Actions for Report on Local Government 2020

Report on Local Government 2020

Local Government
Asset valuation
Compliance
Cyber security
Financial reporting
Fraud
Information technology
Infrastructure
Internal controls and governance
Procurement

What the report is about

Results of the local government sector council financial statement audits for the year ended 30 June 2020.

What we found

Unqualified audit opinions were issued for 127 councils, 9 county councils and 13 joint organisation audits in 2019–20. A qualified audit opinion was issued for Central Coast Council.

Councils were impacted by recent emergency events, including bushfires and the COVID-19 pandemic. The financial implications from these events varied across councils. Councils adapted systems, processes and controls to enable staff to work flexibly.

What the key issues were

There were 1,435 findings reported to councils in audit management letters.

One extreme risk finding was identified related to Central Coast Council’s use of restricted funds for general purposes.

Fifty-three high risk matters were identified across the sector:

  • 21 high risk matters relating to asset management
  • 14 high risk matters relating to information technology
  • 7 high risk matters relating to financial reporting
  • 4 high risk matters to council governance procedures
  • 3 high risk matters relating to financial accounting
  • 3 high risk matters relating to purchasing and payables
  • 1 high risk matter relating to cash and banking.

More can be done to reduce the number of errors identified in financial reports. 61 councils required material adjustments to correct errors in previous audited financial statements.

Fast facts

  • 150 councils and joint organisations in the sector
  • 99% unqualified audit opinions issued for the 30 June 2020 financial statements
  • 490 monetary misstatements were reported in 2019-20
  • 61 prior period errors reported
  • 53 high risk management letters findings identified
  • 49% of reported issues were repeat issues

Rural fire fighting equipment

Sixty-eight councils did not record rural fire fighting equipment worth $119 million in their financial statements.

The NSW Government has confirmed these assets are not controlled by the NSW Rural Fire Service and are not recognised in the financial records of the NSW Government.

What we recommended

The Office of Local Government should communicate the State's view that rural firefighting equipment is controlled by councils in the local government sector, and therefore this equipment should be properly recorded in their financial statements.

Central Coast Council

A qualified opinion was issued for Central Coast Council (the Council) relating to two matters.

Council did not conduct the required revaluation to support the valuation of roads.

Council also disclosed a prior period error relating to restrictions of monies collected for their water, sewer, and drainage operations, which, based on the NSW Crown Solicitor’s advice, should be considered a change in accounting policy.

What we recommended

The Office of Local Government should clarify the legal framework relating to restrictions of water, sewerage and drainage funds (restricted reserves) by either seeking an amendment to the relevant legislation or by issuing a policy instrument to remove ambiguity from the current framework.

Key financial information

In 2019-20, councils:

  • collected $7.3 billion rates and annual charges
  • received $4.7 billion grants and contributions 
  • incurred $4.8 billion of employee benefits and on-costs
  • held $14.2 billion of cash and investments
  • managed $160.0 billion of infrastructure, property, plant and equipment
  • entered into $3.3 billion of borrowings.

Further information

Please contact Ian Goodwin, Deputy Auditor-General on 9275 7347 or by email.

 

Financial reporting is an important element of good governance. Confidence in and transparency of public sector decision making are enhanced when financial reporting is accurate and timely.

This chapter outlines audit observations related to the financial reporting of councils and joint organisations.

Highlights

  • The Office of Local Government within the Department of Planning, Industry and Environment (OLG) extended the statutory deadline for councils and joint organisations to lodge their audited financial statements by an additional month to 30 November 2020 due to the COVID-19 pandemic.
  • One hundred and thirty-three councils and joint organisations (2019: 117) lodged audited financial statements with the OLG by the revised statutory deadline of 30 November (2019: 30 October). Sixteen (2019: 30) councils received extensions to submit audited financial statements to OLG. Canberra Region Joint Organisation did not submit their audited financial statements by the statutory deadline and did not formally apply for extension before the deadline lapsed.
  • Unqualified audit opinions were issued for 127 councils, nine county councils and 13 joint organisation audits in 2019–20. A qualified audit opinion was issued for Central Coast Council.
  • Unqualified audit opinions were issued for the 2018–19 financial audits of Hilltops, MidCoast and Murrumbidgee Councils, which were not completed at the time of tabling the 'Local Government 2019' report in Parliament.
  • The total number and dollar value of corrected and uncorrected financial statement errors increased compared with the prior year.
  • Sixty-eight councils did not record rural fire fighting equipment in their financial statements worth $119 million. The NSW Government has confirmed these assets are not controlled by the NSW Rural Fire Service and are not recognised in the financial records of the NSW Government.
  • The total number of prior period financial statement errors increased from 59 in the prior year to 61, but the total dollar value of the errors decreased from $1,272 million to $813 million.
  • Councils implemented three new accounting standards in 2019–20 relating to revenue and leases.

