Refine search Expand filter

Reports

Published

Actions for Planning, Industry and Environment 2019

Planning, Industry and Environment 2019

Planning
Industry
Environment
Asset valuation
Cyber security
Financial reporting
Information technology
Infrastructure
Internal controls and governance
Management and administration
Service delivery
Workforce and capability

This report outlines the results of audits of the financial statements of agencies now grouped in the NSW Planning, Industry and Environment cluster.

Unqualified audit opinions were issued for 56 of the 66 cluster agencies’ 30 June 2019 financial statements. Ten audits remain incomplete. The cluster agencies need to improve the timeliness of financial reporting. 

The Audit Office continued to identify issues regarding unprocessed Aboriginal land claims and the recognition of Crown land. ‘Auditor-General’s reports to parliament have recommended action to reduce the level of unprocessed land claims since 2007. However, the number of unprocessed claims continued to increase’, Margaret Crawford said.

One in five internal control findings were repeat issues. Key themes included information technology, asset management and improvements required to expense and payroll controls.

The report makes several recommendations including:

  • Property NSW should urgently address the deficiencies in the lease data used to calculate the impact of the new leasing standard effective from 1 July 2019
  • the Department of Planning, Industry and Environment should prioritise action to reduce unprocessed Aboriginal land claims
  • the Department of Planning, Industry and Environment should ensure the Crown land database is complete and accurate so state agencies and local government councils are better informed about the Crown land they control.

This report analyses the results of our audits of financial statements of the Planning, Industry and Environment cluster agencies for the year ended 30 June 2019. The table below summarises our key observations.

1. Machinery of Government changes

Creation of the Planning, Industry and Environment cluster

The Machinery of Government (MoG) changes abolished the former Planning and Environment cluster and former Industry cluster, and created the Planning, Industry and Environment cluster on 1 July 2019.

The Department of Planning and Environment (DPE), the Department of Industry (DOI), the Office of Environment and Heritage, and the Office of Local Government were abolished and the majority of their functions were transferred to the new Department of Planning, Industry and Environment (DPIE).

The Department of Planning, Industry and Environment is still in the process of implementing changes

The MoG changes bring risks and challenges to the cluster. A MoG Steering Committee, with the support of various project control groups and working groups, identified and developed responses to key risks arising from the changes.

However, the DPIE will take some time to fully integrate the policies, systems and processes of the abolished Departments and agencies.

2. Financial reporting

Audit opinions Unqualified audit opinions were issued for 56 of the 66 cluster agencies' 30 June 2019 financial statements audits. Ten financial statements audits are still ongoing.
Timeliness of financial reporting

Fifty-five of the 57 agencies subject to statutory deadlines submitted their financial statements on time.

Due to issues identified during the audit, 13 financial statements audits were not completed and audit opinions issued by the statutory deadline.

Agencies prepared and submitted their early close procedures in accordance with the mandatory timeframe set by NSW Treasury. However, 17 of the 49 agencies where we reviewed early close procedures were assessed as either partially addressing or not addressing one or more of the mandatory requirements. The cluster agencies could benefit from an increased focus on early close procedures.

Introduction of AASB 16 'Leases'

We noted errors in the lease data used in Property NSW's AASB 16 impact calculations, which affect both Property NSW and other government agencies. These errors were significant enough to present a risk of material misstatements to the financial statements of Property NSW and other government agencies in future reporting periods.

We had similar findings in our recent performance audit on 'Property Asset Utilisation', which highlighted issues with the quality of Property NSW's records.

Recommendation: Property NSW should urgently address the deficiencies in the lease data used to calculate the impact of the new leasing standard effective from 1 July 2019.

Unprocessed Aboriginal land claims have continued to increase

Despite an increase in the number of claims resolved, the number of unprocessed Aboriginal land claims increased by 7.2 per cent from the prior year to 35,855 at 30 June 2019. Claims can be made over Crown land assets of the DPIE or other government agencies. Until claims are resolved, there is an uncertainty over who is entitled to the land and the uses and activities that can be carried out on the land. We first recommended action to address unprocessed claims in 2007.

Recommendation (repeat issue): The DPIE should prioritise action to reduce unprocessed Aboriginal land claims.

3. Audit observations

Internal controls

One in five internal control issues identified and reported to management in 2018–19 were repeat issues.

The lack of user access review was the most common IT general control issue in the cluster.

Drought relief

The NSW Government announced an emergency drought relief package of $500 million in 2018, in addition to other financial assistance measures already in place.

Limited documentation and written agreements between relevant delivery agencies resulted in a $31.0 million misstatement relating to grant revenue.

Recognition of Crown land

Crown land is an important asset of the state. Management and recognition of Crown land assets is weakened when there is confusion over who is responsible for a particular Crown land parcel. Last year we recommended the DOI should ensure the database of Crown land is complete and accurate. While the DOI has commenced actions to improve the database, this continued to be an issue in 2018–19.

Recommendation (repeat issue): The DPIE should ensure the Crown land database is complete and accurate so state agencies and local government councils are better informed about the Crown land they control.

Developer contributions The former DPE continued to accumulate more developer contributions revenues than it spent on infrastructure projects. Total unspent funds increased to $274 million at 30 June 2019.

 

This report provides parliament and other users of the Planning, Industry and Environment cluster agencies financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

This cluster was created by the Machinery of Government changes on 1 July 2019. This report is focused on agencies in the Planning, Industry and Environment cluster from 1 July 2019. However, these agencies were all in other clusters during 2018–19. Please refer to the section on Machinery of Government changes for more details.

Machinery of Government (MoG) refers to how the government organises the structures and functions of the public service. MoG changes are where the government reorganises these structures and functions that are given effect by Administrative orders.

The MoG changes, announced following the NSW State election on 23 March 2019, created the Planning, Industry and Environment (PIE) cluster. The Administrative Changes Orders issued on 2 April 2019, 1 May 2019 and 28 June 2019 gave effect to these changes. These orders became effective on 1 July 2019.

Section highlights

The 2019 MoG changes significantly impacted the former Planning and Environment, and Industry clusters and agencies.

  • The PIE cluster combines most of the functions and agencies of the former Planning and Environment and Industry clusters from 1 July 2019.
  • The Department of Planning, Industry and Environment is the principal agency in the PIE cluster.
  • The MoG changes bring risks and challenges to the PIE cluster.
  • A MoG Steering Committee was established to oversee the transitional processes.
  • The full integration of the systems and processes will not be completed in the near future.

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Planning, Industry and Environment (PIE) cluster for 2019. In this chapter, the Department of Planning, Industry and Environment is referred to as DPIE, the former Department of Planning and Environment as DPE, and the former Department of Industry as DOI.

Section highlights

  • Unqualified audit opinions were issued for all completed 30 June 2019 financial statements audits. However, some cluster agencies can further enhance the quality of financial reporting.
  • Timeliness of financial reporting remains an issue for 13 agencies.
  • Deficiencies were identified in the data used to calculate the impact of AASB 16 ‘Leases’ effective from 1 July 2019. Property NSW should urgently address these deficiencies.
  • Unprocessed Aboriginal land claims continue to increase. DPIE should prioritise action to reduce unprocessed Aboriginal land claims.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our audit observations and insights from our financial statement audits of agencies in the Planning, Industry and Environment (PIE) cluster for 2019. In this chapter, the Department of Planning, Industry and Environment is referred to as DPIE, the former Department of Planning and Environment as DPE, and the former Department of Industry as DOI.

Section highlights

  • One in five issues identified and reported to management in 2018–19 were repeat issues.
  • The lack of user access review was the most common IT general control issue in the PIE cluster.
  • The PIE cluster provided significant financial assistance for drought relief.
  • There continues to be significant deficiencies in Crown land records. The DPIE should ensure the Crown land database is complete and accurate.
  • Unspent developer contributions funds continued to build up in 2018–19. 

Appendix one – List of 2019 recommendations

Appendix two – Status of 2018 recommendations

Appendix three – Cluster agencies

Appendix four – Financial data

Appendix five – Management letter findings

Appendix six – Timeliness of financial reporting

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Transport 2019

Transport 2019

Transport
Asset valuation
Financial reporting
Infrastructure
Internal controls and governance
Management and administration
Service delivery
Workforce and capability

This report details the results of the financial audits of NSW Government's Transport cluster for the financial year ended 30 June 2019. The report focuses on key observations and findings from the most recent financial statement audits of agencies in the Transport cluster.

