Train station crowding

Media Release

This report focuses on how Transport for NSW and Sydney Trains manage crowding at selected metropolitan train stations.

The audit found that while Sydney Trains has identified platform crowding as a key strategic risk, it does not have an overarching strategy to manage crowding in the short to medium term. Sydney Trains 'do not have sufficient oversight to know if crowding is being effectively managed’, the Auditor-General said.

Sydney Trains' operational response to crowding involves restricting customer access to platforms or station entries before crowding reaches unsafe levels or when it impacts on-time running. Assuming rail patronage increases, it is likely that Sydney Trains will restrict more customers from accessing platforms or station entries, causing customer delay. ‘Restricting customer access to platforms or station entries is not a sustainable approach to manage station crowding’, said the Auditor-General.

The Auditor-General made seven recommendations to improve Transport for NSW and Sydney Trains' management of station crowding. Transport for NSW have accepted these recommendations on behalf of the Transport cluster.

Public transport patronage has been impacted by COVID-19. This audit was conducted before these impacts occurred.

Read full report (PDF)

Executive summary

Sydney Trains patronage has increased by close to 34 per cent over the last five years, and Transport for NSW (TfNSW) expects the growth in patronage to continue over the next 30 years. As patronage increases there are more passengers entering and exiting stations, moving within stations to change services, and waiting on platforms. As a result, some Sydney metropolitan train stations are becoming increasingly crowded.

There are three main causes of station crowding:

  • patronage growth exceeding the current capacity limits of the rail network
  • service disruptions
  • special events.

Crowds can inhibit movement, cause discomfort and can lead to increased health and safety risks to customers. In the context of a train service, unmanaged crowds can affect service operation as trains spend longer at platforms waiting for customers to alight and board services which can cause service delays. Crowding can also prevent customers from accessing services.

Our 2017 performance audit, ‘Passenger Rail Punctuality’, found that rail agencies would find it hard to maintain train punctuality after 2019 unless they significantly increased the capacity of the network to carry trains and people. TfNSW and Sydney Trains have plans to improve the network to move more passengers. These plans are set out in strategies such as More Trains, More Services and in the continued implementation of new infrastructure such as the Sydney Metro. Since 2017, TfNSW and Sydney Trains have introduced 1,500 more weekly services to increase capacity. Additional network capacity improvements are in progress for delivery from 2022 onwards.

In the meantime, TfNSW and Sydney Trains need to use other ways of managing crowding at train stations until increased capacity comes on line.

This audit examined how effectively TfNSW and Sydney Trains are managing crowding at selected metropolitan train stations in the short and medium term. In doing so, the audit examined how TfNSW and Sydney Trains know whether there is a crowding problem at stations and how they manage that crowding.

TfNSW is the lead agency for transport in NSW. TfNSW is responsible for setting the standard working timetable that Sydney Trains must implement. Sydney Trains is responsible for operating and maintaining the Sydney metropolitan heavy rail passenger service. This includes operating, staffing and maintaining most metropolitan stations. Sydney Trains’ overall responsibility is to run a safe rail network to timetable.

Conclusion

Sydney Trains has identified platform crowding as a key strategic risk, but does not have an overarching strategy to manage crowding in the short to medium term. TfNSW and Sydney Trains devolve responsibility for managing crowding at stations to Customer Area Managers, but do not have sufficient oversight to know if crowding is being effectively managed. TfNSW is delivering a program to influence demand for transport in key precincts but the effectiveness of this program and its impact on station crowding is unclear as Transport for NSW has not evaluated the outcomes of the program.

TfNSW and Sydney Trains do not directly measure or collect data on station crowding. Data and observation on dwell time, which is the time a train waits at a platform for customers to get on and off trains, inform the development of operational approaches to manage crowding at stations. Sydney Trains has KPIs on reliability, punctuality and customer experience and use these to indirectly assess the impact of station crowding. TfNSW and Sydney Trains only formally assess station crowding as part of planning for major projects, developments or events.

Sydney Trains devolve responsibility for crowd management to Customer Area Managers, who rely on frontline Sydney Trains staff to understand how crowding affects individual stations. Station staff at identified key metropolitan train stations have developed customer management plans (also known as crowd management plans). However, Sydney Trains does not have policies to support the creation, monitoring and evaluation of these plans and does not systematically collect data on when station staff activate crowding interventions under these plans.

Sydney Trains stated focus is on providing a safe and reliable rail service. As such, management of station crowding is a by-product of its strategies to manage customer safety and ensure on-time running of services. Sydney Trains' operational response to crowding involves restricting customer access to platforms or stations before crowding reaches unsafe levels, or when it impacts on-time running. As rail patronage increases, it is likely that Sydney Trains will need to increase its use of interventions to manage crowding. As Sydney Trains restrict more customers from accessing platforms or station entries, it is likely these customers will experience delays caused by these interventions.

Since 2015, TfNSW has been delivering the 'Travel Choices' program which aims to influence customer behaviour and to manage the demand for public transport services in key precincts. TfNSW is unable to provide data demonstrating the overall effectiveness of this program and the impact the program has on distributing public transport usage out of peak AM and PM times. TfNSW and Sydney Trains continue to explore initiatives to specifically address crowd management.

Key findings

Sydney Trains has identified crowding on platforms as a key strategic risk but does not have a specific strategy to manage crowding

Sydney Trains has identified overcrowding on platforms as a high rated strategic risk. Sydney Trains risk rating acknowledges that overcrowding can impact the safety and health of staff and customers by causing illness, injuries or fatalities. Sydney Trains has developed some mitigating controls to manage the risks of crowding such as restricting access to platforms or station entries but does not have an overarching strategy to manage crowding.

