Refine search Expand filter

Reports

Published

Actions for Internal Controls and Governance 2017

Internal Controls and Governance 2017

Finance
Education
Community Services
Health
Justice
Whole of Government
Asset valuation
Compliance
Cyber security
Information technology
Internal controls and governance
Project management
Risk

Agencies need to do more to address risks posed by information technology (IT).

Effective internal controls and governance systems help agencies to operate efficiently and effectively and comply with relevant laws, standards and policies. We assessed how well agencies are implementing these systems, and highlighted opportunities for improvement.
 

1. Overall trends

New and repeat findings

The number of reported financial and IT control deficiencies has fallen, but many previously reported findings remain unresolved.

High risk findings

Poor systems implementations contributed to the seven high risk internal control deficiencies that could affect agencies.

Common findings

Poor IT controls are the most commonly reported deficiency across agencies, followed by governance issues relating to cyber security, capital projects, continuous disclosure, shared services, ethics and risk management maturity.

2. Information Technology

IT security

Only two-thirds of agencies are complying with their own policies on IT security. Agencies need to tighten user access and password controls.

Cyber security

Agencies do not have a common view on what constitutes a cyber attack, which limits understanding the extent of the cyber security threat.

Other IT systems

Agencies can improve their disaster recovery plans and the change control processes they use when updating IT systems.

3. Asset Management

Capital investment

Agencies report delays delivering against the significant increase in their budgets for capital projects.

Capital projects

Agencies are underspending their capital budgets and some can improve capital project governance.

Asset disposals

Eleven per cent of agencies were required to sell their real property through Property NSW but didn’t. And eight per cent of agencies can improve their asset disposal processes.

4. Governance

Governance arrangements

Sixty-four per cent of agencies’ disclosure policies support communication of key performance information and prompt public reporting of significant issues.

Shared services

Fifty-nine per cent of agencies use shared services, yet 14 per cent do not have service level agreements in place and 20 per cent can strengthen the performance standards they set.

5. Ethics and Conduct

Ethical framework

Agencies can reinforce their ethical frameworks by updating code‑of‑conduct policies and publishing a Statement of Business Ethics.

Conflicts of interest

All agencies we reviewed have a code of conduct, but they can still improve the way they update and manage their codes to reduce the risk of fraud and unethical behaviour.

6. Risk Management 

Risk management maturity

All agencies have implemented risk management frameworks, but with varying levels of maturity.

Risk management elements

Many agencies can improve risk registers and strengthen their risk culture, particularly in the way that they report risks to their lead agency.

This report covers the findings and recommendations from our 2016–17 financial audits related to the internal controls and governance of the 39 largest agencies (refer to Appendix three) in the NSW public sector. These agencies represent about 95 per cent of total expenditure for all NSW agencies and were considered to be a large enough group to identify common issues and insights.

The findings in this report should not be used to draw conclusions on the effectiveness of individual agency control environments and governance arrangements. Specific financial reporting, controls and service delivery comments are included in the individual 2017 cluster financial audit reports tabled in Parliament from October to December 2017.

This new report offers strategic insight on the public sector as a whole

In previous years, we have commented on internal control and governance issues in the volumes we published on each ‘cluster’ or agency sector, generally between October and December. To add further value, we then commented more broadly about the issues identified for the public sector as a whole at the start of the following year.

This year, we have created this report dedicated to internal controls and governance. This will help Parliament to understand broad issues affecting the public sector, and help agencies to compare their own performance against that of their peers.

Without strong control measures and governance systems, agencies face increased risks in their financial management and service delivery. If they do not, for example, properly authorise payments or manage conflicts of interest, they are at greater risk of fraud. If they do not have strong information technology (IT) systems, sensitive and trusted information may be at risk of unauthorised access and misuse.

These problems can in turn reduce the efficiency of agency operations, increase their costs and reduce the quality of the services they deliver.

Our audits do not review every control or governance measure every year. We select a range of measures, and report on those that present the most significant risks that agencies should mitigate. This report divides these into the following six areas:

  1. Overall trends
  2. Information technology
  3. Asset management
  4. Governance
  5. Ethics and conduct
  6. Risk management.

Internal controls are processes, policies and procedures that help agencies to:

  • operate effectively and efficiently
  • produce reliable financial reports
  • comply with laws and regulations.

This chapter outlines the overall trends for agency controls and governance issues, including the number of findings, level of risk and the most common deficiencies we found across agencies. The rest of this volume then illustrates this year’s controls and governance findings in more detail.

Issues

Recommendations

1.1 New and repeat findings

The number of internal control deficiencies reduced over the past three years, but new higher-risk information technology (IT) control deficiencies were reported in 2016–17.

Deficiencies repeated from previous years still make up a sizeable proportion of all internal control deficiencies.

Recommendation

Agencies should focus on emerging IT risks, but also manage new IT risks, reduce existing IT control deficiencies, and address repeat internal control deficiencies on a more timely basis.

1.2 High risk findings

We found seven high risk internal control deficiencies, which might significantly affect agencies.

Recommendation

Agencies should rectify high risk internal control deficiencies as a priority

1.3 Common findings

The most common internal control deficiencies related to poor or absent IT controls.

We found some common governance deficiencies across multiple agencies.

Recommendation

Agencies should coordinate actions and resources to help rectify common IT control and governance deficiencies.

Information technology (IT) has become increasingly important for government agencies’ financial reporting and to deliver their services efficiently and effectively. Our audits reviewed whether agencies have effective controls in place over their IT systems. We found that IT security remains the source of many control weakness in agencies.

Issues Recommendations

2.1 IT security

User access administration

While 95 per cent of agencies have policies about user access, about two-thirds were compliant with these policies. Agencies can improve how they grant, change and end user access to their systems.

Recommendation

Agencies should strengthen user access administration to prevent inappropriate access to sensitive systems. Agencies should:

  • establish and enforce clear policies and procedures
  • review user access regularly
  • remove user access for terminated staff promptly
  • change user access for transferred staff promptly.

Privileged access

Sixty-eight per cent of agencies do not adequately manage who can access their information systems, and many do not sufficiently monitor or restrict privileged access.

Recommendation

Agencies should tighten privileged user access to protect their information systems and reduce the risks of data misuse and fraud. Agencies should ensure they:

  • only grant privileged access in line with the responsibilities of a position
  • review the level of access regularly
  • limit privileged access to necessary functions and data
  • monitor privileged user account activity on a regular basis.

Password controls

Forty-one per cent of agencies did not meet either their own standards or minimum standards for password controls.

Recommendation

Agencies should review and enforce password controls to strengthen security over sensitive systems. As a minimum, password parameters should include:

  • minimum password lengths and complexity requirements
  • limits on the number of failed log-in attempts
  • password history (such as the number of passwords remembered)
  • maximum and minimum password ages.

2.2 Cyber Security

Cyber security framework

Agencies do not have a common view on what constitutes a cyber attack, which limits understanding the extent of the cyber security threat.

Recommendation

The Department of Finance, Services and Innovation should revisit its existing framework to develop a shared cyber security terminology and strengthen the current reporting requirements for cyber incidents.

Cyber security strategies

While 82 per cent of agencies have dedicated resources to address cyber security, they can strengthen their strategies, expertise and staff awareness.

Recommendations

The Department of Finance, Services and Innovation should:

  • mandate minimum standards and require agencies to regularly assess and report on how well they mitigate cyber security risks against these standards
  • develop a framework that provides for cyber security training.

Agencies should ensure they adequately resource staff dedicated to cyber security.

2.3 Other IT systems

Change control processes

Some agencies need to improve change control processes to avoid unauthorised or inaccurate system changes.

Recommendation

Agencies should consistently perform user acceptance testing before system upgrades and changes. They should also properly approve and document changes to IT systems.

Disaster recovery planning

Agencies can do more to adequately assess critical business systems to enforce effective disaster recovery plans. This includes reviewing and testing their plans on a timely basis.

Recommendation

Agencies should complete business impact analyses to strengthen disaster recovery plans, then regularly test and update their plans.

Agency service delivery relies on developing and renewing infrastructure assets such as schools, hospitals, roads, or public housing. Agencies are currently investing significantly in new assets. Agencies need to manage the scale and volume of current capital projects in order to deliver new infrastructure on time, on budget and realise the intended benefits. We found agencies can improve how they:

  • manage their major capital projects
  • dispose of existing assets.
Issues Recommendations or conclusions

3.1 Capital investment

Capital asset investment ratios

Most agencies report high capital investment ratios, but one-third of agencies’ capital investment ratios are less than one.

Recommendation

Agencies with high capital asset investment ratios should ensure their project management and delivery functions have the capacity to deliver their current and forward work programs.

Volume of capital spending

Most agencies have significant forward spending commitments for capital projects. However, agencies’ actual capital expenditure has been below budget for the last three years.

Conclusion

The significant increase in capital budget underspends warrant investigation, particularly where this has resulted from slower than expected delivery of projects from previous years.

3.2 Capital projects

Major capital projects

Agencies’ major capital projects were underspent by 13 percent against their budgets.

Conclusion

The causes of agency budget underspends warrant investigation to ensure the NSW Government’s infrastructure commitment is delivered on time.

Capital project governance

Agencies do not consistently prepare business cases or use project steering committees to oversee major capital projects.

Conclusion

Agencies that have project management processes that include robust business cases and regular updates to their steering committees (or equivalent) are better able to provide those projects with strategic direction and oversight.

3.3. Asset disposals

Asset disposal procedures

Agencies need to strengthen their asset disposal procedures.

Recommendations

Agencies should have formal processes for disposing of surplus properties.

Agencies should use Property NSW to manage real property sales unless, as in the case for State owned corporations, they have been granted an exemption.

Governance refers to the high-level frameworks, processes and behaviours that help an organisation to achieve its objectives, comply with legal and other requirements, and meet a high standard of probity, accountability and transparency.

This chapter sets out the governance lighthouse model the Audit Office developed to help agencies reach best practice. It then focuses on two key areas: continuous disclosure and shared services arrangements. The following two chapters look at findings related to ethics and risk management.

