Refine search Expand filter

Reports

Published

Actions for Treasury 2022

Treasury 2022

Treasury
Asset valuation
Compliance
Cyber security
Financial reporting
Information technology
Internal controls and governance
Management and administration
Procurement
Regulation
Risk
Service delivery
Shared services and collaboration

What the report is about

Results of the Treasury cluster agencies' financial statement audits for the year ended 30 June 2022.

The results of the audit of the NSW Government's consolidated Total State Sector Accounts (TSSA), which is prepared by NSW Treasury, are reported separately in our report on 'State Finances 2022'.

What we found

Unmodified audit opinions were issued on all 30 June 2022 general purpose financial statement audits.

Qualified audit opinions were issued on three of the 25 other engagements prepared by cluster agencies. These related to payments made from Special Deposit Accounts (SDA) that did not comply with the relevant legislation.

What the key issues were

Commercial agreements were signed between TAHE, the operators and Transport for NSW in June 2022, which reflected an expected rate of return of 2.5% on contributed equity. However, it remains critical that the government continue to provide sufficient funding to the operators so they can pay for access and use TAHE assets. These findings are reported in our report on 'State Finances 2022'.

Eight high-risk issues were raised in 2021–22, of which five relate to NSW Treasury.

A number of previously reported audit findings and recommendations with respect to icare continue to be ongoing issues. This includes the Workers Compensation Nominal Insurer continuing to hold less assets than the estimated present value of its future payment obligations, when measured in accordance with the accounting framework.

What we recommended

Our report on 'State Finances 2022' made several recommendations to improve NSW Treasury's processes.

In this report, we recommended icare should ensure:

  • it has sufficient controls in place over claim payments, including an effective quality assurance program, to minimise claim payment errors
  • that documentation to support PIAWE calculations is appropriately maintained, and that the minimum documentation requirements are set out in a policy.

This report provides Parliament and other users of the Treasury cluster’s financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Treasury cluster (the cluster) for 2022.

Section highlights

  • Unqualified audit opinions were issued on the general purpose financial statements of all cluster agencies.
  • A qualified opinion was issued on the NSW Government's consolidated Total State Sector Accounts (TSSA), which are prepared by NSW Treasury. This is reported separately in our 'State Finances 2022' NSW Auditor-General's Report to Parliament.
  • Three qualified audit opinions were issued on special purpose financial reports, relating to whether payments from the funds complied with the relevant legislation.
  • Reported corrected misstatements increased from seven in 2020–21 to ten in 2021–22 with a gross value of $808.6 million. Reported uncorrected misstatements decreased from 17 in 2020–21 to 11 in 2021–22 with a gross value of $85.7 million.
  • Nine of 15 cluster agencies either did not submit or did not complete certain mandatory early close procedures on time.
  • NSW Treasury corrected a $39.7 million prior period error retrospectively in the financial statements as it overstated its accrual at 30 June 2021 relating to hotel quarantine costs.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Treasury cluster.

Section highlights

  • Eight high-risk issues were identified in 2021–22, an increase from four high-risk and one extreme risk in 2020–21. A further 31 moderate risk findings were reported in 2021–22, of which 12 were repeat findings.
  • Inconsistencies in the Government Sector Finance Act 2018 (GSF Act) and Government Sector Audit Act 1983 (GSA Act) relating to key statutory timeframes have been addressed.
  • Further to last year's reporting, some agencies have again spent moneys without an authorised delegation. 
  • There was a lack of quality review of submissions for audit by NSW Treasury.
  • The Nominal Insurer's net assets decreased from a $2.5 billion surplus at 30 June 2018, to a $1.2 billion deficiency at 30 June 2022.
  • The Nominal Insurer's return-to-work rates stabilised, but remain below the performance levels prior to the COVID-19 pandemic.
  • The Nominal Insurer paid $29.5 million in 2021–22 to remediate historical underpayment of compensation benefits to workers (Pre-Injury Average Weekly Earnings (PIAWE) payments), and a further $8.5 million was payable at 30 June 2022.
  • During its review of historical PIAWE errors, icare found that indexation may have been incorrectly applied, or failed to have been applied when determining injured worker entitlements within the Nominal Insurer between 2012 and 2019. Based on calculations provided by icare, the Audit Office reported an uncorrected judgemental misstatement of $28.5 million (understatement).

Appendix one – Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

Appendix five – Acquittals and other opinions

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for State Finances 2022

State Finances 2022

Treasury
Whole of Government
Asset valuation
Compliance
Cyber security
Financial reporting
Infrastructure
Internal controls and governance
Management and administration
Regulation
Risk

What the report is about

Results of the 2021–22 consolidated General Government Sector (GGS) and Total State Sector (TSS) financial statements audits.

What we found

The Independent Auditor’s Report on the 2021–22 GGS and TSS financial statements was modified with a limitation of scope and also contained an emphasis of matter.

The opinion in the TSS Independent Auditor’s Report was modified with a limitation of scope on certain balances consolidated in the TSS financial statements because the Catholic Metropolitan Cemeteries Trust (CMCT) denied access to its management, books and records for the purpose of conducting a financial audit.

The Independent Auditor’s Report also includes an emphasis of matter drawing attention to the significant uncertainties associated with the GGS’s equity investment in Transport Asset Holding Entity (TAHE). The significant uncertainty relates to key assumptions and estimates used to forecast a 2.5% return from GGS investments into TAHE that supports the accounting treatment as an equity injection, including:

  • funding to support the Rail Operators to pay TAHE’s contracted and forecast access and licence fees up until 2045–46. The Rail Operators are dependent on funding from the GGS to pay access and licence fees. Forecast modelling notes a requirement of a further $10.2 billion in budget funding to pay TAHE to the end of the ten-year contract period in 2030–31, in addition to the $5.5 billion allocated in the forward estimates and up to $50.8 billion for the period 2032 to 2046
  • a significant portion of the projected returns are earnt outside of the ten-year contract period and there is a risk that TAHE may not be able to recontract fees at levels consistent with current projections.

What we recommended

The report includes a number of recommendations including:

  • continued monitoring that TAHE controls the reported assets ensuring the CMCT, Category 2 Statutory Land Managers (SLM) and Commons Trusts meet their statutory reporting obligations
  • ensuring accounting and audit position papers are sufficiently consulted with key stakeholders and are concluded on a timely basis
  • ensuring agencies support the timely conclusion of audits by bringing to the auditors' attention key Cabinet records and identifying references relating to accounting issues impacting the financial statements
  • for Special Deposit Accounts (SDA) responsible managers should ensure amounts appropriated under any Act or law for payment into the account are appropriately recorded, ensuring payments from SDAs are allowable and made in accordance with Treasurer's delegations and standing authorisation.
Image
Margaret Crawford, Auditor-General for New South Wales

Pursuant to section 52A of the Government Sector Audit Act 1983 I am pleased to present my Auditor-General’s Report on State Finances 2022.

Once again this year has presented considerable challenges for the state sector and my Office as we collectively grapple with uncertainties related to COVID-19 and the disruption of emergency events impacting New South Wales. In addition, there were many recommendations arising from last year’s audit to be addressed.

While there is more to do to ensure good financial stewardship of the State, resolution of matters was helped by constructive engagement with the NSW Treasury at the most senior levels. Personally I wish to thank the Treasurer and Secretary for their commitment to instilling integrity in financial management systems and processes. The support Treasury provided for recent amendments to the Government Sector Audit Act 1983 to provide ‘follow the dollar’ powers and other changes recommended by the Public Accounts Committee quadrennial review of my Office is also acknowledged.

Finally I want to thank the teams that contributed to this year’s audit of the Total State Accounts for their diligence, professionalism and commitment. I am very proud of your work.

Margaret Crawford

Auditor-General for New South Wales

The Independent Auditor's Report was qualified and also included an emphasis of matter

The audit opinion on the State's 2021–22 financial statements was modified. The delayed signing of the NSW Total State Sector Accounts (TSSA) by NSW Treasury was in order to resolve significant accounting issues that were material to the TSSA. The key areas requiring significant audit effort included reviewing the State's accounting for TCorp Investment Management (IM) Funds and responding to the risks related to the Catholic Metropolitan Cemeteries Trust (CMCT) denying access to its management and books and records, which is detailed in this Report.

NSW Treasury aimed to sign the TSSA by 19 October 2022. This was delayed by nearly six weeks and the TSSA audit opinion was subsequently signed on the statutory deadline imposed on the Treasurer for tabling of the TSSA in the Legislative Assembly of 30 November 2022.

The Independent Auditor’s Report was modified due to a limitation of scope on the balances consolidated in the TSSA relating to the CMCT

The opinion in the Independent Auditor’s Report was modified with a limitation of scope due to the inability to access management, books and records of a controlled entity, the CMCT.

This year, NSW Treasury, after reconsidering all facts and the perspectives of the CMCT, reconfirmed that the CMCT is a controlled entity of the State for financial reporting purposes. This means CMCT is a GSF agency under the provisions of the Government Sector Finance Act 2018 (GSF Act). As such NSW Treasury is required by Australian Accounting Standards to consolidate the CMCT into the Total State Sector Accounts (TSSA). The value of assets and liabilities of CMCT consolidated into the TSSA is $310.3 million and $15.1 million, respectively, and the loss of CMCT consolidated into the TSSA for the year is $2.4 million.

To date, CMCT has not met its statutory obligations to prepare financial statements under the GSF Act and give them to the Auditor-General. CMCT has not submitted its financial statements to the Auditor-General for audit as required despite repeated requests and has not provided access to its books and records for the purposes of a financial audit. The Secretary of the Department of Planning and Environment wrote to CMCT to request it work with, and offer full assistance to, the Auditor-General in the exercise of her duties.

NSW Treasury has met with and considered CMCT's perspectives. NSW Treasury’s position remains that CMCT is a controlled entity of the State for financial reporting purposes. Consequently, CMCT has not met its statutory obligations as a controlled entity to submit its financial statements for audit and provide access to its books and records. Therefore, the Audit Office was unable to obtain sufficient appropriate audit evidence about the carrying amount of assets and liabilities consolidated into the Total State Sector Accounts as at 30 June 2022 and of the amount of income and expenses for the year then ended. Accordingly a modified audit opinion was issued on the NSW Government's 2021–22 consolidated financial statements.

Section 3 of this report titled 'Limitation of Scope relating to CMCT' discusses this matter in further detail.

An emphasis of matter drawing attention to uncertainty relating to the General Government Sector's investment in the Transport Asset Holding Entity (TAHE) remains

The Independent Auditor’s Report also includes an emphasis of matter, drawing attention to the significant uncertainties associated with the General Government Sector's (GGS) equity investment in TAHE. The significant uncertainty relates to key assumptions used to forecast returns from investments into TAHE in order to support the recognition of the government's funding of TAHE as an equity injection.

At the time of signing the Independent Auditor's Report, there was significant uncertainty with regards to assumptions and estimates used to forecast a return from the GGS investment into TAHE, which supports the recognition of an equity injection. There is significant uncertainty relating to:

  • the 2022–23 Budget committed $5.5 billion to fund TAHE's key customers, Sydney Trains and NSW Trains (the operators), to support their payment of access and licence fees agreed on 23 June 2022. However, this funding only extends out to the end of the forward estimates period in 2025–26, which falls short of the ten-year contractual periods to 2030–31 and the projected period to 2045–46 to achieve a 2.5% return from the government's equity investment. The government will need to fund the operators an additional $10.2 billion in Budget funding so that they can meet their contractual obligations to TAHE from 2026–27 to 2030–31, and a further projected funding of $50.8 billion from 2031 to 2046. This additional funding is not within the government's published Budget figures, leading to uncertainty on whether the government-funded operators can pay access and licence fees beyond the forward estimates period of 2025–26
  • a significant portion of the projected returns are earnt outside the ten-year contract period (terminating 30 June 2031) and there is a risk that TAHE will not be able to recontract for access and licence fees at a level that is consistent with current projections. There is also a risk that funding for TAHE's key customers will not be sufficient to fund payment of access and licence fees at a level that is consistent with current projections.

The 'State Finances 2021' report made recommendations regarding the significant accounting issues relating to TAHE. The State's response to these recommendations are detailed in Section 4 of this report titled ‘Investment in the Transport Asset Holding Entity’. Other significant matters related to the TSSA audit are covered in Section 8 titled ‘Key audit findings’.

Other financial reporting matters

All government agencies were granted an extra week to submit financial statements for audit

A one-week extension provided agencies across the sector with additional time to resolve key accounting issues and submit financial statements for audit by 1 August 2022.

Further extensions were approved for the following seven agencies (ten in 2020–21):

  • State Insurance Regulatory Authority (3 August 2022)
  • Dams Safety NSW (8 August 2022)
  • Jenolan Caves Reserve Trust (8 August 2022)
  • Transport for NSW (8 August 2022)
  • Department of Enterprise, Investment and Trade (22 August 2022)
  • Transport Asset Holding Entity (22 August 2022)
  • Department of Transport (26 August 2022).

Additional extensions provided agencies with more time to complete:

  • asset valuations
  • valuations of actuarially assessed liabilities.

An initial draft of the TSSA was provided to audit on 15 September 2022. This version was incomplete and excluded the impact of consolidating the State's TCorp IM funds under the correct Australian Accounting Standards. An additional three versions of the draft TSSA were provided to audit progressively to update the TCorp IM fund consolidated balances. The final complete version of the TSSA was submitted on 27 October 2022 which included all adjustments relating to the TCorp IM fund consolidation. Refer to section 8.1 for more details on the material restatements relating to the consolidation of the TCorp IM funds.

In 2021–22, agency financial statements presented for audit contained 20 errors exceeding $20 million (24 in 2020–21). The total value of these errors was $973 million, a decrease from the previous year ($6.6 billion in 2020–21).

The graph below shows the number of reported errors exceeding $20 million over the past five years in agencies’ financial statements presented for audit.

The errors resulted from:

  • incorrect application of Australian Accounting Standards and NSW Treasury policies
  • incorrect judgements and assumptions when valuing non-current physical assets and liabilities.

NSW Treasury concluded CMCT is a controlled entity of the State

In response to our recommendation in the ‘State Finances 2021’ report, NSW Treasury reconfirmed that the Catholic Metropolitan Cemeteries Trust (CMCT) is a controlled entity of the State. The Audit Office accepted the position of NSW Treasury.