Sydney Trains response to crowding is to restrict customers from accessing platforms or stations which will likely result in deteriorating satisfaction and increased travel times for those customers directly affected

Sydney Trains operational approach to manage crowding is to restrict access to platforms or station entries before crowding reaches unsafe levels or when it impacts on-time running. We found that these actions are a regular and direct response to expected patterns of crowding at busy metropolitan stations like Wynyard and Town Hall. However, restricting customers access to platforms or stations entries is not a sustainable approach to manage station crowding. As rail patronage increases, it is likely that Sydney Trains will increase its use of interventions to manage crowding. As Sydney Trains restrict more customers from accessing platforms or station entries, it is likely these customers will experience delays caused by these interventions. Increased delays are likely to result in a decrease in customer satisfaction for those customers directly affected and increased crowding. Sydney Trains customer satisfaction data shows an overall increase in customer satisfaction between 2014 to 2019.

Sydney Trains does not directly assess the effect of its management of station crowding on customer experience and travel times

TfNSW and Sydney Trains advise they will continue using existing approaches to manage station crowding before the delivery of network capacity increases. However, Sydney Trains does not directly assess the effect of these actions on passengers. Sydney Trains' Customer Experience Management Program, a customer survey, asks questions about comfort at stations which is used as an indicator of crowding. Sydney Trains customer delay metrics do not account for the time that passengers might wait before reaching the platform. As such, Sydney Trains may not have a full picture of the customer’s experience of crowding.

Sydney Trains devolves responsibility for the management of station crowding to local station managers but does not have sufficient oversight of crowd management plans at stations

Sydney Trains’ Customer Area Managers (CAMs) lead a group of front line station teams. CAMs are accountable for performance at their stations including dwell time management. Sydney Trains expects CAMs to understand local conditions that affect the day-to-day operation of the stations for which they are responsible. At the stations we visited, we observed that CAMs and their staff could describe patterns of customer behaviour over the course of the day.

Identified busy stations on the network have developed Crowd Management Plans (CMPs). Stations currently with CMPs are Central, North Sydney, Parramatta, Redfern, Strathfield, Town Hall, Wynyard, Chatswood, Epping and St Leonards stations. The objective of CMPs is to establish crowding interventions to minimise the risk of injury and to keep rail services running to timetable.

Sydney Trains does not have a policy or directive that requires Customer Area Managers to draft these plans, nor anything that sets out what such a plan should contain. There is considerable variation in CMPs. Sydney Trains advises that this is partly due to variations and complexity in station environments. Sydney Trains does not have a centralised view or collect data on how often crowding interventions occur; and whether they are increasingly prevalent and at what times.

Sydney Trains does not directly measure crowding at stations

Sydney Trains does not directly measure crowding but uses other operational data on dwell time to assess the impact of crowding. Sydney Trains has an operational focus on managing dwell times - which is the time that trains wait at platforms for passengers to get on or off trains. Sydney Trains uses dwell time information to identify where crowding is impacting on-time running or creating risks to customer safety. Sydney Trains is trialling the use of CCTV and cellular signal detection at Wynyard and Redfern stations to identify and monitor crowding in real time.

Sydney Trains does not have key performance indicators (KPIs) directly related to the management of crowding. Crowding at stations impacts KPIs for train punctuality, reliability and customer satisfaction. Reliability means that trains run to timetable and passengers get to their destination without unnecessary delay. Sydney Trains reports annually on these KPIs.

Airport Link is responsible for the management of crowding at stations on the airport line, however the procedures it uses are limited in comparison to Sydney Trains' customer management plans

The Airport Link Company (Airport Link), a privately-run business, is responsible for the operation of four stations on the T8 line. These stations are Domestic Airport, International Airport, Mascot and Green Square. Airport Link is responsible for developing and following a Station Operation Manual which details procedures for the operation and management of stations, which includes station crowding. In response to increasing patronage at Airport Line stations, Sydney Trains has deployed FastTrack teams to manage dwell time on some platforms at Airport Link stations during peak periods.

For day to day operations, Airport Link uses an operational checklist to manage routine crowding at Green Square and Mascot stations particularly during peak times. Airport Link‘s Incident and Emergency Manual describes the roles and responsibilities for managing crowd congestion during service disruption, but these procedures are not station specific and contain limited detail compared to CMPs developed for other stations.

For example, CMPs developed for other stations contain clear objectives, provide information on the number of customers entering and exiting a station in peak periods and contain diagrams to show how station staff position themselves to manage customer flow or crowding. Crowding procedures for Airport Link stations only cover the management of crowding at the platform level, and do not consider station concourses or surrounding areas. Sydney Trains does not regularly collect data on how often Airport Link uses crowd management procedures at Airport Link stations.

TfNSW and Sydney Trains consider crowding when planning for major projects or developments

Sydney Trains and TfNSW collect data and conduct modelling on station crowding when planning for significant infrastructure or network capacity projects such as the Sydney Metro project and More Trains, More Services enhancements. Approaching 2024, pedestrian modelling commissioned by Sydney Trains and TfNSW shows that Town Hall and Redfern stations will come under increasing pressure during normal operations. TfNSW consults with Sydney Trains when development is likely to affect the heavy rail network and maintains a record of development around precincts to assist with future transport planning over the short to long term.

Sydney Trains does not have a routine process for identifying whether crowding contributed to minor safety incidents

Under the Rail Safety National Law (NSW) 2012, Sydney Trains must have a safety management system. The safety management system must identify safety risks, provide a systematic assessment of those risks and specify controls used to manage and monitor those risks.

Sydney Trains does not routinely prompt staff to consider whether crowding is a contributing factor when reporting safety incidents or near misses. As a result, Sydney Trains may not always identify locations where crowd management practices are not sufficiently managing the risk to customers or staff. This risk intensifies as Sydney Trains expects patronage, and therefore crowding, to increase in the short to medium term.

Sydney Trains advises that it investigates all serious safety incidents which includes determining contributing factors such as crowding. Sydney Trains staff who record safety incidents will refer to crowding as a cause of an incident if they deem crowding was the direct cause. Sydney Trains advised that it follows the requirements of the Office of the National Rail Safety Regulator to report safety data.

