Actions for Managing demand for ambulance services 2017

Managing demand for ambulance services 2017

Health
Information technology
Management and administration
Risk
Service delivery
Shared services and collaboration
Workforce and capability

NSW Ambulance has introduced several initiatives over the past decade to better manage the number of unnecessary ambulance responses and transports to hospital emergency departments. However, there is no overall strategy to guide the development of these initiatives nor do NSW Ambulance's data systems properly monitor their impact. As a result, the Audit Office was unable to assess whether NSW Ambulance's approach to managing demand is improving the efficiency of ambulance services.

Demand for ambulance services is increasing. Demographic factors including population growth and ageing have contributed to this and ongoing growth in demand is likely. It is important that NSW Ambulance finds ways to respond to this demand more efficiently, while maintaining patient safety standards and meeting community expectations.

Most triple zero calls to NSW Ambulance do not involve medical issues that require an emergency response. NSW Ambulance has introduced a range of initiatives to change the way it manages these less urgent requests for assistance. Its major demand management initiatives include using a telephone advice line, referring some patients to services other than hospital emergency departments and using specialist paramedics to respond to less urgent cases.

The role of NSW Ambulance has changed in recent years. It is aiming to become a ‘mobile health service’ that identifies the needs of patients and provides or refers them to the most appropriate type of care. This change involves a significant expansion of the clinical decision-making role of paramedics. Considerable strategic and organisational efforts are required to make this work. The successful implementation of demand management initiatives is important to NSW Ambulance's ability to continue to meet demand for its services.

This audit assessed NSW Ambulance's major demand management initiatives that aim to reduce unnecessary demand for ambulance responses and unnecessary transport to hospital emergency departments. It aimed to assess the extent to which these initiatives have improved the efficiency of its services.

Conclusion

NSW Ambulance has introduced several initiatives that aim to manage demand for its services from less urgent cases more efficiently. There is no overall strategy for these initiatives and NSW Ambulance’s data systems do not measure their outputs or outcomes. As a result, we are unable to assess the impact of NSW Ambulance's demand management initiatives on the efficiency of ambulance services. More focus is needed to ensure these initiatives achieve the efficiency improvements necessary to help NSW Ambulance meet future increases in demand.

Increasing demand for ambulance services is a key issue for NSW Ambulance. Demand has increased at a faster rate than population growth in recent years and continued growth is expected. NSW Ambulance has introduced several initiatives that aim to manage demand for its services from people with less urgent medical issues more efficiently and align its approach with the rest of the health system in New South Wales.

These individual initiatives lack a broader strategy to guide their development. NSW Ambulance’s demand management initiatives also lack clear goals and performance targets, with insufficient organisational resources allocated to support their implementation. NSW Ambulance does not have a data system that allows it to conduct accurate routine monitoring of the activity and performance of these initiatives.

More effort is required to make demand management initiatives a core part of NSW Ambulance's work. Key relationships with other health services to support demand management initiatives have only recently been established. NSW Ambulance has not communicated proactively with the public about its demand management initiatives. To ensure paramedics are as well prepared as possible for their expanded roles, they need better professional development and up to date technology.

Demand for ambulance services in New South Wales is increasing steadily. Forecast future increases in demand due to population growth and ageing mean that NSW Ambulance must improve its efficiency to maintain its performance.

Demand for ambulance services is growing at a rate higher than population growth. The increase in demand is likely to continue as the population continues to grow and age. NSW Ambulance has made several recent changes to remove large parts of demand for its services, including moving non-emergency patient transport to a separate government agency and changing the way triple zero calls are categorised.

These changes were expected to improve emergency response time performance, but the anticipated improvements have not been achieved. If demand continues to increase as forecast, NSW Ambulance will need to find more efficient ways to manage demand to maintain its performance.

NSW Ambulance has introduced initiatives to change the way it manages demand from patients who have less urgent medical issues. These have the potential to achieve positive results, but we were unable to fully assess their impact because of weaknesses in data systems and monitoring. More needs to be done to demonstrate progress toward the efficiency improvements required.

NSW Ambulance uses a telephone referral system to manage triple zero calls from people with medical issues that do not require an ambulance. This has the potential to achieve efficiency improvements but there are weaknesses in NSW Ambulance's use and monitoring of this system. Paramedics are now able to make decisions about whether patients need transport to a hospital emergency department. NSW Ambulance does not routinely measure or monitor the decisions paramedics make, so it does not know whether these decisions are improving efficiency. Extended Care Paramedics who have additional skills in diagnosing and treating patients with less urgent medical issues were introduced in 2007. NSW Ambulance analysis indicates that these paramedics have the potential to improve efficiency, but have not been used as effectively as possible.