The reaffirmation of this position means CMCT is a GSF agency under the provisions of the Government Sector Finance Act 2018 (GSF Act). Section 7.6 of the GSF Act places an obligation on CMCT to prepare financial statements and give them to the Auditor-General. Further, section 34 of the Government Sector Audit Act 1983 (the GSA Act) requires the Auditor-General to furnish an audit report on these financial statements.

To date, CMCT has not met its statutory obligations to prepare financial statements under the GSF Act and give them to the Auditor-General. CMCT has not submitted their financial statements to the Auditor-General for audit despite repeated requests and has not provided access to its books and records for the purposes of a financial audit. There was extensive correspondence between the Audit Office of NSW, CMCT, NSW Treasury and the Department of Planning and Environment in 2022 regarding this matter.

Recommendation

NSW Treasury and the Department of Planning and Environment should ensure the Catholic Metropolitan Cemeteries Trust meets its statutory reporting obligations.

In addition, on 10 December 2021, the then Minister for Water, Property and Housing wrote to the Auditor-General requesting a financial and performance audit be performed pursuant to section 27B(3)(c) of the GSA Act. The audit would cover the financial affairs of CMCT, including whether funds have been used for the proper purpose. The Audit Office of New South Wales has written to CMCT on a number of occasions to request the provision of documentation and access to management in order to conduct the performance audit. CMCT has not provided the Audit Office of New South Wales access to its management, books and records for the purpose of the required performance audit.

NSW Treasury has met with and considered CMCT's perspectives. NSW Treasury’s position remains that CMCT is a controlled entity of the State for financial reporting purposes. Consequently, CMCT did not meet its statutory obligations as a controlled entity to submit its financial statements for audit and provide access to its books and records.

The TSSA audit opinion included a limitation of scope

The opinion in the TSSA Independent Auditor’s Report was modified with a limitation of scope due to an inability to access management and the books and records of CMCT. This limitation was appropriately disclosed in Note 1 'Statement of Significant Accounting Policies' of the TSSA. The Statement of Compliance signed by the Secretary of Treasury and the Treasurer on 29 November 2022 was also updated to acknowledge the disclosure in Note 1 regarding CMCT.

The Audit Office was unable to obtain sufficient appropriate audit evidence about the carrying amount of assets and liabilities consolidated into the Total State Sector Accounts as at 30 June 2022 and of the amount of income and expenses for the year then ended. Accordingly a modified audit opinion was issued on the NSW Government's 2021–22 consolidated financial statements.

The process of information sharing by NSW Treasury continues to require improvement

In last year’s ‘State Finances 2021’ report an extreme risk management letter finding was reported for NSW Treasury to ensure it significantly improve its processes so that all relevant information is identified and shared with the Audit Office to support material transactions and balances of the State.

A number of events reconfirmed that NSW Treasury needs to continue improving its process with respect to information sharing with the Audit Office. Notably, NSW Treasury’s finance team had not demonstrated that all available information (on their systems) was considered by them when assessing the State’s control over CMCT.

Critical information relating to CMCT was in the possession of NSW Treasury since late October 2021 but not considered when reconfirming their accounting position on the State's control of CMCT this year. A further reconfirmation of the State's control over CMCT was needed by NSW Treasury to ensure this information was considered in their accounting assessment.

The above demonstrates that more effective consultation is required by NSW Treasury with key stakeholders to ensure all information relevant to forming an accounting position relating to the TSSA is captured. This will ensure new information is not identified late in the audit process and NSW Treasury considers all information when concluding on the accounting position of the State.

Recommendation

NSW Treasury should ensure when drafting position papers and concluding on accounting issues impacting the State, these are provided to audit on a timely basis and reflect a complete and accurate understanding of the key public sector issues being considered.

Last year's report highlighted that NSW Government actions avoided a qualified opinion in 2020–21 relating to the General Government Sector's $2.4 billion cash contribution to Transport Asset Holding Entity (TAHE). These actions included the NSW Government agreeing to provide additional future funding to TAHE's key government customers Sydney Trains and NSW Trains (the operators) to support increases in access and licence fees to be paid to TAHE.

The additional funding by the government was necessary to demonstrate that a reasonable expectation of a sufficient rate of return would be earned on its equity invested in TAHE. Last year, there was no government policy on what the minimum return should be on investments in other public sector entities, so the long-term inflation rate was used as a benchmark. A recommendation was made in last year's State Finances report that NSW Treasury establish a policy on the minimum expected return from its investments.

On 6 September 2022, NSW Treasury finalised its policy relating to the government’s returns on equity investments. The application of this policy is limited to State Owned Corporations and similar to the Commonwealth framework for commercial businesses, which requires the expected return be at least equal to the long-term inflation rate.

The government's commitment to additional funding was conveyed last year through revised shareholder expectations being published in the 2021–22 'NSW Budget-Half yearly Review' on 16 December 2021, increasing the expected returns on equity from 1.5% to the expected long-term inflation rate of 2.5%. On 18 December 2021, Transport for NSW (TfNSW) and the operators entered into a Heads of Agreement (HoA). This formed the basis of negotiations to revise the pricing within the existing ten-year contracts and deliver upon the shareholders’ expected return of 2.5% on contributed equity to be earned over the estimated weighted average remaining useful lives of TAHE's assets.

Further information on last year's audit of the government’s investment in TAHE can be found in our 'State Finances 2021' report.

Ten-year commercial agreements were signed between TAHE, operators and TfNSW

Last year's State Finances report recommended that NSW Treasury facilitate revised commercial agreements to reflect the access and licence fees detailed in the HoA. As these agreements were not executed by 30 June 2021, last year's audit opinion of the Total State Sector Accounts (TSSA) included an Emphasis of Matter drawing attention to the uncertainty that existed at balance date as these agreements were not finalised.

On 23 June 2022, commercial agreements were signed between TAHE, the operators and Transport for NSW through a deed of variation. The revised access and licence fees for the ten-year period 2021–22 to 2030–31 was $16.6 billion, which is $520 million less than the HoA fees of $17.1 billion.

Comparison FY22
$m
FY23
$m
FY24
$m
FY25
$m
FY26
$m
FY27
$m
FY28
$m
FY29
$m
FY30
$m
FY31
$m
Total
$m
Revised commercial agreements 641.1 911.8 1,298.1 1,585 1,807.3 1,921.8 1,992 2,065.4 2,139.1 2,252.8 16,614.4
HoA 679.9 1,081.4 1,236 1,398.9 1,645.8 1,826.1 2,023.3 2,209.4 2,404.5 2,629.2 17,134.6
Difference (38.8) (169.6) 62.1 186.1 161.5 95.7 (31.3) (144) (265.4) (376.4) (520.2)

TAHE's main customers principally rely on government funding to pay access and licence fees

Whilst TAHE has agreed ten-year access and licence fees of $16.6 billion with its two main customers Sydney Trains and NSW Trains, these two operators significantly rely on government funding when making these payments to TAHE. At 30 June 2022, TAHE's expected return of 2.5% is contingent upon the GGS funding the operators to support their payment of access and licence fees that have been agreed with TAHE for the ten-year contracted period and for non-contracted periods from 2031–32 to 2045–46.

The 2022–23 NSW Budget has allocated $5.5 billion to fund the operators, to support their payment of access and licence fees. However, this funding extends to the end of the forward estimates period in 2025–26, which falls short of the ten-year contractual period to 2030–2031 and the projected period to 2045–46 to achieve the 2.5% return.

  2022–261
$b
2027–20312
$b
2032–46
$b
Total
$b
Access and licence fees3 5.5 10.2 50.8 66.5

1 Represents the 2022–23 Budget year and three-year forward estimates which includes: FY2024–26.
2 Whilst excluded from the 2022–23 NSW Budget, these access and licence fees are included in the ten-year commercial agreement between TAHE, operators and TfNSW.
3 Represents cumulative access and licence fees for the period stated.

The government will need to fund the operators an additional $10.2 billion in budget funding to meet their contractual obligations to TAHE from 2026–27 to 2030–2031, and a further projected funding of $50.8 billion from 2032 to 2046. This is needed to ensure the government continues to demonstrate its expected return on investment of 2.5%. This additional funding is not within the government's published 2022–23 NSW Budget figures, leading to uncertainty on whether the government funded operators can pay access and licence fees beyond the forward estimate period of 2025–26.

Significant funding uncertainties remain

While the ten-year access and licence fee agreements were communicated to the NSW Government's Expenditure Review Committee, it is yet to be fully provided for in the government's budget figures. As TAHE's projections are highly dependent on the operators as its key customers, it remains critical that the government continue to provide sufficient funding to the operators so they can pay for access and use of TAHE assets. This means the significant funding uncertainties reported in last year's TSSA audit opinion remain for 2021–22.

The government has estimated $37.9 billion in returns (equivalent to 2.5% on contributed equity) is to be earned from its investment in TAHE over the period from 1 July 2022 to 30 June 2046. As previously reported, TAHE derives most of its revenue from access and licence fee agreements from the operators, who in turn are both funded by grants through TfNSW from the GGS. More than 95% of these returns are estimated to be earned outside of the ten-year contract period (terminating 30 June 2031).

  2022–261
$b
2027–20312
$b
2032–46
$b
Total
$b
Returns to GGS 1.8 4.7 31.5 37.9

1 Represents the 2022–23 budget year and three-year forward estimates which includes: 2023–24, 2024–25 and 2025–26.
2 Whilst excluded from the 2022–23 NSW Budget, these access and licence fees are included in the ten-year commercial agreement between TAHE, operators and TfNSW.

There remains risk that:

  • TAHE will not be able to recontract for access and licence fees at a level that is consistent with current projections
  • future governments' funding to TAHE's key customers will not be sufficient to fund payment of access and licence fees at a level that is consistent with current projections
  • TAHE will be unable to grow its non-government revenues.

This significant funding uncertainty was also reported in last year's TSSA audit opinion and will remain for 2021–22.

In 2021–22, TAHE and NSW Treasury prepared further modelling to support the Government's intent to earn a 2.5% return inclusive of recovering the holding (revaluation) loss of $20.3 billion on its investment in TAHE

Last year's State Finances report highlighted that NSW Treasury, with TAHE, should prepare robust projections and business plans to support the expected returns forecast beyond FY2031.

This year TAHE engaged an expert to help develop a model demonstrating the government's expected returns from its investment in TAHE. The model mathematically forecasts that returns of 2.5% will be achieved by 2046 and this will include recovery of the revaluation losses of $20.3 billion relating to 2020–21.

The current model includes some key assumptions:

  • The main source of revenue is the access and licence fees expected from the two public rail operators (Sydney Trains and NSW Trains) contributing to more than 80% of TAHE's projected revenue. The rail operators are largely funded by the government when paying access and licence fees to TAHE.
  • For the first ten years, the access and licence fees are based on the signed agreements between TAHE and the public rail operators.
  • Beyond the ten-year contracted period, the model assumes existing contractual terms for access and licence fees will continue unchanged allowing for an annual rise for inflation (2.5% per annum), and increased fees to enable a 7.62% return for renewed assets.
  • The capital expenditure included in the model is only the amounts approved by the Expenditure Review Committee (ERC) as part of the ten-year forecast. The model beyond ten years includes expected investment in renewed and replacement assets but excludes any forecasts relating to growth capex that is not approved by the ERC, and any related depreciation expenses for growth capex.

While management has developed a 35-year long term financial model to support the returns, we note this will need to be refined over the next few years. Furthermore, these are forecasted figures and we have not seen sufficient evidence of whether this reflects reality (that is, the achievement of dividends representing a return on equity) as it is still very early. Therefore, this will remain a high-risk matter until we have seen sufficient evidence of reality to the forecasted figures.

There is negative net impact on the budget after 2024–25 and this will grow in the future

There are some key points to highlight with this modelling and these are best conveyed with the graph below. This graph shows total cash injections made by the GGS since the government first announced the creation of TAHE as a for-profit entity in the 2015–16 NSW Budget. It also conveys the forecast returns from TAHE to the GGS and the level of funding operators will need from the GGS to pay TAHE's access and licence fees over the 30-year period. These cash flows are key inputs used in the modelling which calculates a 2.5% return from TAHE inclusive of recovering the holding (revaluation) loss of $20.3 billion.

The government continues to respond to the impact of the COVID-19 pandemic on New South Wales through its economic stimulus measures

The COVID-19 pandemic continued to significantly impact the State’s finances, reducing revenue and increasing expenses especially in sectors directly responsible for responding to the COVID-19 pandemic, such as Health. In October 2021, the government announced through the 'COVID-19 Economic Recovery Strategy' an additional $2.8 billion in economic stimulus and response measures following the conclusion of the three-month lockdown due to the Delta COVID-19 outbreak. Measures included:

  • $739 million in household and social support, including housing support for Aboriginal communities and survivors of domestic violence, and vouchers to thank parents for their efforts to support learning from home
  • $500 million to consumers and businesses including expansion of the 'Dine & Discover' and 'Stay & Rediscover' voucher programs
  • $495 million in education support addressing learning gaps for children and helping schools prepare for future learning disruptions
  • $487 million in combined funding for tourism, events, sports, and recreation throughout New South Wales
  • $130 million to fund mental health services for individuals whose mental health was impacted by the pandemic.

The 2021–22 financial year included $21.9 billion for pandemic response and economic stimulus measures. Of this, $17.9 billion was spent in 2021–22 while a further $1 billion of the budgeted amount from 2021–22 was carried forward into 2022–23. The graph below shows the total allocation and spend by cluster for 2022 compared to target spend.

There were 14 natural disaster declarations including four severe weather events in 2021–22

Natural disasters such as bushfires, storms, floods, and other adverse weather events can have a significant impact on the State's finances. Costs associated with natural disasters include direct response costs such as clean-up and recovery, temporary accommodation, and as well as financial assistance provided to impacted communities such as recovery and business support grants.

The NSW Government can make a natural disaster declaration allowing eligible individuals and communities from impacted Local Government Areas access to a range of special financial assistance measures.

In 2021–22, there were 14 natural disaster declarations announced comparable to 14 in the previous year. These natural disaster declarations largely related to storms and floods throughout the State. In 2021–22, there was a larger number of 'severe weather' events declared, with four in 2021–22 (nil in 2020–21).

Natural disaster expenses increased 143% to $1.4 billion in 2021–22, up from $569 million last year

Over 2021–22, the budgeted cost for declared natural disasters was $1.9 billion ($725 million in 2020–21). Actual expenditure by the State on disaster response increased by $815 million to $1.4 billion. The graph below shows the total allocation and spend by cluster for 2022 compared to their budget spend.