Unqualified audit opinions were issued for all agencies' financial statements. However, valuations of assets continue to create challenges across the cluster. The Audit Office identified some deficiencies in relation to asset valuations at Transport for NSW, Roads and Maritime Services, Rail Corporation New South Wales and Sydney Metro.

The Audit Office noted an increase in findings on internal controls across the Transport cluster. Key themes related to information technology, asset management and employee leave entitlements. The report also highlights the status of significant infrastructure projects across the Transport cluster.

The report makes several recommendations including:

  • agency finance teams need to be consulted on major business decisions and commercial transactions at the time of their execution to assess the financial reporting impacts
  • the Department of Transport should ensure consistent accounting policies are applied across its controlled entities.

Download the Transport 2019 report (PDF)

This report analyses the results of our audits of financial statements of the Transport cluster for the year ended 30 June 2019. The table below summarises our key observations.

1. Machinery of Government changes
Transport for NSW, as the
lead agency, will absorb the
functions of Roads and
Maritime Services

The NSW Government announced its intention to integrate Roads and Maritime Services (RMS) into Transport for NSW (TfNSW) as part of the Machinery of Government changes.

This change was not included in the Administrative Orders as the Transport Administration Act 1988 No. 109 governs the composition of the Transport cluster. The Transport Administration Amendment (RMS Dissolution) Act 2019 (the Act) received assent on 22 November 2019. The Act dissolves RMS and transfers the assets, rights and liabilities of RMS to TfNSW. As at the date of this Report, the Act is not yet in force.

Transport is considering the impact of the changes on its operating model and financial reporting.

2. Financial reporting
Audit opinions

Unqualified audit opinions were issued on the 2018–19 financial statements of all agencies in the Transport cluster.

TfNSW and Sydney Metro obtained a three-week extension from NSW Treasury to submit their financial statements for audit to resolve accounting issues surrounding the valuation of property, plant and equipment.

The Department of Transport reported total consolidated property, plant and equipment of $158 billion at 30 June 2019. In 2018–19, there were issues with asset valuations at TfNSW, RMS, Sydney Metro and Rail Corporation New South Wales (RailCorp), resulting in adjustments after the submission of financial statements for audit and the correction of a prior period error.

There was also a prior period error resulting from an agreement between TfNSW and the former UrbanGrowth Development Corporation due to a lack of assessment of the financial reporting implications at the time of signing the agreement.

Recommendation: Agency finance teams need to be consulted on major business decisions and commercial transactions to assess their accounting impacts at the time of their execution, rather than at the end of a financial year. Agencies also need to resolve all key accounting issues such as valuations as part of the early close procedures.

This would improve the quality of financial reporting and avoid the need for extensions for agencies to submit their financial statements for audit.

Preparedness for new
accounting standards
Agencies across the cluster are progressing in their implementation of the new accounting standards.

Transport cluster agencies need to improve their contracts registers to ensure they have a complete list of contracts and agreements to assess the impact of the new accounting standards.
Valuation of assets remains
a challenge in the
Transport cluster

Whilst agencies complied with the requirements of the accounting standards and NSW Treasury policies on valuations, the Audit Office identified some deficiencies in relation to asset valuations across the cluster.

TfNSW reported a retrospective correction of a prior period error at 1 July 2017 which resulted in a reduction in the valuation of its Country Rail Network earthworks by $2.1 billion. This was due to survey results which identified the earthworks were flatter and lower than estimated in the valuation at 30 June 2017.

RMS made several adjustments during the year to correct asset values due to changes to valuation assumptions or data improvements. This included:

  • reduction of $318 million in the value of land under roads
  • decrease of $84.9 million to the value of land and buildings
  • changes to the value of traffic control and traffic signal network assets, due to data improvements.

Sydney Metro North West officially opened in May 2019 and reported total assets of $9.1 billion. Sydney Metro derecognised $322 million in assets constructed to facilitate its operation but transferred to councils and utilities.

Inconsistent accounting
policies across the
Transport cluster

There was an inconsistency identified in the cluster relating to the valuation of substratum land. In 2018–19, RailCorp derecognised $109 million of substratum land to ensure consistency in its approach with other Transport agencies.

As the parent entity, the Department of Transport needs to ensure accounting policies are consistently applied across all controlled entities for consolidation purposes. Inconsistencies in the application of accounting standards across agencies will impact comparability of financial reporting and decision making across the Transport cluster.

Recommendation: The Department of Transport should ensure consistent accounting policies are applied across its controlled entities.

Revenue growth

Public transport passenger revenue increased by $89.0 million (5.9 per cent) in 2018–19, and patronage increased by 37.8 million (4.9 per cent) across all modes of transport based on data provided by TfNSW.

The increase in revenue is mainly due to an increase in patronage as well as the annual increase in fares.

Negative Opal cards

Negative balance Opal cards resulted in $2.9 million in revenue not collected in 2018–19 ($10.4 million since the introduction of Opal).

In January 2019, Transport made a change to the Sydney Airport stations to prevent customers with high negative balances exiting the station. In addition, in late 2018, Transport increased the minimum top up values for new cards at the airport stations.

Recommendation (repeat): TfNSW should implement further measures to prevent the loss of revenue from passengers tapping off with negative balance Opal cards.

3. Audit observations
Internal controls There was an increase in findings on internal controls across the Transport cluster. Key themes relate to information technology, employee leave entitlements and asset management.

Twenty-nine per cent of all issues were repeat issues. The majority of the repeat issues related to information technology controls.
Write-off of assets In addition to a $322 million derecognition of assets transferred to councils and utilities by Sydney Metro and a $109 million derecognition of substratum land at RailCorp, the Transport cluster wrote-off $278 million of assets related to roads, bridges, maritime assets, traffic signals and controls network.

These mainly related to roads, bridges, maritime assets, traffic signals and the control network where new infrastructure assets substantially replaced an existing asset as part of construction activities.
Transport Asset Holding
Entity (TAHE)
TAHE was established to be a dedicated asset manager for the delivery of public transport asset management. The Transport Administration Amendment (Transport Entities) Act 2017 will transition RailCorp into TAHE. RailCorp is now expected to transition to TAHE from 1 July 2020 (previously 1 July 2019). Several working groups have been considering various aspects of the TAHE transition including its status as a for profit Public Trading Enterprise, the operating model and the impact of the new accounting standards AASB 16 'Leases' and AASB 1059 'Service Concession Arrangements: Grantors'. The considerations of these aspects identified several challenges in the implementation of TAHE which has led to the revised transition date. Given the delays in implementation, it is important to clarify the intent of the TAHE model.
Excess annual leave

Twenty-six per cent of Transport employees have annual leave balances exceeding 30 days. Of the employees with excess leave balances, 732 (10.3 per cent) did not take any annual leave in 2018–19.

Recommendation (repeat): Transport entities should further review the approach to managing excess annual leave in 2019–20. They should:

  • monitor current and projected leave balances to the end of the financial year each month
  • agree formal leave plans with employees to reduce leave balances over an acceptable timeframe
  • ensure leave plans are actioned appropriately
  • encourage all staff with excess leave balances take a minimum two-week period of leave per year.
Completeness and
accuracy of contracts
registers

There are no centralised processes to record all significant contracts and agreements in a register across the Transport cluster.

Across the Transport cluster, contracts and agreements are maintained by the individual agencies using disparate registers. Agencies must perform detailed assessments of their existing contracts and agreements to quantify the impact of the new accounting standards (AASB 16 ‘Leases’, AASB 15 ‘Revenue from Contracts with Customers’, AASB 1058 ‘Income of Not-for-Profit Entities’ and AASB 1059 'Service Concession Arrangements: Grantors').

In 2018–19, there was also a prior period error resulting from an agreement between TfNSW and another government agency due to a lack of assessment of the financial reporting implications at the time of signing the agreement.

A lack of a complete register of all contracts and agreements increases the risk that agencies may not be able to assess the full impact of the new accounting standards, as well as perform a complete assessment of the financial reporting implications of contracts and agreements.