 

Recent emergency events, including drought, bushfires, floods and the COVID-19 pandemic have impacted councils.

This chapter will provide insights into how these events have impacted councils, including:

  • financial implications of the emergency events
  • changes to councils' operating models, processes and controls
  • accessibility to technology and the maturity of councils' systems and controls to prevent unauthorised and fraudulent access to data
  • receipt and delivery of stimulus packages or programs at short notice.

Highlights

  • All councils were impacted by the recent emergency events.
  • Councils changed governance, policies, systems and processes to respond to the recent emergency events.
  • Challenges were experienced adapting Information Technology (IT) infrastructure and controls to enable staff to work from home.
  • Sixty-five per cent of councils updated business continuity plans and 42 per cent updated disaster recovery plans as a response to recent emergency events.
  • Councils received various forms of assistance from government relating to the recent emergencies, which was used to provide support to local communities.

Recent emergency events significantly impacted councils

Recent emergencies, including drought, bushfires, floods and the COVID-19 pandemic have brought particular challenges for councils and their communities.

 

A strong system of internal controls enables councils to operate effectively and efficiently, produce reliable financial reports, comply with laws and regulations and support ethical government.

This chapter outlines the overall trends in governance and internal control findings across councils, county councils and joint organisations in 2019–20. It also includes the findings reported in the 2018–19 audits of Hilltops, MidCoast and Murrumbidgee councils as these audits were finalised after the Report on Local Government 2019 was published.

Financial audits focus on key governance matters and internal controls supporting the preparation of councils' financial statements. Audit findings are reported to management and those charged with governance through audit management letters.

Highlights

  • Total number of findings reported in audit management letters decreased from 1,985 in 2018–19 to 1,435 in 2019–20.
  • One extreme risk finding was identified in 2019–20 (2018–19: nil).
  • Total number of high-risk findings decreased from 82 in 2018–19 to 53 in 2019–20. Thirty per cent of the high-risk findings identified in 2018–19 were reported as high-risk findings in 2019–20.
  • Forty-nine per cent of findings reported in audit management letters were repeat or partial repeat findings.
  • Governance, asset management and information technology (IT) comprise over 61 per cent of findings and continue to be key areas requiring improvement.
  • Fifty-six councils could strengthen their policies, processes and controls around fraud prevention and legislative compliance.
  • Sixty-eight councils had deficiencies in their processes to revalue infrastructure assets.
  • Fifty-eight councils have yet to implement basic governance and internal controls to manage cybersecurity.
  • Sixty-four councils should formalise and periodically review their IT policies and procedures.

Total number of findings reported in audit management letters decreased

In 2019–20, 1,435 findings were reported in audit management letters (2018–19: 1,985 findings). An extreme risk finding was also identified this year related to Central Coast Council's use of restricted funds. The total number of high-risk findings decreased to 53 (2018–19: 82 high-risk findings).

Findings are classified as new, repeat or ongoing findings, based on:

  • new findings were first reported in 2019–20 audits
  • repeat findings were first reported in prior year audits, but remain unresolved in 2019–20
  • ongoing findings were first reported in prior year audits, but the action due dates to address the findings are after 2019–20.

Findings are categorised as governance, financial reporting, financial accounting, asset management, purchases and payables, payroll, cash and banking, revenue and receivables, or information technology. The high-risk and common findings across these areas are explored further in this chapter.

Audit Office’s work plan for 2020–21 onwards

Focus on local council's response and recovery from recent emergencies

Local councils and their communities will continue to experience the effects of recent emergency events, including the bushfires, floods and the COVID 19 pandemic for some time. The full extent of some of these events remain unclear and will continue to have an impact into the future. The recovery is likely to take many years.

The Office of Local Government (OLG) within the Department of Planning, Industry and Environment is working with other state agencies to assist local councils and their communities to recover from these unprecedented events.

These events have created additional risks and challenges, and changed the way that councils deliver their services.

