Reports
Actions for Planning and Environment 2023
Planning and Environment 2023
What this report is about
Results of the Planning and Environment portfolio financial statement audits for the year ended 30 June 2023.
The audit found
Unqualified audit opinions were issued for all completed Planning and Environment portfolio agencies. Seven audits are ongoing.
The Catholic Metropolitan Cemeteries Trust (CMCT) did not comply with its obligations under the Government Sector Finance Act 2018 (GSF Act) to prepare and submit financial statements for audit.
The Department of Planning and Environment (the department) has not yet provided their assessment of the financial reporting requirements for the 579 Category 2 Statutory Land Managers (SLMs) for 2022–23.
One-hundred-and-nineteen Commons Trusts are non-compliant with the GSF Act as they have not submitted their financial statements for audit.
We issued unqualified opinions on the Water Administration Ministerial Corporation's 2020–21, 2021–22 and 2022–23 financial statements.
The number of monetary misstatements identified in our audits decreased from 59 in 2021–22 to 51 in 2022–23, however the gross value of misstatements increased.
The key audit issues were
The former Resilience NSW and NSW Reconstruction Authority (the Authority) re-assessed the accounting implications arising from contractual agreements relating to temporary housing assets associated with the Northern Rivers Temporary Homes Program. This resulted in adjustments to recognise the associated assets and liabilities.
We continue to identify significant deficiencies in NSW Crown land information records.
The department has not been effective in addressing the differing practices for the financial reporting of rural firefighting equipment vested to councils under section 119 (2) of the Rural Fires Act 1997.
The number of findings across the portfolio reported to management increased from 132 in 2021–22 to 140 in 2022–23. Thirty per cent of issues were repeated from the prior year.
Seven high-risk issues were identified. These related to the findings outlined above, deficiencies in quality reviews of asset valuations, internal control processes and IT general controls.
The audit recommended
Recommendations were made to the department and portfolio agencies to address these deficiencies.
This report provides Parliament and other users of the Planning and Environment portfolio of agencies’ financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:
-
financial reporting
- audit observations.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Planning and Environment portfolio of agencies (the portfolio) for 2023.
Section highlights
-
Unqualified audit opinions were issued on all completed 30 June 2023 financial statements audits of portfolio agencies. Seven audits are ongoing.
-
We have been unable to commence audits of the Catholic Metropolitan Cemeteries Trust (CMCT). NSW Treasury's position remains that the Catholic CMCT is a controlled entity of the State for financial reporting purposes. This means CMCT is a Government Sector Finance (GSF) agency and is obliged under Section 7.6 of the Government Sector Finance Act 2018 (GSF Act) to prepare financial statements and submit them to the Auditor-General for audit. To date, CMCT has not met its statutory obligations under the GSF Act.
-
The Department of Planning and Environment has not yet provided their assessment against the reporting exemption requirements in the Government Sector Finance Regulation 2018 (GSF Regulation) for the estimated 579 Category 2 Statutory Land Managers (SLMs) or 119 Commons Trusts for 2022–23 and no Category 2 SLM or Commons Trust has submitted its 2022–23
financial statements for audit. Consequently, the lack of compliance with reporting requirements by these 698 agencies presents a challenge to obtaining reliable financial data for these agencies for the purposes of consolidation to the Total State Sector Accounts.
-
The audits of the Water Administration Ministerial Corporation's (WAMC) financial statements for the years ended 30 June 2021 and 30 June 2022 were completed in June 2023 and unqualified audit opinions issued. The 30 June 2023 audit was completed and an unqualified audit opinion was issued on 12 October 2023.
-
The number of reported corrected misstatements decreased from 46 in 2021–22 to 36, however the gross value of misstatements increased from $73 million in 2021–22 to $491.8 million in 2022–23.
-
Portfolio agencies met the statutory deadline for submitting their 2022–23 early close financial statements and other mandatory procedures.
-
A change to the NSW paid parental leave scheme, effective October 2023, created a new legal obligation that needed to be recognised by impacted government agencies. Impact to the agencies' financial statements were not material.
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.
This chapter outlines our observations and insights from our financial statement audits of agencies in the portfolio.
Section highlights
-
The number of findings across the portfolio reported to management increased from 132 in 2021–22 to 140 in 2022–23 and 30% were repeat issues (34% in 2021–22).
-
The 2022–23 audits identified seven high-risk and 76 moderate risk issues across the portfolio. Four of the high-risk issues were repeat issues, one was a repeat issue with the risk rating reassessed to high-risk in the current year and two were new findings in 2022–23.
-
The former Resilience NSW and NSW Reconstruction Authority had previously assessed that they did not control the temporary housing assets associated with the administration of the Northern Rivers Temporary Homes Program, under relevant accounting standards. A re-assessment of the agreements was made subsequent to the submission of the Authority’s 2022–23 financial statements for audit, which determined that the Authority was the appropriate NSW Government agency to recognise these assets and associated liabilities not previously recognised by the Authority or the former Resilience NSW.
