely payments in line with the grants' objectives and eligibility criteria.

Service NSW and the Department of Customer Service strengthened processes to detect and minimise fraud in response to identified external fraud risks, and to investigate suspected fraudulent applications.

Fraud security checks and investigations are ongoing, and the agencies will not know the full extent of fraud across the grants until these processes have been completed.

The agencies regularly monitored and reported on the timeliness of payments to small business applicants but have not yet measured all benefits of the grants programs.

The $10,000 Support Grant and the $3,000 Recovery Grant have provided around $630 million in one off grant payments to eligible small businesses.

What we recommended

NSW Treasury should finalise and implement an evaluation of both grants programs, including obtaining feedback from businesses.

Service NSW should develop a framework that documents expected controls for how it administers grants, including business processes, fraud control and governance and probity requirements.

Service NSW should publish information on all grants programs, including grants distribution and uptake.

The Department of Customer Service should ensure its processes for managing conflicts of interest meets its policy requirements.

Upcoming performance audit

The Audit Office is conducting a further performance audit into grants administration for disaster relief focussing on bushfire grants. This is planned to complete in 2021-22.

Fast facts

Small Business Support Fund
  • $630m Grant payments made to small businesses under two grants administered
  • Over 52,500 Applications received a $10,000 Grant payment
  • Over 23,000 Businesses paid both $10,000 Support Grant and $3,000 Recovery Grant
  • 36,700 Applications received a $3,000 grant payment
Grant program administration
  • 11 Days taken to deliver the $10,000 Small Business Support Grant application website
  • 26 Days taken to deliver the $3,000 Small Business Recovery Grant application website

Further information

Please contact Ian Goodwin, Deputy Auditor-General on 9275 7347 or by email.

The NSW Government responded to the partial shutdown of the NSW economy caused by the COVID-19 pandemic in 2020 by, among other measures, announcing on 3 April 2020 that it would place $750 million into the Small Business Support Fund (the Fund).

Under the Fund, the NSW Government would pay one-off grants of up to $10,000 to small business impacted by the shutdown. The objectives of the $10,000 Small Business Support Grant ($10,000 Support Grant) were to:

  • ease the pressure on small businesses that have been affected by the COVID-19 pandemic
  • support the ongoing operations of small businesses highly impacted by the COVID-19 restrictions
  • deliver cash-flow into small businesses as soon as possible so that small businesses could meet pressing financial needs.

Grant applications were assessed against eligibility criteria that were determined by the NSW Government. The eligibility criteria for the $10,000 Support Grant required an employing small business to demonstrate it was significantly impacted by the COVID-19 pandemic by self-declaring or demonstrating a significant decline of 75 per cent or more in turnover compared to 2019. Documentation requirements were relaxed for small businesses within highly impacted industries.

In June 2020, the NSW Government announced a second round of one-off grants of up to $3,000 to small businesses that were highly impacted by the COVID-19 pandemic ($3,000 Recovery Grant). The objective of the $3,000 Recovery Grant was to help small businesses in 'highly impacted industries' — those directly impacted by the restrictions and closures put in place under the Public Health Orders — to meet the costs of safely reopening or scaling up operations.

The eligibility criteria for the $3,000 Recovery Grant required that a small business be in a highly impacted industry, demonstrate that it was significantly impacted by the COVID-19 pandemic by declaring a significant decline in turnover, and had costs associated with reopening under the 'COVID-Safe' requirements.

NSW Treasury and Service NSW implemented both grants on behalf of the NSW Government. The process of applying for a grant was intended to be quick and easy, with Service NSW using automated assessments and simple online application forms to process applications. Applicants applied for the $10,000 Support Grant through the Service NSW website between 14 April 2020 to 30 June 2020 and applied for the $3,000 Small Business Recovery Grant between 1 July 2020 and 31 August 2020.

At May 2021, around $520 million has been paid to over 52,500 grant applicants under the $10,000 Support Grant and around $109 million had been paid to around 36,700 grant applicants under the $3,000 Recovery Grant.

The Audit Office plans to undertake a performance audit into grants administration for disaster relief focussing on bushfire grants in 2021–22.

This audit assessed whether the grants funded under the $750 million Small Business Support Fund were effectively administered and implemented to provide disaster relief. It addressed the following questions:

  • Were funded grants programs planned, designed and targeted effectively?
  • Were funded grants programs implemented in line with the objectives and criteria and delivery requirements?
  • Have agencies established measures to monitor intended benefits and outcomes?

This audit did not seek to assess the effectiveness of any other grant programs or stimulus measures. It also did not seek to assess the impact of the funding on applicants, or the future prospects of small businesses that received support.

Conclusion

NSW Treasury and Service NSW effectively implemented two grants within required timeframes reflecting the NSW Government's decision to deliver urgent financial support to small businesses impacted by the COVID-19 pandemic in 2020. The $10,000 Support Grant and the $3,000 Recovery Grant have provided around $630 million in one-off grant payments to eligible small businesses.
NSW Treasury met urgent timeframes to design the grants and Service NSW made timely payments in line with the grants' objectives and eligibility criteria.

NSW Treasury met urgent timeframes to provide advice to the NSW Government on the grant design, proposed delivery partner, expected numbers of eligible businesses and the suitability of the proposed grant payment amount within the required timeframes. This was achieved within one day for the $10,000 Support Grant and within four days for the $3,000 Support Grant. In the context of the complex and changing pandemic and economic conditions between March and July 2020, NSW Treasury's advice to government outlined the risk, feasibility, expected demand estimates and assumptions for the grants.

NSW Treasury's demand projections were limited by uncertainty as to the pandemic's economic impact. Estimated demand for the grants was not met, resulting in around $120 million from the Small Business Support Fund remaining unspent.

Service NSW met urgent timeframes to stand-up both grants: 11 days for the $10,000 Support Grant and 26 days for the $3,000 Recovery Grant. It met agreed delivery requirements and made timely payments to small businesses in line with the grants' objectives and eligibility criteria. Over 65,000 businesses have received a payment under either grant, and over 23,000 businesses received both grants.

Gaps in project and risk management processes were expected given the tight timeframe to implement the grants.

The tight timeframe in which the agencies had to implement the grants contributed to gaps in project and risk management. The agencies advised that compromises were understood by both parties and were a necessary trade-off to ensure payments were made quickly.

Service NSW and the Department of Customer Service have acted to strengthen their processes to detect and minimise fraud in response to identified external fraud risks and to investigate suspected fraudulent applications since the grants commenced. Service NSW intends to further enhance fraud controls for grants applications and payments for future grants by implementing a fraud control framework by December 2021.

The agencies regularly monitored and reported on the timeliness of payments to small business applicants but have not yet measured all benefits of the grants programs.

Service NSW and NSW Treasury established processes to monitor and report on the timeliness of payments to grant applicants.

NSW Treasury has not yet measured all intended impacts of the grants, nor undertaken processes to obtain detailed feedback from grant recipients. Without these measures, there is limited insight into the extent to which the grants helped to support small businesses or ability to capture lessons which could be applied in future grants programs. NSW Treasury advises that an evaluation will commence from mid-2021.

1. Key findings

Around $630 million in timely one-off grant payments have been made to small businesses

Service NSW and NSW Treasury have paid around $630 million in one-off grant payments to small businesses via two grants administered under the $750 million Small Business Support Fund. At May 2021:

  • around $520 million has been paid to over 52,500 grant applications received for the $10,000 Small Business Support Grant ($10,000 Support Grant)
  • around $109 million has been paid to 36,700 grant applications received for the $3,000 Small Business Recovery Grant ($3,000 Recovery Grant).

Across both grants, over 65,000 small businesses received a payment across either grant, and over 23,000 businesses received payments under both grants.

NSW Treasury advise that, while no data was collected on the time to pay applicants for the $10,000 Support Grant, from its monitoring of the grants' outputs it was satisfied that payment timeframes met its expectations. Service NSW met its targeted time to pay applicants with payments made within ten days for the $3,000 Recovery Grant.

Funds for both grants were not fully spent due to limitations in data and uncertainty of the COVID-19 pandemic's impact. At May 2021, the final demand for the $10,000 Support Grant was around 30 per cent less than initially anticipated and the final demand for the $3,000 Recovery Grant was around 40 per cent less than initially anticipated.

