Actions for Machinery of government changes
Machinery of government changes
What the report is about
The term ‘machinery of government’ refers to the way government functions and responsibilities are organised.
The decision to make machinery of government changes is made by the Premier. Changes may be made for a range of reasons, including to support the policy and/or political objectives of the government of the day.
Larger machinery of government changes typically occur after an election or a change of Premier.
This report assessed how effectively the Department of Planning, Industry and Environment (DPIE) and the Department of Regional NSW (DRNSW) managed their 2019 and 2020 machinery of government changes, respectively. It also considered the role of the Department of Premier and Cabinet (DPC) and NSW Treasury in overseeing machinery of government changes.
What we found
The anticipated benefits of the changes were not articulated in sufficient detail and the achievement of benefits has not been monitored. The costs of the changes were not tracked or reported.
DPC and NSW Treasury provided principles to guide implementation but did not require departments to collect or report information about the benefits or costs of the changes.
The implementation of the machinery of government changes was completed within the set timeframes, and operations for the new departments commenced as scheduled.
Major implementation challenges included negotiation about the allocation of corporate support staff and the integration of complex corporate and ICT systems.
What we recommended
DPC and NSW Treasury should:
- consolidate existing guidance on machinery of government changes into a single document that is available to all departments and agencies
- provide guidance for departments and agencies to use when negotiating corporate services staff transfers as a part of machinery of government changes, including a standard rate for calculating corporate services requirements
- progress work to develop and implement common processes and systems for corporate services in order to support more efficient movement of staff between departments and agencies.
Fast facts
- $23.7m is the estimated minimum direct cost of the 2019 DPIE changes to date, noting additional ICT costs will be incurred
- $4.0m is the estimated minimum direct cost of the 2020 DRNSW changes, with an estimated $2.7 million ongoing annual cost
- 40+ NSW Government entities affected by the 2019 machinery of government changes
The term ‘machinery of government’ refers to the way government functions and responsibilities are allocated and structured across government departments and agencies. A machinery of government change is the reorganisation of these structures. This can involve establishing, merging or abolishing departments and agencies and transferring functions and responsibilities from one department or agency to another.
The decision to make machinery of government changes is made by the Premier. These changes may be made for a range of reasons, including to support the policy and/or political objectives of the government of the day. Machinery of government changes are formally set out in Administrative Arrangements Orders, which are prepared by the Department of Premier and Cabinet, as instructed by the Premier, and issued as legislative instruments under the Constitution Act 1902.
The heads of agencies subject to machinery of government changes are responsible for implementing them. For more complex changes, central agencies are also involved in providing guidance and monitoring progress.
The NSW Government announced major machinery of government changes after the 2019 state government election. These changes took place between April and June 2019 and involved abolishing five departments (Industry; Planning and Environment; Family and Community Services; Justice; and Finance, Services and Innovation) and creating three new departments (Planning, Industry and Environment; Communities and Justice; and Customer Service). This also resulted in changes to the 'clusters' associated with departments. The NSW Government uses clusters to group certain agencies and entities with related departments for administrative and financial management. Clusters do not have legal status. Most other departments that were not abolished had some functions added or removed as a part of these machinery of government changes. For example, the functions relating to regional policy and service delivery in the Department of Premier and Cabinet were moved to the new Department of Planning, Industry and Environment.
Our Report on State Finances 2019, tabled in October 2019, outlined these changes and identified several issues that can arise from machinery of government changes if risks are not identified early and properly managed. These include: challenges measuring the costs and benefits of machinery of government changes; disruption to services due to unclear roles and responsibilities; and disruption to control environments due to staff, system and process changes.
In April 2020, the Department of Regional NSW was created in a separate machinery of government change. This involved moving functions and agencies related to regional policy and service delivery from the Department of Planning, Industry and Environment into a standalone department.
This audit assessed how effectively the Department of Planning, Industry and Environment (DPIE) and the Department of Regional NSW (DRNSW) managed their 2019 and 2020 machinery of government changes, respectively. It also considered the role of the Department of Premier and Cabinet and NSW Treasury in overseeing machinery of government changes. The audit investigated whether:
- DPIE and DRNSW have integrated new responsibilities and functions in an effective and timely manner
- DPIE and DRNSW can demonstrate the costs of the machinery of government changes
- The machinery of government changes have achieved or are achieving intended outcomes and benefits.
It is unclear whether the benefits of the machinery of government changes that created the Department of Planning, Industry and Environment (DPIE) and the Department of Regional NSW (DRNSW) outweigh the costs. The anticipated benefits of the changes were not articulated in sufficient detail and the achievement of directly attributable benefits has not been monitored. The costs of the changes were not tracked or reported. The benefits and costs of the machinery of government changes were not tracked because the Department of Premier and Cabinet (DPC) and NSW Treasury did not require departments to collect or report this information. The implementation of the machinery of government changes was completed within the set timeframes, and operations for the new departments commenced as scheduled. This was achieved despite short timelines and no additional budget allocation for the implementation of the changes.
The rationale for establishing DPIE was not documented at the time of the 2019 machinery of government changes and the anticipated benefits of the change were not defined by the government or the department. For DRNSW, the government’s stated purpose was to provide better representation and support for regional areas, but no prior analysis was conducted to quantify any problems or set targets for improvement. Both departments reported some anecdotal benefits linked to the machinery of government changes. However, improvements in these areas are difficult to attribute because neither department set specific measures or targets to align with these intended benefits. Since the machinery of government changes were completed, limited data has been gathered to allow comparisons of performance before and after the changes.
DPC and NSW Treasury advised that they did not define the purpose and benefits of the machinery of government changes, or request affected departments to do so, because these were decisions of the government and the role of the public service was to implement the decisions.
We have attempted to quantify some of the costs of the DPIE and DRNSW changes based on the information the audited agencies could provide. This information does not capture the full costs of the changes because some costs, such as the impact of disruption on staff, are very difficult to quantify, and the costs of ICT separation and integration work may continue for several more years. Noting these limitations, we estimate the initial costs of these machinery of government changes are at least $23.7 million for DPIE and $4.0 million for DRNSW. For DPIE, this is predominantly made up of ICT costs and redundancy payments made around the time of the machinery of government change. For DRNSW it includes ICT costs and an increase in senior executive costs for a standalone department, which we estimate is an ongoing cost of at least $1.9 million per year.
For the DPIE machinery of government change, there were risks associated with placing functions and agencies that represent potentially competing policy interests within the same 'cluster', such as environment protection and industry. We did not see evidence of plans to manage these issues being considered by DPIE as a part of the machinery of government change process.
The efficiency of machinery of government changes could be improved in several ways. This includes providing additional standardised guidance on the allocation of corporate functions and resources when agencies are being merged or separated, and consolidating guidance on defining, measuring and monitoring the benefits and costs of machinery of government changes.
Appendix one – Response from agencies
Appendix two – About the audit
Appendix three – Performance auditing
Copyright notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Parliamentary reference - Report number #359 - released (17 December 2021).
Actions for COVID Intensive Learning Support Program
COVID Intensive Learning Support Program
What the report is about
This audit examined a state-wide program to provide small-group tuition to students disadvantaged by the move to learning from home during 2020.
The audit assessed the design and implementation of the program.
What we found
The program design was based on research and data showing learning loss during 2020.
The department rapidly planned and developed the policy design and guidelines for schools.
Governance arrangements matured during program delivery.
