This report outlines the results of audits of the financial statements of agencies now grouped in the NSW Planning, Industry and Environment cluster.
Unqualified audit opinions were issued for 56 of the 66 cluster agencies’ 30 June 2019 financial statements. Ten audits remain incomplete. The cluster agencies need to improve the timeliness of financial reporting.
The Audit Office continued to identify issues regarding unprocessed Aboriginal land claims and the recognition of Crown land. ‘Auditor-General’s reports to parliament have recommended action to reduce the level of unprocessed land claims since 2007. However, the number of unprocessed claims continued to increase’, Margaret Crawford said.
One in five internal control findings were repeat issues. Key themes included information technology, asset management and improvements required to expense and payroll controls.
The report makes several recommendations including:
- Property NSW should urgently address the deficiencies in the lease data used to calculate the impact of the new leasing standard effective from 1 July 2019
- the Department of Planning, Industry and Environment should prioritise action to reduce unprocessed Aboriginal land claims
- the Department of Planning, Industry and Environment should ensure the Crown land database is complete and accurate so state agencies and local government councils are better informed about the Crown land they control.
This report analyses the results of our audits of financial statements of the Planning, Industry and Environment cluster agencies for the year ended 30 June 2019. The table below summarises our key observations.
1. Machinery of Government changes
Creation of the Planning, Industry and Environment cluster |
The Machinery of Government (MoG) changes abolished the former Planning and Environment cluster and former Industry cluster, and created the Planning, Industry and Environment cluster on 1 July 2019. The Department of Planning and Environment (DPE), the Department of Industry (DOI), the Office of Environment and Heritage, and the Office of Local Government were abolished and the majority of their functions were transferred to the new Department of Planning, Industry and Environment (DPIE). |
The Department of Planning, Industry and Environment is still in the process of implementing changes |
The MoG changes bring risks and challenges to the cluster. A MoG Steering Committee, with the support of various project control groups and working groups, identified and developed responses to key risks arising from the changes. However, the DPIE will take some time to fully integrate the policies, systems and processes of the abolished Departments and agencies. |
2. Financial reporting
Audit opinions | Unqualified audit opinions were issued for 56 of the 66 cluster agencies' 30 June 2019 financial statements audits. Ten financial statements audits are still ongoing. |
Timeliness of financial reporting |
Fifty-five of the 57 agencies subject to statutory deadlines submitted their financial statements on time. Due to issues identified during the audit, 13 financial statements audits were not completed and audit opinions issued by the statutory deadline. Agencies prepared and submitted their early close procedures in accordance with the mandatory timeframe set by NSW Treasury. However, 17 of the 49 agencies where we reviewed early close procedures were assessed as either partially addressing or not addressing one or more of the mandatory requirements. The cluster agencies could benefit from an increased focus on early close procedures. |
Introduction of AASB 16 'Leases' |
We noted errors in the lease data used in Property NSW's AASB 16 impact calculations, which affect both Property NSW and other government agencies. These errors were significant enough to present a risk of material misstatements to the financial statements of Property NSW and other government agencies in future reporting periods. We had similar findings in our recent performance audit on 'Property Asset Utilisation', which highlighted issues with the quality of Property NSW's records. Recommendation: Property NSW should urgently address the deficiencies in the lease data used to calculate the impact of the new leasing standard effective from 1 July 2019. |
Unprocessed Aboriginal land claims have continued to increase |
Despite an increase in the number of claims resolved, the number of unprocessed Aboriginal land claims increased by 7.2 per cent from the prior year to 35,855 at 30 June 2019. Claims can be made over Crown land assets of the DPIE or other government agencies. Until claims are resolved, there is an uncertainty over who is entitled to the land and the uses and activities that can be carried out on the land. We first recommended action to address unprocessed claims in 2007. Recommendation (repeat issue): The DPIE should prioritise action to reduce unprocessed Aboriginal land claims. |
3. Audit observations
Internal controls |
One in five internal control issues identified and reported to management in 2018–19 were repeat issues. The lack of user access review was the most common IT general control issue in the cluster. |
Drought relief |
The NSW Government announced an emergency drought relief package of $500 million in 2018, in addition to other financial assistance measures already in place. Limited documentation and written agreements between relevant delivery agencies resulted in a $31.0 million misstatement relating to grant revenue. |
Recognition of Crown land |
Crown land is an important asset of the state. Management and recognition of Crown land assets is weakened when there is confusion over who is responsible for a particular Crown land parcel. Last year we recommended the DOI should ensure the database of Crown land is complete and accurate. While the DOI has commenced actions to improve the database, this continued to be an issue in 2018–19. Recommendation (repeat issue): The DPIE should ensure the Crown land database is complete and accurate so state agencies and local government councils are better informed about the Crown land they control. |
Developer contributions | The former DPE continued to accumulate more developer contributions revenues than it spent on infrastructure projects. Total unspent funds increased to $274 million at 30 June 2019. |
This report provides parliament and other users of the Planning, Industry and Environment cluster agencies financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations.