NSW Treasury developed proposals establishing high level design and delivery expectations within rapid timeframes

NSW Treasury put forward proposals to the NSW Government for the two grants administered under the $750 million Small Business Support Fund. It met rapid timeframes for producing this advice: within one day for the $10,000 Support Grant and within four days for the $3,000 Recovery Grant. NSW Treasury's advice to the NSW Government on how to best target the total funding, eligibility criteria and the feasibility of delivering the grants through Service NSW was based on comparable grants programs – including the $10,000 Small Business Bushfire Support Grant – which at that time were ongoing.

The proposals established, at a high-level, the rationale for the grants, expected financial costs, risks and analysis on budget impacts, and confirmation that Service NSW could deliver the grants applications platform. NSW Treasury's demand projections were uncertain due to limited data in the early stages of the pandemic regarding potential economic impact.

Given the tight timeframes, the proposals did not fully consider all planning and design aspects for both grants. For example, there was minimal identification of the costs and benefits of the programs, and a lack of detailed design and delivery requirements. The proposals outlined that arrangements to finalise the risk management, controls, and auditing plan would be agreed by Service NSW and NSW Treasury before implementation.

In future circumstances where urgent advice on program design is required, NSW Treasury could set clearer expectations for the delivery agency, including fully considering costs, benefits and delivery requirements that could be carried through to project governance and implementation.

Service NSW implemented both grants in line with delivery expectations

Service NSW met urgent timeframes to stand-up both grants: 11 days for the $10,000 Support Grant and 26 days for the $3,000 Recovery Grant. Delivery expectations for each grant were established under a grant project agreement (grant agreement). Service NSW delivered the online application platform, assessment of applications, payments and reporting of the grants' uptake as per the grant agreements.

The urgent timeframes to deliver the grants contributed to gaps in Service NSW's project and risk management processes throughout the lifecycle of both grants. For example, the requirement to meet pressing timeframes for the $10,000 Support Grant launch meant agencies had reduced time to achieve sign-off on key documentation. As a result, important documents and processes – including the grant agreement, risk documentation and key business process and quality assurance processes – were not finalised ahead of launch.

Quality assurance and compliance processes for detecting fraud were not settled until after the conclusion of the applications for the $10,000 Support Grant, and were not completed until late 2020. Some project documents, including risk registers, communication plans and project briefs are still not finalised.

The longer timeframe to develop the $3,000 Recovery Grant meant that agencies were able to build on their understanding of the implementation requirements from the $10,000 Support Grant, and better document these expectations and understanding while ensuring that key documents and sign-offs were in place prior to launch.

Service NSW tightened its risk management and controls in response to evidence of fraudulent applications

In May 2020, Service NSW and the Department of Customer Service (DCS) were alerted to suspected fraudulent activity within grants administered by Service NSW. Initially, Service NSW anticipated that up to $8.8 million of the $10,000 Support Grant was at risk of exposure to fraudulent applications. However, Service NSW reported that, at April 2021, $1.9 million for the $10,000 Support Grant and $254,000 for the $3,000 Recovery Grant from paid applications were at risk of fraud exposure.

Following an internal review of the potential exposure to fraudulent or ineligible applications, Service NSW implemented additional automated security checks on applications, increased manual assessments of grant applications, established a dedicated taskforce for grants administration and engaged a unit within DCS to manage high-risk investigations.

Service NSW and DCS's increased governance and oversight has resulted in an established case management function, increased referrals to law enforcement, prioritised investigations of suspicious applications and the development of a 'Fraud Control Framework' aimed at addressing external fraud risks. Given Service NSW had limited experience in these processes in context of administering grant payments, such actions were an appropriate response.

Security checks and investigations of suspicious applications are ongoing. Service NSW will not know the full extent of fraud across the grants until these processes have been fully completed.

Service NSW and Department of Customer Service can improve how conflicts of interest are managed for future programs

Compliance with agency policies and processes to manage conflicts of interest and financial subdelegations demonstrates that investment decisions are being made by appropriately skilled and experienced staff, allowing agencies to operate efficiently, and reducing the risk of internal fraud.

DCS was unable to produce employee conflicts of interest declarations for the $10,000 Support Grant. Therefore, it is not known how many employees had completed conflicts of interest declarations for this round.

DCS provided information on conflicts of interest declarations for the $3,000 Recovery Grant. Twenty-nine per cent of declarations provided for employees undertaking grant assessments for the $3,000 Recovery Grant were incomplete at March 2021, and a further nine per cent were not finalised even though they indicated a real, potential or perceived conflict.

For future grants programs, ensuring compliance with conflicts of interest policies would help DCS and Service NSW to have greater confidence that conflicts of interest are appropriately identified and managed.

NSW Treasury has not yet measured all benefits or outcomes of the grants

In April 2021, NSW Treasury updated its evaluation plan for the $10,000 Support Grant and $3,000 Recovery Grant in support of an economic evaluation to commence from mid-2021. The updated evaluation plan outlines inputs, activities, and outputs as well as immediate, short term and medium term outcomes for both grants.

The evaluation will consider the extent to which both grants achieved their intended outcomes, and whether the economic benefits exceeded the costs to help inform decisions about the nature and design of any future small business support programs. This will complement, and feed into a broader review of all NSW Government COVID-19 stimulus measures.

Service NSW rapidly developed an approach to administer the grants

Over recent disasters, such as the 2019–20 bushfires and the COVID-19 pandemic, Service NSW has been responsible for administering grant programs on behalf of other government agencies.

Service NSW implemented both grants under its Project Management Framework and under each grant agreement with NSW Treasury as it does not have its own grants administration framework. To address the risks that emerged during delivery, Service NSW developed an approach to standardise and monitor the administration of the grants while they were being implemented.

Service NSW now has an opportunity to establish a grants administration framework, based on the processes, lessons and outcomes captured under the grants administration taskforce and in developing its fraud control framework. Embedding these processes into business as usual for grants administration will enable Service NSW to have a consistent set of expectations for controls, business processes and governance and probity requirements for future grants it implements.

2. Recommendations

By December 2021, NSW Treasury should:

1. finalise and implement an evaluation of the $10,000 Support Grant and $3,000 Recovery Grant, including obtaining direct feedback from businesses on how grant funds achieved the grant objectives.

By December 2021, Service NSW should:

2. develop a grants administration framework, which documents expected controls – including fraud controls – business processes and governance and probity requirements

3. publish information on all grants programs, including grants distribution and uptake.

By December 2021, the Department of Customer Service should:

4. ensure its process for managing conflicts of interest meets policy requirements by:

  • ensuring employees promptly declare any real, potential or perceived conflicts of interest
  • annually producing a list of conflicts of interest for records retention purposes
  • requiring a separate register of conflicts of interest declarations where a grant program is deemed as high risk.

3. Lessons for grants administered within urgent timeframes

The two grants this audit examined were administered within a context of urgent timeframes, and increased complexity and uncertainty about the impact of the COVID-19 pandemic. The following lessons are shared to assist sponsor and delivery agencies in administering future grants where rapid implementation is required.

Sponsor agencies should consider the following lessons:

1. develop an approach to define and measure benefits for rapidly developed programs and projects where a full business case and cost-benefit analysis is not feasible

2. establish common processes and expectations for co-administered grants:

  • periodically assure agencies' capability to deliver grants programs
  • agree and establish risk appetite statements with administering agencies
  • clearly establish expected performance levels and targets under any agreement

3. review the processes and outcomes of rapidly developed programs, capture lessons learned, and apply these in planning and delivering future programs.

Delivery agencies should consider the following lessons:

1. risk management and risk appetite:

  • perform robust assessment procedures to ensure risks associated with delivery of the project are identified
  • ensure the controls implemented adequately address identified risks
  • agree and document the acceptable risk appetite at the outset
  • review risk management processes after the grants are issued when unable to finalise risk management processes ahead of launch

2. grant agreements between NSW public sector agencies:

  • ensure agreements are finalised in a timely manner
  • ensure agreements clearly outline:
    • roles and responsibilities of both parties,
    • changes in scope of services provided
    • fees and charges applicable

3. frameworks for grants administration:

  • ensure that there is a common set of expectations in place to guide grants administration including standard controls and processes for managing risk, capturing lessons learned and reporting on outcomes.