The department changed the models for funding schools but did not clearly explain the reasons for doing so.
Government schools with over 900 students were disadvantaged by the funding model compared to smaller schools.
Guidelines, resources and professional learning helped schools implement the program.
Staff eligibility for the program was expanded after reported difficulties in recruiting qualified teachers in some areas.
Online tuition and third-party provider options were developed throughout the program.
There were issues with the quality and timeliness of data used to monitor school progress.
Evaluation arrangements were developed early in the program.
Data limitations mean the evaluation will not be able to fully assess all program objectives.
What we recommended
- Distributing funds between schools more equitably and improving communication of the funding methods.
- Clearer communication about the intended targeted group of students.
- Reviewing the time needed to administer the program.
- Improve support for educators other than qualified teachers.
- Offer the online tuition program to more schools.
- Analysis of the effects of learning from home during 2021 across equity groups and geographic areas.
- Working with universities to increase use of pre-service teachers in the program.
The report also identifies lessons learned for future programs.
Fast facts
- $337m in total program funding. $289 million for government schools and $31 million for non government schools
- 12 days to develop the policy and provide costings to Treasury
- 290,000 targeted students in government schools and 31,000 in non government schools
- 80% of schools were providing small group tuition by the target start date of Week 6, Term 1
- 2–4 months was the estimated student learning loss from the move to learning from home during 2020
- 7,600 tutors engaged in the program as at September 2021.
The NSW Government announced the COVID Intensive Learning Support Program on 10 November 2020, as part of the 2020–21 NSW Budget. The primary goal of the $337 million program was to deliver intensive small group tuition for students who were disadvantaged by the move to remote and/or flexible learning, helping to close the equity gap. It included:
- $306 million to provide small-group tuition for eligible students across every NSW Government primary, secondary and special purpose school
- $31.0 million for around 400 non-government schools to provide small-group tuition to students with the greatest levels of need.
The objective of this audit was to assess the effectiveness of the design and implementation of the COVID Intensive Learning Support Program (the program). To address this objective, the audit assessed whether the Department of Education (the department):
- effectively designed the program and supporting governance arrangements
- is effectively implementing the program.
This audit focuses on activities between October 2020 and August 2021, which aimed to address the first session of learning from home in New South Wales. From August to October 2021, students in many areas of New South Wales were learning from home again, but this second period has not been a focus of this audit. On 18 October 2021, the NSW Government announced the program would be extended into 2022.
Conclusion
The COVID Intensive Learning Support Program was effectively designed to help students catch up on learning loss due to the interruptions to schooling caused by COVID-19. The department rapidly stood up a taskforce to implement the program and then developed supporting governance arrangements during implementation.
Most students in New South Wales were required to learn from home for at least seven weeks during 2020 due to the impact of the Novel-Coronavirus (COVID-19). The department researched, analysed and advised government on several options to address the learning loss that resulted. It recommended small group tuition as the preferred option as it was supported by available evidence and could be rolled out at scale with speed. It identified risks of ensuring an adequate supply of educators and options to address those risks. Consistent with its analysis of where the impact of the learning loss was most severe, the department proposed to direct funding to schools with higher concentrations of students from the most disadvantaged backgrounds.
The department established a cross-functional taskforce to conduct detailed planning and support program implementation. Short timeframes meant the taskforce initially sought approval for key decisions from the program sponsor and existing oversight bodies on an as-needed basis before dedicated program governance arrangements were formalised. Once established, the governance body met regularly to oversee program delivery.
The COVID Intensive Learning Support Program is being effectively implemented. The department has refined the program during rollout to respond to risks, issues and feedback from schools. Issues with how schools enter data into department systems have affected the timeliness and accuracy of program monitoring information.
The department provided schools with guidelines, example models of delivery, systems to record student progress and professional learning. Around 80 per cent of schools had begun delivering tuition under the program by the target date. Schools reported issues with sourcing qualified teachers as a key reason they were unable to start the program by the expected date. In response, the department expanded the type of staff schools could employ, developed an online tuition program, and allowed schools to engage third-party providers to help schools that had difficulty finding qualified teachers for the program.
The department used existing systems to monitor school progress in implementing the program. This reduced the administrative burden on schools, but there were several issues with data quality and timeliness. The program included a mid-year review point to check whether schools were on track to spend their funding. This helped focus schools on ensuring funding would be spent and allowed for redistribution between schools.
The department considered program evaluation early in policy design and planning. It embedded an evaluator on the taskforce and expanded a key assessment program to help provide evidence of impact. A process and outcome evaluation is underway which will help inform future delivery. The evaluation will examine educational impacts for students participating in the program but it has not established methods to reliably assess the extent to which the program has met a goal to help 'close the equity gap' for students.
This chapter considers how effectively the COVID Intensive Learning Support Program (the program) was designed and planned for implementation.
This chapter considers how effectively the COVID Intensive Learning Support Program was implemented over our period of review (Terms 1 and 2, 2021).
Appendix one – Response from agency
Appendix two – About the audit
Appendix three – Performance auditing
Copyright notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Parliamentary reference - Report number #358 - released (15 December 2021).
Actions for Delivering school infrastructure
Delivering school infrastructure
The Auditor-General for New South Wales, Margaret Crawford, released a report today examining the planning and delivery of new, redeveloped and upgraded public schools.
School Infrastructure NSW has identified the need to accommodate an additional 180,000 enrolments in public schools by 2039 with a large portion of this growth expected in metropolitan Sydney. It has also identified that around 34,000 teaching spaces will require upgrading to be fit-for-purpose.
Although School Infrastructure NSW has developed a long-term strategic plan that advises government of ongoing funding requirements, it has not presented a list of priorities to meet those needs. Developing a longer-term list of priorities would help signal the areas of greatest need and allow more time to develop the best options to meet those needs.
The audit found that School Infrastructure NSW has focused on delivering existing projects, election commitments and other government announcements. This has diverted attention from identifying and delivering projects that would have better met present and future needs.
The report makes eight recommendations to improve long-term planning for future needs, strengthen the quality of estimated project costs and benefits, and embed a continuous improvement program.
In 2016, the Department of Education prepared a School Assets Strategic Plan (2016 SASP) which outlined long-term funding needs to support the expected growth in enrolments to 2031. Following the release of the 2016 SASP, the NSW Government substantially increased funding for new and upgraded schools from $2.4 billion in the 2016–17 State Budget to $4.2 billion in 2017–18.
In 2017, the Department of Education established School Infrastructure NSW (SINSW) to lead the delivery of the 2016 SASP and the 123 new projects announced in the 2017–18 Budget. This significantly larger program of work required rapid development of internal capacity, governance arrangements, and project management systems. This needed to be done at the same time as scoping and planning for the list of announced projects.
As there are limited funds available to meet growing needs across the State, it is important that SINSW has effective methods to prioritise projects to communities with the greatest need. To ensure that projects deliver value for money, business cases need to have robust estimates of project costs and benefits. Business cases also need to account for the inherent risks in delivering infrastructure projects. Unplanned cost escalations can reduce the number of new or modernised classrooms SINSW can deliver. Unforeseen delays may also impact families who make significant life choices based on their expectations that a school will open at the beginning of the school year.
The objective of this audit was to assess the effectiveness of planning and delivery of new, upgraded and redeveloped schools to meet demand for public school education in New South Wales. To address this objective, the audit examined whether the Department:
- has effective procedures for planning and prioritising school capital works to meet present and future demands
- develops robust business cases for school capital works that reliably inform decision-making
- has effective program/project governance and management systems that support delivering projects on-time, within budget and achievement of intended benefits.