Deficit of $15.3 billion compared with a budgeted deficit of $8.6 billion

The outcomes of the government’s overall activity and policies are reflected in its net operating balance (budget result). This is the difference between the cost of general government service delivery and the revenue earned to fund these sectors.

The General Government Sector, which comprises 196 entities, generally provides goods and services funded centrally by the State.

In addition to the 196 entities within the General Government Sector, a further 85 government controlled businesses are included within the consolidated Total State Sector financial statements. These businesses generally provide goods and services, such as water, electricity and financial services for which consumers pay for directly, and form part of the PNFC (31) and PFC (54) sectors.

The budget result for the 2021–22 financial year was a deficit of $15.3 billion compared to an original forecast of a budget deficit of $8.6 billion.

Revenues increased $16.1 billion to $106.7 billion

The State’s total revenues increased $16.1 billion to $106.7 billion, an increase of 17.8% compared to the previous year. Total revenue growth in 2020–21 was 5.1%. The State's increase in revenue was mostly from $9.2 billion in grants and subsidies and $4.6 billion in taxation.

Taxation revenue increased by 13.3%

Taxation revenue increased by $4.6 billion, mainly due to the net of:

  • $4.9 billion higher stamp duties collected from property sales driven by growth in property transaction volumes and prices during 2021–22. This was growth was experienced across residential and commercial property markets
  • $296 million lower gambling and betting taxes compared to 2020–21. Decrease was primarily attributed to the ongoing effects of COVID-19 restrictions and venue closures within the first half of 2021–22.

Stamp duties of $16.6 billion remains the largest source of taxation revenue, $7.7 billion higher than payroll tax of $8.9 billion, the second-largest source of taxation revenue.

Assets grew by $53 billion to $571 billion

The State’s assets include physical assets such as land, buildings and infrastructure, and financial assets such as cash, and other financial instruments and equity investments. The value of total assets increased by $53.2 billion or 10.3% to $571 billion. The increase was largely due to increases in the carrying value of land, buildings and infrastructure systems.

Valuing the State’s physical assets

State’s physical assets valued at $437 billion

The value of the State’s physical assets increased by $46.8 billion to $437 billion in 2021–22 ($724 million increase in 2020–21). The State’s physical assets include land and buildings ($198 billion), infrastructure systems ($221 billion), and plant and equipment ($18 billion).

The movement in physical asset values between years includes additions, disposals, depreciation and valuation adjustments. Other movements include assets reclassified to held for sale and other opening balance adjustments.

Appendix one – Prescribed entities

Appendix two – Legal opinions

Appendix three – TSS sectors and entities

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Planning and Environment 2022

Planning and Environment 2022

Environment
Industry
Local Government
Planning
Asset valuation
Compliance
Financial reporting
Information technology
Infrastructure
Internal controls and governance
Management and administration
Risk

What the report is about

Result of the Planning and Environment cluster agencies' financial statements audits for the year ended 30 June 2022.

What we found

Unmodified audit opinions were issued for all completed 30 June 2022 financial statements audits of cluster agencies. Seven audits are ongoing.

Disclaimed audit opinions were issued for the 2010–11 to 2015–16 financial statements of the Water Administration Ministerial Corporation (WAMC), as management was unable to certify that the financial statements exhibit a true and fair view of WAMC's financial position and financial performance.

Qualified audit opinions were issued for WAMC's 2016–17 and 2017–18 financial statements due to insufficient evidence to support the completeness and valuation of water meters infrastructure assets, the impairment of water meters, and the completeness of buildings at Nimmie Caira.

Unqualified audit opinions were issued for WAMC's 2018–19 and 2019–20 financial statements.

The Department of Planning and Environment (the department) assessed 45 Category 2 Statutory Land Managers (SLM) did not meet the reporting exemption criteria and therefore were required to prepare 2021–22 financial statements. None of these 45 Category 2 SLMs prepared and submitted their 30 June 2022 financial statements by the statutory reporting deadline.

All 119 Commons Trusts have never submitted their financial statements for audit as required by the Government Sector Finance Act 2018 (GSF Act).

NSW Treasury has confirmed that the Catholic Metropolitan Cemeteries Trust (CMCT) is a controlled entity of the State. To date, CMCT has not met its obligations to prepare financial statements under the GSF Act and it has not submitted financial statements to the Auditor-General for audit.

What the key issues were

Since 2017, the Audit Office has recommended the department address the different practices across the local government sector in accounting for rural firefighting equipment. Despite repeated recommendations, the department did little to resolve this issue. At the time of writing, 32 of 118 completed council audits received qualified audit opinions on their 30 June 2022 financial statements.

There continues to be significant deficiencies in Crown land records. The department uses the Crown Land Information Database (CLID) to record key information relating to Crown land in New South Wales that is managed and controlled by the department and land managers. The CLID system was not designed to facilitate financial reporting, and the department is required to conduct extensive adjustments and reconciliations to produce accurate information for the financial statements.

The department implemented the CrownTracker system as a replacement for CLID. The project was finalised in June 2022, but it has not achieved the intended outcomes.

Nine high-risk issues were identified across the cluster related to the findings outlined above and weaknesses in IT general controls, financial reporting, governance processes and internal controls.

Recommendations were made to address these deficiencies.

This report provides Parliament and other users of the Planning and Environment cluster’s financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Planning and Environment cluster (the cluster) for 2022.

Section highlights

  • Unqualified audit opinions were issued for all completed 30 June 2022 financial statements audits of cluster agencies. Seven audits are ongoing. The audit of the Catholic Metropolitan Cemeteries Trust(CMCT) has not been able to commence, despite repeated requests to do so.
     
  • The audits of the Water Administration Ministerial Corporation's (WAMC) financial statements for the years ended 30 June 2011 to 30 June 2020 were completed in November 2022. These audits had been long outstanding due to insufficient records and evidence to support the transactions and balances of WAMC, particularly for the earlier years. In recent years, management commenced actions to improve WAMC's governance and financial management, and finalise the outstanding audits.

    Disclaimed audit opinions were issued on the 2010–11 to 2015–16 financial statements as management was unable to certify that the financial statements exhibit a true and fair view of WAMC's financial position and financial performance.

    Qualified audit opinions were issued for the 2016–17 and 2017–18 financial statements due to insufficient evidence to support the completeness and valuation of water meters infrastructure assets, the impairment of water meters, and the completeness of buildings at Nimmie Caira.

    Unqualified audit opinions were issued for the 2018–19 and 2019–20 financial statements.

    The 2020–21 and 2021–22 WAMC audits are in progress.
     
  • The Department of Planning and Environment (the department) assessed 45 Category 2 Statutory Land Managers (SLM) did not meet the reporting exemption criteria and therefore were required to prepare 2021–22 financial statements. None of these 45 Category 2 SLMs prepared and submitted their 30 June 2022 financial statements by the statutory reporting deadline.

    All 119 Commons Trusts have never submitted their financial statements for audit as required by the Government Sector Finance Act 2018 (GSF Act).

    The department needs to do more to ensure Category 2 SLMs and Commons Trusts meet their statutory reporting obligations.

    The department and Category 2 SLMs should finalise their reporting exemption assessments earlier to allow sufficient time for the non-exempted SLMs to prepare and submit annual financial statements by the statutory reporting deadline.
     
  • NSW Treasury has met with the Catholic Metropolitan Cemeteries Trust (CMCT) to consider their perspective as part of confirming CMCT is a controlled entity of the State for the purposes of financial reporting. NSW Treasury has confirmed that the CMCT is a controlled entity of the State. This means that the CMCT is statutorily obliged under section 7.6 of the GSF Act to prepare financial statements in accordance with the GSF Act and Treasurer's Directions, and give them to the Auditor-General for audit pursuant to the Government Sector Audit Act 1983 (GSA Act). Section 34 of the GSA Act requires the Auditor-General to furnish an audit report on these financial statements.

    The department wrote to CMCT to request it work with, and offer full assistance to, the Auditor-General in the exercise of her duties. To date, the CMCT has not met its obligations to prepare financial statements under the GSF Act as it has not submitted its financial statements to the Auditor-General for audit despite repeated requests, and has not provided access to its books and records for the purposes of a financial audit. The CMCT contends that they are not a GSF agency as defined by the GSF Act and therefore not a controlled entity of the State.
     
  • Six agencies required to perform early close procedures did not complete a total of 11 mandatory procedures. Incomplete procedures included the delayed resolution of matters raised in prior years and two agencies did not record movements in the fair value of physical assets in the financial statements.

 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Planning and Environment cluster.

Section highlights

  • Since 2017, the Audit Office of New South Wales has recommended that the Department of Planning and Environment (the department) address the different practices across the local government sector in accounting for rural firefighting equipment. Despite repeated recommendations, the department did little to resolve this issue, and in 2022, 32 of 118 completed audits of councils received qualified audit opinions on their 2022 financial statements.
    Consistent with the department’s role to assess councils' compliance with legislative responsibilities, standards or guidelines, the department should intervene where councils do not recognise rural firefighting equipment.
  • There continues to be significant deficiencies in Crown land records. The department should implement an action plan to ensure the Crown land database is complete and accurate.
  • The number of findings reported to management decreased from 161 in 2020–21 to 132 in 2021–22. Eight high-risk findings were identified during 2021–22, of which six were repeat issues. One new high-risk finding related to deficiencies in governance processes and internal controls identified as a part of the Water Administration Ministerial Corporation's 2011–2020 financial statements audits.
  • The department and NSW Treasury did not comply with section 35 of the Energy and Utilities Administration Act 1987 (EUA Act). However, complying with the EUA Act could create non-compliance with other pieces of legislation. Amendments to the EUA Act have been made to resolve this inconsistency. The amendment took effect from April 1999.

 

Appendix one – Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

Appendix five – Councils received qualified audit opinions 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Regional NSW 2022

Regional NSW 2022

Environment
Industry
Planning
Asset valuation
Compliance
Financial reporting
Fraud
Information technology
Infrastructure
Internal controls and governance
Management and administration
Regulation
Risk
Shared services and collaboration

What the report is about

Result of the Regional NSW cluster agencies' financial statement audits for the year ended 30 June 2022.

What we found

Unmodified audit opinions were issued for Regional NSW cluster agencies. Two audits are ongoing.

What the key issues were

The Department of Regional NSW (the department) and Local Land Services (LLS) accepted changes to their office leasing arrangements managed by Property NSW.

These changes resulted in the collective derecognition of $100.6 million of rights-of-use-assets and $110.4 million of lease liabilities.

In 2021–22, the cluster agencies continued to assist communities in their recovery from recent weather emergencies, including significant flooding in New South Wales.

The Northern Rivers Reconstruction Corporation was established in May 2022 to rebuild communities in the Lismore and Northern Rivers region impacted by floods.

The number of matters reported to management decreased from 36 in 2020–21 to 14 in 2021–22.

Five moderate risk issues were identified and 14% of reported issues were repeat issues.

One moderate risk issue was a repeat issue related to Local Land Services' annual fair value assessment of the asset improvements on land reserves used for moving stock.

This report provides Parliament and other users of the Regional NSW cluster financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Regional NSW cluster (the cluster) for 2022.

Section highlights

  • Unqualified audit opinions were issued on the financial statements of cluster agencies. Two audits are ongoing.
  • Cluster agencies completed all required early close procedures.
  • Changes to accommodation arrangements managed by Property NSW on behalf of the department and cluster agencies resulted in the collective derecognition of approximately $100.6 million in right-of-use assets and corresponding lease liabilities totalling $110.4 million from the balance sheets of these agencies.
  • Cluster agencies continue to provide financial assistance to communities affected by natural disasters.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Regional NSW cluster.

Section highlights

  • The 2021–22 audits identified five moderate issues across the cluster. One moderate risk issue was a repeat issue related to Local Land Services' annual fair value assessment of the asset improvements on land reserves used for moving stock.
  • Of the four newly identified moderate rated issues, one related to internal control deficiencies and improvements and three related to financial reporting.
  • The number of findings reported to management has decreased from 36 in 2020–21 to 14 in 2021–22.

Published

Actions for Effectiveness of the Biodiversity Offsets Scheme

Effectiveness of the Biodiversity Offsets Scheme

Planning
Environment
Infrastructure
Internal controls and governance
Management and administration
Regulation

What the report is about

This audit examined whether the Department of Planning and Environment (DPE) and the Biodiversity Conservation Trust (BCT) have effectively designed and implemented the Biodiversity Offsets Scheme (‘the Scheme’) to compensate for the loss of biodiversity due to development.

Under the Biodiversity Conservation Act 2016, the Scheme enables landholders to establish in-perpetuity Biodiversity Stewardship Agreements on sites to generate credits for the unique biodiversity on that land. These credits can be sold to offset the negative impact of development on biodiversity.

What we found

DPE has not effectively designed core elements of the Scheme. DPE did not establish a clear strategic plan to guide the implementation of the Scheme.

The BCT has various roles in the Scheme but lacked safeguards against potential conflicts, creating risks to credit supply.

The effectiveness of its implementation has also been limited. Key concerns around the Scheme’s transparency, sustainability and integrity are yet to be fully resolved.

A market-based approach to biodiversity offsetting is central to the Scheme's operation but credit supply is lacking and poorly matched to growing demand. DPE has not established a clear, resourced plan to manage the shortage in credit supply. Data about the market, published by the DPE and the BCT, does not provide an adequate picture of credit supply, demand and price to readily support market participation.

These factors create a risk that biodiversity gains made through the Scheme will not be sufficient to offset losses resulting from development, and that the DPE will not be able to assess the Scheme’s overall effectiveness.

DPE is leading work with the BCT to improve the Scheme, but this is not yet guided by a long-term strategy with clear goals.

What we recommended

The audit made 11 recommendations to DPE and the BCT, focusing on:

  • a long-term strategic plan for the Scheme
  • improvements to the operation and transparency of the market and credit supply
  • frameworks to ensure the financial and ecological sustainability of biodiversity stewardship sites
  • enhanced public reporting and data management
  • resolving issues in conflicting governance and oversight.

 

 Fast facts

  • 96% –  proportion of developer demand for species credits not met by current supply
  • 97% – proportion of species credits that have never been traded on the biodiversity market
  • 60% – proportion of the 226 Biodiversity Stewardship sites under active land management
  • $90m – value of developers’ obligations paid directly into the Biodiversity Conservation Fund
  • 20% – proportion of developer obligations transferred to the BCT that have been acquitted.