We will take a phased approach to ensure our financial and performance audits address the following elements of the emergencies and the Local Government's responses:

  • local councils' preparedness for emergencies
  • its initial responses to support people and communities impacted by the 2019–20 bushfires and floods, and COVID-19
  • the governance and oversight risks that arise from the need for quick decision making and responsiveness to emergencies
  • the effectiveness and robustness of processes to direct resources toward recovery efforts and ensure good governance and transparency in doing so
  • the mid to long-term impact of government responses to the natural disasters and COVID-19
  • whether government investment has achieved desired outcomes.

Planned financial audit focus areas in Local Government

During 2020–21, the financial audits will focus on the following key areas:

  • cybersecurity, including:
    • cybersecurity framework, policies and procedures
    • assessing the controls management has to address the risk of cybersecurity incidents
    • whether cybersecurity risks represent a risk of material misstatement to council's financial statements
  • budget management
  • financial sustainability
  • quality and timeliness of financial reporting
  • infrastructure, property, plant and equipment
  • information technology general controls.

Audit, risk and improvement committees

All councils are required to have an audit, risk and improvement committee by March 2022

The requirement for all councils to establish an audit, risk and improvement committee was deferred by 12 months to March 2022 due to the COVID 19 pandemic.

Audit, risk and improvement committees are an important contributor to good governance. They help councils to understand strategic risks and how they can mitigate them. An effective committee helps councils to build community confidence, meet legislative and other requirements and meet standards of probity, accountability and transparency.

Local Government elections

Local Government elections were postponed for one year due to the COVID 19 pandemic

The Local Government elections were deferred for one year due to the COVID 19 pandemic and will now be held on 4 September 2021. As the statutory deadline for the 2020–21 financial statements is 30 October 2021, some of the newly elected councillors will be required to endorse them.

Implementation of AASB 1059

Accounting standards implementation continue next year

AASB 1059 is effective for councils for the 2020–21 financial year.

A service concession arrangement typically involves a private sector operator that is involved with designing, constructing or upgrading assets used to provide public services. They then operate and maintain those assets for a specified period of time and is compensated by the public sector entity in return. Examples of potential service concession arrangements impacting councils include roads, community housing, childcare services and nursing homes.

AASB 1059 may result in councils recognising more service concession assets and liabilities in their financial statements.

 

Appendix one – Response from the Department of Planning, Industry and Environment

Appendix two – NSW Crown Solicitor’s advice

Appendix three – Status of 2019 recommendations

Appendix four – Status of audits

 

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Published

Actions for Addressing public inquiry recommendations - Emergency response agencies

Addressing public inquiry recommendations - Emergency response agencies

Community Services
Justice
Environment
Internal controls and governance

The Auditor-General for New South Wales, Margaret Crawford, released a report today examining how effectively NSW emergency response agencies address public inquiry recommendations.

The audit found that agencies’ governance arrangements to address public inquiry recommendations have important and consistent gaps. 

The agencies did not sufficiently verify that they had implemented accepted recommendations as intended, and in line with the outcomes sought. This creates a risk that issues with disaster prevention or responses highlighted by public inquiries are not addressed in a complete or timely way and may persist or recur in the future. 

The audit also found that agencies did not always nominate milestone dates or priority rankings for accepted recommendations, and so could not demonstrate they were managing or monitoring them effectively.

The audit examined how five emergency response agencies – Fire and Rescue NSW, National Parks and Wildlife Service, NSW Rural Fire Service, NSW State Emergency Service and Resilience NSW – have addressed accepted recommendations from public inquiries over the last ten years. The audit assessed the effectiveness of governance arrangements to track recommendation implementation.

The report makes six recommendations to improve disaster response agency arrangements to address public inquiry recommendations.  

While the focus of this audit was agencies that responded to natural disasters, the findings and recommendations from this report have the potential to be applied across the NSW public sector in response to public inquiries related to other areas of government activity.

Major disasters and emergencies often trigger public post-event inquiries and reviews. The purpose of these reviews is to identify the causes of disaster or emergency events and areas for future improvement in prevention, preparedness, response and recovery. Areas identified for future improvement are then the subject of recommendations to government or government agencies and, when accepted, become public commitments to action.

Responses to the bushfires of 2019–20 followed this pattern, producing both NSW and Australian Government commissioned inquiries: the NSW Bushfire Inquiry and the Royal Commission into National Natural Disaster Arrangements. Both highlighted the significant volume of inquiries in recent years. Both asked whether agency responses to previous inquiries were improving Australia's capacity to prevent, prepare for, respond to and recover from natural disasters. The inquiries reflected on the difficulty of answering this question due to insufficient clarity and transparency on whether the improvements and risks that inquiries identified have been addressed in practice.