-
There continues to be significant deficiencies in Crown land records. The department should continue to implement their data strategy and action plan to ensure the Crown land database is complete and accurate.
-
Since 2017, the Audit Office has recommended that the department, through OLG should address the differing practices for the financial reporting of rural firefighting equipment vested to councils under section 119 (2) of the Rural Fires Act 1997. The department has not been effective in resolving this issue. In 2023, twenty-six of 108 completed audits of councils received qualified audit opinions on their 2023 financial statements (43 of 146 completed audits in 2022). Six councils had their qualifications for not recognising vested rural firefighting equipment removed in 2022–23.
Appendix one – Misstatements in financial statements submitted for audit
Appendix two – Early close procedures
Appendix three – Timeliness of financial reporting
Appendix four – Financial data
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Regional NSW 2023
Regional NSW 2023
What this report is about
Results of the Regional NSW financial statements audits for the year ended 30 June 2023.
What we found
Unqualified audit opinions were issued on all completed audits in the Regional NSW portfolio agencies.
The number of monetary misstatements identified in our audits increased from 28 in 2021–22 to 30 in 2022–23.
What the key issues were
Effective 1 July 2023, staff employed in the Northern Rivers Reconstruction Corporation Division of the Department of Regional NSW transferred to the NSW Reconstruction Authority Staff Agency.
The Regional NSW portfolio agencies were migrated into a new government wide enterprise resourcing planning system.
The total number of audit management letter findings across the portfolio of agencies decreased from 36 to 23.
A high risk matter was raised for the NSW Food Authority to improve the internal controls in the information technology environment including monitoring and managing privilege user access.
What we recommended
Local Land Services should prioritise completing all mandatory early close procedures.
Portfolio agencies should:
- ensure any changes to employee entitlements are assessed for their potential financial statements impact under the relevant Australian Accounting Standards
- prioritise and address internal control deficiencies identified in audit management letters.
This report provides Parliament and other users of the Regional NSW portfolio of agencies financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Regional NSW portfolio of agencies (the portfolio) for 2023.
Section highlights
- Unqualified audit opinions were issued on all completed 30 June 2023 financial statements audits of the portfolio agencies. Two audits are ongoing.
- The total number of errors (including corrected and uncorrected) in the financial statements increased compared to the prior year.
- Portfolio agencies met the statutory deadline for submitting their 2022–23 early close financial statements and other mandatory procedures.
- Portfolio agencies continue to provide financial assistance to communities affected by natural disasters.
- A change to the NSW paid parental leave scheme, effective October 2023, created a new legal obligation that needed to be recognised by impacted government agencies. Impact to the agencies' financial statements were not material.
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.
This chapter outlines our observations and insights from our financial statement audits of agencies in the Regional NSW portfolio.
Section highlights
- The 2022–23 audits identified one high risk and nine moderate risk issues across the portfolio. Of these, one was a moderate risk repeat issue.
- The total number of findings decreased from 36 to 23 which mainly related to deficiencies in internal controls.
- The high risk matter relates to the monitoring and managing of privilege user access at NSW Food Authority.
Appendix one – Misstatements in financial statements submitted for audit
Appendix two – Early close procedures
Appendix three – Timeliness of financial reporting
Appendix four – Financial data
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Education 2023
Education 2023
What this report is about
Results of the Education portfolio of agencies’ financial statements audits for the year ended 30 June 2023.
What we found
Unqualified audit opinions were issued for all Education portfolio agencies.
An ‘other matter’ paragraph was included in the TAFE Commission’s independent auditor’s report as it did not have a delegation or sub-delegation from the Minister for Education and Early Learning to incur expenditure on grants from other portfolio agencies.
What the key issues were
Comprehensive valuations of buildings at the Department of Education (the department) and at the TAFE Commission found that certain assumptions applied in previous years needed to be updated, resulting in prior period restatements.
The department prepaid a building contractor for early works on a project and some of the prepayment is in legal dispute.
The department duplicated a claim for project funding from Restart NSW in 2021.
New parental leave legislation increased employee liabilities for portfolio agencies. The department and the NSW Education Standards Authority (the Authority) updated their financial statements to record parental leave liabilities.
A high risk matter was raised for the Authority to improve the quality and timeliness of information to support their financial statement close process.
What we recommended
Portfolio agencies should ensure any changes to employee entitlements are assessed for their potential financial statements impact under the relevant Australian Accounting Standards.
The department should:
- improve processes to ensure project claims are not duplicated
- assess the risks associated with providing prepayments to contractors.
This report provides Parliament and other users of the Education portfolio of agencies’ financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Education portfolio (the portfolio) for 2023.
Section highlights
- Unqualified audit opinions were issued on all the portfolio agencies 2022–23 financial statements.
- An ‘other matter’ paragraph was included in the independent auditor’s report for the Technical and Further Education Commission (the TAFE Commission) as it did not have a delegation or sub-delegation from the Minister for Education and Early Learning to incur expenditure on grants from other portfolio agencies.