The NSW Government's Biodiversity Outlook Report 2020 estimates that, without effective management, only 50% of species and 59% of ecological communities that are listed as threatened in New South Wales will still exist in 100 years. The NSW State of the Environment 2021 report identifies habitat destruction and native vegetation clearing as presenting the single greatest threat to biodiversity in the State.

According to the Organisation for Economic Co-operation and Development (OECD), biodiversity offsets are 'measurable conservation outcomes that result from actions designed to compensate for significant, residual biodiversity loss from development projects'. The OECD states that a feature of such schemes is that biodiversity offsets are intended to be implemented as the 'final step of a mitigation hierarchy' whereby reasonable first steps are taken to avoid and minimise the negative impacts.

The NSW Biodiversity Offsets Scheme was established in 2017 under the Biodiversity Conservation Act 2016 (the Act). The purpose of the Act is to 'maintain a healthy, productive and resilient environment for the greatest well-being of the community, now and into the future, consistent with the principles of ecologically sustainable development'.

The Department of Planning and Environment (DPE) designed and manages this Scheme. Under the Act, a feature of the Scheme is a 'market-based conservation mechanism through which the impacts to biodiversity can be offset.' The Scheme enables landholders to establish in-perpetuity Biodiversity Stewardship Agreements (BSAs) on sites to generate biodiversity credits, which can be sold to offset the negative impact of development on biodiversity. BSA sites are intended to be managed over the long term to generate the biodiversity gains required to offset the impact.

The Biodiversity Conservation Trust (BCT) monitors and supports landholders to manage BSA sites under the Scheme. This includes making payments to landholders from funds held in the Biodiversity Stewardship Payments Fund for undertaking the required biodiversity management actions.

This Scheme was preceded by several other offsetting schemes in New South Wales, including the BioBanking scheme that started in 2008. DPE has arrangements to transition sites, credits, and offset obligations from this and other previous schemes.

The current biodiversity credit market in New South Wales consists of 1394 different types of ecosystem credits, which are approved to be traded in 364 different offset trading groups, and 867 different species credits. Trading rules, set out in the Biodiversity Conservation Regulation 2017 (the Regulation), prioritise offsetting the obligations of a development with like-for-like ecosystem or species credits.

The Scheme is implemented through the planning system in New South Wales. Proposed development that involves the clearing of native vegetation, and meets certain thresholds, is required to undertake a Biodiversity Development Assessment Report. These reports determine an offset obligation, in biodiversity credits, to compensate for the biodiversity loss proposed. These reports are considered by consent authorities (such as a council, for local development, or by the Minister for Planning for major projects). An offset obligation is then included in the conditions of development approval.

In addition to establishing a market for trading between developers, with offset obligations, and landholders, who sell credits from their BSA sites, the Scheme allows developers to pay into the Biodiversity Conservation Fund and transfer their obligations to the BCT. This allows the developer to proceed with their project. The BCT must then meet these acquired obligations by buying the required credits, or by undertaking other approved activities set out in the Regulation. The BCT has more options than developers on how and when it acquits its obligations.

This audit examined whether DPE and the BCT have effectively designed and implemented the Biodiversity Offsets Scheme to compensate for the loss of biodiversity due to development.

Conclusion

The Department of Planning and Environment (DPE) has not effectively designed core elements of the NSW Biodiversity Offsets Scheme. DPE did not establish a clear strategy to develop the biodiversity credit market or determine whether the Scheme’s operation and outcomes are consistent with the purposes of the Biodiversity Conservation Act 2016.

The effectiveness of the Scheme's implementation by DPE and the BCT has been limited. A market-based approach to biodiversity offsetting is central to the Scheme's operation but credit supply is lacking and poorly matched to growing demand: this includes a potential undersupply of in-demand credits for numerous endangered species. Key concerns around the Scheme’s integrity, transparency, and sustainability are also yet to be fully resolved. As such, there is a risk that biodiversity gains made through the Scheme will not be sufficient to offset losses resulting from the impacts of development, and that DPE will not be able to assess the Scheme’s overall effectiveness.

DPE developed the Scheme following a 2014 review of the State's biodiversity legislation and building on previous offsetting arrangements in New South Wales. At the time the Scheme commenced in 2017, DPE lacked a strategic plan to guide its implementation, set clear outcomes and performance measures, and respond effectively to risks. DPE did establish a detailed scientific method for assessing biodiversity impacts under the Scheme and a system for accrediting assessors to undertake this technical work. These are important foundations for the robustness of the Scheme.

The Scheme has been in place for five years, but the biodiversity credit market is not well developed. Most credit types have never been traded. Also, according to DPE data, around 90% of demand cannot be matched to credit supply – and there is likely to be a substantial credit undersupply for at least seven endangered flora species, three endangered fauna species, and eight threatened ecological communities. Credit demand is projected to grow – especially in relation to the NSW Government’s $112.7 billion four-year infrastructure pipeline.

As with any market, potential participants need information about demand and price in order to understand risks and opportunities. But information about the biodiversity credit market, published by DPE and the BCT, does not provide an adequate picture of credit supply, demand and price to support market participation. This can create uncertainty for landholders who may be weighing the costs and benefits of establishing Biodiversity Stewardship Agreement (BSA) sites, and for development proponents who need to know whether they can purchase sufficient credits and at what price. Development proponents who lack market information are being incentivised to meet their offset obligations by paying into the Biodiversity Conservation Fund, which is managed by the BCT. This option provides developers with more certainty that enables them to progress their projects, but does not result in the development being offset until the BCT later acquits the obligation.

The BCT has multiple roles in the Scheme. These include setting-up and administering BSAs which generate credits, acquiring offset obligations from developers who pay into the Biodiversity Conservation Fund, and purchasing credits to meet its acquired obligations. There have been inadequate safeguards to mitigate the potential for conflicts between these roles. As the BCT directs its efforts towards facilitating BSA sites and purchasing credits to meet its obligations, there is a risk that government is insufficiently focused on supporting overall credit supply.

DPE has begun developing a credit supply strategy. Its absence, and a lack of clarity around responsibility for credit supply under the Scheme, has contributed to the significant risk of insufficient and poorly matched credits to meet the growing demand. The BCT's acquired obligations from developers have been increasing year-on-year, and are likely to continue to grow. 

There is a risk that the BCT will not have sufficient funds to acquit its growing obligations with like-for-like credits, which could result in sub-optimal biodiversity outcomes. The Scheme rules allow the BCT to acquit its obligations with measures other than like-for-like credits. DPE has not provided clear guidance to the BCT on when or how to do so, or how this would fulfil the 'no net loss' of biodiversity standard.

There are transparency and integrity risks to the Scheme. DPE does not maintain a public register of biodiversity credits with complete information, including credits' transaction histories, consistent with the legislative intent for a single register. DPE also does not have ready access to information to check that developments have been acquitted with the required credits.

Risks to the sustainability of the Scheme and its outcomes remain. DPE and the BCT have not yet implemented a decision-making and intervention framework to ensure adequate initial and ongoing funding for the long-term management of new and existing BSA sites. DPE also did not collect ecological data from sites under previous schemes before they were transitioned, and BCT only introduced ecological monitoring requirements for new BSA sites in March 2021. The lack of monitoring requirements creates a risk that the biodiversity gains, which BSA sites are required to generate to offset biodiversity losses, will not be measured and achieved under the Scheme.

This section presents an overview of the status of the biodiversity credit market in New South Wales. It describes development of the market under the Scheme in the context of transitional arrangements from previous schemes, and the extent of market participation and transactions to date. It also presents information about emerging trends in credit demand and supply.

Background

A purpose of the Biodiversity Conservation Act 2016 (the Act) is to establish a market-based conservation mechanism through which impacts on biodiversity can be offset. Sufficient credits of appropriate types, which are well matched to demand, are necessary for enough transactions to inform prices and enable efficient like-for-like offsetting. For transactions to occur efficiently in the market, participants require reliable and easy-to-access information about supply, demand and price.

The Scheme was established in 2017 with an existing credit supply and offset obligations (credit demand) as regulations had been introduced to preserve and transition credits and obligations from previous schemes including the BioBanking Scheme, which started in 2008.

Credits under the BioBanking scheme are referred to as 'BBAM credits', and credits under the current Scheme are referred to as 'BAM credits'. BBAM credits are still available, and the transitional arrangements enable DPE to determine the 'reasonable equivalence' of these to the current Scheme's credit numbers and classes. DPE has stated that reasonable equivalence of credits is based on ecological not financial equivalence. 

This section assesses the clarity and alignment of the goals of the Scheme to key features of its design and operations. It also examines structural elements of the Scheme that aim to maintain integrity within administering agencies, and the status of actions to address risks or issues.

Background

The Biodiversity Conservation Act 2016 (the Act) sets out the legal framework for the Scheme. Given the complexities, financial interests, and range of stakeholders associated with the Scheme, it requires strong safeguards. Transparency and assurances around the Scheme's integrity are also relevant to participants' confidence in it, which in turn is important for market development.

Core components of the Scheme, identified in section 1.3 of the Act, are to be consistent with the ‘principles of ecologically sustainable development’.

The Act and other administrative arrangements of government allocate responsibility to DPE and the Minister for Environment and Heritage for the Scheme’s design and elements of its implementation. This includes responsibility for the Scheme’s policy, legislative and regulatory framework.

Responsibility is allocated to the BCT for implementing and operating certain elements of the Scheme. This includes administering Biodiversity Stewardship Agreements (which generate credits) and securing offsets on behalf of development proponents who pay into the Biodiversity Conservation Fund to meet their offset obligations.

This broad legislative framework is not intended to detail responsibilities for the full range of roles and activities that agencies need to take to implement and regulate the Scheme effectively, and ensure its good governance. Agencies should do this as part of sound and transparent public administration. 

This section assesses how effectively components of the Scheme have been designed and are being implemented to provide assurance that the impacts of development are being avoided and minimised such that only ‘unavoidable’ impacts remain to be offset. The section also assesses whether the Scheme and its market embeds the necessary controls to ensure that obligations are offset as required.

Background

The Biodiversity Assessment Method, and the quality of its application by DPE-Accredited Assessors, is critical to the robustness the Scheme. The method is designed to be applied to avoid and minimise impacts at proposed development sites before identifying offset obligations. The effectiveness of Scheme outcomes requires that obligations are offset with the retirement of the necessary and appropriate credits.

The Biodiversity Conservation Act 2016 (the Act) requires the relevant Minister (the current Minister for Environment and Heritage) to establish a method for the purpose of assessing the impacts of actions on threatened species and ecological communities.

The Act also specifies that this method must be applied by an accredited person. DPE is responsible for the design and implementation of this accreditation system, arrangements for which are set out in an instrument under the Act.

A Biodiversity Development Assessment Report is a report by a DPE-Accredited Assessor using the Biodiversity Assessment Method. These reports assess the biodiversity impacts of the proposed development and establish offset obligations as part of the development approval process. It is important that local councils and other development consent authorities understand and can assess the quality of these reports.

DPE manages the process of ‘retiring’ credits against the identified offset obligations. Once a credit is retired it cannot be reused to acquit another obligation, which is critical to Scheme outcomes. DPE is also responsible for maintaining records of credit transactions, which results in a legally binding transfer of credit ownership from seller to buyer. 

This section assesses how effectively the supply of biodiversity credits has been supported by encouraging and enabling landholders to participate in the Scheme. It also assesses whether sufficient action is underway to address issues and risks to the establishment of BSA sites, especially in the context of known credit supply issues (section 2).

Background

Credit supply is generated when a landholder establishes a Biodiversity Stewardship Agreement (BSA) on their land. Establishing a BSA site requires landholders agree to an in-perpetuity management plan, so it is important that they have sufficient support and access to relevant information about risks and opportunities when deciding to do so. Ensuring adequate credits supply underpins the Scheme's ability to deliver the intended biodiversity outcomes.

A landholder establishes an offset site through a BSA, which is a legal agreement with the Minister of Environment and Heritage (delegated to the Biodiversity Conservation Trust). The BSA is registered on the title of the land.

DPE-Accredited Assessors develop Biodiversity Stewardship Site Assessment Reports, which are submitted by landholders to the BCT as part of the BSA application. These reports apply the Biodiversity Assessment Method to detail the number and types of credits that a BSA site is expected to generate by implementing a 20-year management plan. The BCT issues credits to landholders on registration of the BSA.

Ensuring an adequate and appropriate supply of credits is important so that like-for-like matches between credits and obligations can be efficiently secured in a timely way. This minimises the use of offset variation rules, and can avoid potential delays in developers securing appropriate offsets to meet their offset obligations. It also makes it easier for the BCT to locate the necessary credits to acquit the obligations it acquires from developers. 

This section assesses how effectively BSA sites, which need to be managed by landholders to generate the biodiversity gains represented by credits, are regulated and supported by the Biodiversity Conservation Trust. It also assesses whether actions have been taken to address identified risks to the suitability of funds required to ensure long-term BSA site management.

Background

For Biodiversity Stewardship Agreement (BSA) sites to achieve the expected biodiversity gains to offset losses from development impact, they need sufficient funding for the required management actions, and to be effectively regulated and supported over the long-term. Funding for these sites is generated through the returns on landholders' initial investment (Total Fund Deposit). The BCT is required to monitor landholders' compliance with BSAs and should also ensure ecological outcomes on sites are measured.

DPE and the BCT are responsible for developing and implementing a system of oversight to ensure the implementation of management actions at BSA sites is delivering the intended outcomes in a financially and environmentally sustainable way. The agencies' key mechanisms for delivering this are:

  • calculating the costs of the required land management actions in perpetuity
  • annual reporting systems for monitoring compliance with land management requirements
  • reporting systems for monitoring ecological outcomes arising from land management actions.

Landholders are required to pay the required Total Fund Deposit amount for their BSA accounts into the Biodiversity Stewardship Payments Fund, which is held in trust and managed by the BCT. A costing tool is used by landholders to calculate the value of the deposit, based on the required management payments (in perpetuity), administrative fees, and the discount rate applied.

The Total Fund Deposit can be paid upfront but is usually paid from the proceeds of the sale of credits. Once this occurs the BSA site becomes 'active' and management payments commence to enable the landholder to undertake the required management actions. BSA sites that have not yet sold enough credits to make the deposit are 'passive' sites that do not require active land management.

Sites in passive management for an extended duration present risks to biodiversity outcomes, and potentially to Scheme integrity, if the quality of credits is undermined due to an absence of active site management. 