Our 2013 audit of NSW Ambulance found that accurate monitoring of activity and performance was not being conducted. More than four years later, this remains the case. 

NSW Ambulance has recognised the need to change the way it manages demand and has developed initiatives that have the potential to improve efficiency. However, there are significant weaknesses in the strategy for and implementation of its demand management initiatives.

NSW Ambulance has identified the goal of moving from an emergency transport provider to a mobile health service and developed several initiatives to support this. Its demand management initiatives have the potential to contribute to the broader policy directions for the health system in New South Wales. However, there is no clear overall strategy guiding these initiatives and their implementation has been poor.

NSW Ambulance's reasons for changing its approach to demand management have not been communicated proactively to the community. Demand management initiatives that have been operating for over a decade still do not have clear performance measures or targets. Project management of new initiatives has been inadequate, with insufficient organisational resources to oversee them and inadequate engagement with other healthcare providers.

NSW Ambulance uses an in-house Vocational Education and Training course to recruit some paramedics, as well as recruiting paramedics who have completed a university degree. No other Australian ambulance services continue to provide their own Vocational Education and Training qualifications. Paramedics will need more support in several key areas to be able to fulfil their expanded roles in providing a mobile health service. Performance and development systems for paramedics are not used effectively. Up to date technology would help paramedics make better decisions and improve NSW Ambulance's ability to monitor demand management activity.

There are gaps in NSW Ambulance's oversight of the risks of some of the initiatives it has introduced, particularly its lack of information on the outcomes for patients who are not transported to hospital. Weaknesses in the way NSW Ambulance uses its data limit its ability to properly assess the risks of the demand management initiatives it has introduced.

Appendix one - Response from agency

Appendix two - About the audit

Appendix three - Performance auditing

 

Parliamentary reference - Report number #295 - released 13 December 2017

Published

Actions for NorthConnex

NorthConnex

Premier and Cabinet
Treasury
Transport
Compliance
Infrastructure
Internal controls and governance
Management and administration
Procurement

The processes used to assess NorthConnex adequately considered value for money for taxpayers.This report also found that the impact of tolling concessions on road users and the motorway network was consistent with policy objectives described in the 2012 NSW Long Term Transport Master Plan.

NorthConnex is a nine-kilometre tolled motorway tunnel between the M1 Pacific motorway at Wahroonga and the M2 Hills motorway at West Pennant Hills. The total cost for the project is $3.1 billion. NorthConnex will be funded through toll charges, and contributions from the NSW and Australian Governments of up to $405 million each. In January 2015, the NSW Roads Minister signed the final contracts for NorthConnex.

By December 2017, the Department of Premier and Cabinet should:

1. publish an updated ‘Unsolicited Proposals – Guide for Submission and Assessment’ which clarifies obligations with requirements in other NSW Government policies such as the NSW PPP guideline and Infrastructure Investor Assurance Framework. The update should require:

a) a business case to be prepared, and a business case gateway review completed, as part of the assessment of the detailed proposal (currently stage 2)

b) probity reports must be completed and considered before the decision to proceed to the next stage.
 

The Department of Premier and Cabinet and NSW Treasury should immediately:

2. improve record keeping to ensure compliance with the State Records Act 1998 and the NSW Government Standard on Records Management.

 

Published

Actions for Medical equipment management in NSW public hospitals

Medical equipment management in NSW public hospitals

Health
Compliance
Internal controls and governance

In an audit of medical equipment in NSW hospitals, the NSW Auditor-General, Margaret Crawford found that the management of PET-CT scanners could be enhanced by better performance reporting and replacement planning, and that biomedical equipment needed more timely testing and maintenance.

The NSW Auditor-General examined the management of:

  • a high-value piece of equipment primarily used for diagnosing cancer - Positron Emission Tomography and Computed Tomography (PET-CT) scanners
  • a small sample of lower value but critical medical equipment known as biomedical equipment.

Medical equipment needs to be properly managed over its lifecycle, from planning to acquisition, operation and disposal, to ensure patient safety and quality of care.