- Comprehensive valuations of buildings in the current year identified that certain assumptions applied in previous years were incorrect. The effects of these corrections are disclosed as prior period errors in the financial statements of the Department of Education (the department) and the TAFE Commission.
- The department made corrections to its financial statements to reflect increases to NSW teachers’ wages announced post balance date. This impacted amounts recorded as liabilities for a range of employee benefits and entitlements totalling $225.4 million, of which $147.9 million is accepted by the Crown and $77.5 million is borne by the department.
- A change to the NSW paid parental leave scheme, effective October 2022, created a new legal obligation that needed to be recognised by impacted government agencies. Of the three affected portfolio agencies, only the department and the NSW Education Standards Authority recognised a liability to account for this change. The aggregated unrecorded liabilities of other agencies in the portfolio totalled $2.4 million. The errors within the individual agencies’ financial statements were not material.
- The total number of errors (including corrected and uncorrected) in the financial statements increased compared to the prior year.
- The NSW Childcare and Economic Opportunity Fund should prepare financial statements unless NSW Treasury releases a Treasurer’s Direction under section 7.8 of the GSF Act that will exempt the SDA from financial reporting requirements.
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.
This chapter outlines our observations and insights from our financial statement audits of agencies in the Education portfolio.
Section highlights
- The 2022–23 audits identified one high risk and 20 moderate risk issues across the portfolio. Of these, one was a high risk repeat issue and four were moderate risk repeat issues.
- The total number of findings increased from 29 to 36, which mainly related to deficiencies in financial reporting, information technology, payroll and purchasing controls.
- The high risk matter relates to the lack of quality and timely information to support the financial statement close process at the NSW Education Standards Authority.
Appendix one – Early close procedures
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Natural disasters
Natural disasters
What this report is about
This report draws together the financial impact of natural disasters on agencies integral to the response and impact of natural disasters during 2021–22.
What we found
Over the 2021–22 financial year $1.4 billion from a budget of $1.9 billion was spent by the NSW Government in response to natural disasters.
Total expenses were less than the budget due to underspend in the following areas:
- clean-up assistance, including council grants
- anticipated temporary accommodation support
- payments relating to the Northern Rivers Business Support scheme for small businesses.
Natural disaster events damaged council assets such as roads, bridges, waste collection centres and other facilities used to provide essential services. Additional staff, contractors and experts were engaged to restore and repair damaged assets and minimise disruption to service delivery.
At 30 June 2022, the estimated damage to council infrastructure assets totalled $349 million.
Over the first half of the 2022–23 financial year, councils experienced further damage to infrastructure assets due to natural disasters. NSW Government spending on natural disasters continued with a further $1.1 billion spent over this period.
Thirty-six councils did not identify climate change or natural disaster as a strategic risk despite 22 of these having at least one natural disaster during 2021–22.
Section highlights
|
Section highlights
|
Actions for Planning and Environment 2022
Planning and Environment 2022
What the report is about
Result of the Planning and Environment cluster agencies' financial statements audits for the year ended 30 June 2022.
What we found
Unmodified audit opinions were issued for all completed 30 June 2022 financial statements audits of cluster agencies. Seven audits are ongoing.
Disclaimed audit opinions were issued for the 2010–11 to 2015–16 financial statements of the Water Administration Ministerial Corporation (WAMC), as management was unable to certify that the financial statements exhibit a true and fair view of WAMC's financial position and financial performance.
Qualified audit opinions were issued for WAMC's 2016–17 and 2017–18 financial statements due to insufficient evidence to support the completeness and valuation of water meters infrastructure assets, the impairment of water meters, and the completeness of buildings at Nimmie Caira.
Unqualified audit opinions were issued for WAMC's 2018–19 and 2019–20 financial statements.
The Department of Planning and Environment (the department) assessed 45 Category 2 Statutory Land Managers (SLM) did not meet the reporting exemption criteria and therefore were required to prepare 2021–22 financial statements. None of these 45 Category 2 SLMs prepared and submitted their 30 June 2022 financial statements by the statutory reporting deadline.
All 119 Commons Trusts have never submitted their financial statements for audit as required by the Government Sector Finance Act 2018 (GSF Act).
NSW Treasury has confirmed that the Catholic Metropolitan Cemeteries Trust (CMCT) is a controlled entity of the State. To date, CMCT has not met its obligations to prepare financial statements under the GSF Act and it has not submitted financial statements to the Auditor-General for audit.
What the key issues were
Since 2017, the Audit Office has recommended the department address the different practices across the local government sector in accounting for rural firefighting equipment. Despite repeated recommendations, the department did little to resolve this issue. At the time of writing, 32 of 118 completed council audits received qualified audit opinions on their 30 June 2022 financial statements.