Issues Recommendations or conclusions

4.1 Governance arrangements

Continuous disclosure

Continuous disclosure promotes improved performance and public trust and aides better decision-making. Continuous disclosure is only mandatory for NSW Government Businesses such as State owned corporations.

Conclusion

Some agencies promote transparency and accountability by publishing on their websites a continuous disclosure policy that provides for, and encourages:

  • regular public disclosure of key performance information
  • disclosure of both positive and negative information
  • prompt reporting of significant issues.

4.2 Shared services

Service level agreements

Some agencies do not have service level agreements for their shared service arrangements.

Many of the agreements that do exist do not adequately specify controls, performance or reporting requirements. This reduces the effectiveness of shared services arrangements.

Conclusion

Agencies are better able to manage the quality and timeliness of shared service arrangements where they have a service level agreement in place. Ideally, the terms of service should be agreed before services are transferred to the service provider and:

  • specify the controls a provider must maintain
  • specify key performance targets
  • include penalties for non-compliance.

Shared service performance

Some agencies do not set performance standards for their shared service providers or regularly review performance results.

Conclusion

Agencies can achieve better results from shared service arrangements when they regularly monitor the performance of shared service providers using key measures for the benefits realised, costs saved and quality of services received.

Before agencies extend or renegotiate a contract, they should comprehensively assess the services received and test the market to maximise value for money.

All government sector employees must demonstrate the highest levels of ethical conduct, in line with standards set by The Code of Ethics and Conduct for NSW government sector employees.

This chapter looks at how well agencies are managing these requirements, and where they can improve their policies and processes.

We found that agencies mostly have the appropriate codes, frameworks and policies in place. But we have highlighted opportunities to improve the way they manage those systems to reduce the risks of unethical conduct.

Issues Recommendations or conclusions

5.1 Ethical framework

Code of conduct

All agencies we reviewed have a code of conduct, but they can still improve the way they update and manage their codes to reduce the risk of fraud and unethical behaviour.

Recommendation

Agencies should regularly review their code-of-conduct policies and ensure they keep their codes of conduct up-to-date.

Statement of business ethics

Most agencies maintain an ethical framework, but some can enhance their related processes, particularly when dealing with external clients, customers, suppliers and contractors.

Conclusion

Agencies can enhance their ethical frameworks by publishing a Statement of Business Ethics, which communicates their values and culture.

5.2 Potential conflicts of interest

Conflicts of interest

All agencies have a conflicts-of-interest policy, but most can improve how they identify, manage and avoid conflicts of interest.

Recommendation

Agencies should improve the way they manage conflicts of interest, particularly by:

  • requiring senior executives to make a conflict-of-interest declaration at least annually
  • implementing processes to identify and address outstanding declarations
  • providing annual training to staff
  • maintaining current registers of conflicts of interest.

Gifts and benefits

While all agencies already have a formal gifts-and-benefits policy, we found gaps in the management of gifts and benefits by some that increase the risk of unethical conduct.

Recommendation

Agencies should improve the way they manage gifts and benefits by promptly updating registers and providing annual training to staff.

Risk management is an integral part of effective corporate governance. It helps agencies to identify, assess and prioritise the risks they face and in turn minimise, monitor and control the impact of unforeseen events. It also means agencies can respond to opportunities that may emerge and improve their services and activities.

This year we looked at the overall maturity of the risk management frameworks that agencies use, along with two important risk management elements: risk culture and risk registers.

Issues Recommendations or conclusions

6.1 Risk management maturity

All agencies have implemented risk management frameworks, but with varying levels of maturity in their application.

Agencies’ averaged a score of 3.1 out of five across five critical assessment criteria for risk management. While strategy and governance fared best, the areas that most need to improve are risk culture, and systems and intelligence.

Conclusion

Agencies have introduced risk management frameworks and practices as required by the Treasury’s:

  • 'Risk Management Toolkit for the NSW Public Sector'
  • 'Internal Audit and Risk Management Policy for the NSW Public Sector'.

However, more can be done to progress risk management maturity and embed risk management in agency culture.

6.2 Risk management elements

Risk culture

Most agencies have started to embed risk management into the culture of their organisation. But only some have successfully done so, and most agencies can improve their risk culture.

 

 

Conclusion

Agencies can improve their risk culture by:

  • setting an appropriate tone from the top
  • training all staff in effective risk management
  • ensuring desired risk behaviours and culture are supported, monitored, and reinforced through business plans, or the equivalent and employees' performance assessments.

Risk registers and reporting

Some agencies do not report their significant risks to their lead agency, which may impair the way resources are allocated in their cluster. Some agencies do not integrate risk registers at a divisional and whole-of-enterprise level.

Conclusion

Agencies not reporting significant risks at the cluster level increases the likelihood that significant risks are not being mitigated appropriately.

Effective risk management can improve agency decision-making, protect reputations and lead to significant efficiencies and cost savings. By embedding risk management directly into their operations, agencies can also derive extra value for their activities and services.

Published

Actions for Planning and Environment 2017

Planning and Environment 2017

Planning
Environment
Asset valuation
Information technology
Internal controls and governance
Management and administration
Project management

The following report highlights results of financial audits of agencies in the Planning and Environment cluster. The report focuses on key observations and findings from the most recent audits of these agencies.

The audits were completed for most agencies in the cluster and unqualified audit opinions issued. Issues identified during the financial statement audits of seven small agencies delayed their finalisation beyond the statutory deadline, and six of these remain incomplete. Apart from these small agencies, the quality of financial reporting across the cluster remained at a high standard.

1. Financial reporting and controls

Financial reporting Unqualified audit opinions were issued for 39 of the 45 cluster agencies. Issues identified during the financial statement audits of seven small agencies delayed their finalisation beyond the statutory deadline. Six of these audits remain incomplete at the date of this report.
  Agencies completed early close procedures mandated by the Treasury. We noted opportunities for agencies to improve the effectiveness of these procedures.
Internal Controls One in six internal control weaknesses identified during the financial audits were repeat issues. Agencies should action audit recommendations promptly.
  User administration over financial systems needs to be strengthened to prevent inappropriate access to financial information.

2. Service Delivery

 
Housing completions Australian Bureau of Statistics data indicates the Department of Planning and Environment achieved the Premier's priority for housing completions in 2016–17. 
Increasing housing supply Australian Bureau of Statistics data shows the Department of Planning and Environment achieved the annual target of delivering over 50,000 housing approvals over the past three years.
Major project assessment Progress against the State priority target to reduce time taken to assess planning applications for State significant developments is difficult to determine as the measure is unclear.
Litter management The Environment Protection Authority's data indicates that progress towards the Premier's priority target for litter reduction slowed in 2016–17.
Cultural participation The Department of Planning and Environment’s data indicates overall attendance at cultural venues and events in New South Wales increased by 16 per cent in 2015–16.

This report provides Parliament and others with the audit results, observations and recommendations for Planning and Environment cluster agencies. The report has been structured into two chapters focussing on financial reporting and controls and service delivery.

The Planning and Environment cluster plays a role in ensuring each community across New South Wales receives the services and infrastructure it needs.

This chapter outlines our audit observations and recommendations related to financial reporting and controls of Planning and Environment cluster agencies for 2016–17.

Observation Conclusion or recommendation

2.1 Quality of financial reporting

Unqualified audit opinions were issued for 39 of the 45 cluster agencies' financial statements.

Issues identified during the financial statement audits of seven smaller agencies delayed their completion. Six audits remain incomplete at the date of this report.

Apart from these seven small agency audits, the quality of financial reporting across the cluster remained at a high standard.

2.2 Timeliness of financial reporting

Seven agencies' financial statement audits were not completed by the statutory deadline with six audits incomplete at the date of this report.

Issues identified during the financial statement audits of seven smaller agencies delayed their finalisation beyond the statutory deadline. These agencies would benefit from performing additional early close procedures in future reporting periods.

2.3 Financial and sustainability analysis

Water and Electricity utility agencies continue to operate with low liquidity ratios.

A liquidity ratio below one is an indicator that an entity may not be able to pay its debts as and when they fall due.

Whilst liquidity ratios were below one, utility agencies demonstrated they can continue to support ongoing operations due to:

  • access to regulated revenue streams

  • assets with long useful lives to generate revenue

  • debt funding limits approved by the NSW Treasurer under the Public Authorities (Financial Arrangements) Act 1987.

2.5 Internal controls

One in six internal control weaknesses reported in 2016–17 were repeat issues.

Delays in implementing audit recommendations can prolong the risk of fraud and error.

Recommendation (repeat issue): anagement letter recommendations to address internal control weaknesses should be actioned promptly, with a focus on addressing repeat issues.

Nine of these internal control weaknesses related to the creation, modification, deletion and review of user access to financial systems.

These control weaknesses may compromise the integrity and security of financial data.

Recommendation (repeat issue): Management of user administration over financial systems should be strengthened to prevent inappropriate access to financial information.

This chapter outlines our audit observations, conclusions and recommendations relating to service delivery for 2016–17.

Observation Conclusion or recommendation

3.1 Premier's and State priorities

The Planning and Environment cluster is responsible for delivering five Premier's and State priorities.

One priority target was achieved in 2016–17, two targets are on track to be achieved and progress towards one target slowed.

Progress against one target cannot be determined.

3.2 Planning

Housing Completion

 
There were 63,506 housing completions in
2016–17. This was 4.1 per cent above the Premier’s priority target of delivering 61,000 housing completions per year.
The Australian Bureau of Statistics data shows the housing completions target was achieved in
2016–17.

Housing supply

The number of approvals for new houses in
2016–17 was 72,472 against the State priority target of more than 50,000 approvals per year.
The Australian Bureau of Statistics data indicates the housing approvals target was achieved in
2016–17.