This audit stems from similar questions about how effectively government agencies in NSW are delivering on public inquiry recommendations. It assessed how five emergency response agencies have addressed accepted recommendations from 17 public inquiries over the last ten years. For this audit, we considered inquiries and reviews that affected agencies' operational capacity to respond to and recover from bushfire, floods and storms. The in scope public inquiries for this audit relate to:

  • the 2013–14, the 2016–17 and the 2017–18 bushfire seasons
  • severe storms and floods in 2015, 2016 and 2017
  • workforce issues affecting the ability of agencies to respond to natural disasters.

The public inquiries we reviewed included coronial inquiries and inquests, parliamentary inquiries, independent reports and reviews, performance audits and recovery coordinator reports. In total, we looked at the processes that agencies used to implement 191 recommendations from these 17 public inquiries.

The objective of this audit was to determine how effective emergency response agencies are in addressing accepted recommendations from public inquiries. To answer our audit objective, we asked two questions:

  • Do agencies have effective governance arrangements in place to respond to, monitor and implement accepted recommendations from public reviews and inquiries?
  • Do agencies provide timely and accurate information on the implementation of accepted inquiry recommendations to senior decision makers and the public?

The agencies reviewed were:

  • Fire and Rescue NSW
  • NSW National Parks and Wildlife Service (now a division of the Department of Planning, Industry and Environment)
  • NSW Rural Fire Service
  • NSW State Emergency Service
  • Resilience NSW (formerly the Ministry for Police and Emergency Services; and the Office of Emergency Management).

While the focus of this audit was agencies that respond to natural disasters (flood, bushfire and storms), the findings and recommendations from this report have the potential to be applied across the NSW public sector in response to public inquiries related to other areas of government activity.

Conclusion

The arrangements used by NSW emergency response agencies to address public inquiry recommendations have important and consistent gaps.

For two-thirds of the recommendations reviewed as part of this audit, the agencies did not sufficiently verify that they had been implemented as intended, and in line with the outcomes sought. This exposes risks that gaps in disaster responses are not addressed in a complete or timely way and persist or recur in the future.

Two-thirds of the recommendations reviewed as part of this audit had also not been allocated milestone dates or priority rankings, and as such the audited agencies are less accountable and could not demonstrate they were managing or monitoring them effectively.

None of the agencies publicly report the status of actions taken to address public inquiry recommendations, limiting accountability and transparency.

The agencies subject to this audit all address accepted recommendations from public inquiries with varying degrees of formality and transparency. No agency maintained a central and comprehensive approach – such as a register – to track recommendations for all public inquiries.

The agencies do not consistently review evidence that recommendations have been implemented effectively, and in line with the intention of the inquiry. The agencies also often failed to set milestone dates or test that recommendations had been actioned as committed. This increases the risk that recommendations are overlooked or not addressed in line with the intent, priority and risk of the recommendation. In turn, this raises the possibility that gaps and issues identified by public inquiries are not adequately resolved and could persist or recur in future disasters.

None of the audited agencies published a summary of progress made in implementing accepted recommendations to update the public. There are transparency and accountability benefits in doing so. This echoes the findings of the NSW Bushfire Inquiry and the Royal Commission into National Natural Disaster Arrangements. Both inquiries noted that it is difficult, and sometimes impossible, to determine the implementation status for many recommendations by publicly available information.

One factor hindering agencies from publishing this information is the lack of a consistent means of tracking public inquiry recommendation implementation. Adopting a consistent approach, within and across agencies, should help to overcome this barrier in the future. 

This chapter reviews the way agencies have responded to, monitored and ensured they have implemented accepted recommendations from public inquiries.

This chapter reviews how agencies provided information to senior decision makers, agency Audit and Risk Committees and the public on the implementation of accepted recommendations from public inquiries.

Appendix one – Response from agencies

Appendix two – Identifying in scope inquiries

Appendix three – In scope inquiries

Appendix four – Recommendations reported by agencies as still in progress (detail)

Appendix five – Agency reported recommendation implementation status (unaudited) 

Appendix six – About the audit 

Appendix seven – Performance auditing

 

Copyright Notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary reference - Report number #348 - released (22 April 2021).