This cluster was created by the Machinery of Government changes on 1 July 2019. This report is focused on agencies in the Planning, Industry and Environment cluster from 1 July 2019. However, these agencies were all in other clusters during 2018–19. Please refer to the section on Machinery of Government changes for more details.
Machinery of Government (MoG) refers to how the government organises the structures and functions of the public service. MoG changes are where the government reorganises these structures and functions that are given effect by Administrative orders.
The MoG changes, announced following the NSW State election on 23 March 2019, created the Planning, Industry and Environment (PIE) cluster. The Administrative Changes Orders issued on 2 April 2019, 1 May 2019 and 28 June 2019 gave effect to these changes. These orders became effective on 1 July 2019.
Section highlights
The 2019 MoG changes significantly impacted the former Planning and Environment, and Industry clusters and agencies.
- The PIE cluster combines most of the functions and agencies of the former Planning and Environment and Industry clusters from 1 July 2019.
- The Department of Planning, Industry and Environment is the principal agency in the PIE cluster.
- The MoG changes bring risks and challenges to the PIE cluster.
- A MoG Steering Committee was established to oversee the transitional processes.
- The full integration of the systems and processes will not be completed in the near future.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Planning, Industry and Environment (PIE) cluster for 2019. In this chapter, the Department of Planning, Industry and Environment is referred to as DPIE, the former Department of Planning and Environment as DPE, and the former Department of Industry as DOI.
Section highlights
- Unqualified audit opinions were issued for all completed 30 June 2019 financial statements audits. However, some cluster agencies can further enhance the quality of financial reporting.
- Timeliness of financial reporting remains an issue for 13 agencies.
- Deficiencies were identified in the data used to calculate the impact of AASB 16 ‘Leases’ effective from 1 July 2019. Property NSW should urgently address these deficiencies.
- Unprocessed Aboriginal land claims continue to increase. DPIE should prioritise action to reduce unprocessed Aboriginal land claims.
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.
This chapter outlines our audit observations and insights from our financial statement audits of agencies in the Planning, Industry and Environment (PIE) cluster for 2019. In this chapter, the Department of Planning, Industry and Environment is referred to as DPIE, the former Department of Planning and Environment as DPE, and the former Department of Industry as DOI.
Section highlights
- One in five issues identified and reported to management in 2018–19 were repeat issues.
- The lack of user access review was the most common IT general control issue in the PIE cluster.
- The PIE cluster provided significant financial assistance for drought relief.
- There continues to be significant deficiencies in Crown land records. The DPIE should ensure the Crown land database is complete and accurate.
- Unspent developer contributions funds continued to build up in 2018–19.
Appendix one – List of 2019 recommendations
Appendix two – Status of 2018 recommendations
Appendix three – Cluster agencies
Appendix four – Financial data
Appendix five – Management letter findings
Appendix six – Timeliness of financial reporting
Copyright notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Stronger Communities 2019
Stronger Communities 2019
A report has been released on the NSW Stronger Communities cluster.