Major project assessment

 
State significant developments are not clearly defined for the purposes of reporting against the State priority target. The Department of Planning and Environment will clarify with the Department of Premier and Cabinet which developments are captured by the State priority target.
The Department of Planning and Environment’s data shows the time taken to assess complex State significant developments increased by 16 per cent in 2016–17 while the time taken to assess less complex developments reduced by 20 per cent. The Department of Planning and Environment considers it is on track to meet the State priority target of halving the time taken to assess State significant developments, despite uncertainty over the target measure.

Housing acceleration fund

 

Program business cases were not developed for projects in Housing Acceleration Fund Rounds 1 to 4.

The Department advised a program business case will be developed for Housing Acceleration Fund Round 5 projects.

A program business case is necessary to ensure related projects are evaluated, managed and coordinated effectively.
 

A benefit realisation review process has not yet been approved for Housing Acceleration Fund projects.

The Department of Planning and Environment advised it is developing a benefit realisation review process.

A benefit realisation review process is necessary to determine whether funded projects achieved intended outcomes.

Greater Sydney Commission

 
The Greater Sydney Commission forecasts a further 725,000 dwellings in the greater Sydney region will be required up to 2036 to meet housing demand. In response to population growth, the Commission has set a five-year housing supply target of 189,100 houses across the five Greater Sydney Commission districts.

ePlanning system

 
The Department of Planning and Environment did not perform a benefit realisation review for phase one of the ePlanning project. It has committed to performing a benefit realisation review after completion of phase two in 2018. It cannot be determined if phase one of the project delivered expected outcomes as a benefit realisation review was not performed.

3.3. Environment and Heritage

Litter volume in New South Wales was 6.6 litres per 1,000 square metres in 2016–17, an increase of 16 per cent from the prior year. This is above the Premier's priority litter volume target of 4.2 litres per 1,000 square metres by 2020. The Environment Protection Authority's data indicates the progress towards the target of reducing the volume of litter by 40 per cent by 2020 has slowed.
The NSW Government plans to invest $240 million to facilitate strategic biodiversity conservation on private land. Performance measures have not yet been developed for the private land conservation program.

3.4 Water

IPART reduced water usage charges for most Sydney Water Corporation customers in 2016–17. Water usage prices in New South Wales compare favourably to larger water utilities in other jurisdictions.

Hunter Water Corporation's water recycling and water conservation performance has been stable over recent years.

The volume of Sydney Water Corporation’s recycled water reduced by 12 per cent in 2016–17 compared to the previous year.

Sydney Water Corporation experienced reduced industry demand for recycled water. Several large industrial customers relocated away from Sydney.

3.5 Arts and culture

A State priority target is to increase overall attendance at cultural venues and events in New South Wales by 15 per cent from 2014–15 levels by 2019. The Department of Planning and Environment's data indicates overall attendance increased by 16 per cent in 2015–16, although attendance fluctuated across individual venues and events. This indicates progress towards achieving the overall target by 2019.

Published

Actions for Report on Education 2017

Report on Education 2017

Education
Financial reporting
Internal controls and governance
Management and administration
Procurement
Project management
Workforce and capability

The Auditor-General, Margaret Crawford released her report on the results of the financial audits of agencies in the Education cluster. The report focuses on key observations and findings from the most recent audits of these agencies.

'I am pleased to report that unqualified audit opinions were issued on the financial statements for all agencies in the Education cluster', the Auditor-General said. 'The quality and timeliness of financial reporting remains strong'.

Published

Actions for Government Advertising: Campaigns for 2015–16 and 2016–17

Government Advertising: Campaigns for 2015–16 and 2016–17

Premier and Cabinet
Justice
Local Government
Compliance
Internal controls and governance
Management and administration
Procurement

The 'Stronger Councils, Stronger Communities' and the 'Dogs deserve better' government advertising campaigns complied with the Government Advertising Act and most elements of the Government Advertising Guidelines.

However, some advertisements were designed to build support for government policy and used subjective or emotive messages. This is inconsistent with the requirement in the Government Advertising Guidelines for 'objective presentation in a fair and accessible manner'.

Advertisements in the 'Stronger Councils, Stronger Communities' campaign used subjective statements such as 'the system is broken' and 'brighter future'. While advertisements in the 'Dogs deserve better' campaign used confronting imagery such as gun targets, blood smears and gravestones.

The Government Advertising Act 2011 (the Act) requires the Auditor-General to conduct a performance audit in relation to at least one government advertising campaign in each financial year. The performance audit assesses whether advertising campaigns were carried out effectively, economically and efficiently and in compliance with the Act, the regulations, other laws and the Government Advertising Guidelines (the Guidelines). In this audit, we examined two campaigns:

  • the ‘Stronger Councils, Stronger Communities’ campaign run by the Office of Local Government and the Department of Premier and Cabinet
  • the ‘Dogs deserve better’ campaign run by the Department of Justice.    

Section 6 of the Act details the specific prohibitions on political advertising. Under this section, material that is part of a government advertising campaign must not contain the name, voice or image of a minister, member of parliament or a candidate nominated for election to parliament or the name, logo or any slogan of a political party. Further, a campaign must not be designed so as to influence (directly or indirectly) support for a political party.

The ‘Stronger Councils, Stronger Communities’ government advertising campaign was run by the Office of Local Government and the Department of Premier and Cabinet in four phases from August 2015 to May 2016. The total cost of the campaign was over $4.5 million. See Appendix 2 for more details on this campaign.

The ‘Stronger Councils, Stronger Communities’ advertising campaign has not breached the specific provisions of Section 6 of the Act which prohibits political advertising.

Two factors potentially compromised value for money for the campaign. The request for quotes for the design of the Phase 1 advertisement did not reflect the full scale of work to be undertaken, which was substantially greater than initially quoted. Further, the department did not meet all recommended timeframes to minimise media booking costs for all phases of the campaign.

The campaign did not comply with all administrative requirements in all phases. Advertising for Phase 1 commenced before the compliance certificate was signed. There was no evidence that a compliance certificate was signed for Phase 2 extension. The cost benefit analyses for Phase 2 and Phase 2 extension did not sufficiently consider alternatives to advertising, as is required by the Government Advertising Guidelines.

Advertisements adopted subjective messages designed to build public support for council mergers and directed audiences to websites for more detailed information. Campaign research identified statements that were most likely to reduce resistance to mergers. Some advertising content used subjective language, which we consider inconsistent with the requirement for ‘objective presentation’. Evaluations of advertising effectiveness also measured the success of the advertisements in increasing public support for council mergers.

No breach of specific prohibitions in the Act

Section 6 of the Act prohibits the use of government advertising for political advertising. A government advertising campaign must not:

  • be designed to influence (directly or indirectly) support for a political party
  • contain the name, voice or image of a minister, any other member of parliament or a candidate nominated for election to parliament
  • contain the name, logo or any slogan of, or any other reference relating to, a political party.

We did not identify any breach of the specific prohibitions listed above in the advertising content of this campaign.

Request for quotes to design advertisement did not reflect the full scope required

The request for quotes for the design of the Phase 1 advertisement did not reflect the full scale of work that was to be undertaken, and this created a risk to achieving value for money. The Office of Local Government sought quotes for design of a television advertisement only. It did not request an estimate for radio, online advertisements, or translation for linguistically diverse audiences, which were ultimately required for the campaign.
 

A full and fair assessment of which supplier could provide the best value for money could not be made given that the quotes obtained did not reflect the full scope of work. The final amount paid for the design of Phase 1 was 2.7 times the original quote. It is possible that another supplier that provided a quote could have provided overall better value for money.

The Office of Local Government continued to use the Phase 1 supplier for Phase 2 and Phase 2 extension (Exhibit 4). Where there are other suppliers that could feasibly compete for a contract, direct negotiation increases the risk the agency has not obtained the best value for money. The department advised that it continued with the same agency to avoid costs involved in briefing a new agency on the campaign.

The ‘Dogs deserve better’ government advertising campaign was run by the Department of Justice from August 2016, after the government announced its decision to prohibit greyhound racing, and was terminated in October 2016 after a change of government policy. The campaign had a budget of $1.6 million, with an actual spend of $1.3 million. See Appendix 2 for more details on this campaign.

The ‘Dogs deserve better’ advertising campaign has not breached the specific provisions of Section 6 of the Act which prohibits political advertising.

The Secretary of the department determined that urgent circumstances existed that required advertising to commence prior to completing a cost benefit analysis and peer review. There was a concern that industry participants may make impulse decisions to destroy greyhounds without further information on support services; there was also an identified need to promote public greyhound adoptions.

Phase 1 advertisements focused on explaining the reasons for the prohibition on greyhound racing with a reference to a website for further information. While industry participants were identified as the primary audience, media expenditure was not specifically targeted to this group. Phase 2 advertisements more effectively addressed the originally identified ‘urgent needs’ of providing information on support services for greyhound owners and information on how the public could adopt a greyhound.

The urgency to advertise potentially compromised value for money. The department did not use price competition when selecting a creative supplier due to a concern this would add to timeframes. Further, the department did not meet recommended timeframes to minimise media booking costs.

We identified three other areas in Phase 1 advertisements that were inconsistent with government advertising requirements. Advertisements used provocative language and confronting imagery, which we consider to be inconsistent with the requirement for ‘objective presentation’. Two statements presented as fact based on the Special Commission’s Inquiry report were inaccurate; one of these was due to a calculation error. Radio advertisements did not clearly identify that they were authorised by the New South Wales Government for the first few days of the campaign.

No breach of specific prohibitions in the Act

Section 6 of the Act prohibits the use of government advertising for political advertising. A government advertising campaign must not:

  • be designed to influence (directly or indirectly) support for a political party
  • contain the name, voice or image of a minister, any other member of parliament or a candidate nominated for election to parliament
  • contain the name, logo or any slogan of, or any other reference relating to, a political party.

We did not identify any breach of the specific prohibitions listed above in the advertising content of this campaign.
 

Animal welfare concerns were identified as the reason for urgent advertising

A brief prepared by the department in July 2016 raised concerns about the welfare of greyhounds following the NSW Premier’s announcement that the government would prohibit greyhound racing. The brief raised the risk that industry members may make impulse decisions to destroy their greyhounds without information on support that was being offered.