Recommendation: Transport agencies should implement a process to centrally capture all significant contracts and agreements entered. This will ensure:

  • agencies are fully aware of contractual and other obligations
  • appropriate assessment of financial reporting implications
  • assessment of new accounting standards, in particular AASB 16 ‘Leases’, AASB 15 'Revenue from Contract with Customers', AASB 1058 'Income of Not-for-Profit Entities ' and AASB 1059 'Service Concession Arrangements: Grantors' are accurate and complete.

 

This report provides parliament and other users of the Transport cluster’s financial statements with the results of our audits, our observations, analysis, conclusions and recommendations in the following areas:

  • financial reporting
  • audit observations.

This cluster was impacted by the Machinery of Government changes on 1 July 2019. The NSW Government announced its intention to integrate Roads and Maritime Services (RMS) into Transport for NSW (TfNSW). This report is focused on the Transport cluster prior to these changes. Please refer to the section on Machinery of Government changes for more details.

Machinery of Government refers to how the government organises the structures and functions of the public service. Machinery of Government changes are where the government reorganises these structures and functions, and are given effect by Administrative orders.

The Transport cluster was impacted by recent Machinery of Government changes. These changes were announced by the Department of Premier and Cabinet but were not included in the Administrative Orders as the Transport Administration Act 1988 No. 109 governs the composition of the Transport cluster. It was the intention of government to transfer the functions of the RMS into TfNSW. This requires legislative changes to the Transport Administration Act 1988 No. 109.

Section highlights

Under the Machinery of Government changes, the NSW Government will transfer the functions of RMS into TfNSW.

  • The Transport Administration Amendment (RMS Dissolution) Act 2019 (the Act) received assent on 22 November 2019.
  • The Act will dissolve RMS and transfer its functions, assets, rights and liabilities to TfNSW.
  • As at the date of this report, the Act is not yet in force.
  • There are risks and challenges for asset and liability transfers, governance and retention of knowledge.
  • As of 1 July 2019, administrative arrangements (delegations and reporting line changes) were put in place to enable TfNSW and RMS to operate within a single management structure, while still remaining as separate legal entities.
  • Transport is working on a number of options as to how to implement the changes. 

Financial reporting is an important element of good governance. Confidence and transparency in public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines our audit observations related to the financial reporting of agencies in the Transport cluster for 2019.

Section highlights

  • Unqualified audit opinions were issued on all agencies' financial statements.
  • RMS required an extension from NSW Treasury for their early close procedures.
  • TfNSW and Sydney Metro required extensions to submit their year-end financial statements.
  • Valuation of assets remains a challenge across the cluster.
  • There remains Opal cards with negative balances.
  • Sydney Metro derecognised assets of $322 million in relation to assets constructed for third parties.
  • Inconsistencies in the application of accounting policies across cluster agencies impact comparability of financial reporting across the Transport cluster.

Appropriate financial controls help ensure the efficient and effective use of resources and administration of agency policies. They are essential for quality and timely decision making.

This chapter outlines our observations and insights from our financial statement audits of agencies in the Transport cluster.

Section highlights

  • There was an increase in findings on internal controls across the Transport cluster. Twenty-nine per cent of all issues were repeat issues.
  • Transport entities wrote-off over $278 million of assets which were replaced by new assets or technology.
  • Twenty-six per cent of Transport employees have excess annual leave.
  • There are no processes to ensure all significant contracts and agreements are captured by agencies in a centralised register.

Appendix one – Timeliness of financial reporting by agency 

Appendix two – Management letter findings by agency 

Appendix three – List of 2019 recommendations 

Appendix four – Status of 2017 and 2018 recommendations 

Appendix five – Cluster agencies 

 

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Internal Controls and Governance 2019

Internal Controls and Governance 2019

Education
Community Services
Finance
Health
Industry
Justice
Planning
Premier and Cabinet
Transport
Treasury
Whole of Government
Compliance
Cyber security
Fraud
Information technology
Internal controls and governance
Management and administration
Procurement
Project management

This report covers the findings and recommendations from the 2018–19 financial audits that relate to internal controls and governance at 40 of the largest agencies in the NSW public sector. The 40 agencies selected for this report constitute around 84 per cent of total expenditure for all NSW public sector agencies.

The report provides insights into the effectiveness of controls and governance processes across the NSW public sector. It evaluates how agencies identify, mitigate and manage risks related to:

  • financial controls
  • information technology controls
  • gifts and benefits
  • internal audit
  • contingent labour
  • sensitive data.

The Auditor-General recommended that agencies do more to prioritise and address vulnerabilities in their internal controls and governance. The Auditor-General also recommended agencies increase the transparency of their management of gifts and benefits by publishing their registers on their websites.

This report analyses the internal controls and governance of 40 of the largest agencies in the NSW public sector for the year ended 30 June 2019.

1. Internal control trends

New, repeat and high risk findings

There was an increase in internal control deficiencies of 12 per cent compared to last year. The increase is predominately due to a 100 per cent increase in repeat financial and IT control deficiencies.

Some agencies attributed the delay in actioning repeat findings to the diversion of staff from their regular activities to implement and operationalise the recent Machinery of Government changes. As a result, actions to address audit recommendations have been deferred or re prioritised, as the changes are implemented.

Agencies need to ensure they are actively managing the risks associated with having these vulnerabilities in internal control systems unaddressed for extended periods of time.

Common findings

A number of findings were common to multiple agencies. These findings often related to areas that are fundamental to good internal control environments and effective organisational governance, such as:

  • out of date policies or an absence of policies to guide appropriate decisions
  • poor record keeping and document retention
  • incomplete or inaccurate centralised registers or gaps in these registers
  • policies, procedures or controls no longer suited to the current organisational structure or business activities.

2. Information technology controls

IT general controls

We examined information security controls over key financial systems that support the preparation of agency financial statements. We found:

  • user access administration deficiencies at 58 per cent of agencies related to granting, review and removal of user access
  • an absence of privileged user activity reviews at 35 per cent of agencies
  • password controls that did not align to password policies at 20 per cent of agencies.

We also found 20 per cent of agencies had deficient IT program change controls, mainly related to segregation of duties in approval and authorisation processes, and user acceptance testing of program changes prior to deployment into production environments. User acceptance testing helps identify potential issues with software incompatibility, operational workflows, absent controls and software issues, as well as areas where training or user support may be required.

3. Gifts and benefits

Gifts and benefits registers

All agencies had a gifts and benefits policy and 90 per cent of agencies maintain a gifts and benefits register. However, 51 per cent of the gifts and benefits registers we examined contained incomplete declarations, such as missing details for the approving officer, value of the gift and/or benefit offered and reasons supporting the decision.

In some cases, gaps in recorded information meant the basis for decisions around gifts and benefits was not always clear, making it difficult to determine whether decisions in those instances were appropriate, compliant with policy and were not direct or indirect inducements to the recipients to favour suppliers or service providers.

Agencies should ensure their gifts and benefits register includes all key fields specified in the Public Service Commission's minimum standards for gifts and benefits. Agencies should also perform regular reviews of the register to ensure completeness and ensure any gift or benefit accepted by a staff member meets the public's expectations for ethical behaviour.

Managing gifts and benefits

We found opportunities to improve gifts and benefits processes and enhance transparency. For example, only three per cent of agencies publish their gifts and benefits registers on their websites.

Agencies can improve management of gifts and benefits by:

  • ensuring agency policies comprehensively cover the elements necessary to make it effective in an operational environment, such as identifying risks specific to the agency and actions that will be taken in the event of a policy breach
  • establishing and publishing a statement of business ethics on the agency's website to clearly communicate expected behaviours to clients, customers, suppliers and contractors
  • providing on-going training, awareness activities and support to employees, not just at induction
  • publishing their gifts and benefits registers on their websites to demonstrate a commitment to a transparently ethical environment.
Reporting and monitoring

Only 35 per cent of agencies reported trends in the number and nature of gifts and benefits recorded in their registers to the agency's senior executive management and/or a governance committee.

Agencies should regularly report to the agency executive or other governance committee on trends in the offer and acceptance of gifts and benefits.

4. Internal audit

Obtaining value from the internal audit function

Agencies have established and maintained internal audit functions to provide assurance on the effectiveness of agency controls and governance systems. However, we identified areas where agencies' internal audit functions could improve their processes to add greater value. For example, only 73 per cent of CAEs regularly attend meetings of the agency board or executive management committee.