Between January 2016 and October 2019, there were 9,097 customer incidents, of various severity recorded across the network. Sydney Trains reported that crowding at a station was the cause of 31 of these incidents, with 14 of these resulting in an injury.

TfNSW is delivering a program to influence transport demand in key precincts, but the overall impact of this program on crowding is not clear

TfNSW and Sydney Trains acknowledge that crowding will increasingly become part of the experience of travel on the Sydney rail network. Since 2015, TfNSW and Sydney Trains have been delivering the 'Travel Choices' program to manage the demand for public transport services in key precincts such as Sydney CBD and Macquarie Park. Some of the aims of the program are to help distribute public transport usage out of peak AM and PM periods and to reduce private vehicle use in peak AM and PM periods by offering alternative travel choices. TfNSW is unable to provide data to demonstrate the overall impact this program has on managing station crowding, distributing travel out of peak periods and changing customer behaviours, as it has not evaluated it.

While not directly related to station crowding, TfNSW has also invested $170 million on a 'Wayfinding' program that involves the roll out of uniform visual signs across all modes of transport. Effective wayfinding is intended to improve the customer experience and improve the flow of customers moving through a train station and reduce travel time. TfNSW has not conducted an evaluation of the Wayfinding program and the overall impact of the program on customer journey time or crowding is unclear at this time.

TfNSW and Sydney Trains have trialled and evaluated other interventions aimed at influencing customer behaviour, but these interventions are not yet in widespread use across the network.

Recommendations

By December 2020, Sydney Trains should:

1. systematically collect information on the use of crowd management interventions at stations and assess the impact of these interventions

2. enhance existing procedures to require staff to make an assessment on whether crowding was a contributing factor in safety incidents and near-misses and code these incidents for crowding

3. develop a policy for customer management plans. The policy should include:

  • a process for identifying stations requiring a customer management plan
  • essential elements of a customer management plan
  • requirements for the review and approval of customer management plans
  • the requirement to centrally store all customer management plans.
By December 2020, Transport for NSW should:

4. evaluate Travel Choices to determine the overall impact the program has on distributing public transport use out of peak AM and PM periods and its impact on station crowding

5. evaluate the Wayfinding strategy to determine the impact of the program and to identify any lessons learnt for future wayfinding strategies.

By December 2020, Transport for NSW and Sydney Trains should:

6. develop a direct performance measure for station crowding and collect data to measure performance

7. work with the Airport Link Company to develop a more comprehensive crowd management strategy for Airport Link Stations that includes:

  • a crowd management plan for each station, with clearly described roles and responsibilities
  • a service level indicator or KPI relating to station crowding at Airport Link Stations.

1. Introduction

1.1 Background

Station crowding refers to the concentration of people in a train station. The station includes the platforms and station concourse areas. Station crowding is distinct from crowding in train carriages. Crowds can inhibit movement (including alighting and boarding of carriages), cause discomfort and lead to increased health and safety risks to customers. In the context of a train service, crowding can cause delays to train services or prevent customers from accessing these services.

Major work on station infrastructure to relieve crowding is expensive and often challenging due to heritage and other physical constraints. TfNSW and Sydney Trains are working to deliver network capacity improvements, intended to increase the capacity of the network to move more passengers (such as More Trains, More Services and the Sydney Metro). However, network capacity improvements are long term solutions and don't address crowding at train stations in the short and medium-term.

Crowds on train station platform
Exhibit 1: Crowding at a Sydney train station
Source: Sydney Trains.

TfNSW and Sydney Trains

TfNSW is the lead agency for transport in NSW. TfNSW is responsible for:

  • establishing the long term strategic direction for transport in NSW
  • developing and managing whole of transport strategies
  • identifying and planning infrastructure upgrades
  • setting the standard working timetable that Sydney Trains must implement.

Sydney Trains is responsible for operating and maintaining the Sydney metropolitan heavy rail passenger service. This includes:

  • operating, staffing and maintaining most metropolitan stations
  • maintaining large sections of train track and track signalling infrastructure
  • maintaining most rolling stock
  • train crewing.

Sydney Trains’ overall responsibility is to run a safe rail network to timetable.

See Appendix two for a diagram of the Sydney rail network.

The relationship between Sydney Trains and TfNSW is formalised in the 2013 Rail Services Contract. TfNSW sets Sydney Train’s performance targets and service standards outlined in the Rail Services Contract. See Appendix three for a high-level summary of the Rail Services Contract and the key performance indicators.

The Airport Link Company (Airport Link), a privately-run business, is responsible for the operation of four stations on the T8 line. These stations are Domestic Airport, International Airport, Mascot and Green Square. RailCorp, the NSW Government entity that holds rail property assets, maintains the contract with Airport Link.

1.2 Crowding

There are three main causes of station crowding

Growth in patronage

Growing customer demand is a cause of station crowding. In the five years to 2019, Sydney Trains reported a 34 per cent increase in patronage. Sydney Trains and TfNSW expect that patronage growth will continue to grow over the next 30 years.

TfNSW predicts that by 2056 there will be more than ten million people in the Sydney greater metropolitan area. There will be an increasing number of customers travelling on trains, particularly during the weekday AM and PM peak.

As patronage increases there will be more passengers entering and exiting stations, moving within stations to change services and waiting on platforms. As a result, train stations will become increasingly crowded. Exhibit 2 demonstrates the growth in Sydney Trains patronage, alongside growth forecasts.

Line graph showing Sydney Trains rail patronage historical growth and forecasts between 1997 and 2030. The numbers have increased over this period.
Exhibit 2: Rail patronage growth and forecasts
Source: Transport for NSW.

Service disruptions

Disruptions to services can cause station crowding. Service disruptions involve delays and cancellations of trains and can occur for many reasons such as signalling failures. Crowding can occur when services are delayed or cancelled as there are additional customers waiting to board trains.