Appendix one – Response from agencies 

Appendix two – Like-for-like, variation and ancillary rules

Appendix three – Detail on progress of the IIAP

Appendix four – About the audit 

Appendix five – Performance auditing 

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #367 - released 30 August 2022

Published

Actions for Audit Insights 2018-2022

Audit Insights 2018-2022

Community Services
Education
Environment
Finance
Health
Industry
Justice
Local Government
Premier and Cabinet
Planning
Transport
Treasury
Universities
Whole of Government
Asset valuation
Cross-agency collaboration
Compliance
Cyber security
Financial reporting
Fraud
Information technology
Infrastructure
Internal controls and governance
Management and administration
Procurement
Project management
Regulation
Risk
Service delivery
Shared services and collaboration
Workforce and capability

What the report is about

In this report, we have analysed the key findings and recommendations from our audit reports over the past four years.

This analysis includes financial audits, performance audits, and compliance audits of state and local government entities that were tabled in NSW Parliament between July 2018 and February 2022.

The report is framed by recognition that the past four years have seen significant challenges and emergency events.

The scale of government responses to these events has been wide-ranging, involving emergency response coordination, service delivery, governance and policy.

The report is a resource to support public sector agencies and local government to improve future programs and activities.

What we found

Our analysis of findings and recommendations is structured around six key themes:

  • Integrity and transparency
  • Performance and monitoring
  • Governance and oversight
  • Cyber security and data
  • System planning for disruption
  • Resource management.

The report draws from this analysis to present recommendations for elements of good practice that government agencies should consider in relation to these themes. It also includes relevant examples from recent audit reports.

In this report we particularly call out threats to the integrity of government systems, processes and governance arrangements.

The report highlights the need for balanced advice to government on options and risks, for transparent documentation and reporting of directions and decisions, and for early and open sharing of information with integrity bodies and audit.

A number of the matters highlighted in this report are similar to those described in our previous Insights Report, (Performance Audit Insights: key findings from 2014–2018) specifically in relation to cyber and information security, to performance measurement, reporting and evaluation, and system and workforce planning and capability.

Fast facts

  • 72 audits included in the Audit Insights 2018–2022 analysis
  • 4 years of audits tabled by the Auditor-General for New South Wales
  • 6 key themes for Audit Insights 2018–2022.

picture of Margaret Crawford Auditor-General for New South Wales in black dress with city skyline as backgroundI am pleased to present the Audit Insights 2018–2022 report. This report describes key findings, trends and lessons learned from the last four years of audit. It seeks to inform the New South Wales Parliament of key risks identified and to provide insights and suggestions to the agencies we audit to improve performance across the public sector.

The report is framed by a very clear recognition that governments have been responding to significant events, in number, character and scale, over recent years. Further, it acknowledges that public servants at both state and council levels generally bring their best selves to work and diligently strive to deliver great outcomes for citizens and communities. The role of audit in this context is to provide necessary assurance over government spending, programs and services, and make suggestions for continuous improvement.

A number of the matters highlighted in this report are similar to those described in our previous Insights Report, (Performance Audit Insights: key findings from 2014–2018) specifically in relation to cyber and information security, to performance measurement, reporting and evaluation, and system and workforce planning and capability.

However, in this report we particularly call out threats to the integrity of government systems, processes and governance arrangements. We highlight the need for balanced advice to government on options and risks, for transparent documentation and reporting of directions and decisions, and for early and open sharing of information with integrity bodies and audit. Arguably, these considerations are never more important than in an increasingly complex environment and in the face of significant emergency events and they will be key areas of focus in our future audit program.

While we have acknowledged the challenges of the last few years have required rapid responses to address the short-term impacts of emergency events, there is much to be learned to improve future programs. I trust that the insights developed in this report provide a helpful resource to public sector agencies and local government across New South Wales. I would be pleased to receive any feedback you may wish to offer.

Margaret Crawford
Auditor-General for New South Wales

Integrity and transparency Performance and monitoring Governance and oversight Cyber security and data System planning Resource management
Insufficient documentation of decisions reduces the ability to identify, or rule out, misconduct or corruption. Failure to apply lessons learned risks mistakes being repeated and undermines future decisions on the use of public funds. The control environment should be risk-based and keep pace with changes in the quantum and diversity of agency work. Building effective cyber resilience requires leadership and committed executive management, along with dedicated resourcing to build improvements in cyber security and culture. Priorities to meet forecast demand should incorporate regular assessment of need and any emerging risks or trends. Absence of an overarching strategy to guide decision-making results in project-by-project decisions lacking coordination. Governments must weigh up the cost of reliance on consultants at the expense of internal capability, and actively manage contracts and conflicts of interest.
Government entities should report to the public at both system and project level for transparency and accountability. Government activities benefit from a clear statement of objectives and associated performance measures to support systematic monitoring and reporting on outcomes and impact. Management of risk should include mechanisms to escalate risks, and action plans to mitigate risks with effective controls. In implementing strategies to mitigate cyber risk, agencies must set target cyber maturity levels, and document their acceptance of cyber risks consistent with their risk appetite. Service planning should establish future service offerings and service levels relative to current capacity, address risks to avoid or mitigate disruption of business and service delivery, and coordinate across other relevant plans and stakeholders. Negotiations on outsourced services and major transactions must maintain focus on integrity and seeking value for public funds.
Entities must provide balanced advice to decision-makers on the benefits and risks of investments. Benefits realisation should identify responsibility for benefits management, set baselines and targets for benefits, review during delivery, and evaluate costs and benefits post-delivery. Active review of policies and procedures in line with current business activities supports more effective risk management. Governments hold repositories of valuable data and data capabilities that should be leveraged and shared across government and non-government entities to improve strategic planning and forecasting. Formal structures and systems to facilitate coordination between agencies is critical to more efficient allocation of resources and to facilitate a timely response to unexpected events. Transformation programs can be improved by resourcing a program management office.
Clear guidelines and transparency of decisions are critical in distributing grant funding. Quality assurance should underpin key inputs that support performance monitoring and accounting judgements. Governance arrangements can enable input into key decisions from both government and non-government partners, and those with direct experience of complex issues.     Workforce planning should consider service continuity and ensure that specialist and targeted roles can be resourced and allocated to meet community need.
Governments must ensure timely and complete provision of information to support governance, integrity and audit processes.          
Read more Read more Read more Read more Read more Read more

 

This report brings together a summary of key findings arising from NSW Audit Office reports tabled in the New South Wales Parliament between July 2018 and February 2022. This includes analysis of financial audits, performance audits, and compliance audits tabled over this period.

  • Financial audits provide an independent opinion on the financial statements of NSW Government entities, universities and councils and identify whether they comply with accounting standards, relevant laws, regulations, and government directions.
  • Performance audits determine whether government entities carry out their activities effectively, are doing so economically and efficiently, and in accordance with relevant laws. The activities examined by a performance audit may include a selected program or service, all or part of an entity, or more than one government entity. Performance audits can consider issues which affect the whole state and/or the local government sectors.
  • Compliance audits and other assurance reviews are audits that assess whether specific legislation, directions, and regulations have been adhered to.

This report follows our earlier edition titled 'Performance Audit Insights: key findings from 2014–2018'. That report sought to highlight issues and themes emerging from performance audit findings, and to share lessons common across government. In this report, we have analysed the key findings and recommendations from our reports over the past four years. The full list of reports is included in Appendix 1. The analysis included findings and recommendations from 58 performance audits, as well as selected financial and compliance reports tabled between July 2018 and February 2022. The number of recommendations and key findings made across different areas of activity and the top issues are summarised at Exhibit 1.

The past four years have seen unprecedented challenges and several emergency events, and the scale of government responses to these events has been wide-ranging involving emergency response coordination, service delivery, governance and policy. While these emergencies are having a significant impact today, they are also likely to continue to have an impact into the future. There is much to learn from the response to those events that will help the government sector to prepare for and respond to future disruption. The following chapters bring together our recommendations for core elements of good practice across a number of areas of government activity, along with relevant examples from recent audit reports.

This 'Audit Insights 2018–2022' report does not make comparative analysis of trends in public sector performance since our 2018 Insights report, but instead highlights areas where government continues to face challenges, as well as new issues that our audits have identified since our 2018 report. We will continue to use the findings of our Insights analysis to shape our future audit priorities, in line with our purpose to help Parliament hold government accountable for its use of public resources in New South Wales.

Appendix one – Included reports, 2018–2022

Appendix two – About this report

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for NSW planning portal

NSW planning portal

Planning
Industry
Environment
Local Government
Information technology
Project management
Risk

What the report is about

The ePlanning program is an initiative of the Department of Planning and Environment (the department) to deliver a digital planning service for New South Wales through the NSW planning portal (the portal).

Using the portal, relevant planning activities can be carried out online, including all stages of development applications.

The portal has been developed under three separate business cases in 2013, 2014 and 2020.

In late 2019, the government mandated the use of the portal for all development applications. This decision took effect across 2020–21.

This audit assessed the effectiveness of the department's implementation, governance and stakeholder engagement in delivering the NSW planning portal. 

What we found

Since implementation commenced in 2013, the NSW planning portal has progressively achieved its objectives to provide citizens with access to consolidated planning information, and allow them to prepare and submit development applications online.

Shortcomings in the department's initial planning and management of the program led to a significant time overrun. It has taken the department longer and cost significantly more to implement the portal than first anticipated. 

In recent years the department has improved the planning, implementation and governance of the ePlanning program, resulting in improved delivery of the portal’s core functions.

The department now has a clear view of the scope necessary to finalise the program, but has not yet published the services it plans to implement in 2022 and 2023.

Mandating the use of the portal for all development applications changed the program's strategic risk environment and required the department to work more closely with a cohort of stakeholders, many of whom did not want to adopt the portal.

Despite this change, the department kept its overall delivery approach the same.

While implementation of the portal has delivered financial benefits, the department has overestimated their value.

The Department has only reported benefits since 2019 and has not independently assured the calculation of benefits.

What we recommended

By December 2022, the department should:

  • publish a roadmap of the services it expects to release on the portal across 2022 and 2023
  • update its ePlanning program assumptions, benefits targets and change management approach to reflect the government's decision to mandate the use of the portal for all stages of a development application
  • independently assure and report publicly the correct calculation of ePlanning program benefits.

Fast facts

  • 10 years taken to implement the portal when completed
  • 3 years longer than initially planned to implement the portal
  • $146m capital expenditure on the portal when completed
  • $38.5m more spent than planned in the business cases.

The ePlanning program is an initiative of the Department of Planning and Environment (the department) to deliver a digital planning service for New South Wales through the NSW planning portal (the portal, or the planning portal). The department defines the portal as an online environment where community, industry and government can work together to better understand and meet their obligations under the Environmental Planning and Assessment Act 1979 (NSW). Using the portal, relevant planning activities can be carried out online throughout New South Wales. This includes, but is not limited to:

  • applying for and gaining planning approval
  • applying for and gaining approval for building works, sub-dividing land and similar activities
  • issuing occupancy and other certificates.

The portal has been developed under three separate business cases. The first business case in 2013 led to the creation of a central portal, which made planning information available to view by planning applicants and allowed some planning applications to be lodged and tracked online.

Under a second business case prepared in 2014, the department set out to improve and widen the functions available via the portal. The department prepared a third business case in 2020 to fund further improvements to the portal over the period July 2020 to June 2023. The third business case also extended the portal's functions to support the building and occupation stages of the planning cycle.

In late 2019, the government mandated the use of the portal for all stages of development applications. This decision took effect across 2020–21 and applied to all councils as well as certifiers and others involved in the planning process.

The objective of this performance audit was to assess the effectiveness of the department's implementation, governance and stakeholder engagement in delivering the NSW planning portal. We investigated whether:

  • delivery of the NSW planning portal was planned effectively
  • sound governance arrangements are in place to ensure effective implementation of the program
  • users of the NSW planning portal are supported effectively to adopt and use the system.
Conclusion

Since implementation commenced in 2013, the NSW planning portal has progressively achieved its objectives to provide citizens with access to consolidated planning information and allow them to prepare and submit development applications online. Implementation was initially hindered by deficiencies in planning and it has taken the department significantly longer and cost significantly more to implement the portal than first anticipated. While the portal's implementation has delivered financial benefits, the department has overestimated their value. As a result, the department cannot yet demonstrate that the portal has achieved overall financial benefits, relative to its costs.

In the first two years of the ePlanning program, the department delivered a portal that allowed planners, developers, certifiers and the public to view important planning information. However, the department found the delivery of a second, transactional version of the portal in 2017 to be much more challenging. This version was intended to offer more integrated information and allow development applications to be submitted and managed online. The department did not rollout this version after a pilot showed significant weaknesses with the portal's performance. A subsequent review found that this was partly because the department did not have a clear view of the portal’s role or the best way to implement it. In recent years the department has improved the planning, implementation and governance of the ePlanning program resulting in improved delivery of the portal’s core functions.

By the time the program reaches its scheduled completion in 2023, it will have taken the department ten years and around $146 million in capital expenditure to implement the portal. This will be significantly longer and more expensive than the department originally expected. This overrun is partly due to an increased scope of services delivered through the portal and an initial under-appreciation of what is involved in creating a standard, central resource such as the portal. The department also experienced some significant implementation difficulties – which saw the transactional portal discontinued after it was found to be not fit for purpose. Following this, the department re-set the program in 2017–18 and re-planned much of the portal's subsequent development.

In November 2019, the New South Wales Government decided to mandate the use of the portal for all stages of development applications by the end of 2020–21. The department had previously planned that the portal would be progressively adopted by all councils and other stakeholders over the five years to 2025. The decision to mandate the portal's use for all development applications brought forward many of the portal's benefits as well as the challenges of its implementation. The department did not change its overall delivery approach in response to the changed risks associated with the government's decision to mandate use of the portal.

The current version of the portal has given the department more timely and comprehensive planning information and has helped New South Wales to provide continuous planning services during COVID-19 lockdowns, which interrupted many other public functions. The portal has also delivered financial benefits, however the department has not independently assured benefits calculations carried out by its consultant, and the reported benefits are overstated. In addition, some stakeholders report that the portal is a net cost to their organisation. This has included some certifiers and some councils which had implemented or had started to implement their own ePlanning reforms when use of the portal was mandated in 2019. The department now needs to address the issues faced by these stakeholders while continuing to deliver the remaining improvements and enhancements to the portal. Over the remaining year of the program, it will be critical that the department focuses on the agreed program scope and carefully evaluates any opportunities to further develop the portal to support future planning reforms.

This part of the report sets out how:

  • the ePlanning program has been planned and delivered
  • users of the portal have been supported
  • the program has been governed.