There continues to be significant deficiencies in Crown land records. The department uses the Crown Land Information Database (CLID) to record key information relating to Crown land in New South Wales that is managed and controlled by the department and land managers. The CLID system was not designed to facilitate financial reporting, and the department is required to conduct extensive adjustments and reconciliations to produce accurate information for the financial statements.
The department implemented the CrownTracker system as a replacement for CLID. The project was finalised in June 2022, but it has not achieved the intended outcomes.
Nine high-risk issues were identified across the cluster related to the findings outlined above and weaknesses in IT general controls, financial reporting, governance processes and internal controls.
Recommendations were made to address these deficiencies.
This report provides Parliament and other users of the Planning and Environment cluster’s financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Planning and Environment cluster (the cluster) for 2022.
Section highlights
|
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.
This chapter outlines our observations and insights from our financial statement audits of agencies in the Planning and Environment cluster.
Section highlights
|
Appendix one – Misstatements in financial statements submitted for audit
Appendix two – Early close procedures
Appendix three – Timeliness of financial reporting
Appendix four – Financial data
Appendix five – Councils received qualified audit opinions
Copyright notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Regional NSW 2022
Regional NSW 2022
What the report is about
Result of the Regional NSW cluster agencies' financial statement audits for the year ended 30 June 2022.
What we found
Unmodified audit opinions were issued for Regional NSW cluster agencies. Two audits are ongoing.
What the key issues were
The Department of Regional NSW (the department) and Local Land Services (LLS) accepted changes to their office leasing arrangements managed by Property NSW.
These changes resulted in the collective derecognition of $100.6 million of rights-of-use-assets and $110.4 million of lease liabilities.
In 2021–22, the cluster agencies continued to assist communities in their recovery from recent weather emergencies, including significant flooding in New South Wales.
The Northern Rivers Reconstruction Corporation was established in May 2022 to rebuild communities in the Lismore and Northern Rivers region impacted by floods.
The number of matters reported to management decreased from 36 in 2020–21 to 14 in 2021–22.
Five moderate risk issues were identified and 14% of reported issues were repeat issues.
One moderate risk issue was a repeat issue related to Local Land Services' annual fair value assessment of the asset improvements on land reserves used for moving stock.
This report provides Parliament and other users of the Regional NSW cluster financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Regional NSW cluster (the cluster) for 2022.
Section highlights
|
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.
This chapter outlines our observations and insights from our financial statement audits of agencies in the Regional NSW cluster.
Section highlights
|
Actions for Education 2022
Education 2022
What the report is about
Result of the Education cluster financial statement audits for the year ended 30 June 2022.
What we found
Unmodified audit opinions were issued for Education cluster agencies.
An 'other matter' paragraph was included in the TAFE Commission's independent auditor's report as it did not have a delegation or sub-delegation from the Minister for Education and Early Learning to incur expenditure from cluster grants.
What the key issues were
Annual fair value assessments of land and buildings showed material differences in their carrying values. As a result, the Department of Education and the TAFE Commission completed desktop revaluations of land and buildings, collectively increasing the value of these assets by $1.2 billion and $4.7 billion respectively.
The Department of Education and the NSW Education Standards Authority accepted changes to their office leasing arrangements managed by Property NSW. These changes resulted in the collective derecognition of $270.6 million of right-of-use assets and $382.9 million in lease liabilities.
What we recommended
A high-risk matter was reported in the management letter for the TAFE Commission highlighting non-compliance with policies and procedures guiding appropriate use of purchasing cards.
We recommended cluster agencies prioritise and address internal control deficiencies.
This report provides Parliament and other users of the Education cluster’s financial statements with the results of our audits, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Education cluster (the cluster) for 2022.
Section highlights
|
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.
This chapter outlines our observations and insights from our financial statement audits of agencies in the Education cluster.
Section highlights
|
The number of findings reported to management has increased, and 31% were repeat issues
Breakdowns and weaknesses in internal controls increase the risk of fraud and error. Deficiencies in internal controls, matters of governance interest and unresolved issues were reported to management and those charged with governance of agencies. The Audit Office does this through management letters, which include observations, related implications, recommendations and risk ratings.
In 2021–22, there were 29 findings raised across the cluster (28 in 2020–21). Thirty-one per cent of all issues were repeat issues (50% in 2020–21).
The most common new and repeat issues related to internal control deficiencies in agencies’ information technology general controls, application controls, and procurement and payroll practices.
A delay in implementing audit recommendations increases the risk of intentional and accidental errors in processing information, producing management reports and generating financial statements. This can impair decision-making, affect service delivery and expose agencies to fraud, financial loss and reputational damage. Poor controls may also mean agency staff are less likely to follow internal policies, inadvertently causing the agency not to comply with legislation, regulation and central agency policies.