The department used the provisions in Sections 7(4) and 8(3) of the Act to expedite the release of advertising due to ‘other urgent circumstances’. This provision allows advertising to commence prior to completing the peer review process and cost benefit analysis.

In introducing the Government Advertising Bill to parliament in 2011, the then Premier noted that exceptional circumstances would cover situations ‘such as a civil emergency or sudden health epidemic’. There is no other guidance on when it is appropriate to use this section. It is at the discretion of a government agency head to determine whether a campaign is urgent.
 

Phase 1 advertisements did not focus on the urgent needs

This advertising campaign had three overarching objectives:

  • to increase public awareness of the animal welfare reasons for the closure of the greyhound racing industry
  • to change the behaviour of dog owners from potentially harming their greyhounds to treating them humanely, by accessing the support options and packages available
  • to promote greyhound adoptions by the public.

Alongside advertising, the department took other steps to engage with the greyhound racing industry. This included direct mail, face to face meetings around the State, setting up a call centre and community consultation through an online survey. Other government agencies and animal welfare agencies were also engaged to reach out to affected stakeholders.

Phase 1 advertising content focused on providing information about the reasons for the closure of the industry. The department’s radio and television advertisements did not refer to support packages or encourage the public to adopt a greyhound. While print advertisements did mention these things, this was only presented in fine print. In all advertisements, audiences were referred to a website for further information.

The focus of advertisements on the reasons for industry closure was not consistent with the identified needs to urgently commence advertising to influence the behaviour of dog owners and encourage the public to adopt a greyhound.

The content in Phase 2 advertisements, which began around four weeks after the first phase, was more explicit in highlighting the services and support for industry members such as offering business and retraining advice. These advertisements also referred audiences to a call centre number as well as the website.

Peer review process limited to influencing second phase of advertisements

In urgent circumstances, the Act allows for peer review to be completed after advertising has commenced. For this campaign, the peer review process was completed on 19 August 2016, two weeks after advertising had commenced. Where advertising commences before the peer review process is completed, the usefulness of peer reviewers’ recommendations is limited to informing subsequent phases of advertising and the post-campaign evaluation.

The peer review report found the messages in Phase 1 advertisements were not clearly defined, and the role of advertising was not clearly defined amongst other campaign activities. These recommendations informed the second phase of advertising, which ran from 27 August 2016 until the campaign was terminated in October 2016.
 

The department could not demonstrate value for money was achieved for creative work

The department provided a fixed budget for creative work when requesting quotes from creative agencies to develop advertising material. This is not consistent with the quotation requirements in the government’s Guidelines for Advertising and Digital Communication Services. This approach creates risks to achieving value for money as creative agencies are not required to compete on price for their services. The department advised that it had pre-set the creative costs based on a comparative government campaign of a similar size. This was done due to a concern that requiring agencies to compete on price would affect the short timeframe given to develop creative material.

Three creative agencies accepted the opportunity to present design ideas for the campaign. The department was unable to provide evidence of how it chose the preferred supplier out of these three agencies. Records are important for accountability and allow a procurement decision to be audited after an urgent decision.     
 

Short notice did not allow for cost-efficient media booking for all phases

Placement of advertisements in various media channels was done through the State’s Media Agency Services contract. This contract achieves savings as the government can use its aggregated media spend to gain discounts from the media supplier.

The Department of Premier and Cabinet provides guidance to ensure cost efficient media booking. For example, media time for a television advertisement should be booked at least 6 to 12 weeks in advance. Radio advertisements should be booked at least 2 to 8 weeks in advance.

The peer review report noted that the department did not have adequate time to look for the most cost-efficient way to advertise. In its response to the peer reviewers, the department acknowledged this to be due to the urgency to start advertising. The media booking authority was signed by the department one day before the campaign commenced.
 

The department used a wide public campaign for a narrow target audience

The campaign identified greyhound industry participants as the primary target audience. In 201516 there were 1,342 greyhound trainers, 1,695 owner/trainers, 983 attendants and 1,247 breeders in New South Wales. The department’s advertising submission identified ‘concerns that industry members could make impulsive decisions, potentially jeopardising the welfare of a large number of dogs, prior to the shutdown of the industry’.

The submission’s evidence of advertising effectiveness focused on increasing the level of wider community support for the ban rather than stopping industry members from making impulse decisions. It used an early opinion poll to show that total support for the ban on greyhound racing rises by 17 points and opposition drops by four points following explanation of the findings of the Special Commission of Inquiry report.

The peer review report noted that the role of advertising was not clearly defined amongst the department’s range of other direct and targeted communications and consultations held with industry members.

No demonstrated basis for use of confronting imagery and provocative language

The Guidelines require ‘objective presentation in a fair and accessible manner’. Neither the Guidelines or Handbook further explain what objective presentation means. We have used an ordinary definition of this term as ‘not influenced by personal feelings or opinions in considering and representing facts’. This is synonymous with terms like ‘impartial’, ‘neutral’, and ‘dispassionate’ and opposite to ‘subjective’. We consider that to meet the current requirements in the Guidelines for objectivity, advertising content should contain accurate statements or facts, and avoid subjective language.

Phase 1 focussed on the ongoing consequences if no action was taken to close the industry. The advertisements used provocative language, for example ‘Up to 70 per cent of dogs are deemed wastage by their own industry. Wastage! Slaughtered just for being slow’. Advertisements used confronting imagery like gravestones, blood smears and gun targets.

Our literature review into this area highlighted mixed findings on the effectiveness of confrontational advertising materials. In some cases, shock campaigns may cause an audience to reject or ignore the message, and may even encourage people to do the opposite of the intended behaviour. In other cases, such as in road safety campaigns, this style of advertising can be successful. This shows the importance of conducting pre-campaign research before adopting a confrontational or emotive approach in advertising.

The Government Advertising Handbook recommends that an agency explain the rationale and the evidence for their chosen advertising approach. There was no evidence that the department researched the effectiveness of its advertising approach with its target audience. The department had planned to undertake creative concept testing as part of a strategy to ensure the creative material was understood by its audience. The department advised that due to the urgency of the campaign, it did not have time to conduct this testing.

Not all Phase 1 radio advertisements clearly identified that they were authorised by the New South Wales Government

For the first few days on air, Phase 1 radio advertisements ended by referring the audience to a government website, instead of clearly identifying that it had been authorised by the New South Wales Government. Government authorisations and logos ensure the work and the programs of the NSW Government are easily identifiable by the community.    

The department’s cost benefit analysis did not consider alternatives to advertising

For government advertising campaigns that cost over $1.0 million, the Act requires the advertising agency to carry out a cost benefit analysis and obtain approval from the Cabinet Standing Committee on Communications, prior to commencing the campaign.

The department engaged with audiences through direct mail, face to face forums, and a telephone helpline in addition to advertising. However, the department’s cost benefit analysis did not meet the requirements in the Guidelines to specify the extent to which expected benefits could be achieved without advertising, and to compare costs of options other than advertising that could be used to successfully implement the program (see Exhibit 6).

The cost benefit analysis made optimistic assumptions about the impact of the campaign on greyhound adoptions. It estimated that 2,360 greyhounds would be adopted if the campaign was run. This is significantly higher than the ‘most optimistic outcome’ of re-homing in the Special Commission Inquiry report (we calculated this to be 1,467 greyhounds). There was insufficient evidence to support the higher number of adoptions in the cost benefit analysis.

The sensitivity analysis shows that using the Special Commission’s ‘most optimistic outcome’ figure of re-homing would reduce the net present value of advertising to be negative. Further, the cost benefit analysis also assumed that increased government funding would be made available to animal welfare and rehoming organisations to support more adoptions, but did not estimate or include this cost when calculating the net present value of advertising.
 

There were two factual inaccuracies in key messages used for Phase 1 advertisements

Section 8(2) of the Act requires the head of a government agency to certify that the proposed campaign ‘contains accurate information’. The Secretary of the Department of Justice signed the compliance certificate on 29 July 2016, before advertisements commenced.

We examined the accuracy of factual claims in this advertising campaign, by comparing the key statements to the report of Special Commission of Inquiry into the Greyhound Racing Industry (the Commissioner report). The Commissioner report was quoted by the NSW Government as the basis for its policy to transition the greyhound racing industry to closure.

We identified that two of the key statements used in Phase 1 advertisements to support the animal welfare reasons for industry closure were inaccurate (Exhibit 7).    

Published

Actions for Sharing school and community facilities

Sharing school and community facilities

Education
Infrastructure
Management and administration
Risk
Shared services and collaboration

Schools and the community would benefit if school facilities were shared more often. 

The Department of Education’s ‘Community Use of School Facilities Policy’ encourages but does not require schools to share facilities. Sharing depends heavily on the willingness of school principals and there are few incentives. There are many challenges in developing agreements with community users and there is only limited support available from the Department.

There are strategies and plans to support the sharing of facilities between schools and the wider community, but none are backed up with budgets, specific plans or timeframes.

Governments should strive for the best use of assets. This is particularly important in the context of a growing New South Wales population, fiscal constraints and increasing demand for services. 

Lack of available land, rising land costs and population growth highlighted in our April 2017 'Planning for school infrastructure' performance audit report mean that new and existing schools will need to share their facilities with communities more than is currently the case.

This audit assessed how effectively schools share facilities with each other, local councils and community groups. In making this assessment, the audit examined whether the Department of Education (Department):

  • has a clear policy to encourage and support facilities sharing
  • is implementing evidence-based strategies and procedures for facilities sharing
  • can show it is realising an increasing proportion of sharing opportunities.

Facilities sharing is the use of a physical asset, such as a building, rooms, or open spaces, by more than one group for a range of activities at the same time or at different times. For the purposes of this audit, we have divided sharing arrangements into two types: shared use and joint use.