Internal audit functions can add greater value by involving the CAE more extensively in executive forums as an observer.

Internal audit functions should also consider producing an annual report on internal audit. An annual report allows the internal audit function to report on their performance and add value by drawing to the attention of audit and risk committees and senior management strategic issues, thematic trends and emerging risks.

Role of the Chief Audit Executive

Forty-five per cent of agencies assigned responsibilities to the Chief Audit Executive (CAE) that were broader than internal audit, but 17 per cent of these had not documented safeguards to protect the independence of the CAE.

The reporting lines and status of the CAE at some agencies also needs review. At two agencies, the CAE reported to the CFO.

Agencies should ensure:

  • the reporting lines for the CAE comply with the NSW Treasury policy, and the CAE does not report functionally or administratively to the finance function or other significant recipients of internal audit services
  • the CAE's duties are compatible with preserving their independence and where threats to independence exist, safeguards are documented and approved.
Quality assurance and improvement program

Thirty-five per cent of agencies did not have a documented quality assurance and improvement program for its internal audit function.

The policy and the International Standards for the Professional Practice of Internal Auditing require agencies to have a documented quality assurance and improvement program. The results of this program should be reported annually.

Agencies should ensure there is a documented and operational Quality Assurance and Improvement Program for the internal audit function that covers both internal and external assessments.

5. Managing contingent labour

Obtaining value for money from contingent labour

According to NSW Procurement data, spend on contingent labour has increased by 75 per cent over the last five years, to $1.5 billion in 2018–19. Improvements in internal processes and a renewed focus on agency monitoring and oversight of contingent labour can help ensure agencies get the best value for money from their contingent workforces.

Agencies can improve their management of contingent labour by:

  • preparing workforce plans to inform their resourcing strategy and ensure that engaging contingent labour aligns with the strategy and best meets business needs
  • involving agency human resources units in decisions about engaging contingent labour
  • regularly reporting on contingent labour use and tenure to agency executive teams
  • strengthening on-boarding and off-boarding processes.

We also found 57 per cent of the 23 agencies we examined with contingent labour spend of more than $5 million in 2018–19 have implemented the government's vendor management system and service provider 'Contractor Central'.

6. Managing sensitive data

Identifying and assessing sensitive data

Sixty-eight per cent of agencies maintain an inventory of their sensitive data and where it resides. However, these inventories are not always complete and risks may be overlooked.

Agencies can improve processes to manage sensitive data by:

  • identifying and maintaining an inventory of sensitive data through a comprehensive and structured process
  • assessing the criticality and sensitivity of the data so that protection of high risk data can be prioritised.
Managing data breaches

Eighty-eight per cent of agencies have established policies to respond to potential data breaches when they are identified and 70 per cent of agencies maintain a register to record key information in relation to identified data breach incidents.

Agencies should maintain a data breach register to effectively manage the actions undertaken to contain, evaluate and remediate each data breach.

 

This report covers the findings and recommendations from our 2018–19 financial audits that relate to internal controls and governance at 40 of the largest agencies (refer to Appendix three) in the NSW public sector. The 40 agencies selected for this volume constitute around 84 per cent of total expenditure for all NSW public sector agencies.

Although the report includes several agencies that have changed as a result of the Machinery of Government changes that were effective from 1 July 2019, its focus on sector wide issues and insights means that its findings remain relevant to NSW public sector agencies, including newly formed agencies that have assumed the functions of abolished agencies.

This report offers insights into internal controls and governance in the NSW public sector

This is the third report dedicated to internal controls and governance at NSW State Government agencies. The report provides insights into the effectiveness of controls and governance processes in the NSW public sector by:

  • highlighting the potential risks posed by weaknesses in controls and governance processes
  • helping agencies benchmark the adequacy of their processes against their peers
  • focusing on new and emerging risks, and the internal controls and governance processes that might address those risks.

Without strong governance systems and internal controls, agencies increase the risks associated with effectively managing their finances and delivering services to citizens. For example, if they do not have strong information technology controls, sensitive information may be at risk of unauthorised access and misuse.

Areas of specific focus of the report have changed since last year

Last year's report topics included transparency and performance reporting, management of purchasing cards and taxi use, and fraud and corruption control. We are reporting on new topics this year and re-visiting agency management of gifts and benefits, which we first covered in our 2017 report. Re-visiting topics from prior years provides a baseline to show the NSW public sectors’ progress implementing appropriate internal controls and governance processes to mitigate existing, new and emerging risks in the public sector.

Our audits do not review all aspects of internal controls and governance every year. We select a range of measures and report on those that present heightened risks for agencies to mitigate. This year the report focusses on:

  • internal control trends
  • information technology controls, including access to agency systems
  • protecting sensitive information held within agencies
  • managing large and diverse workforces (controls around employing and managing contingent workers)
  • maintaining an ethical culture (management of gifts and benefits)
  • effectiveness of internal audit function and its oversight by Audit and Risk Committees.

The findings in this report should not be used to draw conclusions on the effectiveness of individual agency control environments and governance arrangements. Specific financial reporting, internal controls and audit observations are included in the individual 2019 cluster financial audit reports, which will be tabled in parliament from November to December 2019.

Internal controls are processes, policies and procedures that help agencies to:

  • operate effectively and efficiently
  • produce reliable financial reports
  • comply with laws and regulations
  • support ethical government.

This chapter outlines the overall trends for agency controls and governance issues, including the number of audit findings, the degree of risk those deficiencies pose to the agency, and a summary of the most common deficiencies we found across agencies. The rest of this report presents this year’s controls and governance findings in more detail.

Key conclusions and sector wide learnings

We identified four high risk findings, compared to six last year. None of the findings are common with those in the previous year. There was an overall increase of 12 per cent in the number of internal control deficiencies compared to last year. The increase is predominately due to a 100 per cent increase in the number of repeat financial and IT control deficiencies.
 
Some agencies attributed the delay in actioning repeat findings to the diversion of staff from their regular activities to implement and operationalise the recent Machinery of Government changes. As a result, actions to address audit recommendations have been deferred or re-prioritised, as the changes are implemented. Agencies need to ensure they are actively managing the risks associated with having these vulnerabilities in internal control systems unaddressed for extended periods of time.
 
We also identified a number of findings that were common to multiple agencies. These common findings often related to areas that are fundamental to good internal control environments and effective organisational governance. Examples include:
  • out of date policies or an absence of policies to guide appropriate decisions
  • poor record keeping and document retention
  • incomplete or inaccurate centralised registers or gaps in these registers.

Policies, procedures and internal controls should be properly designed, be appropriate for the current organisational structure and its business activities, and work effectively.

This chapter outlines our audit observations, conclusions and recommendations, arising from our review of agency controls to manage key financial systems.

Key conclusions and sector wide learnings
Government agencies’ financial reporting is heavily reliant on information technology (IT). We continue to see a high number of deficiencies related to IT general controls, particularly those related to user access administration. These controls are key in adequately protecting IT systems from inappropriate access and misuse.
IT is also important to the delivery of agency services. These systems often provide the data to help monitor the efficiency and effectiveness of agency processes and services they deliver. Our financial audits do not review all agency IT systems. For example, IT systems used to support agency service delivery are generally outside the scope of our financial audit. However, agencies should also consider the relevance of our findings to these systems.
Agencies need to continue to focus on assessing the risks of inappropriate access and misuse and the implementation of controls to adequately protect their systems, focussing on the processes in place to grant, remove and monitor user access, particularly privileged user access.

This chapter outlines our audit observations, conclusions and recommendations, arising from our review of agency controls to manage gifts and benefits. 

Key conclusions and sector wide learnings

We found most agencies have implemented the Public Service Commission's minimum standards for gifts and benefits. All agencies had a gifts and benefits policy and 90 per cent of agencies maintained a gifts and benefits register and provided some form of training to employees on the treatment of gifts and benefits.

Based on our analysis of agency registers, we found some areas where opportunities existed to make processes more effective. In some cases, gaps in recorded information meant the basis for decisions around gifts and benefits was not always clear, making it difficult to determine whether decisions in those instances were appropriate and compliant with policy. Fifty-one per cent of the gifts and benefits registers reviewed contained declarations where not all fields of information had been completed. Seventy-seven per cent of agencies that maintained a gifts and benefits register did not include all key fields suggested by the minimum standards.