From 1 July 2019, the functions of the former Department of Justice, the former Department of Family and Community Services and many of the cluster agencies moved to the new Stronger Communities cluster. The Department of Communities and Justice is the principal agency in the new Stronger Communities cluster.
The report focuses on key observations and findings from the most recent financial audits of agencies in the Stronger Communities cluster.
Unqualified audit opinions were issued on the financial statements for all agencies in the cluster.
There were 157 audit findings on internal controls. Two of these were high risk and 59 were repeat findings from previous financial audits. ‘Cluster agencies should prioritise actions to address internal control weaknesses promptly with particular focus given to issues that are assessed as high risk’, the Auditor-General said.
The report notes that the NSW Government’s new workers' compensation legislation, which gave eligible firefighters presumptive rights to workers' compensation, cost emergency services agencies $180 million in 2018–19, mostly in increased premiums.
This report analyses the results of our audits of financial statements of the agencies comprising the Stronger Communities cluster for the year ended 30 June 2019. The table below summarises our key observations.
This report provides parliament and other users of the financial statements of agencies in the Stronger Communities cluster with the results of our audits, our observations, analyses, conclusions and recommendations in the following areas:
- financial reporting
- audit observations.
This cluster was significantly impacted by the Machinery of Government (MoG) changes on 1 July 2019. This report focuses on the agencies that from 1 July 2019, comprised the Stronger Communities cluster. The MoG changes moved some agencies from the clusters to which they belonged in 2018–19 to the Stronger Communities cluster. Conversely, the MoG also moved some agencies formerly in the Family and Community Services cluster and Justice cluster elsewhere. Please refer to the section on Machinery of Government changes for more details.
The Department of Communities and Justice is the principal agency of the cluster. The newly created department combines functions of the former Department of Justice and the Department of Family and Community Services.
Machinery of Government (MoG) refers to how the government organises the structures and functions of the public service. MoG changes occur when the government reorganises these structures and functions and those changes are given effect by Administrative Orders.
The MoG changes announced following the NSW State election on 23 March 2019 significantly impacted the Stronger Communities cluster through Administrative Changes Orders issued on 2 April 2019 and 1 May 2019. These orders took effect on 1 July 2019.
Section highlights
The 2019 MoG changes significantly impacted the former Justice and Family and Community Services (FACS) departments and clusters.
- The Stronger Communities cluster combines most of the functions and agencies of the former Justice and FACS clusters from 1 July 2019.
- The Department of Communities and Justice is now the principal agency in the new cluster.
- The MoG changes bring new responsibilities, risks and challenges to the cluster.
- A temporary office has been established by the Department of Communities and Justice to support the cluster in the planning, delivery and reporting associated with implementing the changes.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations relating to the financial reporting of agencies in the Stronger Communities cluster for 2019.
Section highlights
- Unqualified audit opinions were issued for all agencies' 30 June 2019 financial statements. However, further actions can be taken by some cluster agencies to enhance the quality of their financial reporting.
- In November 2018, the Department of Justice implemented a new Victims Support Services system called VS Connect. Significant data quality issues arising from the VS Connect system implementation impacted the Department's ability to reliably estimate its Victims Support Scheme claims liabilities at 30 June 2019.
We recommend the Department of Communities and Justice resolves the data quality issues in the new VS Connect System before 30 June 2020 and capture and apply lessons learned from recent project implementations, including LifeLink, Justice SAP and VS Connect, in any relevant future implementations. - Our audits found some cluster agencies needed to do more work on their impact assessments and preparedness to implement the new accounting standards, to minimise the risk of errors in their 2019–20 financial statements.
- Cluster agencies with annual leave balances exceeding the State's target should further review their approach to managing leave balances.
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.
This chapter outlines our observations and insights from our financial statement audits of agencies in the Stronger Communities cluster.