A high-risk matter was reported at the TAFE Commission highlighting instances of non-compliance with policies and procedures guiding appropriate purchasing card use
As part of our audit of the TAFE Commission, we integrated the use of data analytics into the audit approach. We performed data analytics over aspects of payroll, procurement and accounts payable activities. This helped us to highlight anomalies or risks in those data sets that are relevant to the audit of the TAFE Commission and plan testing procedures to address those risks. Data analytics also assisted us in providing an insight into the internal control environment of the TAFE Commission, highlighting areas where key controls are not in place or are not operating as management intended.
Our analysis over purchasing card data supplied by the TAFE Commission for the period July 2021 to March 2022 found deficiencies in the provisioning, use and cancellation of purchasing cards. This included identified instances of:
- controls effectively bypassed when a purchasing card surrendered by a former employee had been used by another employee
- split payments, circumventing delegation / cardholder limits
- delays in the submission and approval of purchasing card transactions.
The table below describes the common issues identified across the cluster by category and risk rating:
Risk rating | Issue |
Information technology | |
High: 0 new, 0 repeat 1 Moderate: 5 new, 3 repeat 2 Low: 2 new, 1 repeat 3 |
The financial audits identified areas for agencies to improve information technology processes and controls that support the integrity of financial data used to prepare agencies' financial statements. Of note were deficiencies identified in:
|
Internal control deficiencies or improvements | |
High: 1 new, 0 repeat 1 Moderate: 5 new, 3 repeat 2 Low: 4 new, 1 repeat 3 |
The financial audits identified internal control weaknesses across key business processes relevant to financial reporting. Of note were deficiencies identified in:
|
Financial reporting | |
High: 0 new, 0 repeat 1 Moderate: 1 new, 1 repeat 2 Low: 2 new, 0 repeat 3 |
The financial audits identified:
|
2 Moderate risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
3 Low risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
Recommendation
We recommend cluster agencies prioritise and action recommendations to address the internal control deficiencies outlined above.
Actions for Planning, Industry and Environment 2021
Planning, Industry and Environment 2021
This report analyses the results of our audits of the Planning, Industry and Environment cluster agencies for the year ended 30 June 2021.
Our preferred approach is to table the ‘Report on State Finances’ in Parliament before any other cluster report. This is because the 'Report on State Finances' focuses on the audit results and observations relating to the Total State Sector Accounts, in effect a consolidation of all government agencies. This year the 'Report on State Finances' has been delayed due to significant accounting issues being considered in the Total State Sector Accounts and which may impact the Treasury and Transport clusters.
As there are no outstanding matters relating to audits in the Planning, Industry and Environment cluster impacting the Total State Sector Accounts we have decided to break with normal practice and table this cluster report ahead of the ‘Report on State Finances’.
What the report is about
The results of the Planning, Industry and Environment cluster agencies' financial statements audits for the year ended 30 June 2021.
What we found
Unmodified audit opinions were issued for all completed 30 June 2021 financial statements audits of cluster agencies. Three audits are ongoing.
An 'Other Matter' paragraph was included in the Independent Planning Commission's (the IPC) audit opinion because the prior year comparative figures were not audited. Prior to 2020–21, the IPC was not required to prepare separate financial statements under the Public Finance and Audit Act 1983 (PF&A Act). The financial reporting provisions of the Government Sector Finance Act 2018 now require the IPC to prepare financial statements.
The number of identified misstatements increased from 51 in 2019–20 to 54 in 2020–21.
The 2010–11 to 2019–20 audits of the Water Administration Ministerial Corporation’s (the Corporation) financial statements are incomplete due to insufficient records and evidence to support the transactions of the Corporation, particularly for the earlier years. Management has commenced actions to improve the governance and financial management of the Corporation. These audits are currently in progress and the 2020–21 audit will commence shortly.
There are 609 State controlled Crown land managers (CLMs) across New South Wales that predominantly manage small parcels of Crown land.
Eight CLMs prepared and submitted 2019–20 financial statements by the revised deadline of 30 June 2021. A further 24 CLMs did not prepare financial statements in accordance with the PF&A Act. The remaining CLMs were not required to prepare 2019–20 financial statements as they met NSW Treasury's financial reporting exemption criteria.
The Department of Planning, Industry and Environment's (the department) preliminary assessment indicates that 60 CLMs are required to prepare financial statements in 2020–21. To date, no CLMs have prepared and submitted financial statements for audit in 2020–21.
There are also 120 common trusts that have never submitted financial statements for audit. Common trusts are responsible for the care, control and management of land that has been set aside for specific use in a certain locality, such as grazing, camping or bushwalking.
What the key issues were
The number of matters we reported to management increased from 135 in 2019–20 to 180 in 2020–21, of which 40 per cent were repeat findings.