Areas where agencies can improve their management of gifts and benefits include:

  • ensuring agency policies comprehensively cover the elements necessary to make it effective in an operational environment, such as identifying risks specific to the agency and actions that will be taken in the event of a policy breach
  • establishing and publishing a statement of business ethics on the agency's website to clearly communicate expected behaviours to clients, customers,suppliers and contractors
  • updating gifts and benefits registers to include all key fields suggested by the minimum standards, as well as performing regular reviews of the register to ensure completeness
  • providing on-going training, awareness activities and support to employees, not just at induction
  • regularly reporting gifts and benefits to executive management and/or a governance committee such as the audit and risk committee, focussing on trends in the number and types of gifts and benefits offered to and accepted by agency staff
  • publishing their gifts and benefits registers on their websites to demonstrate a commitment to a transparently ethical environment.

This chapter outlines our audit observations, conclusions and recommendations, arising from our review of agency internal audit functions.

Key conclusions and sector wide learnings 

We found agencies have established and maintained internal audit functions to provide assurance on the effectiveness of agency controls and governance systems as required by TPP15-03 'Internal Audit and Risk Management Policy for the NSW Public Sector'. However, we identified areas where agencies' internal audit functions could improve their processes to add greater value, including: 

  • documenting and implementing safeguards to address conflicting roles performed by the Chief Audit Executive (CAE)
  • ensuring the reporting lines for the CAE comply with the NSW Treasury policy, and the CAE reports neither functionally or administratively to the finance function or other significant recipients of internal audit services
  • involving the CAE more extensively in executive forums as an observer
  • documenting a Quality Assurance and Improvement Program for the internal audit function and performing both internal and external performance assessments to identify opportunities for continuous improvement
  • reporting against key performance indicators or a balanced scorecard and producing an annual report on internal audit to bring to the attention of the audit and risk committee and senior management strategic issues, thematic trends and emerging risks that may require further attention or resources.

This chapter outlines our audit observations, conclusions and recommendations, arising from our review of agency controls to on-board, manage and off-board contingent labour.

Key conclusions and sector wide learnings

Agencies have implemented controls to manage contingent labour and most agencies have some level of reporting and oversight of contingent labour at an executive level. However, the increasing trend in spend on contingent labour warrants a renewed focus on agency monitoring and oversight of their use of contingent labour. Over the last five years spend on contingent labour has increased by 75 per cent, to $1.5 billion in 2018–19.

There are also some key gaps that limit the ability of agencies to effectively manage contingent labour. Key areas where agencies can improve their management of contingent labour include: 

  • preparing workforce plans to inform their resourcing strategy, and confirm prior to engaging contingent labour, that this solution aligns with the strategy and best meets business needs
  • involving agency human resources units in decisions about engaging contingent labour
  • regularly reporting on contingent labour use to agency executive teams, particularly in terms of trends in agency spend, tenure and compliance with policies and procedures
  • strengthening on-boarding and off-boarding processes, including establishing checklists to on-board and off-board contingent labour, making provisions for knowledge transfer, and assessing, documenting and capturing performance information.

This chapter outlines our audit observations, conclusions and recommendations, arising from our review of governance and processes in relation to the management of sensitive data.

Key conclusions and sector wide learnings

Information technology risks are rapidly increasing. More interfaces between agencies and greater connectivity means the amounts of data agencies generate, access, store and share continue to increase. Some of this information is sensitive information, which is protected by the Privacy Act 1988.

It is important that agencies understand what sensitive data they hold, the risks associated with the inadvertent release of this information and how they are mitigating those risks. We found that agencies need to continue to identify and record their sensitive data, as well as expand the methods they use to identify sensitive data. This includes data held in unstructured repositories, such as network shared drives and by agency service providers.

Eighty-eight per cent of agencies have established policies to respond to potential data breaches when they are identified and 70 per cent of agencies maintain a register to record key information in relation to identified data breach incidents.

Key areas where agencies can improve their management of sensitive data include:

  • identifying sensitive data, based on a comprehensive and structured process and maintaining an inventory of the data
  • assessing the criticality and sensitivity of the data so that the protection of high risk data can be prioritised
  • developing comprehensive data breach management policies to ensure data breaches are appropriately managed
  • maintaining a data breach incident register to record key information in relation to identified data breaches incidents, including the estimated cost of the breach
  • providing on-going training and awareness activities to employees in relation to sensitive data and managing data breaches.

Appendix one – List of 2019 recommendations 

Appendix two – Status of 2018 recommendations

Appendix three – In-scope agencies

 

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Ensuring teaching quality in NSW public schools

Ensuring teaching quality in NSW public schools

Education
Management and administration
Regulation
Service delivery
Workforce and capability

The Auditor-General for New South Wales, Margaret Crawford, has released a report on how the New South Wales Education and Standards Authority (NESA) and the Department of Education (the Department) ensure teaching quality in NSW public schools.

Around 2,200 NSW public school principals are responsible for accrediting their teachers in line with the Australian Professional Standards for Teachers. The report found that NESA does not oversight principals’ decisions to ensure that minimum standards for teaching quality are consistently met.

The Department does not effectively monitor teaching quality across the state. With limited data, it is difficult for the Department to ensure its strategies to improve teaching quality are appropriately targeted to improve teaching quality.

The Department’s Performance and Development Framework does not adequately support principals and supervisors to effectively manage and improve teacher performance or actively improve teaching quality. The Department manages those teachers formally identified as underperforming through teacher improvement programs. Only 53 of over 66,000 teachers employed by the Department were involved in these programs in 2018.

The report makes three recommendations towards NESA to improve accreditation processes, and four recommendations to the Department to improve its systems and processes for ensuring teaching quality across the State.

Australian research has shown that quality teaching is the greatest in-school influence on student engagement and outcomes, accounting for 30 per cent of the variance in student performance. An international comparative study of 15-year-old students showed the performance of New South Wales students in reading, mathematics and science has declined between 2006 and 2015.

The Australian Professional Standards for Teachers (the Standards) describe the knowledge, skills and understanding expected of effective teachers at different career stages. Teachers must be accredited against the Standards to be employed in NSW schools. The NSW Education Standards Authority (NESA) is responsible for ensuring all teachers in NSW schools are accredited. As part of the accreditation process the NSW Department of Education (The Department) assesses whether public school teachers meet proficient accreditation standards and advises NESA of its decisions.

The School Excellence Framework provides a method for the Department to monitor teaching quality at a school level across four elements of effective teaching practice. The Performance and Development Framework provides a method for teachers and their supervisors to monitor and improve teaching quality through setting professional goals to guide their performance and development.

The Department has a strategic goal that every student, every teacher, every leader and every school improves every year. In line with this goal, the Department has a range of strategies targeted to improving teaching quality at different career stages. These include additional resources to support new teachers, a program to support teachers to gain higher-level accreditation, support for principals to manage underperforming teachers, and a professional learning program where teachers observe and discuss each other's practice.