The audit examined business cases for 12 projects as case studies. These include a mix of projects initiated before and after the establishment of SINSW.
This audit commenced in June 2020 and examined strategies and demographic projections developed prior to the emergence of COVID-19. This audit did not examine potential longer-term impacts of COVID-19 on future demands for public school education.
ConclusionSchool Infrastructure NSW has been focused on delivering existing projects, election commitments and other government announcements. This has diverted attention from identifying and delivering projects that would have better met present and future student and classroom needs. While it has developed a long-term strategic plan that advises government of ongoing funding requirements, it has not presented a list of priorities to meet these needs. In its first years of operation, SINSW has focused on delivering existing projects and the 123 new projects announced in the 2017–18 Budget. Further NSW Government announcements in the 2018–19 Budget, election commitments in the 2019–20 Budget, and announcements in the 2020–21 Budget, made up the majority of new projects, rather than projects prioritised by SINSW. In early 2020, SINSW advised the NSW Government that the currently funded infrastructure program would not meet forecast classroom requirements for 2023 and beyond. The School Asset Strategic Plan 2020 estimates the annual level of investment needed over the next 20 years to meet growth, update and upgrade facilities to meet compliance obligations. However, SINSW’s ten-year Capital Investment Plans for 2018–19, 2019–20 and 2020–21 only identified priorities over a two-year horizon. Developing a longer-term pipeline of priorities would signal the areas of greatest need and allow greater scope to consider a range of options to best meet those needs. SINSW has made progress in planning across geographic areas but needs to better prioritise which projects move forward. Given the current and projected needs for new classrooms, it is vital that SINSW provides long-term advice based on thorough state-wide analysis to help prioritise projects that best meet this demand. SINSW has improved its capabilities, processes, and systems to support planning in ‘School Community Groups’, which are clusters of between 5 to 15 schools in a geographic area. This addresses a key direction identified in the School Assets Strategic Plan 2016. It has developed a planning tool which allows it to prioritise School Community Groups based on weighted criteria. It has also developed an approach to identify potential projects within School Community Groups but has not yet put in place a structured process to prioritise which projects move to the business case stage to seek funding for delivery. Business cases we examined established service needs, but several had shortcomings in scope definition, cost estimation and risk identification. Most business cases we examined demonstrated the service need and consultation with stakeholders helped to incorporate educational requirements. Common templates and specific cost-benefit guidance developed in partnership with NSW Treasury has helped to promote consistency across business cases. However, there were shortcomings in several business cases we reviewed. Business cases for projects already announced by government presented a limited number of options, and the process for eliminating other options was not transparent. Cost increases and contingency drawdowns for several projects indicate that scoping, costing and risk assessments could be improved, especially for complex projects. Standard program management systems and governance arrangements support project delivery, however, there is scope for better ongoing oversight of benefits. SINSW applies standard governance arrangements to projects based on their size. Higher value projects have executive oversight while lower value projects are overseen on a regional basis. SINSW has improved its project management systems to provide more consistent data and greater transparency to senior management over project status, cost and use of contingencies. SINSW has worked with NSW Treasury to define a consistent set of benefits for new and redeveloped schools. Estimated benefits are currently based on international contexts but SINSW advises it is undertaking further research to improve the evidence base in this area. The current approach to ongoing monitoring, reporting and evaluation of project benefits places responsibility on the infrastructure delivery team. This team is not the most appropriate area to monitor ongoing benefits, which are expected to accrue many years after delivery and depend on actions in other areas of the Department. |
1. Key findings
SINSW delivered projects against an established program of works in its first years of operation
At establishment, SINSW inherited a portfolio of existing projects and 123 new projects announced as part of the 2017–18 Budget (to commence over 2017–18 and 2018–19). It has progressively worked through individual project planning to deliver against these projects.
The 2018–19 Budget funded two new projects that had not already been announced. Both projects were identified by SINSW as a priority. The 2018–19 Budget also allocated funding for 'planning' 22 new projects. Seventeen of the 22 projects had been identified by SINSW as a priority.
SINSW identified 31 new priority projects in its Capital Investment Plan for 2019–20. Thirteen of these projects were funded in that year with a further 27 projects included as election commitments. SINSW identified 20 new projects in its Capital Investment Plan for 2020–21 but only two of these were funded. SINSW advised this was due to a constrained budget environment.
There is an anticipated shortfall of classrooms based on the current funded program
Despite increased funding since 2017–18, SINSW advised the NSW Government in early 2020 that the currently funded infrastructure program would not meet forecast classroom requirements for 2023 and beyond. Accordingly, it is vital that new funding is prioritised to projects which best meet demand.
SINSW only identified specific priorities over a two-year horizon in its Capital Investment Plans for 2018–19, 2019–20 and 2020–21. The School Assets Strategic Plan 2016 and the 2020 update make the case for sustained funding for school building and redevelopment. These plans estimate annual funding requirements and show geographic areas with increasing forecast enrolments. Detailing how priorities over a ten-year timeframe fit within a ten-year capital planning limit would create more certainty about meeting growth demands.
There has been progress in formalising prioritisation frameworks, data tools and supporting governance arrangements
SINSW committed to planning for new and redeveloped schools in 'School Community Groups' in the School Assets Strategic Plan 2016. This is a new way of planning which considers the educational needs over a defined geographical area. It has developed a planning tool to prioritise School Community Groups based on weighted criteria. It has also established governance frameworks to improve transparency over decisions to reprioritise this list.
SINSW has refined its approach to planning in School Community Groups over the past four years. It now prepares Service Needs Reports to investigate needs, identify projects, prioritise, determine scope and timing, and assess non-capital options. SINSW has yet to finalise arrangements for how needs identified in Service Needs Reports progress to the strategic business case stage.
Projects announced prior to developing a business case have less opportunity to consider a range of options to meet the service needs
Business cases for projects already announced by government (or announced for planning) go through the same process of determining the service need and impacts on surrounding schools. However, for some announced projects, the range of options considered in the business case is influenced by the parameters of the announcement. This makes it more difficult to genuinely pursue alternate options that could better meet the identified service need.
Projects identified by SINSW have a more rigorous process of considering options. Service Needs Reports explore a wide range of asset and non-asset interventions across the School Community Group. Options are narrowed as the projects move through the strategic and final business case stages. SINSW uses its Investment Review Committee to engage key stakeholders early in the process so that they are informed about how non-asset solutions have been considered and why SINSW is progressing the business case for a capital solution for particular projects.
Several business cases underestimated project costs and risks, leading to scope and budget increases
Several business cases we reviewed did not adequately identify the initial scope requirements, project-specific risks or the likely project cost. For two business cases, this appeared to be due to an attempt to fit the project within a predetermined amount. Announcing a project’s scope, budget and timeframe before proper planning increases risks to successful delivery against expectations.
Several of the projects we examined required drawdowns on contingency funds due to inadequate consideration of scope, costs and project risks at the planning stage. Contingency funds are intended for unanticipated extra costs rather than those that could have or should have been identified at the planning stage.