This part of the report sets out the ePlanning program's:

  • expected and reported financial benefits
  • calculation of financial benefits.

In 2019, the department increased its expectations for net financial benefits

The department's three ePlanning business cases each forecast substantial financial benefits from the implementation of the planning portal. The department expected that most financial benefits would flow to planning applicants due to a quicker and more consistent planning process. It also expected that government agencies and councils would benefit from the portal.

Exhibit 6: Summary of the financial benefits originally expected
  Business case 1
($ million)
Business case 2
($ million)
Business case 3
($ million)
Total
($ million)
Benefits 90.0 44.3 270.9 405.2
Costs 43.3 29.4 89.8 162.5
Net benefits 46.7 15.0 181.1 242.7

Note: Benefits and costs are incremental. All amounts are calculated over ten years. Amounts for business case 1, 2 and 3 amounts are expressed in 2013, 2015 and 2019 dollars respectively. All amounts are discounted at seven per cent to show their value at the time when they were calculated. Amounts may not add due to rounding.
Source: Audit Office analysis of data provided by the Department of Planning and Environment.

In 2019 the department commissioned a review to explore opportunities to better identify, monitor and realise the benefits of the ePlanning program. Using this work, the department updated the expected benefits for business cases 1 and 2 to take account of:

  • errors and miscalculations in the original benefits calculations
  • slower delivery of the portal and changes to the take-up of portal services by councils
  • changes to the services supported by the portal.
Exhibit 7: Summary of the financial benefits expected for business case 1 and 2 after the 2019 update
  Original business case 1 and 2 (combined)
($ million)
New business case 1 and 2 (combined)
($ million)
Benefits 134.3 210.6
Costs 72.7 96.3
Net benefits 61.7 114.3

Note: Benefits and costs are incremental. All amounts are calculated over ten years. Amounts for the original business case 1 and 2 are expressed in 2013 and 2015 dollars respectively. The new combined amount is expressed in 2019 dollars. All amounts are discounted or inflated at seven per cent to show their value at the time when they were calculated. Amounts may not add due to rounding.
Source: Audit Office analysis of data provided by the Department of Planning and Environment.

Reported benefits significantly exceed the current targets

In September 2021, the department reported that the program had achieved $334 million of benefits over the three financial years up to June 2021 plus the first two months of 2021–22. These reported benefits were significantly higher than expected. 

Exhibit 8: Reported financial benefits from the ePlanning program
  2018–19
($ million)
2019–20
($ million)
2020–21
($ million)
July to August 2021
($ million)
Total
($ million)
Benefits 5.2 68.8 214.7 45.1 333.8
Target 2.5 14.4 56.7 19.2 92.8
Amount and per cent above target 2.7
108%
54.4
378%
158
279%
25.9
135%
241
260%

Source: Audit Office analysis of data provided by the Department of Planning and Environment.

The department attributes the higher-than-expected financial benefits to the following:

  • benefit targets have not been updated to reflect the impact of the 2019 decision to mandate the use of the portal for all development applications. This decision brought forward the expected benefits as well as potential costs of the program. However, the department did not update its third business case which was draft at the time. The business case was subsequently approved in July 2020
  • one-off cost savings for agencies not having to develop their own systems
  • public exhibitions of planning proposals continuing to be available online during 2020 when some newspapers stopping printing due to COVID-19.

The calculation of benefits is overstated

The department reported $334 million of benefits in September 2021 due to the ePlanning program. This calculation is overstated because:

  • a proportion of reported benefits is likely to be due to other planning reforms
  • the calculation of the largest single benefit is incorrect
  • the reported benefits may not fully account for dis-benefits reported by some stakeholders.

The program’s benefits are calculated primarily from changes in planning performance data, such as the time it takes to determine a planning development application. The department currently attributes the benefits from shorter planning cycles entirely to the effect of the ePlanning program. However, planning cycles are impacted by many other factors such as the complexity of planning regulations and the availability of planning professionals. Planning cycles may also be impacted by other departmental initiatives which are designed to improve the time that it takes for a planning application to be evaluated. The Introduction describes some of these initiatives.

The largest contribution to the department’s September 2021 benefit report was an estimated saving of $151 million for developers due to lower costs associated with holding their investment for a shorter time. However, the department’s calculation of this benefit assumes a high baseline for the time to determine a development application. It also assumes that all development applications except for additions or alterations to existing properties will incur financing costs. However, a small but material number of these applications will be self-financed. The calculation also includes several data errors in spreadsheets.

The calculation of some benefits relies upon an extrapolation of the benefits experienced by a small number of early-adopter councils, including lower printing and scanning costs, fewer forms and quicker processing times. However, some councils report that their costs have increased following the introduction of the portal, primarily because aspects of the portal duplicate work that they carry out in their own systems. The portal has also required some councils to re-engineer aspects of their own systems, such as the integration of their planning systems with other council systems such as finance or property and rating systems. It has also required councils to create new ways of integrating council information systems with the planning portal.

The department has published information to help councils and certifiers to automatically integrate their systems with the planning portal. This approach uses application programming interfaces (or APIs) which are an industry-standard way for systems to share information. In April and May 2021, the government granted $4.8 million to 96 regional councils to assist with the cost of developing, implementing and maintaining APIs. The maximum amount of funding for each council was $50,000. The department is closely monitoring the implementation of APIs by councils and other portal users. Once they are fully implemented the department expects APIs to reduce costs incurred by stakeholders.

The department has not yet measured stakeholder costs. It was beyond the scope of this audit to validate these costs.

The department has not independently assured the calculation of reported benefits

In 2020 the department appointed an external provider to calculate the benefits achieved by the ePlanning program. The department advised that it chose to outsource the calculation of benefits because the provider had the required expertise and because it wanted an independent calculation of the benefits. The process involves:

  • extraction and verification of planning performance data by the department
  • population of data input sheets by the department
  • calculation of benefits by the external provider using the data input
  • confirmation by the department that the calculation includes all expected benefit sources.

The department does not have access to the benefits calculation model which is owned and operated by the external provider. The department trusts that the provider correctly calculates the benefits and does not verify the reported benefit numbers. However, as the benefits model involves many linked spreadsheets and approximately 300 individual data points, there is a risk that the calculation model contains errors beyond those discussed in this audit.

The reported benefits have only been calculated since 2019

The department originally intended to track benefits from October 2014. However, it only started to track benefits in 2019 when it appointed an external provider to calculate the benefits achieved by the portal. Any benefits or dis-benefits between the introduction of the portal and 2019 are unknown and not included in the department’s calculation of benefits.

Appendix one – Response from agency

Appendix two – About the audit

Appendix three – Performance auditing

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #366 - released 21 June 2022

Published

Actions for COVID-19: response, recovery and impact

COVID-19: response, recovery and impact

Community Services
Education
Health
Justice
Premier and Cabinet
Transport
Treasury
Whole of Government
Cross-agency collaboration
Financial reporting
Management and administration
Service delivery
Shared services and collaboration

What the report is about

This report draws together the financial impact of COVID-19 on the agencies integral to responses across the state government sector of New South Wales.

What we found

Since the COVID-19 pandemic hit NSW in January 2020, and until 30 June 2021, $7.5 billion was spent by state government agencies for health and economic stimulus. The response was largely funded by borrowings.

The key areas of spending since the start of COVID-19 in NSW to 30 June 2021 were:

  • direct health response measures – $2.2 billion
  • personal protective equipment – $1.4 billion
  • small business grants – $795 million
  • quarantine costs – $613 million
  • increases in employee expenses and cleaning costs across most agencies
  • vaccine distribution, including vaccination hubs – $71 million.

The COVID-19 pandemic significantly impacted the financial performance and position of state government agencies.

Decreases in revenue from providing goods and services were offset by increases in appropriations, grants and contributions, for health and economic stimulus funding in response to the pandemic.

Most agencies had expense growth, due to additional operating requirements to manage and respond to the pandemic along with implementing new or expanded stimulus programs and initiatives.

Response measures for COVID-19 have meant the NSW Government is unlikely to meet targets in the Fiscal Responsibility Act 2012 being:

  • annual expense growth kept below long-term average revenue growth
  • elimination of State’s unfunded superannuation liability by 2030.

 Fast facts

  • First COVID-19 case in NSW on 25 January 2020
  • COVID-19 vaccinations commenced on 21 February 2021
  • By 31 December 2021, 25.2 million PCR tests had been performed in NSW and 13.6 million vaccines administered, with 93.6% of the 16 and over population receiving two doses
  • During 2020–21, NSW Health employed an extra 4,893 full-time staff and incurred $28 million in overtime mainly in response to COVID-19
  • During 2020–21, $1.2 billion was spent on direct health COVID-19 response measures and $532 million was spent on quarantine for incoming international travellers

Section highlights

  • Up to 30 June 2021, $7.5 billion has been spent by state government agencies for health and economic stimulus.
  • Revenue increased for most agencies as falling revenue from providing goods and services was offset by additional funding from appropriations, grants and contributions.
  • Expenses increased as most agencies incurred additional costs to manage and respond to the pandemic along with delivering stimulus and support programs.
  • Borrowings of $7.5 billion over the last two years helped to fund the response to COVID-19.

Section highlights

  • NSW Government unlikely to meet targets in Fiscal Responsibility Act 2012.

Published

Actions for Treasury 2021

Treasury 2021

Treasury
Finance
Compliance
Financial reporting
Internal controls and governance
Management and administration

What the report is about

The results of Treasury cluster agencies' financial statement audits for the year ended 30 June 2021. The results of the audit of the NSW Government's consolidated Total State Sector Accounts (TSSA), which are prepared by NSW Treasury, are reported separately in our report on State Finances 2021.

What we found

Unmodified audit opinions were issued for all Treasury cluster agencies.

The number of identified monetary misstatements increased from 16 in 2019–20 to 24 in 2020–21.

Reported corrected monetary misstatements decreased from 15 in 2019–20 to seven with a gross value of $1.1 billion in 2020–21.

The largest corrected misstatement was in NSW Treasury's financial statements and was a $1 billion correction to administered borrowings.

Reported uncorrected monetary misstatements increased from one in 2019–20 to 17 with a gross value of $168 million in 2020–21.

Seven of the 2020–21 uncorrected misstatements related to one common decision relating to investment management funds terminated during the year by the NSW Treasury Corporation (TCorp).

All agencies submitted their 2020–21 financial statements within NSW Treasury's reporting deadlines.

What the key issues were

Significant audit findings were identified with respect to NSW Treasury's processes to prepare the NSW Government's consolidated TSSA (whole of government accounts). This included one extreme finding and several high-risk findings related to NSW Treasury processes. These are reported in our report on State Finances 2021.

Two high-risk issues raised in 2019–20 were also not addressed by NSW Treasury during the year and were repeat issues reported to management. These related to the appropriations framework and resolution of cross cluster payments, and instances where some agencies spent deemed appropriations money without an authorised delegation.

A number of previously reported audit findings and recommendations with respect to icare continue to be ongoing issues, namely:

  • The Workers Compensation Nominal Insurer continues to hold less assets than the estimated present value of its future payment obligations.
  • The Workers Compensation Nominal Insurer's four week return-to-work rate fell from 68% to 64%. This is below icare's 70% target. Contributing factors include COVID-19 lockdowns which have impacted claims handling processes, and increased barriers to claimants returning to work.
  • Instances were noted where inadequate documentation was kept on file to support claims, including pre-injury average weekly earnings (PIAWE) calculations.

The Workers Compensation (Dust Diseases) Authority increased its outstanding claims liability by $93.9 million, which included $39.3 million to remediate historical underpayments, resulting from workers not being paid the rate required by existing legislation.

The icare Board approved a new approach for remediating PIAWE underpayments on 24 September 2021, the date the Workers Compensation Nominal Insurer’s financial statements were approved for issue. The impact of the decision on the financial statements was not discussed with the Audit Office and assessed as an ‘after balance date event’.

What we recommended

Our report on State Finances 2021 made several recommendations to improve NSW Treasury processes. These included:

  • improve processes to ensure information is shared with audit on a timely basis
  • seek legislative amendments to resolve statutory inconsistencies relating to statutory reporting time frames
  • implement effective quality review processes over key accounting information
  • establish a policy to determine the minimum expected rate of return on equity injections in other public sector entities
  • prepare robust financial projections to support accounting decisions
  • re-confirm sector classifications of TAHE, Sydney Trains and NSW Trains
  • ensure sufficient oversight of its use of consultants and assess the risk of an overdependence on consultants at the cost of internal capability
  • improve disclosures of equity injections invested in other public sector entities
  • determine a state-wide policy on when borrowings are recognised in agency financial statements
  • make legislative amendments to ensure expenditure incurred across financial years does not exceed the appropriation authority and assess the financial reporting impact
  • improve the guidance provided to agencies to ensure expenditure of public money is properly supported by authorised delegations.

We also recommended icare should ensure:

  • it has sufficient controls over claim payments including an effective quality assurance program, to minimise claim payment errors
  • that documentation to support injured worker benefit calculations is appropriately maintained, and the documentation requirements are set out in a policy
  • the impact of ‘after balance date events’ on financial statements is appropriately assessed
  • its operational practices are improved to ensure the correct payment of claims in compliance with legislative requirements. icare also needs to act on a timely basis on received legal advice and amend operational practices to ensure correct payments are made.

Fast facts 

NSW Treasury notes that it is the Government's principal financial and economic adviser to guide the State’s growth for the benefit of the people who live, work and study in NSW.

  • $111b funds under management as at 30 June 2021
  • 100% unqualified audit opinions were issued on agencies’ 30 June 2021 financial statements
  • 24 monetary misstatements were reported in 2020–21
  • $17b total expenditure incurred in 2020–21
  • 12 extreme and high-risk findings were identified
  • 30% of reported issues were repeat issues

This report focuses on agencies within the Treasury cluster and provides parliament and other users of the Treasury cluster's financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

NSW Treasury also prepares the consolidated NSW whole of government financial statements (the Total State Sector Accounts), which is reported in the report on State Finances 2021.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making is enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Treasury cluster (the cluster) for 2021.