The objective of this audit was to assess the effectiveness of the NSW Department of Education's and the NSW Education Standards Authority's arrangements to ensure teaching quality in NSW public schools. To address this objective, the audit examined whether:

  • agencies effectively monitor the quality of teaching in NSW public schools
  • strategies to improve the quality of teaching are planned, communicated, implemented and monitored well.
The NSW Education Standards Authority does not oversight principals’ decisions to accredit teachers as proficient. This means it is not ensuring minimum standards for teaching quality are consistently met.
NESA does not have a process to ensure principals’ decisions to accredit teachers are in line with the Standards. The decision to accredit teachers is one of the main ways to ensure teaching quality. In New South Wales public schools, around 2,200 principals are tasked with making decisions to accredit their teachers as proficient. NESA provides training and guidelines for principals to encourage consistent accreditation decisions but regular turnover of principals makes it difficult to ensure that all principals are adequately supported. NESA has more oversight of provisional and conditional accreditation for beginning teachers, as well as higher-level accreditation for highly effective teachers. That said, there are only limited numbers of teachers with higher-level accreditation across the state.
The Department of Education does not effectively monitor teaching quality at a system level. This makes it difficult to ensure strategies to improve teaching quality are appropriately targeted.
The Department is not collecting sufficient information to monitor teaching quality across the state. No information on teacher assessment against the Performance and Development Framework is collected centrally. Schools self-assess their performance against the School Excellence Framework but this does not assess teaching quality for all teachers. The Department also surveys students about their experiences of teaching quality but schools opt-in to this survey, with 65 per cent of public schools participating in 2018. These factors limit the ability of the Department to target efforts to areas of concern.
We examined five key strategies that support the critical parts of a teacher’s career. Most strategies were based on research and consultation, planned, trialled, reviewed and adjusted before wider rollout. Guidance and training is provided to communicate requirements and help schools implement strategies at a local level. Monitoring of strategies implemented at a local level is variable. We identified several instances where Quality Teaching, Successful Students funding was used outside guidelines. Two strategies have not yet been evaluated, which prevents the Department from determining whether they are having the desired impact.
The Performance and Development Framework is not structured in a way that supports principals and supervisors to actively improve teacher performance and teaching quality.
There is limited opportunity for supervisors to set goals, conduct observations of teaching practice, or provide constructive written feedback on a teacher’s progress towards achieving their goals under this framework. Guidance on how to use the Standards to construct quality goals, observe teaching practice and provide valuable feedback is also insufficient. The framework focuses on teachers’ self-identified development goals but there is no requirement to align these with the Standards. These limitations reduce the ability of supervisors to use this framework to effectively manage teacher performance and improve teaching quality.
The Department manages those teachers formally identified as underperforming through teacher improvement programs. Only 53 of over 66,000 teachers employed by the Department were involved in these programs in 2018. By comparison, a report on inspections conducted in the United Kingdom assessed the quality of teaching as ‘inadequate’ in three per cent of schools.

Appendix one – Response from agencies

Appendix two – About the audit

Appendix three – Performance auditing

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary Reference: Report number #327 - released 26 September 2019

36

Published

Actions for Ensuring contract management capability in government - Department of Education

Ensuring contract management capability in government - Department of Education

Education
Compliance
Internal controls and governance
Management and administration
Procurement
Workforce and capability

This report examines whether the Department of Education has the required contract management capability to effectively manage high-value goods and services contracts (over $250,000). In 2017–18, the department managed high-value goods and services contracts worth $3.08 billion, with most of the contracts running over multiple years.

NSW government agencies are increasingly delivering services and projects through contracts with third parties. These contracts can be complex and governments face challenges in negotiating and implementing them effectively.

Contract management capability is a broad term, which can include aspects of individual staff capability as well as organisational capability (such as policies, frameworks and processes).

In 2017–18, the Department of Education (the Department) managed high-value (over $250,000) goods and services contracts worth $3.08 billion, with most of the contracts running over multiple years. The Department delivers, funds and regulates education services for NSW students from early childhood to secondary school.

This audit examined whether the Department has the required capability to effectively manage high-value goods and services contracts.

We did not examine infrastructure, construction or information communication and technology contracts. We assessed the Department against the following criteria:

  1. The Department’s policies and procedures support effective contract management and are consistent with relevant frameworks, policies and guidelines.
  2. The Department has capable personnel to effectively conduct the monitoring activities throughout the life of the contract.

The NSW Public Service Commission and the Department of Finance, Services and Innovation are included as auditees as they administer policies which directly affect contract management capability, including:

  • NSW Procurement Board Directions and policies
  • NSW Procurement Agency Accreditation Scheme
  • NSW Public Sector Capability Framework.

The Department of Finance, Services and Innovation's responsibility for NSW Procurement will transfer to NSW Treasury on 1 July 2019 as part of changes to government administrative arrangements announced on 2 April 2019 and amended on 1 May 2019.

Conclusion

The Department of Education's procedures and policies for goods and services contract management are consistent with relevant guidance. It also has a systemic approach to defining the capability required for contract management roles. That said, there are gaps in how well the Department uses this capability to ensure its contracts are performing. We also found one program (comprising 645 contracts) that was not compliant with the Department's policies.

The Department has up-to-date policies and procedures that are consistent with relevant guidance. The Department also communicates changes to procurement related policies, monitors compliance with policies and conducts regular reviews aiming to identify non-compliance.

The Department uses the NSW Public Service Commission's capability framework to support its workforce management and development. The capability framework includes general contract management capability for all staff and occupation specific capabilities for contract managers. The Department also provides learning and development for staff who manage contracts to improve their capability.

The Department provides some guidance on different ways that contract managers can validate performance information provided by suppliers. However, the Department does not provide guidance to assist contract managers to choose the best validation strategy according to contract risk. This could lead to inconsistent practice and contracts not delivering what they are supposed to.

We found that none of the 645 contracts associated with the Assisted Schools Travel Program (estimated value of $182 million in 2018–19) have contract management plans. This is contrary to the Department's policies and increases the risk that contract managers are not effectively reviewing performance and resolving disputes.

Appendix one - Response from agencies

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary Reference: Report number #325 - released 28 June 2019

Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Managing native vegetation

Managing native vegetation

Environment
Management and administration
Project management
Regulation
Service delivery

The report found the clearing of native vegetation on rural land is not effectively regulated and managed. The processes supporting the regulatory framework are weak and there is no evidence-based assurance that clearing of native vegetation is carried out in accordance with approvals. 

In 2014 an expert panel completed a review of biodiversity legislation in NSW. The panel’s recommendations included repealing the Native Vegetation Act 2003, proposing a new Act with the goal of maintaining a healthy, productive and resilient environment for the greatest wellbeing of the community, and recommending that management of native vegetation in the context of existing agricultural management would be assisted and supervised by Local Land Services (LLS).

Following the panel report, the NSW Government undertook major biodiversity conservation and land management reforms which saw the introduction of the Biodiversity Conservation Act 2016 (NSW) and the Local Land Services Amendment Act 2016 (NSW). The reforms commenced in August 2017. The Native Vegetation Act 2003, the Threatened Species Conservation Act 1995, the Nature Conservation Trust Act 2001, and parts of the National Parks and Wildlife Act 1974 were repealed.

Under the legislative reforms, the Biodiversity Conservation Act 2016 and Local Land Services Amendment Act 2016, which amended the Local Land Services Act 2013, aim to ensure a balanced approach to land management and biodiversity conservation in NSW.

A core objective of the Biodiversity Conservation Act 2016 is to conserve biodiversity at bioregional and state scales. A core objective of the Local Land Service Act 2013 is to ensure the proper management of natural resources in the social, economic and environmental interests of the state, consistently with the principles of ecologically sustainable development.

The integrated package of reforms included:

  • new arrangements that allow land owners to improve productivity while responding to environmental risks
  • new ways to assess and manage the biodiversity impacts of development
  • a new state Environmental Planning Policy for managing impacts on native vegetation in urban areas
  • significant investment in conservation of private land
  • a risk-based system for regulating human and business interactions with native plants and animals
  • streamlined approvals and dedicated resources to help reduce the regulatory burden.

Transition to this land management framework began on 25 August 2017 with the commencement of the Land Management (Native Vegetation) Code.

The overall objectives of the reforms are:

  • to arrest and ultimately reverse the current decline in the state’s biodiversity while facilitating ecologically sustainable development, in particular efficient and sustainable agricultural development
  • enable landholders to improve the efficiency of their agricultural systems and take a more active role in providing incentive and supporting landholders to improve the condition and function of their ecological systems. 

The objective of this audit is to assess whether the clearing of native vegetation in rural areas is effectively regulated and managed by the Office of Environment and Heritage (OEH) and LLS under these legislative frameworks. The audit also examined the progress of the Biodiversity Conservation Trust in implementing the Biodiversity Conservation Investment Strategy as a counterbalance to rural land clearing. 

At the time of this audit OEH was responsible for preparing the Native Vegetation Regulatory map and for compliance enforcement in relation to unlawful land clearing. Post 1 July 2019, under machinery of government changes, OEH will be abolished and its activities relevant to this audit will be moved to the new Department of Planning, Industry and Environment. For the purposes of this audit we will continue to refer to it as OEH. 