Shared use refers to arrangements where existing school assets are hired out for non-school purposes, usually for a limited time. The assets remain under the control of the school. Generally, there is little alteration or enhancement to the asset required to enable shared use. Shared use can also refer to schools using external facilities, such as council pools, but these arrangements are not included within the scope of this audit. 

Joint use refers to arrangements where new or upgraded school and non-school facilities or community hubs are planned, funded, built and jointly shared between a school and other parties, usually involving significant investment. 

Both shared use and joint use agreements are governed by contractual obligations.

Conclusion
The sharing of school facilities with the community is not fully effective. The Department of Education is implementing strategies to increase shared and joint use but several barriers, some outside the Department’s direct control, must be addressed to fully realise benefits to students and the community of sharing school facilities. In addition, the Department needs to do more to encourage individual schools to share facilities with the community. 

A collaborative, multi-agency approach is needed to overcome barriers to the joint use of facilities, otherwise, the Department may need significantly more funds than planned to deliver sufficient fit-for-purpose school facilities where and when needed.
Government policies encourage, but do not mandate, shared and joint use of facilities.

Since the early 2000’s, several reviews in NSW and other jurisdictions have commented on the benefits of and need to increase the sharing of school facilities. 

Several NSW Government strategies and plans support shared and joint use of facilities between schools and the wider community, but none are backed up with financial incentives, or specific plans with implementation timeframes. In Victoria and Queensland whole-of-government processes are in place to support a more coordinated approach to planning, building and sharing community facilities. For example, Victoria has a comprehensive policy framework encompassing both existing and future use of community facilities and a $50 million program to seed the development of community facilities on school sites over the next four years.  
The Department recognises benefits from the shared use of school facilities, but provides insufficient support to Principals to ensure costs are recovered and that money raised from shared use can be spent by the school in a timely manner. 

There are examples of successful shared use, but more can be done. Information about the available facilities is not readily available to potential community users. Schools should work more closely with councils and other stakeholders to leverage shared use. 

Currently, the administrative burden, costs and risks associated with shared use can exceed the perceived benefits to schools, leading to reluctance amongst some Principals to share. In addition, a substantial backlog of school-initiated infrastructure proposals awaiting Departmental approval means that schools that raise money from sharing their facilities find it difficult to use the funds they raise on improved infrastructure. Some of these proposals have been waiting for approval for more than 12 months. 

The Department could do more to support Principals by ensuring the fees charged for facilities cover the costs incurred by schools, that Principals can access help with negotiating and managing contracts, and that infrastructure proposals initiated and funded by schools are approved in a timely manner. 

The Department is not monitoring shared use across the State, and does not evaluate different approaches as evidence to influence policies and procedures.

Recommendations
By December, 2018, the Department should:
  • increase incentives and reduce impediments for school Principals to share school facilities, including:
    • review the methodology for calculating fees charged for facilities to ensure that shared use of school facilities does not result in a financial burden to schools or the Department 
    • improve support provided to Principals by School Infrastructure NSW, including reducing the backlog of school-initiated infrastructure proposals awaiting approval
    • develop service standards, including timeframes, for assessing and approving school-initiated infrastructure proposals.
  • provide readily-accessible information about available school facilities to community groups and local councils
  • implement processes to monitor and regularly evaluate the implementation of the shared use policy and promote better practice to drive improvements.
The Department is planning a more strategic approach to increase the joint use of school facilities. However, several barriers, some outside the Department’s control, must be addressed to fully realise benefits of joint use agreements.

As discussed in our 2017 audit report on ‘Planning for school infrastructure’, joint use agreements are a key direction of the School Assets Strategic Plan. Joint use of school facilities will be necessary to ensure that there will be enough fit-for-purpose learning spaces for students when and where needed. Under the ‘Community Use of School Facilities Policy’ Principals play the leading role in identifying opportunities, and developing and managing agreements for sharing school facilities. This is impractical for joint use projects which involve substantial investment in new or refurbished assets, in particular for joint use projects in schools that are yet to be built. In addition, the policy does not address joint-use facilities built on land not owned by the Department. For these reasons, the Department is developing a new policy. 

The Department is planning to develop joint use agreements in a more systematic way as part of school community planning, previously known as cluster planning, with a special focus on local councils. Several agreements are currently being piloted, and will be evaluated to provide an evidence-based foundation for this new approach. 

To develop or refurbish school facilities for joint use, the Department, councils and other key stakeholders must work together and prioritise joint use from the earliest stages of any project. A collaborative, multi-agency approach is needed to ensure sufficient fit-for-purpose facilities are available for school students within the funding framework proposed in the School Assets Strategic Plan. 

To increase shared and joint use, the Department is recruiting specialist staff in its Asset Division to assist with the brokerage, community engagement and development of agreements, but these staff are not dedicated to joint use projects and their available time may not be sufficient to provide the necessary support in the timeframes required.

Recommendations
By December, 2018, the Department of Education should:
  • ensure that the implementation of the new ‘Joint Use of School Facilities and Land Policy’ is adequately resourced, and has the support of Principals
  • implement processes to monitor and regularly evaluate the implementation of joint use policy and promote better practice to drive improvements.  

Published

Actions for Office of Strategic Lands

Office of Strategic Lands

Planning
Environment
Management and administration
Procurement

The Office of Strategic Lands effectively fulfils most aspects of its defined role, however, it could do more to support strategic land planning by identifying and acquiring land for future public use proactively rather than waiting for agencies or landholders to approach it. It may also have greater impact if it expanded its activities beyond greater Sydney.

The Office of Strategic Lands (OSL) was established under the Environmental Planning and Assessment Act 1979 (EP&A Act) to identify, acquire, manage and divest land required for long-term planning by the NSW Government, particularly for open space and public purposes. 

OSL is a Corporation Sole acting on behalf of the Minister for Planning and is run within the Department of Planning and Environment (DPE). OSL is a self-funding entity, and is responsible for administering the Sydney Region Development Fund (SRDF), a statutory fund used for ongoing land acquisition and management. OSL currently only operates within greater Sydney and holds over a billion dollars in land assets in this region. 

This audit assessed whether OSL effectively fulfils its role to identify, acquire, manage and dispose of land, and whether OSL ensures it is sustainable over the long-term to meet its objectives. 

Conclusion:

OSL effectively fulfils most aspects of its defined role, but is not supporting strategic land planning through proactive identification and acquisition of land for future public use. OSL is diligent in its financial management over the short and medium terms. However, it has identified that relying on the sale of surplus land to continue funding its ongoing operations is not sustainable, and it is yet to finalise a strategy to address this.


OSL does not currently have a strategic or proactive focus to improve land planning outcomes. This is primarily due to the lack of a clear strategy and business plan to direct its work which defines OSL’s purpose, objectives, goals and performance targets.

OSL expects to finalise and implement a Strategic Business Plan to guide its future direction and long-term sustainability, in late 2017. 

OSL has three primary sources of funding. The largest source is Treasury loans which it needs to repay. The next most significant source of funding is from sales of land no longer required for government’s long-term needs. OSL has identified that it is likely to run out of surplus land within ten years. This is a significant financial risk for OSL, which should be addressed through a long-term financial strategy. 

Contributions by Sydney councils into the SRDF are OSL’s only regular and consistent income stream. The formula to calculate these contributions has not been reviewed for over 25 years, and recent council mergers and border changes have increased the need to review the formula. 

OSL is not used as extensively as it could be by other NSW Government agencies. It has the potential to play a much bigger role in assisting NSW Government agencies with longer term planning by partnering with them to identify, acquire, hold and manage land for future needs. For example, it could acquire land in future residential growth areas for needed public services such as schools, hospitals and transport corridors. There is also potential for OSL to expand its operations beyond the greater Sydney region into other parts of NSW to provide a statewide benefit from its unique role in government.

OSL has a unique role amongst government agencies, and could be used across NSW

NSW Government agencies we spoke with consider OSL fulfils an important role for the state that no other government agency performs. As a self-funding long-term land holder and manager, OSL can acquire and manage land beyond the four-year budget cycle that other government agencies face. Consideration should be given to expanding to other growth areas in NSW, where its unique role could assist in longer term land planning.

OSL has established good processes and procedures for most aspects of its role. This includes governance processes that we found to have been applied effectively. There was also adequate oversight and approvals for land transactions.

OSL has yet to finalise a business strategy to ensure long-term sustainability

OSL has shown that it is financially and operationally viable in the short to medium term. However, it does not have an overarching business strategy to guide its operations and ensure it is financially sustainable for the long-term. With a unique role in government, it is important for OSL to clarify its direction and implement a strategic business plan to drive its progress.

While there is no overarching long-term strategy, OSL has documented operating plans which guide its land acquisition and land divestment activities over the short to medium term. It has not developed a plan for its ongoing land management activities.
OSL advised that its Strategic Business Plan will be finalised and implemented in late 2017. This Plan should clarify OSL’s long-term direction, and guide its business to ensure it is financially sustainable.

OSL does not have adequate performance targets and measures

OSL has four key deliverables as part of DPE’s business plan. These deliverables cover land management, working with other agencies, and ensuring the SRDF is sustainable. There was no evidence that OSL or DPE monitor whether OSL achieves all key deliverables.

Currently, OSL’s performance targets are limited to meeting dollar values. OSL does not have any measures to demonstrate the achievement of outcomes that align with its core business, such as its success in land management or in working with other agencies. OSL staff also said that dollar targets were not always adequate or appropriate to measure its business performance.

With the development of its Strategic Business Plan, OSL has the opportunity to clarify its future business direction. This includes ensuring it has a range of relevant goals and performance measures that will support it becoming a strategic land planning partner with NSW Government agencies and local councils, and a land holder for the long-term.

OSL’s current financial management approach may impact long-term sustainability

OSL has valued the land that it needs to purchase on behalf of government to meet long-term strategic land needs in the Greater Sydney region, at $1.2 billion. However, OSLs annual budget for purchasing land is only between $40 million and $50 million until 2021. Also, in each of the last four years, OSL has not spent more than $30 million on land purchases because it relies on landowners to initiate contact when they are ready to sell their land.