Section highlights

  • Unmodified audit opinions were issued on all the cluster agencies 2020–21 financial statements.
  • The number of identified monetary misstatements increased from 16 in 2019–20 to 24 in 2020–21.
  • Reported corrected monetary misstatements decreased from 15 in 2019–20 to seven with a gross value of $1.1 billion in 2020–21. The largest corrected misstatement was in NSW Treasury's financial statements resulting in a $1 billion correction to its administered borrowings. The correction was to address an understatement by NSW Treasury which did not recognise a liability for funds raised by NSW Treasury Corporation (TCorp) on its behalf as it applied settlement date accounting rather than trade date when recognising these borrowings. A corresponding receivable from TCorp was also recognised to reflect that funds were to be received on 1 July 2021.
  • The number of uncorrected misstatements increased from one in 2019–20 to 17 in 2020–21. Two of the misstatements above $5 million related to investment valuations within the SAS Trustee Corporation Pooled Fund, two related to premium income overstatements within the Workers Compensation Nominal Insurer, and one related to NSW Treasury administered liabilities and expenses where it recognised a provision for remediation costs when it had no present obligation. A further seven related to investment management funds that were terminated during the year by TCorp.
  • Nine agencies that were required to perform early close procedures did not complete a total of 25 mandatory procedures. The most common incomplete early close procedures include inter and intra (cluster) agency balances and transactions not confirmed with the counterparty agency and significant management judgements and assumptions made when estimating transactions and balances not documented.
  • To ensure compliance with Australian Accounting Standards, transactions and balances that were formerly reported in the Crown Entity’s financial statements are now reported by NSW Treasury as it primarily controls or administers the transactions and balances on behalf of the State.
  • icare changed the risk margin applied to measure the Workers Compensation Nominal Insurer's outstanding claims liability. If the risk margin used when valuing its 2019–20 outstanding claims liability had been retained, its net asset deficiency would have worsened compared to the prior year. The change in risk margin aligns the Nominal Insurer’s ‘probability of adequacy’ with the Australian Prudential Regulation Authority’s minimum reporting requirements for general insurers.
  • The icare Board approved a new approach for remediating pre-injury average weekly earnings underpayments (subject to legal advice, and assessment by a wage remediation expert), on 24 September 2021 and announced on 11 November 2021. The impact of the decision on the Nominal Insurer's financial statements was not assessed by icare as an ‘after balance date event’ and was not raised with the Audit Office prior to icare finalising its 2021 financial statements on 24 September 2021.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Treasury cluster.

Section highlights

  • The 2020–21 audits identified one new Extreme Risk and 11 High Risk findings. The extreme risk finding related to the incomplete provision and timely access to information to the Total State Sector Accounts (TSSA) audit and the accounting for the General Government Sector's investment in TAHE. Findings related to the TSSA audit are reported in the report on State Finances 2021. Of the 11 high risk findings, two were repeat findings relating to cross cluster payments and authorisation to spend deemed funds. High risk repeat findings need to be addressed with greater priority.
  • There were 21 moderate risk findings reported to management in 2020–21, ten of which were repeat findings. The most common repeat finding related to claims processing, information technology user access administration. Repeat findings, particularly those that relate to data protection, need greater prioritisation and should be implemented on a timely basis.
  • icare is in the process of implementing organisational reform in response to findings in recent external reviews. These reviews identified 151 recommendations for icare to improve in the areas of risk and governance, performance, and culture and accountability. All of the recommendations were accepted by icare and are expected to be addressed through their ‘Improvement Program’. A number of the observations referred to in this report were also identified in the external reviews.
  • The Nominal Insurer's four week return-to-work rate fell from 68% at 30 June 2020 to 64% at 30 June 2021 and was at 63% at 30 September 2021. This is below icare's target of 70%.
  • The Nominal Insurer overpaid, and underpaid claims to policyholders due to claims processing weaknesses. There was also insufficient documentation to support key inputs to weekly benefit payments, thereby further increasing the risk of claims being overpaid, and underpaid.
  • The Home Building Compensation Fund's net liability position reduced from $746 million at 30 June 2020 to $534 million at 30 June 2021 due to increases in premium rates and increased building activity from stimulus measures.
  • The Nominal Insurer's provision for errors in pre-injury average weekly earnings decreased from $21 million to 30 June 2020, to $11.6 million at 30 June 2021. The provision was not reassessed for icare’s decision to proactively remediate PIAWE underpayments.
  • The NSW Self Insurance Corporation also recognised a $12.8 million provision at 30 June 2021 to remediate past underpayments.

Findings reported to management

The number of findings reported to management has decreased, but 30% of all issues were repeat issues and these need greater focus and prioritisation

Breakdowns and weaknesses in internal controls increase the risk of fraud and error. Deficiencies in internal controls, matters of governance interest and unresolved issues were reported to management and those charged with governance of agencies. The Audit Office does this through management letters, which include observations, related implications, recommendations and risk ratings.

In 2020–21, there were 57 findings raised across the cluster (71 in 2019–20), 30% of which were repeat issues (32% in 2019–20).

The most common repeat issues related to claims processing and information technology user access administration.

A delay in implementing audit recommendations increases the risk of intentional and accidental errors in processing information, producing management reports and generating financial statements. This can impair decision-making, affect service delivery and expose agencies to fraud, financial loss and reputational damage. Poor controls may also mean agency staff are less likely to follow internal policies, inadvertently causing the agency not to comply with legislation, regulation and central agency policies.

The table below describes the common issues identified across the cluster by category and risk rating.

Risk rating Issue
Information technology

Moderate2
4 new
2 repeat

Low1
6 new
4 repeat

The financial audits identified the need for agencies to improve information technology processes and controls that support the integrity of financial data used to prepare agencies' financial statements. Of particular concern are issues associated with:
  • poor user access administration and monitoring of privileged user activities
  • lack of disaster recovery planning.
Internal control deficiencies or improvements

High3
1 repeat

Moderate2
5 new
7 repeat

Low1
9 new
 

 

The financial audits identified internal control weaknesses across key business processes, including:
  • lack of controls to ensure cluster expenditure does not exceed a minister's appropriation authority received under the annual Appropriations Act and the GSF Act
  • inadequate procurement controls including purchase orders not being used and policy documents not stipulating thresholds which require minimum quotations or tenders
  • inadequate claim processing controls leading to documentation not kept to support claims, and errors in payments.
High risk issues are discussed later in this chapter.
Financial reporting

High3
2 new

Moderate2
2 new
1 repeat

Low1
2 new 

The financial audits identified opportunities for agencies to strengthen financial reporting, including:
  • need to review significant judgements, and continue to assess whether assets are controlled
  • grants being incorrectly accounted for leading to errors
  • provisions not including costs to settle the obligation and errors in the accuracy and completeness of underlying data used in valuations.
High risk issues are discussed later in this chapter.
Governance and oversight

Extreme4
1 new

High3
7 new

Low1
1 new
 

The financial audits identified the need for agencies to improve governance and oversight processes, including:
  • documentation was inadequate and key documents were either not provided to the Audit Office, or were not provided on a timely basis, or their existence was not made known to the Audit Office
  • inconsistencies in the GSF Act and GSA Act relating to statutory timeframes
  • numerous versions of working papers were submitted all of which contained errors, omissions and/or poor logic
  • no formal policy or benchmark on expected investment returns from other government sectors
  • addressing significant uncertainty relating to access fees to be paid by rail operators raised in the Total State Sector Accounts audit opinion
  • the sector classification of certain Public Non-Financial Corporations needs to be confirmed with the Australian Bureau of Statistics
  • external consultants were used extensively to advise government agencies on matters related to TAHE
  • there is no state-wide policy about borrowings which provides guidance around performance obligations arising under trades between government agencies.
Extreme and high risk issues are discussed later in this chapter and in the report on State Finances 2021.
Non-compliance with key legislation and/or central agency policies

High3
1 repeat

Low1
1 new
1 repeat

The financial audits identified the need for agencies to improve its compliance with key legislation and central agency policies, including:
  • non-compliance with the GSA Act and expenditure of public monies not supported by authorised delegations or spent for an authorised and valid purpose
  • input tax credits were not always claimed correctly.
High risk issues are discussed later in this chapter.

 Extreme risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
3 High risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
2 Moderate risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
1 Low risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.

 Note: Management letter findings are based either on final management letters issued to agencies, or draft letters where findings have been agreed with management.

The number of moderate risk findings decreased from prior year

There were 21 moderate risk findings reported in 2020–21, representing a 30% decrease from 2019–20. Of these, ten were repeat findings, and 11 were new issues.

Moderate risk repeat findings include:

  • claims processing weaknesses including claim payment errors, and inadequate documentation to support calculations and evidence claims were reviewed by someone with appropriate delegation
  • inadequate review of user access and higher risks of unintended or unauthorised system access
  • controls assurance reports from an outsourced service provider did not cover the services it provided to the government agency
  • failure to review procurement contracts register to ensure it is accurate and complete
  • ongoing control deficiencies with grant application and approval processes
  • key policies including delegations not being reviewed in a number of years and do not incorporate new requirements from more recent legislation
  • quality review processes failing to identify material classification errors associated with grant funding.

NSW Treasury related matters

Accounting for the Government's investment in Transport Asset Holding Entity

A total of seven recommendations were made with respect to NSW Treasury's processes to prepare the NSW Government's consolidated whole of government accounts (the TSSA). This included one extreme risk finding and six high risk findings. The extreme finding related to NSW Treasury needing to significantly improve its processes to ensure all key information is identified and shared with the Audit Office on a timely basis. Other high-risk findings were identified which resulted in the following recommendations for NSW Treasury:

  • establishing a policy to determine the minimum expected rate of return on the GGS equity injections in other public sectors entities and report on the performance of these GGS investments in the TSSA, including how much and what type of returns the government is obtaining from its investments compared to its targeted return
  • facilitate revised commercial agreements to reflect access and license fees that were agreed in the 18 December 2021 Heads of Agreement between Transport for NSW, TAHE and the operators Sydney Trains and NSW Trains
  • with TAHE, prepare robust projections and business plans to support GGS investment returns beyond FY2031.
  • liaising with the ABS to re-confirm the classification of TAHE, NSW Trains and Sydney Trains as entities within the PNFC sector
  • monitoring the risk that control of TAHE assets could change in future reporting periods and the implications on the TSSA
  • consider whether there is sufficient competent oversight of its use of consultants and assess the risk of an over dependence on consultants at the cost of internal capability.

More details on the recommendations to NSW Treasury relating to its accounting for the GGS investment in TAHE are included on pages 7 to 24 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. 

Borrowings of $1 billion were understated by NSW Treasury

NSW Treasury, a GGS agency, made agreements to borrow $1 billion from New South Wales Treasury Corporation (TCorp), a PFC sector agency. Some of these agreements were entered as early as 17 May 2021 and all agreements for borrowings were entered into before 30 June 2021. However, NSW Treasury requested that settlement of those additional borrowings be deferred until 1 July 2021.

As TCorp raised the funds before 30 June 2021, it recognised a financial asset and liability to NSW Treasury on 30 June 2021. Despite TCorp having raised the funds by 30 June 2021 under the mutually agreed trade deal, NSW Treasury did not recognise any borrowings at year end on the basis that it requested the settlement date and receipt of cash to be deferred to past the balance sheet date. This led to an understatement of debt liabilities of $1 billion by NSW Treasury, and an inconsistent accounting treatment between the two agencies. NSW Treasury subsequently corrected the misstatement after the matter was raised by the audit, resulting in the GGS recognising $1 billion in financial assets and borrowings at 30 June 2021.

More detail on these inconsistencies is on page 37 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. We recommended NSW Treasury seek develop a state-wide accounting policy for borrowings which ensure correct and consistent accounting treatment between agencies and sectors.

Inconsistencies exist in the GSF Act and GSA Act related to key statutory timeframes

There are inconsistencies between key statutory reporting timeframes imposed on the Treasurer and Auditor-General for the Consolidated State Financial Statements (the Statements) in the Government Sector Finance Act 2018 (GSF Act) and Government Sector Audit Act 1983 (GSA Act). Ambiguity in the statutory reporting timeframes could impact on the future timely provision of this information to Parliament. More detail on these inconsistencies is on page 54 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. We recommended NSW Treasury seek legislative amendments in Parliament to resolve these inconsistencies.

NSW Treasury lacks a framework to monitor and provide assurance to ministers that they are in compliance with their appropriation authority

In July 2021, NSW Treasury highlighted a potential issue associated with certain cross-cluster payments which was based on advice received from the Crown Solicitor in January 2021. After being made aware of the issue, the Audit Office obtained its own advice on matters related to the appropriations framework under relevant state legislation. In the advice to the Audit Office, the Crown Solicitor advised that an agency is not subject to its own legally appropriated expenditure limit (assuming it is not subject to any annual spending limit imposed through an instrument of delegation or a budget control authority issued by the Treasurer under section 5.1 of the GSF Act). In effect, because responsible ministers are given appropriations, these legal expenditure limits, rest in aggregate, with the principal department and agencies the minister is responsible for. It is not possible for an individual agency to monitor or determine at what ‘point in time’ expenditure has been incurred in excess of the minister’s appropriation authority and there is currently no framework to monitor this.

Further detail on this matter is on pages 54 to 56 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. In this report, we recommended that NSW Treasury:

  • ensure a framework exists to monitor and provide assurance to ministers that expenditure incurred across a financial year by agencies under the relevant minister's coordination does not exceed the appropriation authority conferred by the annual Appropriations Act and the GSF Act
  • assess how the requirement to prepare a Summary of Compliance under Australian Accounting Standards impacts relevant principal departments and cluster agencies financial statement disclosures.

Agencies have again spent monies without an authorised delegation

In the State Finances NSW Auditor-General's Report to Parliament for 2020 and 2021 we reported instances where agencies spent money received from an annual appropriation and/or deemed appropriation money without an authorised delegation from the relevant minister(s) as required by sections 4.6(1) and 5.5(3) of the GSF Act. Further detail on this matter is on pages 56 to 57 of the State Finances 2021 NSW Auditor-General’s Report to Parliament. In this report, we recommended NSW Treasury promptly improve the guidance it provides agencies to ensure that expenditure of public monies is properly supported by authorised delegations.

Control deficiencies at NSW Treasury's service providers

NSW Treasury's business processes and information technology services were provided by Infosys, Unisys and the Department of Customer Service during 2020–21. Together this constitutes the GovConnect environment.

The GovConnect information technology general controls (ITGC) were qualified in 2020–21. The key controls over user access, system changes and batch process failed in all ITGC reports. Most of these deviations were not mitigated or sufficiently mitigated to address the risk of unauthorised user access.

In response to the internal control qualifications, the audit teams performed data analytics over payroll and accounts payable to obtain reasonable assurance that these control deficiencies did not materially impact on relevant agencies' financial statements.

Refer to the Customer Service 2021 NSW Auditor-General’s Report to Parliament for further details.