Appendix one – Response from agencies

Appendix two – Summary of other COVID‑19 Stimulus and Support for small businesses in NSW in April 2020

Appendix three – Public Health Orders

Appendix four – Highly impacted industries

Appendix five – About the audit

Appendix six – Performance auditing

 

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary reference - Report number #352 - released (24 June 2021).

 

Published

Actions for WestConnex: changes since 2014

WestConnex: changes since 2014

Transport
Compliance
Infrastructure
Internal controls and governance
Management and administration
Project management
Risk

What the report is about

The report examined whether Transport for NSW (TfNSW) and Infrastructure NSW (INSW) effectively assessed and justified major scope changes to the WestConnex project since 2014.

What we found

NSW Government decisions to fund WestConnex-related projects outside WestConnex's $16.812 billion budget have reduced transparency and understate the full cost of WestConnex.

The NSW Government's decision to separate Sydney Gateway from WestConnex has reduced transparency over the cost of the road component of Sydney Gateway. $1.76 billion of the cost to complete Sydney Gateway is funded outside the WestConnex budget.

Network integration costs, currently estimated at $2.3 billion, are also funded outside the WestConnex budget. Many of these costs are directly attributable to WestConnex and ought to be included in the reported budget.

The Parramatta Road Urban Amenity Improvement Program, costing $198 million, should also be included as part of the WestConnex reported budget.

Decisions to exclude or remove these elements from WestConnex without justification have seen $4.26 billion of projects funded outside the $16.8 billion budget.

Positively, robust analysis was used to develop and incorporate design improvements into the 2015 WestConnex Updated Strategic Business Case.

The separate components of WestConnex underwent all required assurance reviews. However, the NSW Government's assurance framework does not require ongoing ‘whole-of-program’ assurance for large and complex projects like WestConnex. The absence of a holistic review of WestConnex allows for some costs and benefits to avoid scrutiny.

What we recommended

TfNSW should:

  • review the impact of scope changes on project objectives, costs and benefits for complex infrastructure projects
  • ensure that estimated costs and benefits of works which are reasonably required to meet consent conditions are included in business cases for complex large infrastructure projects
  • establish centralised and project specific record keeping for major infrastructure projects.

Infrastructure NSW should provide transparent whole of program assurance on total costs and benefits when complex projects are split into sub-projects.

Government should consider enhancing public transparency of existing infrastructure assurance processes by requiring that large complex infrastructure programs undergo periodic review at a whole-of-program level.

Fast facts

  • $16.812b 2015 WestConnex business case budget
  • $2.3b current estimated cost of network integration works to enable WestConnex, funded outside the WestConnex budget
  • $1.76b cost to complete Sydney Gateway to enable WestConnex and also funded outside the WestConnex budget
  • $198m Parramatta Road Urban Amenity Improvement Program, originally part of WestConnex but now funded outside the WestConnex budget

WestConnex

WestConnex is a 33 km motorway network that will link the western and south‑western suburbs with the Sydney CBD and the Airport and Port Botany precinct. It will also connect with proposed future motorway links to the north shore, northern beaches, and southern Sydney. The project is being delivered in three stages, with completion scheduled for 2023.

When first conceived by Infrastructure NSW (INSW) in 2012, WestConnex was described as a single integrated concept. In August 2013, government approved a business case for an integrated concept of WestConnex, with an estimated cost of $14.881 billion (in nominal outturn costs). Transport for NSW (TfNSW) is the government agency (sponsor agency) accountable for the delivery of WestConnex in accordance with the business case. In August 2014, the NSW Government established the Sydney Motorway Corporation to fund, deliver and operate WestConnex.

In November 2015, the NSW Government publicly released an updated WestConnex business case with greater detail and design enhancements, which increased the estimated cost to $16.812 billion.

Subsequent to this update, further changes were made to the design, including realignment of the M4 to M5 Link connection to the Western Harbour Tunnel project, an expanded interchange at Rozelle, the deletion of the Camperdown Intersection, and the addition of the Iron Cove Link. The reported budget for WestConnex was not changed as a result of these design updates.

To fund WestConnex, Sydney Motorway Corporation consolidated a concessional loan of $2 billion from the Australian Government, private sector debt and equity funding from the State. The Australian Government also provided a $1.5 billion contribution to the State to partially fund construction of WestConnex.

In August 2018, the NSW Government sold 51 per cent of its stake in Sydney Motorway Corporation for $9.26 billion. At the time of writing, the NSW Government is in the process of selling its remaining 49 per cent stake of Sydney Motorway Corporation.

About this audit

In the course of delivering a complex major infrastructure project, it is reasonable to expect changes to the original design and scope. Changes may occur as the design moves from a high‑level concept to a detailed design for project delivery, as new risks or issues are identified, as demands change, or as other interdependent projects are approved. Changes can also occur in response to potential cost or delivery overruns which arise as a result of planning deficiencies. Where design and scope changes significantly change the project costs and/or expected benefits, the justification for these changes should be robust and transparent.

Following our 2014 performance audit, 'WestConnex: Assurance to the government', the NSW Government established the Infrastructure Investor Assurance Framework (IIAF) to improve accountability and transparency over major projects that are developed, procured, or delivered by government agencies. Under the framework, TfNSW, as project sponsor, is responsible for ensuring the WestConnex project meets all IIAF requirements. These include ensuring the project remains strategically aligned and viable, and benefits are on track. INSW is responsible for coordinating the assurance review process and reporting directly to NSW Cabinet on project delivery against time, budget and risks to project delivery.

The objective of this performance audit is to assess whether TfNSW and INSW effectively assessed and justified major scope changes to the WestConnex project since 2014.

 

Conclusion

Government decisions to separate WestConnex related projects and deliver them outside WestConnex's 2015 business case budget of $16.812 billion has understated the total cost of WestConnex achieving its objectives. The rationale for separating these elements from the WestConnex project scope has not been transparent. Together, these projects represent costs of $4.26 billion funded outside the $16.812 billion WestConnex budget.

Since 2015, the NSW Government has removed several projects from the scope described in the 2015 WestConnex business case, and funded them separately:
  • In mid‑2017, the Sydney Gateway became a separate project outside WestConnex. This project, estimated in 2015 to cost $800 million, now has an estimated cost of $2.56 billion. The project remains partly funded by an $800 million contribution from the $16.812 billion WestConnex budget, with $1.76 billion funded outside the WestConnex budget.
  • In late 2018, the Parramatta Road Urban Amenity Improvement Program became a separate project outside the 2015 WestConnex budget. This project was part of the 2015 WestConnex Business Case and is intended to create urban renewal opportunities around Paramatta Road. It is estimated to cost $198 million.

Work required to integrate WestConnex with existing roads ('network integration') was funded outside the $16.812 billion budget for the November 2015 WestConnex business case. TfNSW is obliged to deliver network integration works to meet the conditions of planning approval for WestConnex. As such, these costs should be included in the WestConnex budget. The current estimated cost of these network integration works is $2.3 billion.

The rationale to exclude or remove each of these elements from the WestConnex project scope has not been transparent, nor supported by robust analysis and justification. These elements are required for WestConnex to achieve its objectives. The additional project costs will also deliver additional benefits not included in the 2015 WestConnex business case. Removing them understates the total cost of achieving the objectives set out in the 2013 and 2015 WestConnex business cases.

WestConnex's complex financing arrangements further reduce transparency on costs.

Transparency over the total cost of WestConnex – including elements funded from other project budgets – is further limited by the project's complex financing arrangements.

Prior to 2018, the Audit Office provided assurance on costs borne and levied by Sydney Motorway Corporation and its controlled entities. Since the NSW Government sold its majority stake in WestConnex in August 2018, the Auditor‑General no longer has the mandate to provide this assurance. Considering this, and the lack of transparency on the cost of projects removed from the WestConnex project scope, there is no transparent or comprehensive view of the total cost to deliver WestConnex – nor of how these cost would be offset by the sale of the government's remaining stake.

There is no 'whole‑of‑program' assurance over the WestConnex program of works. This limits transparency and confidence that WestConnex will meet intended objectives within its budget.