Section highlights
- Cluster agencies should action recommendations to address internal control weaknesses promptly. Particular focus should be given to prioritising high risk issues. The 2018–19 financial audits of cluster agencies identified 157 internal control issues. Of these, two were high risk and 37.6 per cent were repeat findings from previous audits.
- Data from the Department of Justice shows the inmate population reached a maximum of 13,798, compared to an operational capacity of 14,626 beds on 31 August 2019. This equates to an operational vacancy rate of 5.7 per cent, which is more than the recommended 5.0 per cent buffer. This is the first time the vacancy rate has exceeded the target over the last five years. Growth in the NSW prison population is being managed through the NSW Government's $3.8 billion Prison Bed Capacity Program.
- In September 2018, the NSW Government introduced new workers' compensation legislation, which gives eligible firefighters presumptive rights to workers' compensation when diagnosed with one of 12 prescribed cancers. The new legislation cost emergency services agencies $180 million in 2018–19, mainly through additional workers' compensation premiums.
Appendix one – Timeliness of financial reporting by agency
Appendix two – Management letter findings by agency
Appendix three – List of 2019 recommendations
Appendix four – Status of 2018 recommendations
Appendix five – Cluster agencies
Copyright notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Workforce reform in three amalgamated councils
Workforce reform in three amalgamated councils
The Inner West Council and the Snowy Monaro and Queanbeyan-Palerang Regional Councils have all made progress towards efficient organisational structures following the amalgamation of their former council areas in 2016, according to a report released today by the Auditor-General of New South Wales.
All three councils are now operating with a single workforce and have largely achieved the milestones they planned for the first stage of their amalgamations. None have finished reviewing and aligning services across their former council areas nor integrated their ICT systems. They need to do this to be in a position to implement an optimal structure.
On 12 May 2016, the NSW Government announced the amalgamation of 42 councils into 19 new councils. This followed a period of 18 months during which the NSW Independent Pricing and Regulatory Tribunal (IPART) had assessed councils' ‘fitness for the future’, and communities were consulted about proposed mergers. A further amalgamated council was created on 9 September 2016.
Upon amalgamation, existing elected councils were abolished, interim General Managers appointed, and Administrators engaged to undertake the role of the previously elected councils until Local Government elections were held 18 months later. During the period of administration, councils were asked to report on the progress of their amalgamations to the Department of Premier and Cabinet (DPC).
Council amalgamations not only require a re-drawing of boundaries, but re-establishment of local representation, decisions about alignment of services across the former council areas, and establishment of an amalgamated workforce.
The objective of this audit was to assess whether three councils, Inner West Council, Queanbeyan-Palerang Regional Council and Snowy Monaro Regional Council, are effectively reforming their organisation structures to realise efficiency benefits from amalgamation and managing the impact on staff.
Following amalgamation, all three councils developed detailed plans to bring their former workforces together, review positions and salaries, amalgamate salary structures and align human resources policies. All three councils have largely achieved the milestones included in these plans.
Benefits realisation plans show that councils did not expect to achieve material savings or efficiencies from workforce reform within the first three years of amalgamation.
Administrators at all three councils endorsed lower savings targets than the NSW Government’s early analysis suggested may be possible. All three councils have plans or strategies to progress and achieve benefits from the amalgamation. However, Inner West Council and Snowy Monaro Regional Council could more clearly link their reform initiatives with expected benefits and include this in public reporting.
Amalgamations represent a substantial period of change for affected communities and amalgamated councils should be routinely reporting to their communities about the costs and benefits of amalgamation.
Councils have not yet determined their future service offerings and service levels nor completed integration of ICT systems. These decisions need to be made before an optimal organisation structure can be implemented.
Before amalgamated councils can implement an optimal organisation structure, they need to review and confirm their customer service offerings and service levels in consultation with their communities. This work is underway but is not yet complete in any of the councils.