This audit assessed how well NSW hospitals managed medical equipment to meet the needs of patients. We examined the management of:

  1. Positron Emission Tomography and Computed Tomography (PET-CT) scanners, a high-value piece of equipment commonly used for diagnosing cancer
  2. a small sample of lower value but critical medical equipment known as biomedical equipment.  

We examined five hospitals for this audit: Lismore Base Hospital (in the Northern NSW Local Health District (LHD)), Liverpool Hospital (South Western Sydney LHD), Nepean Hospital (Nepean Blue Mountains LHD), Royal Prince Alfred Hospital (Sydney LHD) and Westmead Hospital (Western Sydney LHD).

Conclusion 

Management of PET-CT scanners

PET-CT scanners were well managed, though could be enhanced by better performance reporting and replacement planning.


The PET-CT scanners we reviewed were well utilised and there was prompt reporting of scan results by specialists to referring doctors.  

In 2015–16, 10 per cent of PET-CT scans were inpatient services (funded mostly by NSW Health), 60 per cent were Medicare-funded outpatient services, and the remaining 30 per cent were privately referred outpatient services not funded by Medicare. Service costs for privately referred scans not funded by Medicare were met by a range of sources, including hospitals’ general purpose funds and patient out-of-pocket charges. Across the five hospitals, out-of-pocket charges varied and ranged from $250 to $950 per scan.  

While responsibility for providing PET-CT services has been delegated to Local Health Districts, NSW Health could assume an enabling role in collating performance reporting to inform service planning and benchmarking.

There was little equipment replacement planning for PET-CT scanners, making it unclear when and how equipment might be replaced, including what model of funding might apply.

Management of biomedical equipment

Improvement is needed in the timeliness of testing and maintenance for biomedical equipment. Outdated and inefficient information systems used for day-to-day management of biomedical equipment need to be improved or replaced.


Only about half of the items of equipment included in our sample had testing and maintenance completed according to scheduled intervals or within 30 days of the scheduled date. These intervals were set under the Australian/New Zealand Standard 3551 ‘Management programs for medical equipment’, which requires regular testing and maintenance of biomedical equipment to ensure it is safe and suitable for clinical use.

The information systems used to record service histories of biomedical equipment were inefficient and inadequate for effective planning, monitoring and reporting of testing and maintenance. The implementation of a state-wide asset management system, Asset and Facilities Management Online (AFM Online), which will replace existing systems, has experienced delays. In addition, hospitals did not maintain adequate oversight of testing and maintenance that was outsourced to external contractors.

Management of PET-CT scanners

PET-CT scanners were well utilised and reports were promptly sent to referring doctors

PET-CT scanners in Liverpool, Westmead and Royal Prince Alfred Hospitals were utilised to over 85 per cent of capacity. Utilisation at Nepean Hospital (around 60 per cent) was lower due to the age of the equipment and insufficient ‘uptake rooms’ for patients to receive radioactive injections. Lismore Base Hospital had a lower population to service and scheduled its PET-CT patients into three days a week to optimise efficiency.

PET-CT services were generally available to patients in a timely way and reports were promptly sent back to referring doctors. While clinicians we interviewed advised that there was generally no delay in patients accessing PET-CT scanners, only one hospital collected patient waiting time data to confirm this view.

Funding of PET-CT scans is complex

The funding of health services in NSW public hospitals involves a complex arrangement between the Australian and NSW Governments. In 2015–16, 10 per cent of PET-CT scans were inpatient services (funded mostly by NSW Health), 60 per cent were Medicare-funded outpatient services, and the remaining 30 per cent were privately referred outpatient services not funded by Medicare. Service costs for privately referred scans not funded by Medicare were met by a range of sources, including hospitals’ general purpose funds and patient out-of-pocket charges. Across the five hospitals, out-of-pocket charges varied and ranged from $250 to $950 per scan.

Better performance reporting could enable better planning of PET-CT scanners

NSW Health has delegated the planning functions for many pieces of high-value medical equipment, including PET-CT scanners, to Local Health Districts. This is intended to ensure local decision-making that is responsive to local community needs.

While local planning and service delivery is delegated to each Local Health District, under the Health Administration Act 1982, the Secretary of NSW Health is responsible for planning the provision of comprehensive, balanced and co-ordinated health services throughout New South Wales.

NSW Health could enable better service delivery and planning by collating and sharing performance information about PET-CT services across Local Health Districts.  