Guidance on benefit calculations has provided a consistent framework for business cases
Business cases we examined presented a consistent set of benefits based on guidance developed in partnership with NSW Treasury. Following this guidance helps to compare cost-benefit analyses across business cases. However, the evidence for the estimated benefits is based on contexts outside of NSW. SINSW has the tools and data sources to calculate benefits more suited to the context of particular schools. Doing so would improve the accuracy of cost-benefit analyses. SINSW advised that it is currently updating the guidance in partnership with NSW Treasury.
SINSW involves school principals, executives and teaching staff in developing education rationales when commencing projects. These documents help align projects with education outcomes. They also provide a baseline for post-occupancy evaluation, which is important to determine whether the new school infrastructure is being used in the ways that were anticipated in the business case.
SINSW could elevate its existing assurance review process to consolidate lessons learned
SINSW engages external peer reviewers to conduct assurance reviews on its projects at multiple stages of planning and delivery. It has established a Community of Practice for external reviewers to keep them up to date on new developments and requirements. Higher value projects are also subject to review by Infrastructure NSW under the Investor Assurance Framework.
By looking at all projects at all stages, assurance reviews can identify systematic issues across the full portfolio of projects. A recent assurance review analysed common findings from reviews of strategic and final business cases. This provides a helpful way to improve internal processes. SINSW advised that it is implementing a continuous improvement program, which will be able to take findings from assurance reviews to build organisational capabilities.
2. Recommendations
By September 2021, the Department of Education should:
- finalise the investment prioritisation approach with agreement from key stakeholders
- finalise and update on an ongoing basis a ten-year list of priorities to meet the forecast demand for new classrooms and contemporary fit for purpose learning environments, which identifies individual projects and programs in the short-term and priority geographic areas and programs in the medium-term
- seek a ten-year Capital Planning Limit from NSW Treasury to ensure the needs identified in the ten-year list of priorities are met and are coordinated with the forward capital programs of other agencies
- improve the quality of data on cost benchmarks that underpin the annual ten-year Capital Investment Plan and updates to the School Assets Strategic Plan
- embed an evidence-based cost benefit analysis framework for school investment, in consultation with NSW Treasury, by:
- validating benefits estimated in previous business cases with actual results
- building the evidence base in relation to contemporary learning environments
- regularly share data on forecast needs with relevant planning agencies to promote strategic opportunities for servicing education needs
- implement the continuous improvement program for service planning, options assessment, business case development, project delivery and handover. The program should be informed by findings from assurance reviews, post-occupancy evaluations and project lessons learned
- establish benefits realisation processes and practices that:
- ensure business cases set baselines and targets for benefits
- review benefits during delivery, prior to handover and as part of Post Occupancy Evaluations
- identify which part(s) of the Department are best placed to develop, manage and evaluate benefits on an ongoing basis.
Note: The Department's formal response to this report at Appendix one states that while it 'supports the recommendations, it considers the proposed six-month timeframe to be an unreasonably short period for a large and complex organisation to effectively implement many of these recommendations'. It suggests 12 months would be needed to implement the recommendations. The recommendations stemming from this audit are core business for SINSW. The Audit Office considers it important for SINSW to place priority on implementing the recommendations in time to inform the 2022–23 budget cycle. Extending the deadline to April 2022 would place action outside of that budget cycle. |
There have been significant increases in funding for education infrastructure since the 2017–18 Budget and further growth in demand for places in schools is forecast. SINSW has the challenge, not only of meeting the need for new classrooms due to population growth, but also upgrading facilities to enable modern teaching techniques. In addition, community expectations of what constitutes a vibrant and successful school community continues to increase.
Given growing demand and budget constraints, projects must be selected to best meet the needs of the community and planning and prioritisation are vital. SINSW has been progressing planning for announced projects as well as implementing a new type of strategic state-wide planning and prioritisation, cluster planning, where options are developed for School Community Groups.
The primary role of a business case is to reliably inform an investment and/or policy decision. Over the period of review, the NSW Government's guidelines for business cases have established this requires recommendations based on convincing arguments, sufficient evidence, and accurate costing of alternatives and expected benefits. Business case guidelines are underpinned by guides for economic appraisal and cost-benefit analysis.
As SINSW moves to prioritise business cases for interventions in School Community Groups, it will increasingly need to demonstrate rigour in its assessment of all options. It will also need to ensure that scope identification, cost and risk planning and the setting of contingencies are accurate. This will help decision-makers better understand, plan for and manage the investment required to meet the demand for school infrastructure.
For this audit, we examined business cases and related documentation for 12 projects. Several of these projects were developed before School Infrastructure NSW was established in mid-2017.
Over the period of review, NSW Government policies for business case development and submission have emphasised that effective governance arrangements are critical to a proposal's successful implementation.
SINSW's guidance similarly highlight the importance of effective governance and project management for achieving good outcomes. It prescribes a general governance structure managed by SINSW that can be tailored to the planning and delivery of school infrastructure projects.
Appendix one – Response from agency
Appendix two – About the audit
Appendix three – Performance auditing
Copyright Notice
© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.
Parliamentary reference - Report number #347 - released (8 April 2021).
Auditor-General’s Report to Parliament on Delivering School Infrastructure
This corrigendum has been prepared to amend the following text within my Auditor-General’s Report to Parliament on Delivering School Infrastructure, dated 8 April 2021.
On page two, the original text was as follows:
Further NSW Government announcements in the 2018–19 Budget and election commitments in the 2019–20 Budget made up the majority of new projects, rather than projects prioritised by SINSW.
The original text has now been changed to
Further NSW Government announcements in the 2018–19 Budget, election commitments in the 2019–20 Budget, and announcements in the 2020–21 Budget, made up the majority of new projects, rather than projects prioritised by SINSW.
On page three, the original text was as follows:
The 2018–19 Budget funded three new projects that had not already been announced. One of the three projects was identified by SINSW as a priority.
The original text has now been changed to:
The 2018–19 Budget funded two new projects that had not already been announced. Both projects were identified by SINSW as a priority.
On page three the original text was as follows:
SINSW identified 33 priority projects in its Capital Investment Plan for 2019–20.
The original text has now been changed to
SINSW identified 31 new priority projects in its Capital Investment Plan for 2019–20.
On page eleven, in Exhibit 4, the original text was as follows:
The 2018–19 NSW Budget announced funding for an additional 43 new and upgraded schools to commence works in 2018–19. Of the 43 projects:
• 1 was identified by SINSW as a priority in its Capital Investment Plan (SINSW requested funding for one new project)
• 40 had already been announced
• 2 were new announcements (not identified as a priority by SINSW in its Capital Investment Plan).
The original text has now been changed to:
The 2018–19 NSW Budget announced funding for an additional 42 new and upgraded schools to commence works in 2018–19. Of the 42 projects:
• 2 were identified by SINSW as a priority in its Capital Investment Plan (SINSW requested funding for two new projects)
• 40 had already been announced.
On page eleven, the original text was as follows:
The 2019–20 NSW Budget announced funding for an additional 40 new and upgraded schools as election commitments. Of the 40 election commitment projects:
• 13 were identified by SINSW as priorities in its Capital Investment Plan (SINSW requested funding for a total of 33 new projects)
• 27 were new announcements (not identified as a priority by SINSW in its Capital Investment Plan).
The original text has now been changed to:
The 2019–20 NSW Budget announced funding for an additional 40 new and upgraded schools as election commitments. Of the 40 election commitment projects:
• 13 were identified by SINSW as priorities in its Capital Investment Plan (SINSW requested funding for a total of 31 new projects)
• 27 were new announcements (not identified as a priority by SINSW in its Capital Investment Plan).