Progress towards an efficient structure has been slowed by staff protections in the Local Government Act 1993 (the Act) and a range of logistical and administrative issues associated with amalgamation. These include multiple IT systems and databases that need to be integrated and different working conditions, policies and practices in the former councils that are not yet fully
harmonised.
The councils implemented legislated staff protections and focused on the people side of change but cannot reliably measure the impact of their change management efforts.
The Act provides protections that reduce the impact of amalgamations on staff. Beyond implementing these protections, the councils have communicated with staff, sought to prepare them for change, and involved staff in key decisions. All councils have conducted staff surveys over time. However, at this stage these staff surveys have not provided an effective or reliable measure of the impact of change management efforts.
Appendix one - Response from councils and Office of Local Government
Appendix two - Compliance with staff protections in the Local Government Act 1993
Appendix three - About the audit
Appendix four - Performance auditing
Parliamentary Reference: Report number #317 - released 1 May 2019
Actions for 2016 - An overview
2016 - An overview
This report focuses on key observations and findings from 2016 audits and highlights key areas of focus for financial and performance audits in 2017.
Financial reporting | |
Observation | Conclusion |
Only one qualified audit opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. | The quality of financial reporting continued to improve across the NSW public sector. |
More 2015–16 financial statements and audit opinions were signed within three months of the year end. | Timely financial reporting was facilitated by more agencies resolving significant accounting issues early, completing asset valuations on time and compiling sufficient evidence to support financial statement balances. |
NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues. For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures. |
The narrowed scope of mandatory early close procedures may diminish the good performance in ensuring the quality and timeliness of financial reporting achieved in recent years. To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years. |
Although most agencies complied with NSW Treasury’s early close asset revaluation procedures we identified areas where they can improve. | Asset revaluations need to commence early enough to ensure all assets are identified and the results are analysed, recorded and reflected accurately in the early close financial statements. |
Number of misstatements | |||||
Year ended 30 June | 2015-16 | 2014-15 | 2013-14 | 2012-13 | 2011-12 |
Total reported misstatements | 298 | 396 | 459 | 661 | 1,077 |
All material misstatements identified by agencies and audit teams were corrected before the financial statements and audit opinions were signed. A material misstatement relates to an incorrect amount, classification, presentation or disclosure in the financial statements that could reasonably be expected to influence the economic decisions of users.
Significant matters reported to the portfolio Minister, Treasurer and Agency Head
In 2015–16, we reported the following significant matters to the portfolio Minister, Treasurer and agency head in our Statutory Audit Reports:
Appropriate financial controls help ensure the efficient and effective use of resources and the implementation and administration of agency policies. They are essential for quality and timely decision making.
In 2015–16, our audit teams made the following key observations on the financial controls of NSW public sector agencies.
Financial controls | |
Observation | Conclusion |
More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016. |
Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner. |
Agencies continue to face challenges managing information security. Most information technology issues we identified related to poor IT user administration in areas like password controls and inappropriate access. | Agencies should review the design and effectiveness of information security controls to ensure data is adequately protected. |
We found shared service provider agreements did not always adequately address information security requirements. |
Where agencies use shared service providers they should consider whether the service level arrangements adequately address information security. |
Thirteen of 108 agencies required to attest to having a minimum set of information security controls did not do so in their 2015 annual reports. | The 'NSW Government Digital Information Security Policy' recognises the growing need for effective information security. With cyber security threats continuing to increase as digital services expand we plan to look at cyber security as part of our 2017–18 performance audit program. |
We identified instances where service level agreements with shared service providers were outdated, signed too late or did not exist. | Corporate and shared service arrangements are more effective when service level arrangements are negotiated and signed in time, clearly detail rights and responsibilities and include meaningful KPIs, fee arrangements and dispute resolution processes. |
Internal controls at GovConnect, the private sector provider of transactional and information technology services to many NSW public sector agencies were ineffective in 2015–16. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. | The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector. |
Maintenance backlogs exist in several NSW public sector agencies, including Roads and Maritime Services, Sydney Trains, NSW Health, the Department of Education and the Department of Justice. | To address backlog maintenance it is important for agencies to have asset lifecycle planning strategies that ensure newly built and existing assets are funded and maintained to a desired service level. |
Actions for Building the readiness of the non-government sector for the NDIS
Building the readiness of the non-government sector for the NDIS
The Department of Family and Community Services has managed the risks of the transition to the National Disability Insurance Scheme (NDIS) in New South Wales effectively by increasing the overall capacity of the non-government sector and investing in provider capability.