Equipment replacement planning was unclear 

Planning for future replacement of PET-CT scanners at the hospitals we examined was unclear, including when equipment would be replaced and what funding model might be applied. A better practice would be to have a clear equipment replacement plan for existing scanners that would ensure clarity about when equipment will be replaced, whether the replacement scanner should be leased, purchased or shared, and possible funding sources.

Management of biomedical equipment 

Equipment testing and maintenance did not always comply with intervals set under the Australian/New Zealand Standard All hospitals we examined adopted the Australian/New Zealand Standard 

All hospitals we examined adopted the Australian/New Zealand Standard 3551 ‘Management programs for medical equipment’ (the Standard) for managing medical equipment, the purpose of which is to ensure that equipment is safe and suitable for use. The Standard requires the regular testing and maintenance of biomedical equipment at predetermined intervals.  

Our review of three years of service records for 50 items of biomedical equipment found that:

  • nineteen (38 per cent) items of equipment were tested and maintained within the intervals determined by hospitals under the Standard
  • five (ten per cent) had at least one instance where they were tested and maintained less than 30 days later than when the work was due
  • thirteen (26 per cent) had at least one instance where they were tested and maintained one to six months later than when the work was due
  • six (12 per cent) had at least one instance where they were tested and maintained more than six months later than when the work was due
  • seven (14 per cent) were lost, removed from clinical use or unable to be unidentified.

The Standard envisages that there may be circumstances when testing and maintenance does not occur according to schedule, and sets out a procedure that should be followed when testing and maintenance is overdue. This procedure was not followed in any of the hospitals we reviewed.  

Two out of five audited hospitals used risk rating to oversee equipment maintenance

Only two out of five hospitals we examined used risk rating, under which equipment is classified according to clinical risk, to prioritise equipment maintenance and to determine appropriate frequencies for equipment testing and maintenance.  

Some hospitals had inadequate oversight of work performed by external contractors

There was variable oversight of outsourced service contracts for high-risk biomedical equipment. In some cases, hospitals did not maintain complete histories of testing and maintenance work performed by contractors. Some contractors had incorrectly recorded items they had tested, or had refused to provide details of testing and maintenance performed.

New peer review process may improve assurance over testing and maintenance

NSW Health has started a peer review process in a small number of hospitals. This process covers a range of performance indicators relating to equipment management practices, including the auditing of test and maintenance records for two pieces of equipment per hospital. There is opportunity to build upon this effort by including all hospitals in the peer review process, and by expanding the sample of equipment subject to records audit.  

Hospitals’ record keeping of testing and maintenance service histories was inefficient and inadequate

The Standard requires that adequate and traceable equipment maintenance histories be kept. We found that hospitals’ record keeping of equipment service histories was inefficient and inadequate. None of the hospitals used an information system that provided the full three-levels of capability outlined below:

  • storing equipment information electronically, allowing easy retrieval
  • managing service requests and holding full service histories and test results
  • automatically generating reports to allow risk based prioritisation of equipment maintenance, repairs and replacements.

There is an urgent need to implement the state-wide asset management system for biomedical equipment

Hospitals advised that the current outdated systems will be replaced by a state-wide asset management system, Asset and Facilities Management Online, though this implementation has experienced delays.

There was good governance over equipment acquisition, replacement and disposal

All hospitals had formal processes for acquiring and replacing biomedical equipment, including management committees to oversee equipment needs. Equipment disposal processes were aligned with relevant standards and policies.

All hospitals purchased the majority of their biomedical equipment through HealthShare, the central procurement agency of NSW Health. This contributed to cost savings across the health system.

Management of medical equipment in the NSW public health system

In New South Wales, responsibility for the management of public hospitals is devolved from the NSW Ministry of Health to 15 Local Health Districts and two Speciality Health Networks.The Secretary of NSW Health retains a function under the Health Administration Act 1982 to plan the provision of comprehensive, balanced and co-ordinated health services throughout the State.

Every year, the Ministry of Health and Local Health Districts sign a service agreement that sets out the expected performance from Local Health Districts and the funding they will receive to provide their services. Under these arrangements, responsibility for managing medical equipment is delegated to Local Health Districts.  

Medical equipment is used to diagnose, treat and manage patients. It includes items as diverse as patient beds, dialysis machines, operating tables and heart monitors. The good management of medical equipment contributes to ensuring patient care and safety, as well as keeping the cost burden on the public health system low.