Sydney Trains reports monthly to its Board on its performance including service disruptions. Exhibit 3 shows the number of monthly service incidents which caused delays from March 2018 to February 2020. Sydney Trains advised that the number of service incidents was stable over the last year. However, in February 2020, Sydney Trains recorded an increase in the number of incidents which it attributes to extreme weather. The number of service incidents (932) in February 2020 represented a 19 per cent increase in incidents from January 2020. The length of delays caused by these incidents has fluctuated.

Line graph showing monthly service incidents causing delays on the Sydney Trains network between March 2018 and February 2020
Exhibit 3: Monthly service incidents causing delays on the Sydney Trains network - March 2018 to February 2020
Source: Sydney Trains 2020 unaudited data.

Crowding can also be a contributing factor leading to service disruptions. In February 2020, Sydney Trains attributed eight per cent of all train delay minutes to incidents within its Customer Service Division. This includes incidents with boarding or alighting trains. Alongside crowding, incidents with boarding and alighting trains can be caused by slow boarding due to wet weather or customers falling over. Sydney Trains acknowledges that boarding and alighting continues to be an area of improvement and focus.

Special events

Special events in the Sydney metropolitan area can also cause station crowding. For example, major sporting or entertainment events in Homebush creates crowding at Sydney Olympic Park train station and major interchange stations such as Lidcombe and Central.

1.3 Management of crowding

TfNSW and Sydney Trains focus is on providing a safe and reliable service. Their management of crowding is a by–product of their management of safety and on-time running. Exhibit 4 shows the strategies TfNSW and Sydney Trains use to manage the impacts of crowding.

Infographic showing TfNSW and Sydney Trains strategies that manage the impacts of crowding
Exhibit 4: TfNSW and Sydney Trains strategies that manage the impacts of crowding
Source: Audit Office analysis.

1.4 About the audit

This audit examined how effectively TfNSW and Sydney Trains manage crowding at selected metropolitan train stations in the short and medium term. In doing so, this audit examined how TfNSW and Sydney Trains know whether there is a crowding problem at individual stations and how TfNSW and Sydney Trains act to manage that crowding.

Stations in scope for this audit included:

  • Central
  • Chatswood
  • Green Square
  • North Sydney
  • Parramatta
  • Redfern
  • Town Hall
  • Wynyard.

This audit looked at station crowding at Sydney metropolitan heavy rail stations which does not include Sydney Metro stations. The Sydney Metro is a public transport project which involves the delivery of new metro railway stations. Long-term strategies to manage crowding were out of scope for this audit. Long-term strategies include major signalling infrastructure upgrades and new services such as the next stage of the Sydney Metro.

Lessons from previous audits

Our 2017 performance audit, ‘Passenger Rail Punctuality’, found that rail agencies would find it hard to maintain train punctuality after 2019 unless they significantly increased the capacity of the network to carry trains and people. The report found that there was a significant risk that rail agencies would not make investments soon enough to handle future patronage levels. The report made six recommendations including that TfNSW provide business cases for Cabinet consideration as soon as possible for programs to address rail patronage growth over the next five to ten years (from 2017 to 2027).

We note that TfNSW and Sydney Trains are now investing in long term network capacity improvements. These network capacity improvements will not be available until 2022 and this audit does not seek to assess the likely effectiveness of these investments.

2. Measuring and understanding crowding at train stations

Conclusion

TfNSW and Sydney Trains do not directly measure or collect data on station crowding. There are no key performance indicators directly related to station crowding. Sydney Trains uses performance indicators on reliability, punctuality and customer experience to indirectly assess the impact of station crowding. Sydney Trains does not have a routine process for identifying whether crowding contributed to minor safety incidents. TfNSW and Sydney Trains formally assess station crowding as part of planning for major projects, developments or events.

 

2.1 Measuring the impact of crowding

TfNSW and Sydney Trains do not have a performance measure for crowding at stations

The Rail Services Contract includes key performance indicators for punctuality, reliability and customer satisfaction. Reliability measures whether trains run to timetable and passengers get to their destination without unnecessary delay. There are no KPIs directly related to the management of crowding. However, station crowding can impact punctuality and reliability measures as crowding can cause dwell times to rise and prevent customers from reaching their service. Crowding may impact the customer satisfaction measure as it can be a cause of customer dissatisfaction. In 2018–19, Sydney Trains achieved its KPI for customer satisfaction but it did not meet its headline KPIs for train punctuality and reliability.

See Appendix three for a summary of Sydney Trains KPIs relevant to station crowding.

Sydney Trains does not directly measure crowding at stations

Sydney Trains does not directly measure station crowding and uses other operational data to assess the impact of crowding. Sydney Trains has an operational focus on managing dwell times - which is the time that trains wait at platforms for passengers to get on or off trains. Crowding can prevent Sydney Trains from achieving dwell time targets, especially at busy stations.

Currently, the maximum number of trains Sydney Trains can operate on some, but not all, lines is 20 trains per hour. Trains only run at this frequency during peak AM and PM periods. If average dwell time during a peak period is overrun by ten seconds, then Sydney Trains can only run at 19 trains per hour and risks having to cancel a service to keep the network operating.

Sydney Trains is trialling the use of CCTV and cellular signal detection to identify and monitor crowding in certain locations with a view to better manage dwell time. This followed an earlier trial of a WIFI detection technology at Redfern station that tested whether this technology could provide accurate data on how customers interchange between platforms, how long they take and which sections of the platforms are the busiest.

Crowding has increased in importance to rail passengers

Sydney Trains runs a passenger survey, the Customer Experience Management Program (CXMP), which acts as a lead indicator for the biannual Transport-wide customer survey, the Customer Satisfaction Index. The CXMP, like the Customer Satisfaction Index, asks questions about comfort at stations.