Published

Actions for Delivering school infrastructure

Delivering school infrastructure

Education
Infrastructure
Management and administration
Project management

The Auditor-General for New South Wales, Margaret Crawford, released a report today examining the planning and delivery of new, redeveloped and upgraded public schools.

School Infrastructure NSW has identified the need to accommodate an additional 180,000 enrolments in public schools by 2039 with a large portion of this growth expected in metropolitan Sydney. It has also identified that around 34,000 teaching spaces will require upgrading to be fit-for-purpose.

Although School Infrastructure NSW has developed a long-term strategic plan that advises government of ongoing funding requirements, it has not presented a list of priorities to meet those needs. Developing a longer-term list of priorities would help signal the areas of greatest need and allow more time to develop the best options to meet those needs.

The audit found that School Infrastructure NSW has focused on delivering existing projects, election commitments and other government announcements. This has diverted attention from identifying and delivering projects that would have better met present and future needs. 

The report makes eight recommendations to improve long-term planning for future needs, strengthen the quality of estimated project costs and benefits, and embed a continuous improvement program. 

In 2016, the Department of Education prepared a School Assets Strategic Plan (2016 SASP) which outlined long-term funding needs to support the expected growth in enrolments to 2031. Following the release of the 2016 SASP, the NSW Government substantially increased funding for new and upgraded schools from $2.4 billion in the 2016–17 State Budget to $4.2 billion in 2017–18.

In 2017, the Department of Education established School Infrastructure NSW (SINSW) to lead the delivery of the 2016 SASP and the 123 new projects announced in the 2017–18 Budget. This significantly larger program of work required rapid development of internal capacity, governance arrangements, and project management systems. This needed to be done at the same time as scoping and planning for the list of announced projects.

As there are limited funds available to meet growing needs across the State, it is important that SINSW has effective methods to prioritise projects to communities with the greatest need. To ensure that projects deliver value for money, business cases need to have robust estimates of project costs and benefits. Business cases also need to account for the inherent risks in delivering infrastructure projects. Unplanned cost escalations can reduce the number of new or modernised classrooms SINSW can deliver. Unforeseen delays may also impact families who make significant life choices based on their expectations that a school will open at the beginning of the school year.

The objective of this audit was to assess the effectiveness of planning and delivery of new, upgraded and redeveloped schools to meet demand for public school education in New South Wales. To address this objective, the audit examined whether the Department:

  • has effective procedures for planning and prioritising school capital works to meet present and future demands
  • develops robust business cases for school capital works that reliably inform decision-making
  • has effective program/project governance and management systems that support delivering projects on-time, within budget and achievement of intended benefits.

The audit examined business cases for 12 projects as case studies. These include a mix of projects initiated before and after the establishment of SINSW.

This audit commenced in June 2020 and examined strategies and demographic projections developed prior to the emergence of COVID-19. This audit did not examine potential longer-term impacts of COVID-19 on future demands for public school education.

Conclusion

School Infrastructure NSW has been focused on delivering existing projects, election commitments and other government announcements. This has diverted attention from identifying and delivering projects that would have better met present and future student and classroom needs. While it has developed a long-term strategic plan that advises government of ongoing funding requirements, it has not presented a list of priorities to meet these needs.

In its first years of operation, SINSW has focused on delivering existing projects and the 123 new projects announced in the 2017–18 Budget. Further NSW Government announcements in the 2018–19 Budget, election commitments in the 2019–20 Budget, and announcements in the 2020–21 Budget, made up the majority of new projects, rather than projects prioritised by SINSW. 

In early 2020, SINSW advised the NSW Government that the currently funded infrastructure program would not meet forecast classroom requirements for 2023 and beyond. The School Asset Strategic Plan 2020 estimates the annual level of investment needed over the next 20 years to meet growth, update and upgrade facilities to meet compliance obligations. However, SINSW’s ten-year Capital Investment Plans for 2018–19, 2019–20 and 2020–21 only identified priorities over a two-year horizon.

Developing a longer-term pipeline of priorities would signal the areas of greatest need and allow greater scope to consider a range of options to best meet those needs.

SINSW has made progress in planning across geographic areas but needs to better prioritise which projects move forward.

Given the current and projected needs for new classrooms, it is vital that SINSW provides long-term advice based on thorough state-wide analysis to help prioritise projects that best meet this demand.