The New South Wales public health system uses a wide range of medical equipment. Most of this equipment is used in hospital settings, however, some is also used in community health centres and patients’ homes. The cost of individual items ranges from less than $100 to several million dollars. In total, about $1.2 billion, or six per cent of NSW Health’s total asset value, was for medical equipment.

The approach used to manage medical equipment varies between hospitals, and between expensive and less-expensive items. Different service models are also used, for example, some items may be purchased in one hospital, but leased in another.  

About the audit

This audit assessed how well NSW public hospitals managed medical equipment to meet the needs of patients. We looked at the lifecycle of biomedical equipment, which comprises planning, acquisition, operation and maintenance, and then replacement and disposal. The audit questions in relation to each stage of the lifecycle are summarised in Exhibit 1. 

By June 2018 

  1. NSW Health should review all services provided by Local Health Districts which use high-value medical equipment (with establishment cost that exceeds $3 million), to determine whether state-level coordination, service benchmarking and equipment usage reporting is warranted.

  2. NSW public hospitals offering PET-CT services should collect and use patient waiting time data (the difference between the date of referral and the actual date of the scan) as part of improving service efficiency and meeting patient needs.

  3. Local Health Districts should ensure that there is a formal equipment replacement plan at the time of procuring high-value equipment, for both new and existing services. The plan should include an estimated time of replacement. The Ministry of Health should regularly review capital funding implications from these planned equipment replacements.

By June 2019

4. NSW public hospitals should review internal business rules and processes for biomedical equipment management to ensure that:  

a) equipment is accessible by service technicians for testing and maintenance work, including establishing internal processes to assist service technicians in gaining access to equipment that has missed previous testing and maintenance attempts in accordance with the Australian/New Zealand Standard 3551

b) adequate maintenance records are kept, including descriptions of testing and maintenance work carried out in accordance with the Australian/New Zealand Standard 3551

c) there is regular reporting to Local Health District Chief Executives on the compliance of equipment testing and maintenance, including equipment that is tested or maintained later than scheduled intervals

d) there is specified statement of risk tolerance for late equipment testing and maintenance and mechanisms to appropriately prioritise equipment testing and maintenance.

5. Ministry of Health should encourage that all NSW public hospitals have their biomedical equipment management practices reviewed under the new peer review process, and that the review sample from each hospital be increased to more than two pieces of equipment per hospital.

6. Ministry of Health should complete the implementation of AFM Online for biomedical equipment management.

Appendix One - Response from NSW Health

Appendix Two - About the Audit

 

Parliamentary reference - Report number #286 - released 25 May 2017

Published

Actions for Building the readiness of the non-government sector for the NDIS

Building the readiness of the non-government sector for the NDIS

Community Services
Internal controls and governance
Management and administration
Project management
Risk
Service delivery
Shared services and collaboration
Workforce and capability

The Department of Family and Community Services has managed the risks of the transition to the National Disability Insurance Scheme (NDIS) in New South Wales effectively by increasing the overall capacity of the non-government sector and investing in provider capability.

The National Disability Insurance Scheme (NDIS) is a major reform that aims to change the way disability support is provided and received. Responsibility for overseeing the system to support people with disability in New South Wales will transfer from the NSW Government to the National Disability Insurance Agency (NDIA), an independent statutory agency of the Australian Government. Eligible people with disability will receive individual funding from the NDIA and purchase support from their chosen service providers, rather than being referred to services funded or provided by government. The NSW Government will transfer all disability services it currently provides to the non-government sector.

Approximately 78,000 people received NSW Government-funded disability support in 2015–16 at a cost of around $3.3 billion. An estimated 142,000 people will have an individual NDIS support plan in New South Wales, with total funding rising to around $6.8 billion in 2018–19. NDIS trials began in New South Wales in 2013. The full scheme was introduced in July 2016 and is scheduled to be operating across the state by July 2018.

This audit assessed the effectiveness of the NSW Department of Family and Community Services' (the Department's) management of the risks of the NDIS transition in New South Wales. It focused on the Department's work to build the readiness of the non-government sector for the NDIS. To make this assessment, we asked whether:

  1. the Department supported the non-government sector to build capacity to meet the expected increase in demand under the NDIS
  2. the Department supported disability service providers in NSW to improve their capability to deliver NDIS services
  3. the Department's work to prepare for the NDIS has been coordinated with the Australian Government's NDIS readiness work.