Between 2017 and 2019, data from the CXMP indicates that comfort has increased in importance for passengers. Sydney Trains’ analysis of passenger verbatim comments on the CXMP survey records that ‘overcrowding and lack of seats on trains and stations’ is the dominant reason for dissatisfaction with comfort. However, the Sydney Trains analysis attributes this in part to improvements in hygiene factors such as station cleanliness and station facilities. Between 2014 to 2019, Sydney Trains Customer Satisfaction Index showed an overall increase in customer satisfaction.

Sydney Trains does not have a routine process for identifying whether crowding contributed to minor safety incidents

Under the Rail Safety National Law (NSW) 2012, Sydney Trains must have a safety management system. The safety management system must identify safety risks, provide a systematic assessment of those risks and specify controls used to manage and monitor those risks. Sydney Trains has identified overcrowding at platforms as a key strategic risk.

Sydney Trains does not have a routine process to identify whether crowding contributed to an incident at the time a staff member records an incident. Sydney Trains advises that it investigates all serious safety incidents which includes a determination of contributing factors such as crowding. Sydney Trains staff who record safety incidents will refer to crowding as a cause of an incident if they deem crowding was the direct cause. Sydney trains advises that it follows the requirements of the regulator to report safety data.

Between January 2016 and October 2019, there were 9,097 customer incidents, including NSW Trains and the Airport line, of various severity recorded across the network. Thirty-four incidents were reported within the incident description to have been caused by crowding in that time. Of those 34 incidents, 31 occurred on the station itself. The remaining three occurred on trains. There were 14 reported incidents involving crowding that resulted in an injury during this period.

As Sydney Trains does not routinely prompt staff to consider whether crowding is a contributing factor to incidents, or near misses, Sydney Trains may be at risk of not identifying locations where crowd management practices are not sufficiently managing the risk to customers or staff. This risk intensifies as Sydney Trains expects patronage, and therefore crowding, to increase in the short to medium term.

2.2 Understanding, and planning for, crowding

TfNSW and Sydney Trains formally address crowding as part of major infrastructure, network capacity upgrades and new timetables

Both Sydney Trains and TfNSW collect data and conduct modelling on station crowding when planning for significant infrastructure or network capacity projects such as:

  • the Sydney Metro project
  • More Trains, More Services enhancements
  • major timetable changes occurring every few years
  • other major infrastructure projects including large station enhancements and precinct development.

TfNSW and Sydney Trains use patronage models to identify stations that are most likely to be affected by major changes.

Approaching 2024, pedestrian modelling commissioned by Sydney Trains and TfNSW shows that Town Hall and Redfern stations will come under increasing pressure during normal operations. TfNSW and Sydney Trains do not expect to deliver network capacity upgrades to relieve pressure on these stations until 2022. If service delays occur at Town Hall and Redfern stations in 2022, without intervention by Sydney Trains, models show that customers will experience highly uncomfortable conditions and severely restricted movement.

Further information on pedestrian modelling is presented in Appendix four.

TfNSW and Sydney Trains have a collaborative approach when planning for developments that will increase station demand

TfNSW is responsible for coordinating with planning agencies its consideration of development applications and precinct plans. Where this affects the heavy rail network, TfNSW consults Sydney Trains. Exhibit 5 provides an example of work done by TfNSW and Sydney Trains to plan for increased customers at Redfern station following a major development of an office building near Redfern.

In 2019, Commonwealth Bank of Australia (CBA) began relocating staff to South Eveleigh (formerly known as Australian Technology Park). CBA expects to move around 10,000 CBA employees to South Eveleigh over a two-year period from 2019 to 2020.

Sydney Trains determined it was necessary to implement mitigation measures to cope with the increase in patronage at Redfern Station. In response, it developed a Crowd Management Plan (CMP) for the AM and PM peak periods. The CMP details how staff manage customers while on platforms, use of barricades to guide customer movement or prevent access to platforms and configuration of opal gate lines. It also commissioned pedestrian modelling to highlight pinch points on platforms.

In addition to the CMP, Sydney Trains and TfNSW conducted minor building works including the installation of additional opal card readers on the Platform 10 and Little Eveleigh Street entrances/exits to ease congestion on the stairs and concourse. Sydney Trains installed temporary wayfinding signs to direct customers to South Eveleigh. In addition, during peak AM and PM travel periods, Sydney Trains use announcements to direct customers traveling to South Eveleigh to exit the station via Platform 10.

Wayfinding and new opal readers at Redfern Station.

Two images of Redfern Train Station
Exhibit 5: Planning for increased customers at Redfern station
Source: Sydney Trains and Transport for NSW 2019.

TfNSW maintains a record of development around precincts to assist with future transport planning over the short to long term. The audit team has observed examples of this planning for the Sydney Central Business District, Macquarie Park and Parramatta. TfNSW used this information to inform the rollout of the Travel Choices program. Section 3.2 of this report covers the Travel Choices program is covered in more detail.

3. Strategies to manage station crowding in the short and medium term

Conclusion

Sydney Trains has identified platform crowding as a strategic risk but does not have an overarching strategy to manage station crowding. Sydney Trains' stated focus is on providing a safe and reliable rail service. As such, management of station crowding is a by-product of its strategies to manage customer safety and ensure on-time running of services.

Sydney Trains devolve responsibility for managing crowding at stations to Customer Area Managers but does not have sufficient oversight to know that station crowding is effectively managed. Sydney Trains does not have policies to support the creation, monitoring or evaluation of crowd management plans at key metropolitan train stations. The use of crowding interventions is likely to increase due to increasing patronage, causing more customers to experience delays directly caused by these activities.

TfNSW and Sydney Trains have developed interventions to influence customer behaviour and to manage the demand for public transport services but are yet to evaluate these interventions. As such, their impact on managing station crowding is unclear.

3.1 Crowd management strategies

Sydney Trains has identified crowding at platforms as a key strategic risk but does not have an overarching strategy to manage crowding

Sydney Trains has identified overcrowding on platforms as a high rated strategic risk. Sydney Trains risk rating acknowledges that overcrowding can impact on the safety and health of staff and customers by causing illness, injuries or fatalities. Sydney Trains has also identified the risk of crowds at Wynyard, Town Hall, Chatswood, Central and Epping Stations as part of the introduction of the Sydney Metro. Sydney Trains has developed some mitigating controls to manage the risks of crowding such as restricting access to platforms or station entries but does not have an overarching strategy to manage crowding.