After INSW conducted a gateway review of a draft of the 2015 WestConnex Business Case under the IIAF, the project was broken up into separate components to support staged delivery. Each of these projects, including the Sydney Gateway, as well as the Network Integration Program, underwent the required assurance reviews under the IIAF. INSW also provided monthly progress updates to government. These individual projects are, in themselves, significant in scale and complexity. Addressing them as discrete components for the purposes of the assurance review process is justified and there is no requirement under the IIAF to holistically review projects which together deliver final benefits of the WestConnex program. However, whole‑of‑program review would improve transparency over total costs and benefits.

In 2016, TfNSW revised the design of the M4‑M5 Link and Rozelle to address traffic and integration issues.

TfNSW identified that the concept designs used for the M4‑M5 Link and Rozelle Interchange in the 2015 WestConnex Business Case would not integrate well with surface roads, including the proposed Bays Precinct, and would result in increased traffic on Victoria Road and the ANZAC Bridge. Following a comprehensive review conducted in mid‑2016, TfNSW refined the design of the M4‑M5 Link and Rozelle Interchange to address these limitations without increasing the cost of delivery. TfNSW documented the rationale for the design changes, including how the changes improved on the original design to increase capacity, improve traffic conditions and create more open space.

1. Key findings

Government decisions to fund WestConnex related projects outside of WestConnex's $16.812 billion reported budget have reduced transparency over costs and understate the full cost of WestConnex

In 2015, the work required to integrate WestConnex with existing roads ('network integration') was funded as a separate project with an estimated cost of $1.534 billion outside the 2015 WestConnex budget of $16.812 billion. TfNSW then created the Network Integration Program to respond to the conditions of planning approval for WestConnex. The current estimated cost to deliver all network integration works is $2.3 billion.

Since the 2015 WestConnex Business Case, the NSW Government has removed several elements from the scope of WestConnex and funded them as separate projects, while keeping the published WestConnex budget at an estimated $16.812 billion. Projects removed include:

  • Sydney Gateway, currently costed at $2.56 billion (with an $800 million contribution from WestConnex)
  • Parramatta Road Urban Amenity Improvement Program, costed at $198 million in late 2018 and funded though new funding to the Greater Sydney Commission.

Together, these projects represent costs of $4.26 billion that are not included in the WestConnex budget, but are required for WestConnex to achieve the objectives of the 2013 and 2015 WestConnex Business Cases. The costs of these elements in supporting the objectives of WestConnex is not tracked centrally, and there is no single point of oversight over them. Exhibit 1 compares total WestConnex forecast costs (including related projects) between November 2015 and April 2021.

 

November 2015
($ million)

April 2021
($ million)
WestConnex
Stage 1
Stage 1A (M4 Widening) 497 517
Stage 1B (M4 East) 3,802 3,782
Total 4,299 4,299
Stage 2
King Georges Road Interchange 131 131
New M5 4,335 4,335
Sydney Gateway Contribution 800 800
Total 5,266 5,266
Stage 3
M4‑M5 Link and Rozelle Interchange 7,049 7,049
Urban renewal (Parramatta Road) 198 ‑‑
Urban renewal (Rozelle) ‑‑ 198
Total 7,247 7,247
Total reportable WestConnex 16,812 16,812

Exhibit 1: WestConnex and related projects forecast costs
  November 2015
($ million)
April 2021
($ million)
Related projects
Network integration 1,534 2,300
Urban renewal (Parramatta Road) ‑‑ 198
Sydney Gateway Road Component ‑‑ 1,760
Total 1,534 4,258

Source: AO research.

Many network integration costs are directly attributable to WestConnex and ought to be included in the reported budget for WestConnex

Prior to 2015, the scope of WestConnex included enabling works needed before or during construction, as well as funding for future works to address any adverse traffic outcomes created by WestConnex which become apparent after its opening. These works are also known as network integration works.

When government approved the 2015 WestConnex Business Case, it noted that the project would require $1.534 billion for network integration works to address the impacts of WestConnex on the road network. However, the WestConnex project budget of $16.812 billion did not include funding for network integration works. Instead, Roads and Maritime Services (RMS, now TfNSW) was to fund network integration through its normal budget allocation.

It is important to recognise these costs as part of the total WestConnex project cost because:

  • TfNSW created the Network Integration Program to respond to network traffic and transport elements of the planning conditions of approval for WestConnex granted by the then NSW Department of Planning and Environment under the Environment, Planning and Assessment Act 1979.
  • NSW Treasury guidelines for business cases note that accurate cost estimates include assessment of the financial impact of meeting the conditions of planning approval.
  • Travel time and vehicle operating cost benefits attributed to the WestConnex project in the 2015 WestConnex Business Case assume that some network integration works, then costed at $373 million, were in place.

Refer to Appendix two for more detail on network integration works.

Some of the projects in the WestConnex Network Integration Program provide community and place benefits, such as parklands and cycleways. These benefits have not been attributed to WestConnex. Additionally, some network integration works are likely to deliver additional traffic related benefits to WestConnex. As the Network Integration Program’s primary purpose is to meet the conditions of planning approval for WestConnex, TfNSW should attribute all the costs and benefits of the program to WestConnex.

To September 2021, the total funded cost of the Network Integration Program is approximately $2.077 billion. TfNSW estimates that it will need a further $222 million to complete all expected network integration works.

The NSW Government's decision to separate Sydney Gateway from WestConnex has reduced transparency and accountability for TfNSW's underestimation of the cost of the road component of Sydney Gateway

Sydney Gateway is a high‑capacity connection between the new St Peters Interchange and the Sydney Airport and Port Botany precinct. It includes a road and rail components. The road component was included in the scope of WestConnex in the 2015 WestConnex Business Case. The November 2015 design, which TfNSW costed at $800 million, involved separate roadways from the St Peters Interchange to the International terminal, and to the domestic terminals and Mascot airport precinct.

By October 2016, TfNSW was aware that the $800 million budget for Sydney Gateway was insufficient and revised the forecast cost for the road component to $1.8 billion. The original cost estimate did not sufficiently consider the cost of:

  • constructing a complex design adjacent to the airport precinct
  • obtaining access to land required for the project
  • managing environmental contamination.

On 9 August 2017, the then Minister for WestConnex announced that the Sydney Gateway project was not part of WestConnex.

The 2015 WestConnex Business Case notes that material changes to the WestConnex budget, funding, scope, or timeframe are subject to Cabinet approval processes. It states that, when seeking approval for material changes, the portfolio Minister will make a submission to the relevant Cabinet Committee. Changes in project scope required the approval of the then Cabinet Committee on Infrastructure and should have been endorsed by the WestConnex Interdepartmental Steering Committee.

TfNSW and the NSW Department of Premier and Cabinet (DPC) assert that there is no documentation to support the government’s decision to separate Sydney Gateway from the WestConnex Program, or the WestConnex Interdepartmental Steering Committee's endorsement of a submission to Cabinet seeking approval for the separation.

The established governance processes for major scope changes were not followed in this instance. The lack of transparency regarding government's decision to separate Sydney Gateway from WestConnex also reduces visibility of TfNSW's underestimation of the cost of delivering the road component of Sydney Gateway.

The November 2018 Final Business Case for Sydney Gateway, which was approved by the government, included an estimate of $2.45 billion (nominal outturn cost) for the road component. This estimate included an $800 million contribution from WestConnex. A more recent estimate (late 2020) for this project is $2.56 billion (nominal outturn cost).

The Parramatta Road Urban Amenity Improvement Program should be included as part of the WestConnex budget

A specific objective of the 2015 WestConnex Business Case was the creation of opportunities for urban renewal along and around Parramatta Road. The business case included an allocation of $198 million in the $16.812 billion WestConnex budget for the Parramatta Road Urban Amenity Improvement program, designed to implement aspects of the objective. In November 2018, the NSW Government removed the Parramatta Road Urban Amenity Improvement Program from the WestConnex program of works and reallocated the $198 million (inside the $16.812 billion WestConnex budget) for urban renewal works around the Rozelle Interchange. As part of this decision, government approved new funding of $198 million to the Greater Sydney Commission for the urban amenity program, outside the $16.812 billion WestConnex budget. This understates the cost of WestConnex meeting its objectives by $198 million.