In addition to the audit questions above, this audit identified principles governments should consider when building the capacity and capability of the non-government sector to deliver human services.

Conclusion

The Department of Family and Community Services has managed the risks of the transition to the NDIS in New South Wales effectively by increasing the overall capacity of the sector and investing in provider capability building initiatives. More work is needed to build the sector's capacity to provide services to people with more complex support needs and to help existing providers complete the transition to the NDIS successfully.

The Department expanded the capacity of the non-government sector over the past decade in a way that was consistent with NDIS objectives. The development of a national market and workforce for the NDIS is an Australian Government responsibility and the Department has supported the Australian Government's work. More targeted work will be needed to build the capacity of the non-government sector to provide services to people with the most complex support and access needs.

The Department invested in provider capability building by funding programs that were delivered in partnership with sector peak bodies. The larger programs were evaluated and received positive feedback, but many providers will need more support to transition to the NDIS. The overall impact of the programs on provider readiness for the NDIS is not clear because baseline information on provider capability was not collected and targets for improvement were not set.

The Department managed the transition coordination risks by establishing comprehensive governance arrangements, contributing to the Australian Government's sector development work through national policy coordination forums and sharing lessons from New South Wales.

Building the capacity of the non-government sector

The Department supported an increase in the capacity of non-government providers

The Department started building the capacity of the non-government sector before the NDIS was developed. This included moving services provided by government into the non‑government sector, funding early intervention and community-based disability support, and introducing some individual support packages. The Department checks that the business and operational systems of non-government disability providers are adequate. However, its understanding of the outcomes for people using the services is limited.

Service gaps are possible for people with more complex support or access needs

There are risks to the supply of services to people who have more complex support or access needs, including people who need specialist clinical support, people in remote areas, Aboriginal and Torres Strait Islander communities and culturally and linguistically diverse communities. The Department has supported the NDIA's initial market development work and funded some programs to help providers build their capacity to support these groups.  However, there is a risk the market will not expand quickly enough to meet the increase in demand for services.

Sector sustainability depends on support from outside the disability services sector

The sustainability of funded disability services provided by the non-government sector depends on support from outside the sector. Most people with disability receive significant unpaid support from family members, so carers will play a key role in the sustainability of the NDIS. There are opportunities for organisations that do not provide specific disability services to contribute to sector sustainability by providing some NDIS services. To do this, many will need help to make their services more accessible and inclusive to people with disability.

Helping non-government providers develop their capability

The Department invested in capability building programs for providers

The Department has spent more than $30 million over six years on programs that aim to improve the capability of disability support providers. This work began before the NDIS was established and was adjusted to focus on NDIS readiness from December 2012. It was guided by an industry development strategy that was developed after consultation with the sector and delivered in partnership with sector peak bodies. This approach gave the sector some responsibility for developing its own capability, which is important because the sector will not receive support from the NSW Government after the transition to the NDIS.

The overall impact of the programs on the capability of providers is not clear

The overall effectiveness of the Department's spending on provider capability is not clear. The Department had some information on the general financial health and organisational capability of providers from previous industry development work. However, baseline information on provider capability was not collected before programs commenced and targets for improvements in provider capability were not set. Without this information, the Department cannot demonstrate clearly that the capability building programs it funded represent good value for money.

Most providers will need more support to transition to the NDIS effectively

In late 2015, the Department assessed the transition progress of providers in New South Wales. This assessment indicates almost one third of providers are highly likely to need additional assistance to transition to the NDIS successfully, with only 14 per cent unlikely to need further assistance. We conducted a survey of 299 providers in New South Wales in August 2016. Most reported that they feel they are on track to transition to the NDIS successfully. Sixty-two per cent said the Department-funded programs and resources they had used had improved their readiness for the NDIS. Fifty-four per cent said the changes made because of using these programs and resources had a lasting impact on their organisation.

Coordinating sector development

Governance systems and planning processes for the NDIS transition were established

The Department developed governance arrangements for the transition in New South Wales. It contributed actively to the development of national policy and strategy documents including a strategy for national market development.

The Department shared sector readiness lessons with the Australian Government

Two NDIS sector readiness programs funded by the NSW Government were later expanded to national programs through funding from the Australian Government. New South Wales only received around five per cent of the total Australian Government funding for NDIS sector readiness initiatives. A report by the Australian National Audit Office in 2016 found there was limited evidence of a strategic approach by the Australian Government when allocating this funding to states and territories.