Seven high-risk issues were identified in 2020–21:
- system control deficiencies at the department relating to user access to HR and payroll management systems, vendor master data management and journal processing, which require manual reviews to mitigate risks
- deficiencies related to the Centennial Park and Moore Park Trust's tree assets valuation methodology
- the Lord Howe Island Board did not regularly review and monitor privileged user access rights to key information systems
- the Natural Resources Access Regulator identified and adjusted three prior period errors retrospectively, which indicate deficiencies within the financial reporting processes
- deficiencies relating to the Parramatta Park Trust's tree assets valuation methodology
- lease arrangements have not been confirmed between the Planning Ministerial Corporation and Office of Sport regarding the Sydney International Regatta Centre
- the Wentworth Park Sporting Complex land manager (the land manager) has a $6.5 million loan with Greyhound Racing NSW (GRNSW). GRNSW requested the land manager to repay the loan. However, the land manager subsequently requested GRNSW to convert the loan to a grant. Should this request be denied, the land manager would not be able to continue as a going concern without financial support. This matter remains unresolved for many years.
There continues to be significant deficiencies in Crown land records. The department uses the Crown Land Information Database (CLID) to record key information relating to Crown land in New South Wales that are managed and controlled by the department and land managers (including councils and land managers controlled by the state). The CLID system was not designed to facilitate financial reporting and the department is required to conduct extensive adjustments and reconciliations to produce accurate information for the financial statements.
The department is implementing a new system to record Crown land (the CrownTracker project). The department advised that the project completion date will be confirmed by June 2022.
What we recommended
The department should ensure CLMs and common trusts meet their statutory reporting obligations.
Cluster agencies should prioritise and action recommendations to address internal control deficiencies, with a focus on addressing high-risk and repeat issues.
The department should prioritise action to ensure the Crown land database is complete and accurate. This will allow the department and CLMs to be better informed about the Crown land they control.
Fast facts
The Planning, Industry and Environment cluster aims to make the lives of people in New South Wales better by developing well-connected communities, preserving the environment, supporting industries and contributing to a strong economy.
There are 54 agencies, 609 State controlled Crown land managers that predominantly manage small parcels of Crown land and 120 common trusts in the cluster.
- 42% of the area of NSW is Crown land
- $33.2b water and electricity infrastructure as at 30 June 2021
- 100% unqualified audit opinions were issued for all completed 30 June 2021 financial statements audits
- 7 high-risk management letter findings were identified
- 54 monetary misstatements were reported in 2020–21
- 40% of reported issues were repeat issues
This report provides parliament and other users of the Planning, Industry and Environment cluster (the cluster) agencies’ financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision-making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Planning, Industry and Environment cluster (the cluster) for 2021.
Section highlights
|
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision-making.
This chapter outlines our observations and insights from our financial statements audits of agencies in the Planning, Industry and Environment cluster.
Section highlights
|
Appendix one - Misstatements in financial statements submitted for audit
Appendix two – Early close procedures
Appendix three – Timeliness of financial reporting
Appendix four – Financial data
Copyright notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Education 2021
Education 2021
This report analyses the results of our audits of the Education cluster agencies for the year ended 30 June 2021.
Our preferred approach is to table the ‘Report on State Finances’ in Parliament before any other cluster report. This is because the 'Report on State Finances' focuses on the audit results and observations relating to the Total State Sector Accounts, in effect a consolidation of all government agencies. This year the 'Report on State Finances' has been delayed due to significant accounting issues being considered in the Total State Sector Accounts and which may impact the Treasury and Transport clusters.
As there are no outstanding matters relating to audits in the Education cluster impacting the Total State Sector Accounts we have decided to break with normal practice and table this cluster report ahead of the ‘Report on State Finances’.
What the report is about
The results of the Education cluster (the cluster) agencies' financial statements audits for the year ended 30 June 2021.
What we found
Unmodified audit opinions were issued on the Department of Education (the department), the NSW Education Standards Authority and the NSW Skills Board's financial statements.
An 'other matter' paragraph was included in the Technical and Further Education Commission's (the TAFE Commission) audit opinion drawing attention to legislative non-compliance concerning financial delegations during the reporting year.
The number of misstatements identified in the financial statements of cluster agencies decreased from 14 in 2019–20 to seven.
What the key issues were
The department and the TAFE Commission revalued their land assets this year, recognising collective increases of $863.8 million.
The department and the TAFE Commission are not scheduled to perform comprehensive revaluations of their buildings until 2022–23. Construction costs, which are a key input in their current replacement cost valuation methodologies for buildings, may have increased by an estimated nine per cent since the last comprehensive revaluation in 2017–18 based on broad based indices used by the department and the TAFE Commission. While the estimated index increase indicates the fair value of buildings may exceed the carrying values, the use of such high-level indicators has a degree of estimation uncertainty due to the specialised nature of the assets. Therefore, both agencies did not adjust the values of their buildings.
The number of issues we reported to management decreased. Fifty per cent of issues were repeated from prior years.
Of the 11 newly identified moderate rated issues, seven related to internal control deficiencies, with six identified in procurement and payroll controls.
What we recommended
The department and the TAFE Commission reconsider policy settings governing the frequency of revaluations; and refine and consider the outcomes of interim fair value assessments to ensure asset carrying values reflect fair value at each balance date.
Cluster agencies should prioritise and action recommendations to address internal control deficiencies.