There is no requirement for ongoing ‘whole‑of‑program’ assurance of the WestConnex program of works, including related projects

In August 2015, INSW conducted its first Gateway Review of WestConnex as a program consisting of composite projects. Following that review, TfNSW registered each of the components of WestConnex with INSW as individual projects, rather than keeping WestConnex registered as a program or mega‑project. This is not inconsistent with the IIAF and all WestConnex related projects, including Sydney Gateway and the Network Integration Program, have undergone independent assurance reviews as individual projects under the IIAF.

Once a program like WestConnex is broken down into its composite parts, there is no requirement for the sponsor agency (TfNSW) or INSW to provide independent assurance on the program as a whole until it is completed. This is then done as part of the Gateway review for benefits realisation, which examines whether project benefits are being measured and meet expectations. These individual projects are, in themselves, significant in scale and complexity. While addressing them as discrete components for the purposes of the assurance review process can be justified, the absence of strategic, holistic reviews of WestConnex allows for total costs and benefits to become opaque and avoid scrutiny. Programs of this scale require greater ongoing transparency on total costs and benefits in order to ensure confidence they will meet intended objectives within budget.

There is a lack of public transparency on the total costs and benefits of the WestConnex project

Prior to 2018, the Audit Office provided assurance on costs borne and levied by Sydney Motorway Corporation and its controlled entities. Since the NSW Government sold 51 per cent of its stake in WestConnex in August 2018, the Auditor‑General no longer has the mandate to provide this assurance. The Audit Office is also unable to provide any assurance regarding the performance of tolling concessions.

This means that the total costs of WestConnex, including those levied on road users through tolling, are not reported alongside the full cost of delivering the project. This information, and independent assurance over that information, would provide transparency and context to the outcome of government's sale of its interest in WestConnex.

To enhance the transparency of existing infrastructure assurance processes, government could consider requiring large and complex infrastructure programs to undergo periodic review at a whole‑of‑program level. This could take the form of annual reports to Parliament on the total costs and benefits of selected large and complex projects by the responsible agency. The reports could include an assessment of the cost to government and cost to the community of funding and financing. Independent assurance of the agency report would provide Parliament with greater confidence that infrastructure is delivered economically and providing value for money for the people of NSW.

The Australian National Audit Office provides similar assurance on selected Department of Defence acquisition projects as part of its annual Major Projects Report.

Design enhancements included in the 2015 WestConnex Updated Strategic Business Case were supported by robust analysis

The 2015 WestConnex Business Case contained more detail than the 2013 WestConnex business case. Design enhancements were made as a result of modelling analysis conducted over the two years since the 2013 business case. Enhancements included a full underground link between Kingsgrove and St Peters as part of the New M5 and re‑alignment of the M4‑M5 link tunnel (Stage 3) to include the Rozelle Interchange. The Rozelle Interchange will provide a direct connection to the Anzac Bridge and Victoria Road, and will enable a connection to the proposed Western Harbour Tunnel and Beaches Link. A map and description of these elements can be found at Exhibits 2 and 3 of this report.

In 2016, TfNSW revised the design of the M4‑M5 Link and Rozelle to address traffic and integration issues

As part of preparing the 2015 WestConnex Business Case, TfNSW prepared a Project Definition and Delivery Report (PDDR) for the M4‑M5 Link. This report describes the scope of the project, including a high‑level concept design. TfNSW identified limitations with the proposed design of the M4‑M5 in the PDDR, which it would need to address as the project moved to a detailed design stage. In particular, these limitations included:

  • poor integration with the Bays Precinct masterplan
  • traffic capacity constraints on Victoria Road and Anzac Bridge
  • construction complexity.

Following a comprehensive review in mid‑2016, TfNSW changed the design of the M4‑M5 Link and Rozelle Interchange to address these limitations. These changes included:

  • deletion of the Camperdown intersection to improve traffic conditions on Parramatta Road
  • a fully underground and larger Rozelle Interchange with 10‑hectare dedicated parklands
  • a toll‑free tunnel link from Iron Cove Bridge to Anzac Bridge
  • increasing the lanes in the dual tunnels from three to four each way.

TfNSW documented, but did not publish, the rationale for the design changes, including how the changes addressed the limitations of the previous design while providing increased community benefit through the creation of open space. TfNSW undertook cost comparison studies which estimated that these changes would have a neutral impact on the estimated project cost while achieving the same or improved benefits.

TfNSW's record‑keeping systems for large infrastructure investments negatively impact accountability and transparency

In response to our formal requests for relevant information, made during the conduct of this audit, TfNSW advised that complete and valid records of key decision‑making processes, analysis and advice were unavailable. Additionally, TfNSW often provided information that was incomplete or unverifiable (for instance, unsigned briefing notes). This is not consistent with accepted governance practices and does not comply with the requirements of the State Records Act 1998.

We also requested that TfNSW provide a list of relevant documents held by the Sydney Motorway Corporation (SMC). While TfNSW acknowledged that SMC may hold material relevant to the audit, TfNSW did not have a list or description of these documents. As SMC is now a majority privately held entity, both the Audit Office and TfNSW have limited power to require SMC to provide documentation.

The delivery timeframe for large and complex infrastructure projects such as WestConnex frequently exceeds five years, and some projects can take over a decade to deliver. These projects represent a significant investment of public resources and government agencies should expect independent review and assurance activities such as performance audits. The establishment of dedicated record keeping facilities for major infrastructure projects, such as data rooms, would improve transparency and accountability. This would ensure that the use of public resources is fully auditable in line with public expectations and the requirements of the Government Sector Finance Act 2018, the State Records Act 1998 and the Public Finance and Audit Act 1983.

2. Recommendations

By December 2021, TfNSW should:

1. review the impact of scope changes on project objectives, costs and benefits for complex infrastructure projects

2. when preparing business cases for complex large infrastructure projects, ensure that the estimated costs and benefits of works which are reasonably expected to meet consent conditions are included in the overall project cost and its benefits (as per Treasury guidelines)

3. establish and maintain centralised and project‑specific record keeping, including through dedicated project data rooms, to ensure major infrastructure projects can readily be subject to external oversight and assurance.

By June 2022, INSW should:

4. provide transparent whole‑of‑program assurance on total costs and benefits throughout the project life‑cycle when complex projects are split into sub‑projects.

By June 2022, NSW Government should:

5. consider enhancing the public transparency of existing infrastructure assurance processes by requiring that large complex infrastructure programs undergo periodic review at a whole‑of‑program level. This could take the form of reports to Parliament on the total costs and benefits on selected large and complex projects by the responsible agency, including cost to government and cost to community of funding and financing, as well as an accompanying independent assessment of the agency report.

Following our 2014 performance audit report 'WestConnex: Assurance to the government', the NSW Government established the Infrastructure Investor Assurance Framework (IIAF). INSW is responsible for the development, implementation and administration of the IIAF. The assurance framework involves gateway reviews, health checks, deep dive reviews, and project monitoring and reporting at various stages in the lifecycle of a project. The main aims of the IIAF are to help ensure major infrastructure projects are delivered on time and on budget, and to ensure that reports are regularly monitored by the Cabinet of the NSW Government. The IIAF gateway review process is compulsory for all significant investments and expenditure under the NSW Treasury Gateway Policy.

In accordance with the IIAF, INSW is responsible for the following:

  • providing a dedicated Assurance Team including Gateway Review Managers to coordinate Reviews
  • determining appropriate expert reviewers, and manages scheduling, commissioning and administration of Assurance Review reports. Infrastructure NSW is independent of the Expert Review Team
  • monitoring Tier 1 – High Profile/High Risk projects, Tier 2 and Tier 3 (if required) project performance through independent Assurance Reviews
  • providing independent analysis and advice on key risks and any corrective actions recommended for Tier 1 – High Profile/High Risk, Tier 2 and Tier 3 projects
  • escalating projects to Infrastructure Investor Assurance Committee (IIAC) and Cabinet where projects present ‘red flag issues’ and where corrective action is needed
  • working with delivery agencies to register all capital projects with an estimated cost greater than $10.0 million and ensures they are risk profiled and assigned a risk‑based project tier with an endorsed IIAF Project Registration report
  • preparing forward looking annual Cluster Assurance Plans
  • maintaining and continuously improves the IIAF process
  • reporting to the IIAC, Cabinet and Infrastructure NSW Board
  • regularly report to NSW Treasury on the performance of the IIAF.