Conclusion
The clearing of native vegetation on rural land is not effectively regulated and managed because the processes in place to support the regulatory framework are weak. There is no evidence-based assurance that clearing of native vegetation is being carried out in accordance with approvals. Responses to incidents of unlawful clearing are slow, with few tangible outcomes. Enforcement action is rarely taken against landholders who unlawfully clear native vegetation. 

There are processes in place for approving land clearing but there is limited follow-up to ensure approvals are complied with.
Procedures and systems are in place for assessing applications and issuing approvals for land clearing. Approvals contain conditions for managing clearing and setting aside land for conservation as a counterbalance to permitted clearing. 
There is limited follow-up or capacity to gauge whether landholders are complying with the conditions of approvals and effectively managing areas of their land that have been set aside for conservation (i.e. 'set asides'). 
Certificate assessments are used to grant landholders permission to clear. All assessments we reviewed generally complied with the Land Management (Native Vegetation) Code 2018 (the Code). 
The rules around land clearing may not be responding adequately to environmental risks.
The Code, which contains conditions under which the thinning or clearing of native vegetation can be approved on regulated land, is intended to allow landholders to improve productivity while responding to environmental risks. That said, it may not be achieving this balance. For example, the Code allows some native species to be treated as ‘invasive’ when they may not be invading an area, provides little protection for groundcover and limited management requirements for set asides. There is also limited ability under the Code to reject applications for higher risk clearing proposals.
The release of the Native Vegetation Regulatory (NVR) map has been delayed, limiting landholders' ability to determine if their plans for clearing are lawful.
OEH has applied significant effort in developing a native vegetation regulatory map to guide landholders on which land they can and can’t clear without approval. However, in November 2016 the then Minister for Primary Industries advised Parliament that the two largest land categories of the NVR map will not come into effect until the relevant Ministers are satisfied stakeholders have sufficient confidence in the maps’ accuracy. Not releasing the map has made it harder for landholders to identify the portions of their land that are regulated and ensure they comply with land clearing rules. It has also limited OEH’s ability to consult on and improve the accuracy of the map.
There are significant delays in identifying unlawful clearing and few penalties imposed.
Unexplained land clearing can take over two years to identify and analyse, making it difficult to minimise environmental harm or gather evidence to prosecute unlawful clearing. Despite around 1,000 instances of unexplained clearing identified by OEH and over 500 reports to the environmental hotline each year, with around 300 investigations in progress at any one time, there are only two to three prosecutions, three to five remediation orders and around ten penalty notices issued each year for unlawful clearing. Further, OEH is yet to commence any prosecutions under the current legislation which commenced in August 2017.
Land clearing and private land conservation investment have both increased.
Clearing of native vegetation has increased in recent years. At the same time, the government is also investing in properties with high environmental value with a focus on improving the mix of endangered ecological communities conserved in perpetuity. Processes are in place for identifying and prioritising areas of land for investment but the funding provided to each region is not always consistent with these priorities. 

Local Land Services (LLS) is responsible for processing notifications and issuing certificates to landholders for managing the thinning or clearing of native vegetation on rural land through the ‘Land Management (Native Vegetation) Code 2018’ (the Code). This work includes monitoring and reporting on the implementation of the Code, including the establishment and management of set asides.

OEH is responsible for compliance and enforcement in relation to unlawful land clearing. It is also responsible for producing the NVR map, designed to show landholders where land clearing can occur without approval, where approval is required, and where land clearing is not permitted. Post 1 July 2019, under machinery of government changes, OEH will be abolished and its activities relevant to this audit will be moved to the new Department of Planning, Industry and Environment.

Appendix one - Response from agencies

Appendix two - Authorisations for thinning and clearing, and restoration initiatives under the Native Vegetation Act 2003

Appendix three - About the audit

Appendix four - Performance auditing

 

Parliamentary Reference: Report number #324 - released 27 June 2019

Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Development assessment: pre-lodgement and lodgement in Camden Council and Randwick City Council

Development assessment: pre-lodgement and lodgement in Camden Council and Randwick City Council

Local Government
Management and administration
Service delivery

The report found that both councils could do more to monitor and assess the effectiveness of their pre-lodgement and lodgement stages. The audit highlighted that Randwick City Council closely follows guidance designed to encourage good practice in these initial stages of its development assessments. It also demonstrated it was timely when processing lodgements. Camden Council is partially following the guidance and could not demonstrate that its lodgement stage was timely.

A development application is a formal application for development that requires consent under the NSW Environmental Planning and Assessment Act 1979. It is usually lodged with the local council for processing and determination, and consists of standard application forms, supporting technical reports and plans. 

In March 2017, the NSW Department of Planning and Environment (DPE)1 released the ‘Development Assessment Best Practice Guide' designed to help councils assess development applications in a timely manner and provide a better experience for applicants. 

DPE's guide describes the development assessment process in five stages. 

According to the Guidance, councils should systematically measure, monitor and review development assessment outcomes and timeframes against performance targets to ensure the process is transparent, accountable and outcome-focused.

Appendix one – Response from agencies

Appendix two – Council's alignment with the guidance

Appendix three – About the audit

Appendix four – Performance auditing

 

Parliamentary Reference: Report number #322 - released 20 June 2019

Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Domestic waste management in Campbelltown City Council and Fairfield City Council

Domestic waste management in Campbelltown City Council and Fairfield City Council

Local Government
Management and administration
Service delivery

The Auditor-General for New South Wales, Margaret Crawford, today released a report on Domestic waste management in Campbelltown City Council and Fairfield City Council.The report found that both Councils collect and transport domestic kerbside waste effectively and process it at a low cost. The Councils also effectively process waste placed in green-lid and yellow-lid bins, but neither Council has been able to enforce their contracts for processing red-lid bin waste. As a result, almost all such waste goes straight to landfill. 

Local councils provide waste management services to their residents. They collect domestic waste primarily through kerbside services, but also at council drop off facilities. Waste management is one of the major services local councils deliver. Each year, councils collectively manage an estimated 3.5 million tonnes of waste generated by New South Wales residents.

Waste disposed of in landfills attracts a NSW Government waste levy. Councils’ kerbside services help residents to separate recyclable and non recyclable waste. This reduces the cost of waste disposed to landfill. These services typically provide yellow-lid bins for dry recyclables, green-lid bins for garden organics and red-lid bins for residual waste. To increase the level of recycling, some councils deliver residual waste to alternative waste treatment facilities for processing. This can involve composting and the recovery of resources, including plastics and metals, which can be recycled.

Appendix one - Responses from local councils

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary Reference: Report number #320 - released 5 June 2019

Published

Actions for Engagement of probity advisers and probity auditors

Engagement of probity advisers and probity auditors

Transport
Education
Health
Compliance
Internal controls and governance
Procurement
Project management
Workforce and capability

Three key agencies are not fully complying with the NSW Procurement Board’s Direction for engaging probity practitioners, according to a report released today by the Acting Auditor-General for New South Wales, Ian Goodwin. They also do not have effective processes to achieve compliance or assure that probity engagements achieved value for money.

Probity is defined as the quality of having strong moral principles, honesty and decency. Probity is important for NSW Government agencies as it helps ensure decisions are made with integrity, fairness and accountability, while attaining value for money.

Probity advisers provide guidance on issues concerning integrity, fairness and accountability that may arise throughout asset procurement and disposal processes. Probity auditors verify that agencies' processes are consistent with government laws and legislation, guidelines and best practice principles. 

According to the NSW State Infrastructure Strategy 2018-2038, New South Wales has more infrastructure projects underway than any state or territory in Australia. The scale of the spend on procuring and constructing new public transport networks, roads, schools and hospitals, the complexity of these projects and public scrutiny of aspects of their delivery has increased the focus on probity in the public sector. 

A Procurement Board Direction, 'PBD-2013-05 Engagement of probity advisers and probity auditors' (the Direction), sets out the requirements for NSW Government agencies' use and engagement of probity practitioners. It confirms agencies should routinely take into account probity considerations in their procurement. The Direction also specifies that NSW Government agencies can use probity advisers and probity auditors (probity practitioners) when making decisions on procuring and disposing of assets, but that agencies:

  • should use external probity practitioners as the exception rather than the rule
  • should not use external probity practitioners as an 'insurance policy'
  • must be accountable for decisions made
  • cannot substitute the use of probity practitioners for good management practices
  • not engage the same probity practitioner on an ongoing basis, and ensure the relationship remains robustly independent. 