Without a more proactive approach, it is not possible for OSL to make needed purchases in a timely manner. OSL acknowledges the substantial gap between these values, but has not established a budget or plan for how it will purchase all the identified land.

OSL has developed a Divestment Strategy which provides a five-year schedule of planned divestments. This is land OSL owns which has been identified as no longer required for government purposes. OSL has established an approach to generate the best and highest price for these sales. While funds are generated through the sale of surplus land, it also means that OSL holds fewer land assets to sell. OSL has identified it will run out of surplus land within ten years.

OSL needs to finalise and implement a business model to ensure it is financially and operationally capable to sustain and grow its business for the long-term.

OSL is working to improve transparency and engagement with key stakeholders

To deliver on its role, OSL needs to be able to effectively engage and work with its stakeholders, including NSW Government agencies, local councils, and people selling or buying land.

NSW Government agencies we spoke with are generally satisfied with OSL’s level of engagement and consultation. However, it would be beneficial for all parties to clarify and document their expectations of each other through a formal arrangement. OSL could also be more proactive in promoting its services, and working with additional NSW Government agencies to identify strategic lands.

The local councils in the Sydney region we spoke with are not as satisfied with OSL’s engagement and communication. The councils advised that they do not consider they are well-informed of OSL’s plans for their area, or how their contributions to the SRDF are spent.

More broadly, the activities of OSL are not reported transparently to stakeholders or the general public. OSL is developing a communication package for local councils and the community. This is an opportunity for OSL to improve the transparency of its role, operations, projects, and the SRDF, as well as promote its services and achievements.

The Office of Strategic Lands (OSL) was established in 1951 to identify, acquire, manage and divest land required for the NSW Government's long term planning purposes. OSL acts on behalf of the Minister for Planning, as a Corporation Sole, under the Environmental Planning and Assessment Act 1979 (EP&A Act).

OSL acquires and manages land identified for long-term strategic needs, and then transfers or sells it to other government agencies for ultimate use. It also sells land identified as surplus to government’s long term strategic requirements. Surplus land can also be transferred to local councils. OSL operates only in the greater Sydney region (from Wyong in the north, to the base of the Blue Mountains in the west, and south to Wollondilly). OSL has 20 staff who manage over 6,000 parcels of land.
 

The Department of Planning and Environment (Office of Strategic Lands) should:

By December 2017:  

  1. clarify and document its long-term purpose, role and goals in line with its mandate. This includes:
    • finalising and implementing a business plan with outcome-based performance measures that support the achievement of its goals
    • establishing and implementing a business and financial model, including resourcing, that supports its long-term strategy
    • exploring options for expanding the operation of OSL to other areas of NSW.

By July 2018:

2. develop and implement an approach for working with NSW Government agencies to improve its efficacy in strategic land identification, acquisition and management.

On an ongoing basis:

3. improve the transparency of its operations, and its communication and engagement with all stakeholders. This includes developing engagement strategies appropriate for different stakeholder groups.

Published

Actions for Information and Communication Technologies in schools for teaching and learning

Information and Communication Technologies in schools for teaching and learning

Education
Information technology
Infrastructure
Management and administration
Service delivery
Workforce and capability

Several factors are reducing effective use of information and communication technology (ICT) in the classroom.

These are primarily:

  • ageing ICT equipment and inadequate wireless networks
  • variable student access to devices at school
  • variable teacher access to centrally provided devices for use outside of the classroom.

Information and communication technologies (ICT) are pervasive in modern life. Australian research has identified that the workforce demand for digital literacy and advanced digital skills is growing across most areas of work. There is broad agreement internationally and in Australian school systems that digital literacy is a core skill for the workforce and students will need to be confident with ICT. Education systems around the world are using ICT in classrooms to support learning and employment goals.  

The New South Wales Department of Education’s (the Department’s) overall strategic directions for teaching and learning with ICT are set in the 'Strategic Information Technology Plan 2016–19'. The Department centrally provides a base level of resources to schools for ICT and schools supplement funding from their existing school budget and Parents and Citizens Associations. Each school decides how to allocate these funds to meet local needs. Schools also set expectations for how teachers and students will use technology to help deliver outcomes.

This audit assessed how well New South Wales public schools are using ICT to improve teaching and learning. It focussed on planning and teacher and student use of ICT. We examined whether:

  • the Department identifies key strategic opportunities to enhance the use of ICT platforms and technologies in schools
  • teachers are integrating ICT into classroom practice
  • the Department monitors the impact of ICT on student learning.
Conclusion 

Several factors are reducing the effective use of ICT in the classroom. These are primarily:

  • ageing ICT equipment and inadequate wireless networks
  • variable student access to devices at school
  • variable teacher access to centrally provided devices to use outside of the classroom.

Many schools are struggling to keep up with growing ICT needs within available funding. The Department needs to review whether its current technology programs provide schools with sufficient resources and support to meet the Department’s strategic goals for 21st Century classrooms. The Department should also target additional support to schools to improve planning for ICT resources.  

Most teachers are using ICT in the classroom, however, teacher access to devices outside the classroom varies between schools. In practice, teacher working days extend outside classroom hours. Teachers need access to devices for activities such as lesson preparation and student assessment. With limited access to devices outside of the classroom, teachers may not be able to effectively integrate ICT into lessons. Teachers also require further professional learning to support them to develop their skills in using ICT.  

The Department is not sufficiently monitoring the digital literacy of New South Wales students, which has declined in national tests. Teachers could benefit from support to assess these skills at a school level. The Department also needs to investigate links between student use of ICT and learning outcomes, so they can better support teachers with evidence-based approaches to enhancing learning through ICT.

Old equipment and wireless networks are not keeping pace with modern demands

The Department’s vision for ICT is to enable ‘any learning opportunity, anywhere, anytime’. This vision is at risk due to an ageing stock of devices and wireless networks. The average age of devices in New South Wales schools is over four years. Older devices are less reliable, require greater maintenance and support, and cannot run demanding applications. Further, many school wireless networks are beyond the end of their useful life. This limits the number of teachers and students who can access online content on wireless networks at the same time.

The central funding model for ICT in schools is not meeting current needs

Funding for the Technology for Learning program to deliver ICT in schools has not increased since 2004, despite an increase in the number of students and emphasis placed on ICT in teaching and learning during this time. Schools supplement funding for ICT from their existing school budget and Parents and Citizens Associations.  

The Department’s current funding model for ICT is not adequately addressing a growing gap in the provision of contemporary ICT in classrooms between schools able to access funding from other sources and those which cannot. The Department needs to review whether the Technology for Learning program is equitable in equipping all schools with the modern technology needed to achieve its vision.

Many teachers are not provided with devices for use outside of the classroom

School Principals we interviewed reported that technology is an essential part of a modern classroom and teacher access to devices outside of the classroom can impact how they use ICT. This is because, in practice, teacher working days extend outside classroom hours and teachers need access to devices for activities such as lesson preparation and student assessment. The Department provides teachers with access to a suite of software tools for these tasks.

The Commonwealth Government’s Digital Education Revolution program provided teachers of secondary school students with laptops from 2009 to 2013. The Department’s evaluation of the Digital Education Revolution program found that teachers reported greater confidence with, and use of, ICT throughout the program.  
Providing desktop computers, laptops or tablets for teachers is now a school level decision and arrangements vary across schools. Each school must trade-off between allocating devices for students and teachers. Most other States and Territories provide all teachers with a laptop for use in and outside of the classroom or offer subsidised access to one.  

There is limited teacher professional learning in the use of ICT

The Department’s research has identified that professional learning is an important factor in how effectively teachers use ICT to enhance teaching and learning. Despite this, the Department provides few courses on using ICT in the classroom directly, and most of these are offered in Sydney. This limits accessibility for teachers outside of the metropolitan area. Schools we visited reported that the costs of courses and providing relief teachers limits the number of external courses or events that teachers attend, especially for rural and regional schools. Increasing the use of online learning would improve access for teachers in these areas.  

The Department is not adequately monitoring trends in professional learning in ICT or evaluating the overall effectiveness of courses. A recent upgrade to the professional learning system may provide the Department with better quality data to do this.

Greater monitoring and reporting on technology use in schools is required

The Local Schools, Local Decisions policy gives schools greater authority to make strategic decisions on the use of ICT appropriate to their local contexts. To support this, the Department needs to better monitor current trends, and identify emerging needs to determine future direction and how best to support schools.  

For example, the Department does not currently know how many devices are allocated to teachers or how many schools have implemented a student Bring Your Own Device scheme. This affects how schools are using ICT, and places demand on the network and the type of support the Department must provide. An assessment of the ICT maturity of schools would help the Department target its resources to schools requiring greater assistance with planning.

The Department does not regularly monitor or report on student capabilities with ICT. A national assessment found that the ICT literacy of a sample of Year 6 and Year 10 New South Wales students fell between 2011 and 2014. The fall was greater in New South Wales than in other States and Territories. Without more regular assessment or reporting, the reasons behind this fall and the distribution of student capabilities between schools will remain unknown. 

By July 2018, the Department of Education should:

  1. Review the Technology for Learning program and school ICT support resourcing to determine whether resourcing is adequate for modern school requirements.
     
  2. Develop a program to improve wireless networks in all NSW schools, for instance by expanding the Connecting Country Schools Program to all NSW schools.  
     
  3. Implement an assessment of school ‘ICT maturity’ and use this to target assistance to those schools requiring support with forward planning for ICT.
     
  4. Improve the use of evidence to inform plans and strategies, including:
    • more detailed monitoring of teacher and student access to and use of ICT
    • evaluating the impact of teacher professional learning on student outcomes 
    • further examining the links between ICT and student outcomes.
       
  5. Improve teacher access to devices for use outside of the classroom to improve how effectively they integrate ICT into teaching and learning.
     
  6. Improve teacher professional learning by providing more:
    • online learning opportunities for teachers in regional and remote areas
    • courses focused on pedagogy to make best use of ICT.
       