The above changes will be reflected in the version of the report published on the Audit Office website and should be considered the true and accurate version.
Actions for Internal Controls and Governance 2017
Internal Controls and Governance 2017
Agencies need to do more to address risks posed by information technology (IT).
Effective internal controls and governance systems help agencies to operate efficiently and effectively and comply with relevant laws, standards and policies. We assessed how well agencies are implementing these systems, and highlighted opportunities for improvement.
1. Overall trends
New and repeat findings |
The number of reported financial and IT control deficiencies has fallen, but many previously reported findings remain unresolved. |
High risk findings |
Poor systems implementations contributed to the seven high risk internal control deficiencies that could affect agencies. |
Common findings |
Poor IT controls are the most commonly reported deficiency across agencies, followed by governance issues relating to cyber security, capital projects, continuous disclosure, shared services, ethics and risk management maturity. |
2. Information Technology
IT security |
Only two-thirds of agencies are complying with their own policies on IT security. Agencies need to tighten user access and password controls. |
Cyber security |
Agencies do not have a common view on what constitutes a cyber attack, which limits understanding the extent of the cyber security threat. |
Other IT systems |
Agencies can improve their disaster recovery plans and the change control processes they use when updating IT systems. |
3. Asset Management
Capital investment |
Agencies report delays delivering against the significant increase in their budgets for capital projects. |
Capital projects |
Agencies are underspending their capital budgets and some can improve capital project governance. |
Asset disposals |
Eleven per cent of agencies were required to sell their real property through Property NSW but didn’t. And eight per cent of agencies can improve their asset disposal processes. |
4. Governance
Governance arrangements |
Sixty-four per cent of agencies’ disclosure policies support communication of key performance information and prompt public reporting of significant issues. |
Shared services |
Fifty-nine per cent of agencies use shared services, yet 14 per cent do not have service level agreements in place and 20 per cent can strengthen the performance standards they set. |
5. Ethics and Conduct
Ethical framework |
Agencies can reinforce their ethical frameworks by updating code‑of‑conduct policies and publishing a Statement of Business Ethics. |
Conflicts of interest |
All agencies we reviewed have a code of conduct, but they can still improve the way they update and manage their codes to reduce the risk of fraud and unethical behaviour. |
6. Risk Management
Risk management maturity |
All agencies have implemented risk management frameworks, but with varying levels of maturity. |
Risk management elements |
Many agencies can improve risk registers and strengthen their risk culture, particularly in the way that they report risks to their lead agency. |
This report covers the findings and recommendations from our 2016–17 financial audits related to the internal controls and governance of the 39 largest agencies (refer to Appendix three) in the NSW public sector. These agencies represent about 95 per cent of total expenditure for all NSW agencies and were considered to be a large enough group to identify common issues and insights.
The findings in this report should not be used to draw conclusions on the effectiveness of individual agency control environments and governance arrangements. Specific financial reporting, controls and service delivery comments are included in the individual 2017 cluster financial audit reports tabled in Parliament from October to December 2017.
This new report offers strategic insight on the public sector as a whole
In previous years, we have commented on internal control and governance issues in the volumes we published on each ‘cluster’ or agency sector, generally between October and December. To add further value, we then commented more broadly about the issues identified for the public sector as a whole at the start of the following year.
This year, we have created this report dedicated to internal controls and governance. This will help Parliament to understand broad issues affecting the public sector, and help agencies to compare their own performance against that of their peers.
Without strong control measures and governance systems, agencies face increased risks in their financial management and service delivery. If they do not, for example, properly authorise payments or manage conflicts of interest, they are at greater risk of fraud. If they do not have strong information technology (IT) systems, sensitive and trusted information may be at risk of unauthorised access and misuse.
These problems can in turn reduce the efficiency of agency operations, increase their costs and reduce the quality of the services they deliver.
Our audits do not review every control or governance measure every year. We select a range of measures, and report on those that present the most significant risks that agencies should mitigate. This report divides these into the following six areas:
- Overall trends
- Information technology
- Asset management
- Governance
- Ethics and conduct
- Risk management.
Internal controls are processes, policies and procedures that help agencies to:
- operate effectively and efficiently
- produce reliable financial reports
- comply with laws and regulations.
This chapter outlines the overall trends for agency controls and governance issues, including the number of findings, level of risk and the most common deficiencies we found across agencies. The rest of this volume then illustrates this year’s controls and governance findings in more detail.
Issues |
Recommendations |
1.1 New and repeat findings |
|
The number of internal control deficiencies reduced over the past three years, but new higher-risk information technology (IT) control deficiencies were reported in 2016–17. Deficiencies repeated from previous years still make up a sizeable proportion of all internal control deficiencies. |
Recommendation Agencies should focus on emerging IT risks, but also manage new IT risks, reduce existing IT control deficiencies, and address repeat internal control deficiencies on a more timely basis. |
1.2 High risk findings |
|
We found seven high risk internal control deficiencies, which might significantly affect agencies. |
Recommendation Agencies should rectify high risk internal control deficiencies as a priority |
1.3 Common findings |
|
The most common internal control deficiencies related to poor or absent IT controls. We found some common governance deficiencies across multiple agencies. |
Recommendation Agencies should coordinate actions and resources to help rectify common IT control and governance deficiencies. |
Information technology (IT) has become increasingly important for government agencies’ financial reporting and to deliver their services efficiently and effectively. Our audits reviewed whether agencies have effective controls in place over their IT systems. We found that IT security remains the source of many control weakness in agencies.
Issues | Recommendations |
2.1 IT security |
|
User access administration While 95 per cent of agencies have policies about user access, about two-thirds were compliant with these policies. Agencies can improve how they grant, change and end user access to their systems. |
Recommendation Agencies should strengthen user access administration to prevent inappropriate access to sensitive systems. Agencies should:
|
Privileged access Sixty-eight per cent of agencies do not adequately manage who can access their information systems, and many do not sufficiently monitor or restrict privileged access. |
Recommendation Agencies should tighten privileged user access to protect their information systems and reduce the risks of data misuse and fraud. Agencies should ensure they:
|
Password controls Forty-one per cent of agencies did not meet either their own standards or minimum standards for password controls. |
Recommendation Agencies should review and enforce password controls to strengthen security over sensitive systems. As a minimum, password parameters should include:
|
2.2 Cyber Security |
|
Cyber security framework Agencies do not have a common view on what constitutes a cyber attack, which limits understanding the extent of the cyber security threat. |
Recommendation The Department of Finance, Services and Innovation should revisit its existing framework to develop a shared cyber security terminology and strengthen the current reporting requirements for cyber incidents. |
Cyber security strategies While 82 per cent of agencies have dedicated resources to address cyber security, they can strengthen their strategies, expertise and staff awareness. |
Recommendations The Department of Finance, Services and Innovation should:
Agencies should ensure they adequately resource staff dedicated to cyber security. |
2.3 Other IT systems |
|
Change control processes Some agencies need to improve change control processes to avoid unauthorised or inaccurate system changes. |
Recommendation Agencies should consistently perform user acceptance testing before system upgrades and changes. They should also properly approve and document changes to IT systems. |
Disaster recovery planning Agencies can do more to adequately assess critical business systems to enforce effective disaster recovery plans. This includes reviewing and testing their plans on a timely basis. |
Recommendation Agencies should complete business impact analyses to strengthen disaster recovery plans, then regularly test and update their plans. |
Agency service delivery relies on developing and renewing infrastructure assets such as schools, hospitals, roads, or public housing. Agencies are currently investing significantly in new assets. Agencies need to manage the scale and volume of current capital projects in order to deliver new infrastructure on time, on budget and realise the intended benefits. We found agencies can improve how they:
- manage their major capital projects
- dispose of existing assets.