The National Disability Insurance Scheme (NDIS) is a major reform that aims to change the way disability support is provided and received. Responsibility for overseeing the system to support people with disability in New South Wales will transfer from the NSW Government to the National Disability Insurance Agency (NDIA), an independent statutory agency of the Australian Government. Eligible people with disability will receive individual funding from the NDIA and purchase support from their chosen service providers, rather than being referred to services funded or provided by government. The NSW Government will transfer all disability services it currently provides to the non-government sector.
Approximately 78,000 people received NSW Government-funded disability support in 2015–16 at a cost of around $3.3 billion. An estimated 142,000 people will have an individual NDIS support plan in New South Wales, with total funding rising to around $6.8 billion in 2018–19. NDIS trials began in New South Wales in 2013. The full scheme was introduced in July 2016 and is scheduled to be operating across the state by July 2018.
This audit assessed the effectiveness of the NSW Department of Family and Community Services' (the Department's) management of the risks of the NDIS transition in New South Wales. It focused on the Department's work to build the readiness of the non-government sector for the NDIS. To make this assessment, we asked whether:
- the Department supported the non-government sector to build capacity to meet the expected increase in demand under the NDIS
- the Department supported disability service providers in NSW to improve their capability to deliver NDIS services
- the Department's work to prepare for the NDIS has been coordinated with the Australian Government's NDIS readiness work.
In addition to the audit questions above, this audit identified principles governments should consider when building the capacity and capability of the non-government sector to deliver human services.
Conclusion
The Department of Family and Community Services has managed the risks of the transition to the NDIS in New South Wales effectively by increasing the overall capacity of the sector and investing in provider capability building initiatives. More work is needed to build the sector's capacity to provide services to people with more complex support needs and to help existing providers complete the transition to the NDIS successfully.
The Department expanded the capacity of the non-government sector over the past decade in a way that was consistent with NDIS objectives. The development of a national market and workforce for the NDIS is an Australian Government responsibility and the Department has supported the Australian Government's work. More targeted work will be needed to build the capacity of the non-government sector to provide services to people with the most complex support and access needs.
The Department invested in provider capability building by funding programs that were delivered in partnership with sector peak bodies. The larger programs were evaluated and received positive feedback, but many providers will need more support to transition to the NDIS. The overall impact of the programs on provider readiness for the NDIS is not clear because baseline information on provider capability was not collected and targets for improvement were not set.
The Department managed the transition coordination risks by establishing comprehensive governance arrangements, contributing to the Australian Government's sector development work through national policy coordination forums and sharing lessons from New South Wales.
Building the capacity of the non-government sector
The Department supported an increase in the capacity of non-government providers
The Department started building the capacity of the non-government sector before the NDIS was developed. This included moving services provided by government into the non‑government sector, funding early intervention and community-based disability support, and introducing some individual support packages. The Department checks that the business and operational systems of non-government disability providers are adequate. However, its understanding of the outcomes for people using the services is limited.
Service gaps are possible for people with more complex support or access needs
There are risks to the supply of services to people who have more complex support or access needs, including people who need specialist clinical support, people in remote areas, Aboriginal and Torres Strait Islander communities and culturally and linguistically diverse communities. The Department has supported the NDIA's initial market development work and funded some programs to help providers build their capacity to support these groups. However, there is a risk the market will not expand quickly enough to meet the increase in demand for services.