Insurance related matters

icare is in the process of implementing organisational reform in response to findings in recent external reviews. These reviews have identified 151 recommendations for icare to improve in the areas of risk and governance, performance, and culture and accountability. The reviews include the April 2021 McDougall Review, and the February 2021 ‘Independent Review of icare governance, accountability and culture’ which was recommended by SIRA in the Dore Report.

All of these recommendations were accepted by icare and are expected to be addressed through their ‘Improvement Program’. As at February 2022, icare report that 21 have been addressed, 139 are in progress, and 15 still to commence.

A number of the observations referred to in this report were also identified in the above reviews and are expected to be actioned as part of the improvement program.

Workers Compensation Nominal Insurer (the Nominal Insurer)

The Nominal Insurer’s net asset deficiency at 30 June 2021

Last year's Central Agencies Report to Parliament reported that the Workers Compensation Nominal Insurer (the Nominal Insurer), the NSW Self Insurance Corporation and the Lifetime Care and Support Authority of New South Wales all had negative net assets at 30 June 2020. After strong investment returns in 2020–21, only the Nominal Insurer continued to have negative net assets at 30 June 2021.

The Nominal Insurer's negative net assets of $252.9 million at 30 June 2021 ($316.2 million at 30 June 2020) means that it still does not hold sufficient capital to meet the estimated present value of its future payment obligations, when measured in accordance with the accounting framework. The financial statements continued to be prepared on a going concern basis because the future payment obligations are not all due for settlement within the next 12 months.

As noted in section 2.4 ‘Key accounting issues’, icare changed from an 'Accounting Ratio', to an 'Insurance Ratio', to assess the Nominal Insurer’s capital position from 2020–21. The insurance ratio uses a (higher) discount rate based on the expected earnings rate on the Nominal Insurer’s assets, rather the ‘risk free’ rate which is used for financial reporting.

Last year's Report to Parliament also noted that the deterioration in the value of the Nominal Insurer’s net assets has resulted in its funding ratio at 30 June 2020 being outside of the ‘target operating zone’ set by the Board of icare. The Insurance Ratio at 30 June 2021 is 122%, which is less than icare's target operating zone of over 130%.

icare is assessing how it can increase the Nominal Insurer’s funding ratio, and advises that actions taken to date include the execution of the Nominal Insurer Improvement Program (the Improvement Program) and an increase in premium rates.

icare were given approval by the State Insurance Regulatory Authority (SIRA) to increase workers compensation premium rates from 1.4% to 1.44%  of wages (2.9%) for the 2021–22 policy year. icare advises that their pricing strategy for workers compensation premiums is for ‘modest increases over the medium term’.

Return-to-work rates have worsened

Last year's Central Agencies Report to Parliament noted that the Nominal Insurer has experienced deteriorating return-to-work rates since late 2017. According to data published by SIRA, the Nominal Insurer’s monthly four week return-to-work rate has continued to decline, falling from 68% at 30 June 2020 to 64% at 30 June 2021, and down to 63% at 30 September 2021.

A key assumption when measuring the Nominal Insurer’s outstanding claims liability, is the amount of time that injured workers will remain on benefits (i.e. continuance rates). This assumption is significantly aligned with return-to-work rate measures. At 30 June 2021, the liability was increased by $296 million due to changes in continuance rate assumptions, with workers expected to remain on benefits longer. This change is consistent with the fall in four week return-to-work rates.

The four week return-to-work rate trend since August 2017 is shown in the graph below.

Appendix one - Misstatements in financial statements submitted for audit

Appendix two – Early close procedures

Appendix three – Timeliness of financial reporting

Appendix four – Financial data

Appendix five – Acquittals and other opinions

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Published

Actions for Central Agencies 2020

Central Agencies 2020

Premier and Cabinet
Treasury
Financial reporting
Internal controls and governance
Management and administration
Risk

This report analyses the results of our audits of the financial statements of the Treasury, Premier and Cabinet, Customer Service cluster agencies (central agencies), and the Legislature for the year ended 30 June 2020. The table below summarises our key observations.

1. Financial reporting

Audit opinions and timeliness of reporting

Unqualified audit opinions were issued on the 2019–20 financial statements of central agencies and the Legislature.

The audit opinion on the Social and Affordable Housing NSW Fund's compliance with the payment requirements of the Social and Affordable Housing NSW Fund Act 2016 was qualified.

All agencies met statutory deadlines for submitting
financial statements. 

Agencies were financially impacted by recent emergency events The NSW Government allocated $1.4 billion to provide small business support and bushfire recovery relief, support COVID-19 quarantine compliance management, recruit more staff to respond to increased customer demand, and meet additional COVID-19 cleaning requirements. Agencies spent $901 million (64 per cent of the allocated funding) for the financial year ended 30 June 2020. NSW Self Insurance Corporation reported an increase of $850 million in its liability for claims related to emergency events.
AASB 16 'Leases' resulted in significant changes to agencies' financial position The implementation of new accounting standards was challenging for many agencies. The New South Wales Government Telecommunications Authority was not well-prepared to implement AASB 16 'Leases' and had not completely assessed contracts that contained leases. This resulted in understatements of leased assets and liabilities by $56 million which were subsequently corrected.
Implementation of new revenue standards NSW Treasury did not adequately implement the new revenue standard AASB 1058 ‘Income of Not-for-Profit Entities’ for the Crown Entity. This resulted in understatements of $274 million in opening equity and $254 million to current year revenue, which have been corrected in the final financial statements.

2. Audit observations

Management letter findings and repeat issues Our 2019–20 audits identified nine high risk and 122 moderate risk issues across central agencies and the Legislature. The high risk issues were identified in the audits of:
  • Insurance and Care NSW
  • New South Wales Government Telecommunications Authority
  • Rental Bond Board
  • Independent Commission Against Corruption
  • NSW Treasury
  • Crown Entity
  • Department of Premier and Cabinet.

High risk findings include:

  • Insurance and Care NSW (icare) allocates service costs to the Workers Compensation Nominal Insurer, and the other schemes it supports. The documentation supporting cost allocations does not demonstrate how these allocations reflect actual costs. There is a risk of the Workers Compensation Nominal Insurer being overcharged.
  • New South Wales Government Telecommunications Authority's delay in capitalisation and valuation of material capital projects; and insufficient work performed to implement the new accounting standard AASB 16 ‘Leases’.
  • NSW Treasury's four-year plan to transition RailCorp to a for-profit State Owned Corporation called Transport Asset Holding Entity of New South Wales (TAHE) by 1 July 2019, remains to be implemented. On 1 July 2020, RailCorp converted to TAHE. A large portion of the planned arrangements are still to be implemented. As at the time of the audit, the TAHE operating model, Statement of Corporate Intent (SCI) and other key plans and commercial agreements were not finalised. In the absence of commercial arrangements with the public rail operators, there is a lack of evidence to demonstrate TAHE’s ability to create a commercial return in the long term. This matter has been included as a high risk finding in our management letter as there may be financial reporting implications to the State if TAHE does not generate a commercial return for its shareholders in line with the original intent. NSW Treasury and TAHE should ensure the commercial arrangements, operating model and SCI are finalised in 2020–21.

Of the 122 moderate risk issues, 36 per cent were repeat issues. The most common repeat issue related to weaknesses in controls over information technology user access administration, which increases the risk of inappropriate access to systems and records.

Grants administration for disaster relief Service NSW delivers grants responding to emergency events on behalf of other NSW Public Sector agencies. Since the first grant program commenced in January 2020, Service NSW processed approximately $791 million to NSW citizens and businesses impacted by emergency events for the financial year ended 30 June 2020. A performance audit of grants administration for disaster relief is planned for 2020–21. It will assess whether grants programs administered under the Small Business Support Fund were effectively designed and implemented to provide disaster relief.
Internal controls at GovConnect NSW service providers require enhancement

GovConnect NSW provides transactional and information technology services to central agencies. It engages an independent service auditor (service auditor) from the private sector to perform annual assurance reviews of controls at service providers, namely Infosys, Unisys and the Department of Customer Service (DCS). The service auditor issued:

  • unqualified opinions on information technology and business process controls at Infosys and Unisys, but there was an increase in control deficiencies identified in the user access controls at these service providers
  • a qualified opinion on DCS's information technology (IT) security monitoring controls because security tools were not implemented and monitored for the entire financial year. Responsibility for IT security monitoring transitioned from Unisys to DCS in 2019–20. These control deficiencies can increase the risk of fraud and inappropriate use of sensitive data.

These may impact on the ability of agencies to detect and respond to a cyber incident.

Recommendation:

We recommend DCS work with GovConnect service providers to resolve the identified control deficiencies as a matter of priority.

The NSW Public Sector's cyber security resilience needs to improve

The NSW Cyber Security Policy requires agencies to provide a maturity self-assessment against the Australian Cyber Security Centre (ACSC) Essential 8 to the head of the agency and Cyber Security NSW annually. Completed self-assessment returns highlighted limited progress in implementing the Essential 8.

Repeat recommendation:

Cyber Security NSW and NSW government agencies need to prioritise improvements to their cyber security resilience as a matter of urgency

Three Insurance and Care NSW (icare) entities had net asset deficiencies at 30 June 2020 The Workers Compensation Nominal Insurer, NSW Self Insurance Corporation and the Lifetime Care and Support Authority of NSW all had negative net assets at 30 June 2020. These icare entities did not hold sufficient assets to meet the estimated present value of all of their future payment obligations at 30 June 2020. The deterioration in net assets was largely due to increases in outstanding claims liabilities. Notwithstanding the overall net asset deficiencies, the financial statements for these entities were prepared on a going concern basis. This is because future payment obligations are not all due within the next 12 months. Settlement is instead expected to occur over years into the future, depending on the nature of the benefits provided by each scheme.
icare has not been able to demonstrate that its allocation of costs reflects the actual costs incurred by the Workers Compensation Nominal Insurer and other schemes

Costs are incurred by icare as the 'service entity' of the statutory scheme it administers, and then subsequently recovered from the schemes through 'service fees'. In the absence of documentation supported by robust supporting analysis, there is a risk of the schemes being overcharged, and the allocation of costs being in breach of legislative requirements.

Recommendation:

icare should ensure its approach to allocating service fees to the Workers Compensation Nominal Insurer and the other schemes it manages, is transparent and reflects actual costs.

icare did not comply with GIPA requirements icare did not comply with the Government Information (Public Access) Act 2009 (GIPA) contract disclosure requirements in 2019–20 and has not complied for several years. A total of 417 contracts were identified by management as not having been published on the NSW Government’s eTendering website. The final upload of these past contracts occurred on 20 August 2020.
Implementation of Machinery of Government (MoG) changes MoG changes impacted the governance and business processes of some agencies. Our audits identified and reported areas for improvement in the consolidation of corporate functions following MoG implementation processes at Infrastructure NSW and in the Customer Service cluster.

This report provides Parliament and other users of NSW Government central agencies' financial statements and the Legislature's financial statements with the results of our financial audits, observations, analyses, conclusions and recommendations.

Emergency events, such as bushfires, floods and the COVID-19 pandemic significantly impacted agencies in 2019–20. Our findings on nine agencies that were most impacted by recent emergency events are included throughout this report.

Refer to Appendix one for the names of all central agencies and Appendix four for the nine agencies most impacted by emergency events.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely. This chapter outlines our audit observations on the financial reporting of central agencies and the Legislature for 2020, including the financial implications from recent emergency events.

Section highlights

  • Unqualified audit opinions were issued on the 2019–20 financial statements of central agencies and the Legislature. All agencies met the statutory deadlines for submitting their financial statements.
  • The audit opinion on the Social and Affordable Housing NSW Fund's compliance with the payment requirements of the Social and Affordable Housing NSW Fund Act 2016 was qualified as a result of a payment made without a Treasurer's delegation.
  • Agencies were impacted by emergency events during 2019–20. This included additional grants to fund specific deliverables.
  • The implementation of new accounting standards was challenging for many agencies. The New South Wales Government Telecommunications Authority was not well-prepared to implement AASB 16 'Leases' and had not completely assessed contracts that contained leases. This resulted in understatements of leased assets and liabilities by $56 million which were subsequently corrected.
  • NSW Treasury did not adequately implement the new revenue standard AASB 1058 ‘Income of Not-for-Profit Entities’ for the Crown Entity. This resulted in understatements of $274 million in opening equity and $254 million to current year revenue in the financial statements. These misstatements were due to incorrect revenue calculations performed by the Transport agencies. The Crown Entity relies on information from Transport agencies as they are responsible for carrying out the State’s contractual obligations for Commonwealth funded transport projects. The extent of misstatements could have been reduced with more robust quality review processes in place by Treasury and Transport.

 

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines:

  • our observations and insights from the financial statement audits of agencies in the central agencies and the Legislature
  • our assessment of how well agencies adapted their systems, policies, procedures and governance arrangements in response to recent emergencies.

Section highlights

  • The 2019–20 audits identified nine high risk and 122 moderate risk issues across the agencies. Of the 122 moderate risk issues, 44 (36 per cent) were repeat issues. The most common repeat issue relates to weaknesses in controls over information technology user access administration.
  • Service NSW delivers grants responding to emergency events on behalf of other NSW Public Sector agencies. Since the first grant program commenced in January 2020, Service NSW processed approximately $791 million to NSW citizens and businesses impacted by these emergency events for the financial year ended 30 June 2020.
  • GovConnect NSW engaged an independent auditor (the service auditor) from the private sector to evaluate the internal controls of its service providers. DCS's information technology security monitoring controls were qualified by the service auditor because security tools were not implemented and monitored for the entire financial year. These may impact on the ability of agencies to detect and respond to a cyber incident.
  • NSW Government agency self-assessment results show that the NSW Public Sector's cyber security resilience needs urgent attention.
  • The Workers Compensation Nominal Insurer, NSW Self Insurance Corporation and the Lifetime Care and Support Authority of NSW all had negative net assets at 30 June 2020. The financial statements for these entities continued to be prepared on a going concern basis as their liabilities are not all due for settlement within the next 12 months.
  • icare did not comply with the Government Information (Public Access) Act 2009 (GIPA) contract disclosure requirements in 2019–20, and has not complied for several years. A total of 417 contracts were identified by management as not having been published on the NSW Government’s eTendering website. The final upload of these past contracts occurred on 20 August 2020.
  • Machinery of Government (MoG) changes impacted the governance and business processes of affected agencies. Our audits identified and reported areas for improvement in the consolidation of corporate functions following MoG changes at Infrastructure NSW and in the Customer Service cluster.