Issues | Recommendations or conclusions |
3.1 Capital investment |
|
Capital asset investment ratios Most agencies report high capital investment ratios, but one-third of agencies’ capital investment ratios are less than one. |
Recommendation Agencies with high capital asset investment ratios should ensure their project management and delivery functions have the capacity to deliver their current and forward work programs. |
Volume of capital spending Most agencies have significant forward spending commitments for capital projects. However, agencies’ actual capital expenditure has been below budget for the last three years. |
Conclusion The significant increase in capital budget underspends warrant investigation, particularly where this has resulted from slower than expected delivery of projects from previous years. |
3.2 Capital projects |
|
Major capital projects Agencies’ major capital projects were underspent by 13 percent against their budgets. |
Conclusion The causes of agency budget underspends warrant investigation to ensure the NSW Government’s infrastructure commitment is delivered on time. |
Capital project governance Agencies do not consistently prepare business cases or use project steering committees to oversee major capital projects. |
Conclusion Agencies that have project management processes that include robust business cases and regular updates to their steering committees (or equivalent) are better able to provide those projects with strategic direction and oversight. |
3.3. Asset disposals |
|
Asset disposal procedures Agencies need to strengthen their asset disposal procedures. |
Recommendations Agencies should have formal processes for disposing of surplus properties. Agencies should use Property NSW to manage real property sales unless, as in the case for State owned corporations, they have been granted an exemption. |
Governance refers to the high-level frameworks, processes and behaviours that help an organisation to achieve its objectives, comply with legal and other requirements, and meet a high standard of probity, accountability and transparency.
This chapter sets out the governance lighthouse model the Audit Office developed to help agencies reach best practice. It then focuses on two key areas: continuous disclosure and shared services arrangements. The following two chapters look at findings related to ethics and risk management.
Issues | Recommendations or conclusions |
4.1 Governance arrangements |
|
Continuous disclosure Continuous disclosure promotes improved performance and public trust and aides better decision-making. Continuous disclosure is only mandatory for NSW Government Businesses such as State owned corporations. |
Conclusion Some agencies promote transparency and accountability by publishing on their websites a continuous disclosure policy that provides for, and encourages:
|
4.2 Shared services |
|
Service level agreements Some agencies do not have service level agreements for their shared service arrangements. Many of the agreements that do exist do not adequately specify controls, performance or reporting requirements. This reduces the effectiveness of shared services arrangements. |
Conclusion Agencies are better able to manage the quality and timeliness of shared service arrangements where they have a service level agreement in place. Ideally, the terms of service should be agreed before services are transferred to the service provider and:
|
Shared service performance Some agencies do not set performance standards for their shared service providers or regularly review performance results. |
Conclusion Agencies can achieve better results from shared service arrangements when they regularly monitor the performance of shared service providers using key measures for the benefits realised, costs saved and quality of services received. Before agencies extend or renegotiate a contract, they should comprehensively assess the services received and test the market to maximise value for money. |
All government sector employees must demonstrate the highest levels of ethical conduct, in line with standards set by The Code of Ethics and Conduct for NSW government sector employees.
This chapter looks at how well agencies are managing these requirements, and where they can improve their policies and processes.
We found that agencies mostly have the appropriate codes, frameworks and policies in place. But we have highlighted opportunities to improve the way they manage those systems to reduce the risks of unethical conduct.
Issues | Recommendations or conclusions |
5.1 Ethical framework |
|
Code of conduct All agencies we reviewed have a code of conduct, but they can still improve the way they update and manage their codes to reduce the risk of fraud and unethical behaviour. |
Recommendation Agencies should regularly review their code-of-conduct policies and ensure they keep their codes of conduct up-to-date. |
Statement of business ethics Most agencies maintain an ethical framework, but some can enhance their related processes, particularly when dealing with external clients, customers, suppliers and contractors. |
Conclusion Agencies can enhance their ethical frameworks by publishing a Statement of Business Ethics, which communicates their values and culture. |
5.2 Potential conflicts of interest |
|
Conflicts of interest All agencies have a conflicts-of-interest policy, but most can improve how they identify, manage and avoid conflicts of interest. |
Recommendation Agencies should improve the way they manage conflicts of interest, particularly by:
|
Gifts and benefits While all agencies already have a formal gifts-and-benefits policy, we found gaps in the management of gifts and benefits by some that increase the risk of unethical conduct. |
Recommendation Agencies should improve the way they manage gifts and benefits by promptly updating registers and providing annual training to staff. |
Risk management is an integral part of effective corporate governance. It helps agencies to identify, assess and prioritise the risks they face and in turn minimise, monitor and control the impact of unforeseen events. It also means agencies can respond to opportunities that may emerge and improve their services and activities.
This year we looked at the overall maturity of the risk management frameworks that agencies use, along with two important risk management elements: risk culture and risk registers.
Issues | Recommendations or conclusions |
6.1 Risk management maturity |
|
All agencies have implemented risk management frameworks, but with varying levels of maturity in their application. Agencies’ averaged a score of 3.1 out of five across five critical assessment criteria for risk management. While strategy and governance fared best, the areas that most need to improve are risk culture, and systems and intelligence. |
Conclusion Agencies have introduced risk management frameworks and practices as required by the Treasury’s:
However, more can be done to progress risk management maturity and embed risk management in agency culture. |
6.2 Risk management elements |
|
Risk culture Most agencies have started to embed risk management into the culture of their organisation. But only some have successfully done so, and most agencies can improve their risk culture.
|
Conclusion Agencies can improve their risk culture by:
|
Risk registers and reporting Some agencies do not report their significant risks to their lead agency, which may impair the way resources are allocated in their cluster. Some agencies do not integrate risk registers at a divisional and whole-of-enterprise level. |
Conclusion Agencies not reporting significant risks at the cluster level increases the likelihood that significant risks are not being mitigated appropriately. |
Effective risk management can improve agency decision-making, protect reputations and lead to significant efficiencies and cost savings. By embedding risk management directly into their operations, agencies can also derive extra value for their activities and services.
Actions for Report on Education 2017
Report on Education 2017
The Auditor-General, Margaret Crawford released her report on the results of the financial audits of agencies in the Education cluster. The report focuses on key observations and findings from the most recent audits of these agencies.
'I am pleased to report that unqualified audit opinions were issued on the financial statements for all agencies in the Education cluster', the Auditor-General said. 'The quality and timeliness of financial reporting remains strong'.
Actions for Central Agencies 2017
Central Agencies 2017
This report highlights the results of the financial audits of NSW Government central agencies. The report focuses on key observations and findings from the most recent financial statement audits of agencies in the Treasury, Premier and Cabinet, and Finance, Services and Innovation clusters.
The report includes a range of findings in respect to service delivery. One repeat finding is that while the Government regularly reports on the 12 Premier's priorities, there is no comprehensive reporting on the 18 State priorities.