SINSW has improved its capabilities, processes, and systems to support planning in ‘School Community Groups’, which are clusters of between 5 to 15 schools in a geographic area. This addresses a key direction identified in the School Assets Strategic Plan 2016. It has developed a planning tool which allows it to prioritise School Community Groups based on weighted criteria. It has also developed an approach to identify potential projects within School Community Groups but has not yet put in place a structured process to prioritise which projects move to the business case stage to seek funding for delivery.

Business cases we examined established service needs, but several had shortcomings in scope definition, cost estimation and risk identification.

Most business cases we examined demonstrated the service need and consultation with stakeholders helped to incorporate educational requirements. Common templates and specific cost-benefit guidance developed in partnership with NSW Treasury has helped to promote consistency across business cases.

However, there were shortcomings in several business cases we reviewed. Business cases for projects already announced by government presented a limited number of options, and the process for eliminating other options was not transparent. Cost increases and contingency drawdowns for several projects indicate that scoping, costing and risk assessments could be improved, especially for complex projects.

Standard program management systems and governance arrangements support project delivery, however, there is scope for better ongoing oversight of benefits.

SINSW applies standard governance arrangements to projects based on their size. Higher value projects have executive oversight while lower value projects are overseen on a regional basis. SINSW has improved its project management systems to provide more consistent data and greater transparency to senior management over project status, cost and use of contingencies.

SINSW has worked with NSW Treasury to define a consistent set of benefits for new and redeveloped schools. Estimated benefits are currently based on international contexts but SINSW advises it is undertaking further research to improve the evidence base in this area. The current approach to ongoing monitoring, reporting and evaluation of project benefits places responsibility on the infrastructure delivery team. This team is not the most appropriate area to monitor ongoing benefits, which are expected to accrue many years after delivery and depend on actions in other areas of the Department.

1. Key findings

SINSW delivered projects against an established program of works in its first years of operation

At establishment, SINSW inherited a portfolio of existing projects and 123 new projects announced as part of the 2017–18 Budget (to commence over 2017–18 and 2018–19). It has progressively worked through individual project planning to deliver against these projects.

The 2018–19 Budget funded two new projects that had not already been announced. Both projects were identified by SINSW as a priority. The 2018–19 Budget also allocated funding for 'planning' 22 new projects. Seventeen of the 22 projects had been identified by SINSW as a priority.

SINSW identified 31 new priority projects in its Capital Investment Plan for 2019–20. Thirteen of these projects were funded in that year with a further 27 projects included as election commitments. SINSW identified 20 new projects in its Capital Investment Plan for 2020–21 but only two of these were funded. SINSW advised this was due to a constrained budget environment.

There is an anticipated shortfall of classrooms based on the current funded program

Despite increased funding since 2017–18, SINSW advised the NSW Government in early 2020 that the currently funded infrastructure program would not meet forecast classroom requirements for 2023 and beyond. Accordingly, it is vital that new funding is prioritised to projects which best meet demand.

SINSW only identified specific priorities over a two-year horizon in its Capital Investment Plans for 2018–19, 2019–20 and 2020–21. The School Assets Strategic Plan 2016 and the 2020 update make the case for sustained funding for school building and redevelopment. These plans estimate annual funding requirements and show geographic areas with increasing forecast enrolments. Detailing how priorities over a ten-year timeframe fit within a ten-year capital planning limit would create more certainty about meeting growth demands.

There has been progress in formalising prioritisation frameworks, data tools and supporting governance arrangements

SINSW committed to planning for new and redeveloped schools in 'School Community Groups' in the School Assets Strategic Plan 2016. This is a new way of planning which considers the educational needs over a defined geographical area. It has developed a planning tool to prioritise School Community Groups based on weighted criteria. It has also established governance frameworks to improve transparency over decisions to reprioritise this list.

SINSW has refined its approach to planning in School Community Groups over the past four years. It now prepares Service Needs Reports to investigate needs, identify projects, prioritise, determine scope and timing, and assess non-capital options. SINSW has yet to finalise arrangements for how needs identified in Service Needs Reports progress to the strategic business case stage.

Projects announced prior to developing a business case have less opportunity to consider a range of options to meet the service needs

Business cases for projects already announced by government (or announced for planning) go through the same process of determining the service need and impacts on surrounding schools. However, for some announced projects, the range of options considered in the business case is influenced by the parameters of the announcement. This makes it more difficult to genuinely pursue alternate options that could better meet the identified service need.