  7. Identify the ICT skills students need, and provide teaching resources to develop these skills and monitor their achievement.

Appendix One - Response from the Agency

Appendix Two - About the audit

Appendix Three - Performance auditing

 

Parliamentary reference - Report number #289 - released 6 July 2017 

Published

Actions for NorthConnex

NorthConnex

Premier and Cabinet
Treasury
Transport
Compliance
Infrastructure
Internal controls and governance
Management and administration
Procurement

The processes used to assess NorthConnex adequately considered value for money for taxpayers.This report also found that the impact of tolling concessions on road users and the motorway network was consistent with policy objectives described in the 2012 NSW Long Term Transport Master Plan.

NorthConnex is a nine-kilometre tolled motorway tunnel between the M1 Pacific motorway at Wahroonga and the M2 Hills motorway at West Pennant Hills. The total cost for the project is $3.1 billion. NorthConnex will be funded through toll charges, and contributions from the NSW and Australian Governments of up to $405 million each. In January 2015, the NSW Roads Minister signed the final contracts for NorthConnex.

By December 2017, the Department of Premier and Cabinet should:

1. publish an updated ‘Unsolicited Proposals – Guide for Submission and Assessment’ which clarifies obligations with requirements in other NSW Government policies such as the NSW PPP guideline and Infrastructure Investor Assurance Framework. The update should require:

a) a business case to be prepared, and a business case gateway review completed, as part of the assessment of the detailed proposal (currently stage 2)

b) probity reports must be completed and considered before the decision to proceed to the next stage.
 

The Department of Premier and Cabinet and NSW Treasury should immediately:

2. improve record keeping to ensure compliance with the State Records Act 1998 and the NSW Government Standard on Records Management.

 

Published

Actions for Mining Rehabilitation Security Deposits

Mining Rehabilitation Security Deposits

Planning
Industry
Environment
Infrastructure
Management and administration
Project management

The Department of Planning and Environment requires mining companies to rehabilitate sites according to conditions set in the mining development approval. The Department holds mining rehabilitation security deposits that are meant to cover the full cost of rehabilitation if a mining company defaults on its rehabilitation obligations.

The total value of security deposits held has increased from $500 million in 2005 to around $2.2 billion in 2016, covering around 450 mine sites in New South Wales.

While there have been substantial increases in total deposits held, mine rehabilitation security deposits are still not likely to be sufficient to cover the full costs of each mine's rehabilitation in the event of a default.

This audit was undertaken when the Department of Industry, Skills and Regional Development was responsible for ensuring land disturbed by mining activities is rehabilitated in accordance with the relevant development approval, including the administration of mining rehabilitation security deposits. On 1 April 2017, this responsibility was transferred to the Department of Planning and Environment (the Department).  

This audit assessed whether the Department maintains adequate security deposits to cover the liabilities associated with mine closures, including rehabilitation. Companies authorised by the Department to undertake mining activities must provide a security deposit to cover the full costs of rehabilitation in the event of default by the company. Rehabilitation is the treatment of disturbed land or water to establish a safe, stable, non-polluting and sustainable environment.

Mining companies must provide an estimate of rehabilitation costs for each site. The Department provides a Rehabilitation Cost Calculation tool to assist companies calculate the deposit amount. Companies are also required to ensure that the cost estimate is in accordance with the approved Mining Operations Plan (MOP). The MOP is intended to be a mine rehabilitation and closure plan, and forms the basis for the estimation of the security deposit. The Department reviews the estimates and determines the deposit for each site.  

Security deposits are an option of last resort. The Department has other legislative and regulatory tools which it normally uses to promote compliance with rehabilitation requirements before accessing a security deposit. It can direct action by the mining company, issue fines and even have the Minister revoke a mining lease. To date, the Department has never had to access a security deposit for a state significant development mine site.

Conclusion

The Department holds security deposits for mining rehabilitation consistent with the amounts it has requested from mining companies, and it should be able to claim on a deposit if a mining company defaults on its rehabilitation obligations. The total value of deposits has increased from $500 million in 2005 to around $2.2 billion in 2016, covering around 450 mine sites. The Department’s management of the security deposit process has improved in recent years, and it has well advanced plans for further improvement, including a revised cost calculation tool.

The Department’s policy is that each mine’s security deposit should cover the full costs of rehabilitation for that mine. The security deposits the Department holds are not likely to be sufficient to cover the full costs of each mine’s rehabilitation in the event of a default. The rates and allowances in the current cost calculation tool have not been updated since 2013 and some activities required for effective rehabilitation are not covered, or not covered adequately.

Security deposits also do not include sufficient contingency given the substantial risks and uncertainties associated with mine rehabilitation and closure, particularly in the absence of a detailed closure plan. This risk is exacerbated by the limited independent verification of mining company claims about the size of the outstanding rehabilitation task, which remains the case despite recent improvements to monitoring and review procedures and practices.  

There is also no financial assurance held over the risk of significant unexpected environmental degradation in the long-term after a mine is deemed to be rehabilitated and the security deposit is returned. A security deposit is not an appropriate vehicle for covering this risk.

Security deposits are close to calculated value and should be accessible if needed

The value of securities held by the Department aligns with the latest approved rehabilitation cost estimates. This contrasts with the situation found by investigations in Victoria and Queensland, where deposit amounts held fell below the calculated costs.

The security deposits are usually in the form of a bank guarantee or cash. The Department has obtained legal advice indicating that it should be able to claim on these bank guarantees if the need arises. As the guarantee is between the financial institution and the Department, if a mining company goes into liquidation the Department should still be able to access the funds.  

When the latest estimate of rehabilitation costs is higher than the existing deposit, the Department will request additional security. It has experienced extensive delays in obtaining additional security for some sites, increasing the risk that available funds will be insufficient if needed.

Rehabilitation cost estimates are not yet adequate, but improvements are planned

The Department’s policy is for security deposits to cover the full cost of rehabilitation. No discounts are provided to mining companies for past good behaviour or low likelihood of default, unlike in some other states. Discounting could undermine the policy position.  

Current security deposits are unlikely to cover the full cost of rehabilitation on each mine site. The Department provides a rehabilitation cost calculation tool to help mining companies calculate the cost of rehabilitation and the required deposit amount, but:

  • several activities required to effect closure are not included and others underestimated
  • it does not make provision for industry cost changes over time
  • the rates used in the tool have not been updated since 2013
  • it was not able to provide the basis for the rates and allowances in the tool.

The Department reviews cost estimates provided by mining companies, but its verification of the extent of rehabilitation work on which these estimates are based is limited. It relies instead on section 387C of the Mining Act 1992 which makes it an offence for mining companies to provide false or misleading information. It is not evident how the Department would establish that information provided was false or misleading without more verification work, and six of the 14 cost estimates we reviewed were not signed by the mine manager, making enforcement more difficult.  

The Department has developed a new calculation tool, and recently released it for industry consultation. The new tool should improve rehabilitation estimates. It updates rates and allowances, and includes additional items to better cover required rehabilitation tasks. While a substantial improvement, the new tool could be further improved by providing additional coverage for stakeholder engagement, additional planning approvals, insurance costs, and any additional design, research and verification work required for successful closure.

There is no financial assurance over long-term environmental risks

The Department does not hold any financial assurance to cover the costs associated with mitigating any future environmental degradation once a mine closes and the security deposit is relinquished to the mining company. Security deposits are probably not the appropriate mechanism to cover these long-term risks but the risk of potential post-closure environmental degradation still needs to be costed and covered. A fund to cover the state-wide risk, to which all mines would contribute, is a possible mechanism.

Rehabilitation and closure outcomes are vague, particularly for unplanned closure

Rehabilitation outcomes in the MOPs we reviewed were generally not specific. Any lack of specificity in MOPs translates into uncertainty about rehabilitation work required if a mining company defaults. Part of the problem is that rehabilitation outcomes established in planning approvals are usually not specific and may not address all closure requirements. The Department has recognised there is scope to improve the clarity and specificity of rehabilitation requirements in planning approvals, and has started a review focusing on open-cut mines.

Rehabilitation outcomes are even less specific in the event of an unexpected early closure because they will probably be different from that achievable from a planned closure.  

MOP guidelines do not cover management of some key closure matters, such as the requirements of environment protection licences issued by the Environment Protection Authority and the management of heritage sites during closure.

There were significant variations in quality of MOPs we reviewed and the way closure risks and uncertainties were identified and addressed. The Department plans to improve the quality of rehabilitation programs through enhanced guidance and oversight.

Monitoring is not adequate to effectively gauge rehabilitation progress

The Department was not able to show it has been monitoring operational mine sites effectively to gauge the progress of ongoing site rehabilitation and the management of closure risks. There was no protocol for site inspections and limited evidence of inspections for the sites we reviewed.

The Department receives annual environmental management reports from mining companies, with most describing the areas of disturbance and rehabilitation occurring at each mine site. The Department recently established procedures for reviewing these annual reports, and has developed a risk-based process for prioritising reviews.

Most annual reports we reviewed did not explain environmental changes over time, nor the risks to mine closure and the measures required to mitigate them. For example, analysis of changes to surface water and groundwater quality was limited despite its relevance for assessing future contamination risks.

The Department does not currently have adequate processes in place to effectively verify the reported areas of disturbance and rehabilitation. It is developing geographic information system-based tools to better measure areas of disturbance and rehabilitation, new rehabilitation guidelines, and a procedure for determining whether rehabilitation has been successful. These initiatives should improve the monitoring and reporting of rehabilitation progress at mine sites.

There is no mechanism to prevent a mine being in ‘care and maintenance’ indefinitely

The Department does not have a clear policy on the length of time and circumstances under which a mine can remain in ‘care and maintenance’. Indefinite postponement of rehabilitation and closure is therefore possible. 'Care and maintenance' is the period following temporary cessation of operations when infrastructure remains largely intact and the site continues to be managed. There are a range of valid reasons for a mining company to put a mine in ‘care and maintenance’, but it is also reasonable for the community to expect a limit to how long it has to wait for proper rehabilitation.