In relation to WestConnex, TfNSW is the sponsor agency responsible for meeting relevant IIAF requirements, including:

  • registering and risk profiling projects
  • IIAF gateway, health check, and deep dive assurance reviews
  • regular reporting.

Under the IIAF, it is mandatory for all capital projects valued over $10.0 million to be registered with INSW. Capital projects can be registered either as a program (comprising of a group of related projects or activities) or as a project (which may or may not be part of a program).

According to the IIAF, programs tend to have a lifespan of several years and aim to deliver outcomes and benefits related to an organisation's strategic objectives. Projects tend to have a shorter lifespan, and deal with outputs. Projects can, however, be grouped under a single program if they are similar in nature or if they are aimed at collectively achieving a strategic objective. Complex projects can be delivered in multiple stages, under different contracts, and across different time periods.

The last assurance review of the entire WestConnex program of works as a whole was in 2015

INSW conducted the first IIAF gateway review of WestConnex in August 2015. TfNSW developed a draft WestConnex Updated Strategic Business Case to consolidate the latest analysis on WestConnex, and to confirm that the project remained fit for purpose, economically viable, and financially deliverable. The review followed a recommendation in our 2014 performance audit report that business cases be thoroughly revisited.

During September 2015, INSW conducted additional informal reviews to identify strategic risks associated with public release of the WestConnex business case. Subsequently, INSW gave the Premier of NSW its views on the draft business case, including the following points:

  • The $398 million budget for Sydney Gateway was insufficient to meet the benefits claimed in the business case for a ‘functional’ connection to Sydney Airport and Port Botany. INSW studies indicate a future‑proof solution would require a minimum spend of $755 million.
  • Enabling works for WestConnex estimated at $1.534 billion were excluded from the cost of WestConnex. Significant work remained for RMS to identify mitigation measures to address planning approvals and network performance issues.
  • Enabling works (a Southern Connector), an access ramp and surface road improvements within St Peters were excluded from the draft 2015 business case despite their inclusion in the WestConnex scope in the 2014–15 State Budget.
  • The overall cost of works not funded within the WestConnex budget ranged from $2.011 billion to $2.196 billion. This included the enabling works, access ramp and surface road improvements and the shortfall for Sydney Gateway.

All WestConnex related projects, including Sydney Gateway have undergone independent assurance reviews under the IIAF

Since INSW submitted the first WestConnex progress update report to Cabinet in June 2015, INSW has been reporting monthly on the different stages of the WestConnex Program, including Sydney Gateway, as the projects were registered with INSW as High‑Profile, High‑Risk projects. Separate reporting enabled INSW to report and review each stage with more detailed scrutiny, compared to the reporting and reviewing at a program level.

WestConnex Stage 2 (New M5) underwent both mandatory and non‑mandatory reviews at key points in the project lifecycle. Three mandatory gateway reviews – at Gate 2 (Final business case), Gate 3 (Readiness for market), and Gate 4 (Tender evaluation) – were conducted by TfNSW before the introduction of IIAF. Four non‑mandatory health check reviews and one non‑mandatory deep dive review were conducted after the introduction of the IIAF managed by INSW.

Similarly, WestConnex Stage 3 projects – M4‑M5 link, M4‑M5 Tunnels, and Rozelle Interchange – also underwent mandatory and non‑mandatory reviews at key points in their lifecycle under IIAF.

The M4‑M5 Link had two mandatory gateway reviews and one non‑mandatory health check review under IIAF. These reviews were conducted before Stage 3 was split into two stages, due to major design changes to the Rozelle Interchange and the M4‑M5 tunnels.

The M4‑M5 tunnels had two mandatory gateway reviews (at Gates 3 and 4), one non‑mandatory health check review, and one non‑mandatory deep dive review under IIAF.

Rozelle Interchange also underwent three mandatory gateway reviews at Gate 3 (part 1), Gate 3 (part 2), and Gate 4, two non‑mandatory health check reviews, and one non‑mandatory deep dive review under IIAF.

Since mid‑2017, the Sydney Gateway project has undergone required independent assurance reviews, as well as a number of optional assurance reviews

In November 2016, INSW conducted a mandatory Gate 1 gateway review on a strategic business case for the Sydney Gateway Project. TfNSW did not proceed with this business case. Following the separation of Sydney Gateway from WestConnex in mid‑2017, TfNSW developed a new business case for Sydney Gateway. It has undergone the required Gate 1, Gate 2, and Gate 3 gateway reviews, as well as two non‑mandatory health check reviews, and three non‑mandatory deep dive reviews under IIAF.

Network integration works have undergone all IIAF required assurance reviews

TfNSW completed a strategic business case for the Network Integration Program in August 2020, and INSW completed a gateway review in November 2020. This is despite network integration projects starting as early as 2015, with $645 million having been spent by June 2020. The strategic business case included a prioritisation process for completing remaining works in the program. Prior to November 2020, TfNSW registered individual network integration projects with INSW, and these projects have undergone gateway reviews where required.

The Network Integration Program strategic business case does not include Rozelle interchange network integration works ($353 million) and additional network integration works to settle a contractor claim adjacent to St Peters Interchange ($190 million). These were excluded from the business case on the basis they had already been approved by government, and as such were not subject to the prioritisation elements of the business case. TfNSW has not developed separate business cases for these works, although the scope of the St Peters Interchange works was developed through a negotiated process.

TfNSW did not prepare business cases for some network integration works which have commenced, including the $323 million Campbell Road/Euston Road works

Prior to its development of the August 2020 strategic business case, TfNSW did not prepare business cases for many network integration works that have commenced, and in some instances were completed, before 2019. Significantly, TfNSW did not prepare a business case for the Campbell Road/Euston Road works, which cost $323 million and have been completed.

In 2016, TfNSW’s Business Case Policy requires the creation of business cases for capital projects costing over $1.0 million. At the time of writing this report, TfNSW’s draft policy requires full business cases for capital projects costing $10.0 million or more.

There is no requirement for ongoing ‘whole‑of‑program’ assurance of the WestConnex program of works, including related projects

INSW conducted its first gateway review of WestConnex (as a program, which consisted of composite projects) in August 2015. Following that review, TfNSW registered each of the components of WestConnex with INSW as individual projects, rather than keeping WestConnex registered as a program or complex project. The IIAF allows this to occur.

Separate registration enabled INSW to report and review each stage with more scrutiny compared to whole‑of‑program level review.

Such an approach has merit, considering the individual stages (and components of these stages) are multi‑million dollar works in their own right. Each project has its own timing for gateway reviews at stages such as 'Readiness for Market' and 'Tender Evaluation'.

Once a program such as WestConnex is broken down into its composite parts, there is no requirement for the sponsor agency (TfNSW) or INSW to conduct independent assurance on the program of works as a whole until the whole program is completed as part of the Benefits Realisation (Gate 6) gateway review. The absence of strategic, holistic reviews of projects of the scale and complexity such as WestConnex during their delivery allows for total costs and benefits to become opaque and avoid scrutiny. Projects of this scale require greater ongoing transparency on total costs and benefits in order to ensure confidence they will meet intended objectives within budget.

INSW has advised us that it has prepared a proposal to expand its assurance function to include whole‑of‑program review of inter‑related infrastructure projects.

Appendix one – Responses from agencies

Appendix two – Network integration works

Appendix three – About the audit

Appendix four – Performance auditing

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary reference - Report number #351 - released (17 June 2021).

Published

Actions for Acquisition of 4–6 Grand Avenue, Camellia

Acquisition of 4–6 Grand Avenue, Camellia

Transport
Asset valuation
Compliance
Fraud
Infrastructure
Internal controls and governance
Management and administration
Procurement
Risk

The Auditor-General for New South Wales, Margaret Crawford, has today released a report on Transport for NSW’s (TfNSW) acquisition of 4–6 Grand Avenue in Camellia.