Fast facts
The Education cluster, comprising four agencies, administers and delivers education and training services for NSW students, workers and industry.
- $38.6b property, plant and equipment as at 30 June 2021
- $21.2b total expenditure incurred in 2020–21
- 100% unqualified audit opinions were issued on agencies’ 30 June 2021 financial statements
- 22 moderate risk management letter findings were identified and reported to management
- 7 monetary misstatements were reported in 2020–21
- 50% of reported issues were repeat issues
This report provides Parliament and other users of the Education cluster’s financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.
This chapter outlines our audit observations related to the financial reporting of agencies in the Education cluster (the cluster) for 2021.
Section highlights
|
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.
This chapter outlines our observations and insights from our financial statement audits of agencies in the Education cluster.
Section highlights
|
Findings reported to management
The number of findings reported to management has decreased. Fifty per cent of all issues were repeat issues
Breakdowns and weaknesses in internal controls increase the risk of fraud and error. Deficiencies in internal controls, matters of governance interest and unresolved issues were reported to management and those charged with governance of agencies. The Audit Office does this through management letters, which include observations, related implications, recommendations and risk ratings.
In 2020–21, there were 28 findings raised across the cluster (33 in 2019–20). Fifty per cent of all issues were repeat issues (45 per cent in 2019–20).
The most common repeat issues related to weaknesses in controls over information technology general controls, application controls, and identified deficiencies in procurement and payroll practices.
A delay in implementing audit recommendations increases the risk of intentional and accidental errors in processing information, producing management reports and generating financial statements. This can impair decision-making, affect service delivery and expose agencies to fraud, financial loss and reputational damage. Poor controls may also mean agency staff are less likely to follow internal policies, inadvertently causing the agency not to comply with legislation, regulation and central agency policies.
The table below describes the common issues identified across the cluster by category and risk rating.
Risk rating | Issue |
Information technology | |
Moderate2 |
The financial audits identified areas for agencies to improve information technology processes and controls that support the integrity of financial data used to prepare agencies' financial statements. Of note were deficiencies identified in:
|
Low1 |
|
Internal control deficiencies or improvements | |
Moderate2 |
The financial audits identified internal control weaknesses across key business processes relevant to financial reporting. Of note were deficiencies identified in:
|
Low1 |
|
Financial reporting | |
Moderate2 |
The financial audits identified:
|
Low1 |
3 High risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
2 Moderate risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
1 Low risk from the consequence and/or likelihood of an event that has had, or may have a negative impact on the entity.
The department continues to address recommendations to improve monitoring of privileged user access
Privileged users have higher levels of access to systems, and in some instances, may include access that can bypass segregation of duty controls. If reviews of access logs are not fully embedded in the control environment, the risk of unauthorised transactions occurring and not being detected in a timely manner is elevated.
In 2019–20 a high-risk issue was reported at the department relating to the inadequate monitoring and follow up of privileged user activity in its enterprise resource planning system – SAP. This year the department has largely addressed our findings by initiating a review of the identified instances of privileged user activity and establishing periodic oversight controls. There remains a need to improve the timeliness and completeness of these newly implemented controls.
Data analytics identified the root cause of internal control deficiencies in procurement and payroll
Our 2020–21 agency management letters identified seven new moderate risk internal control deficiency matters, of which six related to payroll and procurement.
To enhance our financial statement audit of the department we applied data analytics over elements of the department's procurement and payroll control processes. Our procedures, conducted over periods across the financial year, helped identify the following:
- a low level of compliance with procurement practices requiring the creation of purchase orders before invoices are received. The root cause was a lack of understanding by agency staff of the procurement processes
- transactions related to previous years being recorded in the current year. The root cause was a lack of understanding of the three-way matching process and the goods received/not invoiced facilities within SAP
- negative payments in fortnightly pay runs, predominantly representing deductions to recover salary payments made in error. The root cause was the lack of timeliness in notifying payroll for cessation of employment, or for employees undertaking secondments who should have been classified as being on leave without pay.
Recommendation
We recommend cluster agencies prioritise and action recommendations to address the internal control deficiencies outlined above.
Appendix one – Early close procedures
Copyright notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Actions for Planning, Industry and Environment 2020
Planning, Industry and Environment 2020
This report analyses the results of our audits of financial statements of the Planning, Industry and Environment cluster agencies for the year ended 30 June 2020. The table below summarises our key observations.