The Department has monitored transition issues and mitigated these where possible

The Department has monitored administrative issues for providers, which have included the changes in funding arrangements and registering for the NDIS. It has taken action to mitigate these where possible, although some issues, such as the operation of NDIA administrative systems, are beyond its control.

The National Disability Insurance Scheme (NDIS)

The NDIS is a fundamental change to the disability support system

The NDIS is a major reform that aims to make significant changes to the way disability support is provided and received. Under the NDIS, the administration of funding for disability support in New South Wales will transfer from the NSW Government to the National Disability Insurance Agency (NDIA), an independent statutory agency of the Australian Government. The NSW and Australian Governments will both contribute to funding the NDIS. The size of the disability services sector in New South Wales is expected to more than double when the NDIS is fully operational (Exhibit 1).

Exhibit 1: Estimated increase in the disability services sector under the NDIS
Measure of sector capacity Pre-NDIS (2015-16) NDIS (2018-19)
Funding for services $3.3 billion $6.8 billion
People receiving support 78,000 142,000
Workforce required 25,000-30,000 48,000-59,000
Number of providers 699 Determined by the market

Sources: NSW Government Budget Paper No.3, 2015–16; NDIS NSW Market Position Statement, March 2016; Department of Family and Community Services Funding Management System, 2015–16 (unpublished).

One of the main objectives of the NDIS is to increase the choice and control that people with disability have over the support they receive. Under the NDIS, people with disability receive individual funding packages which they can use to pay their chosen providers for the support they need, instead of being referred to services that are deemed appropriate for their needs. This is a fundamental change to the nature of disability support. Before the NDIS, people with disability were moved around the system according to decisions made by government or other organisations providing disability support. Under the NDIS, the funding will move around the system based on the choices people with disability make. The development of the new market for NDIS disability services is expected to take up to ten years because the changes to the system are so extensive.

In addition to increasing choice and control for participants, the NDIS aims to:

  • improve outcomes for people with disability by intervening early to help reduce the need for support later in life
  • increase integration by helping people with disability access mainstream government services such as health and education
  • increase the involvement of people with disability in the community by making it easier to access community services such as sports clubs and community groups.

The transition to the NDIS is underway

The transition to the NDIS is underway in most Australian states and territories, following trials over the last three years. In New South Wales, a trial site was established in the Hunter area in July 2013. Early roll out of the NDIS began in July 2015 for people aged under 18 in the Nepean Blue Mountains area. On 30 June 2016, about 7,800 people had an NDIS plan in the Hunter trial site and around 1,800 people had a plan in the Nepean Blue Mountains area.

The full roll out of the NDIS began in about half of New South Wales in July 2016. The NDIS will start operating in the rest of the state from July 2017 and the transition is scheduled to be completed by July 2018 (Exhibit 2).

For the rest of the transition, the Department of Family and Community Services should:

  1. Work with the Australian Government, NDIA and other NSW Government agencies to identify gaps and develop the capacity of specialist clinical services, focusing on regional and rural areas.
  2. Continue to implement projects to increase the number of organisations that can support Aboriginal and Torres Strait Islander and culturally and linguistically diverse communities.
  3. Target remaining capability building assistance to less prepared providers, including via one-to-one support and mentoring in identified areas of weakness.
  4. Continue working with the Australian Government and the NDIA to ensure lessons from sector capability programs are shared.

Principles for developing the non-government sector

  1. Commence work to increase the capacity of the non-government sector early to allow time for service capacity to be built in a sustainable way.
  2. Decide whether to increase the capacity of the sector by supporting existing providers to expand their operations, attracting new organisations from outside the existing provider group, or some combination of these.
  3. Tailor approaches to supporting groups that have additional support or access needs because of cultural or geographic factors.
  4. Define the desired outcomes for people using services and, where possible, include outcomes in service delivery contracts.
  5. Invest in the sector by partnering with sector peak bodies to deliver capability programs.
  6. Include one-to-one support and mentoring in capability building programs where possible to improve the targeting of support to the specific needs of providers.
  7. Collect baseline information on provider capability before commencing programs and build robust tracking and evaluation into their design.
  8. Establish whole-of-government governance arrangements to ensure roles, responsibilities and accountability for delivery are clear.