Projects identified by SINSW have a more rigorous process of considering options. Service Needs Reports explore a wide range of asset and non-asset interventions across the School Community Group. Options are narrowed as the projects move through the strategic and final business case stages. SINSW uses its Investment Review Committee to engage key stakeholders early in the process so that they are informed about how non-asset solutions have been considered and why SINSW is progressing the business case for a capital solution for particular projects.

Several business cases underestimated project costs and risks, leading to scope and budget increases

Several business cases we reviewed did not adequately identify the initial scope requirements, project-specific risks or the likely project cost. For two business cases, this appeared to be due to an attempt to fit the project within a predetermined amount. Announcing a project’s scope, budget and timeframe before proper planning increases risks to successful delivery against expectations.

Several of the projects we examined required drawdowns on contingency funds due to inadequate consideration of scope, costs and project risks at the planning stage. Contingency funds are intended for unanticipated extra costs rather than those that could have or should have been identified at the planning stage.

Guidance on benefit calculations has provided a consistent framework for business cases

Business cases we examined presented a consistent set of benefits based on guidance developed in partnership with NSW Treasury. Following this guidance helps to compare cost-benefit analyses across business cases. However, the evidence for the estimated benefits is based on contexts outside of NSW. SINSW has the tools and data sources to calculate benefits more suited to the context of particular schools. Doing so would improve the accuracy of cost-benefit analyses. SINSW advised that it is currently updating the guidance in partnership with NSW Treasury.

SINSW involves school principals, executives and teaching staff in developing education rationales when commencing projects. These documents help align projects with education outcomes. They also provide a baseline for post-occupancy evaluation, which is important to determine whether the new school infrastructure is being used in the ways that were anticipated in the business case.

SINSW could elevate its existing assurance review process to consolidate lessons learned

SINSW engages external peer reviewers to conduct assurance reviews on its projects at multiple stages of planning and delivery. It has established a Community of Practice for external reviewers to keep them up to date on new developments and requirements. Higher value projects are also subject to review by Infrastructure NSW under the Investor Assurance Framework.

By looking at all projects at all stages, assurance reviews can identify systematic issues across the full portfolio of projects. A recent assurance review analysed common findings from reviews of strategic and final business cases. This provides a helpful way to improve internal processes. SINSW advised that it is implementing a continuous improvement program, which will be able to take findings from assurance reviews to build organisational capabilities.

2. Recommendations

By September 2021, the Department of Education should:

  1. finalise the investment prioritisation approach with agreement from key stakeholders
  2. finalise and update on an ongoing basis a ten-year list of priorities to meet the forecast demand for new classrooms and contemporary fit for purpose learning environments, which identifies individual projects and programs in the short-term and priority geographic areas and programs in the medium-term
  3. seek a ten-year Capital Planning Limit from NSW Treasury to ensure the needs identified in the ten-year list of priorities are met and are coordinated with the forward capital programs of other agencies
  4. improve the quality of data on cost benchmarks that underpin the annual ten-year Capital Investment Plan and updates to the School Assets Strategic Plan
  5. embed an evidence-based cost benefit analysis framework for school investment, in consultation with NSW Treasury, by:
    • validating benefits estimated in previous business cases with actual results
    • building the evidence base in relation to contemporary learning environments
  6. regularly share data on forecast needs with relevant planning agencies to promote strategic opportunities for servicing education needs
  7. implement the continuous improvement program for service planning, options assessment, business case development, project delivery and handover. The program should be informed by findings from assurance reviews, post-occupancy evaluations and project lessons learned
  8. establish benefits realisation processes and practices that:
    • ensure business cases set baselines and targets for benefits
    • review benefits during delivery, prior to handover and as part of Post Occupancy Evaluations
    • identify which part(s) of the Department are best placed to develop, manage and evaluate benefits on an ongoing basis.

Note:

The Department's formal response to this report at Appendix one states that while it 'supports the recommendations, it considers the proposed six-month timeframe to be an unreasonably short period for a large and complex organisation to effectively implement many of these recommendations'. It suggests 12 months would be needed to implement the recommendations.

The recommendations stemming from this audit are core business for SINSW. The Audit Office considers it important for SINSW to place priority on implementing the recommendations in time to inform the 2022–23 budget cycle. Extending the deadline to April 2022 would place action outside of that budget cycle.

There have been significant increases in funding for education infrastructure since the 2017–18 Budget and further growth in demand for places in schools is forecast. SINSW has the challenge, not only of meeting the need for new classrooms due to population growth, but also upgrading facilities to enable modern teaching techniques. In addition, community expectations of what constitutes a vibrant and successful school community continues to increase.