1. Financial reporting and controls
Audit Opinions | Unqualified audit opinions were issued for all agencies' 30 June 2017 financial statements. |
Early close | Early close procedures continue to facilitate the timely preparation of financial statements and completion of audits, but agencies can make further improvement. |
Deficient user administration access | User access administration over financial systems remains an area of weakness. Agencies need to strengthen user access administration to critical systems. |
Transitioning to outsourced service providers | Transitioning of services to outsourced service providers can be improved. Outsourcing services can lead to better outcomes, which may include lower transaction costs and improved services, but it also introduces new risks. |
2. Service delivery
Premier and State Priorities | A comprehensive report of performance against the 18 State Priorities is yet to be published. While some measures are publicly reported through agency annual reports or other sources, a comprehensive report of performance against the 18 State Priorities would ensure all State Priorities are publicly reported, provide a single and easily accessible source of reference and improve transparency. |
ICT and digital government | The Digital Government Strategy was released in May 2017. Targets will need to be set to assess and monitor progress against the Strategy. |
Digital information security | Not all agencies are complying with the NSW Government's information security policy. This increases the risk of noncompliance with legislation, information security breaches and difficulty restoring data or maintaining business continuity in the event of a disaster or disruption. |
Property and asset utilisation | Property NSW's performance reporting would be enhanced by developing and reporting on customer satisfaction, reporting against set targets and benchmarking cost of service to the private sector. |
3. Government financial services
Prudential oversight of NSW Government superannuation funds |
Prudential oversight of SAS Trustee Corporation Pooled Fund and Parliamentary Contributory Superannuation Fund has not been prescribed. Structured and comprehensive prudential oversight of these funds remains important as they operate in a specialised, complex and continuously changing investment market sector, have over 106,000 members and manage investments in excess of $42.4 billion. |
Green slip scheme affordability | Currently, Green Slips in NSW are the most expensive in Australia. However, CTP reforms are expected to reduce the cost of Green Slips. |
This report sets out the results of the 30 June 2017 financial statement audits of NSW Government's central agencies and their cluster agencies.
Central agencies play a key role in ensuring policy coordination, good administrative and people management practices and prudent fiscal management. The central agencies and their key responsibilities are set out below.
Confidence in public sector decision‑making and transparency is enhanced when financial reporting is accurate and timely. Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. This chapter outlines our audit observations, conclusions or recommendations related to financial reporting and controls of agencies for 2016–17.
Observation | Conclusion or recommendation |
2.1 Quality of financial reporting | |
Unqualified audit opinions were issued for all agency financial statements. | The quality of financial reporting continues to remain strong across the clusters. |
2.2 Timeliness of financial reporting | |
Most agencies complied with the statutory timeframes for completion of early close procedures and preparation and audit of financial statements. | Early close procedures continue to facilitate the timely preparation of financial statements and completion of audits, but agencies can make further improvement. |
2.3 Financial performance and sustainability | |
We assessed the performance of agencies listed in Appendix six against some key financial sustainability indicators. This highlighted two agencies with negative operating margins of more than ten per cent and one agency with a liquidity ratio of less than 0.5. | These agencies have strategies in place to remain financially sustainability and manage their liquidity. Our analysis found that, overall, the agencies are not at high risk of sustainability concerns. |
2.4 Internal Controls | |
User access administration over financial systems remains an area of weakness. Sixteen moderate risk and ten low risk issues related to user access administration across eight agencies were identified. |
Recommendation: Agencies should review user access administration to critical systems to ensure:
|
Transitioning of services to outsourced service providers can be improved. Our 2016–17 audits identified one high risk issue relating to Property NSW's outsourcing of property and facility management services to the private sector. While a high risk issue was identified in 2015–16 from the Department of Finance, Services and Innovation's outsourcing of transactional and information technology services to GovConnect there has been an improvement in GovConnect's internal control environment throughout |
Outsourcing services can lead to better outcomes, which may include lower transaction costs and improved services, but it also introduces new risks. The transition needs to be carefully managed and requires thorough planning and effective project governance. This should be supported by oversight and direction from senior management and independent project assurance. |
2.5 Human Resources | |
The percentage of full‑time equivalent staff with annual leave greater than 30 days in the Finance, Services and Innovation, Premier and Cabinet and the Treasury clusters is 7.9 per cent, 17.1 per cent and 18.4 per cent respectively. | Agencies have strategies in place to reduce annual leave balances that are greater than 30 days. The effectiveness of these strategies will need to be monitored to ensure they are helping to achieve the desired outcome. |
This chapter outlines our audit observations, conclusions and recommendations relating to service delivery for 2016–17.
Observation | Conclusion or recommendation |
3.1 Premier and State priorities | |
The Department of Premier and Cabinet monitors the achievement of targets and the implementation of initiatives to deliver the 12 Premier’s Priorities. Responsible ministers and agencies manage the 18 State Priorities. A comprehensive report of performance against the 18 State Priorities is yet to be published. |
While some measures are publicly reported through agency annual reports or other sources, a comprehensive report of performance against the 18 State Priorities would ensure all State Priorities are publicly reported, provide a single and easily accessible source of reference and improve transparency. Where possible, independent sources are used to measure performance, however without independent assurance there is an increased risk that the target measures are inaccurate, not relevant or do not fairly represent actual performance. |
Performance against the State Priority to make NSW the easiest state to start a business is not currently published. |
Initiatives, such as easy to do business and red tape reduction are in place to help achieve this priority. The regulatory policy framework is under review following an October 2016 performance audit on ‘Red tape reduction’ that found the regulatory burden of legislation had increased. |
3.2 Financial management | |
Revenue NSW earned record crown revenue of $30.0 billion in 2016–17 to support the state's finances. | Record crown revenue has been driven by the sustained increase in duties revenue, which has increased by 93.7 per cent over the last five years. This is a consequence of the continued strength in the property market over this time and large one off NSW Government business asset sales and leases. |
3.3 ICT and digital government | |
The Digital Government Strategy (the Strategy) was released in May 2017 to build on reforms set out in previous ICT strategies. | The Strategy’s priorities and enablers aim to support digital innovation. Targets and measures will need to be set to assess and monitor progress against the Strategy. |
The Digital Information Security Policy (DISP) is a key tool that helps ensure a minimum set of information security controls are implemented across NSW Government agencies. A review of 2016 annual reports found 15 agencies (13 in 2015) did not attest to compliance with the DISP and of the agencies that attested to compliance, 34 reported issues associated with their compliance. |
The Strategy’s priorities and enablers aim to support digital innovation. Targets and measures will need to be set to assess and monitor progress against the Strategy. |
3.4 Property and asset utilisation | |
Property NSW's performance reporting could be |
Property NSW's performance reporting would be enhanced by developing and reporting on customer satisfaction, reporting against set targets and benchmarking cost of service to the private sector. |
This chapter outlines our audit observations, conclusions and recommendations specific to NSW Government agencies providing financial services.