Sydney Trains is developing an organisation wide program that will include crowd management initiatives, but it is too early to conclude on its likely effectiveness

Sydney Trains has identified dwell time as a strategic priority in its 2019–20 corporate business plan. As a result, Sydney Trains is developing an organisation wide Dwell Management Program.

Sydney Trains has endorsed the following as being in scope for the program:

  • crowd management initiatives
  • customer education and behavioural change initiatives
  • dwell specific construction, technology and data initiatives
  • operational initiatives including procedure optimisation
  • extended dwell scenarios – for example, medical emergencies and security alerts
  • KPI and business performance metrics to support delivery of the Corporate Business Plan.

A project manager was appointed to the program in August 2019. At the time of writing this report, we were unable to determine whether this approach is likely to be effective at managing station crowding before the delivery of additional network capacity in 2022.

Sydney Trains management of station crowding is often a by-product of its strategies to manage customer safety and ensure on-time running of services

TfNSW and Sydney Trains focus is on providing a safe and reliable rail service. As such, Sydney Trains management of station crowding is a by-product of its strategies to manage customer safety and ensure on-time running of services. Sydney Trains strategies to manage on-time running includes the management of dwell time. Sydney Trains staff describe its operational strategies to manage dwell time at stations as ‘lines of defence’. The objective of these lines of defence is to ultimately defend the Platform-Train Interface (PTI) so that trains can arrive and depart as timetabled and to minimise the risk of injury.

Some common features to manage dwell time at many Sydney central business district stations:

  • 1st line of defence:

− Station staff positioned on platforms who signal to the station guard that passengers have left or boarded the train successfully. This is a key safety measure and allows the guard to authorise the train to leave the station and resume its journey.

− Fast Track staff at key doors to protect passengers getting off trains, coordinate passengers getting on trains and defend doors against last minute, rushing passengers. The composition of Fast Track Teams differs across designated fast track platforms. There is a Fast Track dwell manager coordinating platform activity and over nine other staff positioned on the platform to ensure that train dwell time is within target dwell. During reoccupation, which is the time between trains, the fast track team will guide passengers evenly along the platform or to areas where passengers are likely to be able to board more easily.

  • 2nd line of defence:

− Stair barriers: the dwell manager can determine that it is necessary to close access to the platform until crowds have cleared. Station Duty Managers coordinate this and station staff restrict access to the stairs rather than the Fast Track Team.

− Corralling is an option at some stations across the network. For example, Chatswood station has a large paid concourse area, the area between the gate or ticket line and the stairs to the platform. In the event of any delay with Metro services in the AM peak for instance, staff can direct all escalators to the paid concourse, close stair access to Platform 1 and 2 and corral passengers in the paid concourse to access Platform 3 for alternate services to the city. Sydney Train advises that corralling has only been used once as part of the opening day event.

− Placement of staff in paid concourse to direct passengers to platform access.

  • 3rd line of defence:

− The gate line configuration is routinely altered during AM and PM peak and non-peak periods to affect how passengers access the station. For example, at Wynyard station in the AM peak, most gate lines are configured to exit passengers from the station as quickly as possible. In the PM peak, in contrast, access to the station is more restricted and designed to slow passenger flow onto platforms, reducing levels of congestion. At Town Hall station in the PM peak, gate-lines are configured to divert passengers towards the southern end of the concourse as the bulk of passengers seek to access the station from the northern or Queen Victoria Building end.

Infographic showing 'lines of defence' at a station
Exhibit 6: 'Lines of defence' at a station
Source: Audit Office.

Appendix five provides a case study of how Sydney Trains identified and managed a dwell time issue caused by crowding.

Sydney Trains’ data suggests its strategies to manage customer safety and on-time running are effective at some stations

Sydney Trains deploy staff to manage dwell time during AM and PM peak periods at high volume metropolitan stations. These staff are known as Fast Track teams. Fast Track teams operate on selected platforms at Central, Town Hall, Wynyard and Chatswood Stations. Sydney Trains is also using variations of Fast Track teams at Airport Link stations as described in Appendix five. Sydney Trains data demonstrates that Fast Track teams have resulted in decreased dwell times.

Each Fast Track team is developed to meet the specific needs of the station, as each station has a unique platform layout and service features. On platforms, Fast Track teams position themselves to ensure customers are standing behind the yellow tactile lines prior to a train arrival. When a train arrives, teams help to clear pathways towards exits for customers alighting the train and encourage boarding passengers to move into the train carriage utilising the upstairs and downstairs train compartments. When a train is ready to depart, teams position themselves in a stance to restrict access to the train. Teams communicate with flags and whistles to ensure the train is ready to depart.

The Fast Track team is labour intensive with up to ten additional staff required at platforms during AM or PM peak times. Sydney Trains is exploring the use of moveable mechanical screen doors at stations across the network.

Sydney Trains devolves responsibility for managing crowding at stations to Customer Area Manages and relies on the experience and insight of its staff

Sydney Trains Customer Area Managers (CAMs) are responsible for station operations and are accountable for station performance including dwell time management. Sydney Trains expects CAMs to understand local conditions that affect the day-to-day operation of the stations for which they are responsible. At Wynyard and Town Hall, we observed that CAMs and their staff could describe patterns of customer behaviour over the course of the day.

Sydney Trains and TfNSW consult with CAMs when considering the effect of large changes on stations. These meetings present the opportunity to discuss if there are any concerns with the level of patronage, congestion points or the layout of the station. TfNSW advises that these meetings, together with site visits, enables it to assess the scale of congestion and the capacity of a station. Sydney Trains Customer Service Division and CAMs have meetings to discuss issues at train stations including issues related to station crowding. Sydney Trains advises that these meetings occur on a needs basis or as an event arises i.e. More Trains More Services planning.