Given growing demand and budget constraints, projects must be selected to best meet the needs of the community and planning and prioritisation are vital. SINSW has been progressing planning for announced projects as well as implementing a new type of strategic state-wide planning and prioritisation, cluster planning, where options are developed for School Community Groups.

The primary role of a business case is to reliably inform an investment and/or policy decision. Over the period of review, the NSW Government's guidelines for business cases have established this requires recommendations based on convincing arguments, sufficient evidence, and accurate costing of alternatives and expected benefits. Business case guidelines are underpinned by guides for economic appraisal and cost-benefit analysis.

As SINSW moves to prioritise business cases for interventions in School Community Groups, it will increasingly need to demonstrate rigour in its assessment of all options. It will also need to ensure that scope identification, cost and risk planning and the setting of contingencies are accurate. This will help decision-makers better understand, plan for and manage the investment required to meet the demand for school infrastructure.

For this audit, we examined business cases and related documentation for 12 projects. Several of these projects were developed before School Infrastructure NSW was established in mid-2017.

Over the period of review, NSW Government policies for business case development and submission have emphasised that effective governance arrangements are critical to a proposal's successful implementation.

SINSW's guidance similarly highlight the importance of effective governance and project management for achieving good outcomes. It prescribes a general governance structure managed by SINSW that can be tailored to the planning and delivery of school infrastructure projects.

Appendix one – Response from agency
 
Appendix two – About the audit 

Appendix three – Performance auditing 


Copyright Notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

Parliamentary reference - Report number #347 - released (8 April 2021).

Auditor-General’s Report to Parliament on Delivering School Infrastructure 

This corrigendum has been prepared to amend the following text within my Auditor-General’s Report to Parliament on Delivering School Infrastructure, dated 8 April 2021. 

On page two, the original text was as follows: 

Further NSW Government announcements in the 2018–19 Budget and election commitments in the 2019–20 Budget made up the majority of new projects, rather than projects prioritised by SINSW. 

The original text has now been changed to 

Further NSW Government announcements in the 2018–19 Budget, election commitments in the 2019–20 Budget, and announcements in the 2020–21 Budget, made up the majority of new projects, rather than projects prioritised by SINSW. 

On page three, the original text was as follows: 

The 2018–19 Budget funded three new projects that had not already been announced. One of the three projects was identified by SINSW as a priority. 

The original text has now been changed to: 

The 2018–19 Budget funded two new projects that had not already been announced. Both projects were identified by SINSW as a priority. 

On page three the original text was as follows: 

SINSW identified 33 priority projects in its Capital Investment Plan for 2019–20.

The original text has now been changed to  

SINSW identified 31 new priority projects in its Capital Investment Plan for 2019–20. 

On page eleven, in Exhibit 4, the original text was as follows: 

The 2018–19 NSW Budget announced funding for an additional 43 new and upgraded schools to commence works in 2018–19. Of the 43 projects: 

•    1 was identified by SINSW as a priority in its Capital Investment Plan (SINSW requested funding for one new project)
•    40 had already been announced
•    2 were new announcements (not identified as a priority by SINSW in its Capital Investment Plan).

The original text has now been changed to: 

The 2018–19 NSW Budget announced funding for an additional 42 new and upgraded schools to commence works in 2018–19. Of the 42 projects: 

•    2 were identified by SINSW as a priority in its Capital Investment Plan (SINSW requested funding for two new projects)
•    40 had already been announced.

On page eleven, the original text was as follows: 

The 2019–20 NSW Budget announced funding for an additional 40 new and upgraded schools as election commitments. Of the 40 election commitment projects: 

•    13 were identified by SINSW as priorities in its Capital Investment Plan (SINSW requested funding for a total of 33 new projects)
•    27 were new announcements (not identified as a priority by SINSW in its Capital Investment Plan).

The original text has now been changed to: 

The 2019–20 NSW Budget announced funding for an additional 40 new and upgraded schools as election commitments. Of the 40 election commitment projects: 

•    13 were identified by SINSW as priorities in its Capital Investment Plan (SINSW requested funding for a total of 31 new projects)
•    27 were new announcements (not identified as a priority by SINSW in its Capital Investment Plan).

The above changes will be reflected in the version of the report published on the Audit Office website and should be considered the true and accurate version.