Mining operations make a significant contribution to the NSW economy, including over $1.3 billion in royalties each year. Around 400 mine sites throughout NSW provide over 40,000 jobs and are a major source of economic activity for many communities. Despite these benefits, it is important to ensure that mining companies fulfil their obligations to rehabilitate land disturbed as a result of mining activity.

We recommend that the Department should, by January 2018:

1. Improve the quality of rehabilitation and closure plans by:

  • ensuring plans submitted by mining companies include robust mine rehabilitation and closure risk assessments
  • clarifying the level of detail required in plans at each stage of a mine’s operation
  • specifying how requirements set under other legislative instruments (e.g. environment protection licences, heritage assets) should be addressed.

2. Improve assurance that security deposits are sufficient by:

  • ensuring its new cost calculation tool adequately covers all works needed for rehabilitation and closure
  • increasing the contingency for uncertainties associated with mine rehabilitation and closure, at least until the mining company provides a detailed closure plan
  • verifying the cost estimates for a sample of high risk sites annually
  • ensuring that when mining companies are required to provide increased security deposits, they do so with minimal delay.

3. Enhance oversight of mine rehabilitation by:

  • developing a protocol to ensure sufficient and adequate site inspections
  • ensuring mining companies report performance against rehabilitation targets and environmental changes clearly, including an analysis of long-term surface water and groundwater trends in terms of levels, flow and quality
  • improving how it determines the progress and success of mine rehabilitation
  • developing clear policy and procedures for ensuring a mine cannot be put into ‘care and maintenance’ indefinitely.

4. Collaborate with relevant agencies to establish a financial assurance mechanism, such as a sinking fund, to cover the risk of long-term environmental degradation after mines are closed and security deposits returned.

Appendix One - Response from the Department

Appendix Two - About the audit

 

Parliamentary reference - Report number #285 - released 11 May 2017

Published

Actions for Planning for school infrastructure

Planning for school infrastructure

Education
Infrastructure
Management and administration
Project management

The Department of Education proposes to fundamentally reform school infrastructure planning and delivery to meet the future demand for student places, and to overcome chronic under-investment for much of the last decade. To do this, it will need to spend much more than it has been receiving to date.

The Department of Education (Department) must provide students with a place in a government school if parents desire it. Over the next 15 years, the student population in NSW Government and non-government schools is projected to grow by 21 per cent to nearly 1.5 million students. Over 80 per cent of this is expected to be in the Sydney metropolitan area.

Improving education outcomes of students is a NSW State Priority. Research shows that well designed and maintained facilities improve student learning outcomes. A strategic objective of the 2014 State Infrastructure Strategy Update is to ‘equip growing urban and regional populations with the modern schools and training infrastructure required to deliver educational service for a competitive, innovative economy’. 

This audit assessed whether the Department has a strategy and implementation model to ensure it has sufficient fit-for-purpose student learning spaces when and where needed.

 

Conclusion

For much of the last decade, there has been chronic under-investment in NSW government school infrastructure and deficiencies in asset planning. Many schools have more students than can be accommodated in existing classrooms, and demountables are widely used for extended periods. The condition of classrooms has been declining due to insufficient maintenance, and many are not configured to support contemporary and desired future learning and teaching methods. At the same time, the government school student population is predicted to grow further, particularly in Sydney.

In response to this challenging situation, the Department has recently developed a School Assets Strategic Plan (Strategic Plan) designed to accommodate the expected student population up to 2031. This is the first such plan for the Department. It is a good plan. It covers the issues we would expect and has benefited from expert input and independent validation of assumptions, proposed solutions, and the likely costs.  

The strategy embodied in the Plan includes elements that may be confronting for the community. To contain costs, the Department proposes several potentially controversial changes to the way schools are planned, designed, built, managed and funded. These include increasing the maximum number of students in new and redeveloped schools; stronger emphasis on redeveloping schools; smaller, more intensely developed sites; changing and enforcing school catchments; increased partnerships with the private sector and more recycling of school assets to deliver better facilities.

Even with these reforms, the estimated cost of infrastructure needed up to 2031 is significantly more than the Department has been receiving to date. Without the proposed reforms, the Department will need much more again. The Department’s funding estimates are conservative due to the scale of proposed reform, the radical change it represents, and the risks to implementation. At the time of the audit, the government had not committed to make available the funding needed to implement the Plan.

Even if the Department obtains additional funding, implementing such a major reform will be challenging. It will require effective collaboration between, and the support of, school communities, local government, potential private sector partners, the non-government schools sector and government agencies. Many risks will need to be mitigated, any of which could undermine the strategy and drive up costs.  

Further savings beyond those already identified would be possible through changing operational policies on matters such as class sizes, operating hours, and single-sex, selective, sports and performing arts schools. Any changes to such policies have implications beyond just infrastructure cost and are likely to be even more controversial.

Asset planning and investment for much of the last decade has been deficient

Over the last decade, there has been chronic under-investment in NSW Government school infrastructure. This has affected both new works and maintenance of existing assets. Until recently, the Department did not have a high-level, long-term school asset strategic plan. The Department had limited understanding of the funds needed over the long term to provide the necessary school infrastructure to meet educational needs of students economically. It had no robust method to determine whether priorities were correct and assess whether the funding split between building, upgrading and maintaining was appropriate.  

Permanent classrooms in 37 per cent of government schools are fully utilised, and 180 schools are operating beyond their permanent classroom capacity. The utilisation rates vary between regions and districts. Demountables are being used for extended periods to cater for permanent student population growth. A significant increase in the number of demountables at some schools decreased student access to amenities and open play spaces. 

The Department now has a Plan to meet future needs

The Department recently developed a Strategic Plan designed to ensure that there are sufficient fit-for-purpose places for students where and when required up to 2031. The Strategic Plan outlines the:

  • predicted demand for future learning spaces
  • condition of existing infrastructure and additional infrastructure and maintenance required
  • proposed new initiatives to deliver the required infrastructure economically
  • proposed new cluster planning model to determine priorities and initiatives to be implemented at the school level
  • funding needed to provide appropriate learning spaces where and when needed.

The Strategic Plan has been developed with the benefit of expert advice and has been reviewed extensively within the Department, by other key government agencies and experts. The review process examined the Strategic Plan’s assumptions, data quality, proposals and cost estimation approach. This process has increased assurance and improved the Strategic Plan, but has delayed implementation by approximately a year so far.

Many more learning spaces will be needed

The Strategic Plan identifies that over the next 15 years the student population in government schools will increase by 21 per cent and that the Department will need:

  • 7,200 additional classrooms and to upgrade many existing classrooms to meet future teaching and learning needs
  • to undertake much more planned maintenance, otherwise 40 per cent of existing government school buildings will be in such poor condition that learning outcomes could be compromised.

The Department proposes a new approach designed to minimise costs

Given the need for substantial additional infrastructure and maintenance, and underfunding over the last decade, the Department has sought to minimise costs while maintaining quality.

Initiatives proposed include an increase in the maximum number of students in new and redeveloped schools; a stronger emphasis on redeveloping existing schools; smaller, more intensely developed school sites; strengthening partnerships with the private sector to improve school assets; and school consolidation and sale of surplus land to reinvest in better facilities. We did not identify any additional options that could be proposed to make further cost saving under current operational policy settings.

The proposed new cluster planning model will assess schools in a region or district to identify the best way to deliver school assets to a cluster as a whole rather than individual schools. It will identify the most effective and efficient asset solution within a cluster of five to 15 schools.

It represents an improvement over the previous model which addressed infrastructure needs on a school-by-school basis. The initial focus of school cluster planning will be on areas of highest student growth.

The proposed new cluster planning model has potential to create efficiencies and economies of scale if implemented well. Cluster planning will determine which of the various initiatives should be implemented in the schools in the cluster. It recognises that solving enrolment trends in one school requires consideration of surrounding schools and seeks the optimum asset solution for identified schools.

Implementation will be a major challenge

Effective implementation will require good collaboration with other government agencies, non-government schools, the private sector and the community. The Department has been improving its consultation with other government agencies and the non-government school sector, and has developed models for collaborating with the community and private sector. The Strategic Plan proposes open access to information, which will be important for effective collaboration and partnerships.  

There are many risks to effective implementation, which could drive up costs. These include opposition from school communities, a reduction in the proportion of students educated in non-government schools, unexpected increases in land and construction costs, failure to sufficiently streamline the planning approval system or a blow-out in renovation costs in older schools.  

To provide and maintain the infrastructure needed up until 2031, the Department estimates it will need significantly more money than it receives now even if it implements its initiatives and cluster planning effectively. It would require much more again if it was to retain its current approach to planning and delivering school infrastructure.  

The current school infrastructure funding arrangement does not support effective long-term planning. A four-year commitment to education infrastructure funding does not provide the flexibility needed for the Department to manage its allocations and respond to changes in priorities or emerging challenges. The Health and Transport clusters receive a ten-year funding commitment, known as a capital planning limit.

Changing operational policies could increase school utilisation

Further significant cost savings are only likely if the Department changes some operational policies. Class size is a key determinant of the number of classrooms needed. Choice in school enrolment and the existence of single-sex, selective, sports or creative and performing arts schools all can lead to underutilisation of schools and classrooms because they are not accessible to all students.  

The Department of Education should:

1. regularly revisit and evaluate the Strategic Plan to keep it contemporary, refine it based on learnings, update cost estimates to reflect actual results, and respond to available funding

2. work with NSW Treasury to develop a framework for partnering with the private sector

3. align Total Asset Management plans with cluster plans as they are developed

4. closely consult and collaborate with communities on implementation of the Strategic Plan

5. continue to collaborate with key government agencies, local government, the non-government school sector and the private sector on implementation of the Strategic Plan

6. publish detailed information on the status of assets, current and projected enrolments, and planned school projects to support effective consultation and collaboration

7. seek a ten-year capital planning limit from NSW Treasury

8. advise the government on options to change operational policies and practices to reduce infrastructure requirements.