TfNSW maintains a register of major and minor events which assist Sydney Trains to develop event specific timetables to manage the impact of special events. In addition, Sydney Trains has an established protocol for managing the impact of planned service disruptions due to maintenance or infrastructure upgrades.

Identified busy stations on the network develop crowd management plans which include crowd management interventions

Some identified busy stations on the network develop Crowd Management Plans (CMPs). Stations currently with CMPs are Central, North Sydney, Parramatta, Redfern, Strathfield, Town Hall, Wynyard, Chatswood, Epping and St Leonards. Station staff implement crowd management interventions that use the previously described lines of defence as stations become increasingly crowded or after identifying dwell time issues.

The experience of station staff and their observations inform the day-to-day use of CMPs. At stations we visited, we observed that staff have a good understanding of passenger dynamics at their station. For example, station staff know under what conditions to deploy staff to manage crowds on stairs, or to close the stairs. Sydney Trains advises that only the most experienced Duty Managers work at the busiest stations on the network.

Airport Link is responsible for the management of crowding at stations on the airport line, however the procedures it uses are limited in comparison to Sydney Trains’ customer management plans

The Airport Link Company (Airport Link), a privately-run business, is responsible for the operation of four stations on the T8 line. These stations are Domestic Airport, International Airport, Mascot and Green Square. RailCorp, the NSW Government entity that holds rail property assets, maintains the contract with Airport Link. Under the contract, Airport Link is responsible for developing and following a Station Operation Manual which details procedures for the operation and management of stations, which includes station crowding.

For day to day operations, Airport Link uses an operational checklist to manage routine crowding at Green Square and Mascot stations particularly during peak times. In response to increasing patronage at Airport Link stations, Sydney Trains has deployed FastTrack teams to manage dwell time on some platforms at Airport Link stations during peak periods.

Airport Link‘s Incident and Emergency Manual describes the roles and responsibilities for managing crowd congestion during service disruption, but these procedures are not station specific and contain limited detail compared to CMPs developed for other stations. For example, CMPs developed for other stations contain clear objectives, provide information on the number of customers entering and exiting a station in peak periods and contain diagrams to show how station staff position themselves to manage customer flow or crowding. In addition, crowding procedures for Airport Link stations only cover the management of crowding at the platform level and do not consider station concourses or surrounding areas. Sydney Trains does not regularly collect data on how often crowd management procedures are used at Airport Link stations.

In 2018, as part of preparation for More Trains, More Services Phase 2, TfNSW engaged a consultant to conduct crowding modelling for some stations on the T8 line. The crowding modelling report details that Green Square and Mascot stations experience crowding in peak periods, with extensive queuing at Mascot Station during the morning peak. Between 2016 to 2018, the number of customers entering Green Square and Mascot stations grew 31 per cent and 36 per cent respectively. Given the increase in customers entering these stations, TfNSW and Sydney Trains should continue to work with Airport Link to strengthen procedures to manage crowding.

Sydney Trains does not have policies to support the creation, monitoring or evaluation of crowd management plans at metropolitan stations

Customer Management Plans vary considerably. Some are a few pages, while others such as the Central station CMP, are much more detailed. The Central Station CMP has three levels of escalating action clearly articulated. Other plans provide less guidance on when station staff should implement crowd management procedures. Only two out of the ten stations currently with a CMP have established crowding interventions in the unpaid concourse, which is the area of the station directly outside the ticket gate lines. Establishing crowding interventions in the unpaid concourse is important if Sydney Trains restrict access to platforms or station entries, as it can cause crowding near station entries and exits. Sydney Trains advises that the detail within the CMP varies in part due to the complexity and particular environment of the individual stations.

Sydney Trains does not have a policy or directive that requires Customer Area Managers to draft these plans, nor anything that sets out what such a plan should contain. The revision of CMPs is tied to project cycles rather than periodic review or any other threshold test. There is no documented procedure or requirement for CMPs to be revised over time. Sydney Trains advise that its Customer Readiness Team review these plans and store them centrally. However, we found that the Customer Readiness Team has not centrally stored CMPs for three stations and we found no evidence that the Customer Readiness Team reviews CMPs.

Sydney Trains does not have a policy that details when a CMP should be created, this leads to a risk that some stations may not develop a CMP as soon as desirable. Customer Area Managers reported that they sometimes implement ad hoc interventions when dwell time issues arise. If, due to repeated dwell issues, station staff identify that a problem is emerging, then they might develop a CMP. Also, Sydney Trains prepare CMPs for significant events such as New Year's Eve, City to Surf, Vivid and major events at Olympic Park.

Sydney Trains does not regularly collect data on how often crowd management interventions occur

Sydney Trains does not regularly collect centralised data on how often crowd management interventions occur; and whether they are increasingly prevalent, for longer durations and at what times. Customer Area Managers told us that they regularly use the interventions described in their crowd management plans at large city stations. Sydney Trains advised us that some stations locally record how many times they need to take these actions.

Increasing use of crowd management activities will likely result in deteriorating customer satisfaction and increased travel times for those customers directly affected

TfNSW and Sydney Trains advise they will continue using existing approaches to manage station crowding before the delivery of network capacity increases. However, Sydney Trains does not directly assess the effect of these actions on passengers. Sydney Trains customer delay metrics do not account for the time that passengers might wait before reaching the platform. As such, Sydney Trains may not have a full picture of the customer’s experience of crowding.

Between 2014 to 2019, Sydney Trains customer satisfaction index showed an overall increase in customer satisfaction. However, Sydney Trains use of crowding interventions is likely to increase due to increasing patronage, which will cause more customers to experience delays directly caused by these activities (for example, those customers prevented from freely accessing station concourses due to crowding). Increased delays are likely to result in a decrease in customer satisfaction for those customers directly affected and increased crowding.