This audit, which was requested on 17 November 2020 by the Hon. Andrew Constance MP, the Minister for Transport and Roads, examined:

  • whether TfNSW conducted an effective process to purchase 4–6 Grand Avenue, Camellia
  • whether TfNSW has effective processes and procedures to identify and acquire property required to deliver the NSW Government’s major infrastructure projects.

The audit found that TfNSW conducted an ineffective process when it purchased 4–6 Grand Avenue, Camellia. The audit also found that TfNSW’s internal policies and procedures to guide the transaction were, and continue to be, insufficient.

The Auditor-General has made seven recommendations to address the issues identified in the report.

On 17 November 2020, the Hon. Andrew Constance MP, the Minister for Transport and Roads, requested this audit under section 27B(3)(c) of the Public Finance and Audit Act 1983.

On 15 June 2016, Transport for New South Wales (TfNSW) acquired 6.3 hectares of land at 4–6 Grand Avenue, Camellia, by agreement from Grand 4 Investments Pty Ltd. Grand 4 Investments was a business entity established by the owners of Billbergia Pty Ltd, a property development and investment company.

TfNSW paid Grand 4 Investments $53.5 million and assumed liability for addressing environmental issues and contamination associated with the site. This took place seven months after the vendor acquired the land as part of a competitive Expression of Interest process, in which TfNSW also participated, for $38.15 million.

TfNSW is the NSW Government agency responsible for most major transport infrastructure projects in New South Wales. TfNSW acquired the Camellia site for use as a stabling and maintenance depot to support the Parramatta Light Rail (PLR) project.

Consistent with the minister’s request, this audit assessed:

  • whether TfNSW conducted an effective process to purchase 4–6 Grand Avenue, Camellia
  • whether TfNSW has effective processes and procedures to identify and acquire property required to deliver the NSW Government’s major infrastructure projects.

In considering the effectiveness of the processes for this purchase, the audit considered:

  • the requirements of the Land Acquisition (Just Terms Compensation) Act 1991 (the Act)
  • the application of sound processes to manage risk to the NSW Government and to achieve value for money
  • the application of disciplines associated with complex procurement, such as probity, in a NSW Government context.
The acquisition of the 4–6 Grand Avenue site in Camellia was consistent with a 2014 feasibility study for the PLR, but occurred before the completion of detailed project planning or an acquisition strategy.

TfNSW made two attempts to acquire the 4–6 Grand Avenue site in Camellia, and was successful on the second attempt. TfNSW recognised the risks associated with early acquisition and had high-level strategies in place should the site not be required.

The specific site had been identified in a feasibility study for the PLR commissioned by TfNSW in 2014 as one of several options in Camellia for a stabling and maintenance depot. However, TfNSW had not done any substantive analysis of the various options to identify a preferred location before the two opportunities to acquire 4–6 Grand Avenue were brought to TfNSW’s attention by the landowners (or their agents). On both occasions, TfNSW chose to actively pursue acquisition in advance of any such analysis.

The acquisition was also not informed by a Property Acquisition Strategy, which TfNSW policy recommends in order to guide the process and manage acquisition specific risks.

In 2015, TfNSW identified that it would require a stabling and maintenance depot in the Camellia area for the Parramatta Light Rail

In 2014, TfNSW commissioned an external engineering consultancy to undertake a feasibility design study for the Parramatta Light Rail - the Parramatta Transport Corridor Strategy Feasibility Design study (herein referred to as ‘the feasibility study’). In early 2015, TfNSW received the feasibility study, which was one of several key sources that informed the development of business cases for the PLR.

The feasibility study recommended that TfNSW should consolidate the maintenance and cleaning operations with overnight stabling facilities on one site. The study noted that the optimal location for any such site would be in close proximity to the proposed network, and noted that the site must have access to road connections to accommodate access for cars and trucks.

The study found that a centrally located stabling and maintenance facility would be required for all routes serving the Parramatta CBD, and that the Camellia industrial area was a preferred location for such a facility. The study noted that the Camellia area was contaminated.

The feasibility study notes that its conclusions were based on assumptions about the light rail system adopted and decisions made by the future operator of the system, who had not yet been selected or appointed.

TfNSW's decision to progress a potential acquisition in 2015 considered the risk that the site may not be required

TfNSW's FIC was responsible for making decisions on funding allocations at a whole of program level within TfNSW. FIC was also responsible for approving ‘high-risk/high-value’ variations to program budgets. Members of the FIC included:

  • Secretary of Transport for NSW
  • Deputy Secretary, Infrastructure and Services
  • Deputy Secretary, Freight, Strategy and Planning
  • Deputy Secretary, Customer Services
  • Deputy Secretary Finance and Investment
  • Deputy Secretary People and Corporate Services.

An April 2015 submission, from the then Deputy Director-General to the agency’s FIC, sought authorisation and funding approval to participate in an Expression of Interest sale process. It noted the risk that the project may not go ahead. The submission advised that:

By acquiring a strategic site now, it reduces the risk of having to pay an improved value or a value that may be subject to rapidly improving land values due to changes in land use and rezoning.

The property can be acquired for the project, held strategically and income generated by leasing the site as hardstand 1 space until the project requires the land for the Parramatta Light Rail project.

If the project does not proceed in the medium to longer term, the property can be sold at a premium to what has been paid today as property fundamentals improve.

This submission acknowledged the risks associated with environmental contamination and proposed that these risks would be managed by negotiating a contract where the remediation and associated expenses would be at the landowner’s cost. 

TfNSW assessed the 4–6 Grand Avenue site as one of several sites in Camellia that was a feasible location for a stabling and maintenance facility

The Departmental feasibility study assessed six potential sites for a stabling and maintenance facility, including 4–6 Grand Avenue, noting strengths and weaknesses of each site. A different site on Grand Avenue was assessed as the ‘base case’ option (1 Grand Avenue). The study’s comments on the 4–6 Grand Avenue site included the following:

With an area of approximately 63,000m2, this site has sufficient space for a depot with the required stabling yard and maintenance facilities. The location allows for good road access and LRT [light rail transit] access would be from Grand Avenue, which may require a road crossing or signalised intersection. The site has been used for general industrial uses; however the land has been cleared and is currently undergoing remediation 2. The site is not affected by flooding based on one in 100-year flood data.

In early 2015, once the opportunity to acquire 4–6 Grand Avenue emerged, TfNSW commissioned a specific feasibility study of the 4–6 Grand Avenue site. The feasibility studies clearly documented the existence of environmental contamination. In April 2015, the report concluded:

Given the limitations of this report and within the parameters that have been set it is concluded that from a spatial and geographic perspective the site at 6 Grand Avenue would be suitable as a stabling and maintenance depot for the Parramatta light rail project. There are few engineering and environmental constraints that would affect the feasibility level analysis of this site and all issues identified, within this desk study, are considered to be resolvable. However this being said there is a significant amount of work necessary to reach the final layout and definition of the stabling and maintenance depot. There are numerous items which require further consideration and conformation; planning approvals could impose restrictions on building heights, noise mitigation measures, light and visual impact requirements all of which can have significant impacts on the spatial requirements of any stabling and maintenance depot. 

The acquisition of 4–6 Grand Avenue was not informed by a Property Acquisition Strategy

For major projects, TfNSW typically requires the project team to complete a Property Acquisition Strategy, which is intended to guide both process as well as specific acquisition issues expected to be faced during the project. The Property Acquisition Strategy is not a mandated document but is a recommended tool to support property acquisition as part of major projects.

TfNSW did not have a Property Acquisition Strategy in place to guide the 2015 Expression of Interest process. On 6 November 2015, the then Project Director for the PLR project emailed the property team, noting a need to develop a Property Acquisition Strategy to close off the scoping design and preliminary business case.

In January 2016, TfNSW developed a draft Property Acquisition Strategy for the Parramatta Light Rail Project, although it was silent on the potential sites for the stabling and maintenance facility.

TfNSW focussed on 4–6 Grand Avenue because it was available and aligned to TfNSW's strategic interests

In early 2015, officials commenced monitoring the market for industrial real estate in the Camellia area and surrounds for possible sites for a stabling and maintenance facility.

In March 2015, then owner of the site, Akzo Nobel Pty Limited released the 4–6 Grand Avenue site through an Expression of Interest process managed by CBRE.