Observation | Conclusion or recommendation |
4.1 Key issues | |
The SAS Trustee Corporation (STC) Pooled Fund and the Parliamentary Contributory Superannuation (PCS) Fund are not required to comply with the prudential and reporting standards issued by the Australian Prudential Regulation Authority (APRA). Amendments to relevant legislation allows the Minister for Finance, Services and Property to prescribe applicable prudential standards and audit requirements. |
Structured and comprehensive prudential oversight of these funds remains important as they operate in a specialised, complex and continuously changing investment market sector, have over 106,000 members and manage investments of more than $42.4 billion. Recommendation: The Treasury should liaise with the respective Trustees to implement appropriate prudential standards and oversight arrangements for the exempt public sector superannuation funds. |
Currently, Green Slips in NSW are the most expensive in Australia. Average premiums for Sydney Metropolitan vehicles increased by 10.4 per cent between 1 January 2016 and 31 December 2016. |
CTP reforms are expected to reduce the cost of Green Slips. The State Insurance Regulatory Authority will need to ensure it has appropriate processes in place to track and report against the expected benefits. |
4.2 Financial performance and sustainability | |
Net unfunded superannuation liabilities were $15.0 billion at 30 June 2017. Under the Fiscal Responsibility Act 2012, the NSW Government’s target is to eliminate unfunded superannuation liabilities by 2030. |
The superannuation funds’ strategic asset allocation and investment strategies are monitored and adjusted to help achieve a fully funded position by 2030. |
The Home Warranty Scheme commenced in 2011. Over this time total premiums collected have not been sufficient to cover expected claim costs. | Funding arrangements introduced during 2016–17 allow the Home Building Compensation Fund to apply to the Crown for reimbursement of unfunded realised losses from under-pricing of premiums. Other reforms are planned to address the long term sustainability of the home building compensation scheme. |
4.3 Investment performance | |
The NSW Government’s main superannuation funds have maintained the management expense ratio (MER) at consistent levels over the past two years. The Parliamentary Contributory Superannuation (PCS) Fund does not set an MER target. | MER is an industry recognised ratio to measure the performance of funds and investment managers. Recommendation: The Fund Secretary for the PCS Fund, in conjunction with the Trustee, should consider establishing an appropriate management expense ratio target to measure performance. |
Actions for Information and Communication Technologies in schools for teaching and learning
Information and Communication Technologies in schools for teaching and learning
Several factors are reducing effective use of information and communication technology (ICT) in the classroom.
These are primarily:
Parliamentary reference - Report number #289 - released 6 July 2017
Actions for Planning for school infrastructure
Planning for school infrastructure
The Department of Education proposes to fundamentally reform school infrastructure planning and delivery to meet the future demand for student places, and to overcome chronic under-investment for much of the last decade. To do this, it will need to spend much more than it has been receiving to date.
Parliamentary reference - Report number #284 - released 4 May 2017
Actions for 2016 - An overview
2016 - An overview
This report focuses on key observations and findings from 2016 audits and highlights key areas of focus for financial and performance audits in 2017.
Financial reporting | |
Observation | Conclusion |
Only one qualified audit opinion was issued on the 2015–16 financial statements of NSW public sector agencies, compared to two in 2014–15. | The quality of financial reporting continued to improve across the NSW public sector. |
More 2015–16 financial statements and audit opinions were signed within three months of the year end. | Timely financial reporting was facilitated by more agencies resolving significant accounting issues early, completing asset valuations on time and compiling sufficient evidence to support financial statement balances. |
NSW Treasury’s early close procedures in 2015–16 were again successful in improving the quality and timeliness of financial reporting, largely facilitated by the early resolution of accounting issues. For 2016–17, NSW Treasury has narrowed the scope of mandatory early close procedures. |
The narrowed scope of mandatory early close procedures may diminish the good performance in ensuring the quality and timeliness of financial reporting achieved in recent years. To mitigate this risk, NSW Treasury has mandated that agencies perform non-financial asset valuations and prepare proforma financial statements in their early close procedures. It also encourages them to continue with the good practices embedded in recent years. |
Although most agencies complied with NSW Treasury’s early close asset revaluation procedures we identified areas where they can improve. | Asset revaluations need to commence early enough to ensure all assets are identified and the results are analysed, recorded and reflected accurately in the early close financial statements. |
Number of misstatements | |||||
Year ended 30 June | 2015-16 | 2014-15 | 2013-14 | 2012-13 | 2011-12 |
Total reported misstatements | 298 | 396 | 459 | 661 | 1,077 |
All material misstatements identified by agencies and audit teams were corrected before the financial statements and audit opinions were signed. A material misstatement relates to an incorrect amount, classification, presentation or disclosure in the financial statements that could reasonably be expected to influence the economic decisions of users.
Significant matters reported to the portfolio Minister, Treasurer and Agency Head
In 2015–16, we reported the following significant matters to the portfolio Minister, Treasurer and agency head in our Statutory Audit Reports:
Appropriate financial controls help ensure the efficient and effective use of resources and the implementation and administration of agency policies. They are essential for quality and timely decision making.
In 2015–16, our audit teams made the following key observations on the financial controls of NSW public sector agencies.
Financial controls | |
Observation | Conclusion |
More needs to be done to implement audit recommendations on a timely basis. We found 212 internal control issues identified in previous audits had not been adequately addressed by 30 June 2016. |
Delays in implementing audit recommendations can impact the quality of financial information and the effectiveness of decision making. Agencies need to ensure they have action plans, timeframes and assigned responsibilities to address recommendations in a timely manner. |
Agencies continue to face challenges managing information security. Most information technology issues we identified related to poor IT user administration in areas like password controls and inappropriate access. | Agencies should review the design and effectiveness of information security controls to ensure data is adequately protected. |
We found shared service provider agreements did not always adequately address information security requirements. |
Where agencies use shared service providers they should consider whether the service level arrangements adequately address information security. |
Thirteen of 108 agencies required to attest to having a minimum set of information security controls did not do so in their 2015 annual reports. | The 'NSW Government Digital Information Security Policy' recognises the growing need for effective information security. With cyber security threats continuing to increase as digital services expand we plan to look at cyber security as part of our 2017–18 performance audit program. |
We identified instances where service level agreements with shared service providers were outdated, signed too late or did not exist. | Corporate and shared service arrangements are more effective when service level arrangements are negotiated and signed in time, clearly detail rights and responsibilities and include meaningful KPIs, fee arrangements and dispute resolution processes. |
Internal controls at GovConnect, the private sector provider of transactional and information technology services to many NSW public sector agencies were ineffective in 2015–16. We found mitigating actions taken to manage transition risks from ServiceFirst to GovConnect were ineffective in ensuring effective control over client transactions and data. | The Department of Finance, Services and Innovation should ensure GovConnect addresses the control deficiencies. It should also examine the breakdowns in the transition of the shared service arrangements and apply the learnings to other services being transitioned to the private sector. |
Maintenance backlogs exist in several NSW public sector agencies, including Roads and Maritime Services, Sydney Trains, NSW Health, the Department of Education and the Department of Justice. | To address backlog maintenance it is important for agencies to have asset lifecycle planning strategies that ensure newly built and existing assets are funded and maintained to a desired service level. |
Actions for Relocating Agencies to Regional Areas
Relocating Agencies to Regional Areas
Decisions to relocate government agencies to non-metropolitan areas are not made purely for cost reasons. They can also serve government policy objectives, such as promoting regional economic development.
Regardless of the policy objectives that may exist, I would expect that decisions on individual agency relocations would be based on sound business cases. Those business cases would show how the relocation achieves any relevant government objectives, what costs (or savings) would be involved, logistical considerations such as obtaining appropriate accommodation and staff, and any impacts on levels service to the public.
In my view, the existence of government policy objectives does not remove the need for individual decisions to be made in a transparent, rational and accountable manner. Responsible public servants should provide the appropriate information to government to allow it to judge how best to implement its policies.
Parliamentary reference - Report number #147 - released 14 December 2005