3.2 Behavioural interventions and service

TfNSW and Sydney Trains are exploring different ways of influencing customer behaviour to manage station crowding. There are two main ‘moments’ for influencing customer behaviour:

  • Before a customer decides to travel – influencing customers here can directly impact on the demand for public transport by encouraging customers to consider whether they need to travel at all, to consider another mode of transport or to travel outside the AM or PM peak.
  • While a customer is on their journey – influencing customer's behaviour once they arrive at a train station to manage crowds, improve pedestrian flows, and reduce the impact of crowding on dwell time.
TfNSW is delivering a program to influence transport demand in key precincts, but the overall impact of this program on crowding is not clear

Since 2015, TfNSW has been delivering ‘Travel Choices’, a program that aims to influence demand on transport in key precincts. Travel choices has three broad behavioural outcomes:

  • help reduce private vehicle traffic volumes in AM and PM peak times by offering alternative travel choices
  • help distribute public transport usage out of AM and PM peak times
  • help reduce customers overall travel.

The available evaluation data for Travel Choices indicates that the program may be both a cause, and a solution, for station crowding in Sydney. TfNSW reports that since 2015, the Travel Choices program has contributed to a 13 per cent decrease in vehicles entering the Sydney CBD and a 14.7 per cent increase in public transport use in the AM peak. As the number of private vehicles entering the CBD has decreased, more people are traveling on other modes of transport including trains. TfNSW is unable to provide data demonstrating the overall impact of the program on helping distribute public transport usage out of AM and PM peak times. However, a recent campaign evaluation for the implementation of Travel Choices in Macquarie Park demonstrated an increase in the number of customers moving or intending to move their travel times out of peak AM and PM periods. See Exhibit 7 for more information on the Macquarie Park implementation of Travel Choices.

As part of a work plan for 2019–20, TfNSW is targeting stations including Green Square, Parramatta and Westmead with the aim of managing travel demand by encouraging customers to re-time trips out of AM peaks.

In 2018, TfNSW worked with businesses in Macquarie park during the metro upgrade of the Epping to Chatswood rail line. Part of this work through the Greater Sydney Commission involved an advertising campaign to encourage alternative travel patterns for commuters including train passengers. TfNSW designed a radio and digital advertising campaign to distribute public transport usage out of AM and PM peak times and to reduce customer travel at Macquarie Park station. An example of advertisements is shown below.

Evaluations of the campaign showed an increased instance of customers who recognised the campaign changing their travel out of peak times. Evaluations show that 57 per cent of regular customers in the evening peak have changed their evening travel time and 57 per cent of regular customers in the morning peak say that they intend to change their morning travel time. The evaluations also show that the campaign has increased customers intention to work from home from 34 per cent to 43 per cent.

Three images showing Macquarie Park travel choices advertising campaign material
Exhibit 7: Macquarie Park travel choices advertising campaign
TfNSW and Sydney Trains are delivering a wayfinding program to improve customer flow at stations and reduce travel times

TfNSW is responsible for NSW’s wayfinding strategy to ensure consistency across all modes of public transport. The wayfinding program includes the roll out of uniform visual signs for all modes of public transport. This includes signs at train stations to direct customers to platforms, exits and interchanges with other modes of transport. TfNSW and Sydney Trains are expecting several benefits to the program including improved customer experience and reduced travel times. Effective wayfinding can increase the speed at which customers move through a train station and may reduce the number of confused customers who inefficiently navigate a train station. TfNSW has not conducted an evaluation of the Wayfinding program and the overall impact of the program is unclear.

Sydney Trains and TfNSW have also developed a standalone wayfinding strategy for Central station. TfNSW conducted user testing at Central station that included asking 60 participants about their experience before and after introducing new signage. The results showed that the new signage made six out of seven user journeys easier and showed a reduction in participants’ journey times.

TfNSW and Sydney Trains trialled new decals, signs and announcements at stations to encourage desired behaviours and are planning to use the results of these trials across the network

As part of the introduction of Sydney Metro Services, TfNSW and Sydney Trains investigated the impact of inexpensive behavioural interventions. In 2019, TfNSW research identified 19 interventions to test including:

  • decal and signage refinement for greater message clarity and prominence
  • messaging to encourage passengers to pre-plan trips as much as possible
  • stair decals to encourage walking on the left-hand side and discourage rushing down stairs
  • platform decals to indicate desired behaviour for passengers waiting to board a train
  • showing load capacities on indicator screens (SPI screens) to encourage spread along the length of the platform
  • designated no-standing zones to encourage circulation around station crowding hotspots such as stairs and escalators.
Four images showing samples of behavioural interventions trialled along the T1 and T9 lines
Exhibit 8: Sample of behavioural interventions trialled along the T1 and T9 lines
Source: Transport for NSW.

TfNSW and Sydney Trains commissioned an external evaluation of the trialled interventions. Successful interventions identified in that evaluation included the interventions shown in Panels A, B and D of Exhibit 8. The evaluation found that the intervention in Panel C did not achieve the desired effect as, unlike the Sydney Metro, Sydney Trains operates different types of trains with slightly different door positions. Platform markings can therefore only be approximate. The evaluation found that the markers increase the number of people blocking train doors and require Fast Track team intervention to ensure on-time running of trains. Sydney Trains advised that it is assessing how and when to deliver the successful interventions more widely across the rail network.

Appendices

Appendix one – Response from agency

Appendix two – Sydney rail network

Appendix three – Rail services contract

Appendix four – Crowding pedestrian modelling

Appendix five – Airport Link stations case study

Appendix six – About the audit

Appendix seven – Performance auditing

 

Copyright notice

© Copyright reserved by the Audit Office of New South Wales. All rights reserved. No part of this publication may be reproduced without prior consent of the Audit Office of New South Wales. The Audit Office does not accept responsibility for loss or damage suffered by any person acting on or refraining from action as a result of any of this material.

 

Parliamentary reference - Report number #333 - released 30 April 2020