TfNSW’s then Deputy Director-General, Planning, sought approval from FIC to lodge an Expression of Interest up to $30.0 million. Approval was sought on the basis that it would ‘provide certainty for the Parramatta Light Rail project by allowing for a depot site in a suitable location and potentially avoid higher costs or longer timeframes associated with compulsory acquisition following completion of the project’s business case’. FIC approved the request at its meeting on 9 April 2015.

At this time, TfNSW had not conducted any analysis of financial or operational benefits and costs of the potential sites identified in earlier feasibility studies. TfNSW staff advised us that the decision to participate in the Expression of Interest process for 4–6 Grand Avenue was because it was available. There is no documentation substantiating this statement, which TfNSW staff provided verbally as part of this audit.

In November 2015, TfNSW was advised that it was unsuccessful in the Expression of Interest process and that Grand 4 Investments (a related entity of Billbergia) had purchased 4–6 Grand Avenue. TfNSW did not conduct any further analysis of alternative potential sites in Camellia between this date and commencing discussions with Grand 4 Investments in April 2016. In that time there had been some movement on other properties that were included in the feasibility study, including 37–39a Grand Avenue being under offer in September 2015.

In March 2016, TfNSW approached CBRE to organise a meeting with Grand 4 Investments. On 1 April 2016, TfNSW met with Grand 4 Investments.

TfNSW advises that a perceived benefit of the 4–6 Grand Avenue site was that it was not subject to other uses or leaseholds that would increase the cost of compulsory acquisition. Officers involved in the acquisition advised that other nominated sites in the feasibility study were subject to other uses or leaseholds. 


1  A hardstand space is a large, paved area to store cars, heavy vehicles and machinery.
2  Officers familiar with the acquisition could not confirm the nature of remediation being undertaken, but noted that the previous landowner had cleared buildings from the site, which may have been considered part of remediation.
TfNSW's independent valuation, which it commissioned and received after the acquisition, specifically excluded consideration of environmental contamination risk. As a result, TfNSW is exposed to the risk that the acquisition was not fully compliant with the Land Acquisition (Just Terms Compensation) Act 1991 (the Act) because it did not use an accurate estimate of market value during negotiations. That said, the acquisition of 4–6 Grand Avenue by agreement was consistent with preferred processes described in the Act.

TfNSW acquired the site from the landowner by agreement, and this is consistent with provisions in the Act. Obtaining approval for compulsory acquisition should negotiations for agreement break down is also consistent with the Act. That said, TfNSW did not at any time assess whether a compulsory acquisition could have resulted in acquisition at a lower cost than what was negotiated by agreement.

Despite the high risks associated with the acquisition, TfNSW did not commission a formal valuation in time to inform the negotiation and purchase. Instead, TfNSW relied on internal advice to estimate market value, but did not obtain a formal valuation from those advisors. For high-risk transactions, the greater expertise and arm's-length independence of an external specialist valuer should be preferred over an agency's own staff.

On 15 June 2016, the settlement date for the acquisition, TfNSW commissioned a formal independent valuation of the site. On 23 November 2016, TfNSW received the final formal valuation report. By not obtaining a formal independent valuation of the property in advance of acquisition to inform the acquisition value, TfNSW exposed itself to non-compliance with the Act by not establishing the market value as the basis for the acquisition price. TfNSW also breached its own internal policies.

TfNSW instructed the valuer to conduct its valuation within the following parameters:

  • Market valuation on an ‘as is’ basis – market value based on the methodology described in the Act. This approach valued the site at $25.0 million.
  • Market valuation on a speculative development basis – market value based on the financial value of the vendor's intended use of the site which, in this case, involved leasing the site for industrial use. This approach valued the site at $52.0 million, and TfNSW advised us this valuation supported the purchase price.
  • Disregard the impact of environmental contamination – TfNSW specifically instructed the independent valuer to disregard any known (or unknown) site contamination. As TfNSW knew of the significant environmental contamination affecting the site, this parameter resulted in a valuation that overstated the value of the site as it did not consider the cost of environmental remediation. The valuer applied this assumption for both market valuation approaches.

Additionally, as the independent valuer completed the valuation after the purchase was finalised, there is a risk that the valuation may have been influenced by the known purchase price.

TfNSW's failure to acquire a formal valuation and an assessment of the financial impact of environmental remediation before it purchased 4–6 Grand Avenue represents ineffective administration and governance.
TfNSW acquired the site at a time when there was demand and increasing prices for industrial property in the area. However, TfNSW did not effectively assess and manage the risks associated with the acquisition, and gaps in process led to increased risk. Briefings to decision-makers did not contain important information, and we found no evidence that gaps in advice were queried or explored by decision-makers.

TfNSW did not have plans or advice in place to assist in managing risk, such as:

  • a property acquisition plan
  • a comprehensive and up-to-date risk management plan
  • a negotiation strategy, or any authorisation limit or minimal acceptable position
  • an independent professional evaluation
  • external expert advice (with the exception of legal advice relating to the contract of sale).

TfNSW was aware of contamination issues affecting the land and had access to considerable information about the environmental conditions, such as site environmental audit reports and information on the NSW Environment Protection Authority's contaminated land register. However, TfNSW had not analysed specific technical information about the contamination and therefore was not aware of the risk implications and cost for remediation. Despite this, TfNSW changed its position from not accepting the risks and costs of contamination, to acquiring the site unconditionally. The basis for this decision is unclear and undocumented.

Briefing to senior leaders on the acquisition was silent on a number of important matters that would have been important for approvers to consider, including:

  • an explanation of the 40 per cent increase in purchase price between November 2015 and May 2016, and a 165 per cent increase from TfNSW’s offer in April 2015
  • the contamination risks associated with the site and an evidence-based estimate of potential costs to remediate the site
  • advice that an independent valuation had not been obtained, inconsistent with TfNSW policy.

Consideration of the acquisition by FIC was based on a summary business paper and was managed out-of-session, thereby removing the ability for comprehensive consideration of the acquisition proposal and its risks.

The probity management controls and assurances in place for the acquisition of the 4–6 Grand Avenue site were insufficient. These insufficiencies were exacerbated by the probity risk profile of the transaction.

The 4–6 Grand Avenue acquisition was a high-risk/high-value transaction, undertaken in a volatile property market in a short timeframe under pressure from Grand 4 Investments. TfNSW was engaging in a direct negotiation in advance of detailed planning for the acquisition, or the PLR as a whole. These circumstances contribute to heightened probity risk.

TfNSW did not establish a probity plan and sought no probity support throughout the acquisition. Also, with one exception, the staff involved in the acquisition did not complete conflict of interest declarations.

TfNSW was aware of the potential for probity or integrity issues with the transaction when it commissioned an internal audit in connection with the transaction in 2019. Internal discussions considered whether a misconduct investigation may be more appropriate, however no such investigation was undertaken.

TfNSW's insufficient probity practices, in addition to its failure to keep complete or comprehensive records of negotiations or decisions, reduce transparency of the process and its outcome and expose TfNSW to a greater risk of misconduct, corruption and maladministration.

At the time of the transaction, the TfNSW policy framework was not sufficiently risk-focussed and did not provide clarity on when officers ought to apply specific guidance or procedures. TfNSW's policies and procedures are more focussed on acquiring land to meet project needs and timeframes, and less on assuring value for money and managing risks.

At the time of its acquisition of 4–6 Grand Avenue, TfNSW had property acquisitions policies and procedures in place. Each of these were broadly sound in their content and intent. However, they lacked specificity on how or when to apply guidance, and when risk levels should elevate the importance of recommended guidance.

TfNSW's key guidance was principles based and relied on agency staff using their experience and expertise to apply guidance according to the circumstances of an individual transaction. This guidance was not duly applied in the acquisition of 4–6 Grand Avenue, Camellia. In addition, TfNSW does not have quality or control assurance to identify when TfNSW officers did not apply important policies or processes.

The primary focus of the TfNSW’s property acquisition guidance is to achieve vacant possession of land in a timeframe that meets the need of the relevant transport project. There is less specific focus on the need to meet the requirements of the NSW Government financial management framework.

Appendix one – Response from agency 

Appendix two – About the audit 

Appendix three – Performance auditing

 

Copyright Notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.