Sector sustainability depends on support from outside the disability services sector
The sustainability of funded disability services provided by the non-government sector depends on support from outside the sector. Most people with disability receive significant unpaid support from family members, so carers will play a key role in the sustainability of the NDIS. There are opportunities for organisations that do not provide specific disability services to contribute to sector sustainability by providing some NDIS services. To do this, many will need help to make their services more accessible and inclusive to people with disability.
Helping non-government providers develop their capability
The Department invested in capability building programs for providers
The Department has spent more than $30 million over six years on programs that aim to improve the capability of disability support providers. This work began before the NDIS was established and was adjusted to focus on NDIS readiness from December 2012. It was guided by an industry development strategy that was developed after consultation with the sector and delivered in partnership with sector peak bodies. This approach gave the sector some responsibility for developing its own capability, which is important because the sector will not receive support from the NSW Government after the transition to the NDIS.
The overall impact of the programs on the capability of providers is not clear
The overall effectiveness of the Department's spending on provider capability is not clear. The Department had some information on the general financial health and organisational capability of providers from previous industry development work. However, baseline information on provider capability was not collected before programs commenced and targets for improvements in provider capability were not set. Without this information, the Department cannot demonstrate clearly that the capability building programs it funded represent good value for money.
Most providers will need more support to transition to the NDIS effectively
In late 2015, the Department assessed the transition progress of providers in New South Wales. This assessment indicates almost one third of providers are highly likely to need additional assistance to transition to the NDIS successfully, with only 14 per cent unlikely to need further assistance. We conducted a survey of 299 providers in New South Wales in August 2016. Most reported that they feel they are on track to transition to the NDIS successfully. Sixty-two per cent said the Department-funded programs and resources they had used had improved their readiness for the NDIS. Fifty-four per cent said the changes made because of using these programs and resources had a lasting impact on their organisation.
Coordinating sector development
Governance systems and planning processes for the NDIS transition were established
The Department developed governance arrangements for the transition in New South Wales. It contributed actively to the development of national policy and strategy documents including a strategy for national market development.
The Department shared sector readiness lessons with the Australian Government
Two NDIS sector readiness programs funded by the NSW Government were later expanded to national programs through funding from the Australian Government. New South Wales only received around five per cent of the total Australian Government funding for NDIS sector readiness initiatives. A report by the Australian National Audit Office in 2016 found there was limited evidence of a strategic approach by the Australian Government when allocating this funding to states and territories.
The Department has monitored transition issues and mitigated these where possible
The Department has monitored administrative issues for providers, which have included the changes in funding arrangements and registering for the NDIS. It has taken action to mitigate these where possible, although some issues, such as the operation of NDIA administrative systems, are beyond its control.
The National Disability Insurance Scheme (NDIS)
The NDIS is a fundamental change to the disability support system
The NDIS is a major reform that aims to make significant changes to the way disability support is provided and received. Under the NDIS, the administration of funding for disability support in New South Wales will transfer from the NSW Government to the National Disability Insurance Agency (NDIA), an independent statutory agency of the Australian Government. The NSW and Australian Governments will both contribute to funding the NDIS. The size of the disability services sector in New South Wales is expected to more than double when the NDIS is fully operational (Exhibit 1).
Measure of sector capacity | Pre-NDIS (2015-16) | NDIS (2018-19) |
---|---|---|
Funding for services | $3.3 billion | $6.8 billion |
People receiving support | 78,000 | 142,000 |
Workforce required | 25,000-30,000 | 48,000-59,000 |
Number of providers | 699 | Determined by the market |
One of the main objectives of the NDIS is to increase the choice and control that people with disability have over the support they receive. Under the NDIS, people with disability receive individual funding packages which they can use to pay their chosen providers for the support they need, instead of being referred to services that are deemed appropriate for their needs. This is a fundamental change to the nature of disability support. Before the NDIS, people with disability were moved around the system according to decisions made by government or other organisations providing disability support. Under the NDIS, the funding will move around the system based on the choices people with disability make. The development of the new market for NDIS disability services is expected to take up to ten years because the changes to the system are so extensive.