1. Financial reporting
Audit opinions |
There are 45 separate entities in the cluster. Unqualified audit opinions were issued for 38 cluster agencies' 30 June 2020 financial statements audits. Four financial statements audits are still ongoing, and three agencies were not subject to audit due to NSW Treasury reporting exemptions. |
Timeliness of financial reporting |
The majority of cluster agencies subject to statutory reporting deadlines met the revised timeline for submitting financial statements. Twenty‑four of the 26 cluster agencies required to submit early close financial statements met the revised timeframe. Due to issues identified during the audit, 13 financial statements audits were not completed and audit opinions not issued by the statutory deadline. |
Implementation of AASB 16 'Leases' |
Significant deficiencies were identified in Property NSW's lease data maintenance and lease calculations. Recommendation (partially repeat): Property NSW should:
Our audits of the cluster agencies identified there was a lack of thorough quality assurance over the accuracy of lease information provided by Property NSW. Recommendation: The Department and cluster agencies should:
|
Unprocessed Aboriginal land claims continued to increase |
In 2019–20, the Department resolved an additional 468 Aboriginal land claims compared to the prior year. However, the total number of unprocessed Aboriginal land claims increased by 914 to 36,769 at 30 June 2020. The number of claims remaining unprocessed for more than ten years after lodgement increased by 10.9 per cent from last year. Until claims are resolved, there is an uncertainty over who is entitled to the land and the uses and activities that can be carried out on the land. Auditor-General's Reports to Parliament since 2007 have recommended action to address the increasing number of unprocessed claims. To date, the Department has not been able to resolve this issue. During 2020–21, a performance audit will assess the effectiveness and efficiency of the administration of Aboriginal land claims. |
Financial reporting of Crown land managers |
The Department will need to provide additional support and guidance to help Crown land managers (CLMs) meet their financial reporting obligations. Recommendation: The Department should:
During 2019–20, NSW Treasury established the reporting exemption criteria for the CLMs. Based on available information, the Department determined 31 CLMs would not meet the exemption criteria and therefore are required to prepare annual financial statements. |
2. Audit observations
Internal controls |
Six high‑risk issues were identified across the cluster in 2019–20:
One in three internal control issues identified and reported to management in 2019–20 were repeat issues. Recommendation: Management letter recommendations to address internal control weaknesses should be actioned promptly, with a focus on addressing high‑risk and repeat issues. |
Agencies response to recent emergencies |
The unprecedented bushfires and COVID‑19 pandemic presented challenges for the cluster. Agencies established taskforces or response teams to respond to these emergencies. With more staff working from home, agencies implemented protocols and procedures to manage risks associated with the remote working arrangements, and also needed to address certain technology issues. The Department is responsible for the new Planning System Acceleration Program, which aims to fast‑track planning assessments, boost the State's economy and keep people in jobs during COVID‑19 pandemic. Between April and October 2020, the Department announced and determined 101 major projects and planning proposals. |
Recognition of Crown land |
Crown land is an important asset of the State. Management and recognition of Crown land assets is weakened when there is confusion over who is responsible for a particular Crown land parcel. Auditor-General's Reports to Parliament since 2017 have recommended that the Department should ensure the database of Crown land is complete and accurate. Whilst the Department has commenced actions to improve the database, this remained an issue in 2019–20. Recommendation (repeat issue): The Department should prioritise action to ensure the Crown land database is complete and accurate. This allows state agencies and local councils to be better informed about the Crown land they control. |
Implementation of Machinery of Government (MoG) changes |
Since its creation on 1 July 2019, the Department has largely established its governance arrangements, including setting up the Audit and Risk Committee and internal audit function for the Department and relevant cluster agencies. The Department still operated three main financial reporting systems in 2019–20, and has commenced the process to consolidate some of the systems. The recent Regional NSW MoG change led to the transfer of $446 million net assets and $284 million 2019–20 budget from the Department to the newly created Department of Regional NSW on 2 April 2020. |
This report provides parliament and other users of the Planning, Industry and Environment cluster agencies’ financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:
- financial reporting
- audit observations
- the impact of emergencies and the pandemic.
Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.
The COVID‑19 Legislation Amendment (Emergency Measures–Treasurer) Act 2020 amended legislation administered by the Treasurer to implement further emergency measures as a result of the COVID‑19 pandemic. These amendments:
- allowed the Treasurer to authorise payments from the Consolidated fund until the enactment of the 2020–21 budget – impacting the going concern assessments of cluster agencies
- revised budgetary, financial and annual reporting time frames – impacting the timeliness of financial reporting
- exempted certain statutory bodies and departments from preparing financial statements.
This chapter outlines our audit observations related to the financial reporting of agencies in the Planning, Industry and Environment cluster for 2020, including any financial implications from the recent emergency events.
Section highlights
The Department has not yet developed a statutory reporting framework for Crown land managers and will need to provide additional resources to help Crown land managers meet their financial reporting obligations. |
Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.
This chapter outlines our:
- observations and insights from our financial statements audits of agencies in the Planning, Industry and Environment cluster
- assessment of how well cluster agencies adapted their systems, policies and procedures, and governance arrangements in response to recent emergencies
- review of how the cluster agencies managed the increased risks associated with new programs aimed at stemming the spread of COVID-19 and stimulating the economy.
Cluster agencies experienced a range of control and governance related issues in recent years. An increased number of high risk issues and greater proportion of repeat issues were identified as part of our audits. It is important for cluster agencies to promptly address these issues.