The scale of probity spend may be small in the context of the NSW Government's spend on projects. However, government agencies remain responsible for probity considerations whether they engage external probity practitioners or not.

The audit assessed whether Transport for NSW, the Department of Education and the Ministry of Health:

  • complied with the requirements of ‘PBD-2013-05 Engagement of Probity Advisers and Probity Auditors’
  • effectively ensured they achieved value for money when they used probity practitioners.

These entities are referred to as 'participating agencies' in this report.

We also surveyed 40 NSW Government agencies with the largest total expenditures (top 40 agencies) to get a cross sector view of their use of probity practitioners. These agencies are listed in Appendix two.

Conclusion

We found instances where each of the three participating agencies had not fully complied with the requirements of the NSW Procurement Board Direction ‘PBD-2013-05 Engagement of Probity Advisers and Probity Auditors’ when they engaged probity practitioners. We also found they did not have effective processes to achieve compliance or assure the engagements achieved value for money.

In the sample of engagements we selected, we found instances where the participating agencies did not always:

  • document detailed terms of reference
  • ensure the practitioner was sufficiently independent
  • manage probity practitioners' independence and conflict of interest issues transparently
  • provide practitioners with full access to records, people and meetings
  • establish independent reporting lines   reporting was limited to project managers
  • evaluate whether value for money was achieved.

We also found:

  • agencies tend to rely on only a limited number of probity service providers, sometimes using them on a continuous basis, which may threaten the actual or perceived independence of probity practitioners
  • the NSW Procurement Board does not effectively monitor agencies' compliance with the Direction's requirements. Our enquiries revealed that the Board has not asked any agency to report on its use of probity practitioners since the Direction's inception in 2013. 

There are no professional standards and capability requirements for probity practitioners

NSW Government agencies use probity practitioners to independently verify that their procurement and asset disposal processes are transparent, fair and accountable in the pursuit of value for money. 

Probity practitioners are not subject to regulations that require them to have professional qualifications, experience and capability. Government agencies in New South Wales have difficulty finding probity standards, regulations or best practice guides to reference, which may diminish the degree of reliance stakeholders can place on practitioners’ work.

The NSW Procurement Board provides direction for the use of probity practitioners

The NSW Procurement Board Direction 'PBD-2013-15 for engagement of probity advisers and probity auditors' outlines the requirements for agencies' use of probity practitioners in the New South Wales public sector. All NSW Government agencies, except local government, state owned corporations and universities, must comply with the Direction when engaging probity practitioners. This is illustrated in Exhibit 1 below.

Published

Actions for Wellbeing of secondary school students

Wellbeing of secondary school students

Education
Management and administration
Service delivery
Shared services and collaboration
Workforce and capability

The Department of Education has a strong focus on supporting secondary school students’ wellbeing. However, it is difficult to assess how well the Department is progressing as it is yet to measure or report on the outcomes of this work at a whole-of-state level.

The Department of Education’s (the Department) purpose is to prepare young people for rewarding lives as engaged citizens in a complex and dynamic society. The Department commits to creating quality learning opportunities for children and young people, including a commitment to student wellbeing, which is seen as directly linked to positive learning outcomes. Wellbeing is defined broadly by the Department as “the quality of a person’s life…It is more than the absence of physical or psychological illness”. Student wellbeing can be supported by everything a school does to enhance a student's learning—from curriculum to teacher quality to targeted policies and programs to whole-school approaches to wellbeing.

Several reforms have aimed to support student wellbeing in recent years. 'Local Schools, Local Decisions' gave NSW schools more local authority to make decisions, including schools' approaches to support student wellbeing. In 2016, the 'Supported Students, Successful Students' initiative provided $167 million over four years to support the wellbeing of students. From 2018, the 'Every Student is Known, Valued and Cared For' initiative provides a principal led mentoring program, and a website with policies, procedures and resources to support student wellbeing.

This audit assessed how well the Department of Education supports secondary schools to promote and support the wellbeing of their students and how well secondary schools are promoting and supporting the wellbeing of their students.

Conclusion

The Department has implemented a range of programs and reforms aimed at supporting student wellbeing. However, the outcomes of this work have yet to be measured or reported on at a system level, making it difficult to assess the Department's progress in improving student wellbeing.

Secondary schools have generally adopted a structured approach to deliver wellbeing support and programs, using both Department and localised resources. The approaches have been tailored to meet the needs of their school community. That said, public reporting on wellbeing improvement measures via annual school reports is of variable quality and needs to improve.

The Department’s wellbeing initiatives are supported by research and consultation, but outcomes have not been reported on

The Department’s development of wellbeing policy, guidance, tools and resources has been transparent, consultative and well researched. It has drawn on international and domestic evidence to support its aim to deliver a fundamental shift from welfare to wellbeing at the school and system level.

However, the key performance indicator to monitor and track progress in wellbeing has yet to be reported on despite the strategic plan including this as a priority for the period 2018 to 2022. This includes not yet reporting a baseline for the target, nor how it will be measured.

The Department’s wellbeing resources are mostly well targeted but there is room for improvement

The Department’s allocation of resources to deliver wellbeing initiatives in schools is mostly well targeted, reflects a needs basis and supports current strategic directions. This could be improved with some changes to formula allocations and clearer definitions of the resourcing required for identified wellbeing positions in schools. The workforce modelling for forecasting supply and demand, specifically for school counsellors and psychologists, needs to separately identify these positions as they are currently subsumed in general teacher numbers.

Schools' reporting on wellbeing improvement measures is of variable quality and needs to improve

Schools we visited demonstrated a variety of approaches to wellbeing depending on their local circumstances and student populations. They make use of Department policies, guidelines, and resources, particularly mandatory policies and data collections, which have good compliance and take-up at school level. Professional learning supports specific wellbeing initiatives and online systems for monitoring and reporting have contributed to schools’ capacity and capabilities.

Schools report publicly on wellbeing improvement measures through annual school reports but this reporting is of variable quality. The Department plans to improve the capability of schools in data analysis and we recommend that this include the setting and evaluation of improvement targets for wellbeing.

The implementation of the 2015 Wellbeing Framework in schools is incomplete and the Department has not effectively prioritised and consolidated tools, systems and reporting for wellbeing

Schools' take up of the 2015 Wellbeing Framework is hindered by it not being linked to the school planning and reporting policy and tools—the School Excellence Framework. At some schools we visited, this disconnect has led to a lack of knowledge and confidence in using it in schools. The Department has identified the need to improve alignment of policies, frameworks and plans and has commenced work on this.

We found evidence of overburdening in schools for addressing student wellbeing—in the number of tools, online systems for information collection, and duplication in reporting. Following the significant reforms of recent years, the Department should consolidate its efforts by reinforcing existing effective programs and systems and addressing identified gaps and equity issues, rather than introducing further change for schools. In particular, methods and processes for complex case coordination need improvement.

The NSW Department of Education commits to creating quality learning opportunities for students. This includes strengthening students’ physical, social, emotional and spiritual development. The Department sets out to enable students to be healthy, happy, engaged and successful.

Welfare and wellbeing

The Department’s approach has significantly shifted from student welfare to wellbeing of the whole child and young person. Wellbeing is defined in departmental policy and strategy documents broadly, and as directly linked to learning and positive learning outcomes. “Wellbeing can be described as the quality of a person’s life…It is more than the absence of physical or psychological illness…Wellbeing, or the lack of it, can affect a student’s engagement and success in learning…”

Student wellbeing can be supported by everything a school does to enhance a student's learning—from curriculum to teacher quality to targeted policies and programs to whole-school approaches to wellbeing. Distinctions between wellbeing and welfare in the school context are outlined below.

Exhibit 1: Welfare and wellbeing
Welfare Wellbeing
Operates from a basis of student need and doesn't always take into account a whole child view. For all students.
Rather than building on the strengths of students, operates from a deficit model of individual student problems or negative behaviours. Goes beyond just welfare needs of a few students and aims for all students to be healthy, happy, successful and productive individuals who are active and positive contributors to the school and society in which they live.

Source: Department of Education 2018 'Wellbeing is here' presentation.