In addition to increasing choice and control for participants, the NDIS aims to:
- improve outcomes for people with disability by intervening early to help reduce the need for support later in life
- increase integration by helping people with disability access mainstream government services such as health and education
- increase the involvement of people with disability in the community by making it easier to access community services such as sports clubs and community groups.
The transition to the NDIS is underway
The transition to the NDIS is underway in most Australian states and territories, following trials over the last three years. In New South Wales, a trial site was established in the Hunter area in July 2013. Early roll out of the NDIS began in July 2015 for people aged under 18 in the Nepean Blue Mountains area. On 30 June 2016, about 7,800 people had an NDIS plan in the Hunter trial site and around 1,800 people had a plan in the Nepean Blue Mountains area.
The full roll out of the NDIS began in about half of New South Wales in July 2016. The NDIS will start operating in the rest of the state from July 2017 and the transition is scheduled to be completed by July 2018 (Exhibit 2).
For the rest of the transition, the Department of Family and Community Services should:
- Work with the Australian Government, NDIA and other NSW Government agencies to identify gaps and develop the capacity of specialist clinical services, focusing on regional and rural areas.
- Continue to implement projects to increase the number of organisations that can support Aboriginal and Torres Strait Islander and culturally and linguistically diverse communities.
- Target remaining capability building assistance to less prepared providers, including via one-to-one support and mentoring in identified areas of weakness.
- Continue working with the Australian Government and the NDIA to ensure lessons from sector capability programs are shared.
Principles for developing the non-government sector
- Commence work to increase the capacity of the non-government sector early to allow time for service capacity to be built in a sustainable way.
- Decide whether to increase the capacity of the sector by supporting existing providers to expand their operations, attracting new organisations from outside the existing provider group, or some combination of these.
- Tailor approaches to supporting groups that have additional support or access needs because of cultural or geographic factors.
- Define the desired outcomes for people using services and, where possible, include outcomes in service delivery contracts.
- Invest in the sector by partnering with sector peak bodies to deliver capability programs.
- Include one-to-one support and mentoring in capability building programs where possible to improve the targeting of support to the specific needs of providers.
- Collect baseline information on provider capability before commencing programs and build robust tracking and evaluation into their design.
- Establish whole-of-government governance arrangements to ensure roles, responsibilities and accountability for delivery are clear.
Parliamentary reference - Report number #280 - released 23 February 2017
Actions for Implementation of the NSW Government’s program evaluation initiative
Implementation of the NSW Government’s program evaluation initiative
The NSW Government’s ‘program evaluation initiative’, introduced to assess whether service delivery programs achieve expected outcomes and value for money, is largely ineffective according to a report released today by NSW Auditor-General, Margaret Crawford.
Government services, in areas such as public order and safety, health and education, are delivered by agencies through a variety of programs. In 2016–17, the NSW Government estimates that it will spend over $73 billion on programs to deliver services.
Parliamentary reference - Report number #277 - released 3 November 2016
Actions for Public sector management reforms
Public sector management reforms
The Public Service Commission is making good progress with leading the implementation of public sector management reforms, according to a report released today by the Acting New South Wales Auditor-General, Tony Whitfield.
'The Commission developed a sound evidence base for the reforms and gained wide public sector support by engaging with agency heads and using public sector working groups to develop options', said the Acting Auditor-General. 'They developed good guidance for government agencies and have improved the senior executive structure in the NSW public sector', he added.
Parliamentary reference - Report number #264 - released 28 January 2016
Actions for Volume Nine 2012 focusing on Education and Communities
Volume Nine 2012 focusing on Education and Communities
In New South Wales in 2011, around 20 per cent of public school teachers were under 35 and less than 10 per cent were under 30. Nothing has changed during 2012. We need to do more to attract and retain young teachers to a profession that is essential for our children and our future prosperity.